Anda di halaman 1dari 19

ANALISA HARGA SATUAN

Satuan Kerja : SATUAN KERJA BAGIAN PEMBANGUNAN WADUK BENEL


Nama Paket / Pekerjaan : PEMBANGUNAN SEBAGIAN BENDUNGAN WADUK BENEL
Lokasi / Propinsi : KABUPATEN JEMBRANA - BALI
Tahun Anggaran : 2006
Pekerjaan : Pemboran Lubang Consolidasi Grouting
Harga satuan : Rp. 163,450 / m

Harga satuan Jumlah Harga


No Uraian satuan Volume
( Rp ) ( Rp )

A. Upah / Tenaga

1. Bor Master org/hr 0.050 75,000.00 3,750.00


2. Driller org/hr 0.100 50,000.00 5,000.00
3. Drilling Mekanik org/hr 0.100 50,000.00 5,000.00
4. Tenaga Bantu (Local Labor) org/hr 2.000 35,000.00 70,000.00

B. Material / Bahan

1. Solar Lt 5.000 4,700.00 23,500.00


2. Oil ( SAE.10, 40, 90 ) Lt 0.500 12,000.00 6,000.00
3. Grease Kg 0.100 12,000.00 1,200.00
4. Drilling Rod btg 0.010 400,000.00 4,000.00
5. Metal Bit nos 0.020 150,000.00 3,000.00
7. Water Hose & ass. m 0.100 25,000.00 2,500.00
8. Water Swivel nos 0.010 250,000.00 2,500.00
9. Rubber Piston MG.10 nos 0.050 50,000.00 2,500.00
10. Diesel Sparepart set 0.020 125,000.00 2,500.00
11. Bagan/ Perancah Plate Form Ls 500.00

C. Peralatan

1. Hydraulic Boring Machine & Diesel, 12 PK jam 0.350 50,000.00 17,500.00


2. Water Pump & Diesel, 10 PK jam 0.350 25,000.00 8,750.00
3. Alcon Water Pump & Diesel, 10 PK jam 0.350 15,000.00 5,250.00

Jumlah 163,450.00
ANALISA HARGA SATUAN

Bagian Proyek : BAGIAN PROYEK IRIGASI DAN RAWA HST, HSU DAN TABALONG
Nama Paket / Pekerjaan : PEMBANGUNAN SEBAGIAN BENDUNG DI. PITAB
Lokasi / Propinsi : KABUPATEN BALANGAN
Tahun Anggaran : 2004
No Item :
Pekerjaan : PENGEBORAN DENGAN DIAMOND BIT
Harga satuan : Rp. 203,500 / m'

Harga satuan Jumlah Harga


No Uraian satuan Volume
( Rp ) ( Rp )

A. Upah / Tenaga
1. Drilling Master (bor master) org/hr 0.200 50,000.00 10,000.00
2. Drilling Mechanic org/hr 0.100 55,000.00 5,500.00
3. Tenaga Bantu (Local Labor) org/hr 1.000 30,000.00 30,000.00

B. Material / Bahan
1. Diamond Bit bh 0.035 1,991,740.00 69,710.90
2. Solar Lt 3.500 2,100.00 7,350.00
3. Oil Lt 0.100 12,000.00 1,200.00
4. Grease Kg 0.020 12,000.00 240.00
5. Sparepart Ls 3,500.00

C Peralatan
1. Water Pump & Diesel jam 1.600 10,000.00 16,000.00
2. Boring Machine & Diesel (rotary type) jam 1.600 30,000.00 48,000.00
3. Packer (pneumatic air packer dia 56) jam 1.600 7,500.00 12,000.00

Jumlah 203,500.90
ANALISA HARGA SATUAN

Bagian Proyek : BAGIAN PROYEK IRIGASI DAN RAWA HST, HSU DAN TABALONG
Nama Paket / Pekerjaan : PEMBANGUNAN SEBAGIAN BENDUNG DI. PITAB
Lokasi / Propinsi : KABUPATEN BALANGAN
Tahun Anggaran : 2004
No Item :
Pekerjaan : PENGEBORAN DENGAN CROSS BIT
Harga satuan : Rp. 178,000 / m'

Harga satuan Jumlah Harga


No Uraian satuan Volume
( Rp ) ( Rp )

A. Upah / Tenaga
1. Drilling Master (bor master) org/hr 0.200 50,000.00 10,000.00
2. Drilling Mechanic org/hr 0.100 55,000.00 5,500.00
3. Tenaga Bantu (Local Labor) org/hr 1.000 30,000.00 30,000.00

B. Material / Bahan
1. Single Barrel bh 0.010 1,260,000.00 12,600.00
2. Metal Bit bh 0.200 235,550.00 47,110.00
3. Solar Lt 3.500 2,100.00 7,350.00
4. Oil Lt 0.100 12,000.00 1,200.00
5. Grease Kg 0.020 12,000.00 240.00
6. Sparepart Ls 3,500.00

C Peralatan
1. Water Pump & Diesel jam 1.600 10,000.00 16,000.00
2. Boring Machine & Diesel (rotary type) jam 1.600 30,000.00 48,000.00
3. Packer (pneumatic air packer dia 56) jam 1.600 7,500.00 12,000.00

Jumlah 178,000.00
ANALISA HARGA SATUAN

Bagian Proyek : BAGIAN PROYEK IRIGASI DAN RAWA HST, HSU DAN TABALONG
Nama Paket / Pekerjaan : PEMBANGUNAN SEBAGIAN BENDUNG DI. PITAB
Lokasi / Propinsi : KABUPATEN BALANGAN
Tahun Anggaran : 2004
No Item :
Pekerjaan : SEMENTASI (Grouting)
Harga satuan : Rp. 1,070,000 / Ton

Harga satuan Jumlah Harga


No Uraian satuan Volume
( Rp ) ( Rp )

A. Upah / Tenaga
1. Grout spesialis org/hr 0.526 50,000.00 26,315.79
2. Mechanic org/hr 0.526 55,000.00 28,947.37
3. Drilling Master (bor master) org/hr 0.526 50,000.00 26,315.79
4. Tenaga Bantu (Local Labor) org/hr 1.053 30,000.00 31,578.95

B. Material / Bahan
1. Solar Lt 30.000 2,100.00 63,000.00
2. Oil Lt 3.000 12,000.00 36,000.00
3. Grease Kg 0.600 12,000.00 7,200.00
4. Sparepart Ls 11,695.00
5. Portland cement (tipe I / II) @ 50 kg Zak 20.00 35,000.00 700,000.00

C. Peralatan
1. Grout Pump & Diesel (reciproc piston type) jam 4.211 10,000.00 42,105.26
2. Grout Mixer & Diesel (min 700rpm) jam 4.211 10,000.00 42,105.26
3. Water Pump & Diesel jam 4.211 10,000.00 42,105.26
4. Packer (pneumatic air packer dia 56) jam 1.684 7,500.00 12,631.58

Jumlah 1,070,000.26
DAFTAR KWANTITAS DAN HARGA
PROYEK IRIGASI DAN RAWA ANDALAN KALIMANTAN SELATAN

Bagian Proyek : BAGIAN PROYEK IRIGASI DAN RAWA HST, HSU DAN TABALONG
Nama Paket / Pekerjaan : PEMBANGUNAN SEBAGIAN BENDUNG DI. PITAB
Lokasi / Propinsi : KABUPATEN BALANGAN
Tahun Anggaran : 2004

HARGA SATUAN JUMLAH HARGA


NO. URAIAN SAT. VOLUME
( Rp ) ( Rp )

I. PEKERJAAN GROUTING

1. Mobilisasi & Demobilisasi alat (2 unit) Ls 20,000,000.00


2. Pengeboran dengan diamond bit m' 500.00 203,500.00 101,750,000.00
3. Pengeboran dengan cross bit m' 560.00 178,000.00 99,680,000.00
4. Sementasi (grouting) Ton 242.00 1,070,000.00 258,940,000.00
4. Water pressure test (2 step) kali 10.00 108,000.00 1,080,000.00

Jumlah : 481,450,000.00

Terbilang : ## Empat Ratus Delapan Puluh Satu Juta Empat Ratus Lima Puluh Ribu Rupiah ##

DAFTAR KWANTITAS DAN HARGA ( OE )


PROYEK IRIGASI DAN RAWA ANDALAN KALIMANTAN SELATAN

Bagian Proyek : BAGIAN PROYEK IRIGASI DAN RAWA HST, HSU DAN TABALONG
Nama Paket / Pekerjaan : PEMBANGUNAN SEBAGIAN BENDUNG DI. PITAB
Lokasi / Propinsi : KABUPATEN BALANGAN
Tahun Anggaran : 2004

HARGA SATUAN JUMLAH HARGA


NO. URAIAN SAT. VOLUME
( Rp ) ( Rp )

I. PEKERJAAN GROUTING

1. Mobilisasi & Demobilisasi alat (2 unit) Ls 20,000,000.00


2. Pengeboran dengan diamond bit m' 500.00 529,890.00 264,945,000.00
3. Pengeboran dengan cross bit m' 560.00 297,490.00 166,594,400.00
4. Sementasi (grouting) Ton 242.00 1,197,070.00 289,690,940.00
4. Water pressure test (2 step) kali 10.00 108,000.00 1,080,000.00

Jumlah : 742,310,340.00
Terbilang : ## Empat Ratus Delapan Puluh Satu Juta Empat Ratus Lima Puluh Ribu Rupiah ##

64.86
ANALISA HARGA SATUAN

Bagian Proyek : BAGIAN PROYEK IRIGASI DAN RAWA HST, HSU DAN TABALONG
Nama Paket / Pekerjaan : PEMBANGUNAN SEBAGIAN BENDUNG DI. PITAB
Lokasi / Propinsi : KABUPATEN BALANGAN
Tahun Anggaran : 2004
No Item :
Pekerjaan : PENGEBORAN DENGAN DIAMOND BIT
Harga satuan : Rp. 213,720 / m'

Harga satuan Jumlah Harga


No Uraian satuan Volume
( Rp ) ( Rp )

A. Upah / Tenaga

1. Drilling Master/Kep.Tukang (bor master) org/hr 0.200 28,000.00 5,600.00


2. Drilling Mechanic org/hr 0.100 50,000.00 5,000.00
3. Tenaga Bantu (Local Labor) org/hr 2.000 17,500.00 35,000.00

B. Material / Bahan

1. Diamond Bit bh 0.030 2,500,000.00 75,000.00


2. Drilling Road btg 0.010 1,750,000.00 17,500.00
3. Doble Core Barrel btg 0.010 3,500,000.00 35,000.00
4. Solar Lt 1.500 2,100.00 3,150.00
5. Oil Lt 0.050 12,000.00 600.00
6. Grease Kg 0.010 12,000.00 120.00
7. Sparepart Ls 500.00

C Peralatan

1. Drilling Pump & Diesel jam 0.500 25,000.00 12,500.00


2. Boring Machine & Diesel (rotary type) jam 0.500 40,000.00 20,000.00
3. Flow meter jam 0.500 7,500.00 3,750.00

Jumlah 213,720.00

ANALISA HARGA SATUAN

Bagian Proyek : BAGIAN PROYEK IRIGASI DAN RAWA HST, HSU DAN TABALONG
Nama Paket / Pekerjaan : PEMBANGUNAN SEBAGIAN BENDUNG DI. PITAB
Lokasi / Propinsi : KABUPATEN BALANGAN
Tahun Anggaran : 2004
No Item :
Pekerjaan : PENGEBORAN DENGAN CROSS BIT
Harga satuan : Rp. 180,700 / m'
Harga satuan Jumlah Harga
No Uraian satuan Volume
( Rp ) ( Rp )

A. Upah / Tenaga

1. Drilling Master/Kep.Tukang (bor master) org/hr 0.200 30,000.00 6,000.00


2. Drilling Mechanic org/hr 0.100 50,000.00 5,000.00
3. Tenaga Bantu (Local Labor) org/hr 1.200 17,500.00 21,000.00

B. Material / Bahan

1. Single Core Barrel bh 0.010 3,250,000.00 32,500.00


2. Metal Bit/ Cross Bit bh 0.035 1,250,000.00 43,750.00
3. Drilling Road btg 0.010 1,750,000.00 17,500.00
4. Solar Lt 1.500 2,100.00 3,150.00
5. Oil Lt 0.050 12,000.00 600.00
6. Grease Kg 0.010 12,000.00 120.00
7. Sparepart Ls 500.00

C Peralatan

1. Drilling Pump & Diesel jam 0.850 25,000.00 21,250.00


2. Boring Machine & Diesel (rotary type) jam 0.850 40,000.00 34,000.00
3. Flow meter jam 0.850 7,500.00 6,375.00

Jumlah 180,745.00

ANALISA HARGA SATUAN

Bagian Proyek : BAGIAN PROYEK IRIGASI DAN RAWA HST, HSU DAN TABALONG
Nama Paket / Pekerjaan : PEMBANGUNAN SEBAGIAN BENDUNG DI. PITAB
Lokasi / Propinsi : KABUPATEN BALANGAN
Tahun Anggaran : 2004
No Item :
Pekerjaan : SEMENTASI (Grouting)
Harga satuan : Rp. 1,066,450 / Ton

Harga satuan Jumlah Harga


No Uraian satuan Volume
( Rp ) ( Rp )

A. Upah / Tenaga

1. Grout spesialis org/hr 0.100 50,000.00 5,000.00


2. Mechanic org/hr 0.100 50,000.00 5,000.00
3. Drilling Master (bor master) org/hr 0.600 30,000.00 18,000.00
4. Tenaga Bantu (Local Labor) org/hr 2.000 17,500.00 35,000.00

B. Material / Bahan

1. Solar Lt 5.000 2,100.00 10,500.00


2. Oil Lt 1.000 12,000.00 12,000.00
3. Grease Kg 0.100 12,000.00 1,200.00
4. Sparepart (Injection Pipe,dll) Ls 15,000.00
5. Portland cement (tipe I / II) @ 50 kg Zak 20.50 35,000.00 717,500.00

C. Peralatan

1. Grout Pump & Diesel (reciproc piston type) jam 2.300 25,000.00 57,500.00
2. Grout Mixer & Diesel jam 2.300 20,000.00 46,000.00
3. Boring / Drilling Machine jam 2.300 40,000.00 92,000.00
4. Water Pump & Diesel jam 2.300 15,000.00 34,500.00
5. Flow meter jam 2.300 7,500.00 17,250.00

Jumlah 1,066,450.00

DAFTAR KWANTITAS DAN HARGA


PROYEK IRIGASI DAN RAWA ANDALAN KALIMANTAN SELATAN

Bagian Proyek : BAGIAN PROYEK IRIGASI DAN RAWA HST, HSU DAN TABALONG
Nama Paket / Pekerjaan : PEMBANGUNAN SEBAGIAN BENDUNG DI. PITAB
Lokasi / Propinsi : KABUPATEN BALANGAN
Tahun Anggaran : 2004

HARGA SATUAN JUMLAH HARGA


NO. URAIAN SAT. VOLUME
( Rp ) ( Rp )

I. PEKERJAAN GROUTING

1. Mobilisasi & Demobilisasi alat (2 unit) Ls 20,000,000.00


2. Pengeboran dengan diamond bit m' 500.00 213,720.00 106,860,000.00
3. Pengeboran dengan cross bit m' 560.00 180,700.00 101,192,000.00
4. Sementasi (grouting) Ton 242.00 1,066,450.00 258,080,900.00
4. Water pressure test (2 step) kali 10.00 108,000.00 1,080,000.00

Jumlah : 487,212,900.00
Terbilang : ## Empat Ratus Delapan Puluh Satu Juta Empat Ratus Lima Puluh Ribu Rupiah ##

DAFTAR KWANTITAS DAN HARGA ( OE )


PROYEK IRIGASI DAN RAWA ANDALAN KALIMANTAN SELATAN

Bagian Proyek : BAGIAN PROYEK IRIGASI DAN RAWA HST, HSU DAN TABALONG
Nama Paket / Pekerjaan : PEMBANGUNAN SEBAGIAN BENDUNG DI. PITAB
Lokasi / Propinsi : KABUPATEN BALANGAN
Tahun Anggaran : 2004
HARGA SATUAN JUMLAH HARGA
NO. URAIAN SAT. VOLUME
( Rp ) ( Rp )

I. PEKERJAAN GROUTING

1. Mobilisasi & Demobilisasi alat (2 unit) Ls 20,000,000.00


2. Pengeboran dengan diamond bit m' 500.00 529,890.00 264,945,000.00
3. Pengeboran dengan cross bit m' 560.00 297,490.00 166,594,400.00
4. Sementasi (grouting) Ton 242.00 1,197,070.00 289,690,940.00
4. Water pressure test (2 step) kali 10.00 108,000.00 1,080,000.00

Jumlah : 742,310,340.00
Terbilang : ## Empat Ratus Delapan Puluh Satu Juta Empat Ratus Lima Puluh Ribu Rupiah ##

65.63
CROSS BIT

Upah
Mandor org/hari 0.18 30,000.00
0.250 Kep.Tukang org/hari -
Tukang org/hari 0.54 25,000.00
Pekerja org/hari 1.26 17,000.00
15,500.00 Geologist org/hari 0.18 100,000.00
Mekanik org/hari 0.18 50,000.00
Bahan
Drilling Road btg 0.01 1,875,000.00
Single Tube Core Barrel btg 0.01 3,750,000.00
Cross Bit bh 0.05 1,500,000.00
Sparepart Ls 1.00 56,000.00
82,000.90
Alat
Drilling Machine jam 0.40 50,000.00
Drilling Pump jam 0.40 35,000.00

Biaya umum, 10 %
Total
Upah
Mandor org/hari 0.28 30,000.00
Kep.Tukang org/hari 28,000.00
Tukang org/hari 0.86 25,000.00
Pekerja org/hari 2.02 17,500.00
Geologist org/hari 0.29 100,000.00
Mekanik org/hari 0.29 50,000.00
Bahan
Drilling Road btg 0.01 1,875,000.00
Double Core Barrel btg 0.01 4,750,000.00
Double Diamond Bit bh 0.02 10,125,000.00
Sparepart ls 1.00 75,000.00

Alat
Drilling Machine jam 0.40 50,000.00
Drilling Pump jam 0.40 35,000.00
Grout Pump jam 0.40 30,000.00
Flowmeter jam 0.40 7,500.00
Pressure Gauge jam 1.00 4,000.00

Biaya umum, 10 %
Total

370,000.26 50 ton 25,000.00


10000 50 200

20.00
10,000.00

200.00

25.00 19,258,000.00

203,500.00
178,000.00
1,070,000.00

(%)
203,500.00
178,000.00

0.526
0.526
0.526
1.053
1,070,000.00
5,400.00
-
-
13,500.00
21,420.00
18,000.00
9,000.00
-

18,750.00
18,750.00
75,000.00
56,000.00

-
20,000.00
14,000.00

269,820.00
26,982.00
296,802.00
8,430.00
-
-
21,600.00
35,280.00
28,800.00
14,400.00
-

18,750.00
23,750.00
202,500.00
75,000.00

-
20,000.00
14,000.00
12,000.00
3,000.00
4,000.00

481,510.00
48,151.00
529,661.00

Anda mungkin juga menyukai