REKAPITULASI BIAYA PEKERJAAN LONGSORAN PADA LOKASI JEMBATAN SUBANG

No BIAYA MATERIAL BIAYA PERALATAN KETERANGAN

1 415,651,488.00 238,037,200.00

Total 415,651,488.00 238,037,200.00


JUMLAH HARGA BIAYA MATERIAL + ( Enam Ratus Lima Puluh Tiga Juta Enam Ratus Delapan Puluh
653,688,688.00 Delapan Ribu Enam Ratus Delapan puluh Delapan Rupiah )
BIAYA PERALATAN

Sejiram :

Dibuat Oleh : Di Ketahui Oleh :


Penyedia Jasa
CV. Kapuas Membangun
Wiwin Haryanto, S.ST ( ............................ )

Gatot Eko Putra Dedi Cahyadi ( ............................ )


General Superintendent
No. 5-Jan-20 6-Jan-20 7-Jan-20 8-Jan-20 9-Jan-20 10-Jan-20 12-Jan-20 13-Jan-20
DT. 10 16 20 23 18 14 7 0 26
DT. 32 9 14 22 8 41 19 14 20
DT. 36 13 12 23 20 25 15 17 6
DT. 50 14 18 7 16 13 7 13 14
DT. 55 14 17 19 10 9 7 11 8
DT. 59 17 18 16 6 12 8 11 14
DT. 62 16 18 8 7 16 18 0 0
DT. 65 13 11 0 1 0 0 0 11

DT. 66 14 19 7 17 14 8 0 0
DT. 68 29 18 0 0 0 1 0 14
DT. 71 20 15 12 16 12 7 0 9
DT. 75 17 20 26 11 29 14 10 12
DT. 77 19 21 27 20 17 7 0 14
DT. 78 10 7 22 7 0 1 0 11
Jumlah 221 228 212 157 202 119 76 159
Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Jumlah Retase Koefisien Padat Harga / m3 Jumlah Harga


No Tanggal Ket.
( M3 ) ( M3 ) ( Rp ) ( Rp )
1 5-Jan-20 736 0.85 625.60 100,000.00 62,560,000.00
2 6-Jan-20 1024 0.85 870.40 100,000.00 87,040,000.00
3 7-Jan-20 992 0.85 843.20 100,000.00 84,320,000.00
4 8-Jan-20 700 0.85 595.00 100,000.00 59,500,000.00
5 9-Jan-20 672 0.85 571.20 100,000.00 57,120,000.00
6 10-Jan-20 392 0.85 333.20 100,000.00 33,320,000.00
7 12-Jan-20 404 0.85 343.40 100,000.00 34,340,000.00
8 13-Jan-20 576 0.85 489.60 100,000.00 48,960,000.00

JUMLAH HARGA 5,496.00 467,160,000.00

Sejiram :

Dibuat Oleh : Diperiksa Oleh :


Penyedia Jasa Pengawas Lapangan
CV. Kapuas Membangun

Gatot Eko Putra Erjan


General Superintendent NIP. 19681106 200701 1 024

Di Ketahui Oleh :

- Wiwin Haryanto, S.ST ( ............................ )

- Dedi Cahyadi ( ............................ )


DATA PENDUKUNG KUANTITAS PEKERJAAN

Daftar : Pemakaian Peralatan


Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lama Pemakaian Harga


Jumlah Harga
No Jenis Peralatan Alat Jam Keterangan
( Jam ) ( Rp ) ( Rp )
1 Excavator 1 101 850,000.00 85,850,000 Per jam
2 Excavator 2 80 850,000.00 68,000,000 Per jam
3 Vibratory Roller 72 480,000.00 34,560,000 Per jam
4 Dump Truck 10 49 73,850.00 3,618,650 Per jam
5 Dump Truck 32 56 73,850.00 4,135,600 Per jam
6 Dump Truck 36 56 73,850.00 4,135,600 Per jam
7 Dump Truck 50 56 73,850.00 4,135,600 Per jam
8 Dump Truck 55 56 73,850.00 4,135,600 Per jam
9 Dump Truck 59 56 73,850.00 4,135,600 Per jam
10 Dump Truck 62 42 73,850.00 3,101,700 Per jam
11 Dump Truck 65 28 73,850.00 2,067,800 Per jam
12 Dump Truck 66 42 73,850.00 3,101,700 Per jam
13 Dump Truck 68 28 73,850.00 2,067,800 Per jam
14 Dump Truck 71 49 73,850.00 3,618,650 Per jam
15 Dump Truck 75 56 73,850.00 4,135,600 Per jam
16 Dump Truck 77 49 73,850.00 3,618,650 Per jam
17 Dump Truck 78 49 73,850.00 3,618,650 Per jam

JUMLAH HARGA 238,037,200.00

Sejiram :

Dibuat Oleh : Diperiksa Oleh :


Penyedia Jasa Pengawas Lapangan
CV. Kapuas Membangun

Gatot Eko Putra Erjan


General Superintendent NIP. 19681106 200701 1 024
REKAPITULASI DATA PENDUKUNG KUANTITAS PEKERJAAN

Daftar : Pemakaian Peralatan


Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Volume Jumlah Harga


No Jenis Peralatan Keterangan
( Unit ) ( Rp )
1 Excavator 2.00 153,850,000.00
2 Vibratory Roller 1.00 34,560,000.00
3 Dump Truck 13.00 49,627,200.00

JUMLAH HARGA 238,037,200.00

Sejiram :

Dibuat Oleh : Diperiksa Oleh :


Penyedia Jasa Pengawas Lapangan
CV. Kapuas Membangun

Gatot Eko Putra Erjan


General Superintendent NIP. 19681106 200701 1 024

Di Ketahui Oleh :

- Wiwin Haryanto, S.ST ( ............................ )

- Dedi Cahyadi ( ............................ )


PEMERINTAH PROVINSI KALIMANTAN BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG BINA MARGA
Jln. A. Yani, Telpon/Faximile 0561-734339 E-Mail : binamarga_kalbar@yahoo.co.id
PONTIANAK - 78125
Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Jumlah Retase Jumlah / Retase Koefisien Padat Harga / m3 Jumlah Harga


No Tanggal Ket.
( Rit ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
1 5-Jan-20 736 4.00 0.80 588.80 100,000.00 58,880,000.00
2 6-Jan-20 1024 4.00 0.80 819.20 100,000.00 81,920,000.00
3 7-Jan-20 992 4.00 0.80 793.60 100,000.00 79,360,000.00
4 8-Jan-20 700 4.00 0.80 560.00 100,000.00 56,000,000.00
5 9-Jan-20 672 4.00 0.80 537.60 100,000.00 53,760,000.00
6 10-Jan-20 392 4.00 0.80 313.60 100,000.00 31,360,000.00
7 12-Jan-20 404 4.00 0.80 323.20 100,000.00 32,320,000.00
8 13-Jan-20 576 4.00 0.80 460.80 100,000.00 46,080,000.00

JUMLAH HARGA 5,496.00 439,680,000.00

Sejiram :

Dibuat Oleh : Diperiksa Oleh :


Penyedia Jasa Pengawas Lapangan
CV. Kapuas Membangun

Gatot Eko Putra Erjan


General Superintendent NIP. 19681106 200701 1 024

Di Ketahui Oleh :

- Wiwin Haryanto, S.ST ( ............................ )

- Dedi Cahyadi ( ............................ )


PEMERINTAH PROVINSI KALIMANTAN BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG BINA MARGA
Jln. A. Yani, Telpon/Faximile 0561-734339 E-Mail : binamarga_kalbar@yahoo.co.id
PONTIANAK - 78125

REKAPITULASI DATA PENDUKUNG KUANTITAS PEKERJAAN


Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Jumlah Jumlah / Volume Koefisien


Nama / Nomor Padat Harga / m3 Jumlah Harga
No Retase Retase Gembur Nilai Gembur Ket.
Alat
( Rit ) ( M3 ) ( M3 ) Rata2 ( M3 ) ( Rp ) ( Rp )
1 Dump Truck 10 124 4.00 496.00 0.80 396.80 94,535.00 37,511,488.00
2 Dump Truck 32 147 4.00 588.00 0.80 470.40 94,535.00 44,469,264.00
3 Dump Truck 36 131 4.00 524.00 0.80 419.20 94,535.00 39,629,072.00
4 Dump Truck 50 102 4.00 408.00 0.80 326.40 94,535.00 30,856,224.00
5 Dump Truck 55 95 4.00 380.00 0.80 304.00 94,535.00 28,738,640.00
6 Dump Truck 59 102 4.00 408.00 0.80 326.40 94,535.00 30,856,224.00
7 Dump Truck 62 83 4.00 332.00 0.80 265.60 94,535.00 25,108,496.00
8 Dump Truck 65 36 4.00 144.00 0.80 115.20 94,535.00 10,890,432.00
9 Dump Truck 66 79 4.00 316.00 0.80 252.80 94,535.00 23,898,448.00
10 Dump Truck 68 62 4.00 248.00 0.80 198.40 94,535.00 18,755,744.00
11 Dump Truck 71 91 4.00 364.00 0.80 291.20 94,535.00 27,528,592.00
12 Dump Truck 75 139 4.00 556.00 0.80 444.80 94,535.00 42,049,168.00
13 Dump Truck 77 125 4.00 500.00 0.80 400.00 94,535.00 37,814,000.00
14 Dump Truck 78 58 4.00 232.00 0.80 185.60 94,535.00 17,545,696.00

JUMLAH HARGA 1,374.00 5,496.00 4,396.80 415,651,488.00

Sejiram :

Dibuat Oleh : Diperiksa Oleh :


Penyedia Jasa Pengawas Lapangan
CV. Kapuas Membangun

Gatot Eko Putra Erjan


General Superintendent NIP. 19681106 200701 1 024

Di Ketahui Oleh :

- Wiwin Haryanto, S.ST ( ............................ )

- Dedi Cahyadi ( ............................ )


No. 5-Jan-20 6-Jan-20 7-Jan-20 8-Jan-20 9-Jan-20 10-Jan-20 12-Jan-20 13-Jan-20
DT. 10 16 20 23 18 14 7 0 26
DT. 32 9 14 22 8 41 19 14 20
DT. 36 13 12 23 20 25 15 17 6
DT. 50 14 18 7 16 13 7 13 14
DT. 55 14 17 19 10 9 7 11 8
DT. 59 17 18 16 6 12 8 11 14
DT. 62 16 18 8 7 16 18 0 0
DT. 65 13 11 0 1 0 0 0 11
DT. 66 14 19 7 17 14 8 0 0
DT. 68 29 18 0 0 0 1 0 14
DT. 71 20 15 12 16 12 7 0 9
DT. 75 17 20 26 11 29 14 10 12
DT. 77 19 21 27 20 17 7 0 14
DT. 78 10 7 22 7 0 1 0 11
Jumlah 221 228 212 157 202 119 76 159
PEMERINTAH PROVINSI KALIMANTAN BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG BINA MARGA
Jln. A. Yani, Telpon/Faximile 0561-734339 E-Mail : binamarga_kalbar@yahoo.co.id
PONTIANAK - 78125

REKAPITULASI DATA PENDUKUNG KUANTITAS PEKERJAAN


Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Jumlah Jumlah /
Volume Koefisien Padat Harga / m3 Jumlah Harga
No Tanggal Retase Retase Ket.
( Rit ) ( M3 ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
1 5-Jan-20 221 4.00 884.00 0.80 707.20 100,000.00 70,720,000.00
2 6-Jan-20 228 4.00 912.00 0.80 729.60 100,000.00 72,960,000.00
3 7-Jan-20 212 4.00 848.00 0.80 678.40 100,000.00 67,840,000.00
4 8-Jan-20 157 4.00 628.00 0.80 502.40 100,000.00 50,240,000.00
5 9-Jan-20 202 4.00 808.00 0.80 646.40 100,000.00 64,640,000.00
6 10-Jan-20 119 4.00 476.00 0.80 380.80 100,000.00 38,080,000.00
7 12-Jan-20 76 4.00 304.00 0.80 243.20 100,000.00 24,320,000.00
8 13-Jan-20 159 4.00 636.00 0.80 508.80 100,000.00 50,880,000.00

JUMLAH HARGA 1,374.00 5,496.00 4,396.80 439,680,000.00

Sejiram :

Dibuat Oleh : Diperiksa Oleh :


Penyedia Jasa Pengawas Lapangan
CV. Kapuas Membangun

Gatot Eko Putra Erjan


General Superintendent NIP. 19681106 200701 1 024

Di Ketahui Oleh :

- Wiwin Haryanto, S.ST ( ............................ )

- Dedi Cahyadi ( ............................ )


No. 5-Jan-20 6-Jan-20 7-Jan-20 8-Jan-20 9-Jan-20 10-Jan-20 12-Jan-20 13-Jan-20
DT. 10 16 20 23 18 14 7 0 26
DT. 32 9 14 22 8 41 19 14 20
DT. 36 13 12 23 20 25 15 17 6
DT. 50 14 18 7 16 13 7 13 14
DT. 55 14 17 19 10 9 7 11 8
DT. 59 17 18 16 6 12 8 11 14
DT. 62 16 18 8 7 16 18 0 0
DT. 65 13 11 0 1 0 0 0 11
DT. 66 14 19 7 17 14 8 0 0
DT. 68 29 18 0 0 0 1 0 14
DT. 71 20 15 12 16 12 7 0 9
DT. 75 17 20 26 11 29 14 10 12
DT. 77 19 21 27 20 17 7 0 14
DT. 78 10 7 22 7 0 1 0 11
Jumlah 221 228 212 157 202 119 76 159
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 10 ( B 9198 PYW )


Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
1 5-Jan-20 T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:18:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

2 6-Jan-20 T. Tanah Biasa Kenerak 07:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:23:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:31:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:48:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:23:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:44:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:56:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:17:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:37:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:57:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:07:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

3 7-Jan-20 T. Tanah Biasa Kenerak 07:02:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:18:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:43:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:58:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:32:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:21:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:43:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:23:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:00:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:12:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 10 ( B 9198 PYW )


Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
4 8-Jan-20 T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:31:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:56:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:27:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:43:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:37:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

5 9-Jan-20 T. Tanah Biasa Kenerak 07:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:47:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:37:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:47:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:58:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

6 10-Jan-20 T. Tanah Biasa Kenerak 11:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 12:00:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 12:17:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 12:25:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 12:37:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 12:49:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

7 13-Jan-20 T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:29:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:48:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:14:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:27:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:46:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:02:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:17:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:28:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:47:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:07:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:23:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:31:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:07:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:19:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:29:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:46:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:57:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:06:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:20:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 10 ( B 9198 PYW )


Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
T. Tanah Biasa Kenerak 02:35:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:55:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 03:10:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 03:25:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

JUMLAH HARGA - 496.00 396.80 39,680,000.00

Sejiram :

Dibuat Oleh : Diperiksa Oleh :


Penyedia Jasa Pengawas Lapangan
CV. Kapuas Membangun

Gatot Eko Putra Erjan


General Superintendent NIP. 19681106 200701 1 024
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 32 ( KB 9915 FC)


Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
1 5-Jan-20 T. Tanah Biasa Kenerak 08:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

2 6-Jan-20 T. Tanah Biasa Kenerak 07:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

3 7-Jan-20 T. Tanah Biasa Kenerak 08:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:00:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:10:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:20:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:30:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:45:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:55:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:10:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:29:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:35:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

4 8-Jan-20 T. Tanah Biasa Kenerak 08:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

5 9-Jan-20 T. Tanah Biasa Kenerak 07:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:46:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 32 ( KB 9915 FC)


Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
T. Tanah Biasa Kenerak 07:51:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:52:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:09:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:31:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:41:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:48:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:57:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:16:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:37:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:47:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:51:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:16:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:31:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:49:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:57:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:06:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:37:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:57:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:09:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

6 10-Jan-20 T. Tanah Biasa Kenerak 07:18:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:29:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:46:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:21:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:26:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:41:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:01:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 12:00:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 12:10:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 12:25:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 12:38:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 12:58:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:15:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:30:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

7 12-Jan-20 T. Tanah Biasa Kenerak 07:27:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:21:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:39:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:53:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:17:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:39:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:59:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:14:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 32 ( KB 9915 FC)


Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
T. Tanah Biasa Kenerak 09:32:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:46:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:26:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:01:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

8 13-Jan-20 T. Tanah Biasa Kenerak 09:18:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:39:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:53:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:59:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:29:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:41:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:26:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:46:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:51:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:05:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:18:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:30:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:45:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:59:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 03:01:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 03:10:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

JUMLAH HARGA - 588.00 470.40 47,040,000.00

Sejiram :

Dibuat Oleh : Diperiksa Oleh :


Penyedia Jasa Pengawas Lapangan
CV. Kapuas Membangun

Gatot Eko Putra Erjan


General Superintendent NIP. 19681106 200701 1 024
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 36 ( KB 9837 FD)


Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
1 5-Jan-20 T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

2 6-Jan-20 T. Tanah Biasa Kenerak 07:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

3 7-Jan-20 T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:00:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:15:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:30:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:45:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:00:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

4 8-Jan-20 T. Tanah Biasa Kenerak 08:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 36 ( KB 9837 FD)


Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
T. Tanah Biasa Kenerak 10:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:00:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:15:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:30:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:45:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:00:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

5 9-Jan-20 T. Tanah Biasa Kenerak 07:09:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:01:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:16:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:31:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:41:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:00:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:13:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:35:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

6 10-Jan-20 T. Tanah Biasa Kenerak 07:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:21:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:06:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

7 12-Jan-20 T. Tanah Biasa Kenerak 08:01:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:16:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:31:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:47:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:01:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 36 ( KB 9837 FD)


Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
T. Tanah Biasa Kenerak 10:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:00:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:15:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:30:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

8 13-Jan-20 T. Tanah Biasa Kenerak 07:07:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:19:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:07:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:26:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:41:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

JUMLAH HARGA - 524.00 419.20 41,920,000.00

Sejiram :

Dibuat Oleh : Diperiksa Oleh :


Penyedia Jasa Pengawas Lapangan
CV. Kapuas Membangun

Gatot Eko Putra Erjan


General Superintendent NIP. 19681106 200701 1 024
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 50 ( A 9890 B )
Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
1 5-Jan-20 T. Tanah Biasa Kenerak 07:26:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:44:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:57:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:06:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:31:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:47:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:06:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:56:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:06:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:27:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:43:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:09:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:26:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

2 6-Jan-20 T. Tanah Biasa Kenerak 06:09:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 06:36:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:44:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:27:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:46:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:26:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:56:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:07:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:23:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:00:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:09:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:33:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:50:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:06:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

3 7-Jan-20 T. Tanah Biasa Kenerak 01:06:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:21:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:57:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:01:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:20:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:42:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 03:15:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

4 8-Jan-20 T. Tanah Biasa Kenerak 07:14:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:19:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:23:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:44:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:22:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:34:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:46:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:27:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:57:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:09:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:22:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:49:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

5 9-Jan-20 T. Tanah Biasa Kenerak 07:12:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:27:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:51:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 50 ( A 9890 B )
Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
T. Tanah Biasa Kenerak 09:11:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:29:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:46:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:09:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:21:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:40:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:06:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

6 10-Jan-20 T. Tanah Biasa Kenerak 11:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:06:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:31:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:46:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:04:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:30:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:47:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

7 12-Jan-20 T. Tanah Biasa Kenerak 10:06:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:41:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:06:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:27:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:47:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:02:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:21:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:37:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:46:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 03:03:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 03:20:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 03:40:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

8 13-Jan-20 T. Tanah Biasa Kenerak 08:21:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:39:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:57:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:26:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:48:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:59:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:27:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:42:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:57:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:09:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:32:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:47:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:57:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

JUMLAH HARGA - 408.00 326.40 32,640,000.00

Sejiram :

Dibuat Oleh : Diperiksa Oleh :


Penyedia Jasa Pengawas Lapangan
CV. Kapuas Membangun

Gatot Eko Putra Erjan


General Superintendent NIP. 19681106 200701 1 024
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 55 ( KB 9196 PYW )


Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
1 5-Jan-20 T. Tanah Biasa Kenerak 07:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

2 6-Jan-20 T. Tanah Biasa Kenerak 07:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

3 7-Jan-20 T. Tanah Biasa Kenerak 07:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

4 8-Jan-20 T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:32:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:48:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:58:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:32:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 55 ( KB 9196 PYW )


Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
5 9-Jan-20 T. Tanah Biasa Kenerak 07:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:47:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:22:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:33:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:42:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:58:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

6 10-Jan-20 T. Tanah Biasa Kenerak 07:18:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:28:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:44:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:52:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

7 12-Jan-20 T. Tanah Biasa Kenerak 09:36:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:02:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:16:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:36:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:01:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:21:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:46:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:07:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:21:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:50:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:09:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

8 13-Jan-20 T. Tanah Biasa Kenerak 09:02:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:31:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:48:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:01:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:19:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:36:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:21:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

JUMLAH HARGA - 380.00 304.00 30,400,000.00

Sejiram :

Dibuat Oleh : Diperiksa Oleh :


Penyedia Jasa Pengawas Lapangan
CV. Kapuas Membangun

Gatot Eko Putra Erjan


General Superintendent NIP. 19681106 200701 1 024
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 59 ( A 9188 B)
Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
1 5-Jan-20 T. Tanah Biasa Kenerak 07:32:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:56:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:11:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:27:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:52:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:13:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:37:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:49:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:02:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:47:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:09:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:31:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:56:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

2 6-Jan-20 T. Tanah Biasa Kenerak 07:42:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:19:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:39:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:48:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:07:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:26:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:49:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:02:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:57:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:20:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:41:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:05:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:26:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:47:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 03:05:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

3 7-Jan-20 T. Tanah Biasa Kenerak 07:29:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:49:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

4 8-Jan-20 T. Tanah Biasa Kenerak 08:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

5 9-Jan-20 T. Tanah Biasa Kenerak 07:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 59 ( A 9188 B)
Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
T. Tanah Biasa Kenerak 07:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

6 10-Jan-20 T. Tanah Biasa Kenerak 08:11:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

7 12-Jan-20 T. Tanah Biasa Kenerak 07:02:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:29:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:38:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

8 13-Jan-20 T. Tanah Biasa Kenerak 07:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:59:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:52:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:08:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:07:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

JUMLAH HARGA - 408.00 326.40 32,640,000.00

Sejiram :

Dibuat Oleh : Diperiksa Oleh :


Penyedia Jasa Pengawas Lapangan
CV. Kapuas Membangun

Gatot Eko Putra Erjan


General Superintendent NIP. 19681106 200701 1 024
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 62 ( A 9398 B)
Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
1 5-Jan-20 T. Tanah Biasa Kenerak 07:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:21:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:44:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:51:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:26:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:41:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:59:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:33:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:46:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:58:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:17:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:31:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:01:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

2 6-Jan-20 T. Tanah Biasa Kenerak 07:18:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:33:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:47:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:04:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:46:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:01:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:41:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:57:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:07:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:31:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:59:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:09:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:06:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:27:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:56:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:03:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

3 7-Jan-20 T. Tanah Biasa Kenerak 07:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:46:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:23:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:49:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:01:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

4 8-Jan-20 T. Tanah Biasa Kenerak 10:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:41:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:57:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:09:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:28:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:01:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:20:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

5 9-Jan-20 T. Tanah Biasa Kenerak 07:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:46:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:31:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:52:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:31:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:49:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:29:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:49:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 62 ( A 9398 B)
Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
T. Tanah Biasa Kenerak 11:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:07:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:21:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:41:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:58:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

6 10-Jan-20 T. Tanah Biasa Kenerak 08:01:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:27:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:49:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:21:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:39:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:06:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:19:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:41:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:57:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:09:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:07:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:39:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:49:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:57:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:06:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:10:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

JUMLAH HARGA - 332.00 265.60 26,560,000.00

Sejiram :

Dibuat Oleh : Diperiksa Oleh :


Penyedia Jasa Pengawas Lapangan
CV. Kapuas Membangun

Gatot Eko Putra Erjan


General Superintendent NIP. 19681106 200701 1 024
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 65 ( A 9391 B)
Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
1 5-Jan-20 T. Tanah Biasa Kenerak 07:52:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:07:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:29:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:42:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:53:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:07:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:26:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:49:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:01:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:26:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:39:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

2 6-Jan-20 T. Tanah Biasa Kenerak 07:21:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:08:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:29:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:48:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:02:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:22:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:59:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:36:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

3 8-Jan-20 T. Tanah Biasa Kenerak 07:13:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

4 13-Jan-20 T. Tanah Biasa Kenerak 08:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:29:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:49:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:02:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:24:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:28:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:07:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:28:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

JUMLAH HARGA - 144.00 115.20 11,520,000.00

Sejiram :

Dibuat Oleh : Diperiksa Oleh :


Penyedia Jasa Pengawas Lapangan
CV. Kapuas Membangun

Gatot Eko Putra Erjan


General Superintendent NIP. 19681106 200701 1 024
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 66 ( A 9401 B )
Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
1 5-Jan-20 T. Tanah Biasa Kenerak 08:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

2 6-Jan-20 T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

3 7-Jan-20 T. Tanah Biasa Kenerak 02:10:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:20:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:31:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:40:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:55:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 03:06:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 03:25:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

4 8-Jan-20 T. Tanah Biasa Kenerak 07:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 12:00:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 12:20:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

5 9-Jan-20 T. Tanah Biasa Kenerak 07:01:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 66 ( A 9401 B )
Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
T. Tanah Biasa Kenerak 07:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

6 10-Jan-20 T. Tanah Biasa Kenerak 07:01:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

JUMLAH HARGA - 316.00 252.80 25,280,000.00

Sejiram :

Dibuat Oleh : Diperiksa Oleh :


Penyedia Jasa Pengawas Lapangan
CV. Kapuas Membangun

Gatot Eko Putra Erjan


General Superintendent NIP. 19681106 200701 1 024
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 68 ( A 9397 B)
Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
1 5-Jan-20 T. Tanah Biasa Kenerak 07:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:00:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:15:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:30:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:45:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:00:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:15:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:30:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:45:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 03:00:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

2 6-Jan-20 T. Tanah Biasa Kenerak 07:02:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:47:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:18:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:31:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:57:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:13:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:33:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:53:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:56:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:11:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:27:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

3 10-Jan-20 T. Tanah Biasa Kenerak 01:20:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

4 13-Jan-20 T. Tanah Biasa Kenerak 07:01:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:23:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:09:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:07:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:21:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:39:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:06:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:29:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:49:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:07:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:26:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 68 ( A 9397 B)
Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
T. Tanah Biasa Kenerak 09:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

JUMLAH HARGA - 248.00 198.40 19,840,000.00

Sejiram :

Dibuat Oleh : Diperiksa Oleh :


Penyedia Jasa Pengawas Lapangan
CV. Kapuas Membangun

Gatot Eko Putra Erjan


General Superintendent NIP. 19681106 200701 1 024
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 71 ( A 9403 B )
Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
1 5-Jan-20 T. Tanah Biasa Kenerak 07:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:16:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:26:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:47:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:22:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:29:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:34:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 12:00:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 12:07:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:02:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:10:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:14:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:19:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:27:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:35:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

2 6-Jan-20 T. Tanah Biasa Kenerak 06:37:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:12:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:41:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:53:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:01:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:21:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:02:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

3 7-Jan-20 T. Tanah Biasa Kenerak 08:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:41:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:58:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:57:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:02:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:05:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

4 8-Jan-20 T. Tanah Biasa Kenerak 08:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:36:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:49:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:18:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:53:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:12:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:47:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:19:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 71 ( A 9403 B )
Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
T. Tanah Biasa Kenerak 01:09:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:21:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:34:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:50:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

5 9-Jan-20 T. Tanah Biasa Kenerak 07:47:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:21:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:38:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:47:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:01:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:18:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:39:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:51:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:59:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:47:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

6 10-Jan-20 T. Tanah Biasa Kenerak 11:06:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:19:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:03:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:21:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:42:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:00:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:20:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

7 13-Jan-20 T. Tanah Biasa Kenerak 07:29:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:14:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:31:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:07:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:32:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

JUMLAH HARGA - 348.00 278.40 27,840,000.00

Sejiram :

Dibuat Oleh : Diperiksa Oleh :


Penyedia Jasa Pengawas Lapangan
CV. Kapuas Membangun

Gatot Eko Putra Erjan


General Superintendent NIP. 19681106 200701 1 024
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 75 ( A 9406 B )
Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
1 5-Jan-20 T. Tanah Biasa Kenerak 07:16:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:31:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:43:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:12:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:38:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:16:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:27:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:07:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:20:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

2 6-Jan-20 T. Tanah Biasa Kenerak 06:59:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:57:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:28:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:38:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:47:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:59:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:13:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:48:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:26:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:38:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:15:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:28:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:25:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

3 7-Jan-20 T. Tanah Biasa Kenerak 07:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:51:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:12:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:53:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:02:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:21:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:33:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:05:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:21:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:36:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:51:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:03:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:21:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:34:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:45:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:59:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 03:09:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 03:17:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 75 ( A 9406 B )
Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
T. Tanah Biasa Kenerak 03:39:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

4 8-Jan-20 T. Tanah Biasa Kenerak 10:31:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:44:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:01:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 12:57:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:07:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:15:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:23:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:39:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:51:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:05:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:25:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

5 9-Jan-20 T. Tanah Biasa Kenerak 08:09:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:21:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:39:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:52:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:17:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:39:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:49:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:59:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:28:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:51:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

6 10-Jan-20 T. Tanah Biasa Kenerak 09:51:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:39:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:09:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

7 13-Jan-20 T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

8 10-Jan-20 T. Tanah Biasa Kenerak 08:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:48:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:02:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:22:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:36:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:49:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:59:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

9 12-Jan-20 T. Tanah Biasa Kenerak 08:01:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:22:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:38:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:46:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:19:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:41:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:53:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:28:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

10 13-Jan-20 T. Tanah Biasa Kenerak 09:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 75 ( A 9406 B )
Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
T. Tanah Biasa Kenerak 09:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

11 9-Jan-20 T. Tanah Biasa Kenerak 06:07:00 AM 4.00 0.80 3.20 100,000.00 320,000.00 DT. 62
T. Tanah Biasa Kenerak 06:29:00 AM 4.00 0.80 3.20 100,000.00 320,000.00 DT. 62
T. Tanah Biasa Kenerak 06:57:00 AM 4.00 0.80 3.20 100,000.00 320,000.00 DT. 62
T. Tanah Biasa Kenerak 07:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00 DT. 62
T. Tanah Biasa Kenerak 07:46:00 AM 4.00 0.80 3.20 100,000.00 320,000.00 DT. 62
T. Tanah Biasa Kenerak 08:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00 DT. 62
T. Tanah Biasa Kenerak 08:26:00 AM 4.00 0.80 3.20 100,000.00 320,000.00 DT. 62
T. Tanah Biasa Kenerak 08:47:00 AM 4.00 0.80 3.20 100,000.00 320,000.00 DT. 62
T. Tanah Biasa Kenerak 09:09:00 AM 4.00 0.80 3.20 100,000.00 320,000.00 DT. 62
T. Tanah Biasa Kenerak 09:29:00 AM 4.00 0.80 3.20 100,000.00 320,000.00 DT. 62
T. Tanah Biasa Kenerak 09:48:00 AM 4.00 0.80 3.20 100,000.00 320,000.00 DT. 62
T. Tanah Biasa Kenerak 10:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00 DT. 62
T. Tanah Biasa Kenerak 10:29:00 AM 4.00 0.80 3.20 100,000.00 320,000.00 DT. 62
T. Tanah Biasa Kenerak 10:49:00 AM 4.00 0.80 3.20 100,000.00 320,000.00 DT. 62
T. Tanah Biasa Kenerak 01:06:00 PM 4.00 0.80 3.20 100,000.00 320,000.00 DT. 62
T. Tanah Biasa Kenerak 01:26:00 PM 4.00 0.80 3.20 100,000.00 320,000.00 DT. 62
T. Tanah Biasa Kenerak 01:46:00 PM 4.00 0.80 3.20 100,000.00 320,000.00 DT. 62

JUMLAH HARGA - 556.00 444.80 44,480,000.00

Sejiram :

Dibuat Oleh : Diperiksa Oleh :


Penyedia Jasa Pengawas Lapangan
CV. Kapuas Membangun

Gatot Eko Putra Erjan


General Superintendent NIP. 19681106 200701 1 024
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 77 ( A 9385 B )
Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
1 5-Jan-20 T. Tanah Biasa Kenerak 10:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:21:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:33:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:42:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:01:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:22:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:00:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:15:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:23:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:40:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:51:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:57:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:03:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:12:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:21:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:35:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:50:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

2 6-Jan-20 T. Tanah Biasa Kenerak 06:58:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:13:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:21:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:32:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:41:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:13:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:23:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:29:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:42:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:02:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:22:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:39:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:59:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:13:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:01:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

3 7-Jan-20 T. Tanah Biasa Kenerak 07:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:16:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:51:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:59:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:04:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:12:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:23:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:32:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:42:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:53:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:59:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:18:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:01:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:09:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 77 ( A 9385 B )
Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
T. Tanah Biasa Kenerak 11:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:47:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 12:05:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:10:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:19:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

4 8-Jan-20 T. Tanah Biasa Kenerak 07:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:52:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:59:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:06:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:37:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:59:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:44:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:59:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:13:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:29:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:39:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:47:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:58:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:32:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

5 9-Jan-20 T. Tanah Biasa Kenerak 07:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:39:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:51:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:21:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:33:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:43:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:53:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:19:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:31:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:53:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:54:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

6 10-Jan-20 T. Tanah Biasa Kenerak 07:39:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:52:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:20:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:33:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:52:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:10:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

7 13-Jan-20 T. Tanah Biasa Kenerak 07:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:07:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:22:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:01:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:22:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:51:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:07:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:36:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 77 ( A 9385 B )
Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
T. Tanah Biasa Kenerak 11:19:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:49:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

JUMLAH HARGA - 500.00 400.00 40,000,000.00

Sejiram :

Dibuat Oleh : Diperiksa Oleh :


Penyedia Jasa Pengawas Lapangan
CV. Kapuas Membangun

Gatot Eko Putra Erjan


General Superintendent NIP. 19681106 200701 1 024
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 78 ( A 9395 B)
Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
1 5-Jan-20 T. Tanah Biasa Kenerak 07:35:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:46:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:06:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:21:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:36:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:52:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:07:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:17:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:06:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:27:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

2 6-Jan-20 T. Tanah Biasa Kenerak 06:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 06:22:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 06:49:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:07:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:17:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:03:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

3 7-Jan-20 T. Tanah Biasa Kenerak 07:31:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:50:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:21:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:40:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:55:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:06:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:22:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:46:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:07:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:21:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:36:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:49:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:01:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:29:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:40:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 01:55:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:07:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:25:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:39:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 02:55:00 PM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 03:15:00 PM 4.00 0.80 3.20 100,000.00 320,000.00

4 8-Jan-20 T. Tanah Biasa Kenerak 07:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 07:45:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:00:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:15:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

5 10-Jan-20 T. Tanah Biasa Kenerak 07:26:00 AM 4.00 0.80 3.20 100,000.00 320,000.00

6 13-Jan-20 T. Tanah Biasa Kenerak 08:30:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 08:46:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:05:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:21:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:39:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 09:59:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:06:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:29:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 10:51:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:06:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
T. Tanah Biasa Kenerak 11:25:00 AM 4.00 0.80 3.20 100,000.00 320,000.00
DATA PENDUKUNG KUANTITAS PEKERJAAN

DT. 78 ( A 9395 B)
Daftar : Retase Angkutan Timbunan Tanah
Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lokasi Jam Berngkat Volume Padat Harga / m3 Jumlah Harga


No Tanggal Jenis Material Koefisien Ket.
Quary ( Jam ) ( M3 ) ( M3 ) ( Rp ) ( Rp )
JUMLAH HARGA - 232.00 185.60 18,560,000.00

Sejiram :

Dibuat Oleh : Diperiksa Oleh :


Penyedia Jasa Pengawas Lapangan
CV. Kapuas Membangun

Gatot Eko Putra Erjan


General Superintendent NIP. 19681106 200701 1 024
Harga Alat Operator Minyak Mob + Demob Total
excavator 250,000.00 25,000.00 210,600.00 113,000.00 598,600.00

Harga / KM Jumlah Rit Total


Dumptruck 15,000 1374 20,610,000 ###

(251,400.00)

909,091
113,636
DATA PENDUKUNG KUANTITAS PEKERJAAN

Daftar : Retase Angkutan Timbunan Tanah


Untuk Pekerjaan : Perbaikan Oprit Jembatan Subang STA 21 + 108

Lebar Tinggi / Tinggi / Dalam Total


Panjang Lebar Volume
No Posisi Rata2 Dalam Rata2 Koefisien Volume KET.
(M) (M) (M) ( M3 ) ( M3 ) ( M3 ) ( M3 )
A 20.00 7.40
17.50 20.53 7.20 2,586.15 0.80 2,068.92
B 21.05 7.00
17.50 22.68 5.55 2,202.31 0.80 1,761.85
C 24.30 4.10
17.50 21.15 3.61 1,336.15 0.80 1,068.92
D 18.00 3.12

JUMLAH 63.35 6,124.61 4,899.69

DENAH LOKASI / GAMBAR SKET

Sejiram :

Dibuat Oleh : Diperiksa Oleh :


Penyedia Jasa Pengawas Lapangan
CV. Kapuas Membangun

Gatot Eko Putra Erjan


General Superintendent NIP. 19681106 200701 1 024
No. 5-Jan-20 6-Jan-20 7-Jan-20 8-Jan-20 9-Jan-20 10-Jan-20 12-Jan-20 13-Jan-20
DT. 10 16 20 23 18 14 7 0 26
DT. 32 9 14 22 8 41 19 14 20
DT. 36 13 12 23 20 25 15 17 6
DT. 50 14 18 7 16 13 7 13 14
DT. 55 14 17 19 10 9 7 11 8
DT. 59 17 18 16 6 12 8 11 14
DT. 62 16 18 8 7 16 18 0 0
DT. 65 13 11 0 1 0 0 0 11
DT. 71 20 15 12 16 12 7 0 9
DT. 75 17 20 26 11 29 14 10 12
DT. 77 19 21 27 20 17 7 0 14
DT. 78 10 7 22 7 0 1 0 11
Jumlah 178 191 205 140 188 110 76 145