PEKERJAAN : KOMPUTER BLK KOMUNITAS PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI TAHUN ANGGARAN : 2018 Harga Jumlah Harga No. Uraian pekerjaan Vol Sat. Satuan ( Rp. ) ( Rp. ) A PEKERJAAN PERSIAPAN 11,690,000 1 Papan Proyek 1 unt 500,000 500,000 2 Pek. Pengukuran dan Bowplank 52 m' 157,500 8,190,000 3 Pek. Listrik & Air Kerja 1 ls 2,500,000 2,500,000 4 Pek. Laporan & Dokumentasi 1 ls 1,000,000 1,000,000 B PEKERJAAN PONDASI & TANAH 74,489,747 1 Pek. Galian Tanah Pondasi 77.38 m3 36,740 2,842,941 2 Pek. Urug Tanah Kembali 25.79 m3 13,400 345,586 Pek. Urug Tanah Peninggian Peil Lantai (t = 10 3 19.55 m3 183,900 3,595,245 cm) 4 Pek. Pasir Urug - Bawah Pondasi 11.9 m3 110,000 1,309,000 Bawah Lantai 19.9 m3 110,000 2,189,000 5 Pek. Pondasi Tapak P1 (100x100x20- 40) - Beton K-225 3.92 m3 1,230,825 4,824,834 Pembesian 473.59 kg 11,300 5,351,567 Bekisting 21.28 m2 770,000 16,385,600 6 Pek. Pondasi Batu Belah P2 24.26 m3 730,825 17,729,815 7 Pek. Sloof Beton (20/30) - Beton K-225 3.83 m3 1,230,825 4,714,060 Pembesian 816.72 kg 11,300 9,228,936 Bekisting 51.03 m2 117,052 5,973,164 C PEKERJAAN STRUKTUR 120,307,947 1 Pek. Kolom Beton K1 (30/30) Beton K-225 6.91 m3 1,230,825 8,505,001 Pembesian 1005.9 kg 11,316 11,382,764 Bekisting 92.16 m2 295,290 27,213,926 2 Pek. Kolom Praktis KP (12/12) - Beton K-175 1.08 m3 1,124,383 1,214,334 Pembesian 193.78 kg 11,316 2,192,814 Bekisting 28.8 m2 295,290 8,504,352 3 Pek. Balok Beton B1 (20/30) - Beton K-225 3.33 m3 1,230,825 4,098,647 Pembesian 663.71 kg 11,316 7,510,542 Bekisting 44.4 m2 295,290 13,110,876 4 Pek. Balok Beton Lintel RB (12/15) - Beton K-175 1.8 m3 1,124,383 2,023,889 Pembesian 408.26 kg 11,316 4,619,870 Bekisting 34.66 m2 295,290 10,234,751 5 Pek. Ramp Beton T = 10 cm - Beton K-175 0.35 m3 1,124,383 393,534 Pembesian 42.24 kg 11,316 477,988 Bekisting 0.69 m2 295,290 203,750 6 Rek Kolom Sopi 60/60 - beton K-225 0.75 m3 1,230,825 923,119 Pembesian 84.12 kg 11,316 951,902 Bekisting 9.96 m2 295,290 2,941,088 7 Pek, Ring Balok Praktis Sopi-sopi - Beton K-175 0.96 m3 1,124,383 1,079,408 Pembesian 194.91 kg 11,316 2,205,602 Bekisting 12.81 m2 295,290 3,782,665 8 Pek. plat Beton Topi-topi - Beton K-225 0.86 m3 1,230,825 1,058,510 Pembesian 182.42 kg 11,316 2,064,265 Bekisting 12.24 m2 295,290 3,614,350 D PEKERJAAN ATAP & PLAFOND 83,777,760 D.1 PEKERJAAN ATAP 62,644,900 1 Rangka Atap baja Ringan 205.53 m2 165,000 33,912,450 2 Atap Spandek t=0,35 205.53 m2 65,000 13,359,450 3 Lisplank GRC 73.8 M' 85,000 6,273,000 4 Pasang Aluminium foil, Glaswool, Roofmesh 140 m2 65,000 9,100,000 D.2 PEKERJAAN PLAFOND 21,132,860 1 Plafond Gipsum +Rangka hollow 4/4; t= 136.49 m2 97,000 13,239,530 2 Plafond Calsiboard 4,5 mm + Rangka 53.31 m2 68,000 3,625,080 3 List Gipsum 5 cm 94.85 m2 45,000 4,268,250 E PEKERJAAN PASANGAN 110,064,060 1 Pasangan Dinding Bata 250.73 m2 66,440 16,658,501 2 Plester + Acian 496.17 m3 45,440 22,545,965 3 Pasangan Rolaag Bata 19.8 m' 381,840 7,560,432 4 Pasangan Saluran Terbuka 40 m' 260,045 10,401,800 Pekerjaan Rabat Beton t = 5 cm bawah lantai 5 9.96 m3 115,104 1,146,436 keramik Pekerjaan Rabat Beton t = 5 cm keliling bang 6 2.04 m3 115,104 234,812 lbr = 60 cm 7 Pekerjaan Meja Beton Wastafel t = 8 cm 0.1 m3 875,100 87,510 8 Pasangan Keramik Lantai 40/40 Polished 136.4 m2 123,246 16,810,754 9 Pasangan Keramik Lantai 30/30 Polished 52 m2 257,496 13,389,792 10 Pasangan Keramik Lantai 20/20 Unpolished 3.04 m2 156,780 476,611 11 Pasangan Plint Keramik Lantai 40/10 polished 97.4 m' 48,168 4,691,563 Pasangan Keramik Bak & Meja Wastafel 20/20 12 1.77 m2 1,464,989 2,593,031 Polished 13 Pasangan Keramik Dinding 30/60 Polished 5.29 m2 618,750 3,273,188 14 Pasangan Batu Alam Candi Kolom Entrace 7.62 m2 656,418 5,001,905 15 Pek. Logo & Tulisan 1 ls 1,200,000 1,200,000 16 List Dinding Kusen 97.36 M1 41,000 3,991,760 F PEKERJAAN KUSEN PINTU & JENDELA 64,473,180 1 Kusen/Pintu type P1 1 unt 4,330,040 4,330,040 2 Kusen/Pintu type P2 3 unt 4,174,360 12,523,080 3 Kusen/Pintu type P3 (Spandrel) 1 unt 2,461,080 2,461,080 4 Kusen/Jendela type J1 2 unt 3,909,000 7,818,000 5 Kusen/Jendela type J2 9 unt 3,445,920 31,013,280 6 Kusen/Jendela type J3 1 unt 3,404,520 3,404,520 7 Kusen/Jendela type BV 1 unt 595,680 595,680 Teralis Ventilasi Teras (besi Hollow) 7 m1 350,000 2,327,500 G PEKERJAAN PENGECATAN 16,125,026 1 Pek. Pengecatan Dinding Interior 248.08 m2 25,391 6,298,999 2 Pek. Pengecatan Dinding Exterior 248.08 m2 21,360 5,298,989 3 Pek. Pengecatan Plafond 189.8 m2 21,360 4,054,128 4 Pek. Pengecatan Listplank 22.14 m2 21,360 472,910 H PEKERJAAN PLUMBING & SANITAIR 15,670,043 1 Instalasi Pipa PVC AW 4" 16 m' 180,519 2,888,304 2 Instalasi Pipa PVC AW 2" 12 m' 103,218 1,238,616 3 Instalasi Pipa PVC AW 3/4" 20 m' 98,180 1,963,600 4 Instalasi Pipa PVC AW 1/2" 15 m' 79,323 1,189,845 5 Septic Tank dan Rembesan 1 unt 4,407,413 4,407,413 6 Pemasangan Closed Jongkok 1 bh 627,947 627,947 7 Pemasangan Kran Air 2 bh 216,452 432,904 8 Pemasangan Wastafel + Kran 2 bh 875,074 1,750,148 9 Pemasangan Cermin Wastafel 100x200 1 unt 1,171,266 1,171,266 I PEKERJAAN LISTRIK 67,667,437 1 Penyambungan Daya Listrik 5.500 VA ### VA 1,000 5,500,000 Perijinan Sertifikat Layak Operasi (SLO) 5.500 2 ### VA 1,000 5,500,000 VA 3 Panel Listrik 1 unt 467,280 467,280 4 Pek. Instalasi Kabel Feeder NYY 4x10 mm2 2 m' 1,506,600 3,013,200 Pek. Instalasi Penerangan & Power NYM 5 66 ttk 241,760 15,956,160 3x2,5 mm2 + conduit 6 Pek. Instalasi Power AC 2 ttk 1,800,000 3,600,000 7 Pemasangan Lampu TKI 2x36W 16 bh 317,400 5,078,400 8 Pemasangan Lampu Baret Kotak 22W 7 bh 95,274 666,918 9 Pemasangan Lampu E27ESS 8 Watt + Fitting 3 bh 2,908,080 8,724,240 10 Pemasangan Saklar Engkle 5 bh 105,360 526,800 11 Pemasangan Saklar Double 4 bh 118,440 473,760 12 Pemasangan Stop Kontak Single 9 bh 198,240 1,784,160 13 Pemasangan Stop Kontak Ganda 16 bh 228,660 3,658,560 14 Pemasangan Stop Kontak AC 2 bh 318,480 636,960 15 Pemasangan AC split wall 2 PK 2 unit 6,540,000 13,080,000 16 Grounding (max 2 Ohm) 1 lot 1,850,000 1,850,000 L LAIN – LAIN 15,000,000 1 IMB 1 dok 5,000,000 5,000,000 2 Transportasi 2 paket 1,000,000 2,000,000 3 Ketua Unit Pengelola Teknis 4 OB 400,000 1,600,000 4 Ketua Unit Pengelola Keuangan 4 OB 400,000 1,600,000 5 Anggota Pengelola Teknis 8 OB 300,000 2,400,000 6 Anggota Pengelola Keuangan 8 OB 300,000 2,400,000 RENCANA ANGGARAN BIAYA PEMBANGUNAN GEDUNG WORKSHOP PEKERJAAN : KOMPUTER - BLK KOMUNITAS PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI TAHUN ANGGARAN : 2018
NO ITEM PEKERJAAN TOTAL
A PEKERJAAN PERSIAPAN 11,690,000
B PEKERJAAN PONDASI & TANAH 74,489,747 C PEKERJAAN STRUKTUR 120,307,947 D PEKERJAAN ATAP & PLAFOND 83,777,760 E PEKERJAAN PASANGAN 110,064,060 F PEKERJAAN KUSEN PINTU & JENDELA 64,473,180 G PEKERJAAN PENGECATAN 16,125,026 H PEKERJAAN PLUMBING & SANITAIR 15,670,043 I PEKERJAAN LISTRIK 67,667,437 J LAIN - LAIN 15,000,000 TOTAL 511,597,764 PEMBULATAN 500,000,000 TERBILANG : Lima Ratus Juta Rupiah
Sukabumi, 17 Juli 2018
Pimpinan Pondok Pesantren Ketua Unit Ketua Unit Nurul Hasanah Pengelola Kegiatan Pengelola Kuangan