Garasi Bus
PERENCANAAN KOLOM WF
Profil kolom = H Beam-250.250
Jarak antar kuda-kuda = 4.6 m
Bentang kuda-kuda = 23 m
Sudut kemiringan = 15 o
Gording = C 125.50.20.3,2
Jarak antar gording = 102 cm
Atap = Galvalume 0.35mm
PEMBEBANAN
Berat sendiri H Beam = 25.7 kg/m' akan dihitung otomatis oleh program SAP-90
Selanjutnya untuk mencari gaya-gaya dalam dari rangka batang, digunakan program SAP90
6.00
23.00 18.00
KONTROL KEKUATAN PROFIL KOLOM WF
Dari hasil Output SAP-90 didapat :
Momen max terjadi pada element no. 9 :
- Momen max (M) = 47,145.93 kg.m
- Gaya Tekan (P) = - (5,960.08) kg
- panjang tekuk (lk) = 320.00 cm
- WF-200.100.5,5.8 A = 92.18 cm2
w = = 720.36 cm3
ix = 10.82 cm
iy = 6.29 cm
Cek tekuk :
terhadap sumbu x : l x = lk / ix
320.00
= = 29.6
10.82
terhadap sumbu x : l x = lk / ix
320.00
= = 50.9 … (menekuk tehadap sumbu y)
6.29
Cek terhadap syarat PPBBI ps 4.9.1 utk portal dimana ujungnya bergoyang
P M nx
(1) s = + 0.85 q < s
A w nx - 1
wx
P M nx
(2) s = w y + 0.85 q < s
A w nx - 1
P M
(3) s= = + q < s
A w
karena sumbu lentur (sb x) tegak lurus thd sumbu tekuk (sb y) maka
faktor amplifikasi nx
=1
nx - 1
q = ambil 1
l x= 29.6 ---> wx = 1.13
l y= 50.9 ---> w y = 4.01
syarat PPBBI :
(5,960.08) 4,714,593
(1) s = 1.13 + 0.85 1
92.18 720.36
= (73.06) + 5,563.06
= 5,490.00 kg/cm2 < 1600 kg/cm2 (ok)
(5,960.08) 4,714,593
(2) s = 4.01 + 0.85 1
92.18 720.36
= (259.27) + 5,563.06
= 5,303.78 kg/cm2 < 1600 kg/cm2 (ok)
(5,960.08) 4,714,593
(3) s = + 1
92.18 720.36
= (64.66) + 6,544.77
= 6,480.12 kg/cm2 < 1600 kg/cm2 (ok)
KONTROL KEKUATAN PROFIL BALOK WF-150
Dari hasil Output SAP-90 didapat :
Momen max terjadi pada element no. 21 :
- Momen max (M) = 3,657.70 kg.m
- Gaya Tekan (P) = - 100.00 kg
- WF-150.75 = luas (A) = 21.83 cm2
w = = 171.4 cm3
P M
s= +
A w
100.00 365,770
+
21.83 171.4
= 4.58 + 2,134.01
= 2,138.59 kg/cm2
PERENCANAAN GORDING
Data teknik :
Beban gording :
- Berat sendiri gording = 13.43 kg/m'
- Berat atap : 7.5 x 1,02 = 7.88 kg/m'
- Berat air hujan = 0,02x1000x1,25 = 25 kg/m'
46.31 kg/m'
qx = q cos a
qy = q sin a
PERHITUNGAN STRUKTUR
Cek Tegangan
Mx My
s = +
Wx Wy
= 22938.490182 1344.35422
+
67.84 13.43
= 338.13 + 100.10
Cek Lendutan
5 qx l4 1 Px l3
dx +
= = 384 EIx 48 EIx
= 100,132,024,672.82 + 9,401,935,622.77
341,913,600,000.00 42,739,200,000.00
= 0.2929 + 0.2200
= 0.5128 cm
5 qy l4 1 Py l3
dy +
384 EIy 48 EIy
= =
= 331,238,211.70 + 93,305,224.35
49,835,520,000.00 6,229,440,000.00
= 0.0066 + 0.0150
= 0.0216 cm
d = dx + dy
= ( 0.5128 + 0.0216 )
= 0.731 cm
PEMBEBANAN
A. Beban Tetap (N) = N/cos b = 1175.46 /cos 43.76 = 1628.09 kg
B. Beban Sementara (N) = N/cos b = 1944.60 /cos 43.76 = 2693.39 kg