SATKER : UNIT PENYELENGGARAAN BANDAR UDARA APT PRANOTO

KEGIATAN : PEMBANGUNAN, REHABILITASI DAN PEMELIHARAAN PRASARANA UDARA


PEKERJAAN : PEMBANGUNAN RUMAH DINAS OPERASIONAL TIPE 36 : 15 UNIT BERSERTA MEUBELAIR DAN
KELENGKAPANNYA
VOLUME : 15
SATUAN UKUR : UNIT

REKAPITULASI RENCANA ANGGARAN BIAYA

JUMLAH
NO. JENIS PEKERJAAN HARGA
( Rp. )
I. PEKERJAAN UTAMA
A. PEKERJAAN PENDAHULUAN Rp 3,635,280.00
B. PEKRJAAN TANAH Rp 2,790,541.60
C. PEKERJAAN PONDASI Rp 12,586,294.00
D. PEKERJAAN BETON Rp 41,607,967.11
E. PEKERJAAN KERAMIK Rp 10,096,958.00
F. PEKERJAAN PASANGAN Rp 18,813,854.51
G. PEK. KUSEN, PINTU, JENDELA DAN PENGGANTUNG Rp 14,130,856.18
H. PEKERJAAN PLAFOND Rp 4,661,430.85
I. PEKERJAAN ATAP Rp 23,794,280.00
J. PEKERJAAN CAT-CATAN Rp 7,087,313.02
K. PEKERJAAN SANITAIR Rp 8,241,988.04
L. PEKERJAAN LISTRIK Rp 4,716,469.00
M. PEKERJAAN MEUBELAIR DAN KELENGKAPANNYA Rp 22,000,000.00

II. BIAYA SMK3 (SISTEM MANAJEMEN K3) Rp 6,175,000.00

JUMLAH Rp 180,338,232.30
PPN 10% Rp 18,033,823.23
TOTAL JUMLAH 1 UNIT Rp 198,372,055.53
TOTAL JUMLAH 15 UNIT Rp 2,975,580,833.02
DIBULATKAN Rp 2,975,580,000.00

TERBILANG : #NAME?

Samarinda, 22 Februari 2021


PT. MAHAKAM LEMBU MULAWARMAN

----------------------------------
Direktur
SATKER : UNIT PENYELENGGARAAN BANDAR UDARA APT PRANOTO
KEGIATAN : PEMBANGUNAN, REHABILITASI DAN PEMELIHARAAN PRASARANA UDARA
PEKERJAAN : PEMBANGUNAN RUMAH DINAS OPERASIONAL TIPE 36 : 15 UNIT BERSERTA MEUBELAIR DAN KELENGKAPANNYA
VOLUME : 15
SATUAN UKUR : UNIT

RENCANA ANGGARAN BIAYA (RAB) TYPE 36

KODE HARGA
NO. URAIAN PEKERJAAN VOL. SAT. ANALIS SATUAN
A ( Rp. )
1 2 3 4 5 6
I. PEKERJAAN UTAMA
A. PEKERJAAN PENDAHULUAN
1 Pembersihan Lahan 72.00 M² A.1 Rp 17,000.00
2 Bouwplank 36.00 M A.2 Rp 66,980.00
SUB TOTAL A. PEKERJAAN PENDAHULUAN
B. PEKRJAAN TANAH
1 Galian Tanah Biasa 30.16 M³ B.1 Rp 39,200
2 Urugan Tanah Kembali 23.22 M³ B.2 Rp 18,780
3 Urugan Tanah Bawah Lantai 4.88 M³ B.3 Rp 112,600
4 Urugan Pasir 4.07 M³ B.4 Rp 153,000
SUB TOTAL B. PEKRJAAN TANAH
C. PEKERJAAN PONDASI
1 Pancang Ulin 10x10x200 16.00 Ttk C.1 Rp 132,490
2 Aanstamping 3.57 M³ C.2 Rp 381,000
3 Pas. Batu Gunung 1pc : 4ps 13.20 M³ C.3 Rp 689,870
SUB TOTAL C. PEKERJAAN PONDASI
D. PEKERJAAN BETON
1 Cor Rabat 2.03 M³ D.2 Rp 881,090
2 Sloof 15x20cm 1.09 M³ D.11 Rp 6,842,431
3 Kolom 15x15cm 1.16 M³ D.12 Rp 6,214,876
4 Kolom Praktis 0.64 M³ D.13 Rp 10,155,137
5 Ringbalk 15x15cm 1.00 M³ D.14 Rp 10,498,998
6 Dak Beton 0.36 M³ D.16 Rp 8,631,934
7 Canopy Beton 0.35 M³ D.17 Rp 7,763,178
8 Plate Meja Dapur 0.30 M³ D.17 Rp 7,763,178
SUB TOTAL D. PEKERJAAN BETON
E. PEKERJAAN KERAMIK
1 Keramik Dinding 20x25cm 21.00 M² E.1 Rp 244,643
2 Keramik Lantai 20x20cm 3.00 M² E.2 Rp 179,704
3 Keramik Lantai 40x40cm 30.65 M² E.3 Rp 144,220
SUB TOTAL E. PEKERJAAN KERAMIK
F. PEKERJAAN PASANGAN
1 Pas. Dinding 1/2 Bata 1pc : 4ps 80.71 M² F.2 Rp 103,583
2 Plesteran 1pc : 4ps 147.14 M² F.4 Rp 58,164
3 Batu Alam 5.28 M² F.5 Rp 359,083
SUB TOTAL F. PEKERJAAN PASANGAN
G. PEK. KUSEN, PINTU, JENDELA DAN PENGGANTUNG
1 Pintu Type 1 (P1) 4.00 Unit G.14 Rp 1,921,805
2 PintuType 2 (P2) 1.00 Unit G.15 Rp 1,411,345
3 Jendela Type 1 (J1) 3.00 Unit G.18 Rp 657,020
4 Jendela Type 2 (J2) 2.00 Unit G.19 Rp 1,420,241
5 Bouven Light Type 1 (BV1) 1.00 Unit G.21 Rp 220,749
SUB TOTAL G. PEK. KUSEN, PINTU, JENDELA DAN PENGGANTUNG
H. PEKERJAAN PLAFOND
1 Rangka Plafond Metal Furring 27.89 M² H.1 Rp 98,220
2 Penutup Plafond Gypsum 9mm 27.89 M² H.2 Rp 38,045
3 List Plafond Gypsum 20.00 M H.4 Rp 43,050
SUB TOTAL H. PEKERJAAN PLAFOND
KODE HARGA
NO. URAIAN PEKERJAAN VOL. SAT. ANALIS SATUAN
A ( Rp. )
1 2 3 4 5 6
I. PEKERJAAN ATAP
1 Kuda-kuda Baja ringan 72.00 M² I.1 Rp 188,360
2 Penutup Atap Genteng Metal 72.00 M² I.2 Rp 119,860
3 Bubungan Atap Genteng Metal 6.00 M I.3 Rp 124,940
4 Lisplank Wood Flank 16.00 M I.4 Rp 53,300
SUB TOTAL I. PEKERJAAN ATAP
J. PEKERJAAN CAT-CATAN
1 Cat Tembok Luar 60.91 M² J.1 Rp 34,266
2 Cat Tembok Dalam dan Plafond 145.16 M² J.2 Rp 27,506
3 Cat Minyak 20.00 M² J.3 Rp 50,370
SUB TOTAL J. PEKERJAAN CAT-CATAN
K. PEKERJAAN SANITAIR
1 Pipa PVC dia 4" D dan Accessories 20.00 M K.1 Rp 68,883
2 Pipa PVC dia 1/2" AW dan Accessories 20.00 M K.4 Rp 14,128
3 Kloset duduk + Jet Shower 1.00 Unit K.5 Rp 1,928,932
4 Kran Air 1/2" 3.00 Bh K.6 Rp 157,650
5 Floor Drain 2.00 Bh K.7 Rp 103,900
6 Bak Mandi 1.00 Bh K.9 Rp 354,523
7 Bak Kontrol 1.00 Bh K.11 Rp 117,555
8 Septictank Biofil Kapasitas 0.75 M3 1.00 Bh Rp 3,500,000
SUB TOTAL K. PEKERJAAN SANITAIR
L. PEKERJAAN LISTRIK
1 Instalasi Lampu 9.00 Ttk L.1 Rp 262,300
2 Instalasi Stop Kontak 7.00 Ttk L.2 Rp 262,300
3 Pasang Lampu SL 18 Watt 5.00 Bh L.3 Rp 40,781
4 Pasang Lampu SL 8 Watt 4.00 Bh L.4 Rp 25,781
5 Pasang Skring Kash Listrik 1 Group 1.00 Unit L.5 Rp 212,640
SUB TOTAL L. PEKERJAAN LISTRIK
M. PEKERJAAN MEUBELAIR DAN KELENGKAPANNYA
1 Pengadaan Meubelair dan Kelengkapannya 1.00 Ls M.1 Rp 22,000,000
SUB TOTAL M. PEKERJAAN MEUBELAIR DAN KELENGKAPANNYA
II. BIAYA SMK3 (SISTEM MANAJEMEN K3)
1 Pembuatan Dokumen RKK 1.00 Ls Rp 300,000
2 Sosialisasi, Promosi dan Pelatihan K3 1.00 Ls Rp 300,000
3 Asuransi dan Perjanjian 1.00 Ls Rp 600,000
4 Rambu - rambu K3 terkait Pengendalian Resiko 1.00 Ls Rp 150,000
5 Alat Pemadam Api Ringan (3Kg) 1.00 Bh Rp 500,000
6 Bendera dan Spanduk K3 1.00 Ls Rp 65,000
7 Alat Pelindung Kerja (APK) 1.00 Ls Rp 500,000
8 Alat Pelindung Diri (APD) 1.00 Ls
- Topi pelindung (Safety Helmet) 10.00 Bh Rp 75,000
- Sepetu Keselamatan (Safety Shoes) 10.00 Bh Rp 100,000
- Sarung Tangan (Safety Gloves) 5.00 Pak Rp 30,000
- Rompi Keselamatan (Safety Vest) 10.00 Bh Rp 30,000
9 Fasilitas dan Sarana Kesehatan 1.00 Ls
- Kotak P3k lengkap 1.00 Ls Rp 700,000
- Masker 5.00 Pak Rp 75,000
- Penyedian tempat cuci tangan 1.00 Ls Rp 235,000
10 Titik kumpul (Assembly Area) 1.00 Ls Rp 250,000

SUB TOTAL II. BIAYA SMK3 (SISTEM MANAJEMEN K3)


AH DINAS OPERASIONAL TIPE 36 : 15 UNIT BERSERTA MEUBELAIR DAN KELENGKAPANNYA

RENCANA ANGGARAN BIAYA (RAB) TYPE 36

JUMLAH
HARGA
( Rp. )
7

Rp 1,224,000.00
Rp 2,411,280.00
Rp 3,635,280.00

Rp 1,182,272.00
Rp 436,071.60
Rp 549,488.00
Rp 622,710.00
Rp 2,790,541.60

Rp 2,119,840.00
Rp 1,360,170.00
Rp 9,106,284.00
Rp 12,586,294.00

Rp 1,788,612.70
Rp 7,458,250.16
Rp 7,209,256.28
Rp 6,499,287.78
Rp 10,498,998.33
Rp 3,107,496.19
Rp 2,717,112.29
Rp 2,328,953.39
Rp 41,607,967.11

Rp 5,137,503.00
Rp 539,112.00
Rp 4,420,343.00
Rp 10,096,958.00

Rp 8,360,183.93
Rp 8,558,250.96
Rp 1,895,419.62
Rp 18,813,854.51

Rp 7,687,219.60
Rp 1,411,344.80
Rp 1,971,061.20
Rp 2,840,481.20
Rp 220,749.38
Rp 14,130,856.18

Rp 2,739,355.80
Rp 1,061,075.05
Rp 861,000.00
Rp 4,661,430.85
JUMLAH
HARGA
( Rp. )
7

Rp 13,561,920.00
Rp 8,629,920.00
Rp 749,640.00
Rp 852,800.00
Rp 23,794,280.00

Rp 2,087,142.06
Rp 3,992,770.96
Rp 1,007,400.00
Rp 7,087,313.02

Rp 1,377,660.00
Rp 282,567.60
Rp 1,928,932.00
Rp 472,950.00
Rp 207,800.00
Rp 354,523.41
Rp 117,555.03
Rp 3,500,000.00
Rp 8,241,988.04

Rp 2,360,700.00
Rp 1,836,100.00
Rp 203,905.00
Rp 103,124.00
Rp 212,640.00
Rp 4,716,469.00

Rp 22,000,000.00
Rp 22,000,000.00

Rp 300,000.00
Rp 300,000.00
Rp 600,000.00
Rp 150,000.00
Rp 500,000.00
Rp 65,000.00
Rp 500,000.00

Rp 750,000.00
Rp 1,000,000.00
Rp 150,000.00
Rp 300,000.00

Rp 700,000.00
Rp 375,000.00
Rp 235,000.00
Rp 250,000.00

Rp 6,175,000.00
REKAP ANALISA HARGA SATUAN

No. URAIAN KODE JUMLAH HARGA

A PEKERJAAN PENDAHULUAN
1 1 M² MEMBERSIHKAN LAPANGAN DAN PERATAAN A.1 Rp 17,000.00
2 1 M PENGUKURAN DAN PEMASANGAN BOUWPLANK A.2 Rp 66,980.00

B PEKERJAAN TANAH
1 1 M³ GALIAN TANAH BIASA SEDALAM 1 METER B.1 Rp 39,200.00
2 1 M³ URUGAN KEMBALI B.2 Rp 18,780.00
3 1 M³ URUGAN TANAH BAWAH LANTAI DENGAN PEMADATAN B.3 Rp 112,600.00
4 1 M³ URUGAN PASIR B.4 Rp 153,000.00

C PEKERJAAN PONDASI
1 1 TITIK TONGKAT ULIN UK. 10/10 CM - 200CM C.1 Rp 132,490.00
2 1 M³ PASANGAN BATU KOSONG/AANSTAMPING C.2 Rp 381,000.00
3 1 M³ PASANGAN BATU GUNUNG 1PC : 4PS C.3 Rp 689,870.00
4 1 M² PASANGAN ROLLAG BATA CAMP. 1PC : 4PS C.4 Rp 213,500.50

D PEKERJAAN BETON
1 1 M³ MEMBUAT LANTAI KERJA 1 : 3 : 5 D.1 Rp 161,620.00
2 1 M³ MEMBUAT COR RABAT 1 : 3 : 5 D.2 Rp 881,090.00
3 1 M³ BETON CAMPURAN 1 : 2 : 3 D.3 Rp 1,185,091.00
4 10 KG PEMBESIAN DENGAN BESI POLOS D.4 Rp 204,860.00
4.1 1 KG PEMBESIAN DENGAN BESI POLOS 1.4.1
5 1 M² PASANG BEKISTING UNTUK POER PLAT D.5 Rp 138,070.00
6 1 M² PASANG BEKISTING UNTUK SLOOF D.6 Rp 140,952.50
7 1 M² PASANG BEKISTING UNTUK KOLOM D.7 Rp 194,250.00
8 1 M² PASANG BEKISTING UNTUK RINGBALK D.8 Rp 248,150.00
9 1 M² PASANG BEKISTING UNTUK PLATE D.9 Rp 300,150.00
10 1 M³ BETON BERTULANG PEKERJAAN POER PLATE 70X80X20 D.10 Rp 5,844,814.09
11 1 M³ BETON BERTULANG PEKERJAAN SLOOF 15X20 D.11 Rp 6,842,431.34
12 1 M³ BETON BERTULANG PEKERJAAN KOLOM 15X20 D.12 Rp 6,214,876.11
13 1 M³ BETON BERTULANG PEKERJAAN KOLOM 13X13 D.13 Rp 10,155,137.15
14 1 M³ BETON BERTULANG PEKERJAAN RINGBALK 13x20 D.14 Rp 10,498,998.33
15 1 M³ BETON BERTULANG PEKERJAAN BALOK LATAI 13x20 D.15 Rp 10,498,998.33
16 1 M³ BETON BERTULANG PEKERJAAN PLATE DAK TEBAL 12 CM D.16 Rp 8,631,933.85
17 1 M³ BETON BERTULANG PEKERJAAN CANOPY TEBAL 10 CM D.17 Rp 7,763,177.97

E PEKERJAAN KERAMIK
1 1 M² PASANGAN KERAMIK DINDING 20X25 E.1 Rp 244,643.00
2 1 M² PASANGAN KERAMIK LANTAI 20X20 E.2 Rp 179,704.00
3 1 M² PASANGAN KERAMIK LANTAI 40X40 E.3 Rp 144,220.00

F PEKERJAAN PASANGAN
1 1 M² PASANGAN DINDING 1/2 BATA 1PC : 2PS F.1 Rp 113,110.50
2 1 M² PASANGAN DINDING 1/2 BATA 1PC : 4PS F.2 Rp 103,583.00
3 1 M² PLESTERAN DINDING BATA 1PC : 2PS F.3 Rp 64,805.20
4 1 M² PLESTERAN DINDING BATA 1PC : 4PS F.4 Rp 58,164.00
5 1 M² PASANG BATU ALAM F.5 Rp 359,083.00

G PEKERJAAN KUSEN
1 1 M³ MENGERJAKAN KUSEN PINTU DAN JENDELA G.1 Rp 6,654,000.00
2 1 M² PASANG PINTU PANEL KAYU BENGKIRAI G.2 Rp 480,000.00
3 1 M² PASANG DAUN JENDELA KACA G.3 Rp 394,200.00
4 1 M² PASANG KACA BENING TEBAL 5MM G.4 Rp 132,135.00
5 1 BH PASANG ENGSEL PINTU G.5 Rp 61,635.00
6 1 BH PASANG ENGSEL JENDELA G.6 Rp 41,090.00
7 1 BH PASANG HANDEL PINTU (PULL HANDLE) G.7 Rp 181,635.00
8 1 BH PASANG HANDEL PINTU (LEVER HANDLE) G.8 Rp 363,635.00
9 1 BH PASANG HANDEL PINTU KUNCI BULAT (KNOB HANDLE) G.9 Rp 192,900.00
10 1 BH PASANG HANDEL JENDELA G.10 Rp 44,635.00
11 1 BH PASANG KUNCI TANAM G.11 Rp 292,900.00
12 1 BH GRENDEL JENDELA G.12 Rp 41,635.00
13 1 BH PASANG HAK ANGIN G.13 Rp 50,635.00
14 1 UNIT PINTU TYPE 1 (P1) G.14 Rp 1,921,804.90
15 1 UNIT PINTU TYPE 2 (P2) G.15 Rp 1,411,344.80
16 1 UNIT PINTU TYPE 3 (P3) G.16 Rp 1,142,684.70
17 1 UNIT PINTU JENDELA TYPE 1 (PJ1) G.17 Rp 2,479,486.95
18 1 UNIT JENDELA TYPE 1 (J1) G.18 Rp 657,020.40
19 1 UNIT JENDELA TYPE 2 (J2) G.19 Rp 1,420,240.60
20 1 UNIT JENDELA TYPE 3 (J3) G.20 Rp 742,558.55
21 1 UNIT BOUVENLIGHT TYPE 1 (BV1) G.21 Rp 220,749.38
22 1 UNIT BOUVENLIGHT TYPE 2 (BV2) G.22 Rp 80,133.45
23 1 UNIT BOUVENLIGHT TYPE 3 (BV3) G.23 Rp 117,492.30

H PEKERJAAN PLAFOND
1 1 M² PENGGANTUNG DAN RANGKA PLAFOND H.1 Rp 98,220.00
2 1 M² PLAFOND GYPSUM 9 MM H.2 Rp 38,045.00
3 1 M² PLAFOND CALSIBOARD 4.5MM H.3 Rp 45,545.00
4 1 M² LIST PLAFOND GYPSUM H.4 Rp 43,050.00
5 1 M' LIST PLAFOND KAYU PROFIL H.5 Rp 60,180.00
No. URAIAN KODE JUMLAH HARGA

I PEKERJAAN ATAP
1 1 M² PASANG RANGKA ATAP BAJA RINGAN I.1 Rp 188,360.00
2 1 M² PASANG ATAP GENTENG METAL KELAS MENENGAH I.2 Rp 119,860.00
3 1 M PASANG BUBUNGAN GENTENG METAL I.3 Rp 124,940.00
4 1 M PASANG PAPAN LISTPLANK I.4 Rp 53,300.00

J PEKERJAAN PENGECATAN
1 1 M² PENGECATAN TEMBOK BAGIAN LUAR J.1 Rp 34,266.00
2 1 M² PENGECATAN TEMBOK BAGIAN DALAM DAN PLAFOND J.2 Rp 27,506.00
3 1 M² PENGECATAN BIDANG KAYU BARU J.3 Rp 50,370.00

K PEKEERJAAN SANITAIR
1 MEMASANG 1 M' PIPA PVC TYPE AW Ø 4" K.1 Rp 68,883.00
2 MEMASANG 1 M' PIPA PVC TYPE AW Ø 2" K.2 Rp 27,936.00
3 MEMASANG 1 M' PIPA PVC TYPE AW Ø 3/4" K.3 Rp 14,749.00
4 MEMASANG 1 M' PIPA PVC TYPE AW Ø ½" K.4 Rp 14,128.38
5 MEMASANG 1 BUAH CLOSET DUDUK / MONOBLOK K.5 Rp 1,928,932.00
6 MEMASANG 1 BUAH KRAN Ø ½" K.6 Rp 157,650.00
7 MEMASANG 1 BUAH FLOOR DRAIN K.7 Rp 103,900.00
8 MEMASANG 1 BUAH ROOF DRAIN K.8 Rp 101,900.00
9 MEMASANG 1 BUAH BAK MANDI K.9 Rp 354,523.41
10 1 M SALURAN AIR HUJAN K.10 Rp 81,442.38
11 1 BUAH BAK KONTROL K.11 Rp 117,555.03

L PEKERJAAN LISTRIK
1 1 TTK INSTALASI LAMPU L.1 Rp 262,300.00
2 1 TTK INSTALASI STOP KONTAK L.2 Rp 262,300.00
3 1 BH PASANGAN LAMPU SL 18 WATT L.3 Rp 40,781.00
4 1 BH PASANGAN LAMPU SL 8 WATT L.4 Rp 25,781.00
5 1 UNIT SKRING KASH LISTRIK 1 GROUP L.5 Rp 212,640.00

M MEUBELAIR DAN KELENGKAPANNYA


1 PENGADAAN SECTIONAL SOFA M.1 Rp 18,000,000.00
2 PENGADAAN SPRING BET NO. 2 M.2 Rp 15,000,000.00
3 PENGADAAN LEMARI PAKAIAN 3 PINTU M.3 Rp 10,000,000.00
ANALISA HARGA SATUAN

HARGA HARGA JUMLAH


No. URAIAN SATUAN BAHAN UPAH HARGA
(Rp.) (Rp.) (Rp.) (Rp.)

A PEKERJAAN PENDAHULUAN

1 1 M² MEMBERSIHKAN LAPANGAN DAN PERATAAN


Upah
0.050 Oh Mandor Rp 180,000.00 Rp - Rp 9,000.00 Rp 9,000.00
0.100 Oh Pekerja Rp 80,000.00 Rp - Rp 8,000.00 Rp 8,000.00
TOTAL Rp - Rp 17,000.00 Rp 17,000.00

2 1 M PENGUKURAN DAN PEMASANGAN BOUWPLANK


Bahan
0.020 Kg Paku biasa Rp 14,000.00 Rp 280.00 Rp - Rp 280.00
0.012 M³ Balok meranti Rp 2,450,000.00 Rp 29,400.00 Rp - Rp 29,400.00
0.007 M³ Papan meranti Rp 2,600,000.00 Rp 18,200.00 Rp - Rp 18,200.00
Upah
0.010 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,200.00 Rp 1,200.00
0.005 Oh Mandor Rp 180,000.00 Rp - Rp 900.00 Rp 900.00
0.100 Oh Pekerja Rp 80,000.00 Rp - Rp 8,000.00 Rp 8,000.00
0.100 Oh Tukang Rp 90,000.00 Rp - Rp 9,000.00 Rp 9,000.00
TOTAL Rp 47,880.00 Rp 19,100.00 Rp 66,980.00

B PEKERJAAN TANAH

1 1 M³ GALIAN TANAH BIASA SEDALAM 1 METER


Upah
0.040 Oh Mandor Rp 180,000.00 Rp - Rp 7,200.00 Rp 7,200.00
0.400 Oh Pekerja Rp 80,000.00 Rp - Rp 32,000.00 Rp 32,000.00
TOTAL Rp - Rp 39,200.00 Rp 39,200.00

2 1 M³ URUGAN KEMBALI
Upah
0.019 Oh Mandor Rp 180,000.00 Rp - Rp 3,420.00 Rp 3,420.00
0.192 Oh Pekerja Rp 80,000.00 Rp - Rp 15,360.00 Rp 15,360.00
TOTAL Rp - Rp 18,780.00 Rp 18,780.00

3 1 M³ URUGAN TANAH BAWAH LANTAI DENGAN PEMADATAN


Bahan
1.200 M³ Tanah urug Rp 53,000.00 Rp 63,600.00 Rp - Rp 63,600.00
Upah
0.050 Oh Mandor Rp 180,000.00 Rp - Rp 9,000.00 Rp 9,000.00
0.500 Oh Pekerja Rp 80,000.00 Rp - Rp 40,000.00 Rp 40,000.00
TOTAL Rp 63,600.00 Rp 49,000.00 Rp 112,600.00

4 1 M³ URUGAN PASIR
Bahan
1.200 M³ Pasir urug Rp 106,000.00 Rp 127,200.00 Rp - Rp 127,200.00
Upah
0.010 Oh Mandor Rp 180,000.00 Rp - Rp 1,800.00 Rp 1,800.00
0.300 Oh Pekerja Rp 80,000.00 Rp - Rp 24,000.00 Rp 24,000.00
TOTAL Rp 127,200.00 Rp 25,800.00 Rp 153,000.00

C PEKERJAAN PONDASI

1 1 TITIK TONGKAT ULIN UK. 10/10 CM - 200CM


Bahan
0.020 M³ Balok ulin 10x10x400 Rp 4,550,000.00 Rp 91,000.00 Rp - Rp 91,000.00
Upah
0.015 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,740.00 Rp 1,740.00
0.015 Oh Mandor Rp 180,000.00 Rp - Rp 2,700.00 Rp 2,700.00
0.300 Oh Pekerja Rp 80,000.00 Rp - Rp 24,000.00 Rp 24,000.00
0.145 Oh Tukang Rp 90,000.00 Rp - Rp 13,050.00 Rp 13,050.00
TOTAL Rp 91,000.00 Rp 41,490.00 Rp 132,490.00

2 1 M³ PASANGAN BATU KOSONG/AANSTAMPING


Bahan
1.200 M³ Batu gunung Rp 200,000.00 Rp 240,000.00 Rp - Rp 240,000.00
0.300 M³ Pasir urug Rp 106,000.00 Rp 31,800.00 Rp - Rp 31,800.00
Upah
0.780 Oh Pekerja Rp 80,000.00 Rp - Rp 62,400.00 Rp 62,400.00
0.390 Oh Tukang Rp 90,000.00 Rp - Rp 35,100.00 Rp 35,100.00
0.039 Oh Kepala tukang Rp 120,000.00 Rp - Rp 4,680.00 Rp 4,680.00
0.039 Oh Mandor Rp 180,000.00 Rp - Rp 7,020.00 Rp 7,020.00
TOTAL Rp 271,800.00 Rp 109,200.00 Rp 381,000.00
HARGA HARGA JUMLAH
No. URAIAN SATUAN BAHAN UPAH HARGA
(Rp.) (Rp.) (Rp.) (Rp.)

3 1 M³ PASANGAN BATU GUNUNG 1PC : 4PS


Bahan
163.000 Kg Semen Rp 1,350.00 Rp 220,050.00 Rp - Rp 220,050.00
1.100 M³ Batu gunung Rp 200,000.00 Rp 220,000.00 Rp - Rp 220,000.00
0.520 M³ Pasir pasangan (lokal) Rp 106,000.00 Rp 55,120.00 Rp - Rp 55,120.00
Upah
0.060 Oh Kepala tukang Rp 120,000.00 Rp - Rp 7,200.00 Rp 7,200.00
0.075 Oh Mandor Rp 180,000.00 Rp - Rp 13,500.00 Rp 13,500.00
1.500 Oh Pekerja Rp 80,000.00 Rp - Rp 120,000.00 Rp 120,000.00
0.600 Oh Tukang Rp 90,000.00 Rp - Rp 54,000.00 Rp 54,000.00
TOTAL Rp 495,170.00 Rp 194,700.00 Rp 689,870.00

4 1 M² PASANGAN ROLLAG BATA CAMP. 1PC : 4PS


Bahan
100.000 Bh Batu bata Rp 900.00 Rp 90,000.00 Rp - Rp 90,000.00
26.550 Kg Semen Rp 1,350.00 Rp 35,842.50 Rp - Rp 35,842.50
0.093 M³ Pasir pasangan (lokal) Rp 106,000.00 Rp 9,858.00 Rp - Rp 9,858.00
Upah
0.020 Oh Kepala tukang Rp 120,000.00 Rp - Rp 2,400.00 Rp 2,400.00
0.030 Oh Mandor Rp 180,000.00 Rp - Rp 5,400.00 Rp 5,400.00
0.650 Oh Pekerja Rp 80,000.00 Rp - Rp 52,000.00 Rp 52,000.00
0.200 Oh Tukang Rp 90,000.00 Rp - Rp 18,000.00 Rp 18,000.00
TOTAL Rp 135,700.50 Rp 77,800.00 Rp 213,500.50

D PEKERJAAN BETON

1 1 M³ MEMBUAT LANTAI KERJA 1 : 3 : 5


Bahan
10.000 Kg Semen Rp 1,350.00 Rp 13,500.00 Rp - Rp 13,500.00
0.044 M³ Koral beton Rp 395,000.00 Rp 17,380.00 Rp - Rp 17,380.00
0.260 M³ Pasir beton (lokal) Rp 137,000.00 Rp 35,620.00 Rp - Rp 35,620.00
Upah
0.002 Oh Kepala tukang Rp 120,000.00 Rp - Rp 240.00 Rp 240.00
0.006 Oh Mandor Rp 180,000.00 Rp - Rp 1,080.00 Rp 1,080.00
1.150 Oh Pekerja Rp 80,000.00 Rp - Rp 92,000.00 Rp 92,000.00
0.020 Oh Tukang Rp 90,000.00 Rp - Rp 1,800.00 Rp 1,800.00
TOTAL Rp 66,500.00 Rp 95,120.00 Rp 161,620.00

2 1 M³ MEMBUAT COR RABAT 1 : 3 : 5


Bahan
218.000 Kg Semen Rp 1,350.00 Rp 294,300.00 Rp - Rp 294,300.00
0.870 M³ Koral beton Rp 395,000.00 Rp 343,650.00 Rp - Rp 343,650.00
0.520 M³ Pasir beton (lokal) Rp 137,000.00 Rp 71,240.00 Rp - Rp 71,240.00
Upah
0.025 Oh Kepala tukang Rp 120,000.00 Rp - Rp 3,000.00 Rp 3,000.00
0.080 Oh Mandor Rp 180,000.00 Rp - Rp 14,400.00 Rp 14,400.00
1.650 Oh Pekerja Rp 80,000.00 Rp - Rp 132,000.00 Rp 132,000.00
0.250 Oh Tukang Rp 90,000.00 Rp - Rp 22,500.00 Rp 22,500.00
TOTAL Rp 709,190.00 Rp 171,900.00 Rp 881,090.00

3 1 M³ BETON CAMPURAN 1 : 2 : 3
Bahan
371.000 Kg Semen Rp 1,350.00 Rp 500,850.00 Rp - Rp 500,850.00
1.047 M³ Koral beton Rp 395,000.00 Rp 413,565.00 Rp - Rp 413,565.00
0.698 M³ Pasir beton (lokal) Rp 137,000.00 Rp 95,626.00 Rp - Rp 95,626.00
Upah
0.028 Oh Kepala tukang Rp 120,000.00 Rp - Rp 3,360.00 Rp 3,360.00
0.083 Oh Mandor Rp 180,000.00 Rp - Rp 14,940.00 Rp 14,940.00
1.650 Oh Pekerja Rp 80,000.00 Rp - Rp 132,000.00 Rp 132,000.00
0.275 Oh Tukang Rp 90,000.00 Rp - Rp 24,750.00 Rp 24,750.00
TOTAL Rp 1,010,041.00 Rp 175,050.00 Rp 1,185,091.00

4 10 KG PEMBESIAN DENGAN BESI POLOS


Bahan
10.500 Kg Besi tulangan (polos) Rp 18,000.00 Rp 189,000.00 Rp - Rp 189,000.00
0.150 Kg Kawat bendrat Rp 16,000.00 Rp 2,400.00 Rp - Rp 2,400.00
Upah
0.007 Oh Kepala tukang Rp 120,000.00 Rp - Rp 840.00 Rp 840.00
0.004 Oh Mandor Rp 180,000.00 Rp - Rp 720.00 Rp 720.00
0.070 Oh Pekerja Rp 80,000.00 Rp - Rp 5,600.00 Rp 5,600.00
0.070 Oh Tukang Rp 90,000.00 Rp - Rp 6,300.00 Rp 6,300.00
TOTAL Rp 191,400.00 Rp 13,460.00 Rp 204,860.00
4.1 1 KG PEMBESIAN DENGAN BESI POLOS Rp 20,486.00
HARGA HARGA JUMLAH
No. URAIAN SATUAN BAHAN UPAH HARGA
(Rp.) (Rp.) (Rp.) (Rp.)

5 1 M² PASANG BEKISTING UNTUK POER PLAT


Bahan
0.245 Kg Paku biasa Rp 14,000.00 Rp 3,430.00 Rp - Rp 3,430.00
0.100 Ltr Minyak bekisting Rp 6,000.00 Rp 600.00 Rp - Rp 600.00
0.011 M³ Balok meranti Rp 2,450,000.00 Rp 27,440.00 Rp - Rp 27,440.00
0.020 M³ Papan meranti Rp 2,600,000.00 Rp 52,000.00 Rp - Rp 52,000.00
Upah
0.020 Oh Kepala tukang Rp 120,000.00 Rp - Rp 2,340.00 Rp 2,340.00
0.020 Oh Mandor Rp 180,000.00 Rp - Rp 3,510.00 Rp 3,510.00
0.390 Oh Pekerja Rp 80,000.00 Rp - Rp 31,200.00 Rp 31,200.00
0.195 Oh Tukang Rp 90,000.00 Rp - Rp 17,550.00 Rp 17,550.00
TOTAL Rp 83,470.00 Rp 54,600.00 Rp 138,070.00

6 1 M² PASANG BEKISTING UNTUK SLOOF


Bahan
0.300 Kg Paku biasa Rp 14,000.00 Rp 4,200.00 Rp - Rp 4,200.00
0.035 Lbr Plywood 9 mm Rp 117,000.00 Rp 4,062.50 Rp - Rp 4,062.50
0.100 Ltr Minyak bekisting Rp 6,000.00 Rp 600.00 Rp - Rp 600.00
0.024 M³ Balok meranti Rp 2,450,000.00 Rp 59,290.00 Rp - Rp 59,290.00
Upah
0.026 Oh Kepala tukang Rp 120,000.00 Rp - Rp 3,120.00 Rp 3,120.00
0.026 Oh Mandor Rp 180,000.00 Rp - Rp 4,680.00 Rp 4,680.00
0.520 Oh Pekerja Rp 80,000.00 Rp - Rp 41,600.00 Rp 41,600.00
0.260 Oh Tukang Rp 90,000.00 Rp - Rp 23,400.00 Rp 23,400.00
TOTAL Rp 68,152.50 Rp 72,800.00 Rp 140,952.50

7 1 M² PASANG BEKISTING UNTUK KOLOM


Bahan
2.000 Btg Dolken kayu galam Rp 5,000.00 Rp 10,000.00 Rp - Rp 10,000.00
0.400 Kg Paku biasa Rp 14,000.00 Rp 5,600.00 Rp - Rp 5,600.00
0.350 Lbr Plywood 9 mm Rp 117,000.00 Rp 40,950.00 Rp - Rp 40,950.00
0.200 Ltr Minyak bekisting Rp 6,000.00 Rp 1,200.00 Rp - Rp 1,200.00
0.018 M³ Balok meranti Rp 2,450,000.00 Rp 44,100.00 Rp - Rp 44,100.00
Upah
0.033 Oh Kepala tukang Rp 120,000.00 Rp - Rp 3,960.00 Rp 3,960.00
0.033 Oh Mandor Rp 180,000.00 Rp - Rp 5,940.00 Rp 5,940.00
0.660 Oh Pekerja Rp 80,000.00 Rp - Rp 52,800.00 Rp 52,800.00
0.330 Oh Tukang Rp 90,000.00 Rp - Rp 29,700.00 Rp 29,700.00
TOTAL Rp 101,850.00 Rp 92,400.00 Rp 194,250.00

8 1 M² PASANG BEKISTING UNTUK RINGBALK


Bahan
2.000 Btg Dolken kayu galam Rp 5,000.00 Rp 10,000.00 Rp - Rp 10,000.00
0.400 Kg Paku biasa Rp 14,000.00 Rp 5,600.00 Rp - Rp 5,600.00
0.350 Lbr Plywood 9 mm Rp 117,000.00 Rp 40,950.00 Rp - Rp 40,950.00
0.200 Ltr Minyak bekisting Rp 6,000.00 Rp 1,200.00 Rp - Rp 1,200.00
0.040 M³ Balok meranti Rp 2,450,000.00 Rp 98,000.00 Rp - Rp 98,000.00
Upah
0.033 Oh Kepala tukang Rp 120,000.00 Rp - Rp 3,960.00 Rp 3,960.00
0.033 Oh Mandor Rp 180,000.00 Rp - Rp 5,940.00 Rp 5,940.00
0.660 Oh Pekerja Rp 80,000.00 Rp - Rp 52,800.00 Rp 52,800.00
0.330 Oh Tukang Rp 90,000.00 Rp - Rp 29,700.00 Rp 29,700.00
TOTAL Rp 155,750.00 Rp 92,400.00 Rp 248,150.00

9 1 M² PASANG BEKISTING UNTUK PLATE


Bahan
10.000 Btg Dolken kayu galam Rp 5,000.00 Rp 50,000.00 Rp - Rp 50,000.00
0.400 Kg Paku biasa Rp 14,000.00 Rp 5,600.00 Rp - Rp 5,600.00
0.350 Lbr Plywood 9 mm Rp 117,000.00 Rp 40,950.00 Rp - Rp 40,950.00
0.200 Ltr Minyak bekisting Rp 6,000.00 Rp 1,200.00 Rp - Rp 1,200.00
0.056 M³ Balok meranti Rp 2,450,000.00 Rp 137,200.00 Rp - Rp 137,200.00
Upah
0.033 Oh Kepala tukang Rp 120,000.00 Rp - Rp 3,960.00 Rp 3,960.00
0.033 Oh Mandor Rp 180,000.00 Rp - Rp 5,940.00 Rp 5,940.00
0.320 Oh Pekerja Rp 80,000.00 Rp - Rp 25,600.00 Rp 25,600.00
0.330 Oh Tukang Rp 90,000.00 Rp - Rp 29,700.00 Rp 29,700.00
TOTAL Rp 234,950.00 Rp 65,200.00 Rp 300,150.00

10 1 M³ BETON BERTULANG PEKERJAAN POER PLATE 70X80X20

206.315 Kg Besi Beton (D.4.1) Rp 20,486.00 Rp 4,226,577.78 Rp - Rp 4,226,577.78


1.000 M³ Beton campuran 1:2:3 (D.3) Rp 1,185,091.00 Rp 1,185,091.00 Rp - Rp 1,185,091.00
3.137 M² Bekisting poer plat (D.5) Rp 138,070.00 Rp 433,145.31 Rp - Rp 433,145.31
TOTAL Rp 5,844,814.09 Rp - Rp 5,844,814.09

11 1 M³ BETON BERTULANG PEKERJAAN SLOOF 15X20

184.417 Kg Besi Beton (D.4.1) Rp 20,486.00 Rp 3,777,973.71 Rp - Rp 3,777,973.71


1.000 M³ Beton campuran 1:2:3 (D.3) Rp 1,185,091.00 Rp 1,185,091.00 Rp - Rp 1,185,091.00
13.333 M² Bekisting Sloof (D.6) Rp 140,952.50 Rp 1,879,366.63 Rp - Rp 1,879,366.63
TOTAL Rp 6,842,431.34 Rp - Rp 6,842,431.34
HARGA HARGA JUMLAH
No. URAIAN SATUAN BAHAN UPAH HARGA
(Rp.) (Rp.) (Rp.) (Rp.)

12 1 M³ BETON BERTULANG PEKERJAAN KOLOM 15X20

150.702 Kg Besi Beton (D.4.1) Rp 20,486.00 Rp 3,087,285.11 Rp - Rp 3,087,285.11


1.000 M³ Beton campuran 1:2:3 (D.3) Rp 1,185,091.00 Rp 1,185,091.00 Rp - Rp 1,185,091.00
10.000 M² Bekisting Kolom (D.7) Rp 194,250.00 Rp 1,942,500.00 Rp - Rp 1,942,500.00
TOTAL Rp 6,214,876.11 Rp - Rp 6,214,876.11

13 1 M³ BETON BERTULANG PEKERJAAN KOLOM 13X13

291.984 Kg Besi Beton (D.4.1) Rp 20,486.00 Rp 5,981,584.61 Rp - Rp 5,981,584.61


1.000 M³ Beton campuran 1:2:3 (D.3) Rp 1,185,091.00 Rp 1,185,091.00 Rp - Rp 1,185,091.00
15.385 M² Bekisting Kolom (D.7) Rp 194,250.00 Rp 2,988,461.54 Rp - Rp 2,988,461.54
TOTAL Rp 10,155,137.15 Rp - Rp 10,155,137.15

14 1 M³ BETON BERTULANG PEKERJAAN RINGBALK 13x20

207.726 Kg Besi Beton (D.4.1) Rp 20,486.00 Rp 4,255,465.02 Rp - Rp 4,255,465.02


1.000 M³ Beton campuran 1:2:3 (D.3) Rp 1,185,091.00 Rp 1,185,091.00 Rp - Rp 1,185,091.00
20.385 M² Bekisting Ringbalk (D.8) Rp 248,150.00 Rp 5,058,442.31 Rp - Rp 5,058,442.31
TOTAL Rp 10,498,998.33 Rp - Rp 10,498,998.33

15 1 M³ BETON BERTULANG PEKERJAAN BALOK LATAI 13x20

207.726 Kg Besi Beton (D.4.1) Rp 20,486.00 Rp 4,255,465.02 Rp - Rp 4,255,465.02


1.000 M³ Beton campuran 1:2:3 (D.3) Rp 1,185,091.00 Rp 1,185,091.00 Rp - Rp 1,185,091.00
20.385 M² Bekisting Ringbalk (D.8) Rp 248,150.00 Rp 5,058,442.31 Rp - Rp 5,058,442.31
TOTAL Rp 10,498,998.33 Rp - Rp 10,498,998.33

16 1 M³ BETON BERTULANG PEKERJAAN PLATE DAK TEBAL 12 CM

208.594 Kg Besi Beton (D.4.1) Rp 20,486.00 Rp 4,273,256.85 Rp - Rp 4,273,256.85


1.000 M³ Beton campuran 1:2:3 (D.3) Rp 1,185,091.00 Rp 1,185,091.00 Rp - Rp 1,185,091.00
10.573 M² Bekisting plate (D.9) Rp 300,150.00 Rp 3,173,586.00 Rp - Rp 3,173,586.00
TOTAL Rp 8,631,933.85 Rp - Rp 8,631,933.85

17 1 M³ BETON BERTULANG PEKERJAAN CANOPY TEBAL 10 CM

123.990 Kg Besi Beton (D.4.1) Rp 20,486.00 Rp 2,540,068.97 Rp - Rp 2,540,068.97


1.000 M³ Beton campuran 1:2:3 (D.3) Rp 1,185,091.00 Rp 1,185,091.00 Rp - Rp 1,185,091.00
13.453 M² Bekisting plate (D.9) Rp 300,150.00 Rp 4,038,018.00 Rp - Rp 4,038,018.00
TOTAL Rp 7,763,177.97 Rp - Rp 7,763,177.97

E PEKERJAAN KERAMIK

1 1 M² PASANGAN KERAMIK DINDING 20X25


Bahan
9.300 Kg Semen Rp 1,350.00 Rp 12,555.00 Rp - Rp 12,555.00
1.940 Kg Semen warna Rp 24,000.00 Rp 46,560.00 Rp - Rp 46,560.00
1.000 M² Keramik 20x25 Rp 129,000.00 Rp 129,000.00 Rp - Rp 129,000.00
0.018 M³ Pasir pasangan (lokal) Rp 106,000.00 Rp 1,908.00 Rp - Rp 1,908.00
Upah
0.018 Oh Kepala tukang Rp 120,000.00 Rp - Rp 2,160.00 Rp 2,160.00
0.037 Oh Mandor Rp 180,000.00 Rp - Rp 6,660.00 Rp 6,660.00
0.370 Oh Pekerja Rp 80,000.00 Rp - Rp 29,600.00 Rp 29,600.00
0.180 Oh Tukang Rp 90,000.00 Rp - Rp 16,200.00 Rp 16,200.00
TOTAL Rp 190,023.00 Rp 54,620.00 Rp 244,643.00

2 1 M² PASANGAN KERAMIK LANTAI 20X20


Bahan
10.040 Kg Semen Rp 1,350.00 Rp 13,554.00 Rp - Rp 13,554.00
1.000 M² Keramik 20x20 Rp 124,000.00 Rp 124,000.00 Rp - Rp 124,000.00
0.045 M³ Pasir pasangan (lokal) Rp 106,000.00 Rp 4,770.00 Rp - Rp 4,770.00
Upah
0.013 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,560.00 Rp 1,560.00
0.014 Oh Mandor Rp 180,000.00 Rp - Rp 2,520.00 Rp 2,520.00
0.270 Oh Pekerja Rp 80,000.00 Rp - Rp 21,600.00 Rp 21,600.00
0.130 Oh Tukang Rp 90,000.00 Rp - Rp 11,700.00 Rp 11,700.00
TOTAL Rp 142,324.00 Rp 37,380.00 Rp 179,704.00

3 1 M² PASANGAN KERAMIK LANTAI 40X40


Bahan
10.000 Kg Semen Rp 1,350.00 Rp 13,500.00 Rp - Rp 13,500.00
1.000 M² Keramik 40x40 Rp 90,000.00 Rp 90,000.00 Rp - Rp 90,000.00
0.045 M³ Pasir pasangan (lokal) Rp 106,000.00 Rp 4,770.00 Rp - Rp 4,770.00
Upah
0.013 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,560.00 Rp 1,560.00
0.013 Oh Mandor Rp 180,000.00 Rp - Rp 2,340.00 Rp 2,340.00
0.260 Oh Pekerja Rp 80,000.00 Rp - Rp 20,800.00 Rp 20,800.00
0.125 Oh Tukang Rp 90,000.00 Rp - Rp 11,250.00 Rp 11,250.00
TOTAL Rp 108,270.00 Rp 35,950.00 Rp 144,220.00
HARGA HARGA JUMLAH
No. URAIAN SATUAN BAHAN UPAH HARGA
(Rp.) (Rp.) (Rp.) (Rp.)

F PEKERJAAN PASANGAN

1 1 M² PASANGAN DINDING 1/2 BATA 1PC : 2PS


Bahan
50.000 Bh Batu bata Rp 900.00 Rp 45,000.00 Rp - Rp 45,000.00
18.950 Kg Semen Rp 1,350.00 Rp 25,582.50 Rp - Rp 25,582.50
0.038 M³ Pasir pasangan (lokal) Rp 106,000.00 Rp 4,028.00 Rp - Rp 4,028.00
Upah
0.010 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,200.00 Rp 1,200.00
0.015 Oh Mandor Rp 180,000.00 Rp - Rp 2,700.00 Rp 2,700.00
0.320 Oh Pekerja Rp 80,000.00 Rp - Rp 25,600.00 Rp 25,600.00
0.100 Oh Tukang Rp 90,000.00 Rp - Rp 9,000.00 Rp 9,000.00
TOTAL Rp 74,610.50 Rp 38,500.00 Rp 113,110.50

2 1 M² PASANGAN DINDING 1/2 BATA 1PC : 4PS


Bahan
50.000 Bh Batu bata Rp 900.00 Rp 45,000.00 Rp - Rp 45,000.00
11.500 Kg Semen Rp 1,350.00 Rp 15,525.00 Rp - Rp 15,525.00
0.043 M³ Pasir pasangan (lokal) Rp 106,000.00 Rp 4,558.00 Rp - Rp 4,558.00
Upah
0.010 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,200.00 Rp 1,200.00
0.015 Oh Mandor Rp 180,000.00 Rp - Rp 2,700.00 Rp 2,700.00
0.320 Oh Pekerja Rp 80,000.00 Rp - Rp 25,600.00 Rp 25,600.00
0.100 Oh Tukang Rp 90,000.00 Rp - Rp 9,000.00 Rp 9,000.00
TOTAL Rp 65,083.00 Rp 38,500.00 Rp 103,583.00

3 1 M² PLESTERAN DINDING BATA 1PC : 2PS


Bahan
13.632 Kg Semen Rp 1,350.00 Rp 18,403.20 Rp - Rp 18,403.20
0.027 M³ Pasir pasangan (lokal) Rp 106,000.00 Rp 2,862.00 Rp - Rp 2,862.00
Upah
0.020 Oh Kepala tukang Rp 120,000.00 Rp - Rp 2,400.00 Rp 2,400.00
0.013 Oh Mandor Rp 180,000.00 Rp - Rp 2,340.00 Rp 2,340.00
0.260 Oh Pekerja Rp 80,000.00 Rp - Rp 20,800.00 Rp 20,800.00
0.200 Oh Tukang Rp 90,000.00 Rp - Rp 18,000.00 Rp 18,000.00
TOTAL Rp 21,265.20 Rp 43,540.00 Rp 64,805.20

4 1 M² PLESTERAN DINDING BATA 1PC : 4PS


Bahan
8.320 Kg Semen Rp 1,350.00 Rp 11,232.00 Rp - Rp 11,232.00
0.032 M³ Pasir pasangan (lokal) Rp 106,000.00 Rp 3,392.00 Rp - Rp 3,392.00
Upah
0.020 Oh Kepala tukang Rp 120,000.00 Rp - Rp 2,400.00 Rp 2,400.00
0.013 Oh Mandor Rp 180,000.00 Rp - Rp 2,340.00 Rp 2,340.00
0.260 Oh Pekerja Rp 80,000.00 Rp - Rp 20,800.00 Rp 20,800.00
0.200 Oh Tukang Rp 90,000.00 Rp - Rp 18,000.00 Rp 18,000.00
TOTAL Rp 14,624.00 Rp 43,540.00 Rp 58,164.00

5 1 M² PASANG BATU ALAM


Bahan
9.300 Kg Semen Rp 1,350.00 Rp 12,555.00 Rp - Rp 12,555.00
1.000 M² Batu alam Rp 290,000.00 Rp 290,000.00 Rp - Rp 290,000.00
0.018 M³ Pasir pasangan (lokal) Rp 106,000.00 Rp 1,908.00 Rp - Rp 1,908.00
Upah
0.018 Oh Kepala tukang Rp 120,000.00 Rp - Rp 2,160.00 Rp 2,160.00
0.037 Oh Mandor Rp 180,000.00 Rp - Rp 6,660.00 Rp 6,660.00
0.370 Oh Pekerja Rp 80,000.00 Rp - Rp 29,600.00 Rp 29,600.00
0.180 Oh Tukang Rp 90,000.00 Rp - Rp 16,200.00 Rp 16,200.00
TOTAL Rp 304,463.00 Rp 54,620.00 Rp 359,083.00

G PEKERJAAN KUSEN

1 1 M³ MENGERJAKAN KUSEN PINTU DAN JENDELA


Bahan
1.200 M³ Kayu bengkirai Rp 3,400,000.00 Rp 4,080,000.00 Rp - Rp 4,080,000.00
Upah
2.000 Oh Kepala tukang Rp 120,000.00 Rp - Rp 240,000.00 Rp 240,000.00
0.300 Oh Mandor Rp 180,000.00 Rp - Rp 54,000.00 Rp 54,000.00
6.000 Oh Pekerja Rp 80,000.00 Rp - Rp 480,000.00 Rp 480,000.00
20.000 Oh Tukang Rp 90,000.00 Rp - Rp 1,800,000.00 Rp 1,800,000.00
TOTAL Rp 4,080,000.00 Rp 2,574,000.00 Rp 6,654,000.00

2 1 M² PASANG PINTU PANEL KAYU BENGKIRAI


Bahan
0.040 M³ Kayu bengkirai Rp 3,400,000.00 Rp 136,000.00 Rp - Rp 136,000.00
Upah
0.250 Oh Kepala tukang Rp 120,000.00 Rp - Rp 30,000.00 Rp 30,000.00
0.050 Oh Mandor Rp 180,000.00 Rp - Rp 9,000.00 Rp 9,000.00
1.000 Oh Pekerja Rp 80,000.00 Rp - Rp 80,000.00 Rp 80,000.00
2.500 Oh Tukang Rp 90,000.00 Rp - Rp 225,000.00 Rp 225,000.00
TOTAL Rp 136,000.00 Rp 344,000.00 Rp 480,000.00

3 1 M² PASANG DAUN JENDELA KACA


HARGA HARGA JUMLAH
No. URAIAN SATUAN BAHAN UPAH HARGA
(Rp.) (Rp.) (Rp.) (Rp.)
Bahan
0.035 M³ Kayu bengkirai Rp 3,400,000.00 Rp 119,000.00 Rp - Rp 119,000.00
Upah
0.200 Oh Kepala tukang Rp 120,000.00 Rp - Rp 24,000.00 Rp 24,000.00
0.040 Oh Mandor Rp 180,000.00 Rp - Rp 7,200.00 Rp 7,200.00
0.800 Oh Pekerja Rp 80,000.00 Rp - Rp 64,000.00 Rp 64,000.00
2.000 Oh Tukang Rp 90,000.00 Rp - Rp 180,000.00 Rp 180,000.00
TOTAL Rp 119,000.00 Rp 275,200.00 Rp 394,200.00

4 1 M² PASANG KACA BENING TEBAL 5MM


Bahan
1.100 M² Kaca bening tebal 5 mm Rp 105,000.00 Rp 115,500.00 Rp - Rp 115,500.00
Upah
0.015 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,800.00 Rp 1,800.00
0.001 Oh Mandor Rp 180,000.00 Rp - Rp 135.00 Rp 135.00
0.015 Oh Pekerja Rp 80,000.00 Rp - Rp 1,200.00 Rp 1,200.00
0.150 Oh Tukang Rp 90,000.00 Rp - Rp 13,500.00 Rp 13,500.00
TOTAL Rp 115,500.00 Rp 16,635.00 Rp 132,135.00

5 1 BH PASANG ENGSEL PINTU


Bahan
1.000 Bh Engsel 5" Rp 45,000.00 Rp 45,000.00 Rp - Rp 45,000.00
Upah
0.015 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,800.00 Rp 1,800.00
0.001 Oh Mandor Rp 180,000.00 Rp - Rp 135.00 Rp 135.00
0.015 Oh Pekerja Rp 80,000.00 Rp - Rp 1,200.00 Rp 1,200.00
0.150 Oh Tukang Rp 90,000.00 Rp - Rp 13,500.00 Rp 13,500.00
TOTAL Rp 45,000.00 Rp 16,635.00 Rp 61,635.00

6 1 BH PASANG ENGSEL JENDELA


Bahan
1.000 Bh Engsel 3" Rp 30,000.00 Rp 30,000.00 Rp - Rp 30,000.00
Upah
0.010 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,200.00 Rp 1,200.00
0.001 Oh Mandor Rp 180,000.00 Rp - Rp 90.00 Rp 90.00
0.010 Oh Pekerja Rp 80,000.00 Rp - Rp 800.00 Rp 800.00
0.100 Oh Tukang Rp 90,000.00 Rp - Rp 9,000.00 Rp 9,000.00
TOTAL Rp 30,000.00 Rp 11,090.00 Rp 41,090.00

7 1 BH PASANG HANDEL PINTU (PULL HANDLE)


Bahan
1.000 Bh Pull handle Rp 165,000.00 Rp 165,000.00 Rp - Rp 165,000.00
Upah
0.015 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,800.00 Rp 1,800.00
0.001 Oh Mandor Rp 180,000.00 Rp - Rp 135.00 Rp 135.00
0.015 Oh Pekerja Rp 80,000.00 Rp - Rp 1,200.00 Rp 1,200.00
0.150 Oh Tukang Rp 90,000.00 Rp - Rp 13,500.00 Rp 13,500.00
TOTAL Rp 165,000.00 Rp 16,635.00 Rp 181,635.00

8 1 BH PASANG HANDEL PINTU (LEVER HANDLE)


Bahan
1.000 Bh Lever Handle Rp 347,000.00 Rp 347,000.00 Rp - Rp 347,000.00
Upah
0.015 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,800.00 Rp 1,800.00
0.001 Oh Mandor Rp 180,000.00 Rp - Rp 135.00 Rp 135.00
0.015 Oh Pekerja Rp 80,000.00 Rp - Rp 1,200.00 Rp 1,200.00
0.150 Oh Tukang Rp 90,000.00 Rp - Rp 13,500.00 Rp 13,500.00
TOTAL Rp 347,000.00 Rp 16,635.00 Rp 363,635.00

9 1 BH PASANG HANDEL PINTU KUNCI BULAT (KNOB HANDLE)


Bahan
1.000 Bh Kunci Bulat (Knob Handle) Rp 145,000.00 Rp 145,000.00 Rp - Rp 145,000.00
Upah
0.010 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,200.00 Rp 1,200.00
0.005 Oh Mandor Rp 180,000.00 Rp - Rp 900.00 Rp 900.00
0.010 Oh Pekerja Rp 80,000.00 Rp - Rp 800.00 Rp 800.00
0.500 Oh Tukang Rp 90,000.00 Rp - Rp 45,000.00 Rp 45,000.00
TOTAL Rp 145,000.00 Rp 47,900.00 Rp 192,900.00
HARGA HARGA JUMLAH
No. URAIAN SATUAN BAHAN UPAH HARGA
(Rp.) (Rp.) (Rp.) (Rp.)

10 1 BH PASANG HANDEL JENDELA


Bahan
1.000 Bh Handel jendela Rp 28,000.00 Rp 28,000.00 Rp - Rp 28,000.00
Upah
0.015 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,800.00 Rp 1,800.00
0.001 Oh Mandor Rp 180,000.00 Rp - Rp 135.00 Rp 135.00
0.015 Oh Pekerja Rp 80,000.00 Rp - Rp 1,200.00 Rp 1,200.00
0.150 Oh Tukang Rp 90,000.00 Rp - Rp 13,500.00 Rp 13,500.00
TOTAL Rp 28,000.00 Rp 16,635.00 Rp 44,635.00

11 1 BH PASANG KUNCI TANAM


Bahan
1.000 Bh Kunci tanam 2 slagh Rp 245,000.00 Rp 245,000.00 Rp - Rp 245,000.00
Upah
0.010 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,200.00 Rp 1,200.00
0.005 Oh Mandor Rp 180,000.00 Rp - Rp 900.00 Rp 900.00
0.010 Oh Pekerja Rp 80,000.00 Rp - Rp 800.00 Rp 800.00
0.500 Oh Tukang Rp 90,000.00 Rp - Rp 45,000.00 Rp 45,000.00
TOTAL Rp 245,000.00 Rp 47,900.00 Rp 292,900.00

12 1 BH GRENDEL JENDELA
Bahan
1.000 Bh Grendel jendela Rp 25,000.00 Rp 25,000.00 Rp - Rp 25,000.00
Upah
0.015 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,800.00 Rp 1,800.00
0.001 Oh Mandor Rp 180,000.00 Rp - Rp 135.00 Rp 135.00
0.015 Oh Pekerja Rp 80,000.00 Rp - Rp 1,200.00 Rp 1,200.00
0.150 Oh Tukang Rp 90,000.00 Rp - Rp 13,500.00 Rp 13,500.00
TOTAL Rp 25,000.00 Rp 16,635.00 Rp 41,635.00

13 1 BH PASANG HAK ANGIN


Bahan
1.000 Bh Hak angin Rp 34,000.00 Rp 34,000.00 Rp - Rp 34,000.00
Upah
0.015 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,800.00 Rp 1,800.00
0.001 Oh Mandor Rp 180,000.00 Rp - Rp 135.00 Rp 135.00
0.015 Oh Pekerja Rp 80,000.00 Rp - Rp 1,200.00 Rp 1,200.00
0.150 Oh Tukang Rp 90,000.00 Rp - Rp 13,500.00 Rp 13,500.00
TOTAL Rp 34,000.00 Rp 16,635.00 Rp 50,635.00

14 1 UNIT PINTU TYPE 1 (P1)


0.032 M³ Pasang kusen pintu (G.1) Rp 6,654,000.00 Rp 211,929.90 Rp - Rp 211,929.90
1.560 M² Pasang daun pintu (G.2) Rp 480,000.00 Rp 748,800.00 Rp - Rp 748,800.00
2.000 Bh Pasang engsel pintu (G.5) Rp 61,635.00 Rp 123,270.00 Rp - Rp 123,270.00
3.000 Bh Pasang pull handle (G.7) Rp 181,635.00 Rp 544,905.00 Rp - Rp 544,905.00
1.000 Bh Pasang kunci tanam 2 slagh (G.11) Rp 292,900.00 Rp 292,900.00 Rp - Rp 292,900.00
TOTAL Rp 1,921,804.90 Rp - Rp 1,921,804.90

15 1 UNIT PINTU TYPE 2 (P2)


0.031 M³ Pasang kusen pintu (G.1) Rp 6,654,000.00 Rp 207,604.80 Rp - Rp 207,604.80
1.365 M² Pasang daun pintu (G.2) Rp 480,000.00 Rp 655,200.00 Rp - Rp 655,200.00
3.000 Bh Pasang engsel pintu (G.5) Rp 61,635.00 Rp 184,905.00 Rp - Rp 184,905.00
1.000 Bh Pasang lever handle (G.8) Rp 363,635.00 Rp 363,635.00 Rp - Rp 363,635.00
TOTAL Rp 1,411,344.80 Rp - Rp 1,411,344.80

16 1 UNIT PINTU TYPE 3 (P3)


0.031 M³ Pasang kusen pintu (G.1) Rp 6,654,000.00 Rp 203,279.70 Rp - Rp 203,279.70
1.170 M² Pasang daun pintu (G.2) Rp 480,000.00 Rp 561,600.00 Rp - Rp 561,600.00
3.000 Bh Pasang engsel pintu (G.5) Rp 61,635.00 Rp 184,905.00 Rp - Rp 184,905.00
1.000 Bh Pasang knob handle (G.9) Rp 192,900.00 Rp 192,900.00 Rp - Rp 192,900.00
TOTAL Rp 1,142,684.70 Rp - Rp 1,142,684.70

17 1 UNIT PINTU JENDELA TYPE 1 (PJ1)


0.048 M³ Pasang kusen pintu jendela (G.1) Rp 6,654,000.00 Rp 320,057.40 Rp - Rp 320,057.40
1.560 M² Pasang daun pintu (G.2) Rp 480,000.00 Rp 748,800.00 Rp - Rp 748,800.00
0.650 M² Pasang daun jendela (G.3) Rp 394,200.00 Rp 256,230.00 Rp - Rp 256,230.00
0.330 M² Pasang kaca bening 5mm (G.4) Rp 132,135.00 Rp 43,604.55 Rp - Rp 43,604.55
3.000 Bh Pasang engsel pintu (G.5) Rp 61,635.00 Rp 184,905.00 Rp - Rp 184,905.00
2.000 Bh Pasang engsel jendela (G.6) Rp 41,090.00 Rp 82,180.00 Rp - Rp 82,180.00
2.000 Bh Pasang pull handle (G.7) Rp 181,635.00 Rp 363,270.00 Rp - Rp 363,270.00
1.000 Bh Pasang handle jendela (G.10) Rp 44,635.00 Rp 44,635.00 Rp - Rp 44,635.00
1.000 Bh Pasang kunci tanam 2 slagh (G.11) Rp 292,900.00 Rp 292,900.00 Rp - Rp 292,900.00
1.000 Bh Pasang grendel jendela (G.12) Rp 41,635.00 Rp 41,635.00 Rp - Rp 41,635.00
2.000 Bh Pasang hak angin (G.13) Rp 50,635.00 Rp 101,270.00 Rp - Rp 101,270.00
TOTAL Rp 2,479,486.95 Rp - Rp 2,479,486.95

18 1 UNIT JENDELA TYPE 1 (J1)


0.066 M³ Pasang kusen jendela (G.1) Rp 6,654,000.00 Rp 438,997.65 Rp - Rp 438,997.65
1.650 M² Pasang kaca bening 5mm (G.4) Rp 132,135.00 Rp 218,022.75 Rp - Rp 218,022.75
TOTAL Rp 657,020.40 Rp - Rp 657,020.40

19 1 UNIT JENDELA TYPE 2 (J2)


0.042 M³ Pasang kusen jendela (G.1) Rp 6,654,000.00 Rp 281,131.50 Rp - Rp 281,131.50
HARGA HARGA JUMLAH
No. URAIAN SATUAN BAHAN UPAH HARGA
(Rp.) (Rp.) (Rp.) (Rp.)
1.300 M² Pasang daun jendela (G.3) Rp 394,200.00 Rp 512,460.00 Rp - Rp 512,460.00
0.660 M² Pasang kaca bening 5mm (G.4) Rp 132,135.00 Rp 87,209.10 Rp - Rp 87,209.10
4.000 Bh Pasang engsel jendela (G.6) Rp 41,090.00 Rp 164,360.00 Rp - Rp 164,360.00
2.000 Bh Pasang handle jendela (G.10) Rp 44,635.00 Rp 89,270.00 Rp - Rp 89,270.00
2.000 Bh Pasang grendel jendela (G.12) Rp 41,635.00 Rp 83,270.00 Rp - Rp 83,270.00
4.000 Bh Pasang hak angin (G.13) Rp 50,635.00 Rp 202,540.00 Rp - Rp 202,540.00
TOTAL Rp 1,420,240.60 Rp - Rp 1,420,240.60

20 1 UNIT JENDELA TYPE 3 (J3)


0.026 M³ Pasang kusen jendela (G.1) Rp 6,654,000.00 Rp 173,004.00 Rp - Rp 173,004.00
0.650 M² Pasang daun jendela (G.3) Rp 394,200.00 Rp 256,230.00 Rp - Rp 256,230.00
0.330 M² Pasang kaca bening 5mm (G.4) Rp 132,135.00 Rp 43,604.55 Rp - Rp 43,604.55
2.000 Bh Pasang engsel jendela (G.6) Rp 41,090.00 Rp 82,180.00 Rp - Rp 82,180.00
1.000 Bh Pasang handle jendela (G.10) Rp 44,635.00 Rp 44,635.00 Rp - Rp 44,635.00
1.000 Bh Pasang grendel jendela (G.12) Rp 41,635.00 Rp 41,635.00 Rp - Rp 41,635.00
2.000 Bh Pasang hak angin (G.13) Rp 50,635.00 Rp 101,270.00 Rp - Rp 101,270.00
TOTAL Rp 742,558.55 Rp - Rp 742,558.55

21 1 UNIT BOUVENLIGHT TYPE 1 (BV1)


0.023 M³ Pasang kusen bouvenlight (G.1) Rp 6,654,000.00 Rp 151,378.50 Rp - Rp 151,378.50
0.525 M² Pasang kaca bening 5mm (G.4) Rp 132,135.00 Rp 69,370.88 Rp - Rp 69,370.88
TOTAL Rp 220,749.38 Rp - Rp 220,749.38

22 1 UNIT BOUVENLIGHT TYPE 2 (BV2)


0.011 M³ Pasang kusen bouvenlight (G.1) Rp 6,654,000.00 Rp 73,526.70 Rp - Rp 73,526.70
0.050 M² Pasang kaca bening 5mm (G.4) Rp 132,135.00 Rp 6,606.75 Rp - Rp 6,606.75
TOTAL Rp 80,133.45 Rp - Rp 80,133.45

23 1 UNIT BOUVENLIGHT TYPE 3 (BV3)


0.012 M³ Pasang kusen bouvenlight (G.1) Rp 6,654,000.00 Rp 77,851.80 Rp - Rp 77,851.80
0.300 M² Pasang kaca bening 5mm (G.4) Rp 132,135.00 Rp 39,640.50 Rp - Rp 39,640.50
TOTAL Rp 117,492.30 Rp - Rp 117,492.30

H PEKERJAAN PLAFOND

1 1 M² PENGGANTUNG DAN RANGKA PLAFOND


Bahan
0.200 Kg Baut sekrup Rp 30,000.00 Rp 6,000.00 Rp - Rp 6,000.00
4.580 M Besi holo 2x4 Rp 9,000.00 Rp 41,220.00 Rp - Rp 41,220.00
Upah
0.025 Oh Kepala tukang Rp 120,000.00 Rp - Rp 3,000.00 Rp 3,000.00
0.075 Oh Mandor Rp 180,000.00 Rp - Rp 13,500.00 Rp 13,500.00
0.150 Oh Pekerja Rp 80,000.00 Rp - Rp 12,000.00 Rp 12,000.00
0.250 Oh Tukang Rp 90,000.00 Rp - Rp 22,500.00 Rp 22,500.00
TOTAL Rp 47,220.00 Rp 51,000.00 Rp 98,220.00

2 1 M² PLAFOND GYPSUM 9 MM
Bahan
0.030 Kg Baut sekrup Rp 30,000.00 Rp 900.00 Rp - Rp 900.00
0.375 Lbr Gypsum 9 mm Rp 55,000.00 Rp 20,625.00 Rp - Rp 20,625.00
Upah
0.010 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,200.00 Rp 1,200.00
0.004 Oh Mandor Rp 180,000.00 Rp - Rp 720.00 Rp 720.00
0.070 Oh Pekerja Rp 80,000.00 Rp - Rp 5,600.00 Rp 5,600.00
0.100 Oh Tukang Rp 90,000.00 Rp - Rp 9,000.00 Rp 9,000.00
TOTAL Rp 21,525.00 Rp 16,520.00 Rp 38,045.00

3 1 M² PLAFOND CALSIBOARD 4.5MM


Bahan
0.030 Kg Baut sekrup Rp 30,000.00 Rp 900.00 Rp - Rp 900.00
0.375 Lbr Calsiboard 4.5 mm Rp 75,000.00 Rp 28,125.00 Rp - Rp 28,125.00
Upah
0.010 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,200.00 Rp 1,200.00
0.004 Oh Mandor Rp 180,000.00 Rp - Rp 720.00 Rp 720.00
0.070 Oh Pekerja Rp 80,000.00 Rp - Rp 5,600.00 Rp 5,600.00
0.100 Oh Tukang Rp 90,000.00 Rp - Rp 9,000.00 Rp 9,000.00
TOTAL Rp 29,025.00 Rp 16,520.00 Rp 45,545.00

4 1 M² LIST PLAFOND GYPSUM


Bahan
0.010 Kg Lem gypsum Rp 17,000.00 Rp 170.00 Rp - Rp 170.00
1.050 M List gypsum Rp 32,000.00 Rp 33,600.00 Rp - Rp 33,600.00
Upah
0.002 Oh Kepala tukang Rp 120,000.00 Rp - Rp 240.00 Rp 240.00
0.003 Oh Mandor Rp 180,000.00 Rp - Rp 540.00 Rp 540.00
0.050 Oh Pekerja Rp 80,000.00 Rp - Rp 4,000.00 Rp 4,000.00
0.050 Oh Tukang Rp 90,000.00 Rp - Rp 4,500.00 Rp 4,500.00
TOTAL Rp 33,770.00 Rp 9,280.00 Rp 43,050.00
HARGA HARGA JUMLAH
No. URAIAN SATUAN BAHAN UPAH HARGA
(Rp.) (Rp.) (Rp.) (Rp.)

5 1 M' LIST PLAFOND KAYU PROFIL


Bahan
0.010 Kg Paku biasa Rp 14,000.00 Rp 140.00 Rp - Rp 140.00
1.050 M List kayu profil Rp 48,000.00 Rp 50,400.00 Rp - Rp 50,400.00
Upah
0.005 Oh Kepala tukang Rp 120,000.00 Rp - Rp 600.00 Rp 600.00
0.003 Oh Mandor Rp 180,000.00 Rp - Rp 540.00 Rp 540.00
0.050 Oh Pekerja Rp 80,000.00 Rp - Rp 4,000.00 Rp 4,000.00
0.050 Oh Tukang Rp 90,000.00 Rp - Rp 4,500.00 Rp 4,500.00
TOTAL Rp 50,540.00 Rp 9,640.00 Rp 60,180.00

I PEKERJAAN ATAP

1 1 M² PASANG RANGKA ATAP BAJA RINGAN


Bahan
0.180 Kg Baut sekrup Rp 30,000.00 Rp 5,400.00 Rp - Rp 5,400.00
0.950 Btg Rangka baja ringan AAA 40x30 Rp 44,000.00 Rp 41,800.00 Rp - Rp 41,800.00
1.200 Btg Rangka baja ringan C75 Rp 73,000.00 Rp 87,600.00 Rp - Rp 87,600.00
1.000 Ls Tools (cutting well and drill electric pwr) Rp 9,000.00 Rp 9,000.00 Rp - Rp 9,000.00
Upah
0.016 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,896.00 Rp 1,896.00
0.016 Oh Mandor Rp 180,000.00 Rp - Rp 2,844.00 Rp 2,844.00
0.320 Oh Pekerja Rp 80,000.00 Rp - Rp 25,600.00 Rp 25,600.00
0.158 Oh Tukang Rp 90,000.00 Rp - Rp 14,220.00 Rp 14,220.00
TOTAL Rp 143,800.00 Rp 44,560.00 Rp 188,360.00

2 1 M² PASANG ATAP GENTENG METAL KELAS MENENGAH


Bahan
1.620 Lbr Genteng metal Rp 54,000.00 Rp 87,480.00 Rp - Rp 87,480.00
0.200 Kg Paku genteng metal Rp 30,000.00 Rp 6,000.00 Rp - Rp 6,000.00
Upah
0.010 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,200.00 Rp 1,200.00
0.001 Oh Mandor Rp 180,000.00 Rp - Rp 180.00 Rp 180.00
0.200 Oh Pekerja Rp 80,000.00 Rp - Rp 16,000.00 Rp 16,000.00
0.100 Oh Tukang Rp 90,000.00 Rp - Rp 9,000.00 Rp 9,000.00
TOTAL Rp 93,480.00 Rp 26,380.00 Rp 119,860.00

3 1 M PASANG BUBUNGAN GENTENG METAL


Bahan
1.100 Bh Bubungan genteng metal Rp 78,000.00 Rp 85,800.00 Rp - Rp 85,800.00
0.050 Kg Paku genteng metal Rp 30,000.00 Rp 1,500.00 Rp - Rp 1,500.00
Upah
0.250 Oh Pekerja Rp 80,000.00 Rp - Rp 20,000.00 Rp 20,000.00
0.150 Oh Tukang Rp 90,000.00 Rp - Rp 13,500.00 Rp 13,500.00
0.015 Oh Kepala Tukang Rp 120,000.00 Rp - Rp 1,800.00 Rp 1,800.00
0.013 Oh Mandor Rp 180,000.00 Rp - Rp 2,340.00 Rp 2,340.00
TOTAL Rp 87,300.00 Rp 37,640.00 Rp 124,940.00

4 1 M PASANG PAPAN LISTPLANK


Bahan
0.100 Kg Paku biasa Rp 14,000.00 Rp 1,400.00 Rp - Rp 1,400.00
1.000 M Wood flank Rp 22,000.00 Rp 22,000.00 Rp - Rp 22,000.00
Upah
0.025 Oh Kepala tukang Rp 120,000.00 Rp - Rp 3,000.00 Rp 3,000.00
0.005 Oh Mandor Rp 180,000.00 Rp - Rp 900.00 Rp 900.00
0.100 Oh Pekerja Rp 80,000.00 Rp - Rp 8,000.00 Rp 8,000.00
0.200 Oh Tukang Rp 90,000.00 Rp - Rp 18,000.00 Rp 18,000.00
TOTAL Rp 23,400.00 Rp 29,900.00 Rp 53,300.00

J PEKERJAAN PENGECATAN

1 1 M² PENGECATAN TEMBOK BAGIAN LUAR


Bahan
0.260 Kg Cat air bagian luar setara mowilex Rp 90,000.00 Rp 23,400.00 Rp - Rp 23,400.00
0.100 Kg Plamir Rp 23,000.00 Rp 2,300.00 Rp - Rp 2,300.00
Upah
0.006 Oh Kepala tukang Rp 120,000.00 Rp - Rp 756.00 Rp 756.00
0.003 Oh Mandor Rp 180,000.00 Rp - Rp 540.00 Rp 540.00
0.020 Oh Pekerja Rp 80,000.00 Rp - Rp 1,600.00 Rp 1,600.00
0.063 Oh Tukang Rp 90,000.00 Rp - Rp 5,670.00 Rp 5,670.00
TOTAL Rp 25,700.00 Rp 8,566.00 Rp 34,266.00

2 1 M² PENGECATAN TEMBOK BAGIAN DALAM DAN PLAFOND


Bahan
0.260 Kg Cat air bagian dalam setara mowilex Rp 64,000.00 Rp 16,640.00 Rp - Rp 16,640.00
0.100 Kg Plamir Rp 23,000.00 Rp 2,300.00 Rp - Rp 2,300.00
Upah
0.006 Oh Kepala tukang Rp 120,000.00 Rp - Rp 756.00 Rp 756.00
0.003 Oh Mandor Rp 180,000.00 Rp - Rp 540.00 Rp 540.00
0.020 Oh Pekerja Rp 80,000.00 Rp - Rp 1,600.00 Rp 1,600.00
0.063 Oh Tukang Rp 90,000.00 Rp - Rp 5,670.00 Rp 5,670.00
TOTAL Rp 18,940.00 Rp 8,566.00 Rp 27,506.00
HARGA HARGA JUMLAH
No. URAIAN SATUAN BAHAN UPAH HARGA
(Rp.) (Rp.) (Rp.) (Rp.)
3 1 M² PENGECATAN BIDANG KAYU BARU
Bahan
0.170 Kg Cat dasar Rp 53,000.00 Rp 9,010.00 Rp - Rp 9,010.00
0.200 Kg Cat meni Rp 32,000.00 Rp 6,400.00 Rp - Rp 6,400.00
0.260 Kg Cat penutup Rp 64,000.00 Rp 16,640.00 Rp - Rp 16,640.00
0.150 Kg Plamir Rp 23,000.00 Rp 3,450.00 Rp - Rp 3,450.00
Upah
0.006 Oh Kepala tukang Rp 120,000.00 Rp - Rp 720.00 Rp 720.00
0.003 Oh Mandor Rp 180,000.00 Rp - Rp 450.00 Rp 450.00
0.070 Oh Pekerja Rp 80,000.00 Rp - Rp 5,600.00 Rp 5,600.00
0.090 Oh Tukang Rp 90,000.00 Rp - Rp 8,100.00 Rp 8,100.00
TOTAL Rp 35,500.00 Rp 14,870.00 Rp 50,370.00
HARGA HARGA JUMLAH
No. URAIAN SATUAN BAHAN UPAH HARGA
(Rp.) (Rp.) (Rp.) (Rp.)

K PEKEERJAAN SANITAIR

1 MEMASANG 1 M' PIPA PVC TYPE AW Ø 4"


Bahan
1.200 M Pipa PVC AW Ø 4" Rp 30,900.00 Rp 37,080.00 Rp - Rp 37,080.00
1.000 Ls Perlengkapan (35% harga pipa) Rp 10,815.00 Rp 10,815.00 Rp - Rp 10,815.00
Upah
0.081 Oh Pekerja Rp 80,000.00 Rp - Rp 6,480.00 Rp 6,480.00
0.135 Oh Tukang Rp 90,000.00 Rp - Rp 12,150.00 Rp 12,150.00
0.014 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,620.00 Rp 1,620.00
0.004 Oh Mandor Rp 180,000.00 Rp - Rp 738.00 Rp 738.00
TOTAL Rp 47,895.00 Rp 20,988.00 Rp 68,883.00

2 MEMASANG 1 M' PIPA PVC TYPE AW Ø 2"


Bahan
1.200 M Pipa PVC AW Ø 2" Rp 9,000.00 Rp 10,800.00 Rp - Rp 10,800.00
1.000 Ls Perlengkapan (35% harga pipa) Rp 3,150.00 Rp 3,150.00 Rp - Rp 3,150.00
Upah
0.054 Oh Pekerja Rp 80,000.00 Rp - Rp 4,320.00 Rp 4,320.00
0.090 Oh Tukang Rp 90,000.00 Rp - Rp 8,100.00 Rp 8,100.00
0.009 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,080.00 Rp 1,080.00
0.003 Oh Mandor Rp 180,000.00 Rp - Rp 486.00 Rp 486.00
TOTAL Rp 13,950.00 Rp 13,986.00 Rp 27,936.00

3 MEMASANG 1 M' PIPA PVC TYPE AW Ø 3/4"


Bahan
1.200 M Pipa PVC AW Ø 3/4" Rp 3,500.00 Rp 4,200.00 Rp - Rp 4,200.00
1.000 Ls Perlengkapan (35% harga pipa) Rp 1,225.00 Rp 1,225.00 Rp - Rp 1,225.00
Upah
0.036 Oh Pekerja Rp 80,000.00 Rp - Rp 2,880.00 Rp 2,880.00
0.060 Oh Tukang Rp 90,000.00 Rp - Rp 5,400.00 Rp 5,400.00
0.006 Oh Kepala tukang Rp 120,000.00 Rp - Rp 720.00 Rp 720.00
0.002 Oh Mandor Rp 180,000.00 Rp - Rp 324.00 Rp 324.00
TOTAL Rp 5,425.00 Rp 9,324.00 Rp 14,749.00

4 MEMASANG 1 M' PIPA PVC TYPE AW Ø ½"


Bahan
1.200 M Pipa PVC AW Ø 1/2" Rp 3,099.60 Rp 3,719.52 Rp - Rp 3,719.52
1.000 Ls Perlengkapan (35% harga pipa) Rp 1,084.86 Rp 1,084.86 Rp - Rp 1,084.86
Upah
0.036 Oh Pekerja Rp 80,000.00 Rp - Rp 2,880.00 Rp 2,880.00
0.060 Oh Tukang Rp 90,000.00 Rp - Rp 5,400.00 Rp 5,400.00
0.006 Oh Kepala tukang Rp 120,000.00 Rp - Rp 720.00 Rp 720.00
0.002 Oh Mandor Rp 180,000.00 Rp - Rp 324.00 Rp 324.00
TOTAL Rp 4,804.38 Rp 9,324.00 Rp 14,128.38

5 MEMASANG 1 BUAH CLOSET DUDUK / MONOBLOK


Bahan
1.000 Bh Kloset duduk Rp 1,450,000.00 Rp 1,450,000.00 Rp - Rp 1,450,000.00
1.000 Ls Perlengkapan ( 6% harga kloset) Rp 87,000.00 Rp 87,000.00 Rp - Rp 87,000.00
Upah
3.300 Oh Pekerja Rp 80,000.00 Rp - Rp 264,000.00 Rp 264,000.00
1.100 Oh Tukang Rp 90,000.00 Rp - Rp 99,000.00 Rp 99,000.00
0.001 Oh Kepala tukang Rp 120,000.00 Rp - Rp 132.00 Rp 132.00
0.160 Oh Mandor Rp 180,000.00 Rp - Rp 28,800.00 Rp 28,800.00
TOTAL Rp 1,537,000.00 Rp 391,932.00 Rp 1,928,932.00

6 MEMASANG 1 BUAH KRAN Ø ½"


Bahan
1.000 Bh Kran air Rp 145,000.00 Rp 145,000.00 Rp - Rp 145,000.00
0.250 Bh Seal tape Rp 3,000.00 Rp 750.00 Rp - Rp 750.00
Upah
0.010 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,200.00 Rp 1,200.00
0.005 Oh Mandor Rp 180,000.00 Rp - Rp 900.00 Rp 900.00
0.010 Oh Pekerja Rp 80,000.00 Rp - Rp 800.00 Rp 800.00
0.100 Oh Tukang Rp 90,000.00 Rp - Rp 9,000.00 Rp 9,000.00
TOTAL Rp 145,750.00 Rp 11,900.00 Rp 157,650.00

7 MEMASANG 1 BUAH FLOOR DRAIN


Bahan
1.000 Bh Floor drain Rp 92,000.00 Rp 92,000.00 Rp - Rp 92,000.00
Upah
0.010 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,200.00 Rp 1,200.00
0.005 Oh Mandor Rp 180,000.00 Rp - Rp 900.00 Rp 900.00
0.010 Oh Pekerja Rp 80,000.00 Rp - Rp 800.00 Rp 800.00
0.100 Oh Tukang Rp 90,000.00 Rp - Rp 9,000.00 Rp 9,000.00
TOTAL Rp 92,000.00 Rp 11,900.00 Rp 103,900.00
HARGA HARGA JUMLAH
No. URAIAN SATUAN BAHAN UPAH HARGA
(Rp.) (Rp.) (Rp.) (Rp.)

8 MEMASANG 1 BUAH ROOF DRAIN


Bahan
1.000 Bh Roof drain Rp 90,000.00 Rp 90,000.00 Rp - Rp 90,000.00
Upah
0.010 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,200.00 Rp 1,200.00
0.005 Oh Mandor Rp 180,000.00 Rp - Rp 900.00 Rp 900.00
0.010 Oh Pekerja Rp 80,000.00 Rp - Rp 800.00 Rp 800.00
0.100 Oh Tukang Rp 90,000.00 Rp - Rp 9,000.00 Rp 9,000.00
TOTAL Rp 90,000.00 Rp 11,900.00 Rp 101,900.00

9 MEMASANG 1 BUAH BAK MANDI 70X60X60


0.780 M² Keramik 20x25 (E.1) Rp 244,643.00 Rp 190,821.54 Rp - Rp 190,821.54
0.420 M² Keramik 20x20 (E.2) Rp 179,704.00 Rp 75,475.68 Rp - Rp 75,475.68
0.780 M² Pas. 1/2 bata 1pc : 2ps (F.1) Rp 113,110.50 Rp 88,226.19 Rp - Rp 88,226.19
TOTAL Rp 354,523.41 Rp - Rp 354,523.41

10 1 M SALURAN AIR HUJAN


0.032 M³ Pasir urug (B.4) Rp 153,000.00 Rp 4,896.00 Rp - Rp 4,896.00
0.012 M³ Cor rabat (D.2) Rp 881,090.00 Rp 10,573.08 Rp - Rp 10,573.08
0.300 M² Pasangan 1/2 bata 1:4 (F.2) Rp 103,583.00 Rp 31,074.90 Rp - Rp 31,074.90
0.600 M² Plesteran 1:4 (F.4) Rp 58,164.00 Rp 34,898.40 Rp - Rp 34,898.40
TOTAL Rp 81,442.38 Rp - Rp 81,442.38

11 1 BUAH BAK KONTROL


0.036 M³ Pasir urug (B.4) Rp 153,000.00 Rp 5,508.00 Rp - Rp 5,508.00
0.010 M³ Cor rabat (D.2) Rp 881,090.00 Rp 8,528.95 Rp - Rp 8,528.95
0.640 M² Pasangan 1/2 bata 1:4 (F.2) Rp 103,583.00 Rp 66,293.12 Rp - Rp 66,293.12
0.640 M² Plesteran 1:4 (F.4) Rp 58,164.00 Rp 37,224.96 Rp - Rp 37,224.96
TOTAL Rp 117,555.03 Rp - Rp 117,555.03

L PEKERJAAN LISTRIK

1 1 TTK INSTALASI LAMPU


Bahan
0.256 Roll Kabel NYM 2 x 2,5 mm² Rp 610,000.00 Rp 156,160.00 Rp - Rp 156,160.00
1.000 Bh T dos Rp 8,000.00 Rp 8,000.00 Rp - Rp 8,000.00
0.400 Bh Las dop Rp 5,000.00 Rp 2,000.00 Rp - Rp 2,000.00
2.000 Bh Klam pipa Rp 750.00 Rp 1,500.00 Rp - Rp 1,500.00
1.000 Bh Fitting lampu Rp 19,000.00 Rp 19,000.00 Rp - Rp 19,000.00
1.000 Bh Saklar Rp 30,000.00 Rp 30,000.00 Rp - Rp 30,000.00
2.500 Btg Pipa listrik PVC Rp 12,000.00 Rp 30,000.00 Rp - Rp 30,000.00
Upah
0.008 Oh Pekerja Rp 80,000.00 Rp - Rp 640.00 Rp 640.00
0.140 Oh Tukang Rp 90,000.00 Rp - Rp 12,600.00 Rp 12,600.00
0.014 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,680.00 Rp 1,680.00
0.004 Oh Mandor Rp 180,000.00 Rp - Rp 720.00 Rp 720.00
TOTAL Rp 246,660.00 Rp 15,640.00 Rp 262,300.00

2 1 TTK INSTALASI STOP KONTAK


Bahan
0.256 Roll Kabel NYM 2 x 2,5 mm² Rp 610,000.00 Rp 156,160.00 Rp - Rp 156,160.00
1.000 Bh T dos Rp 8,000.00 Rp 8,000.00 Rp - Rp 8,000.00
0.400 Bh Las dop Rp 5,000.00 Rp 2,000.00 Rp - Rp 2,000.00
2.000 Bh Klam pipa Rp 750.00 Rp 1,500.00 Rp - Rp 1,500.00
1.000 Bh Fitting lampu Rp 19,000.00 Rp 19,000.00 Rp - Rp 19,000.00
1.000 Bh Stop kontak Rp 30,000.00 Rp 30,000.00 Rp - Rp 30,000.00
2.500 Btg Pipa listrik PVC Rp 12,000.00 Rp 30,000.00 Rp - Rp 30,000.00
Upah
0.008 Oh Pekerja Rp 80,000.00 Rp - Rp 640.00 Rp 640.00
0.140 Oh Tukang Rp 90,000.00 Rp - Rp 12,600.00 Rp 12,600.00
0.014 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,680.00 Rp 1,680.00
0.004 Oh Mandor Rp 180,000.00 Rp - Rp 720.00 Rp 720.00
TOTAL Rp 246,660.00 Rp 15,640.00 Rp 262,300.00
HARGA HARGA JUMLAH
No. URAIAN SATUAN BAHAN UPAH HARGA
(Rp.) (Rp.) (Rp.) (Rp.)

3 1 BH PASANGAN LAMPU SL 18 WATT


Bahan
1.000 Bh Lampu SL 18 watt Rp 38,000.00 Rp 38,000.00 Rp - Rp 38,000.00
Upah
0.008 Oh Pekerja Rp 80,000.00 Rp - Rp 648.00 Rp 648.00
0.014 Oh Tukang Rp 90,000.00 Rp - Rp 1,215.00 Rp 1,215.00
0.002 Oh Kepala tukang Rp 120,000.00 Rp - Rp 180.00 Rp 180.00
0.004 Oh Mandor Rp 180,000.00 Rp - Rp 738.00 Rp 738.00
TOTAL Rp 38,000.00 Rp 2,781.00 Rp 40,781.00

4 1 BH PASANGAN LAMPU SL 8 WATT


Bahan
1.000 Bh Lampu SL 8 watt Rp 23,000.00 Rp 23,000.00 Rp - Rp 23,000.00
Upah
0.008 Oh Pekerja Rp 80,000.00 Rp - Rp 648.00 Rp 648.00
0.014 Oh Tukang Rp 90,000.00 Rp - Rp 1,215.00 Rp 1,215.00
0.002 Oh Kepala tukang Rp 120,000.00 Rp - Rp 180.00 Rp 180.00
0.004 Oh Mandor Rp 180,000.00 Rp - Rp 738.00 Rp 738.00
TOTAL Rp 23,000.00 Rp 2,781.00 Rp 25,781.00

5 1 UNIT SKRING KASH LISTRIK 1 GROUP


Bahan
1.000 Unit Panel skring listrik Rp 145,000.00 Rp 145,000.00 Rp - Rp 145,000.00
1.000 Unit MCB listrik Rp 52,000.00 Rp 52,000.00 Rp - Rp 52,000.00
Upah
0.008 Oh Pekerja Rp 80,000.00 Rp - Rp 640.00 Rp 640.00
0.140 Oh Tukang Rp 90,000.00 Rp - Rp 12,600.00 Rp 12,600.00
0.014 Oh Kepala tukang Rp 120,000.00 Rp - Rp 1,680.00 Rp 1,680.00
0.004 Oh Mandor Rp 180,000.00 Rp - Rp 720.00 Rp 720.00
TOTAL Rp 197,000.00 Rp 15,640.00 Rp 212,640.00
HARGA SATUAN

UPAH

NO URAIAN SATUAN HARGA KETERANGAN

1 2 3 4 5
1 Pekerja Oh Rp 80,000
2 Tukang Oh Rp 90,000
3 Kepala tukang Oh Rp 120,000
4 Mandor Oh Rp 180,000

BAHAN

NO URAIAN SATUAN HARGA KETERANGAN

1 2 3 4 5
1 Balok meranti M³ Rp 2,450,000
2 Balok ulin 10x10x400 M³ Rp 4,550,000
3 Batu alam M² Rp 290,000
4 Batu bata Bh Rp 900
5 Batu gunung M³ Rp 200,000
6 Baut sekrup Kg Rp 30,000
7 Besi holo 2x4 M Rp 9,000
8 Besi tulangan (polos) Kg Rp 18,000
9 Bubungan genteng metal Bh Rp 78,000
10 Calsiboard 4.5 mm Lbr Rp 75,000
11 Cat air bagian luar setara mowilex Kg Rp 90,000
12 Cat air bagian dalam setara mowilex Kg Rp 64,000
13 Cat dasar Kg Rp 53,000
14 Cat meni Kg Rp 32,000
15 Cat penutup Kg Rp 64,000
16 Dolken kayu galam Btg Rp 5,000
17 Engsel 3" Bh Rp 30,000
18 Engsel 5" Bh Rp 45,000
19 Fitting lampu Bh Rp 19,000
20 Floor drain Bh Rp 92,000
21 Genteng metal Lbr Rp 54,000
22 Grendel jendela Bh Rp 25,000
23 Gypsum 9 mm Lbr Rp 55,000
24 Hak angin Bh Rp 34,000
25 Handel jendela Bh Rp 28,000
26 Kabel NYM 2 x 2,5 mm² Roll Rp 610,000
27 Kaca bening tebal 5 mm M² Rp 105,000
28 Kawat bendrat Kg Rp 16,000
29 Kayu bengkirai M³ Rp 3,400,000
30 Keramik 20x20 M² Rp 124,000
31 Keramik 20x25 M² Rp 129,000
32 Keramik 40x40 M² Rp 90,000
33 Klam pipa Bh Rp 750
34 Kloset duduk Bh Rp 1,450,000
35 Koral beton M³ Rp 395,000
36 Kran air Bh Rp 145,000
37 Kunci Bulat (Knob Handle) Bh Rp 145,000
38 Kunci tanam 2 slagh Bh Rp 245,000
39 Lampu SL 18 watt Bh Rp 38,000
40 Lampu SL 8 watt Bh Rp 23,000
41 Las dop Bh Rp 5,000
NO URAIAN SATUAN HARGA KETERANGAN

1 2 3 4 5
42 Lem gypsum Kg Rp 17,000
43 Lever Handle Bh Rp 347,000
44 List gypsum M Rp 32,000
45 List kayu profil M Rp 48,000
46 MCB listrik Unit Rp 52,000
47 Minyak bekisting Ltr Rp 6,000
48 Paku biasa Kg Rp 14,000
49 Paku genteng metal Kg Rp 30,000
50 Panel skring listrik Unit Rp 145,000
51 Papan meranti M³ Rp 2,600,000
52 Pasir beton (lokal) M³ Rp 137,000
53 Pasir pasangan (lokal) M³ Rp 106,000
54 Pasir urug M³ Rp 106,000
55 Pipa listrik PVC Btg Rp 12,000
56 Pipa PVC AW Ø 1/2" M Rp 3,100
57 Pipa PVC AW Ø 2" M Rp 9,000
58 Pipa PVC AW Ø 3/4" M Rp 3,500
59 Pipa PVC AW Ø 4" M Rp 30,900
60 Plamir Kg Rp 23,000
61 Plywood 9 mm Lbr Rp 117,000
62 Pull handle Bh Rp 165,000
63 Rangka baja ringan AAA 40x30 Btg Rp 44,000
64 Rangka baja ringan C75 Btg Rp 73,000
65 Roof drain Bh Rp 90,000
66 Saklar Bh Rp 30,000
67 Seal tape Bh Rp 3,000
68 Semen Kg Rp 1,350 Rp 67,500
69 Semen warna Kg Rp 24,000
70 Stop kontak Bh Rp 30,000
71 T dos Bh Rp 8,000
72 Tanah urug M³ Rp 53,000
73 Wood flank M Rp 22,000
NO. URAIAN PEKERJAAN KETERANGAN PANJANG LEBAR

A. PEKERJAAN PENDAHULUAN
1 Pembersihan Lahan 12 6
2 Bouwplank 36 1

B. PEKRJAAN TANAH
1 Galian Tanah Biasa Dinding
x 21.5 0.9
y 24.1 0.9
Pagar
x 0 0.9
y 0 0.9
Poer 0.7 0.8

2 Urugan Tanah Kembali 10.4 1

3 Urugan Tanah Bawah Lantai R. Tamu 2 2


R. Keluarga 2.5 3
Dapur 2 3
Wc 1.3 1.5
R. Tidur I 2.5 3
WC II 1.5 2
R. Tidur II 2.5 3
Teras Belakang 3 0.5
Teras Depan 1 2

4 Urugan Pasir R. Keluarga 2.5 3


Dapur 2 3
Wc 1.3 1.5
R. Tidur I 2.5 3
WC II 1.5 2
R. Tidur II 2.5 3
Teras Belakang 3 0.5
Teras Depan 1 2

C. PEKERJAAN PONDASI
1 Pancang Ulin 10x10x200 28 1
2 Aanstamping 45.6 0.9
3 Pas. Batu Gunung 1pc : 4ps 45.6 0.55
4 Pas. Rollag 0 1

D. PEKERJAAN BETON
1 Lantai Kerja 0.7 0.7

2 Cor Rabat R. Tamu 2 2


R. Keluarga 2.5 3
Dapur 2 3
Wc 1.3 1.5
R. Tidur I 2.5 3
WC II 1.5 2
R. Tidur II 2.5 3
Teras Belakang 3 0.5
Teras Depan 1 2

3 Poer Plate 70x80x20cm 0.7 0.7

4 Sloof 15x20cm 45.6 0.15

5 Kolom 15x15cm 0.15 0.15

6 Kolom Praktis Dinding 0.12 0.12


Pagar 0.12 0.12
Gewel 0.12 0.12

7 Ringbalk 15x15cm Dinding, pagar 45.6 0.15


Gewel 14.3 0.15

8 Balok Latai 13x150cm R. Tamu 2.37 0.15


R. Keluarga 2.75 0.15
Dapur 1.1 0.15
Wc 2.25 0.15
R. Tidur I 1.5 0.15
WC II 4.62 0.15
R. Tidur II 2.5 0.15
Teras Belakang 2 0.15
Teras Depan 1 0.15
Balok Meja Dapur 1.925 0.15

9 Dak Beton Depan 4.83 0.4


Kiri 5.4 0.4
Belakang 2.85 0.4

10 Canopy Beton Depan 1 2 3


Depan 2 1.15 0.6
Belakang 2.2 0.6

11 Plate Meja Dapur Dapur 1.92 1


E. PEKERJAAN KERAMIK
1 Keramik Dinding 20x25cm wc 6 4.01
meja dapur 1.925 1
2 Keramik Lantai 20x20cm wc 6 4.01
meja dapur 1.93 1
3 Keramik Lantai 40x40cm R. Tamu 2 2
R. Keluarga 2.5 3
Dapur 2 3
Wc 1.3 1.5
R. Tidur I 2.5 3
WC II 1.5 2
R. Tidur II 2.5 3
Teras Belakang 3 0.5
Teras Depan 1 2

F. PEKERJAAN PASANGAN
1 Pas. Dinding 1/2 Bata 1pc : 2ps 45.6 1
Pintu Type 1 (P1) -1 0.9
PintuType 2 (P2) -1 0.8
Pintu Type 3 (P3) -1 0.7
Pintu Jendela Type 1 (PJ1) -1 0.9
Jendela Type 1 (J1) -1 1.15
Jendela Type 2 (J2) -1 1.15
Bouvenligth Type 1 (J1) -1 1.15

2 Pas. Dinding 1/2 Bata 1pc : 4ps Dinding 45.6 1


Pagar 0 1
Depan 1 1
1 1
Kanan 1 1
1 1
1 1
Kiri 1 1
1 1
1 1
-1 1
Belakang 1 1
1 1
Trasram -1 1
Pintu Type 1 (P1) -1 0.9
PintuType 2 (P2) -1 0.8
Pintu Type 3 (P3) -1 0.7
Pintu Jendela Type 1 (PJ1) -1 0.9
Jendela (PJ) -1 0.55
Jendela Type 1 (J1) -1 1.15
Jendela Type 2 (J2) -1 1.15
Jendela Type 3 (J3) -1 0.6
Bouven Light Type 1 (BV1) -1 1.15
Bouven Light Type 2 (BV2) -1 0.6
Bouven Light Type 3 (BV3) -1 0.3

3 Plesteran 1pc : 2ps Dinding 2 1


Batu Alam -1 1.35
4 Plesteran 1pc : 4ps Dinding 2 1
Batu Alam -1 1
5 Batu Alam 1 1.35

G. PEK. KUSEN, PINTU, JENDELA DAN PENGGANTUNG


1 Pintu Type 1 (P1) 1 1
2 PintuType 2 (P2) 1 1
3 Pintu Type 3 (P3) 1 1
4 Pintu Jendela Type 1 (PJ1) 1 1
5 Jendela Type 1 (J1) 1 1
6 Jendela Type 2 (J2) 1 1
7 Jendela Type 3 (J3) 1 1
8 Bouven Light Type 1 (BV1) 1 1
9 Bouven Light Type 2 (BV2) 1 1
10 Pintu Jendela Type 2 (PJ2) 1 1

H. PEKERJAAN PLAFOND
1 Rangka Plafond Metal Furring R. Tamu 2 3
R. Keluarga 2.5 3
Dapur 2 3
Wc 1.3 3
R. Tidur I 2.5 1
WC II 1.5 1.2
R. Tidur II 2.5 3
Teras Belakang 3 2.2
Teras Depan 1 2.2

Atap 1 4.28 7.65


4.28 7.65
Atap 2 5.47 9.68
5.47 9.68

2 Penutup Plafond Gypsum 9mm 1 1

3 Penutup Plafond Calsiboard 4.5mm 1 1


4 List Plafond Gypsum R. tamu 10 1
K. tidur Anak 11 1
k. Tidur Utama 10 1
R. Keluarga 6.6 1
Dapur 7.2 1

5 List Plafond Kayu Profile Toilet 11 1


Atap 1 47.72 1
Atap 2 71.54 1

I. PEKERJAAN ATAP
1 Kuda-kuda Baja ringan Atap 1 10.6 6
Atap 2 0 9.68
0 9.68

2 Penutup Atap Genteng Metal 1 1

3 Bubungan Atap Genteng Metal 6 1

4 Lisplank Wood Flank 14.04 1

J. PEKERJAAN CAT-CATAN
1 Cat Tembok Luar Dinding 33.44 1
Pagar 0 1
Depan 0 1
0 1
Kanan 0 1
0 1
0 1
Kiri 0 1
0 1
0 1
0 1
Belakang 0 1
0 1
Pintu Type 1 (P1) -1 0.9
PintuType 2 (P2) -1 0.8
Pintu Type 3 (P3) -1 0.7
Pintu Jendela Type 1 (PJ1) -1 0.9
Jendela (PJ) -1 0.55
Jendela Type 1 (J1) -1 1.15
Jendela Type 2 (J2) -1 1.15
Jendela Type 3 (J3) -1 0.6
Bouven Light Type 1 (BV1) -1 1.15
Bouven Light Type 2 (BV2) -1 0.6
Bouven Light Type 3 (BV3) -1 0.3
dak Beton
Depan 4.83 0.4
Kiri 5.4 0.4
Belakang 2.85 0.4

Canopy
Depan 1 0.6 0.6
Depan 2 1.15 0.6
Belakang 4.62 0.6
1.15 0.6

2 Cat Tembok Dalam dan Plafond Dinding Luar dalam 45.6 1


Pintu Type 1 (P1) -2 0.9
PintuType 2 (P2) -2 0.8
Pintu Type 3 (P3) -2 0.7
Pintu Jendela Type 1 (PJ1) -2 0.9
Jendela (PJ) -2 0.55
Jendela Type 1 (J1) -2 1.15
Jendela Type 2 (J2) -2 1.15
Jendela Type 3 (J3) -2 0.6
Bouven Light Type 1 (BV1) -2 1.15
Bouven Light Type 2 (BV2) -2 0.6
Bouven Light Type 3 (BV3) -2 0.3
Keramik Dinding -1 1
Dinding Luar 33.44 1
Pintu Type 1 (P1) -1 0.9
PintuType 2 (P2) -1 0.8
Pintu Type 3 (P3) -1 0.9
Pintu Jendela Type 1 (PJ1) -1 0.55
Jendela (PJ) -1 1.15
Jendela Type 1 (J1) -1 1.15
Jendela Type 2 (J2) -1 0.6
Jendela Type 3 (J3) -1 1.15
Bouven Light Type 1 (BV1) -1 0.6
Bouven Light Type 2 (BV2) -1 0.3
Bouven Light Type 3 (BV3)
Plafond Luar dalam 1 1
Beton expose di wc 0.5 1.4
3 Cat Minyak 1 1

K. PEKERJAAN SANITAIR
1 Pipa PVC dia 4" D dan Accessories 0 1
2 Pipa PVC dia 2" D dan Accessories 0 1
3 Pipa PVC dia 3/4" AW dan Accessories 0 1
4 Pipa PVC dia 1/2" AW dan Accessories 27.81 1
5 Kloset duduk + Jet Shower 1 1
6 Kran Air 1/2" 1 1
7 Floor Drain 1 1
8 Roof Drain 1 1
9 Bak Mandi 1 1
10 Drainase 0 1
11 Bak Kontrol 1 1
12 Kictchen Zink + Kran Air 1 1
13 Septictank Biofil 1 1

L. PEKERJAAN LISTRIK
1 Instalasi Lampu 1 1
2 Instalasi Stop Kontak 1 1
3 Pasang Lampu SL 18 Watt 1 1
4 Pasang Lampu SL 8 Watt 1 1
5 Pasang Skring Kash Listrik 1 Group 1 1
TINGGI JUMLAH VOLUME VOL. TOTAL SATUAN

1 1 72 72.00 M²
1 1 36 36.00 M

41.60 M³
1 1 19.35
1 1 21.69

1 1 #NAME?
1 1
1 1 0.56 #NAME?
2975580000
#NAME?
1 1 10.4 10.40 M³

0.1 1 0.4 4.10 M³ 4


0.1 1 0.75
0.1 1 0.6
0.1 1 0.195
0.1 1 0.75
0.1 1 0.3
0.1 1 0.75
0.1 1 0.15
0.1 1 0.2

0.1 1 0.75 3.70 M³


0.1 1 0.6 4
0.1 1 0.195
0.1 1 0.75
0.1 1 0.3 5000000000
0.1 1 0.75
0.1 1 0.15
0.1 1 0.2

1 1 28 28.00 Ttk sloof 0.2


0.2 1 8.208 8.21 M³ rabat 0.07
0.7 1 17.556 17.56 M³ pasir 0.1
0.25 1 0.00 M²
0.05 1 0.0245 0.02 M²

0.07 1 0.28 2.73 M³


0.07 1 0.525
0.07 1 0.42
0.07 1 0.1365
0.07 1 0.525
0.07 1 0.21
0.07 1 0.525
0.07 1 0.105
0.07 1 0.14

0.2 1 0.098 0.10 M³

0.2 1 1.368 1.37 M³

3.5 20 1.575 1.58 M³

2.9 19 0.79344 0.82 M³


1.9 1 0.02736
14.1 0 0

0.2 1 1.368 1.80 M³


0.2 1 0.429

0.2 1 0.0711 0.66 M³


0.2 1 0.0825
0.2 1 0.033
0.2 1 0.0675
0.2 1 0.045
0.2 1 0.1386
0.2 1 0.075
0.2 1 0.06
0.2 1 0.03
0.2 1 0.05775

0.1 1 0.1932 0.52 M³


0.1 1 0.216
0.1 1 0.114

0.1 0 0 0.00 M³
0.1 0 0
0.1 0 0

0.15 1 0.288 0.29 M³


2 1 48.12 50.05 M²
1 1 1.925
2 1 48.12 50.05 M²
1 1 1.93
1 1 4 40.95 M²
1 1 7.5
1 1 6
1 1 1.95
1 1 7.5
1 1 3
1 1 7.5
1 1 1.5
1 1 2

0.5 1 22.8 19.74 M²


0.5 4 -1.8
0.5 2 -0.8
0.5 0 0
0.5 0 0
0.05 4 -0.23
0.05 2 -0.115
0.05 2 -0.115

2.9 1 132.24 127.25 M²


2.1 1 #NAME?
1 4.2789 4.2789
1 3.5 3.5
1 4.7247 4.7247
1 15.7311 15.7311
1 1.325 1.325
1 0.2887 0.2887
1 0.3 0.3
1 2.094 2.094
1 0.324 -0.324
1 4.2789 4.2789
1 2.06 2.06
1 19.74 -19.74
2 4 -7.2
2 2 -3.2
2 0 0
2 0 0
1.4 0 0
1.85 4 -8.51
1.4 2 -3.22
1.4 0 0
0.6 2 -1.38
0.25 0 0
0.6 0 0

1 19.74 39.48 38.81 M²


0.5 1.00 -0.675
1 127.25 254.4946 249.89 M²
1 4.60 -4.6035
3.91 1.00 5.2785 5.28 M²

1 3 4 4.00 Unit
1 1 2 2.00 Unit
1 0 0 0.00 Unit
1 1 0 0.00 Unit
1 2 4 4.00 Unit
1 0 2 2.00 Unit
1 0 0 0.00 Unit
1 1 2 2.00 Unit
1 1 0 0.00 Unit
1 1 0 0.00 Unit

1 1 6 54.50 M² 5.7 36.195


1 1 7.5 6.35
1 1 6 2 3.5
1 1 3.9 1.75
1 1 2.5 54.5
1 1 1.8
1 1 7.5
1 1 6.6
1 1 2.2

1 1 32.742
1 -1 -32.742
1 1 52.9496
1 1 52.9496

1 44 44 54.50 M²

1 105.8992 105.8992 105.90 M² 158.41332


1 0 0 0.00 M
1 0 0
1 0 0
1 0 0
1 0 0

1 0 0 0.00 M
1 0 0
1 0 0

1 1 63.6 63.60 M²
1 1
1 1

1 63.60 63.6 63.60 M²

1 1 6 6.00 M

1 1 14.04 14.04 M

3.1 1 103.664 89.90 M²


2.3 2
1 4.2789
1 3.5
1 4.7247
1 15.7311
1 1.325
1 0.2887
1 0.3
1 2.094
1 0.324
1 4.2789
1 2.06
2 4 -7.2
2 2 -3.2
2 0 0
2 0 0
1.4 0 0
1.85 4 -8.51
1.4 2 -3.22
1.4 0 0
0.6 2 -1.38
0.25 0 0
0.6 0 0

1 1 1.932
1 1 2.16
1 1 1.14

1 1 0.36
1 1 0.69
1 1 2.772
1 1 0.69

3.5 2 319.2 195.66 M²


2 4 -14.4
2 2 -6.4
2 0 0
2 0 0
1.4 0 0
1.85 4 -17.02
1.4 2 -6.44
1.4 0 0
0.6 2 -2.76
0.25 0 0
0.6 0 0
1 50.05 -50.045
2.8 1 93.632 81.67
2 0 0
2 0 0
2 4 -7.2
1.4 2 -1.54
1.85 0 0
1.4 2 -3.22
1.4 0 0
0.6 0 0
0.25 0 0
0.6 0 0

1 54.50 54.5
1 1.00 0.7
1 30 30 30.00 M²

1 1 0.00 M
1 1 0.00 M
1 1 0.00 M
1 1 27.81 27.81 M
1 2 2 2.00 Unit
1 6 6 6.00 Bh
1 2 2 2.00 Bh
1 0 0 0.00 Bh
1 1 1 1.00 Bh
1 1 0.00 M
1 1 1 1.00 Bh
1 1 0 0.00 Unit
1 1 1 1.00 Unit

Lampu Stop Kontak


1 9 9 9.00 Ttk tamu 1.00 1
1 7 7 7.00 Ttk t. anak 1.00 1
1 5 5 5.00 Bh keluarga 4 1
1 4 4 4.00 Bh utama 2 1
1 1 1 1.00 Unit dapur 2 1
wc 1

11.00 5
0.03 0.3
Stop Kontak

16.00
Pintu Type 1 (P1) 0.9 2 1
PintuType 2 (P2) 0.8 2 3
Pintu Type 3 (P3) 0.7 2 1
Pintu Jendela Type 1 (PJ1) 0.9 2 1
Jendela (PJ) 0.55 1.4 1
Jendela Type 1 (J1) 1.15 1.85 1
Jendela Type 2 (J2) 1.15 1.4 2
Jendela Type 3 (J3) 0.6 1.4 1
Bouven Light Type 1 (BV1) 1.15 0.6 1
Bouven Light Type 2 (BV2) 0.6 0.25 1
Bouven Light Type 3 (BV3) 0.3 0.6 3

VOLUME KUSEN 1 UNIT


TYPE X X X X Y Y Y
P1 0.9 2 2
P2 0.8 2 2
P3 0.7 2 2
PJ1 0.9 0.55 0.55 2 2 1.4
J1 1.15 1.15 1.15 1.15 1.85 1.85 1.85
J2 1.15 1.15 1.4 1.4 1.4
J3 0.6 0.6 1.4 1.4
BV1 1.15 1.15 0.6 0.6
BV2 0.6 0.6 0.25 0.25
BV3 0.3 0.3 0.6 0.6

LUAS DAUN DALAM 1 UNIT KUSEN


L T JUM. DAUN LUAS
P1 0.8 1.95 1 1.56 M²
P2 0.7 1.95 1 1.365 M²
P3 0.6 1.95 1 1.17 M²
PJ1 P 0.8 1.95 1 1.56 M²
PJ1 J 0.5 1.3 1 0.65 M²
J2 0.5 1.3 2 1.3 M²
J3 0.5 1.3 1 0.65 M²

LUAS KACA DALAM 1 UNIT KUSEN


L T JML. DAUN LUAS
PJ1 J 0.3 1.1 1 0.33 M²
J1 1 1.65 1 1.65 M²
J2 0.3 1.1 2 0.66 M²
J3 0.3 1.1 1 0.33 M²
BV1 1.05 0.5 1 0.525 M²
BV2 0.5 0.1 1 0.05 M²
BV3 0.2 0.5 3 0.3 M²
LUAS PERMUKAAN KUSEN PERMUKAAN TIDAK DI CAT PERMUKAAN KUSEN YG D
CAT KUSEN P L LUAS P L LUAS
P1 4.9 0.36 1.764 4.9 0.13 0.637 1.127
P2 4.8 0.36 1.728 4.8 0.13 0.624 1.104
P3 4.7 0.36 1.692 4.7 0.13 0.611 1.081
PJ1 7.4 0.36 2.664 6 0.13 0.78 1.884
J1 10.15 0.36 3.654 6 0.13 0.78 2.874
J2 6.5 0.36 2.34 5.1 0.13 0.663 1.677
J3 4 0.36 1.44 4 0.13 0.52 0.92
BV1 3.5 0.36 1.26 3.5 0.13 0.455 0.805
BV2 1.7 0.36 0.612 1.7 0.13 0.221 0.391
BV3 1.8 0.36 0.648 1.8 0.13 0.234 0.414

PERDAUN JUM. DAUN PER. KACA DAUN-KACA CAT


P1 1.56 1 1.56 1.56 2 3.12
P2 1.365 1 1.365 1.365 2 2.73
P3 1.17 1 1.17 1.17 2 2.34
PJ1 P 1.56 1 1.56 1.56 2 3.12
PJ1 J 0.65 1 0.65 0.33 0.32 2 0.64
J2 1.3 2 2.6 0.66 1.94 2 3.88
J3 0.65 1 0.65 0.33 0.32 2 0.64

CAT KUSEN
LIST PLANK

TOTAL CAT MINYAK


ANALISA KUSEN

1 UNIT PINTU TYPE 1 (P1)


0.03185 M³ Pasang kusen pintu
1.56 M² Pasang daun pintu
2 Bh Pasang pull handle
3 Bh Pasang engsel pintu
1 Bh Pasang kunci tanam 2 slagh

1 UNIT PINTU TYPE 2 (P2)


0.0312 M³ Pasang kusen pintu
1.365 M² Pasang daun pintu
3 Bh Pasang engsel pintu
1 Bh Pasang lever handle

1 UNIT PINTU TYPE 3 (P3)


0.03055 M³ Pasang kusen pintu
1.17 M² Pasang daun pintu
3 Bh Pasang engsel pintu
1 Bh Pasang knob handle

1 UNIT PINTU JENDELA TYPE 1 (PJ1)


0.0481 M³ Pasang kusen pintu jendela
1.56 M² Pasang daun pintu
0.65 M² Pasang daun jendela
0.33 M² Pasang kaca bening 5mm
3 Bh Pasang engsel pintu
2 Bh Pasang engsel jendela
2 Bh Pasang pull handle
1 Bh Pasang handle jendela
1 Bh Pasang kunci tanam 2 slagh
1 Bh Pasang grendel jendela
2 Bh Pasang hak angin

1 UNIT JENDELA TYPE 1 (J1)


0.065975 M³ Pasang kusen jendela
1.65 M² Pasang kaca bening 5mm

1 UNIT JENDELA TYPE 2 (J2)


0.04225 M³ Pasang kusen jendela
1.3 M² Pasang daun jendela
0.66 M² Pasang kaca bening 5mm
4 Bh Pasang engsel jendela
2 Bh Pasang handle jendela
2 Bh Pasang grendel jendela
4 Bh Pasang hak angin

1 UNIT JENDELA TYPE 3 (J3)


0.026 M³ Pasang kusen jendela
0.65 M² Pasang daun jendela
0.33 M² Pasang kaca bening 5mm
2 Bh Pasang engsel jendela
1 Bh Pasang handle jendela
1 Bh Pasang grendel jendela
2 Bh Pasang hak angin

1 UNIT BOUVENLIGHT TYPE 1 (BV1)


0.02275 M³ Pasang kusen bouvenlight
0.525 M² Pasang kaca bening 5mm

1 UNIT BOUVENLIGHT TYPE 2 (BV2)


0.01105 M³ Pasang kusen bouvenlight
0.05 M² Pasang kaca bening 5mm

1 UNIT BOUVENLIGHT TYPE 3 (BV3)


0.0117 M³ Pasang kusen bouvenlight
0.3 M² Pasang kaca bening 5mm
USEN 1 UNIT
TOTAL PANJANG KUSEN
TINGGI LEBAR VOLUME
4.9 0.05 0.13 0.03185 M³
4.8 0.05 0.13 0.0312 M³
4.7 0.05 0.13 0.03055 M³
7.4 0.05 0.13 0.0481 M³
10.15 0.05 0.13 0.065975 M³
6.5 0.05 0.13 0.04225 M³
4 0.05 0.13 0.026 M³
3.5 0.05 0.13 0.02275 M³
1.7 0.05 0.13 0.01105 M³
1.8 0.05 0.13 0.0117 M³
PERMUKAAN KUSEN YG DI CAT
JML UNIT
1 1.127
3 3.312
1 1.081
1 1.884
1 2.874
2 3.354
1 0.92
1 0.805
1 0.391
3 1.242
16.99 M²
JUM. UNIT
1 3.12
3 8.19
1 2.34
1 3.12
1 0.64
2 7.76
1 0.64
25.81 M²

= 42.8 M²
= 2.808 M²
= 45.608 M²