244,900,000.00
4,898,000
11
330,000
juni 1
juli 31
agustus 31
REKAPITULASI RENCANA ANGGARAN BIAYA ( RAB )
KEGIATAN : REHABILITASI SEDANG/BERAT PUSKESMAS DAN JARINGANNYA
PEKERJAAN : PEKERJAAN KONSTRUKSI REHABILITASI BERAT PUSKESMAS PAKONG (DAK)
LOKASI : KECAMATAN PAKONG KAB. PAMEKASAN
TAHUN ANGGARAN : 2018
Jumlah 1,701,070,949.03
PPn ( 10% ) 170,107,094.90
Jumlah Total 1,871,178,043.94 HPS
Pembulatan 1,871,178,000.00 DSC
Terbilang : Satu Milyar Delapan Ratus Tujuh Puluh Satu Juta Seratus Tujuh Puluh Delapan
Ribu Rupiah
PRAYITNO
Direktur
2,103,600,000.00
11.04877%
Satu Milyar Delapan Ratus Tujuh Puluh Satu Juta SeRatus Tujuh Puluh Delapan Ribu Rupiah
6/22/2018
8/6/2018
700,000
8,400,000
RENCANA ANGGARAN BIAYA ( RAB )
KEGIATAN : REHABILITASI SEDANG/BERAT PUSKESMAS DAN JARINGANNYA
PEKERJAAN : PEKERJAAN KONSTRUKSI REHABILITASI BERAT PUSKESMAS PAKONG (DAK)
LOKASI : KECAMATAN PAKONG KAB. PAMEKASAN
TAHUN ANGGARAN : 2018
I. PEKERJAAN PERSIAPAN
JUMLAH V 225,844,008.19
VI PEKERJAAN PINTU, JENDELA DAN PENGGANTUNG
Seluruh item pekerjaan pintu, jendela dan penggantung
adalah dalam posisi terpasang dengan baik dan sempurna
JUMLAH 1,701,070,949.03
PPN 10% 170,107,094.90
JUMLAH TOTAL 1,871,178,043.94
PEMBULATAN 1,871,178,000.00
KETERANGAN ZONA
Bahan
Kayu Tahun 0.0120 m³ 1,520,000.00 18,240.00
Portland Cement (PC) 5.0000 kg 1,100.00 5,500.00
Pasir Beton (PB) 0.0050 m³ 212,000.00 1,060.00
Koral Beton (maksimum 30 mm) 0.0090 m³ 212,000.00 1,908.00
Kayu 5/7 0.0720 m³ 1,520,000.00 109,440.00
Paku Biasa 2" - 5" 0.0600 kg 12,380.00 742.80
Residu 0.4000 lt -
Jumlah (2) 136,890.80
Jumlah (1) + (2) 185,890.80
Overhead & profit (10%x Jumlah 1+2) 18,589.08
Harga Satuan Pekerjaan 204,479.88
A.002 Mengerjakan 1 m² pengukuran dan pemasangan bouwplank
Tenaga
Pekerja 0.1000 OH 70,000.00 7,000.00
Tukang Kayu 0.1000 OH 85,000.00 8,500.00
Kepala Tukang 0.0100 OH 95,000.00 950.00
Mandor 0.0050 OH 105,000.00 525.00
Jumlah (1) 16,975.00
Bahan
Kayu 5/7 0.0120 m³ 1,520,000.00 18,240.00
Paku Biasa 2" - 5" 0.0200 kg 12,380.00 247.60
Kayu Papan (3 x 20 x 400) 0.0070 m³ 1,520,000.00 10,640.00
Jumlah (2) 29,127.60
Jumlah (1) + (2) 46,102.60
Overhead & profit (10%x Jumlah 1+2) 4,610.26
Harga Satuan Pekerjaan 50,712.86
B. PEKERJAAN TANAH SNI
B.001 Menggali 1 m³ tanah biasa sedalam 1 meter
Tenaga
Pekerja 0.7500 OH 70,000.00 52,500.00
Mandor 0.0250 OH 105,000.00 2,625.00
Jumlah 55,125.00
Overhead & profit (10%x Jumlah 1+2) 5,512.50
Harga Satuan Pekerjaan 60,637.50
B.004 Mengurug kembali 1 m³ galian dihitung dari 1/3 x dari koefisien pekerjaan galian
Tenaga
Pekerja 0.5000 OH 70,000.00 35,000.00
Mandor 0.0500 OH 105,000.00 5,250.00
Jumlah 40,250.00
Overhead & profit (10%x Jumlah 1+2) 4,025.00
Harga Satuan Pekerjaan 44,275.00
B.006 Mengurug 1 m³ pasir urug
Tenaga
Pekerja 0.3000 OH 70,000.00 21,000.00
Mandor 0.0100 OH 105,000.00 1,050.00
Jumlah (1) 22,050.00
Bahan
Pasir Urug 1.2000 m³ 72,000.00 86,400.00
Jumlah (2) 86,400.00
Jumlah (1) + (2) 108,450.00
Overhead & profit (10%x Jumlah 1+2) 10,845.00
Harga Satuan Pekerjaan 119,295.00
B.007 Mengurug 1 m³ Tanah urug
Tenaga
Pekerja 0.3000 OH 70,000.00 21,000.00
Mandor 0.0100 OH 105,000.00 1,050.00
Jumlah (1) 22,050.00
Bahan
Tanah Urug 1.2000 m³ 56,000.00 67,200.00
Jumlah (2) 67,200.00
Jumlah (1) + (2) 89,250.00
Overhead & profit (10%x Jumlah 1+2) 8,925.00
Harga Satuan Pekerjaan 98,175.00
C. PEKERJAAN PONDASI SNI 03-2836-2002
C.001 Memasang 1 m³ pondasi gunung; campuran 1 PC : 8 Ph
Tenaga
Pekerja 1.5000 OH 70,000.00 105,000.00
Tukang Batu 0.6000 OH 85,000.00 51,000.00
Kepala Tukang 0.0600 OH 95,000.00 5,700.00
Mandor 0.0750 OH 105,000.00 7,875.00
Jumlah (1) 169,575.00
Bahan
Batu Gunung 15/20 1.2000 m³ 100,940.00 121,128.00
Portland Cement (PC) 91.0000 kg 1,100.00 100,100.00
Pasir Hitam 0.5840 m³ 212,000.00 123,808.00
Jumlah (2) 345,036.00
Jumlah (1) + (2) 514,611.00
Overhead & profit (10%x Jumlah 1+2) 51,461.10
Harga Satuan Pekerjaan 566,072.10
C.003 Memasang 1 m³ batu kosong (aanstampeeng)
Tenaga
Pekerja 0.7800 OH 70,000.00 54,600.00
Tukang Batu 0.3900 OH 85,000.00 33,150.00
Kepala Tukang 0.0390 OH 95,000.00 3,705.00
Mandor 0.0390 OH 105,000.00 4,095.00
Jumlah (1) 95,550.00
Bahan
Batu Gunung 15/20 1.2000 m³ 100,940.00 121,128.00
Pasir Urug 0.4320 m³ 72,000.00 31,104.00
Jumlah (2) 152,232.00
Jumlah (1) + (2) 247,782.00
Overhead & profit (10%x Jumlah 1+2) 24,778.20
Harga Satuan Pekerjaan 272,560.20
PRAYITNO
Direktur
HARGA SATUAN
NO SPESIFIKASI SATUAN
ZONA C
1 2 3 4
1. UPAH TENAGA KERJA
1.1. UPAH TENAGA KERJA BIDANG
PEKERJAAN UMUM ZONA A-B-C
1 Pengawas hari 110,000
2 Mandor hari 105,000
3 Kepala Tukang Batu hari 95,000
4 Kepala Tukang Besi hari 95,000
5 Kepala Tukang Las hari 95,000
6 Kepala Tukang Cat hari 95,000
7 Kepala Tukang Kayu hari 95,000
8 Kepala Tukang Listrik hari 95,000
9 Kepala Tukang Pipa hari 95,000
10 Kepala Tukang Gali Tanah hari 95,000
11 Kepala Logistik / Gudang hari 95,000
12 Kepala Penjaga hari 95,000
13 Masinis hari 85,000
14 Tukang Batu hari 85,000
15 Tukang Besi hari 85,000
16 Tukang Cat hari 85,000
17 Tukang Gali Tanah hari 85,000
18 Tukang Kayu hari 85,000
19 Tukang Las hari 85,000
20 Tukang Listrik hari 85,000
21 Tukang Pemasak Aspal hari 85,000
22 Tukang Pipa hari 85,000
23 Tukang Plitur hari 85,000
24 Juru Ukur hari 85,000
25 Juru Gambar hari 85,000
26 Operator / Supir jam 17,500
27 Pembantu Kepala Logistik hari 90,000
28 Pembantu Masinis hari 75,000
1 2 3 4
1 Keramik Dinding Ex.Roman/Asia Tile 20x40 golongan A ( warna muda ) - 12/dos dos 78,870.00
2 Keramik Dinding Ex. Roman/Asia Tile 20x25 golongan A ( warna muda ) - 20/dos dos 70,620.00
3 Keramik Dinding Ex. Roman/Asia Tile 20x20 golongan A ( warna muda ) - 25/dos dos 73,920.00
4 Stepnosing 10 x 60 cm bh 24,830.00
5 Granit Tile uk. 60x60 cm Double Loading m2 288,870.00
6 Granit Tile uk. 40x40 cm Ex.Granit Java Grey 40x40 bh 337,740.00
7 Keramik Lantai Ex. Roman/Asia uk.60x60 KW-A dos 69,000.00
8 Keramik Lantai EX. Roman/Asia 20x20 KW-A, 25/dos dos 34,250.00
9 Keramik Lantai Ex. Roman/Asia 30x30, KW-A, 11/dos dos 33,660.00
10 Keramik Lantai Ex. Roman/Asia, KW-A 40 x 40 cm dos 35,490.00
11 Keramik Lantai Ex. Super Milan atau Roman, Rectified, uk. 60x60 cm dos 68,910.00
12 Keramik Lantai Dop Garasi Ex.Grand Royal, Paris 30x30 cm (11/dos) dos 57,770.00
13 Keramik Lantai Kamar Mandi Ex.Grand Royal, Gemini 20x20 cm Blue; Cream; Green; Pink (20/dos) dos 48,690.00
14 Granit Tile 15 x 60 cm m2 121,290.00
15 Border Lantai Keramik Motif Uk. 10 x 40 m2 30,500.00
16 Lis Keramik Ex.Grand Royal Uk : 10x20 cm bh 12,380.00
17 List Dinding keramik uk.7x20 cm bh 12,800.00
18 List Pojok Keramik Kuku Macan Ulir/Motif 10 cm bh 3,300.00
19 List Pojok Keramik Kuku Macan Polos 10 cm bh 1,650.00
20 Mozaik Pebble Interlok 30x30 m² 177,450.00
21 Paving Block Straight/Bata Abu-abu 6 cm ( 1m² = 44 pcs ) m² 66,020.00
22 Paving Block Paving Blok Vibro K.250 m² 70,820.00
22 Vinyl Anti Statis Ex. Silver Knight t = 2mm m2 82,530.00
23 Rooster 20 x 20 bh 9,600.00
-
III BAHAN MENGGUNAKAN KAYU -
-
1 Kayu Bekisting m³ 1,520,000.00
2 Kayu Gelam m³ 2,400,000.00
3 Kayu Kampas m³ 5,200,000.00
4 Kayu Randu m³ 825,350.00
5 Kayu Benuas m³ 6,974,240.00
6 Kayu Jati m³ 14,400,000.00
7 Kayu Kamper m³ 4,539,440.00
8 Kayu Krueng m³ 4,655,470.00
9 Kayu Mereng m³ 5,078,700.00
10 Kayu Meranti m³ 3,200,000.00
11 Kayu Reng Meranti 2x3, P:4m batang 18,570.00
12 Kayu Reng Meranti 3x4, P:4m batang 20,220.00
13 Kayu Usuk/Kaso Meranti 4x6, P:4m batang 30,890.00
14 Kayu Usuk/Kaso Meranti 5x7, P:4m batang 41,980.00
15 List Kayu Untuk Plafon m¹ 6,450.00
16 List Kayu Untuk Daun Pintu m¹ 6,600.00
17 Papan Kayu Kamper 3x20 cm, P : 4 m lbr 181,570.00
18 Papan Kayu Meranti 2 x 20 cm, P : 4 m lbr 61,900.00
19 Papan Kayu Meranti 3 x 20 cm, P : 4 m lbr 93,910.00
20 Papan Kayu Randu 2x20 cm, P : 4 m lbr 16,500.00
21 Papan Kayu Sengon 2x20 cm, P : 4 m lbr 30,950.00
22 Papan Woodplank 20x405 m' 24,000.00
23 Teakwood Tebal 3 mm uk : 122x244 cm lbr 80,880.00
24 Teakwood Tebal 4 mm uk : 90x210 cm lbr 53,640.00
25 Triplek Tebal 6 mm ( 1.20 x 2.40 m¹ ) lbr 63,980.00
26 Triplek Tebal 6 mm ( 1.22 x 2.44 m¹ ) lbr 63,980.00
27 Triplek Tebal 9 mm ( 1.20 x 2.4 m¹ ) lbr 82,530.00
28 Triplek Tebal 9 mm ( 1.22 x 2.44 m¹ ) lbr 63,980.00
29 Triplek Tebal 1 cm lbr 109,370.00
30 Triplek Lapis Aluminium Uk : 0.90 x 2.10 lbr 84,610.00
31 Dolken Kayu 8-10/ 400 cm btg 38,120.00
32 Papan Kayu Sengon 2x20 p=4 m btg 30,950.00
33 Teak Wood lbr 72,230.00
34 Plywood Tebal 9 mm uk : 90x220 cm lbr 92,430.00
IV BAHAN MENGGUNAKAN BESI, BAJA DAN ALUMINIUM
17 Reng - Galvalume Gajah Truss, kecil (30mm) tebal 0.45 panjang 6 meter bh 32,870.00
18 Reng - Galvalume Gajah Truss, besar (46mm) tebal 0.5 panjang 6 meter bh 38,070.00
19 Mur Baut bh 960.00
20 Plat Plendes tebal 8 mm kg 12,410.00
21 Anker besi baut dia 12 mm(panjang 40 cm) bh 9,400.00
22 Gording Baja CNP 150.50.20.2mm kg 9,020.00
23 Besi Strip kg 11,130.00
24 Rangka Atap Galvalum Gajah Truss m2 161,760.00
25 Dynabolt bh 1,600.00
V BAHAN JENIS PAKU, MUR DAN BAUT
PRAYITNO
Direktur
HARGA SATUAN (Rp)
NO NAMA BAHAN MERK / SPESIFIKASI SATUAN
ZONA A ZONA B ZONA C
1 2 3 4 5 6 7
JUMLAH 1,701,070,949.03 100.00% 0.02 5.56% 7.23% 5.84% 5.84% 5.84% 5.84% 7.61% 13.45% 9.51% 5.45% 6.87% 8.16% 0.04 1.28% 2.79% 2.87% 0.02%
KUMULATIF 0.00% 1.61% 7.17% 14.40% 20.24% 26.08% 31.93% 37.77% 45.38% 58.84% 68.35% 73.80% 80.66% 88.83% 93.04% 94.32% 97.11% 99.98% 100.00%
Masa Pemeliharaan 6 (eman) bulan sejak ditandatangani BAST-1
PRAYITNO
Direktur
11.42857
1,344,960.00
0.00%
0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00%
Keterangan
0.00000 0.00
0.00000 0.01
0.00000 0.03
0.00000 0.32
0.00000 0.13
0.00000 0.07
0.00000 0.05
0.00000 0.06
0.00000 0.05
0.00000 0.04
0.00000 0.00
0.00000 0.00
0.00000 0.77
0.77
HARGA SATUAN (Rp)
NO NAMA BAHAN MERK / SPESIFIKASI SATUAN
ZONA C
1 2 3 4 5
1 Paku 2 cm kg 17,250
2 Paku 2.5 cm kg 17,250
3 Paku 3 cm kg 17,250
4 Paku 4 cm kg 17,250
5 Paku 5 cm kg 17,250
6 Paku 6 cm kg 17,250
7 Paku 7 cm kg 17,250
8 Paku 10 cm kg 17,250
9 Paku 12 cm kg 17,250
2.5.1.5. BAHAN UNTUK INSTALASI AIR NON BESI
6 Tandon Air Plastik Model TDA/Profil Tank 650 liter buah 1,063,750
I. BARANG
1). Material Langsung (bahan baku) 1,360,856,759 1,360,856,759 80.00% 80.00% 80.00%
2). Peralatan Barang Jadi - 0.00% 0.00% 0.00%
Sub Total I 1,360,856,759 - 1,360,856,759 80.00% 80.00% 80.00%
II. JASA
3). Menejemen proyek dan perekayasaan - 0.00% 0.00% 0.00%
4). Alat kerja/ Fasilitas kerja 170,107,095 170,107,095 10.00% 10.00% 50.00%
5). Konstruksi dan fabrikasi 85,053,547 85,053,547 5.00% 5.00% 25.00%
6). Jasa umum 85,053,547 85,053,547 5.00% 5.00% 25.00%
Sub Total II 340,214,190 - 340,214,189.81 20.00% 20.00% 20.00%
Dibuat Oleh,
Penawar
CV. ANDIKA PUTRA
PRAYITNO
Direktur