18 December 2020
s/d
24 December 2020
PEMBERI TUGAS :
BANGUNAN : Venue Utama Dan Lapangan Latihan Dalam Rangka Piala Dunia U-20 Tahun 2021
Di Provinsi Bali
LOKASI : BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
A VU : STADION I WAYAN DIPTA, BALI 94.972.543.681,64 68,264 3,88% 2,649 0,83% 0,565 4,71% 3,213
I PEKERJAAN PERSIAPAN 1.733.949.710,40 1,246 76,71% 0,956 0,00% 0,000 76,71% 0,956
II. PEKERJAAN STRUKTUR 4.294.863.078,56 3,087 1,26% 0,039 0,04% 0,001 1,29% 0,040
III. PEKERJAAN ARSITEKTUR 13.150.909.374,19 9,453 0,21% 0,020 2,62% 0,248 2,84% 0,268
IV PEKERJAAN MEKANIKAL ,ELEKTRIKAL DAN PLUMBING 35.394.149.588,60 25,441 0,00% 0,000 0,00% 0,000 0,00% 0,000
V PEKERJAAN LAPANGAN (FOP) 8.600.196.237,89 6,182 22,12% 1,367 5,11% 0,316 27,23% 1,683
VI. PEKERJAAN LAMPU LAPANGAN (LAMPU FOP) 2400 Lux 19.122.524.834,50 13,745 0,00% 0,000 0,00% 0,000 0,00% 0,000
VII. PENGADAAN DAN PEMASANGAN KURSI 5.929.071.520,00 4,262 2,19% 0,093 0,00% 0,000 2,19% 0,093
VIII. PEKERJAAN KAWASAN 6.634.179.337,50 4,769 3,62% 0,173 0,00% 0,000 3,62% 0,173
IX. PENAMBAHAN DAYA STADION I WAYAN DIPTA, BALI 112.700.000,00 0,081 0,00% 0,000 0,00% 0,000 0,00% 0,000
B LL.1 : STADION I GUSTI NGURAH RAI, BALI 11.922.189.389,03 8,569 7,37% 0,631 1,49% 0,127 8,85% 0,758
I. PEKERJAAN PERSIAPAN 88.765.540,00 0,064 79,29% 0,051 0,00% 0,000 79,29% 0,051
II. PEKERJAAN LAPANGAN (FOP) 3.876.534.669,22 2,786 20,84% 0,581 4,57% 0,127 25,40% 0,708
III. PEKERJAAN LAMPU LAPANGAN 800 Lux 6.541.908.120,60 4,702 0,00% 0,000 0,00% 0,000 0,00% 0,000
IV. PEKERJAAN AREA CA (COMPETITION AREA ) 1.239.031.059,21 0,891 0,00% 0,000 0,00% 0,000 0,00% 0,000
V. PENAMBAHAN DAYA STADION I GUSTI NGURAH RAI, BALI 175.950.000,00 0,126 0,00% 0,000 0,00% 0,000 0,00% 0,000
C. LL.4 : STADION KOMPYANG SUJANA, BALI 10.939.907.814,06 7,863 6,67% 0,524 1,70% 0,134 8,37% 0,658
I. PEKERJAAN PERSIAPAN 87.596.260,00 0,063 90,26% 0,057 0,00% 0,000 90,26% 0,057
II. PEKERJAAN LAPANGAN (FOP) 3.984.534.561,22 2,864 16,33% 0,468 4,68% 0,134 21,01% 0,602
III. PEKERJAAN LAMPU LAPANGAN 800 Lux 5.839.105.320,60 4,197 0,00% 0,000 0,00% 0,000 0,00% 0,000
IV. PEKERJAAN AREA CA (COMPETITION AREA ) 881.471.672,24 0,634 0,00% 0,000 0,00% 0,000 0,00% 0,000
V. PENAMBAHAN DAYA STADION KOMPYANG SUJANA, BALI 147.200.000,00 0,106 0,00% 0,000 0,00% 0,000 0,00% 0,000
D. LL.2B : LAPANGAN LATIHAN TRISAKTI, BALI 10.642.530.256,06 7,650 6,93% 0,530 1,45% 0,111 8,38% 0,641
I. PEKERJAAN PERSIAPAN 82.248.352,00 0,059 89,52% 0,053 0,00% 0,000 89,52% 0,053
II. PEKERJAAN LAPANGAN (FOP) 3.984.534.561,22 2,864 16,66% 0,477 3,87% 0,111 20,53% 0,588
III. PEKERJAAN LAMPU LAPANGAN 800 Lux 5.621.428.920,60 4,041 0,00% 0,000 0,00% 0,000 0,00% 0,000
IV. PEKERJAAN AREA CA (COMPETITION AREA ) 835.868.422,24 0,601 0,00% 0,000 0,00% 0,000 0,00% 0,000
V. PENAMBAHAN DAYA LAPANGAN LATIHAN TRISAKTI, BALI 118.450.000,00 0,085 0,00% 0,000 0,00% 0,000 0,00% 0,000
E. LL.2B : LAPANGAN LATIHAN GELORA SAMUDRA KUTA, BALI 10.647.573.034,37 7,649 7,32% 0,560 1,86% 0,142 9,18% 0,703
I. PEKERJAAN PERSIAPAN 82.248.352,00 0,059 89,52% 0,053 0,00% 0,000 89,52% 0,053
II. PEKERJAAN LAPANGAN (FOP) 3.984.534.561,22 2,864 17,71% 0,507 4,97% 0,142 22,68% 0,650
III. PEKERJAAN LAMPU LAPANGAN 800 Lux 5.621.428.920,60 4,041 0,00% 0,000 0,00% 0,000 0,00% 0,000
IV. PEKERJAAN AREA CA (COMPETITION AREA ) 840.911.200,55 0,604 0,00% 0,000 0,00% 0,000 0,00% 0,000
V. PENAMBAHAN DAYA LAPANGAN LATIHAN GELORA SAMUDRA KUTA, BALI 118.450.000,00 0,081 0,00% 0,000 0,00% 0,000 0,00% 0,000
Ade Buddhi Yoga Acyuta, ST Ir. Aleks Olii, MSC Dwi Aji Wicaksono
NIP. 199407032018021001 Team Leader Project Manager
1. MINGGU KE-5.xlsx
LAPORAN PROGRESS MINGGUAN
BANGUNAN : Venue Utama Dan Lapangan Latihan Dalam Rangka Piala Dunia U-20 Tahun 2021
Di Provinsi Bali
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
PLN PENAMBAHAN /PENYAMBUNGAN DAYA (98 Kva) 112.700.000,00 0,081 0,00% 0,000 0,00% 0,000 0,00% 0,000
SUB TOTAL STADION I WAYAN DIPTA, BALI 2,649 0,565 3,213
1. MINGGU KE-5.xlsx
LAPORAN PROGRESS MINGGUAN
BANGUNAN : Venue Utama Dan Lapangan Latihan Dalam Rangka Piala Dunia U-20 Tahun 2021
Di Provinsi Bali
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
5 Pekerjaan Plafond
a. Pekerjaan Bongkaran Plafond dan Buang Bekas Bongkaran
- Pembongkaran Plafond Existing (Lt.1, Lt.2, Lt.3 & Lt.4) Tribun Barat m2 5.739,99 0,095 8,66% 0,008 0,00% 0,000 8,66% 0,008
- Buang Ex. Bongkaran m3 860,95 0,015 6,35% 0,001 0,00% 0,000 6,35% 0,001
b. Pasangan Plafond Lantai - 1
- Pekerjaan Gypsum Board t: 9 mm + Rangka Hollow t:2,3 mm m2 2.473,01 0,182 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pekerjaan Gypsum Board WR t: 12 mm + Hollow t : 2,3 mm (Toilet) m2 229,24 0,026 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pekerjaan List Plafond Almunium Shadowline PN 307 uk. 10x10x0,40mm m' 1.483,80 0,041 0,00% 0,000 0,00% 0,000 0,00% 0,000
c. Pasangan Plafond Lantai - 2
- Pekerjaan Gypsum Board t: 9 mm + Rangka Hollow t:2,3 mm m2 1.283,86 0,094 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pekerjaan Gypsum Board WR t: 12 mm + Hollow t : 2,3 mm (Toilet) m2 80,84 0,009 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pekerjaan List Plafond Almunium Shadowline PN 307 uk. 10x10x0,40mm m' 770,32 0,021 0,00% 0,000 0,00% 0,000 0,00% 0,000
d. Pasangan Plafond Lantai - 3
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
a. Lantai - 1
Pintu Kaca (PK.01) & Jendela Aluminium 3" t: 1 mm Annodized + Daun Pintu
- unit 4,00 0,028 0,00% 0,000 0,00% 0,000 0,00% 0,000
Aluminium Annodized, Kaca Polos 8 mm
Pintu Double (PK.02) Frame Aluminium 3" t: 1 mm Annodized + Daun Pintu
- unit 3,00 0,014 0,00% 0,000 0,00% 0,000 0,00% 0,000
Aluminium Annodized, Kaca Polos 8 mm
Pintu Double (PK.03) Frame Aluminium 3" t: 1 mm Annodized + Daun Pintu
- unit 5,00 0,013 0,00% 0,000 0,00% 0,000 0,00% 0,000
Aluminium Annodized, Kaca Polos 8 mm
Pintu Double (PP.01) Kusen & Frame Galvanis steel Finish Powder Coating +
- unit 17,00 0,079 0,00% 0,000 0,00% 0,000 0,00% 0,000
Daun Pintu Plat Besi t 1,5 mm finish cat lengkap accessories
Pintu Single (PP.02) Kusen & Frame Galvanis steel Finish Powder Coating + Daun
- unit 5,00 0,018 0,00% 0,000 0,00% 0,000 0,00% 0,000
Pintu Plat Besi t 1,5 mm finish cat lengkap accessories
- Pintu Besi (PB.01) Frame Plat Besi t.2,0 mm + Daun Pintu Plat Besi + accs unit 10,00 0,062 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pintu Besi (PB.02) Frame Plat Besi t.2,0 mm + Daun Pintu Plat Besi + accs unit 5,00 0,024 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pintu Besi (PB.03) Frame Plat Besi t.2,0 mm + Daun Pintu Plat Besi + Accs unit 5,00 0,020 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pintu Automatic (PB.04 )/Square Steel Tube 1 set uk.950x350 cm unit 2,00 0,040 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pintu Automatic (PB.04A) /Square Steel Tube 1 set uk.950x350 cm unit 1,00 0,020 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pintu Automatic (PB.05) /Square Steel Tube 1 set uk.950x350 cm unit 2,00 0,040 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pintu Automatic (PB.06) /Square Steel Tube 1 set uk.150x350 cm unit 1,00 0,019 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pintu Besi (PB.07) Frame Plat Besi t.2,0 mm + Daun Pintu Plat Besi 1,5 mm unit 1,00 0,009 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pintu Single (PT.01) Kusen & Frame Aluminium+ Daun Pintu acp + accs unit 1,00 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pintu Single (PT.01A) Kusen & Frame Aluminium+ Daun Pintu acp + accs unit 1,00 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pintu Single PVC + Daun Pintu (PT.02 /P. Toilet) lengkap accessories unit 13,00 0,034 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pintu Single PVC + Daun Pintu (PT.02A /P. Toilet) lengkap accessories unit 12,00 0,031 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pintu Gerbang Stadion (PU.01) Frame Pipa Besi Galvanised + Pengelasan unit 2,00 0,025 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Jendela Boven Frame aluminium kaca polos unit 4,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
b. Lantai - 2
- Pintu Single (PT.01) Kusen & Frame Aluminium+ Daun Pintu acp + accs unit 2,00 0,007 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pintu Single (PT.01A) Kusen & Frame Aluminium+ Daun Pintu acp + accs unit 4,00 0,014 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Jendela Boven Frame aluminium kaca polos unit 32,00 0,040 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Jendela Luar (J.01) unit 30,00 0,066 0,00% 0,000 0,00% 0,000 0,00% 0,000
c. Lantai - 3
- Pintu Single PVC + Daun Pintu (PT.02 /P. Toilet) unit 1,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pintu Single PVC + Daun Pintu (PT.02A /P. Toilet) unit 1,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pintu Single (PT.01A) Kusen & Frame Aluminium+ Daun Pintu acp + accs unit 2,00 0,007 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Façade Porforated ACP Cutting motif m2 91,41 0,081 0,00% 0,000 0,00% 0,000 0,00% 0,000
d. Lantai - 4
Pasang Pintu Kaca (PK.03) & Jendela Aluminium 3" t: 1 mm Annodized + Daun
- unit 1,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
Pintu Frame Aluminium Annodized, Kaca Polos 8 mm + accs
Pasang Pintu Kaca (PK.04) & Jendela Aluminium 3" t: 1 mm Annodized + Daun
- unit 3,00 0,008 0,00% 0,000 0,00% 0,000 0,00% 0,000
Pintu Aluminium Annodized, Kaca Polos 8 mm
Pasang Pintu & Jendela Kaca (PK.05) & Jendela Aluminium 3" t: 1 mm Annodized
- unit 4,00 0,031 0,00% 0,000 0,00% 0,000 0,00% 0,000
+ Daun Pintu Aluminium Annodized, Kaca Polos 8 mm
Pasang Pintu & jendela Kaca (PK.06) & Jendela Aluminium 3" t: 1 mm Annodized
- unit 6,00 0,047 0,00% 0,000 0,00% 0,000 0,00% 0,000
+ Daun Pintu Aluminium Annodized, Kaca Polos 8 mm
Pasang Pintu & Jendela Kaca (PK.07) & Jendela Aluminium 3" t: 1 mm Annodized
- unit 5,00 0,044 0,00% 0,000 0,00% 0,000 0,00% 0,000
+ Daun Pintu Aluminium Annodized, Kaca Polos 8 mm
Pasang Pintu & Jendela Kaca (PK.08) & Jendela Aluminium 3" t: 1 mm Annodized
- unit 5,00 0,044 0,00% 0,000 0,00% 0,000 0,00% 0,000
+ Daun Pintu Aluminium Annodized, Kaca Polos 8 mm
- Jendela Boven Frame aluminium kaca polos unit 30,00 0,038 0,00% 0,000 0,00% 0,000 0,00% 0,000
7 Pekerjaan Pengecatan
a. Pengecatan ( Pengerokan cat lama dan pengecatan Ruangan Tribun Barat)
- Pengerokan cat lama m2 2.967,10 0,021 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pengecatan Dinding Dalam (Interior) Lt. 1 m2 2.967,10 0,037 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pengerokan cat lama m2 2.077,27 0,015 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pengecatan Dinding Dalam (Interior) Lt. 2 m2 2.077,27 0,026 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pengerokan cat lama m2 881,79 0,006 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pengecatan Dinding Dalam (Interior) Lt. 3 m2 881,79 0,011 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pengerokan cat lama m2 1.493,78 0,011 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pengecatan Dinding Dalam (Interior) Lt. 4 m2 1.493,78 0,019 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pengerokan cat lama m2 1.978,13 0,014 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pengecatan Dinding Luar (Eksterior) Lt. 1 m2 1.978,13 0,043 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pengerokan cat lama m2 746,85 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pengecatan Dinding Luar (Eksterior) Lt. 2 m2 746,85 0,016 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pengerokan cat lama m2 88,96 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pengecatan Dinding Luar (Eksterior) Lt. 3 m2 88,96 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pengerokan cat lama m2 476,01 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pengecatan Dinding Luar (Eksterior) Lt. 4 m2 476,01 0,010 0,00% 0,000 0,00% 0,000 0,00% 0,000
8 Pekerjaan Railling
- Bongkar Railing Existing m' 342,42 0,007 15,00% 0,001 0,00% 0,000 15,00% 0,001
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
9 Pekerjaan Sanitair
a. Lantai - 1
- Pasang Closet duduk buah 22,00 0,058 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Washtafel TOTO LW565 + Kran TOTO TX126LE buah 24,00 0,029 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Urinoir TOTO UW447JNM buah 10,00 0,016 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang sekat urinoir buah 8,00 0,006 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang jet washer buah 22,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang tempat tissu buah 22,00 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang gantungan baju buah 42,00 0,007 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang head shower buah 42,00 0,044 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang tempat sabun buah 42,00 0,008 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang floor drain buah 64,00 0,016 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang partisi cubicle m² 119,28 0,107 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Cermin Frameless 80x240 m2 17,52 0,007 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pekerjaan Meja beton wastafel fin. Granit R11 Claro 60 x60x1 cm m2 14,72 0,018 0,00% 0,000 0,00% 0,000 0,00% 0,000
b. Lantai - 2
- Pasang closet duduk buah 14,00 0,037 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang wastafel + Kran air panas dingin buah 10,00 0,012 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang urinoir buah 6,00 0,010 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang sekat urinoir buah 6,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang jet washer buah 6,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang tempat tissu buah 14,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang gantungan baju buah 10,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang floor drain buah 14,00 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang partisi cubicle m² 81,74 0,074 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Cermin Frameless 80x240 m2 11,20 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pekerjaan Meja beton wastafel fin. Granit R11 Claro 60 x60x1 cm m2 8,40 0,010 0,00% 0,000 0,00% 0,000 0,00% 0,000
c. Lantai - 3
- Pasang closet duduk buah 6,00 0,016 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang wastafel + Kran air panas dingin buah 2,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang urinoir buah 2,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang sekat urinoir buah 2,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang jet washer buah 4,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang tempat tissu buah 4,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang gantungan baju buah 4,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang floor drain buah 4,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang partisi cubicle m² 9,09 0,008 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Cermin Frameless 80x240 m2 1,28 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pekerjaan Meja beton wastafel fin. Granit R11 Claro 60 x60x1 cm m2 1,02 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
d. Lantai - 4
- Pasang closet duduk buah 4,00 0,011 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang wastafel + Kran air panas dingin buah 2,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang urinoir buah 2,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang sekat urinoir buah 2,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang jet washer buah 4,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang tempat tissu buah 4,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang gantungan baju buah 4,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang floor drain buah 4,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang partisi cubicle m² 17,04 0,015 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Cermin Frameless 80x240 m2 1,28 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pekerjaan Meja beton wastafel fin. Granit R11 Claro 60 x60x1 cm m2 1,02 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
10 Pekerjaan Penggantian Atap
- Pekerjaan Bongkar Atap Existing m2 1.920,42 0,057 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pek. Atap Zincalume bluscop t : 0.5 mm m2 1.920,42 0,194 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pek. Nok Zincalum t. 0,35 mm m' 317,80 0,027 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Talang Juray Zincalum Aluminium m' 317,80 0,037 0,00% 0,000 0,00% 0,000 0,00% 0,000
11 Pekerjaan Aksesoris Ruang Ganti Pemain
- Pasang Loker Pemain unit 46,00 0,083 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Accesoris Bangku unit 12,00 0,132 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Meja unit 16,00 0,033 0,00% 0,000 0,00% 0,000 0,00% 0,000
12 Pekerjaan Signage
- Pengadaan dan Pemasangan Logo " Stadion I Wayan Dipta" Gianyar Bali) set 1,00 0,039 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Tulisan " Zona Tribun" Bahan Acrilic Rectangle bh 315,00 0,046 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Tulisan " Arah evakuasi" Bahan Acrilic Rectangle bh 294,00 0,043 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Sign Ruangan/Pintu Bahan Acrilic Rectangle bh 288,00 0,042 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Penomoran Kursi bh 5.000,00 0,038 0,00% 0,000 0,00% 0,000 0,00% 0,000
13 Pengadaan dan Pemasangan tempat sampah unit 60,00 0,086 0,00% 0,000 0,00% 0,000 0,00% 0,000
14 Ornamen Kolom sisi barat
- Penebalan kolom pasangan bata 1 : 4 m2 319,20 0,032 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Plester pasangan bata m2 319,20 0,015 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Batu andesit khas bali finish coating m2 319,20 0,069 0,00% 0,000 0,00% 0,000 0,00% 0,000
15 Ornamen balok façade luar ukuran 100 x 600 cm unit 13,00 0,060 0,00% 0,000 0,00% 0,000 0,00% 0,000
16 Ornamen Façade bahan ACP Cutting motif ukuran 600 cm x 10000 cm termasuk rangka unit 4,00 0,213 0,00% 0,000 0,00% 0,000 0,00% 0,000
17 Pekerjaan ACP Frame façade Scooring board termasuk rangka m2 225,60 0,166 0,00% 0,000 0,00% 0,000 0,00% 0,000
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
Pintu Double (PP.01) Frame Galvanized steel + Powder Coating Daun Pintu Besi
- unit 2,00 0,009 0,00% 0,000 0,00% 0,000 0,00% 0,000
+ accessories
5 Pekerjaan Pengerokan Cat lama dan Pengecatan
- Pengerokan cat lama m2 1.232,60 0,009 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pengecatan Dinding Dalam (Interior) m2 1.232,60 0,015 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pengerokan cat lama m2 986,07 0,007 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pengecatan Dinding Luar (Eksterior) m2 986,07 0,021 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pengerokan cat lama dak existing m2 1.711,98 0,012 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pengecatan dak espose m2 1.711,98 0,042 0,00% 0,000 0,00% 0,000 0,00% 0,000
6 Pekerjaan Railling
- Bongkar Railing Existing m' 153,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Railling baru Pipa Galvanized Ø 2'' t:2,3 mm Tribun m' 175,95 0,076 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Railling Baru Pipa Galvanized Ø 2'' t:2,3 mm Tangga m' 64,40 0,028 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pengecatan Railling dengan cat Minyak 3 Lapis m2 60,09 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
7 Pekerjaan Sanitair
- Pasang closet duduk buah 3,00 0,008 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang wastafel buah 6,00 0,007 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang urinoir buah 6,00 0,010 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang sekat urinoir buah 6,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang jet washer buah 3,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang tempat tissu buah 3,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang gantungan baju buah 3,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang head shower buah 4,00 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang tempat sabun buah 4,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang floor drain buah 3,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
1.D. SITE TRAINING (ST) : ls 1,00 0,007 0,00% 0,000 0,00% 0,000 0,00% 0,000
Site Training di-ikuti oleh minimal 5 personil Pengelola Stadion dan Staf Pemerintah Provinsi Bali
dan untuk kegiatan ini disediakan biaya administrasi, akomodasi 3 (tiga) hari di lokasi proyek
1.E. PENGUJIAN ( TESTING AND COMMISSIONING ) : ls 1,00 0,006 0,00% 0,000 0,00% 0,000 0,00% 0,000
Meliputi pengujian system, operational dan instalasi, terminasi, dilakukan selama 2 (dua) hari
dan di-ikuti oleh minimal 5 personil Pengelola Stadion dan Staf Pemerintah Provinsi Bali,
A.3 PEKERJAAN LAMPU KAWASAN (TIANG LAMPU H = 9 ) 0,742 0,000 0,000 0,000
1.1 LP-OUTDOOR LIGHTING unit 2,00 0,038 0,00% 0,000 0,00% 0,000 0,00% 0,000
1.2 Kabeling dari LVMDP ke LP-OUTDOOR LIGHTING;
- Kabel NYFGbY 4 x 10 mm² m' 256,00 0,016 0,00% 0,000 0,00% 0,000 0,00% 0,000
1.3 Kabeling dari LP-OUTDOOR LIGHTING ke Tiang Lampu Jalan;
- Kabel NYFGbY 4 x 6 mm² m' 550,00 0,025 0,00% 0,000 0,00% 0,000 0,00% 0,000
1.4 Kabeling dari Tiang/Panel ke Lampu Jalan;
- Kabel NYM 3 x 2,5 mm² m' 715,00 0,008 0,00% 0,000 0,00% 0,000 0,00% 0,000
1.5 Pondasi Tiang Lampu; material beton K.175 - U.32, atau
1 M3 beton = 150 kg baja, ukr.400 x 400 x 800mm
- Galian tanah m3 30,72 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Urugan Pasir m3 2,56 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Lantai Kerja m3 1,28 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Beton fc' 24,9 Mpa m3 8,45 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Besi kg 1.398,48 0,010 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Bekisting m2 64,00 0,007 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Urugan kembali m3 22,27 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
1.6 Tiang Lampu (Outdoor Lighting) type oktagonal galvanized h : 9 m' unit 40,00 0,455 0,00% 0,000 0,00% 0,000 0,00% 0,000
1.7 Lampu Jalan LED 100 watt, dll bh 40,00 0,131 0,00% 0,000 0,00% 0,000 0,00% 0,000
1.8 Bracket/support lampu dan alat bantu, dll set 40,00 0,043 0,00% 0,000 0,00% 0,000 0,00% 0,000
3.1 LANTAI - 1 :
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
2.A.4 SITE TRAINING (ST) : ls 1,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
Site Training di-ikuti oleh minimal 5 personil Pengelola Stadion dan Staf Pemerintah Provinsi Bali
dan untuk kegiatan ini disediakan biaya administrasi, akomodasi 3 (tiga) hari di lokasi proyek
2.A.5 PENGUJIAN ( TESTING AND COMMISSIONING ) : ls 1,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
Meliputi pengujian system, operational dan instalasi, terminasi, dilakukan selama 2 (dua) hari
dan di-ikuti oleh minimal 5 personil Pengelola Stadion dan Staf Pemerintah Provinsi Bali,
B.2 PEKERJAAN PENDETEKSIAN DINI ( FIRE ALARM ) 0,417 0,000 0,000 0,000
Penawaran pekerjaan termasuk pengadaan dan pemasangan peralatan di-site, sesuai
spesifikasi teknis dan gambar lengkap alat bantu, surge arrester, grounding system,
accessories dan berfungsi dengan baik.
2.B.1 PENGADAAN DAN PEMASANGAN PERALATAN UTAMA :
a Master Control Panel - Fire Alarm (MCP-FA), Semi Addressable type, minimal kapasitasunit2 Loops, 1,00 0,120 0,00% 0,000 0,00% 0,000 0,00% 0,000
micro computer PC based, power supply 220/380 Volt, 1 ph, 50 Hz, dan accessories
Minimal peralatan terintegrasi dan dilengkapi, yaitu;
- Fire Alarm Display Panel
- Rectifier Main Bell serta accessories lainnya
- Lightning Surge Arresster
- Battery, Lead Acid Rechargeable
- Fire Management Station (FMS)
- Interphone
- Personal Computer dan Printer Injet A3 for Maintenance System (workstation)
b Fire Telephone Switch Board set 1,00 0,032 0,00% 0,000 0,00% 0,000 0,00% 0,000
c Sirine / Alarm gong set 1,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
d Announciator unit 1,00 0,014 0,00% 0,000 0,00% 0,000 0,00% 0,000
e Instalasi / pengkabelan dari MCFA ke MDF ls 1,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
f Main Distribution Frame (MDF), minimal kapasitas 200 Pairs, lengkap grounding system,
unit dll 1,00 0,014 0,00% 0,000 0,00% 0,000 0,00% 0,000
g Cable Rack bahan galvanized steel plate, t =2,0mm "hot dip galvanized",
lengkap penggantung, tee, reducer, peralatan bantu dan accessories
- Ukuran 200 mm x 50 mm m' 25,00 0,006 0,00% 0,000 0,00% 0,000 0,00% 0,000
h Personal Computer for Fire Management Station (FMS), lengkap peralatan/komponen; unit 1,00 0,011 0,00% 0,000 0,00% 0,000 0,00% 0,000
Intel Core i7 Processor, minimal 2.2 GHz, 800MHz FSB, 2MB / Latest version
i Printer Injet A3 unit 1,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
j Software Maintenance System set 1,00 0,006 0,00% 0,000 0,00% 0,000 0,00% 0,000
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
3.2 LANTAI - 2 :
a Pekerjaan pengadaan dan pemasangan Module :
- Panel (komponen module) unit 2,00 0,007 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Output Module Detector unit 2,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Input Module Detector unit 2,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Input Module Manual Call Point unit 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
b Pekerjaan Instalasi FA :
- Instalasi Smoke Detector titik 6,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Heat Detector titik - 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Rate of Rise Detector titik 20,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Manual Call Point titik 2,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Indicator Lamp Alarm titik 2,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Fireman Telephone titik 2,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Manual Push Button (Break Glass type) titik 2,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Alarm Bell buah 2,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Flow Switch titik 1,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
c Pengadaan dan pemasangan Fixtures :
- Smoke Detector (conventional c/w Base) buah 6,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Heat Detector (conventional c/w Base) buah - 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Rate of Rise Detector (ROR) buah 20,00 0,010 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Manual Call Point (conventional) buah 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Indicating Lamp Alarm buah 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Jack Fireman Telephone buah 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Manual Push Button (Break Glass type) titik 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
3.3 LANTAI - 3 :
a Pekerjaan pengadaan dan pemasangan Module :
- Panel (komponen module) unit 2,00 0,007 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Output Module Detector unit 2,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Input Module Detector unit 2,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Input Module Manual Call Point unit 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
b Pekerjaan Instalasi FA :
- Instalasi Smoke Detector titik 4,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Heat Detector titik - 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Rate of Rise Detector titik 4,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Manual Call Point titik 2,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Indicator Lamp Alarm titik 2,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Fireman Telephone titik 2,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Manual Push Button (Break Glass type) titik 2,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Alarm Bell buah 2,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Flow Switch titik 1,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
c Pengadaan dan pemasangan Fixtures :
- Smoke Detector (conventional c/w Base) buah 4,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Heat Detector (conventional c/w Base) buah - 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Rate of Rise Detector (ROR) buah 4,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Manual Call Point (conventional) buah 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Indicating Lamp Alarm buah 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Jack Fireman Telephone buah 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Manual Push Button (Break Glass type) titik 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Alarm Bell buah 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Flow Switch buah 1,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
d Pengadaan dan pemasangan Alat Pemadam Api Ringan (APAR) :
- Fire Extinguisher buah 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
Type : Dry Chemical (A, B dan C)
Media : Stored Pressure Nitrogen
Kapasitas : 3,5 Kg
- Boxes Fire Extinguisher (cover mica / glass type) Buah 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
3.4 LANTAI - 4 :
a Pekerjaan pengadaan dan pemasangan Module :
- Panel (komponen module) unit 2,00 0,007 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Output Module Detector unit 2,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Input Module Detector unit 2,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Input Module Manual Call Point unit 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
b Pekerjaan Instalasi FA :
- Instalasi Smoke Detector titik 12,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Heat Detector titik - 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Rate of Rise Detector titik 13,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Manual Call Point titik 2,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Indicator Lamp Alarm titik 2,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Fireman Telephone titik 2,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Manual Push Button (Break Glass type) titik 2,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Alarm Bell buah 2,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Instalasi Flow Switch titik 1,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
c Pengadaan dan pemasangan Fixtures :
- Smoke Detector (conventional c/w Base) buah 12,00 0,006 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Heat Detector (conventional c/w Base) buah - 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Rate of Rise Detector (ROR) buah 13,00 0,006 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Manual Call Point (conventional) buah 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Indicating Lamp Alarm buah 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Jack Fireman Telephone buah 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Manual Push Button (Break Glass type) titik 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Alarm Bell buah 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Flow Switch buah 1,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
d Pengadaan dan pemasangan Alat Pemadam Api Ringan (APAR) :
- Fire Extinguisher buah 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
Type : Dry Chemical (A, B dan C)
Media : Stored Pressure Nitrogen
Kapasitas : 3,5 Kg
- Boxes Fire Extinguisher (cover mica / glass type) Buah 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
2.B.4 SITE TRAINING (ST) : ls 1,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
Site Training di-ikuti oleh minimal 5 personil Pengelola Stadion dan Staf Pemerintah Provinsi Bali
dan untuk kegiatan ini disediakan biaya administrasi, akomodasi 3 (tiga) hari di lokasi proyek
2.B.5 PENGUJIAN ( TESTING AND COMMISSIONING ) : ls 1,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
Meliputi pengujian system, operational dan instalasi, terminasi, dilakukan selama 2 (dua) hari
dan di-ikuti oleh minimal 5 personil Pengelola Stadion dan Staf Pemerintah Provinsi Bali,
B.3 PEKERJAAN TATA SUARA (SOUND SYSTEM) 3,930 0,000 0,000 0,000
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
2.C.3 SITE TRAINING (ST) : ls 1,00 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
Site Training di-ikuti oleh minimal 5 personil Pengelola Stadion dan Staf Pemerintah Provinsi Bali
dan untuk kegiatan ini disediakan biaya administrasi, akomodasi 3 (tiga) hari di lokasi proyek,
2.C.4 PENGUJIAN ( TESTING AND COMMISSIONING ) : ls 1,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
Meliputi pengujian system, operational dan instalasi, terminasi, dilakukan selama 2 (dua) hari
dan di-ikuti oleh minimal 5 personil Pengelola Stadion dan Staf Pemerintah Provinsi Bali,
B.4 PEKERJAAN INSTALASI CLOSED CIRCUIT TELEVISON (CCTV) 1,508 0,000 0,000 0,000
Penawaran pekerjaan CCTV termasuk; pengadaan dan pemasangan peralatan / material di-site,
lengkap alat bantu, sesuai spesifikasi teknis, gambar rencana dan berfungsi dengan baik.
2.D.1 PENGADAAN DAN PEMASANGAN PERALATAN CCTV, DLL :
Pekerjaan termasuk pengadaan dan pemasangan peralatan di-site, lengkap peralatan bantu dan
accessories, sesuai spesifikasi teknis dan gambar serta berfungsi dengan baik,
PERALATAN UTAMA CLOSED CIRCUIT TELEVISION (CCTV) :
1.1 Server dan License :
a HD NVR4 STD 18TB 2U Rack Mount, Window 10 lot LTSB, unit 1,00 0,220 0,00% 0,000 0,00% 0,000 0,00% 0,000
b ACC 6 Standard License for up to 1 Camera ChannelS pcs 6,00 0,025 0,00% 0,000 0,00% 0,000 0,00% 0,000
c Control Centre Professional high performance remote monitoring workstation for upunit to 2 monitors,1,00 0,043 0,00% 0,000 0,00% 0,000 0,00% 0,000
NA power cord,
1.2 Camera Equipment :
a Camera 2,0 Megapixel (1080p) WDR Day/Night 30x, Pendant Dome, Self Learning Analytics
unit 6,00 0,356 0,00% 0,000 0,00% 0,000 0,00% 0,000
b Camera 3,0 Megapixel WDR LightCatcher, Day/Night Indoor/Outdoor Bullet Camera,unit 3 - 9mm f/1,4
26,00 0,357 0,00% 0,000 0,00% 0,000 0,00% 0,000
Integrated IR,
c Cabinet Rack c/w motor fan and accessories, unit 1,00 0,023 0,00% 0,000 0,00% 0,000 0,00% 0,000
d Instalasi / Kabeling peralatan utama CCTV di ruang Kontrol, lengkap alat bantu dan accessories
ls 1,00 0,009 0,00% 0,000 0,00% 0,000 0,00% 0,000
e Kabeling NYY 4 x 4mm2 pada Instalasi ke PP-UPS Peralatan CCTV, ls 1,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
f Uninteruptable Power Supply (UPS), kapasitas 5 kVA back-up power minimal 60 menit unit 1,00 0,031 0,00% 0,000 0,00% 0,000 0,00% 0,000
SINUS Online, Rackmount 380/220 V, 1ph, 50 hz, lengkap surge arrester, grounding system, dll
g Setting peralatan CCTV pada ruangan kontrol ls 1,00 0,010 0,00% 0,000 0,00% 0,000 0,00% 0,000
h Grounding system maximal 1 Ohm titik 1,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
2.D.3 SITE TRAINING (ST) : ls 1,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
Site Training di-ikuti oleh minimal 5 personil Pengelola Stadion dan Staf Pemerintah Provinsi Bali
dan untuk kegiatan ini disediakan biaya administrasi, akomodasi 3 (tiga) hari di lokasi proyek
ls
2.D.4 PENGUJIAN ( TESTING AND COMMISSIONING ) : 1,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
Meliputi pengujian system, operational dan instalasi, terminasi, dilakukan selama 2 (dua) hari
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
2.E.4 SITE TRAINING (ST) : ls 1,00 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
Site Training di-ikuti oleh minimal 5 personil Pengelola Stadion dan Staf Pemerintah Provinsi Bali
dan untuk kegiatan ini disediakan biaya administrasi, akomodasi 3 (tiga) hari di lokasi proyek,
2.E.5 PENGUJIAN ( TESTING AND COMMISSIONING ) : ls 1,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
Meliputi pengujian system, operational dan instalasi, terminasi, dilakukan selama 2 (dua) hari
dan di-ikuti oleh minimal 5 personil Pengelola Stadion dan Staf Pemerintah Provinsi Bali,
B.6 PEKERJAAN BUILDING AUTOMATION SYSTEM ( BAS/BMS ) : 1,233 0,000 0,000 0,000
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
2.2 LANTAI - 1 :
Controller :
a Module Controller (kapasitas 16 DI & 12 DO) unit 3,00 0,023 0,00% 0,000 0,00% 0,000 0,00% 0,000
b Module Controller (kapasitas 16 DI) unit 2,00 0,007 0,00% 0,000 0,00% 0,000 0,00% 0,000
c Module Controller FCU (kapasitas 16 DI) unit 3,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
d Control Panel set 4,00 0,009 0,00% 0,000 0,00% 0,000 0,00% 0,000
Field Device :
a Air Flow Switch unit 6,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
b Smoke Detector unit 20,00 0,045 0,00% 0,000 0,00% 0,000 0,00% 0,000
c Duct Temperature Sensor unit 6,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
d Power Meter unit 6,00 0,028 0,00% 0,000 0,00% 0,000 0,00% 0,000
e Mounting bracket for duct temperature sensor unit 4,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
f Differential Pressure Switch unit 4,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
g Temperature Sensor unit 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
2.K.5 SITE TRAINING (ST) : ls 1,00 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
Site Training di-ikuti oleh minimal 5 personil Pengelola Stadion dan Staf Pemerintah Provinsi Bali
dan untuk kegiatan ini disediakan biaya administrasi, akomodasi 3 (tiga) hari di lokasi proyek,
2.K.6 PENGUJIAN ( TESTING AND COMMISSIONING ) : ls 1,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
Meliputi pengujian system, operational dan instalasi, terminasi, dilakukan selama 2 (dua) hari
dan di-ikuti oleh minimal 5 personil Pengelola Stadion dan Staf Pemerintah Provinsi Bali,
b. Outdoor Unit (OU) – 1.2 unit 1,00 0,116 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Type : VRF Standard (Inverter)
Kombinasi Unit : 28HP (16 HP+ 12 HP)
Kap. Pendingin : 149.625 BTUH
Sound Level : 65 dB(A)
Refrigerant : R - 410A
Karakteristik : 380/400 V , 3 Ph , 50 Hz
c/w base plate pondation unit outdoor, remote control, control cable, hanger indoor,
support outdoor, refrigerant, pipings, insulators, insulation, accessories, instalation etc
c. Indoor Unit (IU) - 1.1 unit 1,00 0,010 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Type : VRF Wall Mounted
Kap. Pendingin : 9.600 Btu/h
Aliran Udara : 530 CFM
Sound Level : 42/37 dB(A)
Karakteristik : 220/240 V , 1 Ph , 50 Hz
c/w remote control, control cable, hanger indoor, support outdoor, refrigerant, pipings, insulators, insulation, accessories, instalation etc
accessoriess, peralatan bantu, ongkos pasang, dll
d. Indoor Unit (IU) - 1.2 sd 1.4, 1.7, 1.8, 1.20, 1.11 sd 1.15 unit 11,00 0,146 0,00% 0,000 0,00% 0,000 0,00% 0,000
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
e. Indoor Unit (IU) - 1.5, 1.6, 1.16 sd 1.9, 1.21, 1.24, 1.28 unit 9,00 0,161 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Type : VRF Wall Mounted
Kap. Pendingin : 24.200 Btu/h
Aliran Udara : 530 CFM
Sound Level : 42/37 dB(A)
Karakteristik : 220/240 V , 1 Ph , 50 Hz
c/w remote control, control cable, hanger indoor, support outdoor, refrigerant, pipings, insulators, insulation, accessories, instalation etc
accessoriess, peralatan bantu, ongkos pasang, dll
f. Indoor Unit (IU) - 1.27 sd 1.30 unit 4,00 0,038 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Type : VRF Wall Mounted
Kap. Pendingin : 7.500 Btu/h
Aliran Udara : 265 CFM
Sound Level : 35/31 dB(A)
Karakteristik : 220/240 V , 1 Ph , 50 Hz
c/w remote control, control cable, hanger indoor, support outdoor, refrigerant, pipings, insulators, insulation, accessories, instalation etc
accessoriess, peralatan bantu, ongkos pasang, dll
g. Indoor Unit (IU) - 1.9, 1.10, 1.22, 1.23 unit 4,00 0,045 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Type : VRF Wall Mounted
Kap. Pendingin : 12.300 Btu/h
Aliran Udara : 300 CFM
Sound Level : 38/31 dB(A)
Karakteristik : 220/240 V , 1 Ph , 50 Hz
c/w remote control, control cable, hanger indoor, support outdoor, refrigerant, pipings, insulators, insulation, accessories, instalation etc
accessoriess, peralatan bantu, ongkos pasang, dll
h. Exhaust Ceiling Fan (ECF) 1.1 sd 1.24 unit 24,00 0,015 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Type : Ceiling Mounted
Aliran Udara : 50 CFM
Static Pressure : 0,3 INWG
Karakteristik : 380/415 V , 3 Ph , 50 Hz
c/w wire remote control, hanger/support, accessoriess, peralatan bantu, ongkos pasang, dll
i. Outdoor Unit (OU) – 2.1 unit 1,00 0,096 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Type : VRF Standard (Inverter)
Kombinasi Unit : 22 HP (10 HP + 12 HP)
Kap. Pendingin : 117.565 BTUH
Sound Level : 65 dB(A)
Refrigerant : R - 410A
Karakteristik : 380/400 V , 3 Ph , 50 Hz
c/w base plate pondation unit outdoor, remote control, control cable, hanger indoor,
support outdoor, refrigerant, pipings, insulators, insulation, accessories, instalation etc
j. Indoor Unit (IU) - 2.5 sd 2.10 unit 6,00 0,080 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Type : VRF Wall Mounted
Kap. Pendingin : 19.100 Btu/h
Aliran Udara : 530 CFM
Sound Level : 42/37 dB(A)
Karakteristik : 220/240 V , 1 Ph , 50 Hz
c/w remote control, control cable, hanger indoor, support outdoor, refrigerant, pipings, insulators, insulation, accessories, instalation etc
accessoriess, peralatan bantu, ongkos pasang, dll
k. Indoor Unit (IU) - 2.1 sd 2.4 unit 4,00 0,072 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Type : VRF Wall Mounted
Kap. Pendingin : 24.200 Btu/h
Aliran Udara : 530 CFM
Sound Level : 42/37 dB(A)
Karakteristik : 220/240 V , 1 Ph , 50 Hz
c/w remote control, control cable, hanger indoor, support outdoor, refrigerant, pipings, insulators, insulation, accessories, instalation etc
accessoriess, peralatan bantu, ongkos pasang, dll
l. Exhaust Ceiling Fan (ECF) - 2.1, 2,2 & 2.3 unit 3,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Type : Ceiling Mounted
Aliran Udara : 50 CFM
Static Pressure : 0,3 INWG
Karakteristik : 380/415 V , 3 Ph , 50 Hz
c/w wire remote control, hanger/support, accessoriess, peralatan bantu, ongkos pasang, dll
m. Exhaust Fan (EF) - 2.2 unit 1,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Type : Centrifugal Inline Duct
Aliran Udara : 650 CFM
Static Pressure : 0,3 INWG
Karakteristik : 220/240 V , 1 Ph , 50 Hz
Termasuk hanger/support, accessoriess, per. bantu, ongkos pasang, dll
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
o. Indoor Unit (IU) - 3.6 sd 3.8 unit 3,00 0,028 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Type : VRF Wall Mounted
Kap. Pendingin : 7.500 Btu/h
Aliran Udara : 265 CFM
Sound Level : 35/31 dB(A)
Karakteristik : 220/240 V , 1 Ph , 50 Hz
c/w remote control, control cable, hanger indoor, support outdoor, refrigerant, pipings, insulators, insulation, accessories, instalation etc
accessoriess, peralatan bantu, ongkos pasang, dll
p. Indoor Unit (IU) - 3.1 sd 3.5 unit 5,00 0,089 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Type : VRF Wall Mounted
Kap. Pendingin : 24.200 Btu/h
Aliran Udara : 530 CFM
Sound Level : 42/37 dB(A)
Karakteristik : 220/240 V , 1 Ph , 50 Hz
c/w remote control, control cable, hanger indoor, support outdoor, refrigerant, pipings, insulators, insulation, accessories, instalation etc
accessoriess, peralatan bantu, ongkos pasang, dll
q. Exhaust Ceiling Fan (ECF) - 3.1 sd 3.5 unit 5,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Type : Ceiling Mounted
Aliran Udara : 50 CFM
Static Pressure : 0,3 INWG
Karakteristik : 380/415 V , 3 Ph , 50 Hz
c/w wire remote control, hanger/support, accessoriess, peralatan bantu, ongkos pasang, dll
r. Outdoor Unit (OU) – 4.1 & 4.2 unit 2,00 0,157 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Type : VRF Standard (Inverter)
Kombinasi Unit : 14 HP
Kap. Pendingin : 74.812 BTUH
Sound Level : 65 dB(A)
Refrigerant : R - 410A
Karakteristik : 380/400 V , 3 Ph , 50 Hz
c/w base plate pondation unit outdoor, remote control, control cable, hanger indoor,
support outdoor, refrigerant, pipings, insulators, insulation, accessories, instalation etc
s. Indoor Unit (IU) - 4.1 sd 4.5, 4.18 sd 4.22 unit 10,00 0,102 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Type : VRF Wall Mounted
Kap. Pendingin : 9.600 Btu/h
Aliran Udara : 530 CFM
Sound Level : 42/37 dB(A)
Karakteristik : 220/240 V , 1 Ph , 50 Hz
c/w remote control, control cable, hanger indoor, support outdoor, refrigerant, pipings, insulators, insulation, accessories, instalation etc
accessoriess, peralatan bantu, ongkos pasang, dll
t. Indoor Unit (IU) - 4.6 sd 4.17 unit 12,00 0,136 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Type : VRF Wall Mounted
Kap. Pendingin : 12.300 Btu/h
Aliran Udara : 300 CFM
Sound Level : 38/31 dB(A)
Karakteristik : 220/240 V , 1 Ph , 50 Hz
c/w remote control, control cable, hanger indoor, support outdoor, refrigerant, pipings, insulators, insulation, accessories, instalation etc
accessoriess, peralatan bantu, ongkos pasang, dll
u. Exhaust Ceiling Fan (ECF) - 4.1 sd 4.4 unit 4,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Type : Ceiling Mounted
Aliran Udara : 50 CFM
Static Pressure : 0,3 INWG
Karakteristik : 380/415 V , 3 Ph , 50 Hz
c/w wire remote control, hanger/support, accessoriess, peralatan bantu, ongkos pasang, dll
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
3.A.4 SITE TRAINING (ST) : ls 1,00 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
Site Training di-ikuti oleh minimal 5 personil Pengelola Stadion dan Staf Pemerintah Provinsi
Bali dan untuk kegiatan ini disediakan biaya administrasi, akomodasi selama 3 (tiga) hari
di lokasi proyek
3.A.5 PENGUJIAN ( TESTING AND COMMISSIONING ) : ls 1,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
Meliputi pengujian system, operational dan instalasi, terminasi, dilakukan selama 2 (dua) hari
dan di-ikuti oleh minimal 5 personil Pengelola Stadion dan Staf Pemerintah Provinsi Bali
3.B.2 INSTALASI/PEMIPAAN DARI GWT KE BOOSTER PUMP AND PRESSURE TANK, DLL :
Pipa menggunakan Bahan PPR PN.10
Lengkap elbow, reducer, T-Way, dll
- Diameter 150 mm (Header) L = 3 m' c/w bracket/support, dll lot 1,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Diameter 100 mm (Balancing) m' 3,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Diameter 80 mm (Ke Pompa Booster) m' 3,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Diameter 50 mm (Drain) m' 10,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
Peralatan bantu pipa, dll
- Gate Valve, diameter 100 mm, 10k pcs 2,00 0,006 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Gate Valve, diameter 80 mm, 16k pcs 3,00 0,007 0,00% 0,000 0,00% 0,000 0,00% 0,000
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
C.3 PEKERJAAN FIRE FIGHTING (HYDRANT DAN SPRINKLER) 2,163 0,000 0,000 0,000
3.C.1 PERALATAN UTAMA :
Pekerjaan pengadaan dan pemasangan Peralatan Utama termasuk alat bantu di - site,
serta dapat beroperasi dengan baik, sesuai Spesifikasi Teknis dan gambar rencana,
a Electric Fire Hydrant Pump : unit 1,00 0,192 0,00% 0,000 0,00% 0,000 0,00% 0,000
Type : Horizontal Split Casing
Kapasitas : 750 us.gpm
Head : 100 Meter
Daya : 90 kW
Putaran : 2.960 rpm
Karakt.listrik : 380/415 V , 3 Ph , 50 Hz
Lengkap dengan Panel Kontrol Standard NFPA-20 serta wiring kabel ke pompa
menggunakan Fire Resistance Cable (FRC), Base Plate Coupling and Gauge,
Pondasi pompa (beton K 225-U 24), dll
b Diesel Fire Hydrant Pump : unit 1,00 0,497 0,00% 0,000 0,00% 0,000 0,00% 0,000
Type : Horizontal Split Casing
Kapasitas : 750 us.gpm
Head : 100 Meter
Daya : 147 HP
Putaran : 2.960 rpm
Accessoriess :
1/2" Automatic Air Rease Valve, 3/4" Casing Relief Valve, Suction and discharge
Gauge, Lead Acid Battery, Engine Cooling System, Flexible Exhaust connection
and Muffler dll.
Diesel Pump dilengkap dengan Panel Kontrol Standard NFPA-20, Base Plate Coupling
and Gauge, Tanki Solar kap. 200 ltr, Pompa bahan bakar solar (automatic dan manual),
instalasi pemipaan bahan bakar solar, Pondasi pompa (beton K.225-U.32), dll
c Jockey Pump : unit 1,00 0,043 0,00% 0,000 0,00% 0,000 0,00% 0,000
Type : Vertikal In Line pump
Kapasitas : 25 us.gpm
Head : 110 Meter
Daya : 5,5 kW
Putaran : 2.900 rpm
Karakt.listrik : 380/415 V , 3 Ph , 50 Hz
Lengkap dengan Panel Kontrol Standard NFPA-20 serta wiring kabel ke pompa
menggunakan Fire Resistance Cable (FRC), Pondasi pompa beton K.225-U.32, dll
d Instalasi Kabel Power Pompa :
Dari PP – HYDRANT ke Panel Kontrol Elektric Hydrant Pump,
- FRC 4 (2 x 1C x 150) mm2 m' 128,00 0,226 0,00% 0,000 0,00% 0,000 0,00% 0,000
Dari PP – HYDRANT ke Panel Kontrol Jockey Pump,
- FRC 4 x 1C x 6 mm2 m' 30,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
e Kabel Tray Ruang Pompa, ukuran 200 x 100 mm (Thickness 2 mm)
material Galvanis Steel Plated c/w braket, supports, dll :
- Straight, panjang 3 meter buah 6,00 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Elbow buah 2,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Tee buah 4,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- In/out side rider buah 5,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Cover, panjang 3 meter buah 6,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
f Pekerjaan Grounding System / Pentanahan untuk Panel, dll lot 1,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
3.C.4.2 1 st FLOOR :
Pekerjaan Instalasi Pemipaan Hydrant/Sprinkler termasuk pengadaan dan pemasangan,
pengecatan (zinkromate dan cat), fitting, hanger / support, peralatan bantu dll
a Indoor Hydrant Box (IHB) buah 4,00 0,016 0,00% 0,000 0,00% 0,000 0,00% 0,000
Lengkap dengan nozzle, hose, hose rack, valve, accessories,dll
b Pekerjaan Instalasi Pemipaan Hydrant Box (HB) :
Pipa menggunakan Black Steel Pipe (BSP), SCh.40
- Diameter 65 mm m' 212,00 0,033 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Diameter 40 mm m' 4,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
c Peralatan Bantu Instalasi Pemipaan Hydrant Box (HB)
- Landing Valve 16 K, diameter 65 mm buah 4,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Accessories pipa (fitting, elbow, tee, reducer dll) ls 1,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Hanger, klem, bracket/support, dll ls 1,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
d Sprinkler Head :
Type : Pendant Glass Bulb buah 228,00 0,010 0,00% 0,000 0,00% 0,000 0,00% 0,000
Temp.Ratings : 57 deg. C
Warna : Orange
Si ze : 1/2 inch
e Pekerjaan Instalasi Pemipaan Sprinkler
Pipa menggunakan Black Steel Pipe (BSP), SCh.40
- Diameter 150 mm m' 34,00 0,016 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Diameter 100 mm m' 117,00 0,032 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Diameter 80 mm m' 21,00 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Diameter 65 mm m' 24,00 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Diameter 50 mm m' 13,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Diameter 40 mm m' 60,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Diameter 32 mm m' 72,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Diameter 25 mm m' 519,00 0,025 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Diameter 25 mm (pipa drain test ke instalasi drain riser) m' 8,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
f Peralatan Bantu Instalasi Pemipaan Sprinkler
- Gate Valve 16 K, diameter 65 mm buah 4,00 0,013 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Gate Valve 150 Psi diameter 25 mm (valve test inspektor sprinkler) buah 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Branch Control Valve (c/w valve, sigh glass, press. gauge dll) set 2,00 0,011 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Preassure Gauge scala 10 Kg/cm²), lengkap dengan gate valve 15 mm buah 2,00 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Flow Switch buah 2,00 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pipa Droper, dia. 25 mm c/w fitting, elbow, tee, reducer dll buah 228,00 0,011 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Accessories pipa (fitting, elbow, tee, reducer dll) ls 1,00 0,014 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Hanger, klem, bracket/support, dll ls 1,00 0,009 0,00% 0,000 0,00% 0,000 0,00% 0,000
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
C.5 PEKERJAAN GROUND WATER TANK ( KAP.350 M3) 0,531 0,000 0,000 0,000
(ukr.9.000mm x 15.000mm x 3.000mm)
1 Pengamanan galian m' 56,00 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
2 Galian Tanah m3 654,50 0,038 0,00% 0,000 0,00% 0,000 0,00% 0,000
3 Pondasi Ground Water tank
Tiang panncang 25 x 25 cm L 12 m titik 15,00 0,055 0,00% 0,000 0,00% 0,000 0,00% 0,000
Pile Caps 60 x 60 x 50 cm
- Bekisting m2 18,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Besi kg 447,39 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Beton fc' 29 Mpa m3 2,70 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
Balok Tie Beam 25 x 40 cm
- Bekisting m2 45,60 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Besi kg 1.461,48 0,011 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Beton fc' 29 Mpa m3 5,70 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
4 Urugan Pasir t : 10 cm m3 18,70 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
5 Lantai kerja t : 5 cm m3 9,35 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
6 Beton Plat Bawah t : 25 cm, Beton fc' 25 Mpa
- Bekisting m2 40,95 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Besi kg 7.877,38 0,059 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Beton fc' 29 Mpa m3 46,75 0,031 0,00% 0,000 0,00% 0,000 0,00% 0,000
7 Beton Dinding Luar t : 25 cm, Beton fc' 25 Mpa
- Bekisting m2 378,00 0,041 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Besi kg 7.961,63 0,059 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Beton fc' 29 Mpa m3 47,25 0,032 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Water Stop m' 189,00 0,016 0,00% 0,000 0,00% 0,000 0,00% 0,000
8 Beton Dinding dalam t : 20 cm, Beton fc' 25 Mpa
- Bekisting m2 158,40 0,017 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Besi kg 3.336,30 0,025 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Beton fc' 29 Mpa m3 19,80 0,013 0,00% 0,000 0,00% 0,000 0,00% 0,000
9 Beton Plat Atas t : 15 cm, Beton fc' 25 Mpa
- Bekisting m2 162,00 0,017 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Besi kg 3.412,13 0,025 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Beton fc' 29 Mpa m3 20,25 0,014 0,00% 0,000 0,00% 0,000 0,00% 0,000
10 Water proofing integeral 4 liter /m3 m3 134,05 0,015 0,00% 0,000 0,00% 0,000 0,00% 0,000
11 Urugan tanah kembali + pemadatan m3 249,50 0,007 0,00% 0,000 0,00% 0,000 0,00% 0,000
12 Buang tanah eks. Galian m3 405,00 0,007 0,00% 0,000 0,00% 0,000 0,00% 0,000
13 Tutup man hole + pipa ventilasi dia.100mm bh 4,00 0,010 0,00% 0,000 0,00% 0,000 0,00% 0,000
14 Tangga Stainlees Steel bh 2,00 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
D. PEKERJAAN TIANG GAWANG, PERLENGKAPAN DAN GARIS PERMAINAN 1,244 0,000 0,000 0,000
1 Galian Tanah m3 2,65 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
2 Buang Tanah m3 2,65 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
3 Beton Bertulang
- Beton m3 1,35 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Besi kg 199,13 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Bekisting m2 6,21 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
4 Tiang Gawang pipa aluminium lengkap dengan jaring unit 2,00 0,045 0,00% 0,000 0,00% 0,000 0,00% 0,000
5 Tiang Bendera tendangan sudut unit 4,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
6 Pengecatan garis permainan (2x cat) ls 2,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
7 Tiang Gawang cadangan pipa aluminium lengkap dengan jaring unit 2,00 0,045 0,00% 0,000 0,00% 0,000 0,00% 0,000
8 Pengadaan dan Pemasangan Bench 23 seat unit 2,00 0,642 0,00% 0,000 0,00% 0,000 0,00% 0,000
9 Pengadaan dan Pemasangan Bench 4 seat unit 2,00 0,038 0,00% 0,000 0,00% 0,000 0,00% 0,000
10 Pengadaan dan Pemasangan Player Tunnel m' 22,00 0,465 0,00% 0,000 0,00% 0,000 0,00% 0,000
VI. PEKERJAAN LAMPU LAPANGAN (LAMPU FOP) 2400 Lux 13,745 0,000 0,000 0,000
A. PENGADAAN DAN PEMASANGAN LAMPU FOP 13,745 0,000 0,000 0,000
1 Pondasi lampu Tiang lampu (Untuk 4 Unit Tiang lampu)
- Tiang Pancang 25 x 25 cm L : 12 m titik 20,00 0,074 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Galian Tanah m3 98,00 0,006 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Urugan pasir t : 10 cm m3 3,60 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Lantai Kerja t : 5 cm m3 1,80 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Bekisting (Pile caps dan Pedestal) m2 61,44 0,007 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Besi BJTD 40 (Pile Caps dan Pedestal) kg 3.933,94 0,029 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Beton fc' 25 Mpa (Pile Caps dan Pedestal) m3 30,14 0,019 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Angkur dia 22 L : 80 cm bh 88,00 0,011 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Urugan Kembali dipadatkan m3 67,88 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Buang tanah m3 34,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
Pengadaan dan Pemasangan Lampu FOP Standard Min 2400 Lux (Horizontal) Sport
2 Floodlight LED, min. 120000 Lumen, max. 1500 W, 5700-6500 K, min. CRI 80, min. IP set - lap 1,00 13,595 0,00% 0,000 0,00% 0,000 0,00% 0,000
65
- Kabel NYY dari Lampu ke Lampu ke Panel LP FOP
- Kabel NYFGBY dari MDP-FOP ke LP-FOP.
- Kabel NYFGBY dari LVMDP ke MDP-FOP
- Kabel NYY 2(4x120 mm²) + NYA 2x1x120 mm2
- Kabel Tray 200 mm2 x 100 mm2
- Panel LP FOP - Outdoor Type , lengkap Box Panel,Busbar MCCB/MCB dan perlengkapannya +Pondasi
- Panel MDP FOP - Outdoor Type, Lengkap Box Panel,Busbar MCCB/MCB dan perlengkapannya +Pondasi
- Kabel BC untuk Grounding Lampu, Panel dan perlengkapannya
- Setting & Aiming Lampu FOP
- Tiang HMP, Hot Dipped Galvanized
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
1. MINGGU KE-5.xlsx
LOKASI : STADION I WAYAN DIPTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
1. MINGGU KE-5.xlsx
LAPORAN PROGRESS MINGGUAN
BANGUNAN : Venue Utama Dan Lapangan Latihan Dalam Rangka Piala Dunia U-20 Tahun 2021
Di Provinsi Bali
LOKASI : STADION I GUSTI NGURAH RAI, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
PLN PENAMBAHAN /PENYAMBUNGAN DAYA (153 Kva) 175.950.000,00 0,126 0,00% 0,000 0,00% 0,000 0,00% 0,000
SUB TOTAL STADION I GUSTI NGURAH RAI, BALI 0,631 0,127 0,758
1. MINGGU KE-5.xlsx
LAPORAN PROGRESS MINGGUAN
BANGUNAN : Venue Utama Dan Lapangan Latihan Dalam Rangka Piala Dunia U-20 Tahun 2021
Di Provinsi Bali
LOKASI : STADION I GUSTI NGURAH RAI, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
C. PEKERJAAN TIANG GAWANG DAN GARIS PERMAINAN 0,054 0,000 0,000 0,000
1 Galian Tanah m3 2,65 0,000 0,00% 0,000 0,00% - 0,00% 0,000
2 Buang Tanah m3 2,65 0,000 0,00% 0,000 0,00% - 0,00% 0,000
3 Beton Bertulang
- Beton m3 1,35 0,001 0,00% 0,000 0,00% - 0,00% 0,000
- Besi kg 199,13 0,001 0,00% 0,000 0,00% - 0,00% 0,000
- Bekisting m2 6,21 0,001 0,00% 0,000 0,00% - 0,00% 0,000
4 Tiang Gawang pipa aluminium lengkap dengan jaring unit 2,00 0,045 0,00% 0,000 0,00% - 0,00% 0,000
5 Tiang Bendera tendangan sudut unit 4,00 0,003 0,00% 0,000 0,00% - 0,00% 0,000
6 Pengecatan garis permainan (2x cat) ls 2,00 0,003 0,00% 0,000 0,00% - 0,00% 0,000
III. PEKERJAAN LAMPU LAPANGAN 800 Lux 4,702 0,000 0,000 0,000
A. PENGADAAN DAN PEMASANGAN LAMPU FOP 4,702 0,000 0,000 0,000
1 Pondasi lampu Tiang lampu (Untuk 4 Unit Tiang lampu)
- Tiang Pancang 25 x 25 cm L : 12 m titik 20,00 0,074 0,00% 0,000 0,00% - 0,00% 0,000
- Galian Tanah m3 98,00 0,006 0,00% 0,000 0,00% - 0,00% 0,000
- Urugan pasir t : 10 cm m3 3,60 0,001 0,00% 0,000 0,00% - 0,00% 0,000
- Lantai Kerja t : 5 cm m3 1,80 0,001 0,00% 0,000 0,00% - 0,00% 0,000
- Bekisting (Pile caps dan Pedestal) m2 61,44 0,007 0,00% 0,000 0,00% - 0,00% 0,000
- Besi BJTD 40 (Pile Caps dan Pedestal) kg 3.933,94 0,029 0,00% 0,000 0,00% - 0,00% 0,000
- Beton fc' 25 Mpa (Pile Caps dan Pedestal) m3 30,14 0,019 0,00% 0,000 0,00% - 0,00% 0,000
- Angkur dia 22 L : 80 cm bh 88,00 0,011 0,00% 0,000 0,00% - 0,00% 0,000
- Urugan Kembali dipadatkan m3 67,88 0,002 0,00% 0,000 0,00% - 0,00% 0,000
2 Pengadaan dan Pemasangan Lampu FOP Standard Min 800 Lux (Horizontal) Sport Set-lap 1,00 4,552 0,00% 0,000 0,00% - 0,00% 0,000
- Kabel NYY dari Lampu ke Lampu ke Panel LP FOP
- Kabel NYFGBY dari Panel LP FOP ke Panel MDP FOP
- Kabel NYFGBY dari LVMDP ke MDP FOP
- Kabel Tray 200 mm2 x 100 mm2
- Panel LP FOP - Outdoor Type , lengkap Box Panel,Busbar MCCB/MCB dan perlengkapannya +Pondasi
- Panel MDP FOP - Outdoor Type, Lengkap Box Panel,Busbar MCCB/MCB dan perlengkapannya +Pondasi
- Kabel BC Grounding untuk lampu, panel
- Setting & Aiming Lampu FOP
- Tiang HMP, Hot Dipped Galvanized c/w Asesories
- 0
- Kabel Data (dari LED Driver ke Panel Kontrol) c/w PVC Pipe Conduit
- Kabel Data FO Dual Core Single Mode (dari Panel Kontrol ke Panel Kontrol ke Ruang Control) c/w HDPE Pipe Conduit
- Ethernet to DMX Converter 8 Port
- Hub Switch 8 Port, Unmanaged c/w OTB
- DMX LED Controller, 1 Universes
- Wall Mounted Rack 12U
- Touch Panel LED Display
- Work Station, Meja+Kursi
- Addressing, Patching, Programming & Light Show + Training & Manual Book
LOKASI : STADION I GUSTI NGURAH RAI, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
BANGUNAN : Venue Utama Dan Lapangan Latihan Dalam Rangka Piala Dunia U-20 Tahun 2021
Di Provinsi Bali
LOKASI : STADION KOMPYANG SUJANA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
PLN PENAMBAHAN /PENYAMBUNGAN DAYA (128 Kva) 147.200.000,00 0,106 0,00% 0,000 0,00% 0,000 0,00% 0,000
SUB TOTAL STADION KOMPYANG SUJANA, BALI 0,524 0,134 0,658
1. MINGGU KE-5.xlsx
LAPORAN PROGRESS MINGGUAN
BANGUNAN : Venue Utama Dan Lapangan Latihan Dalam Rangka Piala Dunia U-20 Tahun 2021
Di Provinsi Bali
LOKASI : STADION KOMPYANG SUJANA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
1. MINGGU KE-5.xlsx
LOKASI : STADION KOMPYANG SUJANA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
C. PEKERJAAN TIANG GAWANG DAN GARIS PERMAINAN 0,054 0,000 0,000 0,000
1 Galian Tanah m3 2,65 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
2 Buang Tanah m3 2,65 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
3 Beton Bertulang
- Beton m3 1,35 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Besi kg 199,13 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Bekisting m2 6,21 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
4 Tiang Gawang pipa aluminium lengkap dengan jaring unit 2,00 0,045 0,00% 0,000 0,00% 0,000 0,00% 0,000
5 Tiang Bendera tendangan sudut unit 4,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
6 Pengecatan garis permainan (2x cat) ls 2,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
III. PEKERJAAN LAMPU LAPANGAN 800 Lux 4,197 0,000 0,000 0,000
A. PEKERJAAN PENGADAAN DAN PEMASANGAN LAMPU FOP 4,197 0,000 0,000 0,000
1 Pondasi lampu Tiang lampu (Untuk 4 Unit Tiang lampu)
- Tiang Pancang 25 x 25 cm L : 12 m titik 20,00 0,074 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Galian Tanah m3 98,00 0,006 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Urugan pasir t : 10 cm m3 3,60 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Lantai Kerja t : 5 cm m3 1,80 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Bekisting (Pile caps dan Pedestal) m2 61,44 0,007 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Besi BJTD 40 (Pile Caps dan Pedestal) kg 3.933,94 0,029 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Beton fc' 25 Mpa (Pile Caps dan Pedestal) m3 30,14 0,019 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Angkur dia 22 L : 80 cm bh 88,00 0,011 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Urugan Kembali dipadatkan m3 67,88 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Buang tanah m3 34,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
2 Pengadaan dan Pemasangan Lampu FOP Standard Min 800 Lux (Horizontal) Sport set-lap 1,00 4,047 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Kabel NYY dari Lampu ke Lampu ke Panel LP FOP
- Kabel NYFGBY dari Panel LP FOP ke Panel MDP FOP
- Kabel NYFGBY dari LVMDP ke MDP FOP
- Kabel Tray 200 mm2 x 100 mm2
- Panel LP FOP - Outdoor Type , lengkap Box Panel,Busbar MCCB/MCB dan perlengkapannya +Pondasi
- Panel MDP FOP - Outdoor Type, Lengkap Box Panel,Busbar MCCB/MCB dan perlengkapannya +Pondasi
- Kabel BC Grounding untuk lampu, panel
- Setting & Aiming Lampu FOP
- Tiang HMP, Hot Dipped Galvanized c/w Asesories
- 2 Set - unit Penangkal Petir, Radius Proteksi min. 120 m, Lengkap kabel kabel, peraltan dan LED Obstruction Light
- Kabel Data (dari LED Driver ke Panel Kontrol) c/w PVC Pipe Conduit
- Kabel Data FO Dual Core Single Mode (dari Panel Kontrol ke Panel Kontrol ke Ruang Control) c/w HDPE Pipe Conduit
- Ethernet to DMX Converter 8 Port
- Hub Switch 8 Port, Unmanaged c/w OTB
- DMX LED Controller, 1 Universes
- Wall Mounted Rack 12U
- Touch Panel LED Display
- Work Station, Meja+Kursi
- Addressing, Patching, Programming & Light Show + Training & Manual Book
1. MINGGU KE-5.xlsx
LOKASI : STADION KOMPYANG SUJANA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
Pintu Jendela (PK.05) Rangka Alumunium 3" Pintu & Jendela Kaca Polos t = 8mm,
- unit 1,00 0,008 0,00% 0,000 0,00% 0,000 0,00% 0,000
lengkap accessories.
Pintu Single (PP.02) Kusen & Frame Galvanis steel Finish Powder Coating + Daun
- unit 6,00 0,021 0,00% 0,000 0,00% 0,000 0,00% 0,000
Pintu Plat Besi t 1,5 mm finish cat lengkap accessories
- Pintu Double (PP.01) Frame Galvanized steel + Powder Coating Daun Pintu Besi + unit 2,00 0,009 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pintu Single PVC + Daun Pintu (P. Toilet) unit 2,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
10 Pekerjaan Partisi dan Pintu Cubicle KM m2 11,60 0,010 0,00% 0,000 0,00% 0,000 0,00% 0,000
11 Pekerjaan Sanitair
- Pasang Closet Duduk, CW245J unit 6,00 0,015 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Wastafel LW 240CJ - TX109LD unit 6,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Kran Tx470SEN unit 6,00 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Floor Drain TX 1BN unit 14,00 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Urinoir AW115J unit 8,00 0,013 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Sekat Urinoir A.100 unit 6,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Shower Head TX 465 SEN unit 6,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Soup Holder S160V1 unit 6,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Kran Shower Head TX452 SE unit 6,00 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Cermin Frameless edging bevel, uk.65x150 cm unit 2,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Meja Wastafel top table finish granit alam unit 2,00 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
12 Pekerjaan Aksesoris Ruang Ganti Pemain
- Pasang Loker Pemain unit 23,00 0,042 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Accesoris Bangku unit 2,00 0,022 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Meja unit 4,00 0,008 0,00% 0,000 0,00% 0,000 0,00% 0,000
1. MINGGU KE-5.xlsx
LOKASI : STADION KOMPYANG SUJANA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
1. MINGGU KE-5.xlsx
LOKASI : STADION KOMPYANG SUJANA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
1. MINGGU KE-5.xlsx
LAPORAN PROGRESS MINGGUAN
BANGUNAN : Venue Utama Dan Lapangan Latihan Dalam Rangka Piala Dunia U-20 Tahun 2021
Di Provinsi Bali
LOKASI : LAPANGAN LATIHAN TRISAKTI, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
PLN PENAMBAHAN /PENYAMBUNGAN DAYA (103) Kva) 118.450.000,00 0,085 0,00% 0,000 0,00% 0,000 0,00% 0,000
SUB TOTAL LAPANGAN LATIHAN TRISAKTI, BALI 0,530 0,111 0,641
1. MINGGU KE-5.xlsx
LAPORAN PROGRESS MINGGUAN
BANGUNAN : Venue Utama Dan Lapangan Latihan Dalam Rangka Piala Dunia U-20 Tahun 2021
Di Provinsi Bali
LOKASI : LAPANGAN LATIHAN TRISAKTI, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
1. MINGGU KE-5.xlsx
Di Provinsi Bali
LOKASI : LAPANGAN LATIHAN TRISAKTI, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
C. PEKERJAAN TIANG GAWANG DAN GARIS PERMAINAN 0,054 0,000 0,000 0,000
1 Galian Tanah m3 2,65 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
2 Buang Tanah m3 2,65 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
3 Beton Bertulang m3
- Beton m3 1,35 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Besi kg 199,13 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Bekisting m2 6,21 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
4 Tiang Gawang pipa aluminium lengkap dengan jaring unit 2,00 0,045 0,00% 0,000 0,00% 0,000 0,00% 0,000
5 Tiang Bendera tendangan sudut unit 4,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
6 Pengecatan garis permainan (2x cat) ls 2,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
III. PEKERJAAN LAMPU LAPANGAN 800 Lux 4,041 0,000 0,000 0,000
A. PENGADAAN DAN PEMASANGAN LAMPU FOP 4,041 0,000 0,000 0,000
1 Pondasi lampu Tiang lampu (Untuk 4 Unit Tiang lampu)
- Tiang Pancang 25 x 25 cm L : 12 m titik 20,00 0,074 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Galian Tanah m3 98,00 0,006 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Urugan pasir t : 10 cm m3 3,60 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Lantai Kerja t : 5 cm m3 1,80 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Bekisting (Pile caps dan Pedestal) m2 61,44 0,007 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Besi BJTD 40 (Pile Caps dan Pedestal) kg 3.933,94 0,029 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Beton fc' 25 Mpa (Pile Caps dan Pedestal) m3 30,14 0,019 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Angkur dia 22 L : 80 cm bh 88,00 0,011 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Urugan Kembali dipadatkan m3 67,88 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Buang tanah m3 34,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
2 Pengadaan dan Pemasangan Lampu FOP Standard Min 800 Lux (Horizontal) Sport set - lap 1,00 3,890 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Kabel NYY dari Lampu ke Lampu ke Panel LP FOP
- Kabel NYFGBY dari Panel LP FOP ke Panel MDP FOP
- Kabel NYFGBY dari LVMDP ke MDP FOP
- Kabel Tray 200 mm2 x 100 mm2
- Panel LP FOP - Outdoor Type , lengkap Box Panel,Busbar MCCB/MCB dan perlengkapannya +Pondasi
- Panel MDP FOP - Outdoor Type, Lengkap Box Panel,Busbar MCCB/MCB dan perlengkapannya +Pondasi
- Kabel BC Grounding untuk lampu, panel
- Setting & Aiming Lampu FOP
- Tiang HMP, Hot Dipped Galvanized c/w Asesories
- 2 Set - unit Penangkal Petir, Radius Proteksi min. 120 m, Lengkap kabel kabel, peraltan dan LED Obstruction Light
- Kabel Data (dari LED Driver ke Panel Kontrol) c/w PVC Pipe Conduit
- Kabel Data FO Dual Core Single Mode (dari Panel Kontrol ke Panel Kontrol ke Ruang Control) c/w HDPE Pipe Conduit
- Ethernet to DMX Converter 8 Port
- Hub Switch 8 Port, Unmanaged c/w OTB
- DMX LED Controller, 1 Universes
- Wall Mounted Rack 12U
- Touch Panel LED Display
- Work Station, Meja+Kursi
- Addressing, Patching, Programming & Light Show + Training & Manual Book
1. MINGGU KE-5.xlsx
Di Provinsi Bali
LOKASI : LAPANGAN LATIHAN TRISAKTI, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
Pintu Double (PP.01) Frame Galvanized steel + Powder Coating Daun Pintu Besi +
- accessories unit 4,00 0,019 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pintu Single (PP.02) Kusen & Frame Galvanis steel Finish Powder Coating + Daun unit 4,00 0,014 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pintu Single PVC + Daun Pintu (P. Toilet) unit 2,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
9 Pekerjaan Partisi dan Pintu Cubicle KM m2 11,60 0,010 0,00% 0,000 0,00% 0,000 0,00% 0,000
10 Pekerjaan Sanitair
- Pasang Closet Duduk, CW245J unit 4,00 0,010 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Wastafel LW 240CJ - TX109LD unit 2,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Kran Tx470SEN unit 4,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Floor Drain TX 1BN unit 10,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Urinoir AW115J unit 6,00 0,010 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Sekat Urinoir A.100 unit 2,00 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Shower Head TX 465 SEN unit 6,00 0,005 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Soup Holder S160V1 unit 6,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Kran Shower Head TX452 SE unit 6,00 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Cermin Frameless edging bevel, uk.65x150 cm m2 3,60 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Meja Wastafel top table finish granit alam unit 2,00 0,004 0,00% 0,000 0,00% 0,000 0,00% 0,000
11 Pekerjaan Aksesoris Ruang Ganti Pemain
- Pasang Loker Pemain unit 23,00 0,042 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Accesoris Bangku unit 2,00 0,022 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Pasang Meja unit 4,00 0,008 0,00% 0,000 0,00% 0,000 0,00% 0,000
1. MINGGU KE-5.xlsx
Di Provinsi Bali
LOKASI : LAPANGAN LATIHAN TRISAKTI, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
1. MINGGU KE-5.xlsx
Di Provinsi Bali
LOKASI : LAPANGAN LATIHAN TRISAKTI, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
1. MINGGU KE-5.xlsx
LAPORAN PROGRESS MINGGUAN
BANGUNAN : Venue Utama Dan Lapangan Latihan Dalam Rangka Piala Dunia U-20 Tahun 2021
Di Provinsi Bali
LOKASI : LAPANGAN LATIHAN GELORA SAMUDRA KUTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
PLN PENAMBAHAN /PENYAMBUNGAN DAYA (103 Kva) 118.450.000,00 0,085 0,00% 0,000 0,00% 0,000 0,00% 0,000
SUB TOTAL LAPANGAN LATIHAN GELORA SAMUDRA KUTA, BALI 0,560 0,142 0,703
1. MINGGU KE-5.xlsx
LAPORAN PROGRESS MINGGUAN
BANGUNAN : Venue Utama Dan Lapangan Latihan Dalam Rangka Piala Dunia U-20 Tahun 2021
Di Provinsi Bali
LOKASI : LAPANGAN LATIHAN GELORA SAMUDRA KUTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
1. MINGGU KE-5.xlsx
Di Provinsi Bali
LOKASI : LAPANGAN LATIHAN GELORA SAMUDRA KUTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
C. PEKERJAAN TIANG GAWANG DAN GARIS PERMAINAN 0,054 0,000 0,000 0,000
1 Galian Tanah m3 2,65 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
2 Buang Tanah m3 2,65 0,000 0,00% 0,000 0,00% 0,000 0,00% 0,000
3 Beton Bertulang
- Beton m3 1,35 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Besi kg 199,13 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Bekisting m2 6,21 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
4 Tiang Gawang pipa aluminium lengkap dengan jaring unit 2,00 0,045 0,00% 0,000 0,00% 0,000 0,00% 0,000
5 Tiang Bendera tendangan sudut unit 4,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
6 Pengecatan garis permainan (2x cat) ls 2,00 0,003 0,00% 0,000 0,00% 0,000 0,00% 0,000
III. PEKERJAAN LAMPU LAPANGAN 800 Lux 4,041 0,000 0,000 0,000
A. PEKERJAAN PENGADAAN DAN PEMASANGAN LAMPU FOP 4,041 0,000 0,000 0,000
1 Pondasi lampu Tiang lampu (Untuk 4 Unit Tiang lampu)
- Tiang Pancang 25 x 25 cm L : 12 m titik 20,00 0,074 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Galian Tanah m3 98,00 0,006 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Urugan pasir t : 10 cm m3 3,60 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Lantai Kerja t : 5 cm m3 1,80 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Bekisting (Pile caps dan Pedestal) m2 61,44 0,007 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Besi BJTD 40 (Pile Caps dan Pedestal) kg 3.933,94 0,029 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Beton fc' 25 Mpa (Pile Caps dan Pedestal) m3 30,14 0,019 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Angkur dia 22 L : 80 cm bh 88,00 0,011 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Urugan Kembali dipadatkan m3 67,88 0,002 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Buang tanah m3 34,00 0,001 0,00% 0,000 0,00% 0,000 0,00% 0,000
2 Pengadaan dan Pemasangan Lampu FOP Standard Min 800 Lux (Horizontal) Sport set-lap 1,00 3,890 0,00% 0,000 0,00% 0,000 0,00% 0,000
- Kabel NYY dari Lampu ke Lampu ke Panel LP FOP
- Kabel NYFGBY dari Panel LP FOP ke Panel MDP FOP
- Kabel NYFGBY dari LVMDP ke MDP FOP
- Kabel Tray 200 mm2 x 100 mm2
- Panel LP FOP - Outdoor Type , lengkap Box Panel,Busbar MCCB/MCB dan perlengkapannya +Pondasi
- Panel MDP FOP - Outdoor Type, Lengkap Box Panel,Busbar MCCB/MCB dan perlengkapannya +Pondasi
- Kabel BC Grounding untuk lampu, panel
- Setting & Aiming Lampu FOP
- Tiang HMP, Hot Dipped Galvanized c/w Asesories
- 2 Set - unit Penangkal Petir, Radius Proteksi min. 120 m, Lengkap kabel kabel, peralatan dan LED Obstruction Light
- Kabel Data (dari LED Driver ke Panel Kontrol) c/w PVC Pipe Conduit
- Kabel Data FO Dual Core Single Mode (dari Panel Kontrol ke Panel Kontrol ke Ruang Control) c/w HDPE Pipe Conduit
- Ethernet to DMX Converter 8 Port
- Hub Switch 8 Port, Unmanaged c/w OTB
- DMX LED Controller, 1 Universes
- Wall Mounted Rack 12U
- Touch Panel LED Display
- Work Station, Meja+Kursi
- Addressing, Patching, Programming & Light Show + Training & Manual Book
1. MINGGU KE-5.xlsx
Di Provinsi Bali
LOKASI : LAPANGAN LATIHAN GELORA SAMUDRA KUTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
1. MINGGU KE-5.xlsx
Di Provinsi Bali
LOKASI : LAPANGAN LATIHAN GELORA SAMUDRA KUTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
1. MINGGU KE-5.xlsx
Di Provinsi Bali
LOKASI : LAPANGAN LATIHAN GELORA SAMUDRA KUTA, BALI Nomor : PP-STDBALI-MINGGU-05
TAHUN : 2020-2021 Tanggal : 18-Dec-20 - 24-Dec-20
1. MINGGU KE-5.xlsx