Anda di halaman 1dari 38

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC.

SEKAYAN/ENTIKONG
LOKASI : KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG
KONTRAKTOR : PT. DUTA MAS INDAH
KONSULTAN : PT. YODYA KARYA (persero) Tbk, JO
PT. SWADAYA INTI SARANA

NOMOR KONTRAK : 280/PKS/Bb20.8.2/2020 NO REQUEST


TANGGAL KONTRAK : 23 SEPTEMBER 2020 AKP / REQ / DJE -
TANGGAL SPMK : 23 SEPTEMBER 2020
WAKTU PELAKSANAAN : 240 (Dua Ratus Empat Puluh) HK
NILAI KONTRAK : 71,594,200,000.00
2021

KOP SURAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENGESAHAN
KEPALA PENGAWAS KONSULTAN SUPERVISI PENYEDIA JASA

……………………….. SUWOKO CORNELIS SEMBIRING


Kepala Pengawas Inspector Engineer Bridge Engineer
SEKAYAN/ENTIKONG
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : DMI/Segmen-2/ENDAR/M2-I/2021 TGL : 11 Januari sd 17 Januari 2021

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
Galian Struktur dengan kedalaman 0 - 2 meter KEC. SIDING/SELUAS - BTS. KEC.
3.1(4) M3 120.00

SEKAYAN/ENTIKONG

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
PERALATAN / BAHAN Metode Pelaksanaan

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Alat Ukur (Optik, Roll meter ) 1 Set - Penentuan referensi BM dan titik awal
Keg. : Pembangunan Jembatan
2 Excavator 1 Unit bangunan/Stationing Koordinat elevasi
Jembatan Endar 3 Alat Bantu 1 set abutmen sesuai dengan Rencana
No.Dok.Gbr : ___________
- Pekerjaan Galian menggunakan excavator
Tgl. Dok.Gbr : ___________
- Pengecekan Posisi dan Elevasi sesuai
DIAJUKAN OLEH
dengan desain rencana
PENYEDIA JASA

PT. DUTA MAS INDAH

CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. YODYA KARYA (persero) Tbk, JO

PT. SWADAYA INTI SARANA

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : DMI/Segmen-2/ENDAR/M2-I/2021 TGL : 11 Januari sd 17 Januari 2021

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
7.6.(8c) Penyediaan Tiang Pancang Baja Diameter 400 Mm M1 180.00 KEC. SIDING/SELUAS - BTS. KEC.
tebal 100 Mm
SEKAYAN/ENTIKONG
Pemancangan Tiang Pancang Baja Diameter 400 mm
7.6.(14b) M1 180.00

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
PERALATAN / BAHAN Metode Pelaksanaan

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


- Tiang pancang  disimpan di sekitar lokasi
1. Alat Ukur (Optik, Roll meter ) 1 Set
yang akan dilakukan pemancangan, disusun
Keg. : Pembangunan Jembatan
2. Alat Pancang Diesel Hammer 1 Unit
seperti piramida, dan dialasi dengan kayu
Jembatan Endar
K 350 1 set dan dikelompokan sesuai dengan type,
No.Dok.Gbr : ___________ diameter, dimensi yang sama
3 Excavator
Tgl. Dok.Gbr : ___________
4 Alat Bantu (welding set, dll) 1 set - Penentuan seting lokasi Tiang Pancang
DIAJUKAN OLEH
- Penentuan Rencana Kemiringan Tiang
PENYEDIA JASA
- Pemanc. menggunakan Diesel Hammer
PT. DUTA MAS INDAH
- Pemancangan sampai penetrasi
maksimum atau penetrasi tertentu sesuai
dengan perencana
- Setelah sampai pada penetrasi tertentu
dilakukan Kalendering yang digunakan
sebagai sebagai bahan perhitngan
secaraempiris untuk mengetahui daya
dukung tiang pancang
CORNELIS SEMBIRING - Memberi Pelindung Pada Lubang Tiang

Bridge Engineer Pancang


DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. YODYA KARYA (persero) Tbk, JO

PT. SWADAYA INTI SARANA

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : DMI/Segmen-2/ENDAR/M2-I/2021 TGL : 18 Januari sd 24 Januari 2021

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
Baja Tulangan Sirip BjTS 420B KEC. SIDING/SELUAS - BTS. KEC.
7.3.(4) Kg 28,733.10
Baja Tulangan Polos-BjTP 280
7.3.(1) Kg 958.52
SEKAYAN/ENTIKONG
Beton, fc’10 Mpa
7.1.(10) M3 3.54
Beton struktur, fc’30 Mpa, tanpa pengaturan air
7.1.(5a) M3 62.34
Beton strukutr memadat sendiri, fc'30 Mpa
7.1.(5c) M3 24.62

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
PERALATAN / BAHAN Metode Pelaksanaan

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


- Material yang sampai telah sesuai
1. Excavator 1 Unit
denganSyarat dan Spesifikasi yang
Keg. : Pembangunan Jembatan
2. Mixer Truck 1 Unit ditetapkan
Jembatan Endar - Material besi tulangan yang telah
3 Corong Pipa Tremi 1 Unit
memenuhi spesifikasi akan disimpan
berdasarkan kelompok diameternya masing-
No.Dok.Gbr : ___________ masing. Dalam penyimpanan, dan dialas
4 Water Pump 1 Unit kayu agar tidak bersentuhan dengan tanah.

Tgl. Dok.Gbr : ___________


4 Alat Bantu (welding set, dll) 1 set
- Setelah seluruh tulangan terpasang, maka
DIAJUKAN OLEH perlu dilakukan pengecekan tulangan oleh
tim Quality Control apakah jumlah dan
posisi tulangan sudah terpasang dengan
PENYEDIA JASA benar sesuai dengan gambar rencana.

PT. DUTA MAS INDAH

- Pengecoran beton dilakukan setelah


dilakukan pengujian dan telah disetujui oleh
direksi, dan area pengecoran siap utk
dilakukan pengecoran dan pemadatan
menggunakan alar vibrator.
CORNELIS SEMBIRING - Setelah dilaksanakan pengecoran, maka
untuk menjaga agar mutu beton tetap terjaga
Bridge Engineer dilakukan perawatan beton.
DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. YODYA KARYA (persero) Tbk, JO

PT. SWADAYA INTI SARANA

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN
………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : DMI/Segmen-2/ANDAR/M3-II/2021 TGL : 15 Februari sd 21 Februari 2021

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
Baja Tulangan Sirip BjTS 420B KEC. SIDING/SELUAS - BTS. KEC.
7.3.(4) Kg 10,179.12
LANTAI JEMBATAN
SEKAYAN/ENTIKONG

Beton struktur, fc’30 Mpa, tanpa pengaturan air


7.1.(5a) M3 71.93
LANTAI JEMBATAN

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
PERALATAN / BAHAN Metode Pelaksanaan

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


- Material yang sampai telah sesuai
1. Excavator 1 Unit
denganSyarat dan Spesifikasi yang
Keg. : Pembangunan Jembatan
2. Mixer Truck 1 Unit ditetapkan
Jembatan Andar - Material besi tulangan yang telah
3 Corong Pipa Tremi 1 Unit
memenuhi spesifikasi akan disimpan
berdasarkan kelompok diameternya masing-
No.Dok.Gbr : ___________
masing. Dalam penyimpanan, dan dialas
4 Water Pump 1 Unit kayu agar tidak bersentuhan dengan tanah.
- Pemasangan besi dilakukan sesuai rencana
Tgl. Dok.Gbr : ___________
4 Alat Bantu (welding set, dll) 1 set agar tidak terjadi dislokasi
- Setelah seluruh tulangan terpasang, maka
DIAJUKAN OLEH
perlu dilakukan pengecekan tulangan oleh
tim Quality Control apakah jumlah dan
PENYEDIA JASA
posisi tulangan sudah terpasang dengan
benar sesuai dengan gambar rencana.
PT. DUTA MAS INDAH

- Pengecoran beton dilakukan setelah


dilakukan pengujian dan telah disetujui oleh
direksi, dan area pengecoran siap utk
dilakukan pengecoran dan pemadatan
menggunakan alar vibrator.
CORNELIS SEMBIRING - Setelah dilaksanakan pengecoran, maka
untuk menjaga agar mutu beton tetap terjaga
Bridge Engineer
dilakukan perawatan beton.
DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. YODYA KARYA (persero) Tbk, JO

PT. SWADAYA INTI SARANA

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..
Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : DMI/Segmen-2/ENKA/M2-I/2021 TGL : 18 Januari sd 24 Januari 2021

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
Galian Struktur dengan kedalaman 0 - 2 meter KEC. SIDING/SELUAS - BTS. KEC.
3.1(4) M3 165.00

SEKAYAN/ENTIKONG

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
PERALATAN / BAHAN Metode Pelaksanaan

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Alat Ukur (Optik, Roll meter ) 1 Set - Penentuan referensi BM dan titik awal
Keg. : Pembangunan Jembatan
2 Excavator 1 Unit bangunan/Stationing Koordinat elevasi
Jembatan Enka 3 Alat Bantu 1 set abutmen sesuai dengan Rencana
No.Dok.Gbr : ___________
- Pekerjaan Galian menggunakan excavator
Tgl. Dok.Gbr : ___________
- Pengecekan Posisi dan Elevasi sesuai
DIAJUKAN OLEH
dengan desain rencana
PENYEDIA JASA

PT. DUTA MAS INDAH

CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. YODYA KARYA (persero) Tbk, JO

PT. SWADAYA INTI SARANA

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : DMI/Segmen-2/ENKA/M2-I/2021 TGL : 18 Januari sd 24 Januari 2021

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
7.6.(8c) Penyediaan Tiang Pancang Baja Diameter 400 Mm M1 180.00 KEC. SIDING/SELUAS - BTS. KEC.
tebal 100 Mm
SEKAYAN/ENTIKONG
Pemancangan Tiang Pancang Baja Diameter 400 mm
7.6.(14b) M1 180.00

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
PERALATAN / BAHAN Metode Pelaksanaan

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


- Tiang pancang  disimpan di sekitar lokasi
1. Alat Ukur (Optik, Roll meter ) 1 Set
yang akan dilakukan pemancangan, disusun
Keg. : Pembangunan Jembatan
2. Alat Pancang Diesel Hammer 1 Unit
seperti piramida, dan dialasi dengan kayu
Jembatan Enka
K 350 1 set dan dikelompokan sesuai dengan type,
No.Dok.Gbr : ___________ diameter, dimensi yang sama
3 Excavator
Tgl. Dok.Gbr : ___________
4 Alat Bantu (welding set, dll) 1 set - Penentuan seting lokasi Tiang Pancang
DIAJUKAN OLEH
- Penentuan Rencana Kemiringan Tiang
PENYEDIA JASA
- Pemanc. menggunakan Diesel Hammer
PT. DUTA MAS INDAH
- Pemancangan sampai penetrasi
maksimum atau penetrasi tertentu sesuai
dengan perencana
- Setelah sampai pada penetrasi tertentu
dilakukan Kalendering yang digunakan
sebagai sebagai bahan perhitngan
secaraempiris untuk mengetahui daya
dukung tiangPelindung
- Memberi pancang Pada Lubang Tiang
CORNELIS SEMBIRING

Bridge Engineer
Pancang
DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. YODYA KARYA (persero) Tbk, JO

PT. SWADAYA INTI SARANA

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : DMI/Segmen-2/ENKA/M2-I/2021 TGL : 25 Januari sd 30 Januari 2021

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
Baja Tulangan Sirip BjTS 420B KEC. SIDING/SELUAS - BTS. KEC.
7.3.(4) Kg 32,212.93
Baja Tulangan Polos-BjTP 280
7.3.(1) Kg 958.52
SEKAYAN/ENTIKONG
Beton, fc’10 Mpa
7.1.(10) M3 3.54
Beton struktur, fc’30 Mpa, tanpa pengaturan air
7.1.(5a) M3 227.53
Beton strukutr memadat sendiri, fc'30 Mpa
7.1.(5c) M3 27.13

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
PERALATAN / BAHAN Metode Pelaksanaan

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


- Material yang sampai telah sesuai
1. Excavator 1 Unit
denganSyarat dan Spesifikasi yang
Keg. : Pembangunan Jembatan
2. Mixer Truck 1 Unit ditetapkan
Jembatan Enka - Material besi tulangan yang telah
3 Corong Pipa Tremi 1 Unit memenuhi spesifikasi akan disimpan
berdasarkan kelompok diameternya masing-
No.Dok.Gbr : ___________
4 Water Pump 1 Unit masing. Dalam penyimpanan, dan dialas
kayu agar tidakbesi
- Pemasangan bersentuhan
dilakukandengan
sesuai tanah.
rencana
Tgl. Dok.Gbr : ___________
4 Alat Bantu (welding set, dll) 1 set -agar tidakseluruh
Setelah terjadi tulangan
dislokasi terpasang, maka
DIAJUKAN OLEH perlu dilakukan pengecekan tulangan oleh
tim Quality Control apakah jumlah dan
posisi tulangan sudah terpasang dengan
PENYEDIA JASA
benar sesuai dengan gambar rencana.
PT. DUTA MAS INDAH

- Pengecoran beton dilakukan setelah


dilakukan pengujian dan telah disetujui oleh
direksi, dan area pengecoran siap utk
dilakukan pengecoran dan pemadatan
menggunakan alar vibrator.
CORNELIS SEMBIRING - Setelah dilaksanakan pengecoran, maka
untuk menjaga agar mutu beton tetap terjaga
Bridge Engineer
dilakukan perawatan beton.
DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. YODYA KARYA (persero) Tbk, JO

PT. SWADAYA INTI SARANA

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : DMI/Segmen-2/ENKA/M2-I/2021 TGL : 01 Februai sd 7 Februari 2021

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
Penyediaan Baja Struktur Grade 345 KEC. SIDING/SELUAS - BTS. KEC.
7.4.(1b) Kg 39,441.00
Pemasangan Baja Struktur
7.4.(2) Kg 39,441.00
SEKAYAN/ENTIKONG

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
PERALATAN / BAHAN Metode Pelaksanaan

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


- Lokasi Kerja Erection Rata ≤ 5%
1. Excavator 2 Unit
Keg. : Pembangunan Jembatan
2. Donkrak 1 Unit
Jembatan Enka Dan Andar - Penempatan dan susunan stock girder
3. Alat Bantu
No.Dok.Gbr : ___________
disesuaikan dengan urutan erction
- Mengukur jarak Bentangan, perencanaan
Tgl. Dok.Gbr : ___________
manajemen trafic
DIAJUKAN OLEH - Tes beban angkat, dan memastikan ruang
hoise crane bisa bergerak
memanjang/melintang sesuai dengan posisi
PENYEDIA JASA
girder
PT. DUTA MAS INDAH

- Memastikan bearinring benar2 rata dan


terletak sesuai dengan posisinya
CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. YODYA KARYA (persero) Tbk, JO

PT. SWADAYA INTI SARANA

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 007.a TGL : 18 August JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
7.6 (19) a Tiang Bor Beton, diameter 800 mm (non casing) M1 99.80
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG
(Pengecoran Tiang Bor
Beton dia 800mm dengan mutu beton Fc'30MPa)
Abutmen 1 (A1)

LAMPIRAN PENDUKUNG

TRIAL MIX BATCHING PLANT

ITEM SAT QUANTITY KET

Peralatan :

Batching plant Set 1.00

slump test tools Set 1.00

silinder Buah 6.00

Material :

Semen Kg 554.05

pasir Kg 646.38

Batu 1-1 Kg 403.99

Batu 1-2 Kg 565.58

Air Liter 205.00

Additive Liter 1.30

PERALATAN UNTUK PELAKSANAAN PENGEBORAN - PENGECORAN

ITEM SAT QUANTITY KET

Excavator Unit 2.00

Bore Pile Machine Unit 1.00

Mixer Truck Unit 3.00

Water Pump Machine Unit 3.00

Crane Unit 1.00

Corong Pipa Tremi Set 1.00

Concrete Vibrator Unit 1.00

Peralatan Las Set 1.00

Peralatan Pemotong Besi Set 1.00


DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 003 TGL : JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
3.2.(2a) Timbunan Pilihan dari sumber galian M3 706.20
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING 1. Berkas Pekerjaan sebelumnya.


No. ......................................................
Keg. : Duplikasi Jembatan Entikong 2. Status Peralatan.
................................................... lembar
3. Status Bahan Mentah. No. ......................................................
No.Dok.Gbr : ___________ 4. Status Bahan Olahan.
No. ......................................................
Tgl. Dok.Gbr : ___________ 5. Status Bahan Jadi.
No. ......................................................
DIAJUKAN OLEH 6. Status Tenaga Kerja.
................................................... lembar
PENYEDIA JASA 7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA 8. Metoda Pelaksanaan.
No. ......................................................
9. Jadwal Pelaksanaan.
................................................... hari
10.Metoda Pengendalian Lalu-lintas. No. ......................................................
11.Perlengkapan antisipasi Cuaca.
................................................... lembar
CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 004 TGL : 07 July JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
7.3 (3) Baja Tulangan U 32 Ulir Kg 164,056.89
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Berkas Pekerjaan sebelumnya. No. ......................................................
Keg. : Duplikasi Jembatan Entikong
2. Status Peralatan. ................................................... lembar

3. Status Bahan Mentah. No. ......................................................


No.Dok.Gbr : ___________
4. Status Bahan Olahan. No. ......................................................
Tgl. Dok.Gbr : ___________
5. Status Bahan Jadi. No. ......................................................
DIAJUKAN OLEH
6. Status Tenaga Kerja. ................................................... lembar
PENYEDIA JASA 7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA
8. Metoda Pelaksanaan. No. ......................................................

9. Jadwal Pelaksanaan. ................................................... hari

10.Metoda Pengendalian Lalu-lintas. No. ......................................................

11.Perlengkapan antisipasi Cuaca. ................................................... lembar


CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 005 TGL : 04 January JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
7.6 (19) a Tiang Bor Beton, diameter 800 mm (non casing) M1 378.00
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

Abutmen 1 (A1)

Abutmen 2 (A2)

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Berkas Pekerjaan sebelumnya. AKP / REQ / DJE - 004
Keg. : Duplikasi Jembatan Entikong
2. Status Peralatan. ................................................... lembar

3. Status Bahan Mentah. No. ......................................................


No.Dok.Gbr : ___________
4. Status Bahan Olahan. No. ......................................................
Tgl. Dok.Gbr : ___________
5. Status Bahan Jadi. No. ......................................................
DIAJUKAN OLEH
6. Status Tenaga Kerja. ................................................... lembar
PENYEDIA JASA 7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA
8. Metoda Pelaksanaan. No. ......................................................

9. Jadwal Pelaksanaan. ................................................... hari

10.Metoda Pengendalian Lalu-lintas. No. ......................................................

11.Perlengkapan antisipasi Cuaca. ................................................... lembar


CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 006 TGL : 08 August JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
7.6 (19) b Tiang Bor Beton, diameter 800 mm (dengan casing) M1 324.00
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

Pilar 1 (P1)

Pilar 2 (P2)

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Berkas Pekerjaan sebelumnya. AKP / REQ / DJE - 005
Keg. : Duplikasi Jembatan Entikong
2. Status Peralatan. ................................................... lembar

3. Status Bahan Mentah. No. ......................................................


No.Dok.Gbr : ___________
4. Status Bahan Olahan. No. ......................................................
Tgl. Dok.Gbr : ___________
5. Status Bahan Jadi. No. ......................................................
DIAJUKAN OLEH
6. Status Tenaga Kerja. ................................................... lembar
PENYEDIA JASA 7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA
8. Metoda Pelaksanaan. No. ......................................................

9. Jadwal Pelaksanaan. ................................................... hari

10.Metoda Pengendalian Lalu-lintas. No. ......................................................

11.Perlengkapan antisipasi Cuaca. ................................................... lembar


CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 007 TGL : 08 August JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
Tambahan Biaya untuk Nomor Mata Pembayaran
7.6 (21) M1 324.00
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG
7.6.(19) bila Tiang Bor Beton dikerjakan ditempat
yang berair
Pilar 1 (P1)

Pilar 2 (P2)

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Berkas Pekerjaan sebelumnya. AKP / REQ / DJE - 006
Keg. : Duplikasi Jembatan Entikong
2. Status Peralatan. ................................................... lembar

3. Status Bahan Mentah. No. ......................................................


No.Dok.Gbr : ___________
4. Status Bahan Olahan. No. ......................................................
Tgl. Dok.Gbr : ___________
5. Status Bahan Jadi. No. ......................................................
DIAJUKAN OLEH
6. Status Tenaga Kerja. ................................................... lembar
PENYEDIA JASA
7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA
8. Metoda Pelaksanaan. No. ......................................................

9. Jadwal Pelaksanaan. ................................................... hari

10.Metoda Pengendalian Lalu-lintas. No. ......................................................

11.Perlengkapan antisipasi Cuaca. ................................................... lembar


CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 006 TGL : 07 August JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
Tambahan Biaya untuk Nomor Mata Pembayaran
7.6 (21) M1 662.00
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG
7.6.(19) bila Tiang Bor Beton dikerjakan ditempat
yang berair
Pilar 1 (P1)

Pilar 2 (P2)

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Berkas Pekerjaan sebelumnya. AKP / REQ / DJE - 005
Keg. : Duplikasi Jembatan Entikong
2. Status Peralatan. ................................................... lembar

3. Status Bahan Mentah. No. ......................................................


No.Dok.Gbr : ___________
4. Status Bahan Olahan. No. ......................................................
Tgl. Dok.Gbr : ___________
5. Status Bahan Jadi. No. ......................................................
DIAJUKAN OLEH
6. Status Tenaga Kerja. ................................................... lembar
PENYEDIA JASA
7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA
8. Metoda Pelaksanaan. No. ......................................................

9. Jadwal Pelaksanaan. ................................................... hari

10.Metoda Pengendalian Lalu-lintas. No. ......................................................

11.Perlengkapan antisipasi Cuaca. ................................................... lembar


CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 007 TGL : 18 August JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
Tiang Bor Beton, diameter 800 mm (non casing)
7.6 (19) a M1 99.80
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG
(Pengecoran Tiang Bor
Beton dia 800mm dengan mutu beton Fc'30MPa)
Abutmen 1 (A1)

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Berkas Pekerjaan sebelumnya. AKP / REQ / DJE - 006
Keg. : Duplikasi Jembatan Entikong
2. Status Peralatan. AKP / REQ / DJE - 007.a

3. Status Bahan Mentah. No. ......................................................


No.Dok.Gbr : ___________
4. Status Bahan Olahan. No. ......................................................
Tgl. Dok.Gbr : ___________
5. Status Bahan Jadi. AKP / REQ / DJE - 007.a
DIAJUKAN OLEH
6. Status Tenaga Kerja. ................................................... lembar
PENYEDIA JASA
7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA
8. Metoda Pelaksanaan. No. ......................................................

9. Jadwal Pelaksanaan. ................................................... hari

10.Metoda Pengendalian Lalu-lintas. No. ......................................................

11.Perlengkapan antisipasi Cuaca. ................................................... lembar


CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 007.a TGL : 18 August JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
7.6 (19) a Tiang Bor Beton, diameter 800 mm (non casing) M1 99.80
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG
(Pengecoran Tiang Bor
Beton dia 800mm dengan mutu beton Fc'30MPa)
Abutmen 1 (A1)

LAMPIRAN PENDUKUNG

TRIAL MIX BATCHING PLANT

ITEM SAT QUANTITY KET

Peralatan :

Batching plant Set 1.00

slump test tools Set 1.00

silinder Buah 6.00

Material :

Semen Kg 554.05

pasir Kg 646.38

Batu 1-1 Kg 403.99

Batu 1-2 Kg 565.58

Air Liter 205.00

Additive Liter 1.30

PERALATAN UNTUK PELAKSANAAN PENGEBORAN - PENGECORAN

ITEM SAT QUANTITY KET

Excavator Set 2.00

Bore Pile Machine Set 1.00

Mixer Truck Set 3.00

Water Pump Machine Set 3.00


DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 008 TGL : 18 August JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
8.4.(5) Patok Pengarah Buah 60.00
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Berkas Pekerjaan sebelumnya. AKP / REQ / DJE - 007
Keg. : Duplikasi Jembatan Entikong
2. Status Peralatan. ................................................... lembar

3. Status Bahan Mentah. No. ......................................................


No.Dok.Gbr : ___________
4. Status Bahan Olahan. No. ......................................................
Tgl. Dok.Gbr : ___________
5. Status Bahan Jadi.
DIAJUKAN OLEH
6. Status Tenaga Kerja. ................................................... lembar
PENYEDIA JASA
7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA
8. Metoda Pelaksanaan. No. ......................................................

9. Jadwal Pelaksanaan. ................................................... hari

10.Metoda Pengendalian Lalu-lintas. No. ......................................................

11.Perlengkapan antisipasi Cuaca. ................................................... lembar


CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 009 TGL : 18 August JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
7.3 (3) Baja Tulangan U 32 Ulir Kg 3,735.34
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG
(Plat Deck)

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Berkas Pekerjaan sebelumnya. AKP / REQ / DJE - 008
Keg. : Duplikasi Jembatan Entikong
2. Status Peralatan. ................................................... lembar

3. Status Bahan Mentah. No. ......................................................


No.Dok.Gbr : ___________
4. Status Bahan Olahan. No. ......................................................
Tgl. Dok.Gbr : ___________
5. Status Bahan Jadi.
DIAJUKAN OLEH
6. Status Tenaga Kerja. ................................................... lembar
PENYEDIA JASA
7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA
8. Metoda Pelaksanaan. No. ......................................................

9. Jadwal Pelaksanaan. ................................................... hari

10.Metoda Pengendalian Lalu-lintas. No. ......................................................

11.Perlengkapan antisipasi Cuaca. ................................................... lembar


CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 0010 TGL : 22 August JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
7.1 (10) Beton mutu rendah fc’10 Mpa M3 33.12
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG
Lantai Kerja Abutmen 2 (A2)
ABUTMEN 2 (A2)

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Berkas Pekerjaan sebelumnya. AKP / REQ / DJE - 009
Keg. : Duplikasi Jembatan Entikong
2. Status Peralatan. AKP / REQ / DJE - 007.a

3. Status Bahan Mentah. No. ......................................................


No.Dok.Gbr : ___________
4. Status Bahan Olahan. No. ......................................................
Tgl. Dok.Gbr : ___________
5. Status Bahan Jadi. AKP / REQ / DJE - 007.a
DIAJUKAN OLEH
6. Status Tenaga Kerja. ................................................... lembar
PENYEDIA JASA
7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA
8. Metoda Pelaksanaan. No. ......................................................

9. Jadwal Pelaksanaan. ................................................... hari

10.Metoda Pengendalian Lalu-lintas. No. ......................................................

11.Perlengkapan antisipasi Cuaca. ................................................... lembar


CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 011 TGL : 25 August JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
7.6 (19) a Tiang Bor Beton, diameter 800 mm (non casing) M1 150.00
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

Pengeboran dan Pemasangan Casing, Pembesian Abutmen 2 (A2)

dan Pengecoran Isian Bore Pile

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Berkas Pekerjaan sebelumnya. AKP / REQ / DJE - 0010
Keg. : Duplikasi Jembatan Entikong
2. Status Peralatan. AKP / REQ / DJE - 007.a

3. Status Bahan Mentah. No. ......................................................


No.Dok.Gbr : ___________
4. Status Bahan Olahan. No. ......................................................
Tgl. Dok.Gbr : ___________
5. Status Bahan Jadi. No. ......................................................
DIAJUKAN OLEH
6. Status Tenaga Kerja. ................................................... lembar
PENYEDIA JASA 7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA
8. Metoda Pelaksanaan. No. ......................................................

9. Jadwal Pelaksanaan. ................................................... hari

10.Metoda Pengendalian Lalu-lintas. No. ......................................................

11.Perlengkapan antisipasi Cuaca. ................................................... lembar


CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 012 TGL : 03 Sep 2018 JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
7.1 (7) a Opnam Pembesian Abutmen 1 (A1) Kg 12,266.38
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

Abutmen 1 (A1)

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Berkas Pekerjaan sebelumnya. AKP / REQ / DJE - 011
Keg. : Duplikasi Jembatan Entikong
2. Status Peralatan.

3. Status Bahan Mentah. No. ......................................................


No.Dok.Gbr : ___________
4. Status Bahan Olahan. No. ......................................................
Tgl. Dok.Gbr : ___________
5. Status Bahan Jadi. No. ......................................................
DIAJUKAN OLEH
6. Status Tenaga Kerja. ................................................... lembar
PENYEDIA JASA 7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA
8. Metoda Pelaksanaan. No. ......................................................

9. Jadwal Pelaksanaan. ................................................... hari

10.Metoda Pengendalian Lalu-lintas. No. ......................................................

11.Perlengkapan antisipasi Cuaca. ................................................... lembar


CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 013 TGL : 03 Sep 2018 JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
7.1 (7) a Bekisting Abutmen 1 (A1) KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

Abutmen 1 (A1)

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Berkas Pekerjaan sebelumnya. AKP / REQ / DJE - 012
Keg. : Duplikasi Jembatan Entikong
2. Status Peralatan.

3. Status Bahan Mentah. No. ......................................................


No.Dok.Gbr : ___________
4. Status Bahan Olahan. No. ......................................................
Tgl. Dok.Gbr : ___________
5. Status Bahan Jadi. No. ......................................................
DIAJUKAN OLEH
6. Status Tenaga Kerja. ................................................... lembar
PENYEDIA JASA 7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA
8. Metoda Pelaksanaan. No. ......................................................

9. Jadwal Pelaksanaan. ................................................... hari

10.Metoda Pengendalian Lalu-lintas. No. ......................................................

11.Perlengkapan antisipasi Cuaca. ................................................... lembar


CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 014 TGL : 22 August JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
7.1 (10) Beton mutu rendah fc’10 Mpa M3 16.56
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG
Lantai Kerja Abutmen 2 (A2)
ABUTMEN 2 (A2)

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Berkas Pekerjaan sebelumnya. AKP / REQ / DJE - 013
Keg. : Duplikasi Jembatan Entikong
2. Status Peralatan. AKP / REQ / DJE - 007.a

3. Status Bahan Mentah. No. ......................................................


No.Dok.Gbr : ___________
4. Status Bahan Olahan. No. ......................................................
Tgl. Dok.Gbr : ___________
5. Status Bahan Jadi. AKP / REQ / DJE - 007.a
DIAJUKAN OLEH
6. Status Tenaga Kerja. ................................................... lembar
PENYEDIA JASA
7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA
8. Metoda Pelaksanaan. No. ......................................................

9. Jadwal Pelaksanaan. ................................................... hari

10.Metoda Pengendalian Lalu-lintas. No. ......................................................

11.Perlengkapan antisipasi Cuaca. ................................................... lembar


CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 015 TGL : 08 September 2018 JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
7.3 (3) Baja Tulangan U 32 Ulir Kg 12,347.80
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

Abutmen 2 (A2)

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Berkas Pekerjaan sebelumnya. AKP / REQ / DJE - 014
Keg. : Duplikasi Jembatan Entikong
2. Status Peralatan. ................................................... lembar

3. Status Bahan Mentah. No. ......................................................


No.Dok.Gbr : ___________
4. Status Bahan Olahan. No. ......................................................
Tgl. Dok.Gbr : ___________
5. Status Bahan Jadi. No. ......................................................
DIAJUKAN OLEH
6. Status Tenaga Kerja. ................................................... lembar
PENYEDIA JASA 7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA
8. Metoda Pelaksanaan. No. ......................................................

9. Jadwal Pelaksanaan. ................................................... hari

10.Metoda Pengendalian Lalu-lintas. No. ......................................................

11.Perlengkapan antisipasi Cuaca. ................................................... lembar


CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 015 TGL : 10 September 2018 JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
7.1 (5) a Beton mutu sedang fc’30 Mpa M3 122.043
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

Abutmen 1 (A1)

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Berkas Pekerjaan sebelumnya. AKP / REQ / DJE - 014
Keg. : Duplikasi Jembatan Entikong
2. Status Peralatan. AKP / REQ / DJE - 007.a

3. Status Bahan Mentah. No. ......................................................


No.Dok.Gbr : ___________
4. Status Bahan Olahan. No. ......................................................
Tgl. Dok.Gbr : ___________
5. Status Bahan Jadi. No. ......................................................
DIAJUKAN OLEH
6. Status Tenaga Kerja. ................................................... lembar
PENYEDIA JASA 7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA
8. Metoda Pelaksanaan. No. ......................................................

9. Jadwal Pelaksanaan. ................................................... hari

10.Metoda Pengendalian Lalu-lintas. No. ......................................................

11.Perlengkapan antisipasi Cuaca. ................................................... lembar


CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 012 - A2 TGL : 16 Sep 2018 JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
7.1 (7) a Opnam Pembesian Abutment 2 (A2) Kg 14,070.764
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

Abutment 2 (A2)

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Berkas Pekerjaan sebelumnya. AKP / REQ / DJE - 012
Keg. : Duplikasi Jembatan Entikong
2. Status Peralatan.

3. Status Bahan Mentah. No. ......................................................


No.Dok.Gbr : ___________
4. Status Bahan Olahan. No. ......................................................
Tgl. Dok.Gbr : ___________
5. Status Bahan Jadi. No. ......................................................
DIAJUKAN OLEH
6. Status Tenaga Kerja. ................................................... lembar
PENYEDIA JASA 7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA
8. Metoda Pelaksanaan. No. ......................................................

9. Jadwal Pelaksanaan. ................................................... hari

10.Metoda Pengendalian Lalu-lintas. No. ......................................................

11.Perlengkapan antisipasi Cuaca. ................................................... lembar


CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 016 TGL : 17 September 2018 JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
7.1 (5) a Beton mutu sedang fc’30 Mpa M3 129.674
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

Abutment 2 (A2)

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Berkas Pekerjaan sebelumnya. AKP / REQ / DJE - 015
Keg. : Duplikasi Jembatan Entikong
2. Status Peralatan. AKP / REQ / DJE - 007.a

3. Status Bahan Mentah. No. ......................................................


No.Dok.Gbr : ___________
4. Status Bahan Olahan. No. ......................................................
Tgl. Dok.Gbr : ___________
5. Status Bahan Jadi. No. ......................................................
DIAJUKAN OLEH
6. Status Tenaga Kerja. ................................................... lembar
PENYEDIA JASA 7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA
8. Metoda Pelaksanaan. No. ......................................................

9. Jadwal Pelaksanaan. ................................................... hari

10.Metoda Pengendalian Lalu-lintas. No. ......................................................

11.Perlengkapan antisipasi Cuaca. ................................................... lembar


CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 016 - P2 TGL : 05 Oct 2018 JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
7.3 (3) Baja Tulangan U 32 Ulir Kg 14,070.764
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

Opnam Pembesian Pilar 2 (P2) Pilar 2 (P2)

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Berkas Pekerjaan sebelumnya. AKP / REQ / DJE - 016
Keg. : Duplikasi Jembatan Entikong
2. Status Peralatan.

3. Status Bahan Mentah. No. ......................................................


No.Dok.Gbr : ___________
4. Status Bahan Olahan. No. ......................................................
Tgl. Dok.Gbr : ___________
5. Status Bahan Jadi. No. ......................................................
DIAJUKAN OLEH
6. Status Tenaga Kerja. ................................................... lembar
PENYEDIA JASA 7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA
8. Metoda Pelaksanaan. No. ......................................................

9. Jadwal Pelaksanaan. ................................................... hari

10.Metoda Pengendalian Lalu-lintas. No. ......................................................

11.Perlengkapan antisipasi Cuaca. ................................................... lembar


CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 017 TGL : 05 October 2018 JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
7.1 (5) a Beton mutu sedang fc’30 MPa (Abutment dan M3 85.600
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG
Pilar)
Pilar 2 (P2)
(Pilecap Pilar 2 (P2)

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Berkas Pekerjaan sebelumnya. AKP / REQ / DJE - 016
Keg. : Duplikasi Jembatan Entikong
2. Status Peralatan. AKP / REQ / DJE - 007.a

3. Status Bahan Mentah. No. ......................................................


No.Dok.Gbr : ___________
4. Status Bahan Olahan. No. ......................................................
Tgl. Dok.Gbr : ___________
5. Status Bahan Jadi. No. ......................................................
DIAJUKAN OLEH
6. Status Tenaga Kerja. ................................................... lembar
PENYEDIA JASA 7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA
8. Metoda Pelaksanaan. No. ......................................................

9. Jadwal Pelaksanaan. ................................................... hari

10.Metoda Pengendalian Lalu-lintas. No. ......................................................

11.Perlengkapan antisipasi Cuaca. ................................................... lembar


CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 017-CSL TGL : 05 October 2018 JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
7.6 (27) a Pengujian Crosshole sonic logging (CSL) pada Bh 4.000
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG
Tiang bor beton
Pilar 2 (P2)
Pilar 2 (P2)

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Berkas Pekerjaan sebelumnya. AKP / REQ / DJE - 016 - P2
Keg. : Duplikasi Jembatan Entikong
2. Status Peralatan.

3. Status Bahan Mentah. No. ......................................................


No.Dok.Gbr : ___________
4. Status Bahan Olahan. No. ......................................................
Tgl. Dok.Gbr : ___________
5. Status Bahan Jadi. No. ......................................................
DIAJUKAN OLEH
6. Status Tenaga Kerja. ................................................... lembar
PENYEDIA JASA 7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA
8. Metoda Pelaksanaan. No. ......................................................

9. Jadwal Pelaksanaan. ................................................... hari

10.Metoda Pengendalian Lalu-lintas. No. ......................................................

11.Perlengkapan antisipasi Cuaca. ................................................... lembar


CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 018 TGL : 13 October 2018 JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
7.1 (5) a Beton mutu sedang fc’30 MPa (Abutment dan M3 172.580
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG
Pilar)
Pilar 2 (P2)
Pilar 2 (P2)

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Berkas Pekerjaan sebelumnya. AKP / REQ / DJE - 017
Keg. : Duplikasi Jembatan Entikong
2. Status Peralatan. AKP / REQ / DJE - 007.a

3. Status Bahan Mentah. No. ......................................................


No.Dok.Gbr : ___________
4. Status Bahan Olahan. No. ......................................................
Tgl. Dok.Gbr : ___________
5. Status Bahan Jadi. No. ......................................................
DIAJUKAN OLEH
6. Status Tenaga Kerja. ................................................... lembar
PENYEDIA JASA 7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA
8. Metoda Pelaksanaan. No. ......................................................

9. Jadwal Pelaksanaan. ................................................... hari

10.Metoda Pengendalian Lalu-lintas. No. ......................................................

11.Perlengkapan antisipasi Cuaca. ................................................... lembar


CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 019 TGL : 13 October JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
7.6 (19) b Tiang Bor Beton, diameter 800 mm (dengan casing) M1 144.00
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

Pilar 2 (P2)

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Berkas Pekerjaan sebelumnya. AKP / REQ / DJE - 018
Keg. : Duplikasi Jembatan Entikong
2. Status Peralatan. AKP / REQ / DJE - 007.a

3. Status Bahan Mentah. No. ......................................................


No.Dok.Gbr : ___________
4. Status Bahan Olahan. No. ......................................................
Tgl. Dok.Gbr : ___________
5. Status Bahan Jadi. No. ......................................................
DIAJUKAN OLEH
6. Status Tenaga Kerja. ................................................... lembar
PENYEDIA JASA 7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA
8. Metoda Pelaksanaan. No. ......................................................

9. Jadwal Pelaksanaan. ................................................... hari

10.Metoda Pengendalian Lalu-lintas. No. ......................................................

11.Perlengkapan antisipasi Cuaca. ................................................... lembar


CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :

DIREKSI PEKERJAAN

………………………..

Kepala Pengawas
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XI
SATUAN KERJA PARALEL PERBATASAN NANGA BADAU - ENTIKONG - ARUK - TEMAJOK PROVINSI KALBAR
PPK PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PEKERJAAN : PAKET PEMBANGUNAN JEMBATAN BTS. KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG

PENYEDIA JASA : PT. DUTA MAS INDAH NO.KONTRAK : 280/PKS/Bb20.8.2/2020

PENGAJUAN MEMULAI PEKERJAAN ( REQUEST ) NO : AKP / REQ / DJE - 020 TGL : 20 October 2018 JAM : 08.00

NO. MATA
JENIS PEKERJAAN SATUAN PERKIRAAN KUANTITAS LOKASI
PEMBAYARAN
7.1 (5) a Beton mutu sedang fc’30 MPa (Abutment dan M3 59.020
KEC. SIDING/SELUAS - BTS. KEC. SEKAYAN/ENTIKONG
Pilar)
Pilar 2 (P2)
Pilar 2 (P2)

HASIL PEMERIKSAAN
RUJUKAN GAMBAR KERJA YANG
DATA PENDUKUNG URAIAN

AWC
ACC
DILAMPIRKAN

NA
PARAF

SHOP DRAWING / AS BUILT DRAWING


1. Berkas Pekerjaan sebelumnya. AKP / REQ / DJE - 019
Keg. : Duplikasi Jembatan Entikong
2. Status Peralatan. AKP / REQ / DJE - 007.a

3. Status Bahan Mentah. No. ......................................................


No.Dok.Gbr : ___________
4. Status Bahan Olahan. No. ......................................................
Tgl. Dok.Gbr : ___________
5. Status Bahan Jadi. No. ......................................................
DIAJUKAN OLEH
6. Status Tenaga Kerja. ................................................... lembar
PENYEDIA JASA 7. Kondisi / Kesiapan Lapangan. ................................................... lembar
PT.ALAM KAPUAS PERSADA
8. Metoda Pelaksanaan. No. ......................................................

9. Jadwal Pelaksanaan. ................................................... hari

10.Metoda Pengendalian Lalu-lintas. No. ......................................................

11.Perlengkapan antisipasi Cuaca. ................................................... lembar


CORNELIS SEMBIRING

Bridge Engineer

DIPERIKSA OLEH CATATAN / REKOMENDASI PEMERIKSAAN :

KONSULTAN PENGAWAS

PT. BINA KARYA (persero) Tbk,

PT. ASTAKON DUTASARANA,

DIMENSI, PT. GLOBAL PROSFEK SYNERGY, JO

SUWOKO

Inspector Engineer

DISETUJUI CATATAN / REKOMENDASI PERSETUJUAN :