I PEKERJAAN PERMULAAN
1 Pembersihan Lapangan 21.93 m2 9,750.00 213,817.50
2 Pasangan Bowplank 9.40 m1 58,295.00 547,973.00
3 Pekerjaan Pembongkaran Dinding 1.00 ls 539,000.00 539,000.00
4 Pekerjaan Pembongkaran Plafon 91.21 m2 7,524.00 686,264.04
4 Pembobokan Pondasi lama 1.00 ls 515,000.00 515,000.00
5 Galian Tanah Pondasi 12.74 m3 43,375.00 552,597.50
6 Urugan Pasir 0.62 m3 65,350.00 40,517.00
7 Pasangan Aanstampang 1.68 m3 262,860.00 441,604.80
8 Pasangan Pondasi batu kali 4.04 m3 542,975.00 2,190,904.13
9 Pasangan Pondasi Plat 1.20 m3 2,247,181.47 2,696,617.77
10 Urugan Kembali 3.19 m3 14,458.33 46,049.79
SUB TOTAL I 7,784,081.49
II PEKERJAAN BETON & DINDING
1 Pasangan Sloof 20/30 1.43 m3 3,310,724.00 4,747,578.22
2 Pasangan Kolom 25/25 1.00 m3 7,281,883.80 7,281,883.80
3 Pasangan Ring Balok 20/25 1.20 m3 4,290,361.70 5,126,982.24
4 Pas. Lisplank Beton tebal 8 0.04 m3 3,146,207.52 124,589.82
5 Pasangan Bata 1 : 2 5.64 M2 114,905.00 648,064.20
6 Pasangan Bata 1 : 4 55.16 M2 106,365.00 5,867,093.40
7 Pasangan Kuzen 0.04 m3 4,190,500.00 172,858.13
8 Meni Kunzen 3.30 m2 15,000.00 49,500.00
9 Pasangan Anggker Kuzen 0.62 kg 23,400.00 14,478.75
SUB TOTAL II 24,033,028.54
III PEKERJAAN ATAP
1 Pasangan Plat Beton Bertulang t. 12 cm 2.70 m3 4,152,382.25 11,228,872.08
SUB TOTAL III 11,228,872.08
IV PEKERJAAN LANTAI
1 Urugan Tanah 2.19 m3 50,458.33 110,655.13
2 Urugan Pasir 1.10 m3 65,350.00 71,656.28
3 Cor Lantai 1.10 m3 365,971.43 401,287.67
4 Pasangan Keramik Lantai 40 X 40 CM 21.93 m2 139,975.00 3,069,651.75
SUB TOTAL IV 3,653,250.82
V PEKERJAAN PLESTERAN
1 Plesteran 1 : 2 11.28 m2 38,243.80 431,390.06
2 Plesteren 1 : 4 110.32 m2 33,783.00 3,726,940.56
3 Acian 121.60 m2 21,180.00 2,575,488.00
4 Afwerking Beton 6.00 m2 42,979.80 257,878.80
SUB TOTAL V 6,991,697.42
VI PEKERJAAN PLAFON
1 Pasangan Rangka Plafon 113.14 m2 79,705.00 9,017,823.70
2 Pasangan Plafon Triplek t=4mm 113.14 m2 32,392.50 3,664,887.45
3 Pasangan List Profil loteng 4 x 4 110.00 m1 12,590.00 1,384,900.00
SUB TOTAL VI 14,067,611.15
VII PEKERJAAN JENDELA
1 Pasangan Jendela rangka kaca 0.70 m2 271,900.00 190,330.00
2 Pasangan Engsel Jendela 3" 2.00 bh 18,942.50 37,885.00
3 Pasangan Tangan - tangan Jendela 2.00 bh 22,885.00 45,770.00
4 Pasangan Grendel Jendela 2.00 bh 25,885.00 51,770.00
5 Pasangan Kait angin Jendela 2.00 bh 18,413.75 36,827.50
SUB TOTAL VII 362,582.50
VIII PEKERJAAN CAT
1 Pengecatan Plat Beton Dengan Water Prufing 22.54 m2 34,797.50 784,161.66
2 Pengecatan Kuzen (cat minyak) 50.33 m2 24,772.50 1,246,839.56
3 Pengecatan Pintu & Jendela (cat minyak) 14.18 m2 24,772.50 351,150.19
4 Pengecatan dinding (cat air) 372.23 m2 13,923.00 5,182,488.68
5 Pengecatan Plafon (cat air) 114.00 m2 13,923.00 1,587,222.00
SUB TOTAL VIII 9,151,862.09
TOTAL 77,272,986.09
REKAPITULASI
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : REHAB KANTOR LURAH AUR KUNING
LOKASI : KANTOR LURAH AUR KUNING
TH. ANGG : 2013
NO URAIAN JUMLAH
_____________________ _____________________
Nip. Nip.
Disetujui Oleh,
Kuasa Pengguna Anggaran
_____________________
Nip.
ACTUAL CHECK
PEKERJAAN : REHAB KANTOR LURAH AUR KUNING
LOKASI : KANTOR LURAH AUR KUNING
TH. ANGG : 2013
PEKERJAAN PERMULAAN
6 Pasangan Pondasi batu kali =( 0.30 + 0.60 ) x 0.60 x 10.50 x 1.00 = 2.84 m3
2 0.45
1.24 m2
PEKERJAAN LANTAI
1 Urugan Tanah
= 0.1 x 5.1 x 4.3 = 2.193
PEKERJAAN LOTENG
PEKERJAAN JENDELA
PEKERJAAN CAT
luas kusen
= 323.40 - 14.18 = 309.23 = 309.23
Pengecatan dinding (cat air) Jumlah 372.23 m2
cat plafon baru
5 Pengecatan Plafon (cat air) = 5.3 x 4.3 = 22.79
cat plafon lama
= 13.3 x 5.5 = 73.15 = 91.21
= 4.2 x 4.3 = 18.06 Jumlah 114.00 m2
RENCANA ANGGARAN BIAYA
PROGRAM :
KEGIATAN :
PEKERJAAN :
LOKASI :
TH. ANGG :
I PEKERJAAN PERMULAAN
1 Pembersihan Lapangan 21.93 m2 9,750.00 213,817.50
2 Pasangan Bowplank 9.40 m1 58,295.00 547,973.00
3 Galian Tanah Pondasi 12.74 m3 43,375.00 552,597.50
4 Urugan Pasir 0.62 m3 65,350.00 40,517.00
5 Pasangan Aanstampang 1.68 m3 262,860.00 441,604.80
6 Pasangan Pondasi batu kali 4.04 m3 542,975.00 2,190,904.13
7 Pasangan Pondasi Plat 8.00 Ttk 1,896,000.00 15,168,000.00
8 Urugan Kembali 3.19 m3 14,458.33 46,049.79
SUB TOTAL I 19,201,463.72
II PEKERJAAN BETON & DINDING
1 Pasangan Sloof 15/20 1.43 m3 4,845,629.06 6,948,632.07
2 Pasangan Kolom Praktis 13/13 1.56 m3 10,031,450.30 15,681,664.68
3 Pasangan Kolom 20/20 - m3 6,254,205.60 -
4 Pasangan Kolom 20/50 1.00 m3 4,660,706.98 4,660,706.98
5 Pasangan Kolom 25/100 - m3 3,391,940.34 -
6 Pasangan Balok Pinggang 13/20 0.62 m3 6,130,933.80 3,809,762.26
7 Pasangan Ring Balok 13/20 1.20 m3 6,130,933.80 7,326,465.89
8 Pas. Plat Jendela 1.29 m3 3,146,207.52 4,058,607.70
9 Pasangan Bata 1 : 2 5.64 M2 114,905.00 648,064.20
10 Pasangan Bata 1 : 4 55.16 M2 106,365.00 5,867,093.40
11 Pasangan Kuzen 0.17 m3 4,190,500.00 691,432.50
12 Meni Kunzen 15.10 m2 15,000.00 226,492.20
13 Pasangan Anggker Kuzen 2.48 kg 23,400.00 57,915.00
SUB TOTAL II 49,976,836.89
III PEKERJAAN ATAP
1 Pasangan Kuda kuda Rangka Atap Baja Ringan 155.73 m2 160,000.00 24,917,408.00
2 Pasangan List Plank Kayu Double dipropil 15.30 m2 81,825.00 1,251,922.50
3 Pasangan Khilgot 21.89 m1 88,425.00 1,935,256.82
4 Pasangan Atap Genteng Metal 155.73 m2 73,455.00 11,439,426.28
5 Pasangan Nok Genteng Metal 15.63 m1 51,430.00 803,858.56
6 Pasangan Dak Beton t. 10 cm 2.70 m3 3,146,207.52 8,507,974.38
SUB TOTAL III 48,855,846.54
IV PEKERJAAN LANTAI
1 Urugan Tanah 18.75 m3 50,458.33 946,093.75
2 Urugan Pasir 13.75 m3 65,350.00 898,562.50
3 Cor Lantai 0.09 m3 365,971.43 32,022.50
4 Pasangan Keramik Lantai 40 X 40 CM 121.36 m2 139,975.00 16,986,666.13
5 Pasangan Keramik Teras 40 X 40 CM 21.93 m2 139,975.00 3,069,651.75
6 Pasangan Keramik lantai WC 3.65 m2 136,055.00 495,920.48
SUB TOTAL IV 22,428,917.10
NO URAIAN VOLUME H. SATUAN JUMLAH SATUAN
V PEKERJAAN PLESTERAN
1 Plesteran 1 : 2 11.28 m2 38,243.80 431,390.06
2 Plesteren 1 : 4 110.32 m2 33,783.00 3,726,940.56
3 Acian 121.60 m2 21,180.00 2,575,488.00
4 Afwerking Beton 36.72 m2 42,979.80 1,578,218.26
5 Pas. Keramik Dinding KM / WC uk. 20/25 29.85 m2 142,925.00 4,266,311.25
SUB TOTAL V 12,578,348.13
VI PEKERJAAN LOTENG
1 Pasangan Rangka Loteng Dalam 125.00 m2 79,705.00 9,963,125.00
2 Pasangan Rangka Loteng Luar 49.83 m2 79,705.00 3,971,349.45
3 Pasangan Loteng Triplek t=4mm Dalam 125.00 m2 32,392.50 4,049,062.50
4 Pasangan Loteng Triplek t=4mm Luar 49.83 m2 32,392.50 1,613,975.75
5 Pasangan List Profil loteng 4 x 4 dalam 336.28 m1 12,590.00 4,233,765.20
6 Pasangan List Profil loteng 4 x 4 luar 20.00 m1 12,590.00 251,800.00
SUB TOTAL VI 24,083,077.90
VII PEKERJAAN PINTU & JENDELA
1 Pasangan Pintu Panil 15.28 m2 351,500.00 5,371,623.00
2 Pasang Pintu WC (Fiber) 3.00 set 286,000.00 858,000.00
3 Pasangan Jendela rangka kaca 0.70 m2 271,900.00 190,330.00
4 Pasangan Kunci tanam 2 x slagh' 9.00 bh 211,221.25 1,900,991.25
5 Pasangan Kunci Tanam bodi Pelor 1.00 bh 211,221.25 211,221.25
6 Pasangan Engsel pintu 4" 33.00 bh 25,413.75 838,653.75
7 Pasangan Engsel Jendela 3" 40.00 bh 18,942.50 757,700.00
8 Pasang Tangan Pintu 2.00 ps 210,000.00 420,000.00
9 Pasangan Tangan - tangan Jendela 20.00 bh 22,885.00 457,700.00
10 Pasangan Grendel Jendela 40.00 bh 25,885.00 1,035,400.00
11 Pasangan Grendel Tanam Pintu 1.00 ps 127,500.00 127,500.00
12 Pasangan Kait angin Jendela 40.00 bh 18,413.75 736,550.00
SUB TOTAL VII 12,905,669.25
VIII PEKERJAAN CAT
1 Pengecatan Kuzen (cat minyak) 50.33 m2 24,772.50 1,246,839.56
2 Pengecatan Pintu & Jendela (cat minyak) 14.18 m2 24,772.50 351,150.19
3 Pengecatan List Plank (cat minyak) 15.30 m2 24,772.50 379,019.25
4 Pengecatan dinding (cat air) 158.32 m2 13,923.00 2,204,289.36
5 Pengecatan Loteng (cat air) 174.83 m2 13,923.00 2,434,096.83
SUB TOTAL VIII 6,615,395.19
IX PEKERJAAN INSTALASI LISTRIK
1 Pasangan Instalasi Listrik 26 ttk 140,000.00 3,640,000.00
2 Pasangan Saklar Tunggal 10 bh 22,000.00 220,000.00
3 Pasangan Saklar Ganda 3 bh 25,000.00 75,000.00
4 Pasangan Stop Kontak 9 bh 22,000.00 198,000.00
5 Pasangan Lampu xl 23 watt 12 bh 32,000.00 384,000.00
6 Pasangan Lampu xl 18 watt 5 bh 25,000.00 125,000.00
7 Memasukan Daya Listrik 900 watt 1 Ls 1,200,000.00 1,200,000.00
SUB TOTAL IX 5,842,000.00
X PEKERJAAN INSTALASI AIR
1 Pasangan Pipa Tinja 4" 24 m1 - -
2 Pasangan Pipa Air Kotor 3" 7 m1 34,248.00 239,736.00
3 Pasangan Pipa saluran 2 " 9 m1 20,705.50 186,349.50
4 Pasangan Pipa 1/2" 27 m1 13,893.00 375,111.00
5 Pasangan Pipa 1" Ke Sumber Air 30 m1 13,893.00 416,790.00
6 Pasangan Kran Air 3 bh 40,450.00 121,350.00
7 Pasangan Kran Air Bebek Angsa 1 nh 40,450.00 40,450.00
NO URAIAN VOLUME H. SATUAN JUMLAH SATUAN
PEKERJAAN PAGAR