LAPORAN HARIAN PROYEK (PRODUKTIVITAS, TENAGA, Tgl. Efektif : 1 Oktober 2020
DAN BAHAN) No. Revisi : 0.0
Halaman :1/1

KONTRAKTOR : PT. SUMBERNUSANTARA


PROYEK : 21-08 CIPUTRA BEACH RESORT
HARI / TANGGAL : Selasa, 01 Juni 2021
PRODUKTIVITAS
VOLUME
VOLUME s/d s/d HARI SATUAN HARGA JUMLAH
No PEKERJAAN HARI INI
KONTRAK KEMARIN INI
A B C = A+ B D E F=BxE

2 PEKERJAAN STRIPING & SUBGRADE


2.1 Striping & Leveling 7,346.1 2250 300 2550 m3 23,260 6,977,986.58
2.2 Timbunan subgrade (limestone) 3,195.0 m3 16,772

3 PEKERJAAN BASE COURSE & PEMADATAN


Sub Base (Aggr. Class B) h.30cm dipadatkan CBR min.
3.1 1,458.9 m3 21,568
70%
Base Course (Aggr. Class A) h.20cm dipadatkan CBR
3.2 972.6 m3 24,283
min. 100%

5 PEKERJAAN BAHU JALAN (PATHWAY/ PEDISTRIAN)


5.4 Perapihan/perataan & pembentukan level taman 4,549.0 m2 11,630

7 PEKERJAAN SALURAN JALAN (DRAINAGE)


7.1 Pekerjaan galian tanah utk. U-ditch 667.4 m3 29,889
7.2 Timbunan kembali utk. U-ditch, dipadatkan 222.5 m3 8,701
7.3 Buang tanah kelebihan, area U-Ditch 445.0 m3 16,496
7.5 U-ditch 400x600x1200 (Saluran Jalan) 291.0 m 104,329
7.6 U-ditch 600x800x1200 (Saluran Jalan) 1,245.0 m 157,366
7.7 Pekerjaan galian tanah utk. Box Culvert 306.2 m3 29,889
7.8 Timbunan kembali utk. Box Culvert, dipadatkan 204.2 m3 8,701
7.9 Buang tanah kelebihan, area Box Culvert 102.1 m3 16,496
7.11 Box Culvert 800x800x1200 HD (entr. Resvara) 22.0 m 222,989
7.12 Box Culvert 1000x1000x1200 HD - Cr-BC1 88.0 m 326,814

10 UNIT BOX CONTROL - SQ.1500x2000(t) DGN


10
MANHOLE SQ.600mm
10.1 Galian tanah 67.5 m3 29,889
10.2 Urugan kembali (dipadatkan) 22.5 m3 8,701
10.3 Buang tanah kelebihan(disekitar lokasi proyek) 45.0 m3 16,496

11 LAIN-LAIN (Pekerjaan Jalan Akses Konstruksi - L.5m)


11.1 Striping & Leveling (5x173m) 1,045.0 m3 23,260
11.2 Timbunan subgrade (limestone) 437.5 m3 16,772

TOTAL PRODUKTIVITAS Rp 6,977,987


PENGELUARAN
No. BBM (liter)
No ALAT BERAT JAM KERJA HARGA JUMLAH
LAMBUNG SOLAR BENSIN
1 Exca PC200 101 100 8 351,619 2,812,950
2 Dozer D31 A06 60 8 268,669 2,149,350
3 Vibro 268,669
4 Dump Truck 164,194 -
5 Watertank 100,000

TOTAL PENGELUARAN Rp 4,962,300


TOTAL PRODUKTIVITAS (A) : Rp 6,977,987 PENGELUARAN (B): Rp 4,962,300 DEVIASI (C = A-B) : Rp 2,015,687
BBM
SISA MASUK PAKAI SALDO
No JENIS BAHAN BAKAR KETERANGAN
(liter) (liter) (liter) (liter)
1 SOLAR 535 0 160 375
2 BENSIN
BAHAN-BAHAN YANG MASUK PEKERJAAN SIPIL YANG DILAKSANAKAN / TENAGA KERJA
JENIS BAHAN VOL SATUAN Stripping lahan BAGIAN JUMLAH
PM 1
Drafter 1
Pelaksana 1
Surveyor 1
Admin 1
Harian 1

Jumlah 6
: SEPENUHNYA *) Catatan :
HARI : SEBAGIAN TIDAK *)
DAPAT DIGUNAKAN UNTUK KERJA
*) coret salah satu KETERANGAN 24 1 2 Kontraktor,
23 3
22 PT. SUMBER NUSANTARA
JUMLAH JAM KERJA : JAM
21

4
18 19 20

5
6

: CERAH : BERAWAN
7 8
17
16

10
: HUJAN : GERIMIS 11
12 13 14