TARGET
NO NAMA KOLEKTOR WILAYAH KERJA KETERANGAN
SPPT LEMBAR BESARNYA (RP)
1 AA CECEP SAEPULOH 1294 32,776,902 RW.01,RW.02,RW.03,RW.10
2 ETE KOSIDIN 1956 44,425,856 RW.04,RW.05,RW.06,RW.07
3 ATANG 1541 35,679,215 RW.08,RW,09
H.KADAR SOLIHAT