TAHUN 2021 - -

NO. NAMA VENDOR No. PO JUMLAH PEMBAYARAN SISA MATERIAL STATUS PENGIRIMAN
28 PT. VALVINDO MEGAH 028/PJK/PEL-SEMARANG/PO/II/2021 490.050.000 490.050.000 - SDV SUDAH ON SITE
62 PT DUTA FIRZA 062/PJK/PEL-SEMARANG/PO/II/2021 91.924.800 91.924.800 - PRESSURE SWITCH
70 PT. PIP VALCON 070/REV/PJK/PEL-SEMARANG/PO/II/2021 16.500.000 16.500.000 - PSV
92 PT LADANG USAHA JAYA BERSAMA 092/PJK/PEL-SEMARANG/PO/II/2021 149.688.000 149.688.000 HOUSE DANTEC SIAP KIRIM TUNGGU PELUNASAN
93 PT DEXA ENERGY 093/PJK/PEL-SEMARANG/PO/II/2021 145.530.000 43.659.000 101.871.000 COMPRESSOR TUNGGU PELUNASAN
103 PT ARKAN MITRA SELARAS 103/PJK/PEL-SEMARANG/PO/II/2021 308.000.000 92.400.000 215.600.000 MERCAPTAN SIAP KIRIM TUNGGU PELUNASAN
132 PT. ADHIGANA PERKASA MANDIRI 132/PJK/PEL-SEMARANG/PO/II/2021 99.000.000 99.000.000 - GAS DETECTOR DIAMBIL PAK IMAM
133 PT. SEJAHTERABANTA SOLUSI TAMA 133/PJK/PEL-SEMARANG/PO/II/2021 31.900.000 22.330.000 - COMPOSITE HOUSE
143 PT RODA NURMALA 143/REV/PJK/PEL-SEMARANG/PO/II/2021 280.500.000 84.150.000 196.350.000 ELECTRIC FIRE PUMP SIAP KIRIM TUNGGU PELUNASAN
10 PT USAHA JAYAMAS BHAKTI 010/PJK/PEL-SEMARANG/PO/III/2021 151.620.040 151.620.040 DRY GAS COUPLING STATUS GIMANA
44 CV RAJAWALI DIESEL 044/PJK/PEL-SEMARANG/PO/III/2021 170.000.001 170.000.001 GENSET SIAP KIRIM TUNGGU PELUNASAN
48 PT ZAHRA INTI RETSUNA 048/REV/PJK/PEL-SEMARANG/PO/III/2021 396.000.000 396.000.000 - VALVE SUDAH ON SITE
7 CV AGRY LINTAS NIAGA 007/PJK/PEL-SEMARANG/PO/IV/2021 194.500.000 97.250.000 97.250.000 CONATINER TANGGAL 29 APRIL PEKERJAAN SEPTITANK DI SITE
14 PT SAMAMANTAP SEJAHTERA 014/PJK/PEL-SEMARANG/PO/IV/2021 139.250.000 139.250.000 HYDRANT
18 ENDLESSAFE SINERGI SAFETINDO 018/PJK/PEL-SEMARANG/PO/IV/2021 116.358.000 116.358.000 - APAR SUDAH ON SITE
19 MAJU BERSAMA 019/PJK/PEL-SEMARANG/PO/IV/2021 18.500.000 18.500.000 - PRESSURE RELIEF VALVE PAK IMAM
PT. BIRO KLASIFIKASI INDONESIA 045/PJK/PEL-SEMARANG/PO/IV/2021 98.150.000 98.150.000 PLO BELUM TERIMA INVOICE
CV INTAN WELD 047/PJK/PEL-SEMARANG/PO/IV/2021 16.637.600 16.637.600 - PIPA & FITTING TAMBAHAN
TARGET PENGIRIMAN TANGGAL 21 APRIL 2021
PT. PARADISE PERKASA 048/PJK/PEL-SEMARANG/PO/IV/2021 5.102.081 5.102.081 - FITTING TAMBAHAN TARGET PENGIRIMAN TANGGAL 21 APRIL 2021
PT. DINAMIKA TEKNIK PERSADA 002/PJK/SPK/PEL-SEMARANG/III/2021 55.000.000 27.500.000 PENELAAH DESIGN MENUNGGU FINAL LAPORAN

CV GASKINDO SENTOSA 130/PJK/PEL-SEMARANG/PO/III/2021 659,998 659,998 - FITTING REVISI SUDAH ON SITE


TOTAL KEBUTUHAN 1.168.159.001
TOTAL DIUTAMAKAN 704.559.000