X X
BATANG TARIK
a Batang tarik tersesusun dari baja siku ganda.
b. Gaya batang , Pembebanan Tetap = 3,111.75 kg (N)
c. Panjang bentang kritis = 3,000.00 mm (Lk)
Ketentuan
a Tegangan izin dasar, pembebanan tetap = 1,600.00 kg/cm2
b. Tegangan izin tarik (75% x 5), pembebanan tetap = 1,200.00 kg/cm2
300
d. Jari-jari inersia i min > Lk / c mak = = 1.25 cm
240
e. Jumlah lubang < 15% x Fnetto
f. Ditentukan profil minimum batang struktur û ë 100. 100. 8
Perhitungan
N 3,111.75
Anetto = = = 2.59 cm2
sa 1,200.00
Abruto 2.59
Abruto = = = 3.05 cm2
85% 0.85
imin = 1.25 cm
Dari tabel diperoleh û ë 100. 100. 8 , F=15,47 c2, 2F = 30,94.48, ix = 3,07 > 2.08 ….ok!
Kontrol Tegangan
N 3,111.75
s =
Anetto
=
26.30
= 118.3 cm2 < 1,200.00 kg/cm2 ……ok!
TUGAS WAJIB KONSTRUKSI BAJA
Kontrol Kelangsingan
Lk 300
c = ix = = 3.07
= 97.72 < 240.00 kg/cm2 ……ok!
Y
Gambar Profil Baja untuk Batang Tarik
TUGAS WAJIB KONSTRUKSI BAJA
BATANG TEKAN
a Batang tekan tersesusun dari baja siku ganda.
b. Gaya batang , Pembebanan Tetap = 11,338.95 kg (N)
c. Panjang Tekuk = 5,550.00 mm (Lk)
Ketentuan
a Tebal pelat buhul = 10 mm
b. Tebal pelat kopel = 5 mm
c. Alat sambung paku = 10 mm
- Tegangan izin dsr. s = 1,400.00 kg/cm2
cx > 110
Lk 555
c =
ix
= =
3.07
= 180.78 > 110.00 kg/cm2 ……ok!
X X
Y
TUGAS WAJIB KONSTRUKSI BAJA
Kontrol Tekuk
Lk 555
c =
ix
=
3.07
= 180.78 > 110.00 kg/cm2 ……ok!
Faktor Tekuk
E cx 180.78
cg = p x
0.70 x 1200 cg =
cg
=
171.30
= 1.06
2500000
= 3.14 x wx = 1.61
840
cg = 171.30
Tegangan Tekuk
N -11,338.95
sx = wx Atotal
= 1.61
30.94
= -590.04 < 1,200.00 kg/cm2 ok!
X X
Y
3.07 3.07
1.00
Iy tot 1,239.58
iy = = = 6.33 cm
Atot 30.94
Lk 555.00
cy =
iy
=
6.33
= 87.68 cm
TUGAS WAJIB KONSTRUKSI BAJA
m
c iy = c y2 +
2 c 12
Dimana
c y = 58.26
m = 2
Lk / n
c y =
i min
£ 50
555/ n
50 =
1.16
555
n =
58
Lk / n 555 / 10
c 1 =
i min
=
1.16
= 43.50
Maka :
m
c iy = c y2 +
2 c 12
2 + m 2
= 58.26 43.50
2
c iy = 72.7
N -11,338.95
sx = wx Atotal
= 0.85
30.94
= -311.51 < 1,200.00 kg/cm2 ok!
KONTROL KESTABILAN
c 1 = 43.50 1.20 c 1 = 43.50
Ip I1 I1
£ 10 atau Ip £ 10 a
a L1 L1
maka : 83 292
£ 10
7 21.00
a
Y
X X
e e
w w
L/2
S1
N/2
N/2
L/2
c=S
L/2
N/2
N/2
S1
L/2
S2 S2
TUGAS WAJIB KONSTRUKSI BAJA
PERENCANAAN BAUT
Jarak Baut :
2,5 (1.4) ≤ U ≤ 7 (1,4)
3.50 ≤ U ≤ 9.80
L 10
ambil nilai U = 4 cm
Gaya yang dipkul baut, akiat gaya gese= 3112 kg dipikul oleh 6 buah baut masing-masing baut
memikul beban= 519 kg
Jumlah baut yang digunakan adalah 6 buah. 3 di sisi kiri dan 3 di sisi kanan plat kopel
TUGAS WAJIB KONSTRUKSI BAJA
RENCANA PAKU
Paku, diameter = 10 mm
S1 = 2d = 20 mm
S1 diambil = 15 mm
C = S = 3d = 30 mm
C = S1 diambil = 30 mm
h = 2 S1 diambil + S = 60 mm
S2 = w = 35 mm
b = 2S2 + g = 78 mm
KEKUATAN PAKU
S1 > 2d , s ds = 2,800 kg/cm2