PERENCANAAN KOLOM WF
Profil kolom = WF-198.99.5.8
Jarak antar kuda-kuda = 3.5 m
Bentang kuda-kuda = 10 m
Sudut kemiringan = 15 o
Gording = C 100.50.20.3,2
Jarak antar gording = 104 cm
Atap = Zincoated 0.35mm
PEMBEBANAN
Beban Mati :
Atap Galvalum = 5 kg/m2 ; 5,79x10x2 = 115,8 m2; 5x115,8 = 579 kg
Besi canal C = 896 kg ; 896 kg : 2 = 448 kg
Beban kolom H beam = 30 kg/m
Total = 579 kg + 448 kg + 30 kg= 1057 kg
Bebab Hidup :
Beban Pekerja = 70 kg
Beban Air hujan = 1x 0,05 x 115,8 = 5,79 kg
Beban Angin =30 kg
Total = 70 + 5,79 = 75,79 kg
6.00
1/2 P 1/2 P
200
60
PERENCANAAN STRUKTUR BAJA
Proyek : CV WANA ANUGRAH ALBASINDO
Pekerjaan : PABRIK
Lokasi : KEJAWAR - BANYUMAS
Selanjutnya untuk mencari gaya-gaya dalam dari rangka batang, digunakan program SAP
Berat sendiri balok WF akan dihitung otomatis oleh program SAP-90
Cek terhadap syarat PPBBI ps 4.9.1 utk portal dimana ujungnya bergoyang
P M nx
(1) s = A + 0.85 q w nx - 1 < s
wx
P M nx
(2) s = w y + 0.85 q < s
A w nx - 1
P M
(3) s= = A + q w < s
karena sumbu lentur (sb x) tegak lurus thd sumbu tekuk (sb y) maka
faktor amplifikasi nx
=1
nx - 1
q = ambil 1
l x = 48.4 ---> wx = 1.13
l y = 181.0 ---> wy = 4.01
syarat PPBBI :
2,388.37 385
(1) s = 1.13 + 0.85 1
23.18 160
= 116.43 + 2.05
= 118.48 kg/cm2 < 1600 kg/cm2 (ok)
2,388.37 385
(2) s = 4.01 + 0.85 1
23.18 160
= 413.17 + 2.05
= 415.22 kg/cm2 < 1600 kg/cm2 (ok)
2,388.37 385
(3) s = + 1
23.18 160
= 103.04 + 2.41
= 105.44 kg/cm2 < 1600 kg/cm2 (ok)
PERENCANAAN STRUKTUR BAJA
Proyek : CV WANA ANUGRAH ALBASINDO
Pekerjaan : PABRIK
Lokasi : KEJAWAR - BANYUMAS
P M
s= A + w
3,174.00 10,631
23.18 + 160
= 136.93 + 66.44
= 203.37 kg/cm2
P M
s= A + w
69.15 2,610
23.18 + 160
= 2.98 + 16.31
= 19.30 kg/cm2
s < s ijin
= 1600 kg/cm2 --------> OK !
PT TATA BUMI RAYA
PERHITUNGAN STRUKTUR
Proyek : RUKO KEBRAON
Pekerjaan : Atap Baja
Lokasi : Kebraon, Surabaya
PERENCANAAN GORDING
Data teknik :
Beban gording :
- Berat sendiri gording = 6.31 kg/m'
- Berat atap asbes : 11.3 x 1,25 = 14.13 kg/m'
- Berat air hujan = 0,02x1000x1,25 = 25 kg/m'
45.44 kg/m'
qx = q cos a
qy = q sin a
hal - 4
PT TATA BUMI RAYA
PERHITUNGAN STRUKTUR
Proyek : RUKO KEBRAON
Pekerjaan : Atap Baja
Lokasi : Kebraon, Surabaya
Cek Tegangan
Mx My
s = Wx + Wy
= 34794.51174 1387.5153
29 + 8.02
= 1,199.81 + 173.01
Cek Lendutan
5 qx l4 1 Px l3
dx =
384 EIx
+
48 EIx
=
= 289,009,497,398.04 + 21,203,147,162.47
145,958,400,000.00 18,244,800,000.00
= 1.9801 + 1.1621
= 3.1422 cm
5 qy l4 1 Py l3
dy = 384 EIy
+
48 EIy
=
= 693,552,536.39 + 152,647,196.30
21,450,240,000.00 2,681,280,000.00
= 0.0323 0.0569
+
= 0.0893 cm
d = dx + dy
= ( 3.1422 + 0.0893 )
= 1.798 cm
hal - 5
PERENCANAAN PONDASI
( Untuk Gudang bentang 10 m')
0 1 2 3 4 5 6 7 8
0 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
10 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
20 1.000 1.004 1.011 1.017 1.024 1.031
30 1.066 1.073 1.081 1.088 1.096 1.103
40 1.144 1.152 1.161 1.169 1.178 1.187
50 1.234 1.244 1.254 1.264 1.274 1.284
60 1.339 1.351 1.363 1.375 1.387 1.399
70 1.465 1.478 1.492 1.507 1.521 1.536
80 1.616 1.632 1.650 1.667 1.685 1.703
90 1.801 1.822 1.844 1.866 1.888 1.911
100 2.036 2.062 2.090 2.118 2.147 2.177
110 2.340 2.375 2.421 2.464 2.508 2.552
120 2.779 2.826 2.873 2.920 2.968 3.016
130 3.262 3.312 3.363 3.414 3.465 3.517
140 3.783 3.837 3.892 3.947 4.002 4.058
150 4.342 4.401 4.459 4.518 4.577 4.637
160 4.941 5.003 5.065 5.128 5.191 5.254
170 5.578 5.643 5.710 5.776 5.843 5.911
180 6.253 6.323 6.393 6.463 6.534 6.605
190 6.967 7.041 7.115 7.189 7.264 7.339
200 7.720
9
1.000
1.000
PERHITUNGAN STRUKTUR JEMBATAN ITC
balok , t=90cm
DENAH JEMBATAN
balok , t=90cm
+ 5.00
+ 4.10
jalan
+/- 0.00
PENAMPANG JEMBATAN
railling pagar
+ 6.20
+ 4.10
POTONGAN JEMBATAN
10
PERHITUNGAN STRUKTUR JEMBATAN ITC
1,227.40 kg
Kombinasi pembebanan :
Qu = 1,2 B.Mati + 1,6 B.Hidup
= 1,472.88 + 1,472.00
= 2,944.88 kg
Mencari Momen :
10.50
Perhitungan Momen :
Mmax = 1/8 q l2 = 1/8 3,533.86 10.5 2 = 48,700.95 kg.m
Pembesian pelat :
- tebal pelat = 120 mm
- beton decking = 20 mm
- tebal efektif d = 100 mm
- Mutu beton fc' = K-225 = 17.89 Mpa
- Mutu baja fy = U-24 = 240 MPa
m = fc / (0,85 .fy)
= 240 / (0.85 . 17,89)
= 15.78
Rn = M / (f b d2)
= ( 993.9E4) / (0,85 1000 . 1002)
= 57.2952
= Err:502
PERENCANAAN PONDASI
11
PERHITUNGAN STRUKTUR JEMBATAN ITC
jembatan
kolom 40x40
P1 P2
Beban P1 (4 kolom) :
- Berat pelat lantai = 2944.88 x (30.1 / 2) = 44,320.44 kg
- Berat balok 30x90 = 0.3 x 0.9 x 2 x 2400 x (30.1 / 2) = 19,504.80 kg
- Berat kolom 40x40 = 0.4 x 0.4 x 4 x 5 x 2400 = 7,680.00 kg
- Berat balok 30x50 = 0.3 x 0.5 x (2.3 x 8) x 2400 = 6,624.00 kg
- Berat tangga = 2.3 x 0.15 x 4 x 2400 = 3,312.00 kg
= 81,441.24 kg
1.85
12
PERHITUNGAN STRUKTUR JEMBATAN ITC
= 97.73
18
= 5.43 t/m2 > 3 t/m2
A. Cn K. JHP
P= +
3 5
5298.75 23550
P= +
3 5
P = 1766.25 + 4710
P = 6,476.25 kg
= 6.48 ton
43.73
- Jumlah strauss yang dipakai = = 6.75
6.48
13
PERHITUNGAN STRUKTUR JEMBATAN ITC
P = 30,244.94 kg
M = 574.50 kg.m
panjang tekuk = 500 cm
M 574.50
eo1 = = = 0.02 = 1.90 cm
P 30,244.94
1 ###
eo2 = ht = = 1.333 cm
### ###
eo 3.23
= = 0.081 cm
ht 40
e1 = C1 C2 ( lk / 100.ht )2 . ht
e2 = 0.15 ht = 6 cm
eu = eo + e1 + e2
= 3.23 + 4.219 + 6 = 13.45 cm
eau = eu + ( 1/2 ht )
= 13.45 + ###
= 33.45 cm
Pembesian kolom :
- lebar kolom = 400 mm
- beton decking = 20 mm
- tebal efektif d = 380 mm
- Mutu beton fc' = K-225 = 17.89 Mpa
- Mutu baja fy = U-24 = 240 MPa
m = fc / (0,85 .fy)
= 240 / (0.85 . 17,89)
= 15.78
14
PERHITUNGAN STRUKTUR JEMBATAN ITC
Rn = M / (f b d2)
= ( 10117.4E4) / (0,85 400 . 3802)
= 2.061
= 0.00926
8d 19
d10-150 400
400
15
PERENCANAAN JEMBATAN
PROYEK : ITC MANGGA DUA
LOKASI : JL.BUNGURAN - SURABAYA
Potongan :
10,5
Denah
15,00
10,5
Pembebanan :
Beban Mati :
- Berat sendiri pelat 20cm = 0.2*2400*2 = 960 kg/m2
- Berat aspal = 0.07*2300*2 = 322 kg/m2
- Berat air hujan = 0,01 * 1000 *2 = 20 kg/m2
1302 kg/m2
Beban Hidup :
- Beban Hidup = 400 *2 = 800 kg/m2
16 / 41
PERENCANAAN JEMBATAN
PROYEK : ITC MANGGA DUA
LOKASI : JL.BUNGURAN - SURABAYA
Beban Kendaraan :
P = 10000 kg
l= 10.5 m
2
= 1/8 6356.8 10.5 + 1/4 6,000 10.5
= 87,604.65 + 15,750
= 103,354.65 kg.m
= 103,354.65 E4 N.mm
Pembesian Balok :
m = fy / (0,85 .fc')
320
=
0.85 24.61
= 15.30
Rn = M / (f b d2)
1,033,546,500.00
=
0.85 400 875 2
= 3.9704
17 / 41
PERENCANAAN JEMBATAN
PROYEK : ITC MANGGA DUA
LOKASI : JL.BUNGURAN - SURABAYA
1 2 3.9704 15.30
= (1- 1-
15.30 320
= 0.01388137
0,85*f'c'*b1 600
rb =
fy 600 + fy
= 0.03623789
r max = 0,75 r b
= 0,75 0.03623789
= 0.02717842 > r = 0.01388137
r min = 1,4 / fy
= 0.00438 < r = 0.01388137
Aperlu = r .b .d
= 0.01388 400 875 = 4,858.48 mm2
Dipasang tulangan :
A = 10 D 25 ( Aact = 4,908.74 mm2)
A' = 4 D 25 ( Aact = 1,963.50 mm2)
PERHITUNGAN PONDASI
Berat Jembatan :
- Berat pelat beton = 0,2*15*10,5*2400 = 75,600.00 kg
- Berat Aspal = 0,2*15*10,5*2300 = 72,450.00 kg
- Berat Balok 40x90 = 0,4*0,7*8*10,5*2400 = 56,448.00 kg
- Berat Balok 30x60 = 0,3*0,4*7*15*2400 = 30,240.00 kg
- Berat air hujan = 0,01*15*10,5*1000 = 1,575.00 kg
- Berat railing = 1,500.00 kg
- Berat abutment (2bh) = 2,2*16*0,75*2*2400 = 126,720.00 kg
- Beban Hidup = 400*15*10,5 = 63,000.00 kg
- Berat Kendaraan = 10000*2 = 20,000.00 kg
= 447,533.00 kg
Rencana Pondasi :
18 / 41
PERENCANAAN JEMBATAN
PROYEK : ITC MANGGA DUA
LOKASI : JL.BUNGURAN - SURABAYA
A. Cn K. JHP
P= +
3 5
18840 37680
= +
3 5
= 6,280.00 + 7,536
= 13,816.00 kg
447,533.00
= = 12,431 kg < P= 13.816 kg ….. OK
36
19 / 41
PERENCANAAN JEMBATAN
PROYEK : ITC MANGGA DUA
LOKASI : JL.BUNGURAN - SURABAYA
20 / 41
PERENCANAAN PELAT LANTAI RAMP UP
PROYEK : ITC MANGGA DUA
LOKASI : JL. - SURABAYA
Denah :
UP
lx = 4
DOWN
ly = 15
Pembebanan :
Beban Mati :
- Berat sendiri pelat 12.5cm = 0.125*2400 = 300 kg/m2
- Berat finishing (Pelapis Granit) = 50 kg/m2
- Berat air hujan = 0,01 * 1000 = 10 kg/m2
360 kg/m2
Beban Hidup
- Beban Hidup gedung parkir untuk lantai bawah = 800 kg/m2
Beban Kejut
- Berat kendaraan Truck = 10,000 kg
P = 5000 kg
1 2 1.6802 11.29
= (1- 1-
11.29 240
= 0.00730
r min = 1,4 / fy
= 0.00583
Aperlu = r .b .d
= 0.00730 1000 110 = 803.20 mm2
Dipasang tulangan : dia. 10 - 100 ( Aact = 785 cm2) < A perlu ---> Not OK !
d dia. 10 - 80 ( Aact = 982 cm2) > A perlu ---> OK !
1 2 0.9485 11.29
= (1- 1-
11.29 240
= 0.004044
r min = 1,4 / fy
= 0.00583
Aperlu = r .b .d
= 0.00583 1000 110 = 641.67 mm2
Dipasang tulangan : dia. 10 - 175 ( Aact = 448.80 cm2) > A perlu ---> Not OK !
N.mm
--> Not OK !
--> Not OK !
PT TATA BUMI RAYA
PERENCANAAN PELAT LANTAI
PROYEK : LAPANGAN TENIS
LOKASI : CLUB HOUSE GRAHA FAMILY - SURABAYA BARAT
Pelat diasumsikan sebagai unsur sekunder yang terjepit elastis pada ke empat sisinya,
dan akan membebani balok-balok disekelilingnya.
Denah :
(diambil pelat ukuran terbesar)
lx = 4
ly = 8
Pembebanan :
Beban Mati :
- Berat sendiri pelat 12.5cm = 0.125*2400 = 300 kg/m2
- Berat screed + granit = 24 + 21 = 45 kg/m2
- Berat air hujan = 0,01 * 1000 = 10 kg/m2
355 kg/m2
m = fy / (0,85 .fc')
240
=
0.85 20.11
= 14.04
27
PT TATA BUMI RAYA
PERENCANAAN PELAT LANTAI
PROYEK : LAPANGAN TENIS
LOKASI : CLUB HOUSE GRAHA FAMILY - SURABAYA BARAT
Rn = M / (f b d2)
8.99E+06
=
0.85 1000 110 2
= 0.8738
1 2 0.8738 14.04
= (1- 1-
14.04 240
= 0.003739
r min = 1,4 / fy
= 0.00583
Aperlu = r .b .d
= 0.00583 1000 110 = 641.67 mm2
Dipasang tulangan : dia. 10 - 125 ( Aact = 628.32 cm2) > A perlu ---> OK !
d 8 - 10
28
PT TATA BUMI RAYA
PERENCANAAN PELAT LANTAI
PROYEK : LAPANGAN TENIS
LOKASI : CLUB HOUSE GRAHA FAMILY - SURABAYA BARAT
1 2 0.4933 14.04
= (1- 1-
14.04 240
= 0.002086
r min = 1,4 / fy
= 0.00583
Aperlu = r .b .d
= 0.00583 1000 110 = 641.67 mm2
Dipasang tulangan : dia. 10 - 250 ( Aact = 314.16 cm2) > A perlu ---> OK !
d 8 - 10
29
1.00 1.10 1.20 1.30 1.40 1.50 1.60 1.70 1.80 1.90
Mtx 36 42 46 50 53 56 58 59 60 61
Mlx 36 37 38 38 38 37 36 36 35 35
2.00 2.10 2.20 2.30 2.40 2.50
62 62 62 63 63 63
35 34 34 34 34 34
PERENCANAAN PELAT LANTAI
PROYEK : LAPANGAN TENIS
LOKASI : CLUB HOUSE GRAHA FAMILY - SURABAYA BARAT
Data teknis :
- bentang panjang = 720 cm
- bentang pendek = 360 cm
- tebal pelat = 13 cm
- mutu beton = K 250 ----> s *bk = 250 kg/cm2
- mutu baja = U 24 ----> s*au = 2080 kg/cm2
- pembesian pelat terpasang = d10 - 100 (Aact = 7.85 cm2)
Lendutan ijin :
1 1
f = lo = 360 = 1.44 cm
250 250
Lendutan terjadi :
g'. k1 . k2 + p'
f = fe
g+p
sa .lo2
fe =
a ( 1- x) h. 10-6
s a = sa = 1850 kg/cm2
lo = 360 cm (yang terkecil antara lx dan ly)
a = 20.8 (baja polos)
2.5 A s*au
x =
b . h sbk
2.5 7.854 2080
= = 0.14
100 13 225
sa .lo2
fe =
a ( 1- x) h. 10-6
= 1.340 cm
g'. k1 . k2 + p'
f = fe
g+p
712 0.6 + 0
= 1.340
288 + 400
= 0.8319 cm < f = 1.44 cm
PERENCANAAN PONDASI
PROYEK : RUMAH TINGGAL
LOKASI : SAKURA REGENCY - KETINTANG - SURABAYA
P1
10
20
80
3,00
3,00
3,00 3,00
Beban Mati :
- Berat pelat lajur = 0,8*0,25*12*2400 = 5,760.00 kg
- Berat balok 20x40 = 0,2*0,4*12*2400 = 2,304.00 kg
- Berat kolom 20x40 = 0,2*0,4*4*2*2400 = 1,536.00 kg
- Berat pelat lantai 12cm = 6*6*0,12*2400 = 10,368.00 kg
- Berat keramik = 6*6*(21+24) = 1,620.00 kg
- Berat dinding bata = (6+3)*250*4,3 = 9,675.00 kg
- Berat plafond = 6*6*(11+7) = 648.00 kg
- Berat kuda-kuda = 6*6*50 = 1,800.00 kg
- Berat penutup atap = 6*6*50 = 1,800.00 kg
= 35,511.00 kg
34
PT TATA BUMI RAYA
PERENCANAAN PONDASI
PROYEK : RUMAH TINGGAL
LOKASI : SAKURA REGENCY - KETINTANG - SURABAYA
48,062.10
=
96,000
10
20
800
35
PT TATA BUMI RAYA
PERENCANAAN PONDASI
PROYEK : RUMAH TINGGAL
LOKASI : SAKURA REGENCY - KETINTANG - SURABAYA
A. Cn K. JHP
P= +
3 5
3532.5 2826
P= +
3 5
P = 1177.5 + 565.2
P = 1,742.70 kg
9,600.00
- Jumlah strauss yang dipakai = = 5.51
1,742.70
==> dipakai 6 titik pondasi strauss untuk pelat lajur sepanjang 12 m'
36
PT TATA BUMI RAYA
PERENCANAAN PONDASI
PROYEK : RUMAH TINGGAL
LOKASI : SAKURA REGENCY - KETINTANG - SURABAYA
P = 30,244.94 kg
M = 574.50 kg.m
panjang tekuk = 500 cm
M 574.50
eo1 = = = 0.02 = 1.90 cm
P 30,244.94
1 ###
eo2 = ht = = 1.333 cm
### ###
eo 3.23
= = 0.081 cm
ht 40
e1 = C1 C2 ( lk / 100.ht )2 . ht
e2 = 0.15 ht = 6 cm
eu = eo + e1 + e2
= 3.23 + 4.219 + 6 = 13.45 cm
eau = eu + ( 1/2 ht )
= 13.45 + ###
= 33.45 cm
37
PT TATA BUMI RAYA
PERENCANAAN PONDASI
PROYEK : RUMAH TINGGAL
LOKASI : SAKURA REGENCY - KETINTANG - SURABAYA
= 10,117.41 kg.m
Pembesian kolom :
- lebar kolom = 400 mm
- beton decking = 20 mm
- tebal efektif d = 380 mm
- Mutu beton fc' = K-225 = 17.89 Mpa
- Mutu baja fy = U-24 = 240 MPa
m = fc / (0,85 .fy)
= 240 / (0.85 . 17,89)
= 15.78
Rn = M / (f b d2)
= ( 10117.4E4) / (0,85 400 . 3802)
= 2.061
= 0.00926
8d 19
d10-150 400
400
38
PT TATA BUMI RAYA
PERENCANAAN PONDASI
PROYEK : RUMAH TINGGAL
LOKASI : SAKURA REGENCY - KETINTANG - SURABAYA
39
Kunjungi ilmubeton.com
mari sharing tekniksipil
dan memajukan konstruksi indon
Gratis https://www.ilmubeton.com/2018/06/kumpulan-gamb
video dari sponsor https://www.ilmubeton.com/2018/06/paket-lengkap-vide
n.com
onstruksi indonesia
on.com/2018/06/kumpulan-gambar-rencana-rumah-cad-dalam.html
.com/2018/06/paket-lengkap-video-tutorial-software_25.html