Anda di halaman 1dari 1

20 ALIRAN KELUAR

19 ALIRAN MASUK
CTW
18 NOMOR ALIRAN
S
17 TEMPERATURE ( oC)
16 TEKANAN (atm)
15 ALIRAN LIQUID
14 ALIRAN PADAT
13 ALIRAN GAS
12 WC WEIGHT CONTROL
FRC FLOW RATIO CONTROL
11
10 LC LEVEL CONTROL
9 FC FLOW CONTROL

C-115 8 TC TEMPERATURE CONTROL


F-117 1 7 PC PRESSURE CONTROL
J-114 A
110 1
G-124 6 LI LEVEL INDICATOR
J-113 B J-114 B WC
1 6 PI PRESSURE INDICATOR
75
5
30 4 SC
8
STEAM CONDENSAT
1
C-116
3 CTWR COOLING TOWER WATER RETURN
F-111 E-125
J-113 A 2 S STEAM
TC 1 CTW COOLING TOWER WATER
V-120A V-120B
TC
NO SIMBOL KETERANGAN
J-113 C
110
TC TC
3
110
X-130
5
1
1 1
1
30
110 H-122
L-123
29 F-137 1
STORAGE ALUMINIUM SULFAT
2 110 108
F-121 2 28 P-136 PACKING 1
LI 3 7 9
85
27 F-135 BIN PRODUK 1
E-119 1 J-134 BUCKET ELEVATOR
L-131 10 26 1
1
L-118 L-121 30 50 24 J-133 VIBRATING CONVEYOR 1
4 23 H-132 CENTRIFUGE 1
F-135
H-132 22 X-130 KRISTALIZER 1
J-134 21 L-131 POMPA IV 1
WC 20 E-125 BAROMETRIK KONDENS OR 1
12
11 30 19 G-124 JET EJEKTOR 1
30 18 V-120 EVAPORATOR 2
F-137
17 L-123 POMPA III 1
J-133 16 H-122 SETTLING TANK 11
P-136 14 L-121 POMPA II 1
13 R-110 REAKTOR 2
12 E-119 HEATER 1
11 L-118 POMPA I 1
10 F-112 STORAGE ASAM SULFAT 5
9 F-117 BIN BAUXIE 1
8 J-114 B BUCKET ELEVATOR 1
7 J-113 C BELT CONVEYOR 1
6 C-116 HAMMER MILL 1
5 J-113 B BELT CONVEYOR 1
4 C-115 JAW CRUSHER 1
CTWR J-114 A BUCKET ELEVATOR
3 1
SC
2 J-113 A BELT CONVEYOR 1
1 F-111 STORAGE BAUXITE 1
W NO KODE NAMA ALAT JML

Material Balance (kg/jam)


Nomor Aliran
Komponen BM
1 2 3 4 5 56 7 8 9 10 11 12 PROGRAM STUDI TEKNIK KIMIA
FAKULTAS TEKNOLOGI INDUSTRI
Al2(SO4)3 342,12 INSTITUT TEKNOLOGI NASIONAL MALANG
Fe2O3 159,8
FLOW SHEET
Al2O3 101,94 PRA RENCANA PABRIK
ALUMINIUM SULFAT DARI DENGAN PROSES DORR
TiO2 79,9 KAPASASITAS PRODUKSI 80.000 TON/TAHUN
H2O 18,0
DIRANCANG OLEH: DOSEN PEMBIMBING:
H2SO4 98,08
SiO2 60,06
Al2(SO4)3.18H2O 666
Total Galih Pikatra 17.14.001 M. Istnaeny Hudha S.T, M.T.
Jim Mualimin 17.14.020 NIP P 1030400400