Anda di halaman 1dari 31

REALCOST 129,300,000

LEPTOP 6 6,000,000 36,000,000


PC 6 4,000,000 24,000,000
PRINTER 3 2,750,000 8,250,000
HARDISK 3 850,000 2,550,000
70,800,000

FI DINAS 10% 129,300,000 12,930,000


FI BENDERA 1 5,000,000 5,000,000
17,930,000

Mobilisasi 1 10,000,000 10,000,000


OP dan ET 1 5,000,000 5,000,000
15,000,000

TOTAL BIAYA PELAKSANAAN 103,730,000


TOTAL BIAYA PELAKSANAAN 129,300,000
SISA 25,570,000
REALCOST 129,300,000

LEPTOP 6 6,000,000 36,000,000


PC 6 4,000,000 24,000,000
PRINTER 3 2,750,000 8,250,000
HARDISK 3 850,000 2,550,000
70,800,000

FI DINAS 10% 129,300,000 12,930,000


FI BENDERA 1 5,000,000 5,000,000
17,930,000

Mobilisasi 1 10,000,000 10,000,000


OP dan ET 1 5,000,000 5,000,000
15,000,000

TOTAL BIAYA PELAKSANAAN 103,730,000


TOTAL BIAYA PELAKSANAAN 129,300,000
SISA 25,570,000
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG
Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019

JUMLAH HARGA
No. URAIAN PEKERJAAN
( Rp )

I PEKERJAAN PENDAHULUAN 15,578,284.35

II PEKERJAAN STRUKTUR 52,582,016.50


A. PEKERJAAN STRUKTUR NON STANDART 16,162,241.39
1 PEKERJAAN TANAH , DAN PASIR 1,512,484.4038
2 PEKERJAAN PONDASI 5,458,029.0960
3 PEKERJAAN SLOOF 15 / 20 9,191,727.8903
B. PEKERJAAN STRUKTUR STANDART 36,419,775.11
1 PEKERJAAN KOLOM 20 / 20 5,377,760.0825
2 PEKERJAAN KOLOM 15 / 15 6,702,714.9681
3 PEKERJAAN RING BALK 15 / 20 11,687,567.6587
4 PEKERJAAN DAK ENTRACE 12,651,732.4006

III PEKERJAAN ARSITEK 330,349,567.33


A. PEKERJAAN ARSITEK STANDART 330,349,567.33
1 PEKERJAAN DINDING 82,533,353.8400
2 PEKERJAAN LANTAI 86,984,154.4347
3 PEKERJAAN PLAFOND 61,974,663.7231
4 PEKERJAAN KUSEN DAN DAUN PINTU JENDELA 70,440,211.4429
5 PEKERJAAN PENUTUP ATAP 28,417,183.8877

IV PEKERJAAN MEKANIKAL ELEKTRIKAL 17,766,432.95


A. PEKERJAAN ELEKTRIKAL 17,766,432.95
1 PEKERJAAN LISTRIK ARUS KUAT ( LAK ) 17,766,432.9502

A. JUMLAH REALCOST 416,276,301.13


B. PPN 10% ( A x 10 % ) 41,627,630.11
C. TOTAL ( A + B ) 457,903,931.24
D. DIBULATKAN 457,900,000.00

TERBILANG : EMPAT RATUS LIMA PULUH TUJUH JUTA SEMBILAN RATUS RIBU RUPIAH
RENCANA ANGGARAN BIAYA
(RAB)
Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG
Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019

HARGA SATUAN TOTAL HARGA BOBOT


No. URAIAN PEKERJAAN SATUAN VOLUME
(Rp.) (Rp.) %

I PEKERJAAN PENDAHULUAN 15,578,284.35 3.74

1 Pembongkaran Atap Existing Ls 1.00 4,000,000.00 4,000,000.00 0.9609


2 Pembongkaran Dinding Existing Ls 1.00 2,800,000.00 2,800,000.00 0.6726
3 Pembongkaran Kusen Existing Ls 1.00 2,300,000.00 2,300,000.00 0.5525
4 Pembongkaran Plafond Existing Ls 1.00 2,800,000.00 2,800,000.00 0.6726
5 Pembongkaran Lantai Existing Ls 1.00 1,940,000.00 1,940,000.00 0.4660
6 Pengukuran & pemasangan Bowplank M 25.00 69,531.37 1,738,284.35 0.4176

II PEKERJAAN STRUKTUR 52,582,016.50 12.63


A. PEKERJAAN STRUKTUR NON STANDART 16,162,241.39 3.88
1 PEKERJAAN TANAH , DAN PASIR 1,512,484.40 0.36
a Galian Tanah Pondasi M3 7.68 123,852.47 951,186.93 0.2285
b Urugan Pasir Bawah Pondasi M3 0.96 194,740.99 186,951.35 0.0449
c Urugan Tanah Kembali Bekas Galian M3 4.20 89,130.03 374,346.13 0.0899

2 PEKERJAAN PONDASI 5,458,029.10 1.31


a Pas. Batu Kosong M2 1.92 640,752.18 1,230,244.18 0.2955
b Pas. Pondasi Batu Gunung Camp 1:4 M3 3.90 1,084,047.42 4,227,784.92 1.0156

3 PEKERJAAN SLOOF 15 / 20 9,191,727.89 2.21


a Bekisting M2 23.20 222,018.12 5,150,820.32 1.2374
b Besi Beton Kg 155.25 14,261.14 2,214,027.57 0.5319
c Beton Camp 1 : 2 : 3 M3 1.32 1,384,000.00 1,826,880.00 0.4389

B. PEKERJAAN STRUKTUR STANDART 36,419,775.11 8.75


1 PEKERJAAN KOLOM 20 / 20 5,377,760.08 1.29
a Bekisting M2 12.00 222,018.12 2,664,217.41 0.6400
b Besi Beton Kg 117.49 14,261.14 1,675,542.68 0.4025
c Beton Camp 1 : 2 : 3 M3 0.75 1,384,000.00 1,038,000.00 0.2494

2 PEKERJAAN KOLOM 15 / 15 6,702,714.97 1.61


a Bekisting M2 14.40 222,018.12 3,197,060.89 0.7680
b Besi Beton Kg 193.41 14,261.14 2,758,294.08 0.6626
c Beton Camp 1 : 2 : 3 M3 0.54 1,384,000.00 747,360.00 0.1795

3 PEKERJAAN RING BALK 15 / 20 11,687,567.66 2.81


a Bekisting M2 31.90 222,018.12 7,082,377.94 1.7014
b Besi Beton Kg 154.06 14,261.14 2,197,029.72 0.5278
c Beton Camp 1 : 2 : 3 M3 1.74 1,384,000.00 2,408,160.00 0.5785

4 PEKERJAAN DAK ENTRACE 12,651,732.40 3.04


a Bekisting M2 19.00 465,090.30 8,836,715.75 2.1228
b Besi Beton Kg 120.00 14,261.14 1,711,336.65 0.4111
c Beton Camp 1 : 2 : 3 M3 1.52 1,384,000.00 2,103,680.00 0.5054
HARGA SATUAN TOTAL HARGA BOBOT
No. URAIAN PEKERJAAN SATUAN VOLUME
(Rp.) (Rp.) %
III PEKERJAAN ARSITEK 330,349,567.33 79.36
A. PEKERJAAN ARSITEK STANDART 330,349,567.33 79.36
1 PEKERJAAN DINDING 82,533,353.84 19.83
a Pas. Dinding Bata Merah M2 94.43 205,410.37 19,396,901.24 4.6596
b Plesteran + Aci Dinding Interior M2 94.43 152,483.71 14,399,036.26 3.4590
c Plesteran + Aci Dinding Exterior M2 94.43 152,483.71 14,399,036.26 3.4590
d Cat Interior M2 738.13 33,083.42 24,419,697.31 5.8662
e Cat Exterior M2 271.63 36,515.42 9,918,682.77 2.3827

2 PEKERJAAN LANTAI 86,984,154.43 20.90


a Cor Lantai Beton Tumbuk t=0,05 m M3 13.05 1,384,000.00 18,060,508.00 4.3386
b Pas. Keramik 40 x 40 M2 238.02 258,030.93 61,416,521.24 14.7538
d Pas. Keramik 20 x 20 M2 25.34 296,255.93 7,507,125.19 1.8034

3 PEKERJAAN PLAFOND 61,974,663.72 14.89


a Pas. Plafond Tripleks M2 263.36 181,209.25 47,723,267.55 11.4643
b Pas. List Plafond M 338.86 16,344.65 5,538,547.42 1.3305
c Pek. Pengecetan Plafond M2 263.36 33,083.42 8,712,848.75 2.0930

4 PEKERJAAN KUSEN DAN DAUN PINTU JENDELA 70,440,211.44 16.92


a Pas. Kusen + Daun Pintu Type P1 Unit 4.00 2,727,967.46 10,911,869.85 2.6213
b Pas. Kusen + Daun Pintu Type P2 Unit 9.00 2,353,727.32 21,183,545.85 5.0888
c Pas. Kusen + Daun Jendela Type J1 Unit 1.00 3,410,134.38 3,410,134.38 0.8192
d Pas. Kusen + Daun Jendela Type J2 Unit 14.00 2,409,411.45 33,731,760.32 8.1032
e Pas. BV Unit 3.00 400,967.01 1,202,901.03 0.2890

5 PEKERJAAN PENUTUP ATAP 28,417,183.89 6.83


a Penutup Seng BJLS 30 M2 304.00 51,441.82 15,638,312.50 3.7567
b Pasang Nok M 45.98 87,916.73 4,042,411.45 0.9711
c Pasang Lisplank Papan 2x25 + Cat M 68.61 127,335.08 8,736,459.94 2.0987

IV PEKERJAAN MEKANIKAL ELEKTRIKAL 17,766,432.95 4.27


A. PEKERJAAN ELEKTRIKAL 17,766,432.95 4.27
1 PEKERJAAN LISTRIK ARUS KUAT ( LAK ) 17,766,432.95 4.27
# PEKERJAAN PANEL LISTRIK 339,148.05 0.08
a Pas. MCB Unit 1.00 339,148.05 339,148.05 0.0815

# PEKERJAAN INSTALASI PENERANGAN 17,427,284.90 4.19


a Instalasi Penerangan, Sakelar dan Stop Kontak Titik 58.00 225,848.05 13,099,186.83 3.1468
b Pas.Stop Kontak Titik 15.00 59,734.45 896,016.74 0.2152
c Pas.Sakelar Tunggal Titik 11.00 59,734.45 657,078.94 0.1578
d Pas.Sakelar Ganda Titik 7.00 65,234.45 456,641.15 0.1097
e Pas. Lampu XL 20 Watt Bh 25.00 92,734.45 2,318,361.24 0.5569
ANALISA HARGA SATUAN PEKERJAAN

Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG


Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019
PEKERJAAN : STRUKTUR
1 m³ GALIAN TANAH
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.7500 144,159.00 108,119.25
2 Mandor OH 0.0250 178,956.00 4,473.90
JUMLAH HARGA TENAGA KERJA 112,593.15
B Bahan

JUMLAH HARGA BAHAN -


C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 112,593.15
E OVERHEAD & PROFIT 10 % 10 % X D 11,259.32
F HARGA SATUAN PEKERJAAN 123,852.47

1 m³ URUGAN PASIR
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.3000 144,159.00 43,247.70
2 Mandor OH 0.0100 178,956.00 1,789.56
JUMLAH HARGA TENAGA KERJA 45,037.26
B Bahan
1 Pasir Urug m3 1.2000 110,000.00 132,000.00

JUMLAH HARGA BAHAN 132,000.00


C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 177,037.26
E OVERHEAD & PROFIT 10 % 10 % X D 17,703.73
F HARGA SATUAN PEKERJAAN 194,740.99

1 m³ URUGAN TANAH KEMBALI BEKAS GALIAN


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.5000 144,159.00 72,079.50
2 Mandor OH 0.0500 178,956.00 8,947.80
JUMLAH HARGA TENAGA KERJA 81,027.30
B Bahan

JUMLAH HARGA BAHAN -


C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 81,027.30
E OVERHEAD & PROFIT 10 % 10 % X D 8,102.73
F HARGA SATUAN PEKERJAAN 89,130.03

1 m³ URUGAN TANAH PENINGGI LANTAI


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.3000 144,159.00 43,247.70
2 Mandor OH 0.0100 178,956.00 1,789.56
JUMLAH HARGA TENAGA KERJA 45,037.26
B Bahan
1 Tanah Urug M3 1.2000 35,000.00 42,000.00
JUMLAH HARGA BAHAN 42,000.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 87,037.26
ANALISA HARGA SATUAN PEKERJAAN

Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG


Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019
E OVERHEAD & PROFIT 10 % 10 % X D 8,703.73
F HARGA SATUAN PEKERJAAN 95,740.99

1 m³ PASANGAN BATU KOSONG


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.7800 144,159.00 112,444.02
2 Tukang OH 0.3900 154,101.00 60,099.39
3 Kepala Tukang OH 0.0390 178,956.00 6,979.28
4 Mandor OH 0.0390 178,956.00 6,979.28
JUMLAH HARGA TENAGA KERJA 186,501.98
B Bahan
1 Batu Gunung M3 1.2000 330,000.00 396,000.00
JUMLAH HARGA BAHAN 396,000.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 582,501.98
E OVERHEAD & PROFIT 10 % 10 % X D 58,250.20
F HARGA SATUAN PEKERJAAN 640,752.18

1 m³ PASANGAN PONDASI BATU GUNUNG


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 1.5000 144,159.00 216,238.50
2 Tukang OH 0.7500 154,101.00 115,575.75
3 Kepala Tukang OH 0.0750 178,956.00 13,421.70
4 Mandor OH 0.0750 178,956.00 13,421.70
JUMLAH HARGA TENAGA KERJA 358,657.65
B Bahan
1 Batu Gunung M³ 1.1000 330,000.00 363,000.00
2 Semen Portland (PC) Kg 136.0000 1,500.00 204,000.00
3 Pasir Pasang M³ 0.5440 110,000.00 59,840.00
JUMLAH HARGA BAHAN 626,840.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 985,497.65
E OVERHEAD & PROFIT 10 % 10 % X D 98,549.77
F HARGA SATUAN PEKERJAAN 1,084,047.42

1 m2 PEMBUATAN DAN PEMASANGAN BEKISTING PONDASI


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.5200 144,159.00 74,962.68
2 Tukang OH 0.2600 154,101.00 40,066.26
3 Kepala Tukang OH 0.0260 178,956.00 4,652.86
4 Mandor OH 0.0260 178,956.00 4,652.86
JUMLAH HARGA TENAGA KERJA 124,334.65
B Bahan
Kayu Kelas III M³ 0.0400 1,600,000.00 64,000.00
Paku 5 - 12 cm Kg 0.3000 15,000.00 4,500.00
Minyak Bekisting Liter 0.1000 10,000.00 1,000.00
JUMLAH HARGA BAHAN 69,500.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 193,834.65
E OVERHEAD & PROFIT 10 % 10 % X D 19,383.47
F HARGA SATUAN PEKERJAAN 213,218.12
ANALISA HARGA SATUAN PEKERJAAN

Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG


Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019

1 m2 PEMBUATAN DAN PEMASANGAN BEKISTING TIEBEAM


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.5200 144,159.00 74,962.68
2 Tukang OH 0.2600 154,101.00 40,066.26
3 Kepala Tukang OH 0.0260 178,956.00 4,652.86
4 Mandor OH 0.0260 178,956.00 4,652.86
JUMLAH HARGA TENAGA KERJA 124,334.65
B Bahan
1 Kayu Kelas III M³ 0.0450 1,600,000.00 72,000.00
2 Paku 5 - 12 cm Kg 0.3000 15,000.00 4,500.00
3 Minyak Bekisting Liter 0.1000 10,000.00 1,000.00
JUMLAH HARGA BAHAN 77,500.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 201,834.65
E OVERHEAD & PROFIT 10 % 10 % X D 20,183.47
F HARGA SATUAN PEKERJAAN 222,018.12

1 m2 PEMBUATAN DAN PEMASANGAN BEKISTING KOLOM


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.6600 144,159.00 95,144.94
2 Tukang OH 0.3300 154,101.00 50,853.33
3 Kepala Tukang OH 0.0330 178,956.00 5,905.55
4 Mandor OH 0.0330 178,956.00 5,905.55
JUMLAH HARGA TENAGA KERJA 157,809.37
B Bahan
1 Kayu Kelas III M³ 0.0400 1,600,000.00 64,000.00
2 Paku 5 - 12 cm Kg 0.4000 15,000.00 6,000.00
3 Minyak Bekisting Liter 0.2000 10,000.00 2,000.00
4 Balok Kayu Kelas II M³ 0.0150 2,300,000.00 34,500.00
5 Plywood 9 mm Lbr 0.3500 110,000.00 38,500.00
6 Dolken Kayu Ø 8 - 10 cm, p = 4 m Btg 2.0000 20,000.00 40,000.00
JUMLAH HARGA BAHAN 185,000.00
C Peralatan
- - -
JUMLAH HARGA PERALATAN -
D JUMLAH HARGA 342,809.37
E OVERHEAD & PROFIT 10 % 10 % X D 34,280.94
F HARGA SATUAN PEKERJAAN 377,090.30

1 m2 PEMBUATAN DAN PEMASANGAN BEKISTING BALOK


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.6600 144,159.00 95,144.94
2 Tukang OH 0.3300 154,101.00 50,853.33
3 Kepala Tukang OH 0.0330 178,956.00 5,905.55
4 Mandor OH 0.0330 178,956.00 5,905.55
JUMLAH HARGA TENAGA KERJA 157,809.37
B Bahan
1 Kayu Kelas III M³ 0.0400 1,600,000.00 64,000.00
2 Paku 5 - 12 cm Kg 0.4000 15,000.00 6,000.00
3 Minyak Bekisting Liter 0.2000 10,000.00 2,000.00
4 Balok Kayu Kelas II M³ 0.0180 2,300,000.00 41,400.00
5 Plywood 9 mm Lbr 0.3500 110,000.00 38,500.00
6 Dolken Kayu Ø 8 - 10 cm, p = 4 m Btg 2.0000 20,000.00 40,000.00
JUMLAH HARGA BAHAN 191,900.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 349,709.37
E OVERHEAD & PROFIT 10 % 10 % X D 34,970.94
F HARGA SATUAN PEKERJAAN 384,680.30
ANALISA HARGA SATUAN PEKERJAAN

Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG


Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019

1 m2 PEMBUATAN DAN PEMASANGAN BEKISTING PELAT LANTAI


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.6600 144,159.00 95,144.94
2 Tukang OH 0.3300 154,101.00 50,853.33
3 Kepala Tukang OH 0.0330 178,956.00 5,905.55
4 Mandor OH 0.0330 178,956.00 5,905.55
JUMLAH HARGA TENAGA KERJA 157,809.37
B Bahan
1 Kayu Kelas III M³ 0.0400 1,600,000.00 64,000.00
2 Paku 5 - 12 cm Kg 0.4000 15,000.00 6,000.00
3 Minyak Bekisting Liter 0.2000 10,000.00 2,000.00
4 Balok Kayu Kelas II M³ 0.0150 2,300,000.00 34,500.00
5 Plywood 9 mm Lbr 0.3500 110,000.00 38,500.00
6 Dolken Kayu Ø 8 - 10 cm, p = 4 m Btg 6.0000 20,000.00 120,000.00
JUMLAH HARGA BAHAN 265,000.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 422,809.37
E OVERHEAD & PROFIT 10 % 10 % X D 42,280.94
F HARGA SATUAN PEKERJAAN 465,090.30

1 KG BESI BETON
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.0070 144,159.00 1,009.11
2 Tukang OH 0.0070 154,101.00 1,078.71
3 Kepala Tukang OH 0.0007 178,956.00 125.27
4 Mandor OH 0.0004 178,956.00 71.58
JUMLAH HARGA TENAGA KERJA 2,284.67
B Bahan
1 Besi Beton Polos / Ulir Kg 1.0500 10,000.00 10,500.00
2 Kawat Ikat Beton (Bendrat) Kg 0.0150 12,000.00 180.00
JUMLAH HARGA BAHAN 10,680.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 12,964.67
E OVERHEAD & PROFIT 10 % 10 % X D 1,296.47
F HARGA SATUAN PEKERJAAN 14,261.14

1 m³ BETON CAMP . 1:2:3


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 1.6500 144,159.00 237,862.35
2 Tukang OH 0.2750 154,101.00 42,377.78
3 Kepala Tukang OH 0.0280 178,956.00 5,010.77
4 Mandor OH 0.0830 178,956.00 14,853.35
JUMLAH HARGA TENAGA KERJA 285,000.00
B Bahan
1 Semen Portland (PC) Kg 384 1,500.00 576,000.00
2 Pasir Beton Kg 692 100.00 69,200.00
3 Batu Pecah 2 - 3 cm Kg 1,039 296.30 307,851.85
4 Air Liter 215 100.00 21,500.00
JUMLAH HARGA BAHAN 974,000.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 1,259,000.00
E OVERHEAD & PROFIT 10 % 10 % X D 125,900.00
F HARGA SATUAN PEKERJAAN 1,384,000.00
ANALISA HARGA SATUAN PEKERJAAN

Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG


Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019

1 m³ KUDA-KUDA KAYU BESI 5/10


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 4.0000 144,159.00 576,636.00
2 Tukang OH 12.0000 154,101.00 1,849,212.00
3 Kepala Tukang OH 1.2000 178,956.00 214,747.20
4 Mandor OH 0.2000 178,956.00 35,791.20
JUMLAH HARGA TENAGA KERJA 2,676,386.40
B Bahan
1 Kayu Klas I, balok m3 1.1000 3,500,000.00 3,850,000.00
2 Besi strip Kg 15.0000 5,000.00 75,000.00
3 Paku biasa Kg 5.6000 15,000.00 84,000.00
JUMLAH HARGA BAHAN 4,009,000.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 6,685,386.40
E OVERHEAD & PROFIT 10 % 10 % X D 668,538.64
F HARGA SATUAN PEKERJAAN 7,353,925.04

1 m³ PEMASANGAN GORDING
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 2.4000 144,159.00 345,981.60
2 Tukang OH 7.2000 154,101.00 1,109,527.20
3 Kepala Tukang OH 0.7200 178,956.00 128,848.32
4 Mandor OH 0.1200 178,956.00 21,474.72
JUMLAH HARGA TENAGA KERJA 1,605,831.84
B Bahan
1 Kayu Klas I m3 1.1000 3,500,000.00 3,850,000.00
2 Besi strip Kg 15.0000 5,000.00 75,000.00
3 Paku biasa Kg 3.0000 15,000.00 45,000.00
JUMLAH HARGA BAHAN 3,970,000.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 5,575,831.84
E OVERHEAD & PROFIT 10 % 10 % X D 557,583.18
F HARGA SATUAN PEKERJAAN 6,133,415.02

1 m2 RANGKA ATAP BAJA RINGAN


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.2470 144,159.00 35,607.27
2 Tukang Besi OH 0.1760 154,101.00 27,121.78
3 Kepala Tukang OH 0.1170 178,956.00 20,937.85
4 Mandor OH 0.2800 178,956.00 50,107.68
JUMLAH HARGA TENAGA KERJA 133,774.58
B Bahan
1 Main Truss C 80.0,75 M¹ 3.0000 22,500.00 67,500.00
2 Roof Bottom R 35-0,75 M¹ 2.5000 10,000.00 25,000.00
3 Self Drilling Screw dia.6x20 mm (Trsuss S Bh 35.0000 200.00 7,000.00
4 Self Drilling Screw dia.4x16 mm (Roof bo Bh 1.5000 200.00 300.00
5 Dynabolt dia.10 x 80 mm Bh 1.0000 1,000.00 1,000.00

JUMLAH HARGA BAHAN 100,800.00


C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 234,574.58
E OVERHEAD & PROFIT 10 % 10 % X D 23,457.46
F HARGA SATUAN PEKERJAAN 258,032.04
ANALISA HARGA SATUAN PEKERJAAN

Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG


Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019

1 m2 PEMBERSIHAN LOKASI
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.1000 144,159.00 14,415.90
2 Mandor OH 0.0500 178,956.00 8,947.80
JUMLAH HARGA TENAGA KERJA 23,363.70
B Bahan
- - -
JUMLAH HARGA BAHAN -
C Peralatan
- - -
JUMLAH HARGA PERALATAN -
D JUMLAH HARGA 23,363.70
E OVERHEAD & PROFIT 10 % 10 % X D 2,336.37
F HARGA SATUAN PEKERJAAN 25,700.07

1 m2 PEMBUATAN GUDANG
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
Pekerja OH 1.0000 144,159.00 144,159.00
Tukang Kayu OH 2.0000 154,101.00 308,202.00
Kepala Tukang OH 0.2000 178,956.00 35,791.20
Mandor OH 0.0500 178,956.00 8,947.80
JUMLAH HARGA TENAGA KERJA 497,100.00
B Bahan
Dolken Kayu Ø 8 - 10 cm, p = 4 m Btg 1.2500 20,000.00 25,000.00
Balok Kayu Kelas II M³ 0.1860 2,300,000.00 427,800.00
Paku 5 - 12 cm Kg 0.3000 15,000.00 4,500.00
Seng Gelombang BJLS 0,25 mm Lbr 1.5000 200.00 300.00
Multipleks 4 mm Lbr 1.3500 72,000.00 97,200.00
JUMLAH HARGA BAHAN 554,800.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 1,051,900.00
E OVERHEAD & PROFIT 10 % 10 % X D 105,190.00
F HARGA SATUAN PEKERJAAN 1,157,090.00

1 m PENGUKURAN DAN PEMASANGAN BOWPLANK


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
Pekerja OH 0.1000 144,159.00 14,415.90
Tukang Kayu OH 0.1000 154,101.00 15,410.10
Kepala Tukang OH 0.0100 178,956.00 1,789.56
Mandor OH 0.0050 178,956.00 894.78
JUMLAH HARGA TENAGA KERJA 32,510.34
B Bahan
Balok Kayu 5 x 7 cm Kelas III M³ 0.0120 1,600,000.00 19,200.00
Papan Kayu Kelas III M³ 0.0070 1,600,000.00 11,200.00
Paku 5 - 7 cm Kg 0.0200 15,000.00 300.00
JUMLAH HARGA BAHAN 30,700.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 63,210.34
E OVERHEAD & PROFIT 10 % 10 % X D 6,321.03
F HARGA SATUAN PEKERJAAN 69,531.37
ANALISA HARGA SATUAN PEKERJAAN
Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG
Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019
PEKERJAAN : ARSITEKTUR
1 m2 PASANG BATA MERAH
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.3000 144,159.00 43,247.70
2 Tukang Kayu OH 0.1000 154,101.00 15,410.10
3 Kepala Tukang OH 0.0100 178,956.00 1,789.56
4 Mandor OH 0.0150 178,956.00 2,684.34
JUMLAH HARGA TENAGA KERJA 63,131.70
B Bahan
1 Bata Merah Bh 70.0000 1,300.00 91,000.00
2 Semen Portland Kg 18.9500 1,500.00 28,425.00
3 Pasir Pasang m3 0.0380 110,000.00 4,180.00
JUMLAH HARGA BAHAN 123,605.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 186,736.70
E OVERHEAD & PROFIT 10 % 10 % X D 18,673.67
F HARGA SATUAN PEKERJAAN 205,410.37

1 m2 PLESTERAN DINDING
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.3000 144,159.00 43,247.70
2 Tukang Batu OH 0.1500 154,101.00 23,115.15
3 Kepala Tukang OH 0.0150 178,956.00 2,684.34
4 Mandor OH 0.0150 178,956.00 2,684.34
JUMLAH HARGA TENAGA KERJA 71,731.53
B Bahan
1 Semen Portland (PC) Kg 7.7760 1,500.00 11,664.00
2 Pasir Pasang M³ 0.0230 110,000.00 2,530.00
JUMLAH HARGA BAHAN 14,194.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 85,925.53
E OVERHEAD & PROFIT 10 % 10 % X D 8,592.55
F HARGA SATUAN PEKERJAAN 94,518.08

1 m2 ACIAN DINDING
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.2000 144,159.00 28,831.80
2 Tukang Batu OH 0.1000 154,101.00 15,410.10
3 Kepala Tukang OH 0.0100 178,956.00 1,789.56
4 Mandor OH 0.0100 178,956.00 1,789.56
JUMLAH HARGA TENAGA KERJA 47,821.02
B Bahan
1 Semen Portland (PC) Kg 3.2500 1,500.00 4,875.00
JUMLAH HARGA BAHAN 4,875.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 52,696.02
E OVERHEAD & PROFIT 10 % 10 % X D 5,269.60
F HARGA SATUAN PEKERJAAN 57,965.62
ANALISA HARGA SATUAN PEKERJAAN
Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG
Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019

1 m2 Cat Interior
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.0200 144,159.00 2,883.18
2 Tukang Cat OH 0.0630 154,101.00 9,708.36
3 Kepala Tukang OH 0.0063 178,956.00 1,127.42
4 Mandor OH 0.0030 178,956.00 536.87
JUMLAH HARGA TENAGA KERJA 14,255.83
B Bahan
1 Plamur Kg 0.1000 8,000.00 800.00
2 Cat Dasar Tembok Interior Kg 0.1000 15,000.00 1,500.00
3 Cat Penutup Tembok Interior Kg 0.2600 52,000.00 13,520.00
JUMLAH HARGA BAHAN 15,820.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 30,075.83
E OVERHEAD & PROFIT 10 % 10 % X D 3,007.58
F HARGA SATUAN PEKERJAAN 33,083.42

1 m2 Cat Exterior
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.0200 144,159.00 2,883.18
2 Tukang Cat OH 0.0630 154,101.00 9,708.36
3 Kepala Tukang OH 0.0063 178,956.00 1,127.42
4 Mandor OH 0.0030 178,956.00 536.87
JUMLAH HARGA TENAGA KERJA 14,255.83
B Bahan
1 Plamur Kg 0.1000 8,000.00 800.00
2 Cat Dasar Tembok Exterior Kg 0.1000 15,000.00 1,500.00
3 Cat Penutup Tembok Exterior Kg 0.2600 64,000.00 16,640.00
JUMLAH HARGA BAHAN 18,940.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 33,195.83
E OVERHEAD & PROFIT 10 % 10 % X D 3,319.58
F HARGA SATUAN PEKERJAAN 36,515.42

1 m2 Cor Lantai Beton Tumbuk t=0,05 m


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 1.6500 144,159.00 237,862.35
2 Tukang Batu OH 0.2750 154,101.00 42,377.78
3 Kepala Tukang OH 0.0280 178,956.00 5,010.77
4 Mandor OH 0.0830 178,956.00 14,853.35
JUMLAH HARGA TENAGA KERJA 300,104.24
B Bahan
1 Semen Portland (PC) Kg 326.0000 1,500.00 489,000.00
2 Pasir Beton Kg 0.5429 140,000.00 76,000.00
3 Batu Pecah 2 - 3 cm Kg 0.7097 400,000.00 283,862.07
4 Air Liter 200.0000 100.00 20,000.00
JUMLAH HARGA BAHAN 868,862.07
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 1,168,966.31
E OVERHEAD & PROFIT 10 % 10 % X D 116,896.63
F HARGA SATUAN PEKERJAAN 1,285,862.94
ANALISA HARGA SATUAN PEKERJAAN
Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG
Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019

1 m2 PEMASANGAN KERAMIK 40 x 40
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.7000 144,159.00 100,911.30
2 Tukang Batu OH 0.3500 154,101.00 53,935.35
3 Kepala Tukang OH 0.0350 178,956.00 6,263.46
4 Mandor OH 0.0350 178,956.00 6,263.46
JUMLAH HARGA TENAGA KERJA 167,373.57
B Bahan
1 Keramik uk. 40 x 40 cm Bh 6.5625 6,666.67 43,750.00
2 Semen Portland (PC) Kg 10.0000 1,500.00 15,000.00
3 Semen Warna Kg 0.5000 7,000.00 3,500.00
4 Pasir Pasang M³ 0.0450 110,000.00 4,950.00
JUMLAH HARGA BAHAN 67,200.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 234,573.57
E OVERHEAD & PROFIT 10 % 10 % X D 23,457.36
F HARGA SATUAN PEKERJAAN 258,030.93

1 m2 RANGKA PLAFOND KAYU


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.2000 144,159.00 28,831.80
2 Tukang OH 0.3000 154,101.00 46,230.30
3 Kepala Tukang OH 0.0300 178,956.00 5,368.68
4 Mandor OH 0.0100 178,956.00 1,789.56
JUMLAH HARGA TENAGA KERJA 82,220.34
B Bahan
1 Kayu Klas II, balok M3 0.0082 2,300,000.00 18,745.00
2 Paku biasa M3 0.2500 15,000.00 3,750.00
JUMLAH HARGA BAHAN 22,495.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 104,715.34
E OVERHEAD & PROFIT 10 % 10 % X D 10,471.53
F HARGA SATUAN PEKERJAAN 115,186.87

1 m2 PASANG PLAFOND TRIPLEKS


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.1000 144,159.00 14,415.90
2 Tukang OH 0.1000 154,101.00 15,410.10
3 Kepala Tukang OH 0.0100 178,956.00 1,789.56
4 Mandor OH 0.0050 178,956.00 894.78
JUMLAH HARGA TENAGA KERJA 32,510.34
B Bahan
1 Tripleks 4 mm Lbr 0.3750 72,000.00 27,000.00
2 Paku Tripleks Kg 0.0300 17,000.00 510.00
JUMLAH HARGA BAHAN 27,510.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 60,020.34
E OVERHEAD & PROFIT 10 % 10 % X D 6,002.03
F HARGA SATUAN PEKERJAAN 66,022.37
ANALISA HARGA SATUAN PEKERJAAN
Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG
Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019

1 m2 Pas. List Plafond


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.0500 144,159.00 7,207.95
2 Tukang OH 0.0500 154,101.00 7,705.05
3 Kepala Tukang OH 0.0050 178,956.00 894.78
4 Mandor OH 0.0030 178,956.00 536.87
JUMLAH HARGA TENAGA KERJA 16,344.65
B Bahan
1 Profil List M 1.0500 15,000.00 15,750.00
2 Paku Kg 0.0100 15,000.00 150.00

JUMLAH HARGA BAHAN 15,900.00


C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 32,244.65
E OVERHEAD & PROFIT 10 % 10 % X D 3,224.46
F HARGA SATUAN PEKERJAAN 35,469.11

1 m³ Pekerjaan Pasang Kusen Pintu dan Jendela Kayu Klas l


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 7.0000 144,159.00 1,009,113.00
2 Tukang OH 21.0000 154,101.00 3,236,121.00
3 Kepala Tukang OH 2.1000 178,956.00 375,807.60
4 Mandor OH 0.3500 178,956.00 62,634.60
JUMLAH HARGA TENAGA KERJA 4,683,676.20
B Bahan
1 Kayu Klas I, balok M³ 1.1000 3,500,000.00 3,850,000.00
2 Paku 10 cm Kg 1.2500 15,000.00 18,750.00
3 Lem Kayu Kg 1.0000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 3,888,750.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 8,572,426.20
E OVERHEAD & PROFIT 10 % 10 % X D 857,242.62
F HARGA SATUAN PEKERJAAN 9,429,668.82

1 m² Pekerjaan Pasang Pintu Panel Kayu Klas I


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 1.0000 144,159.00 144,159.00
2 Tukang OH 3.0000 154,101.00 462,303.00
3 Kepala Tukang OH 0.3000 178,956.00 53,686.80
4 Mandor OH 0.0500 178,956.00 8,947.80
JUMLAH HARGA TENAGA KERJA 669,096.60
B Bahan
1 Papan Kayu Klas I M³ 0.0400 2,500,000.00 100,000.00
2 Lem Kayu Kg 0.5000 20,000.00 10,000.00
JUMLAH HARGA BAHAN 110,000.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 779,096.60
E OVERHEAD & PROFIT 10 % 10 % X D 77,909.66
F HARGA SATUAN PEKERJAAN 857,006.26
ANALISA HARGA SATUAN PEKERJAAN
Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG
Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019

1 m² Bingkai Jendela kaca Kayu Kls. 1


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.8000 144,159.00 115,327.20
2 Tukang OH 2.4000 154,101.00 369,842.40
3 Kepala Tukang OH 0.2400 178,956.00 42,949.44
4 Mandor OH 0.0400 178,956.00 7,158.24
JUMLAH HARGA TENAGA KERJA 535,277.28
B Bahan
1 Papan Kayu Klas I M³ 0.0240 2,500,000.00 60,000.00
2 Lem Kayu Kg 0.3000 20,000.00 6,000.00
JUMLAH HARGA BAHAN 66,000.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 601,277.28
E OVERHEAD & PROFIT 10 % 10 % X D 60,127.73
F HARGA SATUAN PEKERJAAN 661,405.01

1 m² Pas. Jalusi Pintu, Jendela dan ventilasi


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 1.0000 144,159.00 144,159.00
2 Tukang OH 3.0000 154,101.00 462,303.00
3 Kepala Tukang OH 0.3000 178,956.00 53,686.80
4 Mandor OH 0.0500 178,956.00 8,947.80
JUMLAH HARGA TENAGA KERJA 669,096.60
B Bahan
1 Kayu Papan Klas I M³ 0.0640 2,500,000.00 160,000.00
2 Lem Kayu Kg 0.5000 20,000.00 10,000.00
JUMLAH HARGA BAHAN 170,000.00
C Peralatan
- - -
JUMLAH HARGA PERALATAN -
D JUMLAH HARGA 839,096.60
E OVERHEAD & PROFIT 10 % 10 % X D 83,909.66
F HARGA SATUAN PEKERJAAN 923,006.26

1 m² Pasang Kaca Polos


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.0150 144,159.00 2,162.39
2 Tukang OH 0.1500 154,101.00 23,115.15
3 Kepala Tukang OH 0.0150 178,956.00 2,684.34
4 Mandor OH 0.0008 178,956.00 134.22
JUMLAH HARGA TENAGA KERJA 28,096.09
B Bahan
1 Kaca Polos 5 mm M2 1.1000 175,000.00 192,500.00

JUMLAH HARGA BAHAN 192,500.00


C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 220,596.09
E OVERHEAD & PROFIT 10 % 10 % X D 22,059.61
F HARGA SATUAN PEKERJAAN 242,655.70
ANALISA HARGA SATUAN PEKERJAAN
Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG
Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019

1 Bh Kunci Tanam
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.0100 144,159.00 1,441.59
2 Tukang OH 0.5000 154,101.00 77,050.50
3 Kepala Tukang OH 0.0100 178,956.00 1,789.56
4 Mandor OH 0.0050 178,956.00 894.78
JUMLAH HARGA TENAGA KERJA 81,176.43
B Bahan
1 Kunci Pintu Bh 1.0000 100,000.00 100,000.00

JUMLAH HARGA BAHAN 100,000.00


C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 181,176.43
E OVERHEAD & PROFIT 10 % 10 % X D 18,117.64
F HARGA SATUAN PEKERJAAN 199,294.07

1 Bh Engsel Pintu
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.0150 144,159.00 2,162.39
2 Tukang OH 0.1500 154,101.00 23,115.15
3 Kepala Tukang OH 0.0150 178,956.00 2,684.34
4 Mandor OH 0.0008 178,956.00 134.22
JUMLAH HARGA TENAGA KERJA 28,096.09
B Bahan
1 Engsel Pintu Bh 1.0000 30,000.00 30,000.00

JUMLAH HARGA BAHAN 30,000.00


C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 58,096.09
E OVERHEAD & PROFIT 10 % 10 % X D 5,809.61
F HARGA SATUAN PEKERJAAN 63,905.70

1 Bh Engsel Jendela
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.0150 144,159.00 2,162.39
2 Tukang OH 0.1500 154,101.00 23,115.15
3 Kepala Tukang OH 0.0150 178,956.00 2,684.34
4 Mandor OH 0.0008 178,956.00 134.22
JUMLAH HARGA TENAGA KERJA 28,096.09
B Bahan
1 Engsel Jendela Bh 1.0000 30,000.00 30,000.00
JUMLAH HARGA BAHAN 30,000.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 58,096.09
E OVERHEAD & PROFIT 10 % 10 % X D 5,809.61
F HARGA SATUAN PEKERJAAN 63,905.70
ANALISA HARGA SATUAN PEKERJAAN
Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG
Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019

1 Bh Grandel Pintu
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.0150 144,159.00 2,162.39
2 Tukang OH 0.1500 154,101.00 23,115.15
3 Kepala Tukang OH 0.0150 178,956.00 2,684.34
4 Mandor OH 0.0008 178,956.00 134.22
JUMLAH HARGA TENAGA KERJA 28,096.09
B Bahan
1 Grendel Pintu Bh 1.0000 20,000.00 20,000.00

JUMLAH HARGA BAHAN 20,000.00


C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 48,096.09
E OVERHEAD & PROFIT 10 % 10 % X D 4,809.61
F HARGA SATUAN PEKERJAAN 52,905.70

1 Bh Grandel Jendela
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.0150 144,159.00 2,162.39
2 Tukang OH 0.1500 154,101.00 23,115.15
3 Kepala Tukang OH 0.0150 178,956.00 2,684.34
4 Mandor OH 0.0008 178,956.00 134.22
JUMLAH HARGA TENAGA KERJA 28,096.09
B Bahan
1 Grendel Jendela Bh 1.0000 20,000.00 20,000.00

JUMLAH HARGA BAHAN 20,000.00


C Peralatan
- - -
JUMLAH HARGA PERALATAN -
D JUMLAH HARGA 48,096.09
E OVERHEAD & PROFIT 10 % 10 % X D 4,809.61
F HARGA SATUAN PEKERJAAN 52,905.70

1 Bh Hak Angin
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.0150 144,159.00 2,162.39
2 Tukang OH 0.1500 154,101.00 23,115.15
3 Kepala Tukang OH 0.0150 178,956.00 2,684.34
4 Mandor OH 0.0008 178,956.00 134.22
JUMLAH HARGA TENAGA KERJA 28,096.09
B Bahan
1 Hak Angin Bh 1.0000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 20,000.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 48,096.09
E OVERHEAD & PROFIT 10 % 10 % X D 4,809.61
F HARGA SATUAN PEKERJAAN 52,905.70
ANALISA HARGA SATUAN PEKERJAAN
Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG
Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019

1 m2 Cat Permukaan Bidang Kayu


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.0700 144,159.00 10,091.13
2 Tukang OH 0.0090 154,101.00 1,386.91
3 Kepala Tukang OH 0.0060 178,956.00 1,073.74
4 Mandor OH 0.0025 178,956.00 447.39
JUMLAH HARGA TENAGA KERJA 12,999.17
B Bahan
1 Plamur kayu Kg 0.1500 20,000.00 3,000.00
2 Cat dasar Kg 0.1700 25,000.00 4,250.00
3 Cat penutup 2 kali Kg 0.2600 25,000.00 6,500.00

JUMLAH HARGA BAHAN 13,750.00


C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 26,749.17
E OVERHEAD & PROFIT 10 % 10 % X D 2,674.92
F HARGA SATUAN PEKERJAAN 29,424.08

1 Unit Pas. Kusen + Daun Pintu Type P1


NO URAIAN Kusen Kayu
Pabrikasi dan Pemasangan SATUAN KOEF HARGA SATUAN JUMLAH HARGA
1 Besi M3 0.0360 9,429,668.82 339,468.08
Pabrikasi dan Pemasangan Daun Pintu
2 M2 1.8450 857,006.26 1,581,176.55
Panil
3 Pemasangan Kaca Polos t=5mm M2 0.1200 242,655.70 29,118.68
4 Pemasangan Engsel Bh 3.0000 63,905.70 191,717.10
5 Pemasangan Grandel Bh 2.0000 52,905.70 105,811.40
6 Pengecetan Kusen m2 2.2800 13,750.00 31,350.00
7 Pengecetan Daun Pintu m2 3.6900 13,750.00 50,737.50
8 Pemasangan Kunci Tanam Bh 2.0000 199,294.07 398,588.15

A JUMLAH HARGA 2,727,967.46


B HARGA SATUAN PEKERJAAN 2,727,967.46

1 Unit Pas. Kusen + Daun Pintu Type P2


NO URAIAN Kusen Kayu
Pabrikasi dan Pemasangan SATUAN KOEF HARGA SATUAN JUMLAH HARGA
1 Besi M3 0.0260 9,429,668.82 245,171.39
Pabrikasi dan Pemasangan Daun Pintu
2 M2 1.8450 857,006.26 1,581,176.55
Panil
3 Pemasangan Engsel Bh 3.0000 63,905.70 191,717.10
4 Pemasangan Grandel Bh 1.0000 52,905.70 52,905.70
5 Pengecetan Kusen m2 2.3800 13,750.00 32,725.00
6 Pengecetan Daun Pintu m2 3.6900 13,750.00 50,737.50
10 Pemasangan Kunci Tanam Bh 1.0000 199,294.07 199,294.07

A JUMLAH HARGA 2,353,727.32


B HARGA SATUAN PEKERJAAN 2,353,727.32

1 Unit Pas. Kusen + Daun Jendela Type J1


NO URAIAN Kusen Kayu
Pabrikasi dan Pemasangan SATUAN KOEF HARGA SATUAN JUMLAH HARGA
1 Besi M2 0.0800 9,429,668.82 754,373.51
Pabrikasi dan Pemasangan Bingkai Daun
2 M2 2.0400 661,405.01 1,349,266.22
Jendela
3 Pemasangan Kaca Polos t=5mm M2 1.2500 242,655.70 303,319.63
4 Pemasangan Engsel Bh 6.0000 63,905.70 383,434.21
5 Pemasangan Grandel Bh 3.0000 52,905.70 158,717.10
6 Pengecetan Kusen m2 3.2000 29,424.08 94,157.06
7 Pengecetan Bingkai Jendela m2 1.6800 29,424.08 49,432.46
8 Pemasangan Hak Angin Bh 6.0000 52,905.70 317,434.21

A JUMLAH HARGA 3,410,134.38


B HARGA SATUAN PEKERJAAN 3,410,134.38
ANALISA HARGA SATUAN PEKERJAAN
Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG
Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019

1 Unit Pas. Kusen + Daun Jendela Type J2


NO URAIAN Kusen Kayu
Pabrikasi dan Pemasangan SATUAN KOEF HARGA SATUAN JUMLAH HARGA
1 Besi M2 0.0603 9,429,669 568,137.55
Pabrikasi dan Pemasangan Bingkai Daun
2 M2 1.0200 661,405 674,633.11
Jendela
3 Pemasangan Kaca Polos t=5mm M2 0.6300 242,656 152,873.09
4 Pemasangan Engsel Bh 6.0000 63,906 383,434.21
5 Pemasangan Grandel Bh 3.0000 52,906 158,717.10
6 Pengecetan Kusen m2 3.2000 29,424 94,157.06
7 Pengecetan Bingkai Jendela m2 2.0400 29,424 60,025.13
8 Pemasangan Hak Angin Bh 6.0000 52,906 317,434.21

A JUMLAH HARGA 2,409,411.45


B HARGA SATUAN PEKERJAAN 2,409,411.45

1 Unit Pas. BV
NO URAIAN Kusen Kayu
Pabrikasi dan Pemasangan SATUAN KOEF HARGA SATUAN JUMLAH HARGA
1 Besi M2 0.0400 9,429,669 377,186.75
2 Pemasangan Kaca Polos t=5mm M2 0.0980 242,656 23,780.26

A JUMLAH HARGA 400,967.01


B HARGA SATUAN PEKERJAAN 400,967.01

1 m2 Penutup Seng BJLS 30


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.0200 144,159.00 2,883.18
2 Tukang OH 0.0800 154,101.00 12,328.08
3 Kepala Tukang OH 0.0100 178,956.00 1,789.56
4 Mandor OH 0.0067 178,956.00 1,193.04
JUMLAH HARGA TENAGA KERJA 18,193.86
B Bahan
1 Atap Spandek 0.25 mm m' 1.4286 20,000.00 28,571.43

JUMLAH HARGA BAHAN 28,571.43


C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 46,765.29
E OVERHEAD & PROFIT 10 % 10 % X D 4,676.53
F HARGA SATUAN PEKERJAAN 51,441.82

1 m Pasang Nok
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.1500 144,159.00 21,623.85
2 Tukang Kayu OH 0.0700 154,101.00 10,787.07
3 Kepala Tukang OH 0.0080 178,956.00 1,431.65
4 Mandor OH 0.0060 178,956.00 1,073.74
JUMLAH HARGA TENAGA KERJA 34,916.30
B Bahan
1 Nok Spandek M¹ 1.0000 45,000.00 45,000.00
2 Paku Metal Roof Kg 0.0400 200.00 8.00
JUMLAH HARGA BAHAN 45,008.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 79,924.30
E OVERHEAD & PROFIT 10 % 10 % X D 7,992.43
F HARGA SATUAN PEKERJAAN 87,916.73
ANALISA HARGA SATUAN PEKERJAAN
Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG
Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019

1 m Pasang Listplank
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.1000 144,159.00 14,415.90
2 Tukang Kayu OH 0.2000 154,101.00 30,820.20
3 Kepala Tukang OH 0.0200 178,956.00 3,579.12
4 Mandor OH 0.0050 178,956.00 894.78
JUMLAH HARGA TENAGA KERJA 49,710.00
B Bahan
1 Papan 2x20 M3 0.0108 3,500,000.00 37,800.00
2 Paku Kg 0.1000 15,000.00 1,500.00

JUMLAH HARGA BAHAN 39,300.00


C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 89,010.00
E OVERHEAD & PROFIT 10 % 10 % X D 8,901.00
F HARGA SATUAN PEKERJAAN 97,911.00

1 m2 Pasang Pondasi Rolag Bata Merah


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.3000 144,159.00 43,247.70
2 Tukang OH 0.1000 154,101.00 15,410.10
3 Kepala Tukang OH 0.0100 178,956.00 1,789.56
4 Mandor OH 0.0150 178,956.00 2,684.34
JUMLAH HARGA TENAGA KERJA 63,131.70
B Bahan
1 Bata Merah Bh 70.0000 1,300.00 91,000.00
2 Semen portland Kg 18.9500 1,500.00 28,425.00
3 Pasir pasang m3 0.0380 110,000.00 4,180.00
JUMLAH HARGA BAHAN 123,605.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 186,736.70
E OVERHEAD & PROFIT 10 % 10 % X D 18,673.67
F HARGA SATUAN PEKERJAAN 205,410.37

1 m2 PEMASANGAN KERAMIK 20 x 20
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.7000 144,159.00 100,911.30
2 Tukang Batu OH 0.3500 154,101.00 53,935.35
3 Kepala Tukang OH 0.0350 178,956.00 6,263.46
4 Mandor OH 0.0350 178,956.00 6,263.46
JUMLAH HARGA TENAGA KERJA 167,373.57
B Bahan
1 Keramik uk. 20 x 20 cm Anti Selip Dos 1.1000 65,000.00 71,500.00
2 Semen Portland (PC) Kg 10.0000 1,500.00 15,000.00
3 Semen Warna Kg 1.5000 7,000.00 10,500.00
4 Pasir Pasang M³ 0.0450 110,000.00 4,950.00
JUMLAH HARGA BAHAN 101,950.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 269,323.57
E OVERHEAD & PROFIT 10 % 10 % X D 26,932.36
F HARGA SATUAN PEKERJAAN 296,255.93
ANALISA HARGA SATUAN PEKERJAAN
Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG
Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019

1 m2 PEMASANGAN KERAMIK 20 x 25
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.7000 144,159.00 100,911.30
2 Tukang Batu OH 0.3500 154,101.00 53,935.35
3 Kepala Tukang OH 0.0350 178,956.00 6,263.46
4 Mandor OH 0.0350 178,956.00 6,263.46
JUMLAH HARGA TENAGA KERJA 167,373.57
B Bahan
1 Keramik uk. 20 x 20 cm Anti Selip Dos 1.1000 75,000.00 82,500.00
2 Semen Portland (PC) Kg 10.0000 1,500.00 15,000.00
3 Semen Warna Kg 1.5000 7,000.00 10,500.00
4 Pasir Pasang M³ 0.0450 110,000.00 4,950.00
JUMLAH HARGA BAHAN 112,950.00
C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 280,323.57
E OVERHEAD & PROFIT 10 % 10 % X D 28,032.36
F HARGA SATUAN PEKERJAAN 308,355.93
ANALISA HARGA SATUAN PEKERJAAN

Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG


Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019
PEKERJAAN : MEKANIKAL ELEKTRIKAL
1 Unit Pas. MCB
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.3600 144,159.00 51,897.24
2 Tukang OH 0.6000 154,101.00 92,460.60
3 Kepala Tukang OH 0.0600 178,956.00 10,737.36
4 Mandor OH 0.0180 178,956.00 3,221.21
JUMLAH HARGA TENAGA KERJA 158,316.41
B Bahan
1 MCB Bh 1.0000 150,000.00 150,000.00

JUMLAH HARGA BAHAN 150,000.00


C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 308,316.41
E OVERHEAD & PROFIT 10 % 10 % X D 30,831.64
F HARGA SATUAN PEKERJAAN 339,148.05

1 Unit Instalasi Penerangan, Sakelar dan Stop Kontak


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.3600 144,159.00 51,897.24
2 Tukang OH 0.6000 154,101.00 92,460.60
3 Kepala Tukang OH 0.0600 178,956.00 10,737.36
4 Mandor OH 0.0180 178,956.00 3,221.21
JUMLAH HARGA TENAGA KERJA 158,316.41
B Bahan
1 Kabel NYM 3x2,5mm2 M¹ 8.0000 3,500.00 28,000.00
2 Pipa Listrik PVC 1/2'' M¹ 3.0000 4,500.00 13,500.00
3 Tee Doz Bh 1.0000 3,000.00 3,000.00
4 Isolasi Listrik Bh 0.2000 2,000.00 400.00
5 Paku Klem Listrik Kg 0.3000 7,000.00 2,100.00

JUMLAH HARGA BAHAN 47,000.00


C Peralatan

- - -
JUMLAH HARGA PERALATAN -
D JUMLAH HARGA 205,316.41
E OVERHEAD & PROFIT 10 % 10 % X D 20,531.64
F HARGA SATUAN PEKERJAAN 225,848.05
ANALISA HARGA SATUAN PEKERJAAN

Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG


Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019

1 Titik Pas.Stop Kontak


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.0150 144,159.00 2,162.39
2 Tukang OH 0.1500 154,101.00 23,115.15
3 Kepala Tukang OH 0.0150 178,956.00 2,684.34
4 Mandor OH 0.0075 178,956.00 1,342.17
JUMLAH HARGA TENAGA KERJA 29,304.05
B Bahan
1 Stop Kontak Bh 1.0000 25,000.00 25,000.00

JUMLAH HARGA BAHAN 25,000.00


C Peralatan

- - -
JUMLAH HARGA PERALATAN -
D JUMLAH HARGA 54,304.05
E OVERHEAD & PROFIT 10 % 10 % X D 5,430.40
F HARGA SATUAN PEKERJAAN 59,734.45

1 Titik Pas.Sakelar Tunggal


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
1 Pekerja OH 0.0150 144,159.00 2,162.39
2 Tukang OH 0.1500 154,101.00 23,115.15
3 Kepala Tukang OH 0.0150 178,956.00 2,684.34
4 Mandor OH 0.0075 178,956.00 1,342.17
JUMLAH HARGA TENAGA KERJA 29,304.05
B Bahan
1 Saklar Tunggal Bh 1.0000 25,000.00 25,000.00

JUMLAH HARGA BAHAN 25,000.00


C Peralatan

- - -
JUMLAH HARGA PERALATAN -
D JUMLAH HARGA 54,304.05
E OVERHEAD & PROFIT 10 % 10 % X D 5,430.40
F HARGA SATUAN PEKERJAAN 59,734.45
ANALISA HARGA SATUAN PEKERJAAN

Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG


Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019

1 Titik Pas.Sakelar Ganda


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
Pekerja OH 0.0150 144,159.00 2,162.39
Tukang OH 0.1500 154,101.00 23,115.15
Kepala Tukang OH 0.0150 178,956.00 2,684.34
Mandor OH 0.0075 178,956.00 1,342.17
JUMLAH HARGA TENAGA KERJA 29,304.05
B Bahan
Saklar Ganda Bh 1.0000 30,000.00 30,000.00
-
JUMLAH HARGA BAHAN 30,000.00
C Peralatan

- - -
JUMLAH HARGA PERALATAN -
D JUMLAH HARGA 59,304.05
E OVERHEAD & PROFIT 10 % 10 % X D 5,930.40
F HARGA SATUAN PEKERJAAN 65,234.45

1 Bh Pas. Lampu XL 20 Watt


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
Pekerja OH 0.0150 144,159.00 2,162.39
Tukang OH 0.1500 154,101.00 23,115.15
Kepala Tukang OH 0.0150 178,956.00 2,684.34
Mandor OH 0.0075 178,956.00 1,342.17
JUMLAH HARGA TENAGA KERJA 29,304.05
B Bahan
Lampu XL 20 Watt Bh 1.0000 55,000.00 55,000.00

JUMLAH HARGA BAHAN 55,000.00


C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 84,304.05
E OVERHEAD & PROFIT 10 % 10 % X D 8,430.40
F HARGA SATUAN PEKERJAAN 92,734.45
ANALISA HARGA SATUAN PEKERJAAN

Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG


Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019

1 Bh Pasang Kloset Jongkok


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
Pekerja OH 1.0000 144,159.00 144,159.00
Tukang Batu OH 1.5000 154,101.00 231,151.50
Kepala Tukang OH 0.1500 178,956.00 26,843.40
Mandor OH 0.1600 178,956.00 28,632.96
JUMLAH HARGA TENAGA KERJA 430,786.86
B Bahan
Kloset Jongkok Porselen Unit 1.0000 180,000.00 180,000.00
Semen Portland (PC) Kg 6.0000 1,500.00 9,000.00
Pasir Pasang M³ 0.0100 110,000.00 1,100.00

JUMLAH HARGA BAHAN 190,100.00


C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 620,886.86
E OVERHEAD & PROFIT 10 % 10 % X D 62,088.69
F HARGA SATUAN PEKERJAAN 682,975.55

1 Bh Pasang Floordrain
NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
Pekerja OH 0.0100 144,159.00 1,441.59
Tukang Pipa OH 0.1000 154,101.00 15,410.10
Kepala Tukang OH 0.0100 178,956.00 1,789.56
Mandor OH 0.0050 178,956.00 894.78
JUMLAH HARGA TENAGA KERJA 19,536.03
B Bahan
Floor Drain Unit 1.0000 110,000.00 110,000.00

JUMLAH HARGA BAHAN 110,000.00


C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 129,536.03
E OVERHEAD & PROFIT 10 % 10 % X D 12,953.60
F HARGA SATUAN PEKERJAAN 142,489.63
ANALISA HARGA SATUAN PEKERJAAN

Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG


Nama Paket : PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019

1 Bh Pasang Kran Air


NO URAIAN SATUAN KOEF HARGA SATUAN JUMLAH HARGA
A Tenaga Kerja
Pekerja OH 0.0100 144,159.00 1,441.59
Tukang Pipa OH 0.1000 154,101.00 15,410.10
Kepala Tukang OH 0.0100 178,956.00 1,789.56
Mandor OH 0.0050 178,956.00 894.78
JUMLAH HARGA TENAGA KERJA 19,536.03
B Bahan
Kran Air Unit 1.0000 25,000.00 25,000.00

JUMLAH HARGA BAHAN 25,000.00


C Peralatan

JUMLAH HARGA PERALATAN -


D JUMLAH HARGA 44,536.03
E OVERHEAD & PROFIT 10 % 10 % X D 4,453.60
F HARGA SATUAN PEKERJAAN 48,989.63
DAFTAR HARGA SATUAN DASAR
TENAGA KERJA, BAHAN DAN PERALATAN

Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG


PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA
Nama Paket :
MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019

No. UPAH / BAHAN SATUAN HARGA SATUAN KET.

I HARGA UPAH

1 Mandor OH Rp 178,956.00 On Site


2 Kepala Tukang OH Rp 178,956.00 On Site
3 Tukang Batu OH Rp 154,101.00 On Site
4 Tukang Kayu OH Rp 154,101.00 On Site
5 Tukang Besi OH Rp 154,101.00 On Site
6 Tukang Pipa OH Rp 154,101.00 On Site
7 Tukang Las OH Rp 154,101.00 On Site
8 Tukang Cat OH Rp 154,101.00 On Site
9 Tukang Listrik OH Rp 154,101.00 On Site
10 Pekerja OH Rp 144,159.00 On Site

II. HARGA MATERIAL

A. BAHAN PASIR
1 Pasir Plester M3 Rp 200,000.00 On Site
2 Pasir Pasang M3 Rp 110,000.00 On Site
3 Pasir Cor M3 Rp 140,000.00 On Site
4 Tanah Urug M3 Rp 35,000.00 On Site
B. BAHAN BATU
1 Batu Pecah 2 - 3 cm M3 Rp 400,000.00 On Site
2 Bata Merah Bh Rp 1,300.00 On Site
3 Batu Gunung M³ Rp 330,000.00 On Site
C. BAHAN SEMEN
1 Semen Portland @ 50 Kg (PC) Sak Rp 75,000.00 On Site
2 Semen Portland (PC) Kg Rp 1,500.00 On Site
3 Semen Warna Kg Rp 7,000.00 On Site
4 Air Ltr Rp 100.00 On Site
D. BAHAN LANTAI
1 Keramik uk. 40 x 40 cm Bh Rp 6,666.67 On Site
2 Keramik uk. 20 x 20 cm Bh Rp 2,600.00 On Site
3 Keramik uk. 20 x 25 cm Bh Rp 3,750.00 On Site
E. BAHAN KAYU
1 Balok Kayu Kelas I M3 Rp 3,500,000.00 On Site
2 Papan Kayu Kelas II M3 Rp 2,500,000.00 On Site
3 Balok Kayu Kelas II M3 Rp 2,300,000.00 On Site
4 Kayu Kelas III M3 Rp 1,600,000.00 On Site
5 Balok Kayu 5 x 7 cm Kelas III M3 Rp 1,600,000.00 On Site
6 Papan Kayu Kelas III M3 Rp 1,600,000.00 On Site
DAFTAR HARGA SATUAN DASAR
TENAGA KERJA, BAHAN DAN PERALATAN

Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG


PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA
Nama Paket :
MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019

No. UPAH / BAHAN SATUAN HARGA SATUAN KET.

7 Dolken Kayu Ø 8 - 10 cm, p = 4 m Btg Rp 20,000.00 On Site


F. BAHAN KAYU LAPIS
1 Multiplek 9 mm Lbr Rp 110,000.00 On Site
2 Tripleks 4 mm Lbr Rp 72,000.00 On Site
3 List Plafond Kayu M Rp 15,000.00 On Site
G. BAHAN BESI
1 Besi Beton Polos Kg Rp 10,000.00 On Site
2 Besi Strip Kg Rp 5,000.00 On Site
3 Kawat Ikat Beton (Bendrat) Kg Rp 12,000.00 On Site
4 Paku 5 - 7 cm Kg Rp 15,000.00 On Site
5 Paku 5 - 10 cm Kg Rp 15,000.00 On Site
6 Paku 5 - 12 cm Kg Rp 15,000.00 On Site
7 Paku 10 cm Kg Rp 15,000.00 On Site
8 Paku 12 cm Kg Rp 15,000.00 On Site
9 Paku Tripleks Kg Rp 17,000.00 On Site
H. BAHAN PENUTUP ATAP
1 Main Truss C 80.0,75 M¹ Rp 22,500.00
2 Roof Bottom R 35-0,75 M¹ Rp 10,000.00
3 Self Drilling Screw dia.6x20 mm (Trsuss Screw) Bh Rp 200.00
4 Self Drilling Screw dia.4x16 mm (Roof bottom Screw) Bh Rp 200.00
5 Dynabolt dia.10 x 80 mm Bh Rp 1,000.00
6 Spandek 0,25 Lbr Rp 120,000.00 On Site
7 Nok Spandek Polos M¹ Rp 45,000.00 On Site
8 Baut Genteng bh Rp 200.00 On Site
9 Listplang GRC m1 Rp 25,000.00 On Site
8 Paku Sekrup Kg Rp 15,000.00 On Site

I. BAHAN PENGECATAN
1 Cat Meni Kayu Kg Rp 25,000.00 On Site
2 Cat Dasar Kayu Kg Rp 25,000.00 On Site
3 Cat Penutup Kayu Kg Rp 25,000.00 On Site
4 Cat Dasar Tembok Interior Kg Rp 15,000.00 On Site
5 Cat Penutup Tembok Interior Kg Rp 52,000.00 On Site
6 Cat Dasar Tembok Exterior Kg Rp 15,000.00 On Site
7 Cat Penutup Tembok Exterior Kg Rp 64,000.00 On Site
8 Plamur Tembok Kg Rp 8,000.00 On Site
9 Plamur Kayu Kg Rp 20,000.00 On Site
J. BAHAN KACA
1 Kaca Polos 5 mm M2 Rp 175,000.00 On Site
K. BAHAN ASSESSORIES PINTU JENDELA
1 Engsel pintu Bh Rp 30,000.00 On Site
2 Engsel jendela Bh Rp 30,000.00 On Site
3 Kait Angin Bh Rp 20,000.00 On Site
4 Gerendel Pintu Bh Rp 20,000.00 On Site
5 Gerendel Jendela Bh Rp 20,000.00
6 Kunci Tanam bh Rp 100,000.00 On Site
L. BAHAN LAIN-LAIN
DAFTAR HARGA SATUAN DASAR
TENAGA KERJA, BAHAN DAN PERALATAN

Instansi : MADRASAH ALIYAH NEGERI KOTA SORONG


PEMBANGUNAN/PENYELESAIAN ASRAMA SISWA PADA
Nama Paket :
MADRASAH NEGERI
Nilai Kontrak : Rp. 459.420.000,-
Tahun Anggaran : 2019

No. UPAH / BAHAN SATUAN HARGA SATUAN KET.

1 Lem Kayu Kg Rp 20,000.00 On Site


2 Minyak Bekisting Kg Rp 10,000.00 On Site
3 Kloset Jongkok Bh Rp 180,000.00 On Site
4 Floordrain Bh Rp 110,000.00 On Site
5 Kran 3/4 Bh Rp 25,000.00 On Site

M. BAHAN LISTRIK
1 Lampu SL 25 Watt Bh Rp 55,000.00 On Site
2 Saklar Tunggal Bh Rp 25,000.00 On Site
3 Saklar Ganda Bh Rp 30,000.00 On Site
4 Paku Klem Listrik Kg Rp 7,000.00 On Site
5 Pipa Listrik PVC 1/2'' M Rp 4,500.00 On Site
6 Kabel NYM 3x2,5mm2 M Rp 3,500.00 On Site
7 Tee Doz Bh Rp 3,000.00 On Site
8 Isolasi Listrik Bh Rp 2,000.00 On Site
9 MCB + BOX Unit Rp 150,000.00 On Site
10 stop Kontak Unit Rp 25,000.00 On Site
VOLUME BONGKARAN VOLUME PASANGAN DINDING
13.5 9.49
3.57 8.72
11.07 13.5
3.51 12.9
24.6 7.79
10.39 3.57
5.47
5.47
66.91