Anda di halaman 1dari 3

No.

Dokumen : FM-PRY-01a
Tgl. Efektif : 1 Oktober 2020
LAPORAN HARIAN PROYEK (PRODUKTIVITAS, TENAGA, DAN BAHAN)
No. Revisi : 0.0
Halaman :1/1

KONTRAKTOR : PT. SUMBERNUSANTARA


PROYEK : 21-08 CIPUTRA BEACH RESORT
HARI / TANGGAL : Jumat, 28 Mei 2021
PRODUKTIVITAS
VOLUME
VOLUME s/d s/d HARI SATUAN HARGA JUMLAH
No PEKERJAAN HARI INI
KONTRAK KEMARIN INI
A B C = A+ B D E F=BxE

2 PEKERJAAN STRIPING & SUBGRADE


2.1 Striping & Leveling 7.346,1 1180 190 1370 m3 23.260 4.419.391
2.2 Timbunan subgrade (limestone) 3.195,0 m3 16.772

3 PEKERJAAN BASE COURSE & PEMADATAN


3.1 Sub Base (Aggr. Class B) h.30cm dipadatkan CBR min. 70% 1.458,9 m3 21.568
3.2 Base Course (Aggr. Class A) h.20cm dipadatkan CBR min. 100% 972,6 m3 24.283

5 PEKERJAAN BAHU JALAN (PATHWAY/ PEDISTRIAN)


5.4 Perapihan/perataan & pembentukan level taman 4.549,0 m2 11.630

7 PEKERJAAN SALURAN JALAN (DRAINAGE)


7.1 Pekerjaan galian tanah utk. U-ditch 667,4 m3 29.889
7.2 Timbunan kembali utk. U-ditch, dipadatkan 222,5 m3 8.701
7.3 Buang tanah kelebihan, area U-Ditch 445,0 m3 16.496
7.5 U-ditch 400x600x1200 (Saluran Jalan) 291,0 m 104.329
7.6 U-ditch 600x800x1200 (Saluran Jalan) 1.245,0 m 157.366
7.7 Pekerjaan galian tanah utk. Box Culvert 306,2 m3 29.889
7.8 Timbunan kembali utk. Box Culvert, dipadatkan 204,2 m3 8.701
7.9 Buang tanah kelebihan, area Box Culvert 102,1 m3 16.496
7.11 Box Culvert 800x800x1200 HD (entr. Resvara) 22,0 m 222.989
7.12 Box Culvert 1000x1000x1200 HD - Cr-BC1 88,0 m 326.814

10 10 UNIT BOX CONTROL - SQ.1500x2000(t) DGN MANHOLE SQ.600mm


10.1 Galian tanah 67,5 m3 29.889
10.2 Urugan kembali (dipadatkan) 22,5 m3 8.701
10.3 Buang tanah kelebihan(disekitar lokasi proyek) 45,0 m3 16.496

11 LAIN-LAIN (Pekerjaan Jalan Akses Konstruksi - L.5m)


11.1 Striping & Leveling (5x173m) 1.045,0 m3 23.260
11.2 Timbunan subgrade (limestone) 437,5 m3 16.772

TOTAL PRODUKTIVITAS 4.419.391


PENGELUARAN
No. BBM (liter)
No ALAT BERAT JAM KERJA HARGA JUMLAH
LAMBUNG SOLAR BENSIN
1 Exca PC200 101 100 8 351.619 2.812.950
2 Dozer D31 A06 - 0 268.669 -
3 Vibro 268.669
4 Dump Truck 164.194 -
5 Watertank 100.000
6 Panther
TOTAL PENGELUARAN Rp. 2.812.950
TOTAL PRODUKTIVITAS (A) : Rp 4.419.391 PENGELUARAN (B): Rp 2.812.950 DEVIASI (C = A-B) : Rp 1.606.441

BBM
MASUK PAKAI SALDO
No JENIS BAHAN BAKAR KETERANGAN
(liter) (liter) (liter)
1 SOLAR 100 45 clearing/pembersihan persiapan lahan
2 BENSIN Dozer STB Karna Hujan lahan banjir
PEKERJAAN SIPIL YANG DILAKSANAKAN /
BAHAN-BAHAN YANG MASUK TENAGA KERJA
SELESAI HARI INI
JENIS BAHAN VOL SATUAN BAGIAN JUMLAH

Jumlah :
: SEPENUHNYA *) Catatan : Hujan jam 07.00 s/d jam 15.00

HARI : SEBAGIAN TIDAK *)


*) coret salah satu
KETERANGAN 24 1 2 Kontraktor,
23 3
22 PT. SUMBER NUSANTARA
JUMLAH JAM KERJA : JAM
21

4
18 19 20

5 6

: CERAH : BERAWAN
7 8
17
16

: HUJAN : GERIMIS
10
11 15
12 13 14
No. Dokumen : FM-PRY-01a
Tgl. Efektif : 1 Oktober 2020
LAPORAN HARIAN PROYEK (PRODUKTIVITAS, TENAGA, DAN BAHAN)
No. Revisi : 0.0
Halaman :1/1

KONTRAKTOR : PT. SUMBERNUSANTARA


PROYEK : 21-08 CIPUTRA BEACH RESORT
HARI / TANGGAL : Sabtu, 29 Mei 2021
PRODUKTIVITAS
VOLUME
VOLUME s/d s/d HARI SATUAN HARGA JUMLAH
No PEKERJAAN HARI INI
KONTRAK KEMARIN INI
A B C = A+ B D E F=BxE

2 PEKERJAAN STRIPING & SUBGRADE


2.1 Striping & Leveling 7.346,1 1370 250 1620 m3 23.260 5.814.989
2.2 Timbunan subgrade (limestone) 3.195,0 m3 16.772

3 PEKERJAAN BASE COURSE & PEMADATAN


3.1 Sub Base (Aggr. Class B) h.30cm dipadatkan CBR min. 70% 1.458,9 m3 21.568
3.2 Base Course (Aggr. Class A) h.20cm dipadatkan CBR min. 100% 972,6 m3 24.283

5 PEKERJAAN BAHU JALAN (PATHWAY/ PEDISTRIAN)


5.4 Perapihan/perataan & pembentukan level taman 4.549,0 m2 11.630

7 PEKERJAAN SALURAN JALAN (DRAINAGE)


7.1 Pekerjaan galian tanah utk. U-ditch 667,4 m3 29.889
7.2 Timbunan kembali utk. U-ditch, dipadatkan 222,5 m3 8.701
7.3 Buang tanah kelebihan, area U-Ditch 445,0 m3 16.496
7.5 U-ditch 400x600x1200 (Saluran Jalan) 291,0 m 104.329
7.6 U-ditch 600x800x1200 (Saluran Jalan) 1.245,0 m 157.366
7.7 Pekerjaan galian tanah utk. Box Culvert 306,2 m3 29.889
7.8 Timbunan kembali utk. Box Culvert, dipadatkan 204,2 m3 8.701
7.9 Buang tanah kelebihan, area Box Culvert 102,1 m3 16.496
7.11 Box Culvert 800x800x1200 HD (entr. Resvara) 22,0 m 222.989
7.12 Box Culvert 1000x1000x1200 HD - Cr-BC1 88,0 m 326.814

10 10 UNIT BOX CONTROL - SQ.1500x2000(t) DGN MANHOLE SQ.600mm


10.1 Galian tanah 67,5 m3 29.889
10.2 Urugan kembali (dipadatkan) 22,5 m3 8.701
10.3 Buang tanah kelebihan(disekitar lokasi proyek) 45,0 m3 16.496

11 LAIN-LAIN (Pekerjaan Jalan Akses Konstruksi - L.5m)


11.1 Striping & Leveling (5x173m) 1.045,0 m3 23.260
11.2 Timbunan subgrade (limestone) 437,5 m3 16.772

TOTAL PRODUKTIVITAS 5.814.989


PENGELUARAN
No. BBM (liter)
No ALAT BERAT JAM KERJA HARGA JUMLAH
LAMBUNG SOLAR BENSIN
1 Exca PC200 101 100 8 351.619 2.812.950
2 Dozer D31 A06 60 8 268.669 2.149.350
3 Vibro 268.669
4 Dump Truck 164.194 -
5 Watertank 100.000
6 Panther
TOTAL PENGELUARAN Rp. 4.962.300
TOTAL PRODUKTIVITAS (A) : Rp 5.814.989 PENGELUARAN (B): Rp 4.962.300 DEVIASI (C = A-B) : Rp 852.689

BBM
MASUK PAKAI SALDO
No JENIS BAHAN BAKAR KETERANGAN
(liter) (liter) (liter)
1 SOLAR 1000 160 885 clearing/pembersihan persiapan lahan
2 BENSIN
PEKERJAAN SIPIL YANG DILAKSANAKAN /
BAHAN-BAHAN YANG MASUK TENAGA KERJA
SELESAI HARI INI
JENIS BAHAN VOL SATUAN BAGIAN JUMLAH

Jumlah :
: SEPENUHNYA *) Catatan :

HARI : SEBAGIAN TIDAK *)


*) coret salah satu
KETERANGAN 24 1 2 Kontraktor,
23 3
22 PT. SUMBER NUSANTARA
JUMLAH JAM KERJA : JAM
21

4
18 19 20

5 6

: CERAH : BERAWAN
7 8
17
16

: HUJAN : GERIMIS
10
11 15
12 13 14
No. Dokumen : FM-PRY-01a
Tgl. Efektif : 1 Oktober 2020
LAPORAN HARIAN PROYEK (PRODUKTIVITAS, TENAGA, DAN BAHAN)
No. Revisi : 0.0
Halaman :1/1

KONTRAKTOR : PT. SUMBERNUSANTARA


PROYEK : 21-08 CIPUTRA BEACH RESORT
HARI / TANGGAL : Minggu, 30 Mei 2021
PRODUKTIVITAS
VOLUME
VOLUME s/d s/d HARI SATUAN HARGA JUMLAH
No PEKERJAAN HARI INI
KONTRAK KEMARIN INI
A B C = A+ B D E F=BxE

2 PEKERJAAN STRIPING & SUBGRADE


2.1 Striping & Leveling 7.346,1 1620 350 1970 m3 23.260 8.140.984
2.2 Timbunan subgrade (limestone) 3.195,0 m3 16.772

3 PEKERJAAN BASE COURSE & PEMADATAN


3.1 Sub Base (Aggr. Class B) h.30cm dipadatkan CBR min. 70% 1.458,9 m3 21.568
3.2 Base Course (Aggr. Class A) h.20cm dipadatkan CBR min. 100% 972,6 m3 24.283

5 PEKERJAAN BAHU JALAN (PATHWAY/ PEDISTRIAN)


5.4 Perapihan/perataan & pembentukan level taman 4.549,0 m2 11.630

7 PEKERJAAN SALURAN JALAN (DRAINAGE)


7.1 Pekerjaan galian tanah utk. U-ditch 667,4 m3 29.889
7.2 Timbunan kembali utk. U-ditch, dipadatkan 222,5 m3 8.701
7.3 Buang tanah kelebihan, area U-Ditch 445,0 m3 16.496
7.5 U-ditch 400x600x1200 (Saluran Jalan) 291,0 m 104.329
7.6 U-ditch 600x800x1200 (Saluran Jalan) 1.245,0 m 157.366
7.7 Pekerjaan galian tanah utk. Box Culvert 306,2 m3 29.889
7.8 Timbunan kembali utk. Box Culvert, dipadatkan 204,2 m3 8.701
7.9 Buang tanah kelebihan, area Box Culvert 102,1 m3 16.496
7.11 Box Culvert 800x800x1200 HD (entr. Resvara) 22,0 m 222.989
7.12 Box Culvert 1000x1000x1200 HD - Cr-BC1 88,0 m 326.814

10 10 UNIT BOX CONTROL - SQ.1500x2000(t) DGN MANHOLE SQ.600mm


10.1 Galian tanah 67,5 m3 29.889
10.2 Urugan kembali (dipadatkan) 22,5 m3 8.701
10.3 Buang tanah kelebihan(disekitar lokasi proyek) 45,0 m3 16.496

11 LAIN-LAIN (Pekerjaan Jalan Akses Konstruksi - L.5m)


11.1 Striping & Leveling (5x173m) 1.045,0 m3 23.260
11.2 Timbunan subgrade (limestone) 437,5 m3 16.772

TOTAL PRODUKTIVITAS 8.140.984


PENGELUARAN
No. BBM (liter)
No ALAT BERAT JAM KERJA HARGA JUMLAH
LAMBUNG SOLAR BENSIN
1 Exca PC200 101 100 8 351.619 2.812.950
2 Dozer D31 A06 60 8 268.669 2.149.350
3 Vibro 268.669
4 Dump Truck 164.194 -
5 Watertank 100.000
6 Panther
TOTAL PENGELUARAN Rp. 4.962.300
TOTAL PRODUKTIVITAS (A) : Rp 8.140.984 PENGELUARAN (B): Rp 4.962.300 DEVIASI (C = A-B) : Rp 3.178.684

BBM
MASUK PAKAI SALDO
No JENIS BAHAN BAKAR KETERANGAN
(liter) (liter) (liter)
1 SOLAR 1000 160 885 clearing/pembersihan persiapan lahan
2 BENSIN
PEKERJAAN SIPIL YANG DILAKSANAKAN /
BAHAN-BAHAN YANG MASUK TENAGA KERJA
SELESAI HARI INI
JENIS BAHAN VOL SATUAN BAGIAN JUMLAH

Jumlah :
: SEPENUHNYA *) Catatan :

HARI : SEBAGIAN TIDAK *)


*) coret salah satu
KETERANGAN 24 1 2 Kontraktor,
23 3
22 PT. SUMBER NUSANTARA
JUMLAH JAM KERJA : JAM
21

4
18 19 20

5 6

: CERAH : BERAWAN
7 8
17
16

: HUJAN : GERIMIS
10
11 15
12 13 14

Anda mungkin juga menyukai