BILL OF QUANTITY (BQ)

PEKERJAAN : PEMBANGUNAN GEDUNG AUDITORIUM FEM


LOKASI : KAMPUS IPB DRAMAGA BOGOR
TAHUN : 2018

REKAPITULASI

No. ITEM PEKERJAAN TOTAL HARGA

I PERSIAPAN - -

II PEKERJAAN STRUKTUR -
A. PEK. TANAH -
B. PEK. PONDASI -
C. PEK. KONSTRUKSI BETON -
D. PEKERJAAN STRUKTUR ATAP (ELEVASI +21.86) -

III PEKERJAAN ARSITEKTUR -


A. PEK. DINDING -
B. PEK. LANTAI -
C. PEK. KUSEN LENGKAP -
D. PEK. PENUTUP ATAP -
E. PEK. PLAFOND -
F. PEK. SANITAIR -
G. PEK. PENGECATAN -
H. PEK. FINISHING KANOPI ENTRANCE -

IV PEKERJAAN MEKANIKAL -
A SISTEM PLUMBING -
B SISTEM TATA UDARA -

V PEKERJAAN FIRE FIGHTING - -

VI PEKERJAAN ELEKTRIKAL - -

VII PEKERJAAN GENSET - -

VIII PEKERJAAN ELEKTRONIK -


A. FIRE ALARM -
B. TATA SUARA (SOUND SYSTEM) -
C. SISTEM TELPON -
D. SISTEM DATA -
E. SISTEM CCTV -

IX PRASARANA LINGKUNGAN JALAN DAN PARKIR -


A. PEKERJAAN PEMATANGAN LAHAN -
B. PEKERJAAN JALAN DAN PARKIR -
C. PEKERJAAN SALURAN KELILING BANGUNAN DAN AREA PARKIR -
D. PEKERJAAN DINDING PENAHAN TANAH (DPT) BATU KALI -

X MEBEULAIR AUDITORIUM - -

XI LIFT PENUMPANG 1 UNIT - -

JUMLAH -
PPN (10%) -
TOTAL -
DIBULATKAN -

Terbilang : ...............................................................................................................................................................................................................................

Bogor, ..................... 2018


Kontraktor,
PT,.................................

Cap & Tanda Tangan

NAMA
Jabatan
I PERSIAPAN

No. Item Pekerjaan Satuan Volume Harga Satuan Total Harga

1 Dokumen Proyek eks 7,00 -

Pembuatan laporan harian, mingguan dan bulanan, foto-foto berwarna kemajuan pekerjaan dan gambar
sesuai pelaksanaan (As Built Drawing) diserahkan kepada pihak-pihak terkait, diserahkan setiap bulan hingga
masa penyerahan pertama, laporan-laporan tersebut dibuat sebanyak 7 eksemplar.

2 Kantor Direksi Keet M2 12,96 -

Pembuatan bangunan kantor sementara dilokasi proyek yang dilengkapi dengan apar, P3 dan membongkar
setelah tidak diperlukan sesuai perintah pemberi kerja serta menyerahkan kepada perintah pemberi pekerjaan
(User)

3 Gudang dan Los Kerja M2 50,00 -

Pembuatan gudang dan barak pekerja dan membongkar setelah tidak diperlukan sesuai perintah pemberi
kerja serta menyerahkan kepada perintah pemberi pekerjaan (User)

4 Penyediaan air untuk MCK dan Pekerja Ls 1,00 -

Pemborong wajib menyediakan sumber air bersih dan alat pendukungnya untuk kebutuhan pekerja

5 Pagar Pengaman sementara di Pintu Masuk Proyek M1 235,00 -

Pagar sementara proyek berikut pintu-pintu masuk dari seng BJLS 30 termasuk rangka/balok/kaso/baja ringan
tinggi 180 cm dan membongkar setelah tidak diperlikan sesuai perintah pemberi kerja serta menyerahkan
kepada perintah pemberi pekerjaan (User)

6 Papan Nama Proyek M2 3,60 -

Pembuatan dan pemasangan papan nama proyek ukuran sekurang-kurngnya 100 x 150 cm dilokasi pekerjaan

7 Mobilisasi dan Demobilisasi alat berat Ls 1,00 -


Alat berat Boldozer dan Exavator

8 Penyedian Listrik Ls 1,00 -

Penyediaan listrik untuk penerangan direksi kit, barak kerja, gudang dan penerangan lingkungan.

9 Pekerjaan Pembersihan Ls 1,00 -

Pembersihan hasil pekerjaan dan dilingkungan akibat dari pelaksanaan pekerjaan.

10 Pembuatan Ijin Mendirikan Bangunan (IMB) dibayarkan sesuai bukti pembayaran pemerintah setempat Ls 1,00 -
Luas gedung auditorium luas lantai dasar = 1.318 m2,
Luas lantai 2 = 1.294 m2, luas lantai 3 = 256,35 m2, luas lantai 4 ruang mesin = 26,24 m2
11 Alat bantu vertikal (Hoist Crane) lengkap dengan pondasi plat beton Ls 1,00 -

12 Pekerjaan pencegahan rayap (soil treatment) Pra Kontruksi M2 1.318,00 -


TOTAL -

Keterangan : 2.583,00
Seluruh barang-barang persiapan ini diserahkan kepada pemberi kerja
sesuai dengan jumlahnya
II PEKERJAAN STRUKTUR

No. Item Pekerjaan Satuan Volume Harga Satuan Total Harga

A. PEK. TANAH
1 Galian tanah pile cap m3 131,96 -
2 Galian tanah tie beam m3 214,49 -
3 Urugan tanah kembali m3 128,79 -
4 Urug dan pemadatan tanah merah m3 108,43 -
5 Urug pasir bawah lantai t. 5 cm m3 74,31 -
6 Urug pasir bawah pile cap & sloof t. 5 cm m3 40,00 -
7 Galian tanah pondasi batu kali m3 36,61 -
Jumlah A -
B. PEK. PONDASI
1 Pengadaan dan Pelaksanaan Tiang Pancang uk:25x25; (L rata 12: M')/ttk
- Mini pile M25 ( Segi empat ) m' 2.832,00 -
- Biaya Penyambungan ttk 236,00 -
- Potong tiang pancang ttk 236,00 -
2 Mobilisasi dan Demob Alat Pancang unit 1,00 -
3 Pek. Loading Test - Pile Driving Analyzer (PDA) Ttk 1,00 -
4 Pondasi Batu Kali m3 71,93 -
5 Rollag Bata Pondasi Tangga m2 12,71 -
6 Lantai Kerja; Beton ad.1:3:5; t=5cm m3 22,77 -
Jumlah B -
C. PEK. KONSTRUKSI BETON
C.1. LANTAI 1 (BETON PILE CAP, SLOOP, KOLOM SD ELEVASI +4.50)
1 Pek. Beton Pile Cap PC1 dan PC1A m3 56,54 -
2 Pek. Beton Pile Cap PC2 m3 2,04 -
3 Pek. Beton Pile Cap PC4A (PC PITLIFT) m3 3,72 -
4 Pek. Beton Pile Cap PC3 m3 2,18 -
5 Pek. Beton Pile Cap PC4 m3 22,41 -
6 Pek. Tie Beam TB1:400x750 m3 107,58 -
7 Pek. Tie Beam TB2:250x400 m3 18,27 -
8 Pek. Tie Beam TB3:200x400 m3 6,89 -
9 Pek. Kolom 1K1; D600 m3 23,20 -
10 Pek. Kolom 1K2; D600 m3 59,30 -
11 Pek. Kolom 1K3; 300X300 m3 0,43 -
12 Pek. Kolom K2A; 300X400 m3 3,28 -
13 Plat lantai t. 10 cm elv -0.05 m3 148,41 -
14 Pek. Tangga As C, D/5, 6, 7 dan Tangga Entrance m3 10,80 -
15 Pek. Balok Bordes B4K:250x500 m3 0,66 -
16 Pek. Ramp Beton K-300; Ready Mix
- Pek. Pondasi Ramp m3 0,47 -
- Pek. Balok Ramp B:250x400 m3 0,95 -
- Pek. Pelat Lantai t=12cm m3 3,14 -
17 Pek. Lift
- Pek. Dinding Pit Lift : m3 3,22 -
- Pek. Kolom Lift : m3 25,77 -
- Pek. Balok Separator dan Balok Hosting Hook; B:200x300 m3 1,71 -
Jumlah C.1 -

C.2. LANTAI 2 (ELEVASI +4.50 SD +10.50)


A. ELEVASI +4.50 + 10.50
1 Pek. Kolom 2K1; D600 m3 9,60 -
2 Pek. Kolom 2K2; D600 m3 75,70 -
3 Pek. Kolom 2K3; 300X300 m3 1,02 -
4 Pek. Kolom K2A; 300X400 m3 4,19 -

B. ELEVASI +4.50 (LANTAI-2)


5 Pek. Balok B1:400x750 m3 88,27 -
6 Pek. Balok B1K:400x750 m3 23,74 -
7 Pek. Balok B2:300x450 m3 17,75 -
8 Pek. Balok B3:300x650 m3 3,40 -
9 Pek. Balok BL:300x450+100X550 m3 24,51 -
10 Pek. Balok B1L:400x750+200X250 m3 6,11 -
11 Pek. Balok B1K:400x750+200X250 m3 1,56 -
12 Pek. Pelat Lantai t=12cm (selasar) m3 22,55 -
13 Pek. Pelat Lantai t=15cm m3 71,24 -
14 Plat beton tangga t=15cm AS-4/E, I; AS-6/D, J m3 2,19 -
15 Balok bordes B:(400x750) m3 0,08 -

C. LANTAI 2 (ELEVASI +4.50 PANGGUNG)


16 Pek. Balok B1:400x750 m3 4,54 -
17 Pek. Balok B2:300x450 m3 6,50 -
18 Pek. Balok B3:300x650 m3 9,98 -
19 Pek. Balok B4:250x500 m3 5,41 -
20 Pek. Pelat Lantai t=15cm m3 26,05 -
21 Pek. Plat beton tangga AS-G/1; TANGGA AS-I/2 m3 2,89 -
22 Pek. Balok Bordes B4K:250x500 m3 0,08 -
No. Item Pekerjaan Satuan Volume Harga Satuan Total Harga

D. LANTAI 2 (ELEVASI +4.50 s/d +6.80 TRIBUN)


23 Pek. Balok B1:400x750 m3 31,14 -
24 Pek. Balok B2:300x450 m3 5,75 -
25 Pek. Balok B3:300x650 m3 26,74 -
26 Pek. Pelat Lantai t=15cm m3 60,21 -
27 Pek. Pelat Lantai Trap Tribun m3 21,36 -
28 Pek. Plat beton ; TANGGA AS-E/9; TANGGA AS-D/8 m3 5,34 -
29 Pek. Balok Bordes B4K:250x500 m3 0,11 -
30 Pek. Plat beton ; TANGGA AS-G/10 m3 2,04 -
31 Pek. Balok Bordes B4K:250x500 m3 0,10 -
Jumlah C.2 -
C.3. PEKERJAAN BETON LANTAI-3 (ELEV +10.50 SD +12.10)
A ELEVASI +10.50 SD +12.10
1 Pek. Kolom 2K1; D600 m3 1,76 -
2 Pek. Kolom 2K2; D600 m3 17,55 -
3 Pek. Kolom K4; 400X400 m3 0,50 -
4 Pek. Kolom K5; 300X400 m3 1,30 -

B ELEVASI +10.50 (LANTAI-3)


5 Pek. Balok B1:400x750 m3 40,09 -
6 Pek. Balok B1K:400x750 m3 21,46 -
7 Pek. Balok B2:300x450 m3 23,74 -
8 Pek. Balok B3:300x650 m3 4,50 -
9 Pek. Balok B4:250x500 m3 0,95 -
10 Pek. Balok BL:300x450+100X550 m3 24,55 -
11 Pek. Balok B1:400x750+200X1250 m3 9,32 -
12 Pek. Balok B1:400x750+200X1250 m3 1,56 -
13 Pek. Pelat Lantai t=12cm (dak) m3 40,68 -
14 Pek. Pelat Lantai t=15cm m3 19,96 -

C ELEVASI +11.30 (TRIBUN VIP)


15 Pek. Balok B1:400x750 m3 6,81 -
16 Pek. Balok B1K:400x750 m3 0,87 -
17 Pek. Balok B2:300x450 m3 6,32 -
18 Pek. Balok B3:300x650 m3 2,96 -
19 Pek. Balok BL:150x1000 m3 4,89 -
20 Pek. Pelat Lantai t=15cm m3 9,52 -
21 Pek. Pelat Lantai Trap Tribun m3 1,73 -
Jumlah C.3 -
C.4. PEKERJAAN BETON ATAP/RING BALOK (ELEV +12.10 SD +TOP)
A KOLOM ELEVASI +12.10 SD TOP
1 Pek. Kolom 2K1; D600 m3 2,47 -
2 Pek. Kolom 2K2; D600 m3 39,49 -
3 Pek. Kolom K5; 300X400 m3 3,18 -

B BALOK ELEVASI +10.50 SD. +21.000


4 Pek. Balok B1:400x750 m3 13,10 -
5 Pek. Balok B2:300x450 m3 17,00 -
6 Pek. Balok B5:250x400 m3 6,98 -
7 Pek. Balok BR:150x300 m3 9,01 -
8 Pek. Pelat Lantai t=15cm (Ruang Mesin Lift). m3 2,34 -
Jumlah C.4 -
Jumlah C -
D. PEKERJAAN STRUKTUR ATAP (ELEVASI +21.86)
Spesifikasi sambungan menggunakan Baut, Las sudut dan Las tumpul;
Mutu Baja Profil : ST-37
Mutu Angkur Baut : ST-41
Mutu Baut : ASTM A-325 dan A-307
Mutu Bahan Las : AWS; E-70xx

1 Base Plate t=12 kg 489,35 -


2 Angkur Bout dia. 22 bh 216,00 -
3 Kolom; Profil WF 350.175.7.11 (49.58Kg/m') kg 1.874,12 -
4 Balok; Profil WF 350.175.7.11 (49.58Kg/m') kg 18.561,07 -
5 Balok; Profil WF 250.125.6.9 (29.58Kg/m') kg 1.419,84 -
6 Plat Sambungan Profil; Plat Pengaku/Stiffner; t=12; t=10 kg 1.441,31 -
7 Bout Sambungan; dia.19 bh 1.142,00 -
8 Purlin; C-150.65.20.3,2 (7.51Kg/m') kg 11.801,66 -
9 Rangka Penggantung Utilitas; C-125.50.20.2,3 (4.51Kg/m') kg 1.095,93 -
10 Rangka Kaso & Reng Baja Ringan m2 1.587,07 -
11 Pengecatan Profil Baja kg 1.654,00 -

12 Pek. Catwalk
- Rangka; C-125.50.20.2,3 (4.51Kg/m') kg 429,80 -
- Rangka siku lantai; L-50.50.5 (3.77Kg/m') kg 457,87 -
- Rangka Penggantung siku; L-50.50.5 (3.77Kg/m') kg 352,87 -
- Rangka Hand Railling siku; L-50.50.5 (3.77Kg/m') kg 718,56 -
- Pelat Bordes/Grill kg 47,65 -
- Pengecatan Profil Baja kg 222,36 -
Jumlah D -
No. Item Pekerjaan Satuan Volume Harga Satuan Total Harga

E. PEKERJAAN STRUKTUR KANOPI ENTRANCE

1 Base Plate t=12 kg 66,05 -


2 Angkur Bout dia. 22 bh 20,00 -
3 Kolom; Profil H 300.300.10.15 (94.00Kg/m') kg 1.903,50 -
4 Kolom; Profil H 250.250.9.14 (72.42Kg/m') kg 2.168,40 -
5 Balok; Profil WF 300.150.6,5.9 (36.67Kg/m') kg 1.901,34 -
6 Balok; Profil WF 250.125.6.9 (29.58Kg/m') kg 3.145,09 -
7 Rangka; Hollow 50.100.3,2 (7.54Kg/m') kg 2.210,59 -
8 Plat Sambungan Profil; Plat Pengaku/Stiffner; t=12; t=10; t=6 kg 195,92 -
9 Bout Sambungan; dia.19 bh 60,00 -
10 Bout Dynabolt; dia.12 bh 26,00 -
11 Pengecatan Profil Baja kg 332,52 -
Jumlah E -
SUB TOTAL. II -
III PEKERJAAN ARSITEKTUR

No. Item Pekerjaan Satuan Volume Harga Satuan Total Harga

A. PEK. DINDING
A.1 LANTAI 1 (elevasi +0.00 s/d +4.50)
1 Dinding hebel t 10 cm + MU 380 m2 1.266,70 -
Railing besi pipa stainless steel hendel dia. 2,5", tiang dia. 1,5", ornamen dia. 1" (entrance dan tangga
2 m' 34,44 -
utama)
3 Railing besi pipa stainless steel hendel dia. 2,5", tiang dia. 1,5", ornamen dia. 1" (ram) m' 37,20 -
4 kolom Praktis 10x10 m' 245,80 -
5 Ring Balok 10x15 m' 41,78 -
6 Balok lintel 10x15 m' 103,56 -
7 Plesteran dinding MU 100 t.10 mm m2 2.533,40 -
8 Acian MU 200 t. 3 mm m2 2.533,40 -
9 Dinding granite homogenous tile 40x40 cm toilet Pria/Wanita, setara Esenza/Granito/Niro Granite m2 469,11 -
10 Border granite homogenous tile 10 x 40 cm toilet Pria/Wanita, setara Esenza/Granito/Niro Granite m2 142,34 -
11 Granite alam tebal 2 cm pada top dinding urinoir dan meja wastafel m2 8,63 -
12 Finishing Kolom ( Acian MU 200 ) m2 421,52 -
13 Finishing Balok dan listplang beton ( Acian MU 200 ) m2 274,13 -
14 Granite alam slab tebal 2 cm ukuran 60/120 cm, dinding entrance lantai 1 s/d 3 m2 282,84 -
15 Finishing ornamen kolom beton 30x40 pada entrance ( Acian MU 200 ) m2 60,73 -
16 Granite alam slab tebal 2 cm ukuran 60/120 cm, dinding LIFT lantai 1 m2 10,86 -
17 Sun screen Panellux unit 56,00 TIDAK DITAWARKAN
18 Dudukan sun screen besi hollow 100x50x2,2 finishing cat m' 112,00 TIDAK DITAWARKAN
19 Dudukan sun screen besi hollow 40x40x2 finishing cat m' 161,24 TIDAK DITAWARKAN
-
A.2. LANTAI 2 (elevasi +4.50 s/d +10.50)
1 Dinding Hebel t. 10 cm + MU 380 m2 1.738,24 -
2 Railing tangga besi pipa stainless steel hendel dia. 2,5", tiang dia. 1,5", ornamen dia. 1" (balkon) m' 23,15 -
Railing tangga besi pipa stainless steel hendel dia. 2,5", tiang dia. 1,5", ornamen dia. 1" (tribun ke
3 m' 27,36 -
balkon)
Hand railing tangga besi pipa stainless steel hendel dia. 2,5", dudukan hand railing dia. 1" (balkon ke
4 m' 14,88 -
selasar)
5 Railing tangga besi pipa hitam finishing cat (ruang selver dan ke selasar) m' 25,70 -
6 Railing selasar keliling pipa hitam finishing cat m' 122,28 -
7 Hand railing ruang mesin keselasar pipa hitam finishing cat m' 14,52 -
8 Dinding hebel t 10 cm + MU 380, dinding parapet tangga dan tribun m2 34,09 -
9 Kolom Praktis 10 x 10 m' 229,05 -
10 Ring Balok 10 x 15 m' 39,56 -
11 Balok Lintel 10 x 15 m' 60,36 -
12 Plesteran Dinding MU 100 t. 10 mm m2 3.476,48 -
13 Acian MU 200 t. 3 mm m2 3.476,48 -
14 Dinding granite homogenous tile 40x40 cm toilet Pria/Wanita, setara Esenza/Granito/Niro Granite m2 456,67 -
15 Border granite homogenous tile 10 x 40 cm toilet Pria/Wanita, setara Esenza/Granito/Niro Granite m2 149,53 -
16 Granite alam tebal 2 cm, lebar 60 cm pada toilet m2 8,63 -
17 Finishing Kolom ( Acian MU 200 ) m2 508,92 -
18 Finishing Balok dan listplang beton ( Acian MU 200 ) m2 274,13 -
19 Rockwool tebal 5 cm dinding samping kanan, kiri dan belakang m2 741,01 -

20 Pelapis dinding multiplex 9 mm, triplex 4 mm + HPL, setara WINSTON/GRASMERINO/AICA (samping m2 104,71 -
kanan dan kiri bawah bagian dalam)

21 Pelapis dinding multiplex 9 mm, triplex 4 mm + HPL + rangka galvanis 4x4 cm, setara m2 130,85 -
WINSTON/GRASMERINO/AICA ( kanan dan kiri bawah bagian luar)

22 Pelapis dinding multiplex 9 mm, triplex 4 mm + HPL + rangka galvanis 4x4 cm, setara m2 296,15 -
WINSTON/GRASMERINO/AICA ( kanan dan kiri atas)

23 m2 207,45 -
Pelapis dinding multiplex 9 mm, triplex 4 mm + HPL, setara WINSTON/GRASMERINO/AICA (belakang)

24 Pelapis dinding multiplex 9 mm, triplex 4 mm + HPL, setara WINSTON/GRASMERINO/AICA (pojok m2 132,70 -
depan kanan kiri)

25 Pelapis kolom pojok depan multiplex 9 mm, triplex 4 mm + HPL, setara WINSTON/GRASMERINO/AICA m2 10,93 -
(pojok depan kanan kiri)
26 Pelapis LIFT, kolom tengah dan belakang dengan walpaper, setara MAESTRO/BELLAGIO/KING m2 154,38 -

27 Pelapis dinding parapet tribun dengan multiplex 9 mm + triplex 4 mm finishing HPL, setara m2 68,18 -
WINSTON/GRASMERINO/AICA
28 Pelapis dinding beton panggung dengan multiplex 9 mm + triplex 4 mm finishing HPL, setara m2 33,11 -

29 Beakdrop Auditorium (rangka hollou galvanis 4/4, triplex 12 mm, triplex 4 mm + HPL+ lampu + screen) unit 1,00 -

Ornamen kolom samping (rangka hollou galvanis 4/4, multiplex 12 mm, multiplex 9 mm, triplex 4 mm +
30 HPL) Type 1 unit 4,00 -

Ornamen kolom samping (rangka hollou galvanis 4/4, multiplex 12 mm, multiplex 9 mm, triplex 4 mm +
31 unit 2,00 -
HPL) Type 2
32 Plint kayu solid ukuran 2 x 10 cm, finishing melamik m' 162,14 -
33 Sun screen GRC rangka besi hollou galnanis 2x4/4 tebal 1,2 mm m2 114,20 -
34 Sun screen Panellux unit 112,00 TIDAK DITAWARKAN
35 Dudukan sun screen besi hollow 100x50x2,2 finishing cat m' 324,80 TIDAK DITAWARKAN
36 Dudukan sun screen besi hollow 40x40x2 finishing cat m' 322,48 TIDAK DITAWARKAN
-
No. Item Pekerjaan Satuan Volume Harga Satuan Total Harga
A.3 LANTAI 3 (elevasi + 10.50 s/d +21.86)
1 Dinding Hebel t. 10 cm + MU 380 m2 932,68 -
2 Kolom Praktis 10 x 10 m' 116,12 -
3 Ring Balok 10 x 15 m' 85,84 -
4 Balok Lintel 10 x 15 m' 104,61 -
5 Plesteran Dinding MU 100 t. 10 mm m2 1.865,37 -
6 Acian MU 200 t. 3 mm m2 1.865,37 -
7 Finishing Kolom ( Acian MU 200 ) m2 321,57 -
-
Jumlah A -

B. PEK. LANTAI
B. 1 LANTAI 1 (elevasi +0.00 s/d +4.50)
1 Granite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, Ruangan m2 536,72 TIDAK DITAWARKAN
2 Granite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, coridor dan lobby m2 352,57 -

3 Granite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, pola pada coridor dan lobby m2 249,08 -

4 Granite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, selasar m2 321,87 TIDAK DITAWARKAN
5 Granite homogenous tile 40x40 cm, setara Esenza/Granito/Niro Granite, km/wc m2 118,20 -
6 Granite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, tangga m2 55,20 -

7 Granite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, tangga entrance dan belakang m2 40,57 -

8 Stepnosing Granite Homogenous tile 8x60 cm, setara Esenza/Granito/Niro Granite, tangga dan entrance m2 146,04 -

-
B.2 LANTAI 2 (elevasi +4.50 s/d +10.50)
Lantai parkit kayu merbau ukuran 9 x 60 cm tebal 1,5 cm, setara AMSTRONG/ GRAHA
1 m2 891,25 -
PARKET/RAJAWALIPARKET
2 Granite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, Ruangan m2 155,51 TIDAK DITAWARKAN

3 Ganite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, pola lobby depan dan belakang m2 161,84 -

4 Ganite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, selasar m2 235,06 TIDAK DITAWARKAN
5 Ganite homogenous tile 40x40 cm, setara Esenza/Granito/Niro Granite, km/wc m2 118,89 -
6 Ganite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, tangga m2 72,49 -

7 Stepnosing Granite Homogenous tile 8x60 cm, setara Esenza/Granito/Niro Granite, tangga dan entrance m2 108,26 -

8 Waterproofing MU 600, setara SIKA m2 142,67 -


-
B.3 LANTAI 3 (elevasi + 10.50 s/d +21.86)
1 Screeding tebal 2 - 4 cm plat dak belakang dan selasar m2 335,40 -
2 Waterproofing membran bakar plat dak entrance, belakang dan selasar, setara SIKA m2 568,41 -
Lantai parkit kayu merbau ukuran 9 x 60 cm tebal 1,5 cm, setara AMSTRONG/ GRAHA
3 m2 82,04 -
PARKET/RAJAWALIPARKET
4 Granite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, Ruangan m2 143,80 TIDAK DITAWARKAN
5 Ganite homogenous tile 60x60 cm, setara Esenza/Granito/Niro Granite, tangga m2 11,545 -
Stepnosing tangga Granite Homogenous tile 8 x 60 cm, setara Esenza/Granito/Niro Granite, tangga dan
6 m2 22,50 -
entrance
-
Jumlah B -

C. PEK. KUSEN LENGKAP


C.1 LANTAI 1 (elevasi +0.00 s/d +4.50)
1 P1 (PM) unit 5,00 -
2 P2 (PM) unit 4,00 -
3 P3 (PA) unit 4,00 -
4 P4 (PA) unit 14,00 -
5 J1 (JA) unit 12,00 -
6 J2 (JA) unit 4,00 -
7 PS1 (JM) unit 2,00 -
8 PS2 (JM) unit 4,00 -
9 BV1 (JA) unit 6,00 -
10 BV2 (JA) unit 4,00 -

Pas. Follding Gate Hollow frame 5 x 5, meranti wood inside, multiplek 1,5 mm, glasswoll 50mm/ rokwoll,
11 Accourete sound reduce 3 mm, cotton sheet 3 mm, finishing cosglow/wallpaper/oscar/Hpl dll. (Pabrikasi), m2 24,32 TIDAK DITAWARKAN
setara WINA/LUCKY
-
C.2 LANTAI 2 (elevasi +4.50 s/d +10.50)
1 PU1 (PK) unit 1,00 -
2 PU2 (PK) unit 1,00 -
3 PU3 (PT) unit 1,00 -
4 P2 (PM) unit 8,00 -
5 P3 (PA) unit 4,00 -
6 P4 (PA) unit 18,00 -
7 J2 (JA) unit 5,00 -
8 J3 (JA) unit 2,00 -
9 J4 (JA) unit 1,00 -
10 J5 (JA) unit 2,00 -
11 J6 (JA) unit 2,00 -
12 PJ1 (PA) unit 1,00 -
13 PS1 (JM) unit 2,00 -
No. Item Pekerjaan Satuan Volume Harga Satuan Total Harga
14 PS2 (JM) unit 4,00 -
15 BV1 (JA) unit 6,00 -
16 BV2 (JA) unit 6,00 -
-
C.3 LANTAI 3 (elevasi + 10.50 s/d +21.86)
1 P2 (PM) unit 3,00 -
2 J2 (JA) unit 7,00 -
3 PJ1 (PA) unit 1,00 -
4 BV3 (JA) unit 24,00 -
-
Jumlah C -

D. PEK. PENUTUP ATAP


1 Genteng keramik glazur setara M-Class/Kanmuri/KIA m2 1.587,07 -
2 Bubungan genteng keramik glazur setara M-Class/Kanmuri/KIA m' 48,92 -
3 Alumunium foil satu muka m2 1.587,07 -
4 Lisplang GRC uk 3000x300x12 mm m' 171,24 -
5 Talang Tegak Type 1 (PVC 6" AW + cat) pada plat dak selasar lantai 1 s/d lantai 2 unit 10,00 -

6 Talang Tegak Type 2 (PVC 6" AW + cat) pada shaf lantai 1 s/d 3 plat dak atap entrance dan belakang unit 6,00 -

7 Roof drain plat dak entrance dan selasar, lantai 3 bh 16,00 -


Jumlah D -

E. PEK. PLAFOND
E.1 LANTAI 1 (elevasi +0.00 s/d +4.50)

1 Plafond Gypsum board 9 mm + rangka hollow galvalume 2/4+4/4 cm, setara JAYA BOARD/ELEPHANT m2 1.351,19 -

2 Plafond GRC board 4 mm + rangka hollow galvalume 2/4+4/4 cm, setara JAYA BOARD/ELEPHANT m2 104,59 -

3 List Plafond Gypsum, setara JAYA BOARD/ELEPHANT m' 732,94 -


4 List Plafond GRC, setara JAYA BOARD/ELEPHANT m' 106,93 -
5 Drop ceilling gypsum board t. 9 mm, setara JAYA BOARD/ELEPHANTP m' 160,80 -
-
E.2 LANTAI 2 (elevasi +4.50 s/d +10.50)

1 Plafond Gypsum board 9 mm + rangka hollow galvalume 2/4+4/4 cm, setara JAYA BOARD/ELEPHANT m2 544,73 -

2 Plafond GRC board 4 mm + rangka hollow galvalume 2/4+4/4 cm, setara JAYA BOARD/ELEPHANT m2 159,19 -

3 Drop ceilling gypsum board t. 9 mm, setara JAYA BOARD/ELEPHANT m2 28,30 -


Plafond Gypsum board 9 mm + rangka hollow galvalume 2/4+4/4 cm, setara JAYA BOARD/ELEPHANT
4 m2 86,51 -
(balkon)
5 Penutup listplang balkon bawah multiplex 9 mm + triplex 4 mm finishing HPL m2 37,04 -
6 List plafond gypsum, setara JAYA BOARD/ELEPHANT m' 437,71 -
7 List Plafond GRC, setara JAYA BOARD/ELEPHANT m' 175,41 -
8 List kayu 2x10 cm, balkon m' 56,61 -
-
E.3 LANTAI 3 (elevasi + 10.50 s/d +21.86)

1 Plafond Gypsum board 9 mm + rangka hollow galvanis 2/4+4/4 cm, setara JAYA BOARD/ELEPHANT m2 988,57 -

2 Plafond multiplex 9 mm + triplex 4 mm finishing HPL, rangka hollou galvanis, auditorium dan balkon m2 331,08 -

3 List plafond gypsum, setara JAYA BOARD/ELEPHANT m' 161,97 -


4 List kayu 2x10 cm, auditorium dan balkon m' 121,35 -
5 Drop ceilling gypsum board t. 9 mm, setara JAYA BOARD/ELEPHANT m2 160,25 -
Plafond GRC board 4 mm + rangka hollow galvanis 2/4+4/4 cm overstek, setara JAYA
6 m2 267,63 -
BOARD/ELEPHANT
7 List Plafond GRC overstek, setara JAYA BOARD/ELEPHANTP m' 193,32 -
-
Jumlah E -

F. PEK. SANITAIR
F.1 LANTAI 1
1 Closet Duduk (Flashing) Toilet Pria/Wanita, setara TOTO bh 8,00 -
2 Closet jongkok (Flashing) Toilet Pria/Wanita, setara TOTO bh 4,00 -
3 Washtafel Toilet Pria/Wanita, setara TOTO bh 12,00 -
4 Urinoar U 57 M bh 6,00 -
5 Sekat Urinoar A 100 bh 5,00 -
6 Jet Whoser + stopkran + kran air Lengkap ACC, setara TOTO bh 12,00 -
7 Kran dinding TOTO T23 B13 bh 5,00 -
8 Kran bebek TOTO T30 ARQ 13N bh 4,00 -
9 Kitchen Zink Stainless ( 1 Lobang ) unit 4,00 -
10 Meja beton m' 6,84 -
11 Cermin TOTO TS 119 AS 5 bh 4,00 -
12 Floordrain Stailes Steel, setara SUN-EI bh 20,00 -
-
No. Item Pekerjaan Satuan Volume Harga Satuan Total Harga
F.2 LANTAI 2
1 Closet Duduk (Flashing) Toilet Pria/Wanita, setara TOTO bh 10,00 -
2 Closet jongkok (Flashing) Toilet Pria/Wanita, setara TOTO bh 4,00 -
3 Washtafel Toilet Pria/Wanita, setara TOTO bh 14,00 -
4 Urinoar U 57 M bh 6,00 -
5 Sekat Urinoar A 100 bh 5,00 -
6 Jet Whoser air Lengkap ACC, setara TOTO bh 14,00 -
7 Kran bebek TOTO T30 ARQ 13N bh 4,00 -
8 Kitchen Zink Stainless ( 1 Lobang ) unit 4,00 -
9 Meja beton lapis keramik 20x20 m' 3,72 -
10 Cermin TOTO TS 119 AS 5 bh 6,00 -
11 Floordrain Stailes Steel, setara SUN-EI bh 20,00 -
12 Roof drain plat dak selasar, lantai 2 bh 10,00 -
-
Jumlah F -

G. PEK. PENGECATAN
G.1 LANTAI 1 (elevasi +0.00 s/d +4.50)
1 Cat dinding exterior dengan Weathersield, setara Dulux/Mowilex/Jotun m2 1.266,70 -
2 Cat dinding interior, setara Dulux/Mowilex/Jotun m2 1.266,70 -
3 Cat kolom exterior dengan Weathersield, setara Dulux/Mowilex/Jotun m2 210,76 -
4 Cat kolom interior, setara Dulux/Mowilex/Jotun m2 210,76 -
5 Cat balok dan listplang beton exterior dengan Weathersield, setara Dulux/Mowilex/Jotun m2 274,13 -
6 Cat plafond gypsum interior, setara Dulux/Mowilex/Jotun m2 1.351,19 -
7 Cat plafond GRC interior, setara Dulux/Mowilex/Jotun m2 104,59 -
8 Cat plafond drop ceiling interior, setara Dulux/Mowilex/Jotun m2 80,40 -
9 Cat list plafond gypsum interior, setara Dulux/Mowilex/Jotun m' 732,94 -
10 Cat list plafond GRC interior, setara Dulux/Mowilex/Jotun m' 106,93 -
-
G.2 LANTAI 2 (elevasi +4.50 s/d +10.50)
1 Cat dinding exterior dengan Weathersield, setara Dulux/Mowilex/Jotun m2 1.867,09 -
2 Cat dinding interior, setara Dulux/Mowilex/Jotun m2 800,18 -
3 Cat kolom exterior dengan Weathersield, setara Dulux/Mowilex/Jotun m2 356,24 -
4 Cat kolom interior, setara Dulux/Mowilex/Jotun m2 152,68 -
5 Cat balok dan listplang beton exterior dengan Weathersield, setara Dulux/Mowilex/Jotun m2 274,13 -
6 Cat plafond gypsum interior, setara Dulux/Mowilex/Jotun m2 631,24 -
7 Cat plafond GRC interior, setara Dulux/Mowilex/Jotun m2 159,19 -
8 Cat plafond drop ceiling interior, setara Dulux/Mowilex/Jotun m2 14,15 -
9 Cat list plafond gypsum interior, setara Dulux/Mowilex/Jotun m' 437,71 -
10 Cat list plafond GRC interior, setara Dulux/Mowilex/Jotun m' 175,41 -
11 Cat list kayu 2x10 cm balkon interior, setara Dulux/Mowilex/Jotun m2 56,61 -
-
G.3 LANTAI 3 (elevasi + 10.50 s/d +21.86)
1 Cat dinding exterior dengan Weathersield, setara Dulux/Mowilex/Jotun m2 1.305,76 -
2 Cat dinding interior, setara Dulux/Mowilex/Jotun m2 559,61 -
3 Cat kolom exterior dengan Weathersield, setara Dulux/Mowilex/Jotun m2 225,10 -
4 Cat kolom interior, setara Dulux/Mowilex/Jotun m2 96,47 -
5 Cat plafond gypsum interior, setara Dulux/Mowilex/Jotun m2 988,57 -
6 Cat plafond drop ceiling interior, setara Dulux/Mowilex/Jotun (warna gelap) m2 160,25 -
7 Cat list plafond gypsum interior, setara Dulux/Mowilex/Jotun m' 161,97 -
8 Cat list kayu 2x10 cm balkon interior, setara Dulux/Mowilex/Jotun m' 121,35 -
9 Cat plafond GRC overstek exterior dengan Weathersield, setara Dulux/Mowilex/Jotun m2 267,63 -
10 Cat List plafond GRC overstek exterior dengan Weathersield, setara Dulux/Mowilex/Jotun m' 193,32 -
-
Jumlah G -
H. PEK. FINISHING KANOPI ENTRANCE
1 Pek. ACP Kolom + rangka Hollow 40x40 Galvanis, setara ALCOPAN/MACO/SEVEN m2 90,52 -
2 Pek. ACP Kanopi + rangka Hollow 40x40 Galvanis, ALCOPAN/MACO/SEVEN m2 237,49 -
3 Pek. Finishing Kaca Tempered Penutup Kanopi; t=10mm ASAHI m2 152,53 -
4 Pek. Talang metal 30x30 colour (t= 0,75mm) poudercoating m2 14,40 -
5 Roof drain plat dak selasar, lantai 2 m2 4,00 -
-
IV PEKERJAAN MEKANIKAL

No. Item Pekerjaan Satuan Volume Harga Satuan Total Harga

A SISTEM PLUMBING

ILANTAI SATU
A - Pemipaan air bersih
- Polypropylene (PPR-Pipe) PN-16, incl. Supportt
- dia. 50 mm (2") m' 6,00 -
- dia. 42 mm (1,5") m' 16,00 -
- dia. 25 mm (1") m' 28,00 -
- dia. 15 mm (1/2") m' 110,00 -
- dia. 20 mm (3/4") m' 25,00 -
- Fitting & aksessories ls 1,00 -
- Gate valve, dia. 40 mm (1,5") bh 3,00 -
- Gate valve, dia. 50 mm (2") bh 1,00 -

B Polivinyl Chloride Pipe (PVC) AW klas 10 Kg/cm² incl. Support


- dia.150 mm (6") + pipa tegak m' 206,00 -
- dia.100 mm (4") + pipa tegak m' 95,00 -
- dia. 75 mm (3") m' 41,00 -
- dia. 65 mm (2,5") m' 18,00 -
- dia. 50 mm (2") m' 38,00 -
-Clen out dia.3" ls 4,00 -
- Fitting & aksessories ls 1,00 -

Exhoust Fans bh 12,00 -


Jenis : Mini siroco
Tipe : centrifugal inline fans
Kapasitas : 50 m3/h
Static pressure : 1,0 in.wg
Power input : 30 W

SEPTIC TANK unit 4,00 -


Tipe : Biotech / Concrete
Kapasitas : 4 M3
C/W Accessories

LANTAI SATU -
II LANTAI DUA
A - Pemipaan air bersih
- Polypropylene (PPR-Pipe) PN-20, incl. Supportt
- dia. 50 mm (2") m' 8,00 -
- dia. 42 mm (1,5") m' 19,68 -
- dia. 25 mm (1") m' 21,00 -
- dia. 15 mm (1/2") m' 110,00 -
- dia. 20 mm (3/4") m' 25,00 -
- Fitting & aksessories ls 1,00 -
- Gate valve, dia. 65 mm (2,5") bh 1,00 -

B Polivinyl Chloride Pipe (PVC) AW klas 10 Kg/cm² incl. Support


- dia.150 mm (6") m' 28,00 -
- dia.100 mm (4") m' 27,60 -
- dia. 75 mm (3") m' 30,00 -
- dia. 65 mm (2,5") m' 18,00 -
- dia. 50 mm (2") m' 53,00 -
-Clen out dia.4" ls 4,00 -
-Clen out dia.3" ls 5,00 -
-Clen out dia.2" ls 2,00 -
- Fitting & aksessories ls 1,00 -

Exhoust Fans bh 12,00 -


Jenis : Mini siroco
Tipe : centrifugal inline fans
Kapasitas : 50 m3/h
Static pressure : 1,0 in.wg
Power input : 30 W

LANTAI DUA -
No. Item Pekerjaan Satuan Volume Harga Satuan Total Harga

III LANTAI ATAP

Sistem plumbing
1 Valve & aksessories :
- Gate valve, dia. 65 mm (2 1/2") bh 6,00 -
- Gate valve, dia. 65 mm (2") bh 2,00 -
- Strainer, dia. 65 mm (2 1/2") bh 1,00 -
- WLC bh 2,00 -
2 - Tangki Piber Kap. 2 m3 & assesoris unit 8,00 -
- dia. 50 mm (2") m' 76,00 -

LANTAI ATAP -

IV Pekerjaan Pompa & Instalasi Air Bersih


1 Pengadaan dan Pemasangan Pompa Transfer type Centrifugal pump kap.346 l/m unit 2,00 -
Head 32 m H2O daya Motor 5,5 kw
- Header unit 1,00 -
- Floating Valve dia. 2" unit 1,00 -
- Tapping Pipa Suplay ls 1,00 -
- Gate Valve dia 4" bh 2,00 -
2 Gate Valve dia 2 " bh 2,00 -
3 Gate Valve dia 2,5 " bh 2,00 -
4 Check Valve dia 2" bh 1,00 -
5 Flexible Joint 2" bh 2,00 -
6 Flexible Joint 2,5" bh 2,00 -
7 Pressure Gauge bh 2,00 -
8 Pressure Switch bh 1,00 -
9 Foot Valve dia.2,5" bh 2,00 -
10 Strainner dia 2,5" bh 2,00 -
11 Elektrode water Level Kontrol WLC unit 1,00 -
12 Panel Pompa Air Bersih unit 1,00 -
13 Penarikan kabel dari Panel Pompa di r. Pompa Ke Panel Pompa Air bersih
NYY 4 x 10 mm m' 15,00 -
14 Penarikan kabel dari Panel Pompa bersih Ke Panel Pompa Transfer
NYY 4 x 10 mm m' 8,00 -
15 Penarikan kabel dari Panel Pompa bersih Ke Pompa Transfer
NYY 2 x 4 x 4 mm m' 20,00 -
16 Penarikan kabel dari Panel Pompa bersih Ke Water Level Control
NYY 4 x 2,5 mm m' 65,00 -
Pekerjaan Instalasi Air Bersih
dia. 50 mm (2") High density polyethylene, HDPEdiameter 2"
- dia. 2" m' 165,00 -

17 Fitting dan Alat bantu ls 1,00 -

TOTAL PEK. POMPA -

V TESTING COMISSIONING lot 1,00 -

TOTAL PEK. PLUMBING -


No. Item Pekerjaan Satuan Volume Harga Satuan Total Harga

B SISTEM TATA UDARA

I SISTEM TATA UDARA LT. SATU


A Pengadaan dan Pemasangan Peralatan Utama
Unit AC VRV System dan Ventilasi
1 Pengadaan dan Pemasangan IU VRV Wall Mounted Type unit 13,00 TIDAK DITAWARKAN
Kap.18.000 BTUH
2 Pengadaan dan Pemasangan IU VRV Wall Mounted Type unit 2,00 TIDAK DITAWARKAN
Kap.13.500 BTUH
3 Pengadaan dan Pemasangan OU VRV Lt 1 unit 2,00 TIDAK DITAWARKAN
Kap. 225.000 BTUH (7.500 cfm) (Cadangan 1 unit)
4 Pengadaan dan pemasangan pipa Refrigran dari indoor unit m' 105,00 TIDAK DITAWARKAN
ke Out door unit dengan ukuran pipa 5/8 + 11/8 lengkap dengan Isolasi
5 Pengadaan dan Pemasangan Refnet bh 12,00 TIDAK DITAWARKAN
6 Pengadaan dan pemasangan thermostat control bh 5,00 TIDAK DITAWARKAN
7 Instalasi kabel thermostat dengan ukuran 3x2.5mm dalam pipa ttk 5,00 TIDAK DITAWARKAN
conduit high impact
8 Pengadaan dan pemasangan kabel Split Control dari ttk 5,00 TIDAK DITAWARKAN
Out door ke In door Unit dengan kabel NYM 3 x 2,5 mm2
9 Peralatan bantu ls 1,00 TIDAK DITAWARKAN

SISTEM TATA UDARA LT. SATU -

II SISTEM TATA UDARA LT. DUA


A Pengadaan dan Pemasangan Peralatan Utama
Unit AC VRV System dan Ventilasi
1 Pengadaan dan Pemasangan IU VRV Split Cassette Type unit 10,00 TIDAK DITAWARKAN
Kap.47.000 BTUH
2 Pengadaan dan Pemasangan IU VRV Wall Mounted Type unit 3,00 TIDAK DITAWARKAN
Kap.18.000 BTUH
3 Pengadaan dan Pemasangan IU VRV Wall Mounted Type unit 2,00 TIDAK DITAWARKAN
Kapasitas : 7.200 Btuh
4 Pengadaan dan Pemasangan OU VRV Lt 2 unit 2,00 TIDAK DITAWARKAN
Kap. 398.000 BTUH (13.250 cfm) (Cadangan 1 unit)
5 Pengadaan dan Pemasangan OU VRV Lt 2 unit 2,00 TIDAK DITAWARKAN
Kap. 141.000 BTUH (4.700 cfm) (Cadangan 1 unit)
6 Pengadaan dan pemasangan pipa Refrigran dari indoor unit m' 150,00 TIDAK DITAWARKAN
ke Out door unit dengan ukuran pipa 5/8 + 11/8 lengkap dengan Isolasi
7 Pengadaan dan Pemasangan Refnet bh 12,00 TIDAK DITAWARKAN
8 Pengadaan dan pemasangan thermostat control bh 6,00 TIDAK DITAWARKAN
9 Instalasi kabel thermostat dengan ukuran 3x2.5mm dalam pipa ttk 6,00 TIDAK DITAWARKAN
conduit high impact
10 Pengadaan dan pemasangan kabel Split Control dari ttk 15,00 TIDAK DITAWARKAN
Out door ke In door Unit dengan kabel NYM 3 x 2,5 mm2
11 Peralatan bantu ls 1,00 TIDAK DITAWARKAN

SISTEM TATA UDARA LT. DUA -

III SISTEM TATA UDARA LT. TIGA


A Pengadaan dan Pemasangan Peralatan Utama
Unit AC VRV System dan Ventilasi
1 Pengadaan dan Pemasangan IU VRV Wall Mounted Type unit 1,00 TIDAK DITAWARKAN
Kap.18.000 BTUH
2 Pengadaan dan Pemasangan IU VRV Wall Mounted Type unit 1,00 TIDAK DITAWARKAN
Kap.10.800 BTUH (R. M. LIFT)
3 Pengadaan dan Pemasangan IU VRV Split Cassette Type unit 3,00 TIDAK DITAWARKAN
Kap.47.000 BTUH
4 Pengadaan dan Pemasangan OU VRV Lt 2 unit 1,00 TIDAK DITAWARKAN
Kap. 215.000 BTUH (7.250 cfm) (Cadangan 1 unit)
5 Pengadaan dan pemasangan pipa Refrigran dari indoor unit m' 42,00 TIDAK DITAWARKAN
ke Out door unit dengan ukuran pipa 5/8 + 11/8 lengkap dengan Isolasi
6 Pengadaan dan Pemasangan Refnet bh 3,00 TIDAK DITAWARKAN
7 Pengadaan dan pemasangan thermostat control bh 2,00 TIDAK DITAWARKAN
8 Instalasi kabel thermostat dengan ukuran 3x2.5mm dalam pipa ttk 2,00 TIDAK DITAWARKAN
conduit high impact
9 Pengadaan dan pemasangan kabel Split Control dari ttk 2,00 TIDAK DITAWARKAN
Out door ke In door Unit dengan kabel NYM 3 x 2,5 mm2
10 Peralatan bantu ls 1,00 TIDAK DITAWARKAN

SISTEM TATA UDARA LT. TIGA -

IV TESTING KOMISIONING ls 1,00 TIDAK DITAWARKAN

Total Pekerjaan VAC


V PEKERJAAN FIRE FIGHTING

No. Item Pekerjaan Satuan Volume Harga Satuan Total Harga

I A PEKERJAAN INSTALASI HYDRANT LT. SATU


Pemipaan
Black Steel Pipe (BSP) sch 40, termasuk galian & timbunan
- dia.100 mm (4") m' 76,00 TIDAK DITAWARKAN
- dia.65 mm (2,5") m' 23,00 TIDAK DITAWARKAN
- Fitting & aksessories ls 1,00 TIDAK DITAWARKAN
Valve :
- Gate valve, dia.100 mm (4") bh 1,00 TIDAK DITAWARKAN
- Check valve, dia.100 mm (4") bh 1,00 TIDAK DITAWARKAN
- Gate valve, dia.50 mm (2,5") bh 2,00 TIDAK DITAWARKAN
- Check valve, dia.50 mm (2,5") bh 2,00 TIDAK DITAWARKAN
Isolasi Anti karat Pipa Hydrant dengan Wraping Tape ls 1,00 TIDAK DITAWARKAN
Hydrant box (tipe indoor), berikut hose & nozzle unit 2,00 TIDAK DITAWARKAN
FE, tipe ABC Dry Chemical
- Kapasitas : 6 kg bh 3,00 TIDAK DITAWARKAN
Box valve
- Box valve + tutup (cash iron ) unit 3,00 TIDAK DITAWARKAN
Testing & commissioning ls 1,00 TIDAK DITAWARKAN

LANTAI SATU -

II PEKERJAAN INSTALASI HYDRANT LT. DUA


Pemipaan
Black Steel Pipe (BSP) sch 40, termasuk galian & timbunan
- dia.65 mm (2,5") m' 22,00 TIDAK DITAWARKAN
- Fitting & aksessories ls 1,00 TIDAK DITAWARKAN
Valve :
- Gate valve, dia.100 mm (4") bh 1,00 TIDAK DITAWARKAN
- Check valve, dia.100 mm (4") bh 1,00 TIDAK DITAWARKAN
- Gate valve, dia.50 mm (2,5") bh 2,00 TIDAK DITAWARKAN
- Check valve, dia.50 mm (2,5") bh 2,00 TIDAK DITAWARKAN
Isolasi Anti karat Pipa Hydrant dengan Wraping Tape ls 1,00 TIDAK DITAWARKAN
Hydrant box (tipe indoor), berikut hose & nozzle unit 2,00 TIDAK DITAWARKAN
FE, tipe ABC Dry Chemical
- Kapasitas : 6 kg bh 3,00 TIDAK DITAWARKAN
Testing & commissioning ls 1,00 TIDAK DITAWARKAN
LANTAI DUA -

III PEKERJAAN INSTALASI HYDRANT LT. TIGA


Pemipaan
Black Steel Pipe (BSP) sch 40, termasuk galian & timbunan
- dia.65 mm (2,5") m' 14,00 TIDAK DITAWARKAN
- Fitting & aksessories ls 1,00 TIDAK DITAWARKAN
Valve :
- Gate valve, dia.50 mm (2,5") bh 1,00 TIDAK DITAWARKAN
- Check valve, dia.50 mm (2,5") bh 1,00 TIDAK DITAWARKAN
Isolasi Anti karat Pipa Hydrant dengan Wraping Tape ls 1,00 TIDAK DITAWARKAN
Hydrant box (tipe indoor), berikut hose & nozzle unit 2,00 TIDAK DITAWARKAN
FE, tipe ABC Dry Chemical
- Kapasitas : 6 kg bh 2,00 TIDAK DITAWARKAN
Testing & commissioning ls 1,00 TIDAK DITAWARKAN

LANTAI TIGA -

TOTAL PEK. HYDRANT -


VI PEKERJAAN ELEKTRIKAL

No. Uraian Pekerjaan Satuan Volume Harga Satuan Total Harga

I PANEL - PANEL

1 Pengadaan dan Pemasangan Panel TR unit 1,00 -


2 P-SDP LT.I unit 1,00 -
3 P-LP/PP.LT.1 unit 1,00 -
4 P-LP/PP.LT.2 unit 1,00 -
5 P-LP/PP.LT.3A unit 1,00 -
6 P-LP/PP.LT.3 unit 1,00 -

7 P-PP.AC.LT.1 unit 1,00 -


8 P-PP.AC.LT.2 unit 1,00 -
9 P-PP.AC.LT.3 unit 1,00 -
10 P-PP.AC.Outdoor Unit unit 1,00 -
SUB TOTAL I -

II Feeder Kabel
Pengadaan dan Instalasi kabel feeder lengkap dengan
kabel ties, gland serta accessories yang di perlukan

A Dari P.SDP ke :
1 P-LVMDP ,Kabel NYFGBY 4 x 300 mm2 m 195,00 -

B Dari P.SDP LT.1 ke :


1 P-LP/PP.LT.1 Kabel NYY 4 x 6 mm2 + BC 6 mm2 m 6,00 -
2 P-PP.AC. LT.1 Kabel NYY 4 x 10 mm2 + BC 10 mm2 m 8,00 -

C Dari P.SDP LT.1 ke :


1 P-LP/PP.LT.2 , Kabel NYY 4 x 6 mm2 + BC 6 mm2 m 14,00 -
2 P-PP.AC.LT.2, Kabel NYY 4 x 50 mm2 + BC 50 mm2 m 16,00 -

D Dari P.SDP LT.1 ke :


1 P-LP/PP LT.3 , Kabel NYY 3 x 4 mm2 + BC 10 mm2 m 22,00 -
2 P-LP/PP.LT.2 , Kabel NYY 4 x 6 mm2 + BC 6 mm2 m 22,00 -
3 P-PP.AC.LT.3, Kabel NYY 4 x 10 mm2 + BC 50 mm2 m 24,00 -

E Dari P.SDP LT.1 ke :


P-PP.AC.Outdor unit ,LT.Atap Kabel NYY 4 x 70 mm2 + BC 50 mm2 m 35,00 -

SUB TOTAL -

III Kabel Ladder

- 400 x100 LT.1 m 3,00 -


- 400 x100 LT.2 m 3,00 -
- 400 x100 LT.3 m 3,00 -

SUB TOTAL -

IV Kabel Tray

- 400 x100 Lt.1 m 39,00 -


- 400 x100 Lt.2 m 70,00 -
- 400 x100 Lt.3 m 23,00 -

SUB TOTAL -

V Instalasi Penerangan dan kotak-kontak


LANTAI SATU

1 Downlight COB Natural Lampu LED [10 W] bh 81,00 -


2 Lampu Baret LED16 Watt bh 28,00 -
3 Lampu TL LED 2 x 20 Watt,TKI-Mirror bh 69,00 -
4 Lampu TL T.8 LED 18 Watt, bh 74,00 -
No. Uraian Pekerjaan Satuan Volume Harga Satuan Total Harga

5 Saklar Tunggal bh 18,00 -


6 Saklar Ganda bh 22,00 -
7 Saklar Hotel bh 2,00 -

8 Kotak Kontak Dinding ± 30 cm 1P (10 A ) bh 32,00 -


9 Instalasi lampu kabel NYM 3 x 2.5 mm2 in PVC HI ttk 252,00 -
conduit Ø 20 mm
10 Instalasi saklar kabel NYM 3 x 2.5 mm2 in PVC HI ttk 42,00 -
conduit Ø 20 mm
11 Instalasi kotak-kontak 1P kabel NYM 3 x 2.5 mm2 ttk 32,00 -
in PVC HI conduit Ø 20 mm
12 Material Bantu lot 1,00 -
SUB TOTAL -
VI Instalasi Penerangan dan kotak-kontak
LANTAI DUA

1 Lampu Baret LED16 Watt bh 37,00 -


2 Lampu TL LED 2 x 20 Watt,TKI-Mirror bh 6,00 -
3 Lampu DL -LED 18 Watt bh 62,00 -
4 Saklar Tunggal bh 26,00 -
5 Saklar Ganda bh 13,00 -
6 Saklar Hotel bh 2,00 -
7 Kotak Kontak Dinding ± 30 cm 1P (10 A) bh 36,00 -
8 Instalasi lampu kabel NYM 3 x 2.5 mm2 ttk 105,00 -
in PVC HI conduit Ø 20 mm
9 Instalasi saklar dan Grid Switch kabel NYM 3 x 2.5 mm2 ttk 41,00 -
in PVC HI conduit Ø 20 mm
10 Instalasi kotak-kontak 1P kabel NYM 3 x 2.5 mm2 ttk 36,00 -
in PVC HI conduit Ø 20 mm
11 Material Bantu lot 1,00 -
SUB TOTAL -

VII Instalasi Penerangan dan kotak-kontak


LANTAI TIGA

1 Lampu DL - LED 18 Watt bh 177,00 -


2 Lampu Spotlight dipanggung -LED 25 Watt bh 39,00 -
3 Lampu TL T.8 LED 18 Watt, di dinding tiang kolom bh 174,00 -
4 Lampu Baret 18 Watt bh 1,00 -
5 Lampu RMI 2 X 36 Watt bh 8,00 -
6 Lampu DL - PLC 18 Watt bh 17,00 -
7 Saklar Tunggal bh 1,00 -
8 Saklar Ganda bh 3,00 -
9 Saklar Hotel bh 1,00 -
10 Saklar Group 10 Group bh 5,00 -
11 Kotak Kontak Dinding ± 30 cm 1P (10 A) bh 3,00 -
12 Instalasi lampu kabel NYM 3 x 2.5 mm2 ttk 416,00 -
in PVC HI conduit Ø 20 mm
13 Instalasi saklar dan Grid Switch kabel NYM 3 x 2.5 mm2 ttk 10,00 -
in PVC HI conduit Ø 20 mm
14 Instalasi kotak-kontak 1P kabel NYM 3 x 2.5 mm2 ttk 3,00 -
in PVC HI conduit Ø 20 mm
15 Material Bantu lot 1,00 -
SUB TOTAL -
No. Uraian Pekerjaan Satuan Volume Harga Satuan Total Harga
VIII Instalasi Penerangan dan kotak-kontak
LANTAI R. MESIN LIFT
1 Lampu Baret 18 Watt bh 3,00 -
2 Saklar Ganda bh 1,00 -
3 Saklar Hotel bh 1,00 -
4 Panel LP/PP. R. M. Lift bh 1,00 -
5 Kotak Kontak Dinding ± 30 cm 1P (10 A) bh 2,00 -
6 Instalasi lampu kabel NYM 3 x 2.5 mm2 ttk 3,00 -
in PVC HI conduit Ø 20 mm
7 Instalasi saklar dan Grid Switch kabel NYM 3 x 2.5 mm2 ttk 2,00 -
in PVC HI conduit Ø 20 mm
8 Instalasi kotak-kontak 1P kabel NYM 3 x 2.5 mm2 ttk 2,00 -
in PVC HI conduit Ø 20 mm
9 Material Bantu lot 1,00 -
SUB TOTAL -
IX PeK. Penangkal Petir
Electrostatic System dengan proteksi radius 110 meter, termasuk pipa galv. Dia. 1
- 1/4" dengan tinggi 4 Meter dan support, klem dan alat bantu lainnya sesuai gambar Unit 1,00 -
dan spesifikasi

- Obstruction Lamp 100 W bh 1,00 -

- Instalasi Obstruction light 100 W ttk 1,00 -

- NYY 70 mm2 , termasuk klem, pipa PVC dan alat bantu lainnya m 43,00 -

- Bak Kontrol 400 x 300, termasuk pentanahan (Spitz tembaga) maks. 3 ohm unit 1,00 -

- Pentanahan Ls 1,00 -

- Box Test Ls 1,00 -

SUB TOTAL -

SUB TOTAL ELECTRICAL -


VII PEKERJAAN GENSET

No. Uraian Pekerjaan Satuan Volume Harga Satuan Total Harga

PEKERJAAN GENERATOR SET


I Generator Set (Baru)
1 Unit Diesel Genset unit 1,00 TIDAK DITAWARKAN
- Generator Prime Power 200 KVA
- 0,8 pf,380 V,3 Phase,1.500 RPM
- Silent Type c/w accessories
- Panel AC/DC
- Oily Tangki Kap.1000 Litter
- Batterai 4 pcs
- COC
- Manual Book
- Tool Kit Standards

II PEKERJAAN DISTRIBUSI/INSTALASI GENSET DAN PANEL

1 Distribusi kabel Genset


a Pek. Pengadaan dan Pemasangan Kabel dari Panel PKG 200 kva Ke m' 150,00 TIDAK DITAWARKAN
Panel SDP NYFGBY 2x(4X 150 MM )
b Penarikan/gelar kabel kontrol dari Panel ATS ke kontrol panel genset m' 150,00 TIDAK DITAWARKAN
Panel Genset NYY 4 x 2,5 mm

III PEKERJAAN PENUNJANG GENSET


1 Pek.Pengadaan dan Pemasangan Tangki Mingguan 5000 lt berikut dudukan konstruksi sipil ls 1,00 TIDAK DITAWARKAN
2 Pek Pengadaan Hand Pump Solar dia 1" 1 bh lot 1,00 TIDAK DITAWARKAN
3 Pek Pengadaan motor Pump Solar dia 1" 1 bh lot 1,00 TIDAK DITAWARKAN
4 Instalasi pipa bahan bakar lot 1,00 TIDAK DITAWARKAN
5 Saringan Solar pcs 1,00 TIDAK DITAWARKAN
6 Setting, leveling and loading genset 200 KVA pcs 1,00 TIDAK DITAWARKAN
7 Pabrikasi dudukan tangki Harian lot 1,00 TIDAK DITAWARKAN
8 BBM 3000 liter ( untuk Genset ) ltr 3.000,00 TIDAK DITAWARKAN
9 Pembuatan Jalur kabel 10 m' m' 10,00 TIDAK DITAWARKAN
10 Testing & Commissioning lot 1,00 TIDAK DITAWARKAN

SUB TOTAL I -
VIII PEKERJAAN ELEKTRONIK

No. Uraian Pekerjaan Satuan Volume Harga Satuan Total Harga

A. FIRE ALARM

CATATAN HARGA (PRICING NOTES)

I Pengadaan, Pemasangan dan Pengetesan Peralatan dan Instalasi

A Peralatan Utama
1 - MCP-FA 1 Loops 20 Points Semi Addressable Unit 1,00 TIDAK DITAWARKAN
2 - Panel Annunciator Unit 1,00 TIDAK DITAWARKAN
3 - Surge Arester + Rectifier + Battery Unit 1,00 TIDAK DITAWARKAN

Peralatan Utama -

B Kabel NYY 2 x 2,5 mm2 in PVC HI Conduit Φ 20 mm dari MCP-FA ke :


1 Alarm Bell (Provisional) m 98,00 TIDAK DITAWARKAN
2 Manual Break Glass Push Button (Provisional) m 98,00 TIDAK DITAWARKAN
3 Sirine (Provisional) m 98,00 TIDAK DITAWARKAN
4 Fire Man Telephone (Provisional) m 98,00 TIDAK DITAWARKAN
5 Sound System m 98,00 TIDAK DITAWARKAN
6 Fire Brigade (Provisional) m 98,00 TIDAK DITAWARKAN
7 Kabel Shield Twisted AWG 1Pairs dari MCP-FA ke TB-FA Lt. 1 m 8,00 TIDAK DITAWARKAN
8 Kabel Shield Twisted AWG 1 Pairs dari MCP-FA ke TB-FA Lt. 2 m 35,00 TIDAK DITAWARKAN
9 Grounding System ls 1,00 TIDAK DITAWARKAN

Kabel NYY 2 x 2,5 mm2 in PVC HI Conduit Φ 20 mm dari MCP-FA ke : -

C EQUIPMENT DAN INSTALASINYA


I LANTAI SATU
1 - TB - FA 10 Pairs Bh 1,00 TIDAK DITAWARKAN
2 - Smoke Detector Bh 1,00 TIDAK DITAWARKAN
3 - ROR Heat Detector c/w LED Bh 14,00 TIDAK DITAWARKAN
4 - Manual Break Glass Push Button Bh 2,00 TIDAK DITAWARKAN
5 - Alarm Bell + Indicator Lamp Bh 2,00 TIDAK DITAWARKAN
6 - Jack Intercom Bh 2,00 TIDAK DITAWARKAN
7 - End of Line Bh 2,00 TIDAK DITAWARKAN
8 - NYA 2 x 1,5 mm2 + PVC HI Con. Φ 20 mm ke Detector Ttk 15,00 TIDAK DITAWARKAN
9 - NYA 2 x 1,5 mm2 + PVC HI Condt Φ 20 mm ke Mnl P. Btn, I. lamp, Bell Ttk 2,00 TIDAK DITAWARKAN
10 - ITC 2 x 2 x 0.6 mm2 + PVC HI Condt Φ 20 mm keJack Intercom. Ttk 2,00 TIDAK DITAWARKAN
11 - NYA 2 x 1,5 mm2 + PVC HI Condt Φ 20 mm ke Flow Switch Ttk 2,00 TIDAK DITAWARKAN

LANTAI SATU -

II LANTAI DUA
1 - TB - FA 10 Pairs Bh 1,00 TIDAK DITAWARKAN
2 - Smoke Detector Bh 1,00 TIDAK DITAWARKAN
3 - ROR Heat Detector c/w LED Bh 14,00 TIDAK DITAWARKAN
4 - Manual Break Glass Push Button Bh 2,00 TIDAK DITAWARKAN
5 - Alarm Bell + Indicator Lamp Bh 2,00 TIDAK DITAWARKAN
6 - Jack Intercom Bh 2,00 TIDAK DITAWARKAN
7 - End of Line Bh 2,00 TIDAK DITAWARKAN
8 - NYA 2 x 1,5 mm2 + PVC HI Con. Φ 20 mm ke Detector Ttk 15,00 TIDAK DITAWARKAN
9 - NYA 2 x 1,5 mm2 + PVC HI Condt Φ 20 mm ke Mnl P. Btn, I. lamp, Bell Ttk 3,00 TIDAK DITAWARKAN
10 - ITC 2 x 2 x 0.6 mm2 + PVC HI Condt Φ 20 mm keJack Intercom. Ttk 3,00 TIDAK DITAWARKAN
11 - NYA 2 x 1,5 mm2 + PVC HI Condt Φ 20 mm ke Flow Switch Ttk 3,00 TIDAK DITAWARKAN

LANTAI DUA -
No. Uraian Pekerjaan Satuan Volume Harga Satuan Total Harga

III LANTAI TIGA


1 - TB - FA 10 Pairs Bh 1,00 TIDAK DITAWARKAN
2 - Smoke Detector Bh 3,00 TIDAK DITAWARKAN
3 - ROR Heat Detector c/w LED Bh 2,00 TIDAK DITAWARKAN
4 - Manual Break Glass Push Button Bh 1,00 TIDAK DITAWARKAN
5 - Alarm Bell + Indicator Lamp Bh 1,00 TIDAK DITAWARKAN
6 - Jack Intercom Bh 1,00 TIDAK DITAWARKAN
7 - End of Line Bh 1,00 TIDAK DITAWARKAN
8 - NYA 2 x 1,5 mm2 + PVC HI Con. Φ 20 mm ke Detector Ttk 2,00 TIDAK DITAWARKAN
9 - NYA 2 x 1,5 mm2 + PVC HI Condt Φ 20 mm ke Mnl P. Btn, I. lamp, Bell Ttk 1,00 TIDAK DITAWARKAN
10 - ITC 2 x 2 x 0.6 mm2 + PVC HI Condt Φ 20 mm keJack Intercom. Ttk 1,00 TIDAK DITAWARKAN
11 - NYA 2 x 1,5 mm2 + PVC HI Condt Φ 20 mm ke Flow Switch Ttk 1,00 TIDAK DITAWARKAN

LANTAI TIGA -

D - Testing & Commisioning Ls 1,00 TIDAK DITAWARKAN

TOTAL PEK. FIRE ALARM


No. Uraian Pekerjaan Satuan Volume Harga Satuan Total Harga

B. TATA SUARA (SOUND SYSTEM)

A PAGING SYSTEM
1 Mic Emergency unit 1,00 TIDAK DITAWARKAN
2 Mic Paging unit 1,00 TIDAK DITAWARKAN
3 Power Amp 2 x 240 Watt unit 1,00 TIDAK DITAWARKAN
4 Mixer Pre - Amp unit 1,00 TIDAK DITAWARKAN
5 Equalizer unit 1,00 TIDAK DITAWARKAN
6 Zone Selector unit 1,00 TIDAK DITAWARKAN
7 Sirene unit 1,00 TIDAK DITAWARKAN
8 Radio Tunner AM / FM unit 1,00 TIDAK DITAWARKAN
9 CD Player unit 1,00 TIDAK DITAWARKAN
10 Battery Back Up 4 Jam unit 1,00 TIDAK DITAWARKAN
11 Rack Kabinet unit 1,00 TIDAK DITAWARKAN
12 MDF - SS unit 1,00 TIDAK DITAWARKAN
13 Grounding lot 1,00 TIDAK DITAWARKAN

PAGING SYSTEM -

B CAR CALL SYSTEM


1 Mic Paging unit 1,00 TIDAK DITAWARKAN
2 Mixer Pre - Amp unit 1,00 TIDAK DITAWARKAN
3 Power Amplifier 120 W + 60 Watt unit 1,00 TIDAK DITAWARKAN
4 Rack Kabinet unit 1,00 TIDAK DITAWARKAN
5 TBCC unit 1,00 TIDAK DITAWARKAN
6 Horn Speaker 15 Watt bh 6,00 TIDAK DITAWARKAN

CAR CALL SYSTEM -

C LANTAI SATU
1 TBSS-B1 unit 1,00 TIDAK DITAWARKAN
2 Ceiling Speaker 3 watt unit 23,00 TIDAK DITAWARKAN
3 Volume Control unit 4,00 TIDAK DITAWARKAN
4 Coulum Speaker 15 Watt unit 4,00 TIDAK DITAWARKAN

KABEL INSTALASI
1 NYMHY 5 x 1,5 mm2 dari MDF - SS Ke TBSS - B1 m 25,00 TIDAK DITAWARKAN
2 NYMHY 2 x 1,5 mm2 + Conduit dia 20 mm2 dari TBSS - BS Ke titik 23,00 TIDAK DITAWARKAN
Ceiling Speaker
3 NYMHY 3 x 1,5 mm2 + Conduit dia 20 mm2 ke Volume Control titik 4,00 TIDAK DITAWARKAN
4 Material Bantu lot 1,00 TIDAK DITAWARKAN

LANTAI SATU -
D LANTAI DUA

1 TBSS - 1B unit 1,00 TIDAK DITAWARKAN


2 Ceiling Speaker 3 watt unit 5,00 TIDAK DITAWARKAN
3 Volume Control unit 5,00 TIDAK DITAWARKAN
4 Ceiling Coulum Speaker 25 watt unit 4,00 TIDAK DITAWARKAN

KABEL INSTALASI
1 NYMHY 5 x 1,5 mm2 dari MDF - SS Ke TBSS - 1B m 35,00 TIDAK DITAWARKAN
4 NYMHY 2 x 1,5 mm2 + Conduit dia 20 mm2 dari titik 5,00 TIDAK DITAWARKAN
TBSS - 1A, Ke Speaker
5 NYMHY 3 x 1,5 mm2 + Conduit dia 20 mm2 ke Volume Control titik 5,00 TIDAK DITAWARKAN
6 Material Bantu lot 1,00 TIDAK DITAWARKAN

LANTAI DUA -
No. Uraian Pekerjaan Satuan Volume Harga Satuan Total Harga
E LANTAI TIGA

1 TBSS - 1B unit 1,00 TIDAK DITAWARKAN


2 Ceiling Speaker 3 watt unit 2,00 TIDAK DITAWARKAN
3 Volume Control unit 1,00 TIDAK DITAWARKAN

KABEL INSTALASI
1 NYMHY 5 x 1,5 mm2 dari MDF - SS Ke TBSS - 1B m 45,00 TIDAK DITAWARKAN
4 NYMHY 2 x 1,5 mm2 + Conduit dia 20 mm2 dari titik 2,00 TIDAK DITAWARKAN
TBSS - 1A, Ke Speaker
5 NYMHY 3 x 1,5 mm2 + Conduit dia 20 mm2 ke Volume Control titik 1,00 TIDAK DITAWARKAN
6 Material Bantu lot 1,00 TIDAK DITAWARKAN

LANTAI TIGA -

F Testing & Commisioning lot 1,00 TIDAK DITAWARKAN

TOTAL TATA SUARA (SOUND SYSTEM)


No. Uraian Pekerjaan Satuan Volume Harga Satuan Total Harga

C. SISTEM TELPON

I Telepon Lantai 1
Peralatan dan Instalasi Telepon
1 Peralatan dan Instalasi Telepon set 1,00 TIDAK DITAWARKAN
Key Telepon / PBX
Kapasitas instalasi :
- 6 line CO
- 4 digital extension
- 48 line analog
MDF 40 pairs
2 Attendant console
- Headset operator console bh 1,00 TIDAK DITAWARKAN
- DSS Console bh 1,00 TIDAK DITAWARKAN
3 Handset telepon analog bh 5,00 TIDAK DITAWARKAN
4 Handset telepon digital bh 1,00 TIDAK DITAWARKAN
5 Instalasi peralatan ke MDF lot 1,00 TIDAK DITAWARKAN
6 Oulet telepon bh 6,00 TIDAK DITAWARKAN
7 Instalasi telepon dalam conduit ttk 6,00 TIDAK DITAWARKAN
- Instalasi Kabel ITC 10 Pairs ke luar bangunan m' 50,00 TIDAK DITAWARKAN
Telepon Lantai 1 -

II Telepon Lantai 2
Peralatan dan Instalasi Telepon
1 Handset telepon analog bh 1,00 TIDAK DITAWARKAN
2 Oulet telepon bh 1,00 TIDAK DITAWARKAN
3 Instalasi telepon + PVC ttk 1,00 TIDAK DITAWARKAN
Telepon Lantai 2 -

III Telepon Lantai 3


Peralatan dan Instalasi Telepon
1 Handset telepon analog bh 1,00 TIDAK DITAWARKAN
3 Oulet telepon bh 1,00 TIDAK DITAWARKAN
4 Instalasi telepon + PVC ttk 1,00 TIDAK DITAWARKAN
Telepon Lantai 2 -
IV Telepon R. MESIN LIFT
Peralatan dan Instalasi Telepon
1 Handset telepon analog bh 1,00 TIDAK DITAWARKAN
3 Oulet telepon bh 1,00 TIDAK DITAWARKAN
4 Instalasi telepon + PVC ttk 1,00 TIDAK DITAWARKAN
Telepon R. MESIN LIFT -

V Testing & Commisioning lot 1,00 TIDAK DITAWARKAN

TOTAL SISTEM TELEPON


No. Uraian Pekerjaan Satuan Volume Harga Satuan Total Harga

D. SISTEM DATA

I IT Lantai 1
Instalasi IT/Data
1 Outlet data cat 5 bh 5,00 TIDAK DITAWARKAN
2 Instalasi cable UTP cat 6 + PVC ttk 5,00 TIDAK DITAWARKAN
3 Switch Hub 24 Port Unmanageble bh 1,00 TIDAK DITAWARKAN
4 Instalasi Kabel Backbone UTP Cat. 6 m' 36,00 TIDAK DITAWARKAN
IT Lantai 1 -

II IT Lantai 2
Instalasi IT/Data
1 Outlet data cat 5 bh 2,00 TIDAK DITAWARKAN
2 Instalasi cable UTP cat 6 + PVC ttk 2,00 TIDAK DITAWARKAN
3 Instalasi Kabel Backbone UTP Cat. 6 m' 48,00 TIDAK DITAWARKAN
IT Lantai 2 -

III IT Lantai 3
Instalasi IT/Data
1 Outlet data cat 5 bh 1,00 TIDAK DITAWARKAN
2 Instalasi cable UTP cat 6 + PVC ttk 1,00 TIDAK DITAWARKAN
3 Instalasi Kabel Backbone UTP Cat. 6 m' 60,00 TIDAK DITAWARKAN
IT Lantai 3 -

IV Testing & Commisioning lot 1,00 TIDAK DITAWARKAN

TOTAL SISTEM DATA


No. Uraian Pekerjaan Satuan Volume Harga Satuan Total Harga

E. SISTEM CCTV

I Peralatan Utama
Peralatan Utama CCTV
- DVR 16 Chanel, 2 TB set 1,00 TIDAK DITAWARKAN
- LCD Color monitor 20" (Multi screen ) set 1,00 TIDAK DITAWARKAN
SISTEM CCTV -

II CCTV Lantai 1
Instalasi CCTV
1 Indoor Dome Camera set 4,00 TIDAK DITAWARKAN
Image device 1/4" CCD, High resolu-
tion, sensitivity 0,33 lux ( day mode )
- 360⁰ Pan, -5⁰ ke 90⁰ Tilt
- 12x zoom digital
- 26x zoom lens optical (3,5mm-91mm)
- Speed 120⁰ / detik
- 3.9 - 46 mm Varivocal Lens
Instalasi + PVC :
a. Instalasi kabel coaxial RG 59 ttk 4,00 TIDAK DITAWARKAN
b. Instalasi power NYM 3 x 1,5 mm2 ttk 4,00 TIDAK DITAWARKAN
c. Instalasi kabel kontrol Twisted ttk 4,00 TIDAK DITAWARKAN
shielded (STP)
2 Fixed camera 15" bit set 2,00 TIDAK DITAWARKAN
- 1/3" High Resolution Day/nith
High Resolution 530 TV Lines
Instalasi + PVC :
a. Instalasi kabel coaxial RG 59 ttk 2,00 TIDAK DITAWARKAN
b. Instalasi power NYMHY 3 x 1,5 mm2 ttk 2,00 TIDAK DITAWARKAN
CCTV Lantai 1 -

III CCTV Lantai 2


Instalasi CCTV
1 Indoor Dome Camera set 5,00 TIDAK DITAWARKAN
Image device 1/4" CCD, High resolution
- 360⁰ Pan, -5⁰
- 12x zoom digital
- 26x zoom lens optical (3,5mm-91mm)
- 3.9 - 46 mm Varivocal Lens
Instalasi + PVC :
a. Instalasi kabel coaxial RG 59 ttk 5,00 TIDAK DITAWARKAN
b. Instalasi power NYMHY 3 x 1,5 mm2 ttk 5,00 TIDAK DITAWARKAN
c. Instalasi kabel kontrol Twisted ttk 5,00 TIDAK DITAWARKAN
shielded (STP)
CCTV Lantai 2 -

IV CCTV Lantai 3
Instalasi CCTV
1 Indoor Dome Camera set 1,00 TIDAK DITAWARKAN
Image device 1/4" CCD, High resolution
- 360⁰ Pan, -5⁰
- 12x zoom digital
- 26x zoom lens optical (3,5mm-91mm)
- 3.9 - 46 mm Varivocal Lens
Instalasi + PVC :
a. Instalasi kabel coaxial RG 59 ttk 1,00 TIDAK DITAWARKAN
b. Instalasi power NYMHY 3 x 1,5 mm2 ttk 1,00 TIDAK DITAWARKAN
c. Instalasi kabel kontrol Twisted ttk 1,00 TIDAK DITAWARKAN
shielded (STP)
CCTV Lantai 3 -

V Testing & Commisioning ls 1,00 TIDAK DITAWARKAN

TOTAL SISTEM CCTV


IX PRASARANA LINGKUNGAN JALAN DAN PARKIR

No. Item Pekerjaan Satuan Volume Harga Satuan Total Harga

A. PEKERJAAN PEMATANGAN LAHAN


1 Penebangan pohon, pembuangan tunggul dan pencabutan akar pohon ls 1,00 -
2 Pematangan lahan Cut and Fill menggunakan alat berat M3 3.366,00 -
SUB TOTAL A -

B. PEKERJAAN JALAN DAN PARKIR


1 Pek. Pembentukan badan jalan t = 20 cm M3 215,64 TIDAK DITAWARKAN
2 Pek. Hamparan sirtu tebal 20 cm padat M3 143,76 TIDAK DITAWARKAN
1 Pek. Penetrasi tebal 4 cm M2 718,79 TIDAK DITAWARKAN
1 Pek. Hotmik tebal 3 cm M2 718,79 TIDAK DITAWARKAN
2 Pek. Pasang kansteen beton M1 107,70 TIDAK DITAWARKAN
SUB TOTAL B -

C. PEKERJAAN SALURAN KELILING BANGUNAN DAN AREA PARKIR


1 Saluran keliling bangunan 60x60 M' 185,02 TIDAK DITAWARKAN
2 Beton decker t.6 cm 0,45x70 m M' 176,02 TIDAK DITAWARKAN
3 Grill galvanis 0,45x0,70 m Bh 18,00 TIDAK DITAWARKAN
SUB TOTAL C -

D. PEKERJAAN DINDING PENAHAN TANAH (DPT) BATU KALI


1 Pek. Galian tanah untuk pondasi M3 94,28 TIDAK DITAWARKAN
2 Pek. Urugan tanah kembali pondasi M3 33,14 TIDAK DITAWARKAN
3 Pek. Urugan pasir dibawah pondasi t=5 cm M3 4,71 TIDAK DITAWARKAN
4 Pek. Pasangan pondasi batu kali 1: 4 DPT M3 70,71 TIDAK DITAWARKAN
5 Pek. Pasangan batu kali 1: 4 Dinding Penahan Tanah (DPT) M3 117,85 TIDAK DITAWARKAN
6 Pek. Pembuatan siaran timbul pada batu muka DPT M2 196,42 TIDAK DITAWARKAN
7 Pek. Plesteran 1 : 4, t=20 mm + aci, ban-banan topian DPT M2 58,93 TIDAK DITAWARKAN
8 Pek. Pasang sulingan air pipa PVC Ø.2" + injuk dan pasir Titik 294,63 TIDAK DITAWARKAN
SUB TOTAL E -
PEKERJAAN : PEMBANGUNAN GEDUNG AUDITORIUM FEM
LOKASI : KAMPUS IPB DRAMAGA BOGOR
TAHUN : 2018

X MEBEULAIR AUDITORIUM

No Item Pekerjaan Type Satuan Volume Harga Satuan Total Harga

RUANG AUDITORIUM LT.2

1 Kursi + meja teater Ruang Auditorium, setara Ex- Archigramma Type NEW CHAIR unit 577,00 TIDAK DITAWARKAN
AMPHITEATER

2 Kursi + meja teater Ruang Balkon VIP, setara Ex- Archigramma Type NEW CHAIR unit 47,00 TIDAK DITAWARKAN
AMPHITEATER

JUMLAH -
XI LIFT PENUMPANG 1 UNIT

No Uraian Pekerjaan Satuan Volume Harga Satuan Total Harga

I PEKERJAAN PERSIAPAN (PENDAHULUAN)


1 Pekerjaan Persiapan lot 1,00 - TIDAK DITAWARKAN
a. Pembuatan Direksi Keet
b. Pembuatan Gudang Peralatan
c. Pembuatan Gudang Penyimpanan bekas bongkaran LIft
d. P3K
e. Pembuatan Shop Drawing
f. Setting, Mobilisasi, Demobilisasi

PEKERJAAN PERSIAPAN (PENDAHULUAN) -

II PEKERJAAN PREPARASI HOISTWAY + PEKERJAAN PENUNJANG


1 Preparasi Hoistway + Pekerjaan Penunjang (Grouting sill, jamb & sill suport) set 1,00 - TIDAK DITAWARKAN

PEKERJAAN PREPARASI HOISTWAY + PEKERJAAN PENUNJANG -

III PEKERJAAN PENGADAAN LIFT PASSANGER

c.1 Pekerjaan pengadaan & Pemasangan Lift Penumpang Unit 1,00 - TIDAK DITAWARKAN
- Kapasitas : 6 Orang (450 kg)
- Tipe : Traction Drive AC Geared/Gearless/GETM/GeN2-MR
- Pelayanan : Lt. 1 s/d Lt. 3 (2stop/opening)
- Kecepatan : 60 mpm
- Interior
· Dinding Kiri & Kanan : Mirror Stainless Steel
· Dinding Tengah : Mirror Stainless Steel
· Pintu Dalam Lift : Mirror Stainless Steel
- Lantai : Granit Tile Motif
- Ceiling : Standar Type
- Car Door : Mirror Stainless Steel
- Front Return Walls : Mirror Stainless Steel
- Entrance Coulomn : Mirror Stainless Steel
- Jamb : Jamb Stainless Stell Wide Jamb
- Hand railling : Stainless Steel
- Car Operation Features
a. Regenerative Drive
b. Multi Beam Infrared Door Protection
c. Fire Service Operation PhaseI
d. Attendant Operation
e. AES Monitoring System by PC
f. Eath quake Operation+1unit Seismic Sensor
g. Anaonment
h.Panel Control, Peralatan penunjang, Kabel Kontrol
Sudah Termasuk Testing & Commisioning dan Perijinan Ke Kemnaker.
c.2 Automatic Rescue Device (ARD) Unit 1,00 - TIDAK DITAWARKAN

PEKERJAAN PENGADAAN LIFT PASSANGER -


IV PEKERJAAN PENGADAAN KABEL TOEVOOR
1 ke Panel kontrol Lift 1, NYY 4 x 1C x 16 mm² + NYA 10 mm² m' 20,00 - TIDAK DITAWARKAN

PEKERJAAN PENGADAAN KABEL TOEVOOR -

V PEKERJAAN PENGADAAN PANEL DAYA


1 Pengadaan MCB Panel Daya Lift + Accesoris Unit 1,00 - TIDAK DITAWARKAN

PEKERJAAN PENGADAAN PANEL DAYA -

VI PEKERJAAN INSTALASI UNIT LIFT 1


1 Biaya Pemasangan Lift 1 Unit 1,00 TIDAK DITAWARKAN

PEKERJAAN INSTALASI UNIT LIFT 1 -

VII PEKERJAAN LAIN-LAIN


1 Pekerjaan Pengadaan dan Pemasangan AC Splith 1 Pk (Cadangan 1) ls 2,00 - TIDAK DITAWARKAN

PEKERJAAN LAIN-LAIN -

TOTAL PEKERJAAN LIFT -


DAFTAR HARGA SATUAN PEKERJAAN PERSIAPAN DAN STRUKTUR

No. Item Pekerjaan Harga Satuan

GEDUNG AUDITORIUM

1 1 M1 Pengukuran & bouwplank -


2 1 M1 Pagar Proyek t. 1,8 m -
3 1 M2 Papan Nama Proyek -
4 1 M2 Pembuatan Gudang Semen dan Alat-alat -
5 1 M2 Direksikeet (3,6x3,6) -
6 1 M3 Galian tanah biasa max kedalaman 1 m' -
7 1 M3 Urugan kembali -
8 1 M3 Pemadatan tanah -
9 1 M3 Urugan pasir -
10 1 M3 Urugan Sirtu -
11 1 M3 Urugan tanah merah -
12 1 M3 Aanstamping batu belah -
13 1 M3 Pas. Batu belah 1pc:4ps -
14 1 M3 Lantai kerja/beton tumbuk 1pc : 3ps : 5kr -
15 1 M2 Rabat beton t. 6 cm (M4 1 Lapis) - Beton site mix K-175 -
16 1 M3 Beton site mix K-175 -
17 1 M3 Readymix K-250 -
18 1 M3 Readymix K-300 -
19 1 Kg Besi beton terpasang < d 12 -
20 1 Kg Besi beton terpasang > D 13 -
21 1 M2 Bondex Alkadeck 950 -
22 1 M2 Wire Mesh M-10 (1 lapis) -
23 1 M2 Wire Mesh M-8 (1 lapis) -
24 1 M2 Wire Mesh M-4 (1 lapis) -
25 1 M2 Bekisting multiplex 9 mm -
26 1 M2 Stoot Werk -
27 1 M2 Form work system klm d. 60cm (9.137 m2) 4x -
28 1 M1 Stoot Werk Blk 40x75 (14.2 m') 3x -
29 1 M1 Stoot Werk Blk 35x55 (4.5 m') 3x -
30 1 M1 Stoot Werk Blk 35x75 (3 m') 3x -
31 1 M1 Stoot Werk Blk 30x45 (3 m') 3xpakai -
32 1 M1 Stoot Werk Ring Blk 35x65 (9 m') 3x pakai -
33 1 M1 Stoot Werk Blk 25x65 (9 m') 3x -
34 1 M1 Stoot Werk Blk 35x40 (4.5m') 3x -
35 1 M2 Bekisting Plat beton 2x pakai -
36 1 M2 Bekisting Plat beton -
37 1 M1 Sloof praktis 10/15 -

C.1. LANTAI 1 (BETON PILE CAP, SLOOP, KOLOM SD ELEVASI +4.50)


38 1 M3 Pek. Beton Pile Cap PC1 dan PC1A -
39 1 M3 Pek. Beton Pile Cap PC2 -
40 1 M3 Pek. Beton Pile Cap PC4A (PC PITLIFT) -
41 1 M3 Pek. Beton Pile Cap PC3 -
42 1 M3 Pek. Beton Pile Cap PC4 -
43 1 M3 Pek. Tie Beam TB1:400x750 -
44 1 M3 Pek. Tie Beam TB2:250x400 -
45 1 M3 Pek. Tie Beam TB3:200x400 -
46 1 M3 Pek. Kolom 1K1; D600 -
47 1 M3 Pek. Kolom 1K2; D600 -
48 1 M3 Pek. Kolom 1K3; 300X300 -
49 1 M3 Pek. Kolom K2A; 300X400 -
50 1 M3 Plat lantai t. 10 cm elv -0,05 -
51 1 M3 Plat beton tangga t=15 cm -
52 1 M3 Pek. Balok Bordes B4K:250x500 -
53 1 M3 Pek. Pondasi Ramp -
54 1 M3 Pek. Balok Ramp B:250x400 -
55 1 M3 Pek. Pelat Lantai t=12cm -
56 1 M3 Pek. Dinding Pit Lift : -
57 1 M3 Pek. Kolom Lift : -
58 1 M3 Pek. Balok Separator dan Balok Hosting Hook; B:200x300 -

C.2. LANTAI 2 (ELEVASI +4.50 SD +10.50)


A. ELEVASI +4.50 + 10.50
No. Item Pekerjaan Harga Satuan
59 1 M3 Pek. Kolom 2K1; D600 -
60 1 M3 Pek. Kolom 2K2; D600 -
61 1 M3 Pek. Kolom 2K3; 300X300 -
62 1 M3 Pek. Kolom K2A; 300X400 -

B. ELEVASI +4.50 (LANTAI-2)


63 1 M3 Pek. Balok B1:400x750 -
64 1 M3 Pek. Balok B1K:400x750 -
65 1 M3 Pek. Balok B2:300x450 -
66 1 M3 Pek. Balok B3:300x650 -
67 1 M3 Pek. Balok BL:300x450+100X550 -
68 1 M3 Pek. Balok B1L:400x750+200X250 -
69 1 M3 Pek. Balok B1K:400x750+200X250 -
70 1 M3 Pek. Pelat Lantai t=12cm (selasar) -
71 1 M3 Pek. Pelat Lantai t=15cm -
72 1 M3 Plat beton tangga t=15cm AS-4/E, I; AS-6/D, J -
73 1 M3 Pek. Balok Bordes B4K:250x500 -

C. LANTAI 2 (ELEVASI +4.50 PANGGUNG)


74 1 M3 Pek. Balok B1:400x750 -
75 1 M3 Pek. Balok B2:300x450 -
76 1 M3 Pek. Balok B3:300x650 -
77 1 M3 Pek. Balok B4:250x500 -
78 1 M3 Pek. Pelat Lantai t=15cm -
79 1 M3 Pek. Plat beton tangga AS-G/1; TANGGA AS-I/2 -
80 1 M3 Pek. Balok Bordes B4K:250x500 -

D. LANTAI 2 (ELEVASI +4.50 s/d +6.80 TRIBUN)


81 1 M3 Pek. Balok B1:400x750 -
82 1 M3 Pek. Balok B2:300x450 -
83 1 M3 Pek. Balok B3:300x650 -
84 1 M3 Pek. Pelat Lantai t=15cm -
85 1 M3 Pek. Pelat Lantai Trap Tribun -
86 1 M3 Pek. Plat beton ; TANGGA AS-E/9; TANGGA AS-D/8 -
87 1 M3 Pek. Balok Bordes B4K:250x500 -
88 1 M3 Pek. Plat beton ; TANGGA AS-G/10 -
89 1 M3 Pek. Balok Bordes B4K:250x500 -

C.3. PEKERJAAN BETON LANTAI-3 (ELEV +10.50 SD +12.10)


A ELEVASI +10.50 SD +12.10
90 1 M3 Pek. Kolom 2K1; D600 -
91 1 M3 Pek. Kolom 2K2; D600 -
92 1 M3 Pek. Kolom K4; 400X400 -
93 1 M3 Pek. Kolom K5; 300X400 -

B ELEVASI +10.50 (LANTAI-3)


94 1 M3 Pek. Balok B1:400x750 -
95 1 M3 Pek. Balok B1K:400x750 -
96 1 M3 Pek. Balok B2:300x450 -
97 1 M3 Pek. Balok B3:300x650 -
98 1 M3 Pek. Balok B4:250x500 -
99 1 M3 Pek. Balok BL:300x450+100X550 -
100 1 M3 Pek. Balok B1:400x750+200X1250 -
101 1 M3 Pek. Balok B1:400x750+200X1250 -
102 1 M3 Pek. Pelat Lantai t=12cm (dak) -
103 1 M3 Pek. Pelat Lantai t=15cm -

C. LANTAI 2 (ELEVASI +4.50 PANGGUNG)


104 1 M3 Pek. Balok B1:400x750 -
105 1 M3 Pek. Balok B1K:400x750 -
106 1 M3 Pek. Balok B2:300x450 -
107 1 M3 Pek. Balok B3:300x650 -
108 1 M3 Pek. Balok BL:150x1000 -
109 1 M3 Pek. Pelat Lantai t=15cm -
110 1 M3 Pek. Pelat Lantai Trap Tribun -

C.4. PEKERJAAN BETON ATAP/RING BALOK (ELEV +12.10 SD +TOP)


A KOLOM ELEVASI +12.10 SD TOP
No. Item Pekerjaan Harga Satuan
111 1 M3 Pek. Kolom 2K1; D600 -
112 1 M3 Pek. Kolom 2K2; D600 -
113 1 M3 Pek. Kolom K5; 300X400 -
114 1 M3 Pek. Balok B1:400x750 -
115 1 M3 Pek. Balok B2:300x450 -
116 1 M3 Pek. Balok B5:250x400 -
117 1 M3 Pek. Balok BR:150x300 -
118 1 M3 Cut and Fill menggunakan alat berat -

Bogor, ..................... 2018


Kontraktor,
PT,.................................

Cap & Tanda Tangan

NAMA
Jabatan
ANALISA HARGA SATUAN PEKERJAAN STRUKTUR

No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga


1 2 3 4 5 6 = 3x5

GEDUNG AUDITORIUM

1 1 M1 Pengukuran & bouwplank


Kayu Balok Albasia 0,0120 M3 - -
Kayu Papan Albasia 0,0070 M3 - -
Paku 8 s/d 15 cm 0,0200 Kg - -
Pekerja 0,1000 O/H - -
Tukang kayu setengah terampil 0,1000 O/H - -
Kepala tukang kayu 0,0100 O/H - -
Mandor 0,0050 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
2 1 M1 Pagar Proyek t. 1,8 m M'
Dolken 7 s/d 10 1,2500 Btg - -
PC 2,5000 Kg - -
Seng gelombang BJLS T=180 cm 1,2000 Lbr - -
Pasir beton 0,0050 M3 - -
Koral Beton 0,0090 M3 - -
Kayu terentang 0,0648 M3 - -
Paku 5 s/d 7 cm 0,0600 Kg - -
Meni kayu/besi 0,4500 Kg - -
Pekerja 0,4000 O/H - -
Tukang kayu terampil 0,2000 O/H - -
Kepala tukang kayu 0,0200 O/H - -
Mandor 0,0200 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
3 1 M2 Papan Nama Proyek
Kayu balok borneo super 0,0650 M3 - -
Triplek 4 mm 120 x 240 1,0000 Lbr - -
Paku 5 s/d 7 cm 0,2500 Kg - -
Cat Minyak 1,0000 Kg - -
Penulisan 0,1250 Ls - -
Ongkos Pasang 0,1250 Ls - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
4 1 M2 Pembuatan Gudang Semen dan Alat-alat
Dolken Kayu θ 8-10/400 cm 1,7000 Btg - -
Kayu Balok Terentang 0,2100 M3 - -
Paku Biasa 0,3000 Kg - -
Semen Portland 10,5000 kg - -
Pasir Beton 0,0300 M3 - -
Koral Beton 0,0500 M3 - -
Seng Gelombang Besar 80x180x4mm 1,5000 Lbr - -
Pekerja 1,0000 Oh - -
Tukang Kayu 2,0000 Oh - -
Kepala Tukang 0,2000 Oh - -
Mandor 0,0500 Oh - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
5 1 M2 Direksikeet (3,6x3,6)
Dolken 7 s/d 10 1,2500 Btg - -
Kayu terentang 0,1700 M3 - -
Paku 5 s/d 7 cm 0,8500 Kg - -
Besi Strip/Plat 1,1000 Kg - -
PC 35,0000 Kg - -
Pasir pasang 0,1500 M3 - -
Pasir beton 0,1000 M3 - -
Batu koral beton kali (sirtu) 0,1500 M3 - -
Bata merah bakar kelas I 30,0000 Bh - -
Seng Plat BJLS 30 90 cm ( 100 m1 ) 0,2500 M' - -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
Kawat harmonika 4 cm 2 2,0000 Bh - -
Kaca Polos 5 mm ( ASAHI ) 0,0800 M2 - -
Kunci 2 slaag kuda terbang 0,1500 Bh - -
Triplek 4 mm 120 x 240 0,0600 Lbr - -
Pekerja 2,0000 O/H - -
Tukang kayu terampil 1,0000 O/H - -
Tukang batu terampil 2,0000 O/H - -
Kepala tukang batu 0,3000 O/H - -
Mandor 0,0500 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
6 1 M3 Galian tanah biasa max kedalaman 1 m'
Pekerja 0,3750 O/H - -
Mandor 0,0375 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
7 1 M3 Urugan kembali
Pekerja 0,1720 O/H - -
Mandor 0,0172 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
8 1 M3 Pemadatan tanah
Pekerja 0,4500 O/H - -
Mandor 0,0450 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
9 1 M3 Urugan pasir
Pasir urug 1,2000 M3 - -
Pekerja 0,3000 O/H - -
Mandor 0,0300 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
10 1 M3 Urugan Sirtu
Pasir urug 1,2000 M3 - -
Pekerja 0,2500 O/H - -
Mandor 0,0250 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
11 1 M3 Urugan tanah merah
Tanah merah/Tanah Urug Pilihan 1,2000 M3 - -
Pekerja 0,2500 O/H - -
Mandor 0,0250 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
12 1 M3 Aanstamping batu belah
Batu Belah Pondasi 1,2000 M3 - -
Pasir urug 0,3000 M3 - -
Pekerja 0,7800 O/H - -
Tukang batu terampil 0,3900 O/H - -
Kepala tukang batu 0,0390 O/H - -
Mandor 0,0390 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
13 1 2
M3 Pas. Batu belah 1pc:4ps
Batu Belah Pondasi 1,1000 M3 - -
PC 163,0000 Kg - -
Pasir pasang 0,5200 M3 - -
Pekerja 1,5000 O/H - -
Tukang batu terampil 0,6000 O/H - -
Kepala tukang batu 0,0600 O/H - -
Mandor 0,0750 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
14 1 M3 Lantai kerja/beton tumbuk 1pc : 3ps : 5kr
PC 200,0000 Kg - -
Pasir beton 0,5200 M3 - -
Koral Beton 0,8700 M3 - -
Pekerja 1,6500 O/H - -
Tukang batu terampil 0,2500 O/H - -
Kepala tukang batu 0,0250 O/H - -
Mandor 0,0800 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
15 1 M2 Rabat beton t. 6 cm (M4 1 Lapis) - Beton site mix K-175
Beton site mix K-175 0,0600 M3 - -
Wire Mesh M-4 (1 lapis) 1,0000 M2 - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
16 1 M3 Beton site mix K-175
PC (50 kg) 6,8000 Zak - -
Batu Pecah Mesin 1/2 0,8300 M3 - -
Pasir beton 0,5400 M3 - -
Pekerja 6,0000 O/H - -
Tukang batu terampil 1,0000 O/H - -
Kepala tukang batu 0,1000 O/H - -
Mandor 0,3000 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
17 1 M3 Readymix K-300
Readymix Beton K-300, Tanpa Pompa ( Selang ) 1,0000 M3 - -
Pekerja 2,5000 O/H - -
Tukang batu terampil 0,2500 O/H - -
Kepala tukang batu 0,1000 O/H - -
Mandor 0,0100 O/H - -
Alat bantu (Concrete pump + Vibrator) 1,0000 Lot - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
18 1 M3 Readymix K-250
Readymix Beton K-250, Tanpa Pompa ( Selang ) 1,0000 M3 - -
Pekerja 2,5000 O/H - -
Kepala Tukang pipa 0,2500 O/H - -
Pekerja 0,1000 O/H - -
Tukang kayu setengah terampil 0,0100 O/H - -
Alat bantu (Concrete pump + Vibrator) 1,0000 Lot - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
19 1 Kg Besi beton terpasang < 2d 12
Besi Beton U-24 Rata-rata 1,1000 Kg - -
Kawat beton 0,0100 Kg - -
Pekerja 0,0040 O/H - -
Tukang besi beton terampil 0,0040 O/H - -
Kepala tukang besi beton 0,0040 O/H - -
Mandor 0,0040 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
20 1 Kg Besi beton terpasang > D 13
Besi Beton U-40 Rata-rata 1,1000 Kg - -
Kawat beton 0,0100 Kg - -
Pekerja 0,0040 O/H - -
Tukang besi beton terampil 0,0040 O/H - -
Kepala tukang besi beton 0,0040 O/H - -
Mandor 0,0040 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
21 1 M2 Bondex Alkadeck 950
Bondex 1,0100 M2 - -
Kawat Las 0,1000 Kg - -
Pekerja terampil 0,0500 O/H - -
Tukang besi profil terampil 0,0300 O/H - -
Mandor 0,0100 O/H - -
Shear Connector 0,0500 Ls - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
22 1 M2 Wire Mesh M-10 (1 lapis)
MK 10 (2,10 x 5,4 m) 0,0882 Lbr - -
Pekerja 0,0596 O/H - -
Tukang besi profil terampil 0,0596 O/H - -
Kepala tukang besi profil 0,0060 O/H - -
Mandor 0,0026 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
23 1 M2 Wire Mesh M-8 (1 lapis)
MK 8 (2,10 x 5,4 m) 0,0882 Lbr - -
Pekerja 0,0382 O/H - -
Tukang besi profil terampil 0,0382 O/H - -
Kepala tukang besi profil 0,0038 O/H - -
Mandor 0,0016 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
24 1 M2 Wire Mesh M-4 (1 lapis)
MK 4 (2,10 x 5,4 m) 0,0882 Lbr - -
Pekerja 0,0096 O/H - -
Tukang besi beton terampil 0,0096 O/H - -
Kepala tukang besi beton 0,0010 O/H - -
Mandor 0,0004 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
25 1 M2 Bekisting multiplex 9 mm
Kayu balok borneo super - 5/7 (2x pakai) 50% 0,0170 M3 - -
Multiplek 9 mm 120x240 0,3470 Lbr - -
Paku 1 s/d 3 cm 0,4000 Kg - -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
Pekerja 2 0,1200 O/H - -
Tukang kayu terampil 0,1500 O/H - -
Kepala tukang kayu 0,1500 O/H - -
Mandor 0,0500 O/H - -
Tukang kayu setengah terampil 0,1200 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
26 1 M2 Stoot Werk 13,5000
Dolken 7 s/d 10 (2x pakai) 4,5000 Btg - -
Kayu Papan Albasia (2x pakai) 0,0080 M3 - -
Paku 5 s/d 7 cm 0,5000 Kg - -
Pekerja 0,1500 O/H - -
Tukang kayu terampil 0,2000 O/H - -
Kepala tukang batu 0,2000 O/H - -
Mandor 0,0170 O/H - -
Jumlah/m2 -
Overhead + Profit -
Jumlah -
Dibulatkan -
27 1 M2 Form work system klm d. 60cm (9.137 m2) 4x 9,1370
A Girder GT-24 :
- Girder GT24 390cm 12,0000 sw/unit/2bln - -
-
B Column Wale U100 SSRZ 116/151 :
- Column Wale U100 SSRZ 116/151 6,0000 sw/unit/2bln - -
-
C Accessories :
- Hook Strap HB 24-100/120 36,0000 sw/unit/2bln - -
- Wedge KZ, Galv 12,0000 sw/unit/2bln - -
- Tie Yoke SKZ 12,0000 sw/unit/2bln - -
- Wingnut DW15, Galv 12,0000 sw/unit/2bln - -
- Girder Headpiece GT24,Galv 4,0000 sw/unit/2bln - -
- Wedge Headpiece 4,0000 sw/unit/2bln - -
- Base Plate For RSS 4,0000 sw/unit/2bln - -
- Push-Pull Prop RSS1 4,0000 sw/unit/2bln - -
- Kicker AV 4,0000 sw/unit/2bln - -
- Wedge K, Galv 4,0000 sw/unit/2bln - -
- Scaffold Jack GB 80 4,0000 sw/unit/2bln - -
-
D Tie Rod Accessories :
- Tie Rod DW15, L=1m 6,0000 sw/unit/2bln - -
-
E Pin Accessories :
- Pin 16x42, Galv 16,0000 sw/unit/2bln - -
- Cotter Pin FS 4/1 Galv. 16,0000 sw/unit/2bln - -
-
F Consumable Part :
- TSS-TORX 6x60, galv. 125,0000 bh - -
- F.H Bolt M8x70 W.nut 72,0000 bh - -
- Bit Point TX30 1,0000 bh - -
-
G Upah Kerja 0,1500 lot - -

H Los 0,1500 lot - -


Jumlah/unit -
Jumlah/m2 1xpakai -
Jumlah/m2 4xpakai -
Overhead + Profit -
Jumlah -
Dibulatkan -
28 1 M1 Stoot Werk Blk 40x75 (14.2 m') 3x 14,2000
A Stoot Werk
Kayu balok borneo super - 6/12 0,0486 M3 - -
Paku 8 s/d 15 cm 2,4000 Kg - -
-
B Girder GT-24 :
- Girder GT24 390cm 4,0000 sw/unit/2bln - -
- Girder GT24 150cm 2,0000 sw/unit/2bln - -
-
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
C Main Scaffolding : 2
- Pola Frame 170 Galv 30,0000 sw/unit/2bln - -
- Cross Brace 220 Galv 48,0000 sw/unit/2bln - -
- Cross Brace 193 Galv 48,0000 sw/unit/2bln - -
- Joint Pin 36 Galv 40,0000 sw/unit/2bln - -
- Jack Base S60 Galv CPL 60,0000 sw/unit/2bln - -
- U-Head Jack S60 Galv CPL 60,0000 sw/unit/2bln - -
- Cross Head Jack S.60 CPL 4,0000 sw/unit/2bln - -
-

D Upah Kerja 0,1500 lot - -

E Los 0,1500 lot - -


Jumlah/unit -
Jumlah/m' -
Overhead + Profit -
Jumlah -
Dibulatkan -
29 1 M1 Stoot Werk Blk 35x55 (4.5 m') 3x 4,5000
A Stoot Werk
Kayu balok borneo super - 6/12 0,0486 M3 - -
Paku 8 s/d 15 cm 2,4000 Kg - -
-
B Girder GT-24 :
- Girder GT24 300cm 4,0000 sw/unit/2bln - -
-
C Main Scaffolding :
- Pola Frame 170 Galv 6,0000 sw/unit/2bln - -
- Cross Brace 220 Galv 6,0000 sw/unit/2bln - -
- Cross Brace 193 Galv 6,0000 sw/unit/2bln - -
- Joint Pin 36 Galv 8,0000 sw/unit/2bln - -
- Jack Base S60 Galv CPL 4,0000 sw/unit/2bln - -
- U-Head Jack S60 Galv CPL 4,0000 sw/unit/2bln - -
-
D Upah Kerja 0,1500 Lot - -

E Los 0,1500 Lot - -


Jumlah/unit -
Jumlah/m' -
Overhead + Profit -
Jumlah -
Dibulatkan -
30 1 M1 Stoot Werk Blk 35x75 (3 m') 3x 3,0000
A Stoot Werk
Kaso 6/12 Borneo 0,0486 M3 - -
Paku 8 cm s/d 12 cm 2,4000 Kg - -
-
B Girder GT-24 :
- Girder GT24 300cm 2,0000 sw/unit/2bln - -
-
C Main Scaffolding :
- Pola Frame 170 Galv 6,0000 sw/unit/2bln - -
- Cross Brace 220 Galv 4,0000 sw/unit/2bln - -
- Cross Brace 193 Galv 4,0000 sw/unit/2bln - -
- Joint Pin 36 Galv 8,0000 sw/unit/2bln - -
- Jack Base S60 Galv CPL 4,0000 sw/unit/2bln - -
- U-Head Jack S60 Galv CPL 4,0000 sw/unit/2bln - -
-
D Upah Kerja 0,1500 Lot - -

E Los 0,1500 Lot - -


Jumlah/unit -
Jumlah/m2 -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
31 1 M1 Stoot Werk Blk 30x45 (32 m') 3xpakai 3,0000
A Stoot Werk
Kaso 6/12 Borneo 0,0194 M3 - -
Paku 8 cm s/d 12 cm 0,9600 Kg - -
-
B Girder GT-24 :
- Girder GT24 300cm 2,0000 sw/unit/2bln - -
-
C Main Scaffolding :
- Pola Frame 170 Galv 6,0000 sw/unit/2bln - -
- Cross Brace 220 Galv 4,0000 sw/unit/2bln - -
- Cross Brace 193 Galv 4,0000 sw/unit/2bln - -
- Joint Pin 36 Galv 8,0000 sw/unit/2bln - -
- Jack Base S60 Galv CPL 4,0000 sw/unit/2bln - -
- U-Head Jack S60 Galv CPL 4,0000 sw/unit/2bln - -
-
D Upah Kerja 0,1500 Lot - -

E Los 0,1500 Lot - -


Jumlah/unit -
Jumlah/m2 -
Overhead + Profit -
Jumlah -
Dibulatkan -
32 1 M1 Stoot Werk Ring Blk 35x65 (9 m') 3x pakai 9,0000
A Stoot Werk
Kayu balok borneo super - 6/12 0,0486 M3 - -
Paku 8 s/d 15 cm 2,4000 Kg - -
-
B Girder GT-24 :
- Girder GT24 390cm 4,0000 sw/unit/2bln - -
- Girder GT24 150cm 2,0000 sw/unit/2bln - -
-
C Main Scaffolding :
- Pola Frame 170 Galv 30,0000 sw/unit/2bln - -
- Cross Brace 220 Galv 48,0000 sw/unit/2bln - -
- Cross Brace 193 Galv 48,0000 sw/unit/2bln - -
- Joint Pin 36 Galv 40,0000 sw/unit/2bln - -
- Jack Base S60 Galv CPL 20,0000 sw/unit/2bln - -
- U-Head Jack S60 Galv CPL 20,0000 sw/unit/2bln - -
- Cross Head Jack S.60 CPL 4,0000 sw/unit/2bln - -
-
D Upah Kerja 0,1500 Lot - -

E Los 0,1500 Lot - -


Jumlah/unit -
Jumlah/m2 -
Overhead + Profit -
Jumlah -
Dibulatkan -
33 1 M1 Stoot Werk Blk 25x65 (9 m') 3x 9,0000
A Stoot Werk
Kaso 6/12 Borneo 0,0288 M3 - -
Paku 8 s/d 15 cm 0,9600 Kg - -
-
B Girder GT-24 :
- Girder GT24 390cm 2,0000 sw/unit/2bln - -
- Girder GT24 300cm 4,0000 sw/unit/2bln - -
- Girder GT24 210cm 2,0000 sw/unit/2bln - -
-
C Main Scaffolding :
- Pola Frame 170 Galv 30,0000 sw/unit/2bln - -
- Cross Brace 220 Galv 48,0000 sw/unit/2bln - -
- Cross Brace 193 Galv 48,0000 sw/unit/2bln - -
- Joint Pin 36 Galv 40,0000 sw/unit/2bln - -
- Jack Base S60 Galv CPL 20,0000 sw/unit/2bln - -
- U-Head Jack S60 Galv CPL 20,0000 sw/unit/2bln - -
- Cross Head Jack S.60 CPL 4,0000 sw/unit/2bln - -
-
D Upah Kerja 0,1500 Lot - -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
2
E Los 0,1500 Lot - -
Jumlah/unit -
Jumlah/m' -
Overhead + Profit -
Jumlah -
Dibulatkan -
34 1 M1 Stoot Werk Blk 35x40 (4.5m') 3x 4,5000
A Stoot Werk
Kaso 6/12 Borneo 0,0194 M3 - -
Paku 8 s/d 15 cm 0,9600 Kg - -
-
B Girder GT-24 :
- Girder GT24 300cm 2,0000 sw/unit/2bln - -
-
C Main Scaffolding :
- Pola Frame 170 Galv 6,0000 sw/unit/2bln - -
- Cross Brace 220 Galv 6,0000 sw/unit/2bln - -
- Cross Brace 193 Galv 6,0000 sw/unit/2bln - -
- Joint Pin 36 Galv 8,0000 sw/unit/2bln - -
- Jack Base S60 Galv CPL 4,0000 sw/unit/2bln - -
- U-Head Jack S60 Galv CPL 4,0000 sw/unit/2bln - -
-

D Upah Kerja 0,1500 Lot - -


Upah lt. 3 0,1200 Lot - -

E Los 0,1500 Lot 0 -


Jumlah/unit -
Jumlah/m2 -
35 1 M2 Bekisting Plat beton 2x pakai 17,1175
A Panel
Kayu balok borneo super - 5/7 (2x pakai) 50% 0,1236 M3 - -
Multiplek 9 mm 120x240 3,0000 Lbr - -
Paku 5 s/d 7 cm 6,8880 Kg - -
-
B Stoot Werk
Kayu balok borneo super - 8/12 0,0787 M3 - -
Paku 8 s/d 15 cm 0,4923 Kg - -
-
C Skafolding (sewa)
Main frame MF-1217 4,0000 sw/unit/2bln - -
Main frame MF-1219 4,0000 sw/unit/2bln - -
Jack base BJ 60 8,0000 sw/unit/2bln - -
Joint pin 42 8,0000 sw/unit/2bln - -
Cross brace 1218 4,0000 sw/unit/2bln - -
Head Jack 60 Bj-60 8,0000 sw/unit/2bln - -
-

D Upah kerja 0,1500 Lot - -


Jumlah/unit -
Jumlah/m2 -
Overhead + Profit -
Jumlah -
Dibulatkan -
36 1 M2 Bekisting Plat beton 40,5000
- Hory Beam HB-14 4,0000 sw/unit/2bln - -
- Pola Frame 190 Galv 6,0000 sw/unit/2bln - -
- Cross Brace 220 Galv 8,0000 sw/unit/2bln - -
- Joint Pin 36 Galv 6,0000 sw/unit/2bln - -
- Jack Base S60 Galv CPL 6,0000 sw/unit/2bln - -
- U-Head Jack S60 Galv CPL 3,0000 sw/unit/2bln - -
- Girder GT24 390cm 1,0000 sw/unit/2bln - -

- Upah kerja 0,2000 Lot - -


Jumlah/unit -
Jumlah/m2 -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
37 1 M1 Sloof praktis 10/15 2
Beton site mix K-175 0,0150 M3 - -
Besi beton terpasang d. 8 0,9875 Kg - -
Besi beton terpasang d. 10 2,4800 Kg - -
Bekisting multiplex 9 mm 0,3000 M2 - -
Jumlah -
Dibulatkan -

C.1. LANTAI 1 (BETON PILE CAP, SLOOP, KOLOM SD ELEVASI +4.50)

38 1 M3 Pile cap PC1 dan PC1A


Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 19 102,0551 Kg - -
Besi beton terpasang D. 16 46,3359 Kg - -
Besi beton terpasang D. 13 10,1288 Kg - -
Bekisting multiplex 9 mm 2,8924 M2 - -
Jumlah -
Dibulatkan -
39 1 M3 Pek. Beton Pile Cap PC2
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 19 111,5920 Kg - -
Besi beton terpasang D. 16 48,3113 Kg - -
Besi beton terpasang D. 13 9,4753 Kg - -
Bekisting multiplex 9 mm 3,4286 M2 - -
Jumlah -
Dibulatkan -
40 1 M3 Pek. Beton Pile Cap PC4A (PC PITLIFT)
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 19 99,6272 Kg - -
Besi beton terpasang D. 16 63,3240 Kg - -
Bekisting multiplex 9 mm 1,1787 M2 - -
Jumlah -
Dibulatkan -
41 1 M3 Pek. Beton Pile Cap PC3
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 19 77,5161 Kg - -
Besi beton terpasang D. 16 37,0922 Kg - -
Besi beton terpasang D. 13 8,2543 Kg - -
Bekisting multiplex 9 mm 2,3080 M2 - -
Jumlah -
Dibulatkan -
42 1 M3 Pek. Beton Pile Cap PC4
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 19 95,8097 Kg - -
Besi beton terpasang D. 16 42,1043 Kg - -
Besi beton terpasang D. 13 10,4349 Kg - -
Bekisting multiplex 9 mm 3,2468 M2 - -
Jumlah -
Dibulatkan -
43 1 M3 Pek. Tie Beam TB1:400x750
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 138,1130 Kg - -
Besi beton terpasang D. 13 6,9056 Kg - -
Besi beton terpasang D. 10 24,5309 Kg - -
Bekisting multiplex 9 mm 5,0000 M2 - -
Jumlah -
Dibulatkan -
44 1 M3 Pek. Tie Beam TB2:250x400
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 16 140,5744 Kg - -
Besi beton terpasang D. 13 20,7169 Kg - -
Besi beton terpasang D. 10 41,5959 Kg - -
Bekisting multiplex 9 mm 8,0000 M2 - -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
45 1 2
M3 Pek. Tie Beam TB3:200x400
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 16 121,7710 Kg - -
Besi beton terpasang D. 13 25,8962 Kg - -
Besi beton terpasang D. 10 47,9953 Kg - -
Bekisting multiplex 9 mm 10,0000 M2 - -
Jumlah -
Dibulatkan -
46 1 M3 Pek. Kolom 1K1; D600
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 290,1149 Kg - -
Besi beton terpasang D. 10 34,5261 Kg - -
Form work system klm d. 60cm (9.137 m2) 4x 6,6667 M2 - -
Jumlah -
Dibulatkan -
47 1 M3 Pek. Kolom 1K2; D600
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 243,8466 Kg - -
Besi beton terpasang D. 10 34,5261 Kg - -
Form work system klm d. 60cm (9.137 m2) 4x 6,6667 M2 - -
Jumlah -
Dibulatkan -
48 1 M3 Pek. Kolom 1K3; 300X300
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 16 153,9426 Kg - -
Besi beton terpasang D. 10 54,8033 Kg - -
Bekisting; Multiplek 9mm+stootwerk 13,3333 M2 - -
Jumlah -
Dibulatkan -
49 1 M3 Pek. Kolom K2A; 300X400
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 16 115,4569 Kg - -
Besi beton terpasang D. 10 47,9529 Kg - -
Bekisting; Multiplek 9mm+stootwerk 11,6667 M2 - -
Jumlah -
Dibulatkan -
50 1 M3 Plat lantai t. 10 cm elv -0,05
Readymix K-250 1,0000 M3 - -
Besi beton terpasang D. 10 106,1815 Kg - -
Jumlah -
Dibulatkan -
51 1 M3 Plat beton tangga t=15 cm
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 13 100,4726 Kg - -
Besi beton terpasang D. 10 51,4320 Kg - -
Besi beton terpasang d. 8 86,6156 Kg - -
Bekisting multiplex 9 mm 4,9732 M2 - -
Stoot Werk 2,4866 M2 - -
Jumlah -
Dibulatkan -
52 1 M3 Pek. Balok Bordes B4K:250x500
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 19 131,2028 Kg - -
Besi beton terpasang D. 13 16,5736 Kg - -
Besi beton terpasang D. 10 44,7956 Kg - -
Bekisting multiplex 9 mm 10,8571 M2 - -
Stoot Werk 5,4286 M2 - -
Jumlah -
Dibulatkan -
53 1 M3 Pek. Pondasi Ramp
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 13 160,1006 Kg - -
Bekisting multiplex 9 mm 19,1667 M2 - -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
54 1 2
M3 Pek. Balok Ramp B:250x400
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 19 144,9221 Kg - -
Besi beton terpasang D. 13 21,3577 Kg - -
Besi beton terpasang D. 10 42,8824 Kg - -
Bekisting multiplex 9 mm 10,0042 M2 - -
Jumlah -
Dibulatkan -
55 1 M3 Pek. Pelat Lantai t=12cm
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 10 116,7996 Kg - -
Bekisting multiplex 9 mm 1,6667 M2 - -
Jumlah -
Dibulatkan -
56 1 M3 Pek. Dinding Pit Lift :
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 13 132,3498 Kg - -
Bekisting multiplex 9 mm 8,0000 M2 - -
Jumlah -
Dibulatkan -
57 1 M3 Pek. Kolom Lift :
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 16 173,1854 Kg - -
Besi beton terpasang D. 10 41,1025 Kg - -
Bekisting; Multiplek 9mm+stootwerk 8,3333 M2 - -
Jumlah -
Dibulatkan -
58 1 M3 Pek. Balok Separator dan Balok Hosting Hook; B:200x300
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 16 108,2409 Kg - -
Besi beton terpasang d. 8 43,8427 Kg - -
Bekisting; Multiplek 9mm+stootwerk 13,3333 M2 - -
Jumlah -
Dibulatkan -

C.2. LANTAI 2 (ELEVASI +4.50 SD +10.50)


A. ELEVASI +4.50 + 10.50

59 1 M3 Pek. Kolom 2K1; D600


Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 250,0991 Kg - -
Besi beton terpasang D. 10 34,5261 Kg - -
Form work system klm d. 60cm (9.137 m2) 4x 6,6667 M2 - -
Jumlah -
Dibulatkan -
60 1 M3 Pek. Kolom 2K2; D600
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 203,2055 Kg - -
Besi beton terpasang D. 10 34,5261 Kg - -
Form work system klm d. 60cm (9.137 m2) 4x 6,6667 M2 - -
Jumlah -
Dibulatkan -
61 1 M3 Pek. Kolom 2K3; 300X300
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 16 153,9426 Kg - -
Besi beton terpasang D. 10 54,8033 Kg - -
Bekisting; Multiplek 9mm+stootwerk 13,3333 M2 - -
Jumlah -
Dibulatkan -
62 1 M3 Pek. Kolom K2A; 300X400
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 16 115,4569 Kg - -
Besi beton terpasang D. 10 47,9529 Kg - -
Bekisting; Multiplek 9mm+stootwerk 11,6667 M2 - -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
2
B. ELEVASI +4.50 (LANTAI-2)

63 1 M3 Pek. Balok B1:400x750


Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 110,4904 Kg - -
Besi beton terpasang D. 13 6,9056 Kg - -
Besi beton terpasang D. 10 28,6194 Kg - -
Bekisting; Multiplek 9mm+stootwerk 6,3333 M2 - -
Stoot Werk Blk 40x75 (14.2 m') 3x 3,1667 M2 - -
Jumlah -
Dibulatkan -
64 1 M3 Pek. Balok B1K:400x750
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 110,4904 Kg - -
Besi beton terpasang D. 13 6,9056 Kg - -
Besi beton terpasang D. 10 28,6194 Kg - -
Bekisting; Multiplek 9mm+stootwerk 6,3333 M2 - -
Stoot Werk Blk 40x75 (14.2 m') 3x 3,1667 M2 - -
Jumlah -
Dibulatkan -
65 1 M3 Pek. Balok B2:300x450
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 22 104,1292 Kg - -
Besi beton terpasang D. 13 15,3459 Kg - -
Besi beton terpasang D. 10 35,5521 Kg - -
Bekisting; Multiplek 9mm+stootwerk 8,8889 M2 - -
Stoot Werk Blk 30x45 (3 m') 3xpakai 4,4444 M2 - -
Jumlah -
Dibulatkan -
66 1 M3 Pek. Balok B3:300x650
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 22 97,3892 Kg - -
Besi beton terpasang D. 13 10,6241 Kg - -
Besi beton terpasang D. 10 31,1764 Kg - -
Bekisting; Multiplek 9mm+stootwerk 8,2051 M2 - -
Stoot Werk Blk 30x60 (4.5 m') 3x 4,1026 M2 - -
Jumlah -
Dibulatkan -
67 1 M3 Pek. Balok BL:300x450+100X550
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 19 73,9865 Kg - -
Besi beton terpasang D. 13 10,9037 Kg - -
Besi beton terpasang D. 10 65,5725 Kg - -
Bekisting; Multiplek 9mm+stootwerk 9,0000 M2 - -
Stoot Werk Blk 30x45 (3 m') 3xpakai 5,7000 M2 - -
Jumlah -
Dibulatkan -
68 1 M3 Pek. Balok B1L:400x750+200X250
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 94,7060 Kg - -
Besi beton terpasang D. 13 5,9191 Kg - -
Besi beton terpasang D. 10 36,0917 Kg - -
Besi beton terpasang D. 16 9,2778 Kg - -
Bekisting; Multiplek 9mm+stootwerk 6,8571 M2 - -
Stoot Werk Blk 40x75 (14.2 m') 3x 3,4286 M2 - -
Jumlah -
Dibulatkan -
69 1 M3 Pek. Balok B1K:400x750+200X250
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 94,7060 Kg - -
Besi beton terpasang D. 13 5,9191 Kg - -
Besi beton terpasang D. 10 36,0917 Kg - -
Besi beton terpasang D. 16 9,2778 Kg - -
Bekisting; Multiplek 9mm+stootwerk 6,8571 M2 - -
Stoot Werk Blk 40x75 (14.2 m') 3x 3,1667 M2 - -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
70 1 2 (selasar)
M3 Pek. Pelat Lantai t=12cm
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 10 155,7328 M2 - -
Bekisting Plat beton 2x pakai 8,3333 M2 - -
Jumlah -
Dibulatkan -
71 1 M3 Pek. Pelat Lantai t=15cm
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 10 124,5863 Kg - -
Bekisting Plat beton 2x pakai 6,6667 M2 - -
Jumlah -
Dibulatkan -
72 1 M3 Plat beton tangga t=15cm AS-4/E, I; AS-6/D, J
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 13 100,4726 Kg - -
Besi beton terpasang D. 10 51,4320 Kg - -
Besi beton terpasang d. 8 86,6156 Kg - -
Bekisting multiplex 9 mm 4,9732 M2 - -
Stoot Werk 2,4866 M2 - -
Jumlah -
Dibulatkan -
73 1 M3 Pek. Balok Bordes B4K:250x500
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 19 131,2028 Kg - -
Besi beton terpasang D. 13 16,5736 Kg - -
Besi beton terpasang D. 10 44,7956 Kg - -
Bekisting multiplex 9 mm 10,8571 M2 - -
Stoot Werk 5,4286 M2 - -
Jumlah -
Dibulatkan -

C. LANTAI 2 (ELEVASI +4.50 PANGGUNG)

74 1 M3 Pek. Balok B1:400x750


Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 110,4904 Kg - -
Besi beton terpasang D. 13 6,9056 Kg - -
Besi beton terpasang D. 10 28,6194 Kg - -
Bekisting; Multiplek 9mm+stootwerk 6,3333 M2 - -
Stoot Werk Blk 40x75 (14.2 m') 3x 3,1667 M2 - -
Jumlah -
Dibulatkan -
75 1 M3 Pek. Balok B2:300x450
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 22 104,1292 Kg - -
Besi beton terpasang D. 13 15,3459 Kg - -
Besi beton terpasang D. 10 35,5521 Kg - -
Bekisting; Multiplek 9mm+stootwerk 8,8889 M2 - -
Stoot Werk Blk 30x45 (3 m') 3xpakai 4,4444 M2 - -
Jumlah -
Dibulatkan -
76 1 M3 Pek. Balok B3:300x650
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 22 97,3892 Kg - -
Besi beton terpasang D. 13 10,6241 Kg - -
Besi beton terpasang D. 10 31,1764 Kg - -
Bekisting; Multiplek 9mm+stootwerk 8,2051 M2 - -
Stoot Werk Blk 30x60 (4.5 m') 3x 4,1026 M2 - -
Jumlah -
Dibulatkan -
77 1 M3 Pek. Balok B4:250x500
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 19 96,9479 Kg - -
Besi beton terpasang D. 13 14,2875 Kg - -
Besi beton terpasang D. 10 33,1002 Kg - -
Bekisting; Multiplek 9mm+stootwerk 10,0000 M2 - -
Stoot Werk Blk 25x50 (4.5m') 3x 5,0000 M2 - -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
78 1 2
M3 Pek. Pelat Lantai t=15cm
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 10 124,5863 Kg - -
Bekisting Plat beton 2x pakai 6,6667 M2 - -
Jumlah -
Dibulatkan -
79 1 M3 Pek. Plat beton tangga AS-G/1; TANGGA AS-I/2
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 13 100,4726 Kg - -
Besi beton terpasang D. 10 51,4320 Kg - -
Besi beton terpasang d. 8 86,6156 Kg - -
Bekisting multiplex 9 mm 4,9732 M2 - -
Stoot Werk 2,4866 M2 - -
Jumlah -
Dibulatkan -
80 1 M3 Pek. Balok Bordes B4K:250x500
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 19 131,2028 Kg - -
Besi beton terpasang D. 13 16,5736 Kg - -
Besi beton terpasang D. 10 44,7956 Kg - -
Bekisting multiplex 9 mm 10,8571 M2 - -
Stoot Werk 5,4286 M2 - -
Jumlah -
Dibulatkan -

D. LANTAI 2 (ELEVASI +4.50 s/d +6.80 TRIBUN)

81 1 M3 Pek. Balok B1:400x750


Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 110,4904 Kg - -
Besi beton terpasang D. 13 6,9056 Kg - -
Besi beton terpasang D. 10 28,6194 Kg - -
Bekisting; Multiplek 9mm+stootwerk 6,3333 M2 - -
Stoot Werk Blk 40x75 (14.2 m') 3x 3,1667 M2 - -
Jumlah -
Dibulatkan -
82 1 M3 Pek. Balok B2:300x450
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 22 104,1292 Kg - -
Besi beton terpasang D. 13 15,3459 Kg - -
Besi beton terpasang D. 10 35,5521 Kg - -
Bekisting; Multiplek 9mm+stootwerk 8,8889 M2 - -
Stoot Werk Blk 30x45 (3 m') 3xpakai 4,4444 M2 - -
Jumlah -
Dibulatkan -
83 1 M3 Pek. Balok B3:300x650
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 22 97,3892 Kg - -
Besi beton terpasang D. 13 10,6241 Kg - -
Besi beton terpasang D. 10 31,1764 Kg - -
Bekisting; Multiplek 9mm+stootwerk 8,2051 M2 - -
Stoot Werk Ring Blk 30x65 (9 m') 3x pakai 4,1026 M2 - -
Jumlah -
Dibulatkan -
84 1 M3 Pek. Pelat Lantai t=15cm
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 10 124,5863 Kg - -
Bekisting Plat beton 2x pakai 6,6667 M2 - -
Jumlah -
Dibulatkan -
85 1 M3 Pek. Pelat Lantai Trap Tribun
Readymix K-300 1,00 M3 - -
Besi beton terpasang D. 10 126,25 Kg - -
Bekisting Plat beton 2x pakai 0,68 M2 - -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
86 1 2
M3 Pek. Plat beton ; TANGGA AS-E/9; TANGGA AS-D/8
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 13 100,4726 Kg - -
Besi beton terpasang D. 10 51,4320 Kg - -
Besi beton terpasang d. 8 86,6156 Kg - -
Bekisting multiplex 9 mm 6,2414 M2 - -
Stoot Werk 3,1207 M2 - -
Jumlah -
Dibulatkan -
87 1 M3 Pek. Balok Bordes B4K:250x500
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 19 131,2028 Kg - -
Besi beton terpasang D. 13 16,5736 Kg - -
Besi beton terpasang D. 10 44,7956 Kg - -
Bekisting multiplex 9 mm 10,8571 M2 - -
Stoot Werk 5,4286 M2 - -
Jumlah -
Dibulatkan -
88 1 M3 Pek. Plat beton ; TANGGA AS-G/10
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 13 38,3380 Kg - -
Besi beton terpasang D. 10 19,6252 Kg - -
Besi beton terpasang d. 8 23,9229 Kg - -
Bekisting multiplex 9 mm 2,5209 M2 - -
Stoot Werk 1,2605 M2 - -
Jumlah -
Dibulatkan -
89 1 M3 Pek. Balok Bordes B4K:250x500
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 19 125,9547 Kg - -
Besi beton terpasang D. 13 15,9106 Kg - -
Besi beton terpasang D. 10 43,0038 Kg - -
Bekisting multiplex 9 mm 10,4229 M2 - -
Stoot Werk 5,2114 M2 - -
Jumlah -
Dibulatkan -

C.3. PEKERJAAN BETON LANTAI-3 (ELEV +10.50 SD +12.10)


A ELEVASI +10.50 SD +12.10

90 1 M3 Pek. Kolom 2K1; D600


Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 250,0991 Kg - -
Besi beton terpasang D. 10 34,5261 Kg - -
Form work system klm d. 60cm (9.137 m2) 4x 6,6667 M2 - -
Jumlah -
Dibulatkan -
91 1 M3 Pek. Kolom 2K2; D600
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 203,2055 Kg - -
Besi beton terpasang D. 10 34,5261 Kg - -
Form work system klm d. 60cm (9.137 m2) 4x 6,6667 M2 - -
Jumlah -
Dibulatkan -
92 1 M3 Pek. Kolom K4; 400X400
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 124,9550 Kg - -
Besi beton terpasang D. 10 41,1025 Kg - -
Bekisting; Multiplek 9mm+stootwerk 10,0000 M2 - -
Jumlah -
Dibulatkan -
93 1 M3 Pek. Kolom K5; 300X400
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 115,4569 Kg - -
Besi beton terpasang D. 10 47,9529 Kg - -
Bekisting; Multiplek 9mm+stootwerk 11,6667 M2 - -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
2
B ELEVASI +10.50 (LANTAI-3)

94 1 M3 Pek. Balok B1:400x750


Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 110,4904 Kg - -
Besi beton terpasang D. 13 6,9056 Kg - -
Besi beton terpasang D. 10 28,6194 Kg - -
Bekisting; Multiplek 9mm+stootwerk 6,3333 M2 - -
Stoot Werk Blk 40x75 (14.2 m') 3x 3,1667 M2 - -
Jumlah -
Dibulatkan -
95 1 M3 Pek. Balok B1K:400x750
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 122,3383 Kg - -
Besi beton terpasang D. 13 7,6461 Kg - -
Besi beton terpasang D. 10 31,6883 Kg - -
Bekisting; Multiplek 9mm+stootwerk 7,0125 M2 - -
Stoot Werk Blk 40x75 (14.2 m') 3x 3,5062 M2 - -
Jumlah -
Dibulatkan -
96 1 M3 Pek. Balok B2:300x450
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 19 102,0104 Kg - -
Besi beton terpasang D. 13 15,0336 Kg - -
Besi beton terpasang D. 10 34,8286 Kg - -
Bekisting; Multiplek 9mm+stootwerk 8,7080 M2 - -
Stoot Werk Blk 30x45 (3 m') 3xpakai 4,3540 M2 - -
Jumlah -
Dibulatkan -
97 1 M3 Pek. Balok B3:300x650
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 22 97,3892 Kg - -
Besi beton terpasang D. 13 10,6241 Kg - -
Besi beton terpasang D. 10 31,1764 Kg - -
Bekisting; Multiplek 9mm+stootwerk 8,2051 M2 - -
Stoot Werk Ring Blk 30x65 (9 m') 3x pakai 4,1026 M2 - -
Jumlah -
Dibulatkan -
98 1 M3 Pek. Balok B4:250x500
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 19 96,9479 Kg - -
Besi beton terpasang D. 13 14,2875 Kg - -
Besi beton terpasang D. 10 33,1002 Kg - -
Bekisting; Multiplek 9mm+stootwerk 10,0000 M2 - -
Stoot Werk Blk 25x50 (4.5m') 3x 5,0000 M2 - -
Jumlah -
Dibulatkan -
99 1 M3 Pek. Balok BL:300x450+100X550
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 19 73,9865 Kg - -
Besi beton terpasang D. 13 10,9037 Kg - -
Besi beton terpasang D. 10 65,5725 Kg - -
Bekisting; Multiplek 9mm+stootwerk 9,0000 M2 - -
Stoot Werk Blk 30x45 (3 m') 3xpakai 5,7000 M2 - -
Jumlah -
Dibulatkan -
100 1 M3 Pek. Balok B1:400x750+200X1250
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 63,1374 Kg - -
Besi beton terpasang D. 13 3,9461 Kg - -
Besi beton terpasang D. 10 46,2596 Kg - -
Besi beton terpasang D. 16 8,3500 Kg - -
Bekisting; Multiplek 9mm+stootwerk 8,2857 M2 - -
Stoot Werk Blk 40x75 (14.2 m') 3x 4,1429 M2 - -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
101 1 2
M3 Pek. Balok B1:400x750+200X1250
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 94,7060 Kg - -
Besi beton terpasang D. 13 5,9191 Kg - -
Besi beton terpasang D. 10 36,0917 Kg - -
Besi beton terpasang D. 16 9,2778 Kg - -
Bekisting; Multiplek 9mm+stootwerk 7,4286 M2 - -
Stoot Werk Blk 40x75 (14.2 m') 3x 3,7143 M2 - -
Jumlah -
Dibulatkan -
102 1 M3 Pek. Pelat Lantai t=12cm (dak)
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 10 155,7328 M2 - -
Bekisting Plat beton 2x pakai 8,3333 M2 - -
Jumlah -
Dibulatkan -
103 1 M3 Pek. Pelat Lantai t=15cm
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 10 124,5863 Kg - -
Bekisting Plat beton 2x pakai 6,6667 M2 - -
Jumlah -
Dibulatkan -

C ELEVASI +11.30 (TRIBUN VIP)

104 1 M3 Pek. Balok B1:400x750


Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 110,4904 Kg - -
Besi beton terpasang D. 13 6,9056 Kg - -
Besi beton terpasang D. 10 28,6194 Kg - -
Bekisting; Multiplek 9mm+stootwerk 6,3333 M2 - -
Stoot Werk Blk 40x75 (14.2 m') 3x 3,1667 M2 - -
Jumlah -
Dibulatkan -
105 1 M3 Pek. Balok B1K:400x750
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 110,4904 Kg - -
Besi beton terpasang D. 13 6,9056 Kg - -
Besi beton terpasang D. 10 28,6194 Kg - -
Bekisting; Multiplek 9mm+stootwerk 6,3333 M2 - -
Stoot Werk Blk 40x75 (14.2 m') 3x 3,1667 M2 - -
Jumlah -
Dibulatkan -
106 1 M3 Pek. Balok B2:300x450
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 19 102,0104 Kg - -
Besi beton terpasang D. 13 15,0336 Kg - -
Besi beton terpasang D. 10 34,8286 Kg - -
Bekisting; Multiplek 9mm+stootwerk 8,7080 M2 - -
Stoot Werk Blk 30x45 (3 m') 3xpakai 4,3540 M2 - -
Jumlah -
Dibulatkan -
107 1 M3 Pek. Balok B3:300x650
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 22 97,3892 Kg - -
Besi beton terpasang D. 13 10,6241 Kg - -
Besi beton terpasang D. 10 31,1764 Kg - -
Bekisting; Multiplek 9mm+stootwerk 8,2051 M2 - -
Stoot Werk Ring Blk 30x65 (9 m') 3x pakai 4,1026 M2 - -
Jumlah -
Dibulatkan -
108 1 M3 Pek. Balok BL:150x1000
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 13 41,4339 Kg - -
Besi beton terpasang d. 8 139,2590 Kg - -
Bekisting; Multiplek 9mm+stootwerk 14,3333 M2 - -
Stoot Werk Blk 15x100 (14.2 m') 3x 7,1667 M2 - -
- -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
109 1 2
M3 Pek. Pelat Lantai t=15cm
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 10 124,5863 Kg - -
Bekisting Plat beton 2x pakai 6,6667 M2 - -
Jumlah -
Dibulatkan -
110 1 M3 Pek. Pelat Lantai Trap Tribun
Readymix K-300 1,0000 M3 - -
Besi beton terpasang d. 8 126,2474 Kg - -
Bekisting Plat beton 2x pakai 1,6866 M2 - -
Jumlah -
Dibulatkan -

C.4. PEKERJAAN BETON ATAP/RING BALOK (ELEV +12.10 SD +TOP)


A KOLOM ELEVASI +12.10 SD TOP

111 1 M3 Pek. Kolom 2K1; D600


Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 250,0991 Kg - -
Besi beton terpasang D. 10 34,5261 Kg - -
Form work system klm d. 60cm (9.137 m2) 4x 6,6667 M2 - -
Jumlah -
Dibulatkan -
112 1 M3 Pek. Kolom 2K2; D600
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 203,2055 Kg - -
Besi beton terpasang D. 10 34,5261 Kg - -
Form work system klm d. 60cm (9.137 m2) 4x 6,6667 M2 - -
Jumlah -
Dibulatkan -
113 1 M3 Pek. Kolom K5; 300X400
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 115,4569 Kg - -
Besi beton terpasang D. 10 47,9529 Kg - -
Bekisting; Multiplek 9mm+stootwerk 11,6667 M2 - -
Jumlah -
Dibulatkan -

B BALOK ELEVASI +10.50 SD. +21.000

114 1 M3 Pek. Balok B1:400x750


Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 25 110,4904 Kg - -
Besi beton terpasang D. 13 6,9056 Kg - -
Besi beton terpasang D. 10 28,6194 Kg - -
Bekisting; Multiplek 9mm+stootwerk 6,3333 M2 - -
Stoot Werk Blk 40x75 (14.2 m') 3x 3,1667 M2 - -
Jumlah -
Dibulatkan -
115 1 M3 Pek. Balok B2:300x450
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 19 104,1292 Kg - -
Besi beton terpasang D. 13 15,3459 Kg - -
Besi beton terpasang D. 10 35,5521 Kg - -
Bekisting; Multiplek 9mm+stootwerk 8,8889 M2 - -
Stoot Werk Blk 30x45 (3 m') 3xpakai 4,4444 M2 - -
Jumlah -
Dibulatkan -
116 1 M3 Pek. Balok B5:250x400
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 19 140,5744 Kg - -
Besi beton terpasang D. 13 20,7169 Kg - -
Besi beton terpasang D. 10 41,5959 Kg - -
Bekisting; Multiplek 9mm+stootwerk 10,5000 M2 - -
Stoot Werk Blk 25x40 (3 m') 3xpakai 5,2500 M2 - -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
117 1 M3 Pek. Balok BR:150x3002
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 16 69,5834 Kg - -
Besi beton terpasang D. 10 34,2823 Kg - -
Bekisting; Multiplek 9mm+stootwerk 16,6667 M2 - -
Stoot Werk Blk 15x40 (3 m') 3xpakai 8,3333 M2 - -
Jumlah -
Dibulatkan -
118 1 M3 Pek. Pelat Lantai t=15cm (Ruang Mesin Lift).
Readymix K-300 1,0000 M3 - -
Besi beton terpasang D. 10 124,5863 Kg - -
Bekisting Plat beton 2x pakai 6,6667 M2 - -
Jumlah -
Dibulatkan -
A PENGGUNAAN ALAT BERAT RENCANA ANGGARAN PEMBUATAN PROYEK
No Armadada jam HARGA MINYAK UANG MAKAN TOTAL

1 DAM TRUK 1 -
2 EXCAVATOR PC 200 1 -
3 BULLDOZER 1 -
-

B PENGGUNAAN ALAT / ITEM PEKERJAAN


HARGA
No ARMADA UNIT JAM MUATAN SAT RIT
Rp

1 DAM TRUK 1 1,00 11,00 M3 5


2 EXCAVATOR PC 200 1 1,00
3 DOZER 1 1,00
4 TOTAL UNIT 3
5 Vibra/Stoom 5
-

C STRIPING MUATAN/PENDAPAT
1 DOZER 1 8,00 - 1.200,00

D 1 M3 PEKERJAAN CUT AND FILL MENGGUNAKAN ALAT BERAT


TOTAL HARGA
No URAIAN PEKERJAAN TOTAL VOLUME PEMBULATAN
Rp

1 Pekerjaan Cut and Fill 55 -

Jumlah Pekerjaan Cut and Fill/m3 -


DAFTAR HARGA SATUAN PEKERJAAN ARSITEKTUR

No. Item Pekerjaan Harga Satuan

1 M2 Bata Merah tebal 1/2 bata, 1 Pc : 5 Ps -


2 M2 Screeding t. 2 cm (MU 440) -
3 M1 Kolom Praktis 10x10 -
4 M1 Balok lintel 10x15 -
5 M1 Railing selasar besi pipa hitam finishing cat -
6 M1 Railing tangga entrance dan tangga auditorium, satinless steel -
7 M1 Hand Railing tangga entrance dan tangga auditorium, satinless steel -
8 M2 Genteng keramik berglazur, setara M-Class/Kanmuri/KIA -
9 M1 Bubungan Genteng keramik berglazur, setara M-Class/Kanmuri/KIA -
10 M2 Alumunium foil satu muka -
11 Unit Sun screen Panellux (1.11 x 1.9) -
12 M1 Dudukan sun screen C 100x50x2,3 & cat besi -
13 M2 Dinding granite homogenous tile 40x40 cm polished -
14 M2 Dinding granite homogenous tile 60x120 cm polished -
15 M2 Lantai granite homogenous tile 40x40 cm unpolished -
16 M2 Lantai granite homogenous tile 60x60 cm polished -
17 M2 Lantai granite homogenous tile 60x60 cm polished berpola -
18 M1 Border granit ukuran (10 x 60) cm -
19 M1 Step nosing/plint granito ukuran (8 x 60) cm -
20 M2 Granite alam slab tebal 2 cm uk. 60x120 cm (meja washtafel) -
21 M2 Granite alam slab tebal 2 cm uk. 60x120 cm (dinding entrance) -
22 M2 Lantai parkit kayu merbau ukuran 9 x 60 cm tebal 1,5 cm -
23 M2 Pas. Paving Block Natural Tbl. 6 cm -
24 M2 Pas. Batako PC pres 10x20x40 ad 1:4 -
25 M2 Dinding hebel t 10 cm + MU 380 -
26 M2 Plesteran dinding MU 100 t. 10 mm -
27 M2 Acian MU 200 t. 3 mm -
28 M2 Rockwool tebal 5 cm dinding samping kanan, kiri dan belakang
29 M2 Rangka hollou galvanis 40x40 mm, tebal 1,5 mm -
30 M2 Pelapis dinding multiplex 9 mm, triplex 4 mm + HPL -
31 M2 Pelapis dinding multiplek 9 mm, triplex 4 mm + HPL rangka hollou galvanis 4x4 cm -
32 M2 Pelapis dinding walpaper (samping kanan, kiri dan belakang) -
33 M2 Beakdrop Auditorium (rangka hollou galvanis 4/4, triplex 12 mm, triplex 4 mm + HPL+ lampu + screen) -
34 M2 Ornamen dinding (rangka hollou galvanis 4/4, triplex 9 mm, triplex 4 mm + HPL) -
35 Unit Ornamen kolom pintu utama (rangka hollou galvanis 4/4, triplex 9 mm, triplex 4 mm + HPL), Type 1 -
36 Unit Ornamen kolom pintu utama (rangka hollou galvanis 4/4, triplex 9 mm, triplex 4 mm + HPL), Type 2 -
37 M2 Waterproofing MU 600 -
38 M2 Water proofing membran bakar -
39 M2 Plafond GRC 4 mm, rangka hollou galvalume 40x40+20x40 mm -
40 M2 Plafond gypsum board, rangka hollou galvalume 40x40+20x40 mm -
41 M2 Plafond multiplex 9 mm + triplex 4 mm finishing HPL, rangka hollou galvalume 40x40 mm -
42 M2 Listplang multiplex 9 mm + triplex 4 mm finishing HPL, rangka hollou galvalume 40x40 mm -
43 M2 Penutup listplang multiplex 9 mm + triplex 4 mm finishing HPL -
44 M1 Lisplang GRC uk 3000x300x12 mm -
45 M2 Cat dinding exterior dengan Weathersield, setara Dulux/Mowilex/Jotun -
46 M2 Cat dinding interior, setara Dulux/Mowilex/Jotun -
47 M2 Cat plafond gypsum interior, setara Dulux/Mowilex/Jotun -
48 M2 Cat plafond GRC overstek exterior dengan Weathersield, setara Dulux/Mowilex/Jotun -
49 M2 Cat permukaan baja dengan meni besi -
50 M2 Pengecatan permukaan baja -
51 M2 Pengecatan talang -
52 M2 Pengecatan kayu (3x) berikut meni -
53 M2 Pelaburan Bidang Kayu dengan Politur -
54 M1 Listplank + Talang metal 30/30 -
55 Unit Talang Tegak Type 1 (PVC 6" AW + cat) -
56 Unit Talang Tegak Type 2 (PVC 6" AW + cat) -
57 KG Besi profil WF -
58 KG Besi profil C -
59 Unit PU1 (PK) -
60 Unit PU2 (PK) -
61 Unit PU3 (PT) -
62 Unit PJ1 (PA) -
63 Unit P1 (PM) -
64 Unit P2 (PM) -
65 Unit P3 (PA) -
66 Unit P4 (PA) -
67 Unit J1 (JA) -
68 Unit J2 (JA) -
69 Unit J3 (JA) -
No. Item Pekerjaan Harga Satuan
70 Unit J4 (JA) -
71 Unit J5 (JA) -
72 Unit J6 (JA) -
73 Unit PS1 (JM) -
74 Unit PS2 (JM) -
75 Unit BV1 (JA) -
76 Unit BV2 (JA) -
77 Unit BV3 (JA) -
78 M2 Pasang kaca tempered 10 mm (ASAHI) -
79 M2 Pasang Allumunium Composite Panel (ACP), setara ALCOPAN/MACO/SEVEN -

Pas. Follding Gate Hollow frame 5 x 5, meranti wood inside, multiplek 1,5 mm, glasswoll 50mm/ rokwoll, Accourete
80 M2 -
sound reduce 3 mm, cotton sheet 3 mm, finishing cosglow/wallpaper/oscar/Hpl dll. (Pabrikasi), setara WINA/LUCKY
81 M1 Saluran keliling bangunan 60x60 -
82 M1 Beton decker t. 6 cm (45X70) -
83 M3 Beton decker t. 20 cm -
84 M2 Plesteran Siar adk. 1pc : 2ps batu belah -
85 M2 Plesteran adk. 1pc : 4ps -
86 M2 Acian Plesteran -
87 M1 Meja beton -
88 Bh Closet Duduk (Flashing), setara TOTO -
89 Bh Closet jongkok (Flashing), setara TOTO -
90 Bh Washtafel Toilet Pria/Wanita, setara TOTO -
91 Unit Kitchen Zink Stainless ( 1 Lobang ) -
92 Bh Urinoir TOTO U 57M -
93 Bh Sekat urinoir TOTO -
94 Bh Jet Whoser + stopkran + kran air Lengkap ACC, setara TOTO -
95 Bh Kran dinding TOTO T23 B13 -
96 Bh Kran bebek TOTO T30 ARQ 13N -
97 Bh Floordrain Stailes Steel, setara SUN-EI -
98 Bh Roof drain Stailes Steel, setara SUN-EI -
99 Bh Cermin TOTO TS 119 AS 5 -
100 Titik Pasangan Sulingan Pipa PVC type AW 2" WAVIN + Ijuk -

Bogor, ..................... 2018


Kontraktor,
PT,.................................

Cap & Tanda Tangan

NAMA
Jabatan
ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
1 2 3 4 5 6 = 3x6

1 1 M2 Bata Merah tebal 1/2 bata, 1 Pc : 5 Ps


Bata merah bakar kelas I 70,0000 Bh - -
PC 9,6800 Kg - -
Pasir pasang 0,0450 M3 - -
Pekerja 0,3200 O/H - -
Tukang batu terampil 0,1000 O/H - -
Kepala tukang batu 0,0100 O/H - -
Mandor 0,0150 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
2 1 M2 Screeding t. 2 cm (MU 440)
MU 440 - perata lantai/1,2 m2 (40 kg) 0,8333 Zak - -
Pekerja 0,0495 O/H - -
Tukang batu terampil 0,0075 O/H - -
Kepala tukang batu 0,0008 O/H - -
Mandor 0,0024 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
3 1 M1 Kolom Praktis 10x10
Beton site mix K-175 0,0100 M3 - -
Besi beton terpasang < d 12 d. 8 0,7900 Kg - -
Besi beton terpasang < d 12 d. 10 2,4800 Kg - -
Bekisting multiplex 9 mm 0,2000 M2 - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
4 1 M1 Balok lintel 10x15
Beton site mix K-175 0,0150 M3 - -
Besi beton terpasang < d 12 d. 8 0,9875 Kg - -
Besi beton terpasang < d 12 d. 10 2,4800 Kg - -
Bekisting multiplex 9 mm 0,3000 M2 - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
5 1 M1 Railing selasar pipa hitam finishing cat
Pipa GIP Medium A d. 2" 0,1100 Btg - -
Pipa GIP Medium A d. 1 1/2" 0,3670 Btg - -
Cat permukaan baja dengan meni besi 0,3630 M2 - -
Cat besi 0,3000 Kg - -
Tukang besi profil terampil 0,0250 O/H - -
Pekerja 0,2500 O/H - -
Kepala tukang besi profil 0,0250 O/H - -
Mandor 0,0010 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
6 1 M1 Railing besi pipa stainless steel
Besi Pipa Stainless steel 2,5" 1,0000 M1 - -
Besi Pipa Stainless steel 1,5" 2,0000 M1 - -
Besi Pipa Stainless steel 1" 1,8000 M1 - -
Upah Kerja pengelasan dan peralatan bantu 97,4400 CM - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
7 1 M1 Hand railing besi pipa stainless steel
Besi Pipa Stainless steel 2,5" 1,0000 M1 - -
Besi Pipa Stainless steel 1" 0,5000 M1 - -
Upah Kerja pengelasan dan peralatan bantu 33,0400 CM - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
8 1 M2 Genteng keramik berglazur, setara M-Class/Kanmuri/KIA
Genteng keramik glazur, setara M-Class/Kanmuri/KIA 13,6000 M2 - -
Pekerja 0,1500 Kg - -
Tukang Kayu 0,0750 O/H - -
Kepala tukang 0,0080 O/H - -
Mandor 0,0080 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
9 1 M1 Bubungan Genteng keramik berglazur, setara M-Class/Kanmuri/KIA
Bubungan Genteng keramik berglazur, setara M-Class/Kanmuri/KIA 3,8000 Bh - -
Semen Portland 8,0000 Kg - -
Pasir pasang 0,0320 M3 - -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
Pekerja 2 0,4000 HO - -
Tukang kayu 0,2000 HO - -
Kepala tukang 0,0200 HO - -
Mandor 0,0020 HO - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
10 1 M2 Alumunium foil satu muka
Alumunium foil satu muka 1,1000 M2 - -
Pekerja 0,1500 HO - -
Tukang kayu terampil 0,0500 HO - -
Kepala tukang kayu 0,0050 HO - -
Mandor 0,0080 HO - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
11 1 Unit Sun screen Panellux (1.11 x 1.9)
Panellux sun screen 26,0000 M1 - -
Stringer SL-1 @3m 2,0000 M1 - -
Upah pasang 0,1000 M2 - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
12 1 M1 Dudukan sun screen C 100x50x2,3 & cat besi
Besi profil canal C 4,4730 Kg - -
Plat t. 2 mm 1,6220 Kg - -
Meni kayu/besi 0,3250 Kg - -
Tukang besi profil terampil 0,0240 O/H - -
Pekerja 0,2440 O/H - -
Kepala tukang besi profil 0,0240 O/H - -
Mandor 0,0010 O/H - -
Cat permukaan baja dengan meni besi 0,4000 M2 - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
13 1 M2 Dinding granite homogenous tile 40x40 cm polish
Granit homogenous tile ukuran (40 x 40) polish 6,0000 Bh - -
Semen Tiga Roda @ 50 kg/zak 9,3000 Kg - -
Pasir Pasang 0,0180 M2 - -
Semen Warna 1,3000 Kg - -
Pekerja 0,9000 HO - -
Tukang batu 0,4500 HO - -
Kepala tukang 0,0450 HO - -
Mandor 0,0450 HO - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
14 1 M2 Dinding granite homogenous tile 60x120 cm polished setara INDOGRES
Granit homogenous tile ukuran (60 x 120) polished setara INDOGRES 1,0000 M2 -
Semen Tiga Roda @ 50 kg/zak 9,3000 Kg -
Pasir Pasang 0,0180 M2 -
Semen Warna 1,3000 Kg -
Material dan peralatan bantu 1,0000 lot -
Pekerja 0,9000 HO -
Tukang batu 0,4500 HO -
Kepala tukang 0,0450 HO -
Mandor 0,0450 HO -
- -
Overhead + Profit -
Jumlah -
Dibulatkan -
15 1 M2 Lantai granite homogenous tile 40x40 cm unpolish
Granit homogenous tile ukuran (40 x 40) unpolish 6,0000 Bh - -
Semen Tiga Roda @ 50 kg/zak 9,3000 Kg - -
Pasir Pasang 0,0180 M2 - -
Semen Warna 1,3000 Kg - -
Pekerja 0,9000 HO - -
Tukang batu 0,4500 HO - -
Kepala tukang 0,0450 HO - -
Mandor 0,0450 HO - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
16 1 M2 Lantai granite homogenous tile 60x60 cm 2 polish
Granit homogenous tile ukuran (60 x 60) polish 3,0000 Bh - -
Semen Tiga Roda @ 50 kg/zak 9,8000 Kg - -
Pasir Pasang 0,0450 M2 - -
Semen Warna 1,3000 Kg - -
Pekerja 0,2500 HO - -
Tukang batu 0,1250 HO - -
Kepala tukang 0,0130 HO - -
Mandor 0,0130 HO - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
17 1 M2 Lantai granite homogenous tile 60x60 cm polish berpola
Granit homogenous tile ukuran (60 x 60) polish 3,0000 Bh - -
Semen Tiga Roda @ 50 kg/zak 9,8000 Kg - -
Pasir Pasang 0,0450 M2 - -
Semen Warna 1,3000 Kg - -
Pekerja 0,5000 HO - -
Tukang batu 0,2500 HO - -
Kepala tukang 0,0260 HO - -
Mandor 0,0260 HO - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
18 1 M2 Border granit ukuran (10 x 60) cm
Border granit ukuran (10 x 60) cm 1,6700 Bh - -
Portland Cement 0,9300 Kg - -
Pasir Pasang 0,0018 M2 - -
Semen Warna 0,1300 Kg - -
Pekerja 0,0900 HO - -
Tukang batu 0,0450 HO - -
Kepala tukang 0,0045 HO - -
Mandor 0,0045 HO - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
19 1 M2 Step nosing/plint granito ukuran (8 x 60) cm
Step nosing/plint granito ukuran (8 x 60) cm 1,6700 Bh - -
Portland Cement 0,9300 Kg - -
Pasir Pasang 0,0018 M2 - -
Semen Warna 0,1300 Kg - -
Pekerja 0,0900 HO - -
Tukang batu 0,0450 HO - -
Kepala tukang 0,0045 HO - -
Mandor 0,0045 HO - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
20 1 M2 Granite alam slab tebal 2 cm uk. 60x120 cm (meja washtafel)
Granite alam slab tebal 2 cm uk. 60x120 cm 1,1000 Bh - -
Portland Cement 1,3950 Kg - -
Pasir Pasang 0,0027 M2 - -
Semen Warna 0,1950 Kg - -
Pekerja 1,8000 HO - -
Tukang batu 0,9000 HO - -
Kepala tukang 0,0900 HO - -
Mandor 0,0900 HO - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
21 1 M2 Granite alam slab tebal 2 cm uk. 60x120 cm (dinding entrance)
Granite alam slab tebal 2 cm uk. 60x120 cm 1,1000 Bh -
Portland Cement 1,3950 Kg -
Pasir Pasang 0,0027 M2 -
Semen Warna 0,1950 Kg -
Material dan peralatan bantu 1,0000 lot -
Pekerja 1,8000 HO -
Tukang batu 0,9000 HO -
Kepala tukang 0,0900 HO -
Mandor 0,0900 HO -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
22 1 M2 Lantai parkit kayu merbau ukuran 9 x 60 2cm tebal 1,5 cm (kayu solid)
Lantai parkit kayu merbau ukuran 9 x 60 cm tebal 1,5 cm (kayu solid) 1,1000 M2 -
Lem kuning (Aibond) 0,5000 Ltr -
Material dan peralatan bantu 1,0000 Lot -
Pekerja 1,2000 HO -
Tukang kayu 0,6000 HO -
Kepala tukang 0,0600 HO -
Mandor 0,0600 HO -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
23 1 M2 Pas. Paving Block Natural Tbl. 6 cm
Paving block natural 1,0100 M2 - -
Pasir pasang 0,1000 Kg - -
Pekerja 0,2500 Oh - -
Tukang Batu 0,5000 Oh - -
Kepala Tukang 0,0250 Oh - -
Mandor 0,0025 Oh - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
24 1 M2 Pas. Batako PC pres 10x20x40 ad 1:4
PC 10,8500 Kg - -
Pasir pasang 0,0279 M3 - -
Batako kecil 8x10x20 13,0000 Bh - -
Pekerja 0,2720 O/H - -
Tukang batu terampil 0,0850 O/H - -
Kepala tukang batu 0,0085 O/H - -
Mandor 0,0128 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
25 1 M2 Dinding hebel t 10 cm + MU 380
Hebel t. 10x20x60 8,5000 Bh - -
MU 380 - pas. Bata ringan/10 m2 (40 kg) 0,1000 Zak - -
Pekerja 0,3500 O/H - -
Tukang batu terampil 0,1500 O/H - -
Kepala tukang batu 0,0150 O/H - -
Mandor 0,0170 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
26 1 M2 Plesteran dinding MU 100 t. 10 mm
MU 100 - plesteran/2,4 m2 (40 kg) 0,4167 Zak - -
Pekerja 0,2000 O/H - -
Tukang batu terampil 0,1500 O/H - -
Kepala tukang batu 0,0150 O/H - -
Mandor 0,0100 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
27 1 M2 Acian MU 200 t. 3 mm
MU 200 - acian plesteran/20 m2 (40 kg) 0,0500 Zak - -
Pekerja 0,1430 O/H - -
Tukang batu terampil 0,1070 O/H - -
Kepala tukang batu 0,0105 O/H - -
Mandor 0,0105 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
28 1 M2 Rockwool tebal 5 cm dinding samping kanan, kiri dan belakang
Rockwool tebal 5 cm 1,0000 M2 -
Kawat/peralatan 1,0000 Lot -
Pekerja 0,1500 HO -
Tukang kayu terampil 0,1620 HO -
Kepala tukang kayu 0,0162 HO -
Mandor 0,0029 HO -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
29 1 M2 Rangka hollou galvanis 40x40 mm, tebal21,5 mm
Besi hollow galvanis 40x40 mm, tebal 1,5 mm 1,3440 Btg - -
Paku Skrup 0,1000 Bks - -
Pekerja 0,1500 HO - -
Tukang kayu terampil 0,4500 HO - -
Kepala tukang kayu 0,0450 HO - -
Mandor 0,0080 HO - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
30 1 M2 Pelapis dinding multiplek 9 mm, triplex 4 mm + HPL
Multiplek 9 mm 0,3472 M2 - -
Triplek 4 mm 0,3472 M2 - -
HPL serat kayu 0,3472 M2 - -
Edging ex.Taco 34 mm 4,0000 M1 - -
Sekrup 0,1000 Bks - -
Lem Kuning (Aibond) 1,1200 Ltr - -
Pekerja 1,1500 HO - -
Tukang kayu 0,4500 HO - -
Kepala tukang 0,1000 HO - -
Mandor 0,0100 HO - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
31 1 M2 Pelapis dinding multiplek 9 mm, triplex 4 mm + HPL rangka hollou galvanis 4x4 cm
Besi hollow galvanis 40x40 mm, tebal 1,5 mm 1,1200 M1 - -
Multiplek 18 mm 0,5208 M2 - -
Multiplek 9 mm 0,3742 M2 - -
HPL serat kayu 0,3819 M2 - -
Sekrup 0,2000 Bks - -
Lem Kuning (Aibond) 1,1200 Ltr - -
Pekerja 1,1500 HO - -
Tukang kayu 0,4500 HO - -
Kepala tukang 0,1000 HO - -
Mandor 0,0100 HO - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
32 1 M2 Pelapis dinding wallpaper, lebar 50 cm
Wall paper 1,2000 M2 - -
Kuas Roll 0,0200 Bh - -
Kape set 0,0200 Bh - -
Ampelas 0,2500 Lbr - -
Lem 0,2500 Kg - -
Pekerja 0,2000 HO - -
Tukang 0,2000 HO - -
Kepala tukang 0,0200 HO - -
Mandor 0,0020 HO - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
33 1 M2 Beakdrop Auditorium (rangka hollou galvanis 4/4, triplek 12 mm, triplex 4 mm + HPL + screen lengkap acc)
Besi hollow 40x40 mm galvanis 1,3440 Btg -
Multiplek 12 mm 0,8400 Lbr -
Multiplek 9 mm 0,3335 Lbr -
Triplek 4 mm 0,8400 Lbr -
Triplek 4 mm lapis melamin 0,1551 Lbr -
HPL serat kayu 1,6800 M2 -
Kaca 5 mm lengkap dengan dudukan 0,1550 M2 -
stainless steel 0,1500 M1 -
Sekrup 0,4800 Bks -
Lem Kuning (Aibond) 0,5160 Ltr -
Alat bantu 1,0000 Lot -
Pekerja 2,5000 HO -
Tukang kayu 1,5000 HO -
Kepala tukang 1,2000 HO -
Mandor 0,7500 HO -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
1 Unit Screen 96"x96" Automatis, setara MICROVISION/BRITE/D-LIGHT lengkap dengan acessories
Screen 96"x96" Automatis, set. MICROVISION/BRITE/D-LIGHT 1,0000 Unit - -
Upah Kerja 1,0000 HO - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
1 Unit 2 lengkap ornamen, acessories dan Screen
Backdrop multiplex 18 mm + 9mm finising HPL
1 Unit Backdrop multiplex 18 mm + 9mm finising HPL lengkap ornamen 63,9600 M2 - -
1 Unit Screen, setara MICROVISION/BRITE/D-LIGHT lengkap acessories 1,0000 Unit - -
Jumlah Total -
34 1 Unit Ornamen pada dinding (rangka hollou galvanis 4/4, multiplek 9 mm, triplek 4 mm + HPL)
Besi hollow 40x40 mm galvanis 1,1200 Btg - -
Multiplek 9 mm 0,3472 Lbr - -
Triplek 4 mm 0,3472 Lbr - -
HPL serat kayu 0,3472 M2 - -
Sekrup 0,4800 Bks - -
Lem Kuning (Aibond) 0,5160 Ltr - -
Alat bantu 1,0000 Lot - -
Pekerja 1,1500 HO - -
Tukang kayu 0,4500 HO - -
Kepala tukang 0,1000 HO - -
Mandor 0,0100 HO - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
35 1 Unit ornamen kolompintu utama multiplex 12 mm + 9 mm finising HPL lengkap acessories, Type 1
1 M2 Pasang rangka hollou galvanis 4x4 21,4820 M2 - -
1 M2 Pasang multiplex 9 mm finising HPL lengkap acessories 21,4820 M2 - -
Jumlah Total -
36 1 Unit ornamen kolompintu utama multiplex 12 mm + 9 mm finising HPL lengkap acessories, Type 2
1 M2 Pasang rangka hollou galvanis 4x4 11,5401 M2 - -
1 M2 Pasang multiplex 9 mm finising HPL lengkap acessories 11,5401 M2 - -
Jumlah Total -
37 1 M2 Waterproofing MU 600
MU 600 - pelapis kedap air/1,5 m2 (3 kg) 0,6667 Zak - -
Pekerja 0,2000 O/H - -
Tukang batu terampil 0,1500 O/H - -
Kepala tukang batu 0,0150 O/H - -
Mandor 0,0100 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
38 1 M2 Water proofing membran bakar
Membran Shield 1,0000 m2 - -
Pekerja 0,0200 HO - -
Tukang cat terampil 0,0630 HO - -
Kepala tukang cat 0,0063 HO - -
Mandor 0,0025 HO - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
39 1 M2 Plafond GRC 4 mm, rangka hollow galvalume 40x40+20x40 mm
Hollow galvalume 40x40 mm 0,4150 Btg -
Hollow galvalume 20x40 mm 0,1500 Btg -
Gantungan plafond kawat putih dia. 3-4 mm 4,8000 M1 -
GRC (120 x 240 x 4) mm 0,3640 Lbr -
Paku GRC 0,1100 Kg -
Ramset/Dina Bolt 4,0000 Buah -
Cotton Plaster 0,0720 Buah -
Compoun 0,1250 Zak -
Pekerja 0,1000 M2 -
Tukang kayu terampil 0,0500 M2 -
Kepala tukang kayu 0,0050 M2 -
Mandor 0,0050 M2 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
40 1 M2 Plafond gypsum board, , rangka hollow galvalume 40x40+20x40 mm
Hollow galvalume 40x40 mm 0,4150 Btg - -
Hollow galvalume 20x40 mm 0,1500 Btg - -
Gantungan plafond kawat putih dia. 3-4 mm 4,8000 M1 - -
Gypsum board (120 x 240 x 9) mm 0,3640 Lbr - -
Paku Gypsum 0,1100 Kg - -
Ramset/Dina Bolt 4,0000 Buah - -
Cotton Plaster 0,0720 Buah - -
Compoun 0,1250 Zak - -
Pekerja 0,1000 Oh - -
Tukang Kayu 0,0500 Oh - -
Kepala Tukang 0,0050 Oh - -
Mandor 0,0050 Oh - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
41 1 M2 2 HPL, rangka hollou galvalume
Plafond multiplex 9 mm + triplex 4 mm finishing
Hollow 40x40 galvalume 0,4150 Btg - -
Hollow 40x40 galvalume 0,4150 Btg - -
Gantungan plafond besi galvanis dia. 4 mm 1,2000 M1 - -
Paku Biasa 2" - 5" 0,0600 Kg - -
Multiplek 120 cm x 240 cm x 9 mm 0,3900 Lbr - -
Trplex 4 mm 0,3900 Lbr - -
HPL 0,3900 Lbr - -
Lem Kuning (Aibond) 0,4500 Lbr - -
Pekerja 0,5000 Oh - -
Tukang Kayu 0,2500 Oh - -
Kepala Tukang 0,0250 Oh - -
Mandor 0,0250 Oh - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
42 1 M2 Listplang multiplex 9 mm + triplex 4 mm finishing HPL, rangka hollou galvalume
Hollow 40x40 galvalume 0,4150 Btg - -
Hollow 40x40 galvalume 0,4150 Btg - -
Paku Biasa 2" - 5" 0,0600 Kg - -
Multiplek 120 cm x 240 cm x 9 mm 0,3900 Lbr - -
Trplex 4 mm 0,3900 Lbr - -
HPL 0,3900 Lbr - -
Lem Kuning (Aibond) 0,4500 Lbr - -
Pekerja 0,6000 Oh - -
Tukang Kayu 0,3000 Oh - -
Kepala Tukang 0,0300 Oh - -
Mandor 0,0300 Oh - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
43 1 M2 Penutup listplang multiplex 9 mm + triplex 4 mm finishing HPL
Multiplek 120 cm x 240 cm x 9 mm 0,3900 Lbr - -
Trplex 4 mm 0,3900 Lbr - -
HPL 0,3900 Lbr - -
Lem Kuning (Aibond) 0,4500 Lbr - -
Pekerja 0,3000 Oh - -
Tukang Kayu 0,1500 Oh - -
Kepala Tukang 0,0150 Oh - -
Mandor 0,0150 Oh - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
44 1 M1 Lisplang GRC uk 3000x300x12 mm
Kalsiplank uk. 3000x300x12 mm 0,3400 Lbr - -
Kaso 4/6 0,0030 M3 - -
Paku Biasa ½" - 1" 0,3000 Kg - -
Pekerja 0,1100 Oh - -
Tukang Kayu 0,2200 Oh - -
Kepala Tukang 0,0220 Oh - -
Mandor 0,0050 Oh - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
45 1 M2 Cat dinding exterior dengan Weathersield, setara Dulux/Mowilex/Jotun
Cat tembok ICI weathershield 0,2000 Kg -
Plamir tembok 0,1600 Kg -
Rol cat tembok 0,0100 Bh -
Amplas 0,5000 Lbr -
Pekerja setengah terampil 0,1000 O/H -
Tukang cat setengah terampil 0,1500 O/H -
Kepala tukang cat 0,0150 O/H -
Mandor 0,0050 O/H -
Steger werk 0,0425 Ls -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
46 2
1 M2 Cat dinding interior, setara Dulux/Mowilex/Jotun
Cat tembok ICI Interior 0,2000 Kg - -
Plamir tembok 0,1600 Kg - -
Rol cat tembok 0,0100 Bh - -
Amplas 0,5000 Lbr - -
Pekerja setengah terampil 0,1000 O/H - -
Tukang cat setengah terampil 0,1500 O/H - -
Kepala tukang cat 0,0150 O/H - -
Mandor 0,0050 O/H - -
Steger werk 0,0425 Ls - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
47 1 M2 Cat plafond interior, setara Dulux/Mowilex/Jotun
Plamir tembok 0,1600 Kg - -
Cat tembok ICI Interior 0,2600 Kg - -
Rol cat tembok 0,0500 Bh - -
Ampelas 0,0200 Lbr - -
Pekerja setengah terampil 0,1600 O/H - -
Tukang cat setengah terampil 0,0280 O/H - -
Kepala tukang cat 0,0300 O/H - -
Mandor 0,0100 O/H - -
Steger werk 0,0425 Ls - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
48 1 M2 Cat plafond exterior dengan Weathersield, setara Dulux/Mowilex/Jotun
Plamir tembok 0,1600 Kg - -
Cat tembok ICI weathershield 0,2600 Kg - -
Rol cat tembok 0,0500 Bh - -
Ampelas 0,0200 Lbr - -
Pekerja setengah terampil 0,1600 O/H - -
Tukang cat setengah terampil 0,0280 O/H - -
Kepala tukang cat 0,0300 O/H - -
Mandor 0,0100 O/H - -
Steger werk 0,0425 Ls - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
49 1 M2 Cat permukaan baja dengan meni besi
Meni kayu/besi 0,1000 Kg - -
Kuas 3" 0,0100 Bh - -
Pekerja 0,0200 O/H - -
Tukang cat terampil 0,1800 O/H - -
Kepala tukang cat 0,0200 O/H - -
Mandor 0,0100 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
50 1 M2 Pengecatan permukaan baja
Cat besi 0,3000 Kg - -
Pekerja 0,0060 O/H - -
Tukang cat terampil 0,0600 O/H - -
Kepala tukang kayu 0,0120 O/H - -
Mandor 0,0060 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
51 1 M2 Pengecatan talang
Cat dasar 0,1700 Kg - -
Cat besi 0,3500 Kg - -
Pekerja 0,0700 O/H - -
Tukang cat terampil 0,1050 O/H - -
Kepala tukang cat 0,0040 O/H - -
Mandor 0,0025 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
52 1 M2 Pengecatan kayu (3x) berikut meni 2
Meni kayu/besi 0,2000 Kg - -
Plamir kayu 0,1500 Kg - -
Cat dasar 0,1700 Kg - -
Cat kayu glotex 0,3500 Kg - -
Pekerja 0,0700 O/H - -
Tukang cat terampil 0,1050 O/H - -
Kepala tukang cat 0,0040 O/H - -
Mandor 0,0025 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
53 1 M2 Pelaburan Bidang Kayu dengan Politur
Politur 0,1500 Ltr - -
Politur jadi 0,3720 Ltr - -
Amplas 2,0000 Lbr - -
Tukang cat terampil 0,0600 O/H - -
Kepala tukang cat 0,0160 O/H - -
Mandor 0,0025 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
Dibulatkan -
54 1 M1 Listplank + Talang metal 30/30 (Lt. 1)
Pekerja terampil 0,1750 O/H - -
Tukang kayu setengah terampil 0,5000 O/H - -
Kepala tukang kayu 0,0500 O/H - -
Mandor 0,0100 O/H - -
Listplank dan talang Zam t=0,8mm powdercoating 1,0000 M1 - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
55 1 Unit Talang Tegak Type 1 (PVC 6" AW + cat)
Pipa PVC RUCIKA type AW 6" 3,9750 Btg -
Pipa PVC RUCIKA type AW 2" 0,5000 Btg -
Dop 6" 2,0000 Bh -
Klem 6" 5,0000 Bh -
Knie 6" 4,0000 Bh -
Tee 6" 3,0000 Bh -
Knie 2" 1,0000 Bh -
Upah kerja 10% dari material 0,1000 Unit -
Pengecatan talang 5,5786 M2 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
56 1 Unit Talang Tegak Type 2 (PVC 6" AW + cat)
Pipa PVC RUCIKA type AW 6" 3,5000 Btg - -
Klem 6" 7,0000 Bh - -
Knie 6" 3,0000 Bh - -
Upah kerja 10% dari material 0,1000 Unit - -
Pengecatan talang 3,1821 M2 - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
57 1 Kg Besi profil WF
Besi WF Ex DN SII 1,1000 kg - -
Meni besi 0,0800 kg - -
Pekerja 0,0600 Oh - -
Tukang besi 0,0060 Oh - -
Kepala tukang 0,0060 Oh - -
Mandor 0,0003 Oh - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
58 1 Kg Besi profil C
Besi C 1,1000 kg - -
Meni besi 0,0800 kg - -
Pekerja 0,0600 Oh - -
Tukang besi 0,0060 Oh - -
Kepala tukang 0,0060 Oh - -
Mandor 0,0003 Oh - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
59 1 Unit PU1 (PK) 2
Rangka hollou galvanis 4/4 cm 70,1700 M2 -
Rangka penebalan partisi multipleks lebar 10 cm x t=18 mm 70,1700 M2 -
Partisi multipleks t=18 mm 70,1700 M2 -
Pasang HPL 70,1700 M2 -
Lem Kuning 14,0340 Kg -
Paku skrup 3" 421,0200 Bh -
Pek. Roter nat 63,5200 M1 -
Kusen aluminium 4 " coating 26,2800 M' -
Pintu panel solid kamper samarinda awet oven besar L=1 m, finishing melamik 2,0000 bh -
Kaca tempered 8 mm (ASAHI) 8,1000 M2 -
Silikone 17,2000 M' -
Kunci Solid (lockcase,handle,cylinder) 1,0000 Bh -
Stoper 4,0000 Set -
Grendel pintu Solid (flush bold) 12" 2,0000 Bh -
Pek. Plin kayu 2/10 cm, finishing melamik 4,7000 M1 -
Upah kerja 0,1000 Unit -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
60 1 Unit PU2 (PK)
Rangka hollou galvanis 4/4 cm 70,1700 M2 - -
Rangka penebalan partisi multipleks lebar 10 cm x t=18 mm 70,1700 M2 - -
Partisi multipleks t=18 mm 70,1700 M2 - -
Pasang HPL 70,1700 M2 - -
Lem Kuning 14,0340 Kg - -
Paku skrup 3" 421,0200 Bh - -
Pek. Roter nat 63,5200 M1 - -
Kusen aluminium 4 " coating 26,2800 M' - -
Pintu panel solid kamper samarinda awet oven besar L=1 m, finishing melamik 2,0000 bh - -
Kaca tempered 8 mm (ASAHI) 8,1000 M2 - -
Silikone 17,2000 M' - -
Kunci Solid (lockcase,handle,cylinder) 1,0000 Bh - -
Stoper 4,0000 Set - -
Grendel pintu Solid (flush bold) 12" 2,0000 Bh - -
Pek. Plin kayu 2/10 cm, finishing melamik 4,7000 M1 - -
Upah kerja 0,1000 Unit - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
61 1 Unit PU3 (PT)
Pintu Frameless (tempered 12 mm polos) floor hinge dorma BTS 84 4,4100 M2 -
Handle Pintu Kaca 110 cm - Setara Dorma 2,0000 Psg -
Kunci Solid (lockcase,handle,cylinder) 1,0000 Bh -
Rangka penebalan partisi multipleks lebar 10 cm x t=18 mm 7,4980 M2 -
Partisi multipleks t=18 mm 13,1200 M2 -
Pasang HPL 13,1200 M2 -
Lem Kuning 0,2000 Kg -
Paku skrup 3" 9,0000 Bh -
Pek. Roter nat 4,8000 M1 -
Pek. Plin alumunium plat 4,7000 M1 -
Kusen aluminium 4 " coating 57,3300 M' -
Jendela sliding besar 4,0000 bh -
Kaca Rayband 5 mm ( ASAHI ) 14,4800 M2 -
Silikone 69,2400 M' -
Springknip solid 4,0000 Set -
Casement Solid 8" 4,0000 Bh -
Grendel sliding Solid 2,0000 Bh -
Upah kerja 0,1000 Unit -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
62 1 Unit PJ1 (PA)
Kusen aluminium 4 " coating 12,7000 M1 - -
Pintu plat 1,0000 Bh - -
Jendela jungkit besar 1,0000 Bh - -
Stoper 1,0000 Set - -
Kaca Rayband 5 mm ( ASAHI ) 1,4800 M2 - -
Silikone 10,5500 M1 - -
Engsel solid 4" 3,0000 Bh - -
Kunci Solid (lockcase,handle,cylinder) 1,0000 Set - -
Grendel pintu Solid (flush bold) 6" 1,0000 Bh - -
Grendel pintu Solid (flush bold) 12" 1,0000 Bh - -
Casement Solid 8" 3,0000 Set - -
Springknip solid 3,0000 Bh - -
Upah kerja 0,1000 Unit - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
63 1 Unit P1 (PM) 2
Kusen aluminium 4 " coating 10,5000 M1 - -
Jendela jungkit kecil 2,0000 Bh - -
Pintu dobel riplek 4 mm finishing HPL rk kamper samarinda awet oven besar 2,0000 Bh - -
Stoper 2,0000 Set - -
Kaca Rayband 5 mm ( ASAHI ) 0,9000 M2 - -
Kaca Polos 3 mm ( ASAHI ) 0,3200 M2 - -
Silikone 8,0000 M1 - -
Casement Solid 8" 2,0000 Set - -
Springknip solid 2,0000 Bh - -
Engsel solid 4" 6,0000 Bh - -
Kunci Solid (lockcase,handle,cylinder) 1,0000 Set - -
Upah Pasang 0,1000 Unit - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
64 1 Unit P2 (PM)
Kusen aluminium 4 " coating 6,8400 M1 - -
Jendela jungkit kecil 1,0000 Bh - -
Pintu dobel riplek 4 mm finishing HPL rk kamper samarinda awet oven besar 1,0000 Bh - -
Stoper 1,0000 Set - -
Kaca Rayband 5 mm ( ASAHI ) 0,4500 M2 - -
Kaca Polos 3 mm ( ASAHI ) 0,1600 M2 - -
Silikone 4,0000 M1 - -
Casement Solid 8" 1,0000 Set - -
Springknip solid 1,0000 Bh - -
Engsel solid 4" 3,0000 Bh - -
Kunci Solid (lockcase,handle,cylinder) 1,0000 Set - -
Upah Pasang 0,1000 Unit - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
65 1 Unit P3 (PA)
Kusen aluminium 4 " coating 8,7000 M1 - -
Pintu plat 1,0000 Bh - -
Jendela jungkit kecil 1,0000 Bh - -
Casement Solid 8" 1,0000 Set - -
Springknip solid 1,0000 Bh - -
Stoper 1,0000 Set - -
Engsel solid 4" 3,0000 Bh - -
Kunci Solid (lockcase,handle,cylinder) 1,0000 Set - -
Kaca Rayband 5 mm ( ASAHI ) 0,5604 M2 - -
Silikone 4,0000 M1 - -
Upah Pasang 0,1000 Unit - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
66 1 Unit P4 (PA)
Kusen aluminium 4 " coating 4,9000 M1 - -
Pintu Spandrel 1,0000 Bh - -
Silikone 9,8000 M1 - -
Kunci Solid (lockcase,handle,cylinder) 1,0000 Set - -
Engsel solid 4" 3,0000 Bh - -
Upah Pasang 0,1000 Unit - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
67 1 Un J1 (JA)
Kusen aluminium 4 " coating 16,8500 M' - -
Jendela sliding besar 2,0000 bh - -
Kaca Rayband 5 mm ( ASAHI ) 4,2600 M2 - -
Silikone 26,4200 M' - -
Casement Solid 8" 2,0000 Set - -
Casement Solid 12" 2,0000 Set - -
Springknip solid 2,0000 Bh - -
Upah kerja 0,1000 Un - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
68 1 Un J2 (JA) 2
Kusen aluminium 4 " coating 9,9900 M' - -
Jendela sliding besar 2,0000 bh - -
Kaca Rayband 5 mm ( ASAHI ) 2,2500 M2 - -
Silikone 13,1400 M' - -
Casement Solid 8" 2,0000 Set - -
Casement Solid 12" 2,0000 Set - -
Springknip solid 2,0000 Bh - -
Upah kerja 0,1000 Un - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
69 1 Un J3 (JA)
Kusen aluminium 4 " coating 19,4800 M' - -
Jendela sliding besar 2,0000 bh - -
Kaca Rayband 5 mm ( ASAHI ) 5,5000 M2 - -
Silikone 28,7000 M' - -
Casement Solid 8" 2,0000 Set - -
Casement Solid 12" 2,0000 Set - -
Springknip solid 2,0000 Bh - -
Upah kerja 0,1000 Un - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
70 1 Un J4 (JA)
Kusen aluminium 4 " coating 10,3000 M' - -
Kaca Rayband 8 mm ( ASAHI ) 6,1000 M2 - -
Silikone 9,9000 M' - -
Upah kerja 0,1000 Un - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
71 1 Un J5 (JA)
Kusen aluminium 4 " coating 25,9600 M' - -
Jendela sliding besar 2,0000 bh - -
Kaca Rayband 5 mm ( ASAHI ) 11,5000 M2 - -
Silikone 58,8400 M' - -
Casement Solid 8" 2,0000 Set - -
Casement Solid 12" 2,0000 Set - -
Springknip solid 2,0000 Bh - -
Upah kerja 0,1000 Un - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
72 1 Un J6 (JA)
Kusen aluminium 4 " coating 4,8400 M' - -
Jendela sliding besar 2,0000 bh - -
Kaca Rayband 5 mm ( ASAHI ) 1,0400 M2 - -
Silikone 5,9600 M' - -
Casement Solid 8" 2,0000 Set - -
Casement Solid 12" 2,0000 Set - -
Springknip solid 2,0000 Bh - -
Upah kerja 0,1000 Un - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
73 1 Unit PS1 (JM)
Kusen aluminium 4 " coating 4,8000 M1 - -
Pintu dobel riplek 4 mm finishing HPL rk kamper samarinda awet oven kecil 2,0000 Bh - -
Stoper 1,0000 Set - -
Silikone 9,6000 M1 - -
Upah kerja 0,1000 Unit - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
74 1 Unit PS2 (JM)
Kusen aluminium 4 " coating 4,5000 M1 - -
Pintu dobel riplek 4 mm finishing HPL rk kamper samarinda awet oven kecil 2,0000 Bh - -
Stoper 1,0000 Set - -
Silikone 9,6000 M1 - -
Upah kerja 0,1000 Unit - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
75 1 Un BV1 (JA) 2
Kusen aluminium 4 " coating 3,3600 M' - -
Jendela jungkit kecil 1,0000 bh - -
Kaca Rayband 5 mm ( ASAHI ) 0,4300 M2 - -
Silikone 3,8800 M' - -
Casement Solid 8" 1,0000 Set - -
Springknip solid 1,0000 Bh - -
Upah kerja 0,1000 Un - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
76 1 Un BV2 (JA)
Kusen aluminium 4 " coating 12,3000 M' - -
Jendela jungkit kecil 4,0000 bh - -
Kaca Rayband 5 mm ( ASAHI ) 1,7200 M2 - -
Silikone 15,5200 M' - -
Casement Solid 8" 4,0000 Set - -
Springknip solid 4,0000 Bh - -
Upah kerja 0,1000 Un - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
77 1 Un BV3 (JA)
Kusen aluminium 4 " coating 10,5000 M' - -
Jendela jungkit kecil 2,0000 bh - -
Kaca Rayband 5 mm ( ASAHI ) 0,8600 M2 - -
Silikone 7,7600 M' - -
Casement Solid 8" 2,0000 Set - -
Springknip solid 2,0000 Bh - -
Upah kerja 0,1000 Un - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
78 1 M2 Pasang kaca tempered 10 mm (ASAHI)
Kaca tempered 10 mm (ASAHI) 1,0000 M2 -
Sealend back up 2,0000 M' -
Material bantu 1,0000 ls -
Upah kerja 0,1000 Un -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
79 1 M2 Pasang Allumunium Composite Panel (ACP), setara ALCOPAN/MACO/SEVEN
Allumunium Composite Panel (ACP) 1,0000 M2 -
Besi hollow 40/40 8,7225 Kg -
Paku ripet 0,1000 dus -
Sealend back up 1,0000 ls -
Pekerja 0,2564 HO -
Tukang besi profil terampil 0,2200 HO -
Kepala tukang besi profil 0,0220 HO -
Mandor 0,0073 HO -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
80 1 M2 Partisi folding gate kedap suara sliding lengkap acessories (Pabrikasi)

1,0000 M2 - -
Pas. Follding Gate Hollow frame 5 x 5, meranti wood inside, multiplek 1,5 mm, glasswoll 50mm/ rokwoll, Accourete sound reduce 3 mm, cotton sheet 3 mm, finishing cosglow
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
81 1 M1 Saluran keliling bangunan 60x60
Galian tanah biasa max kedalaman 1 m' 0,6300 M3 - -
Urugan pasir 0,0450 M3 - -
Rabat beton t. 6 cm (MK-4 1 Lapis) 0,5000 M2 - -
Bata Merah tebal 1/2 bata, 1 Pc : 5 Ps 0,8000 M2 - -
Acian MU 200 t. 3 mm 2,1000 M2 - -
Plesteran dinding MU 100 t. 10 mm 2,1000 M2 - -
Jumlah -
Dibulatkan -
82 1 M1 Beton decker t. 6 cm (45X70)
Beton site mix K-175 0,0189 M3 - -
Wire Mesh M-4 (1 lapis) 0,5000 M2 - -
PC (50 kg) 0,1000 Zak - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
83 1 M3 Beton decker t. 20 cm 2
Beton site mix K-175 1,0000 M3 - -
Wire Mesh M-10 (2 lapis) 10,0000 M2 - -
Bekisting multiplex 9 mm 5,0000 M2 - -
Jumlah -
Dibulatkan -
84 1 M2 Plesteran Siar adk. 1pc : 2ps batu belah
PC 6,3400 Kg - -
Pasir pasang 0,0120 M3 - -
Pekerja 0,3000 O/H - -
Tukang batu terampil 0,1500 O/H - -
Kepala tukang batu 0,0150 O/H - -
Mandor 0,0150 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
85 1 M2 Plesteran Siar adk. 1pc : 4ps
PC 6,2400 Kg - -
Pasir pasang 0,0240 M3 - -
Pekerja 0,3000 O/H - -
Tukang batu terampil 0,1500 O/H - -
Kepala tukang batu 0,0150 O/H - -
Mandor 0,0150 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
86 1 M2 Acian Plesteran
PC 4,0000 Kg - -
Pekerja 0,1430 O/H - -
Tukang batu terampil 0,1070 O/H - -
Kepala tukang batu 0,0105 O/H - -
Mandor 0,0105 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
87 1 M1 Meja beton
Beton site mix K-175 0,0600 M3 - -
Wire Mesh M-4 (1 lapis) 0,6000 M2 - -
Bekisting multiplex 9 mm 0,6000 M2 - -
Bata Merah tebal 1/2 bata, 1 Pc : 5 Ps 0,8000 M2 - -
Screeding t. 2 cm (MU 440) 0,8000 M2 - -
Jumlah -
Dibulatkan -
88 1 Bh Closet Duduk (Flashing), setara TOTO
Closet Duduk (Flashing), setara TOTO 1,0000 Unit - -
Pekerja 3,3000 O/H - -
Tukang batu terampil 1,1000 O/H - -
Kepala tukang batu 0,0010 O/H - -
Mandor 0,1600 O/H - -
Perlengkapan 6 % harga material 0,0600 Ls - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
89 1 Bh Closet jongkok (Flashing), setara TOTO
Closet jongkok (Flashing), setara TOTO 1,0000 Unit - -
PC 6,0000 Kg - -
Pasir pasang 0,0100 M3 - -
Pekerja 1,0000 O/H - -
Tukang batu terampil 1,5000 O/H - -
Kepala tukang batu 1,5000 O/H - -
Mandor 0,1600 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
90 1 Bh Washtafel Toilet Pria/Wanita, setara TOTO
Washtafel Toilet Pria/Wanita, setara TOTO 1,0000 Bh - -
PC 6,0000 Kg - -
Pasir pasang 0,0100 M3 - -
Pekerja 1,2000 O/H - -
Tukang batu terampil 1,4500 O/H - -
Kepala tukang batu 0,1500 O/H - -
Mandor 0,1000 O/H - -
Perlengkapan 0,1200 Unit - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
91 1 Unit Kitchen Zink Stainless ( 1 Lobang ) 2
Kitchen Zink Stainless Standard Lokal ( 1 Lubang ) 1,0000 Bh - -
Pekerja 0,0300 O/H - -
Tukang batu terampil 0,3000 O/H - -
Kepala tukang batu 0,0300 O/H - -
Mandor 0,0015 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
92 1 Bh Urinoir TOTO U 57M
Urinoir TOTO U 57M 1,0000 Bh - -
Semen Portland 0,1200 Zak - -
Pasir Pasang 0,0100 M3 - -
Pekerja Setengah Terampil 1,0000 Org - -
Tukang Batu Setengah Terampil 1,0000 Org - -
Kepala Tukang Batu 0,1000 Org - -
Mandor 0,1100 Org - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
93 1 Bh Sekat urinoir TOTO
Sekat urinoir TOTO 1,0000 Bh - -
Pekerja Setengah Terampil 1,0000 Org - -
Tukang Batu Setengah Terampil 1,0000 Org - -
Kepala Tukang Batu 0,1000 Org - -
Mandor 0,1100 Org - -
Perlengkapan 0,1200 Unit - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
94 1 Bh Jet Whoser + stopkran + kran air Lengkap ACC, setara TOTO
Jet Whoser air Lengkap ACC, setara TOTO 1,0000 Bh -
Stop kran air Lengkap ACC, setara TOTO 1,0000 Bh -
Kran air Lengkap ACC, setara TOTO 1,0000 Bh -
Seal tape 0,0250 Bh -
Pekerja 0,0100 O/H -
Tukang batu terampil 0,1000 O/H -
Kepala tukang batu 0,0100 O/H -
Mandor 0,0050 O/H -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
95 1 Bh Kran dinding TOTO T23 B13
Kran dinding TOTO T23 B13 1,0000 Bh - -
Seal tape 0,0250 Bh - -
Pekerja 0,0100 O/H - -
Tukang batu terampil 0,1000 O/H - -
Kepala tukang batu 0,0100 O/H - -
Mandor 0,0050 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
96 1 Bh Kran bebek TOTO T30 ARQ 13N
Kran bebek TOTO T30 ARQ 13N 1,0000 Bh - -
Seal tape 0,0250 Bh - -
Pekerja 0,0100 O/H - -
Tukang batu terampil 0,1000 O/H - -
Kepala tukang batu 0,0100 O/H - -
Mandor 0,0050 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
97 1 Bh Floordrain Stailes Steel, setara SUN-EI
Floordrain Stailes Steel, setara SUN-EI 1,0000 Bh - -
Pekerja 0,0100 O/H - -
Tukang batu terampil 0,1000 O/H - -
Kepala tukang batu 0,0100 O/H - -
Mandor 0,0050 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga
98 1 Bh Roof drain Stailes Steel, setara SUN-EI 2
Roof drain Stailes Steel, setara SUN-EI 1,0000 Bh - -
Pekerja 0,0100 O/H - -
Tukang batu terampil 0,1000 O/H - -
Kepala tukang batu 0,0100 O/H - -
Mandor 0,0050 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
99 1 Bh Cermin TOTO TS 119 AS 5
Cermin TOTO TS 119 AS 5 1,0000 Bh - -
Pekerja 0,0100 O/H - -
Tukang batu terampil 0,1000 O/H - -
Kepala tukang batu 0,0100 O/H - -
Mandor 0,0050 O/H - -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
100 1 Titik Pasangan Sulingan Pipa PVC type AW 2" WAVIN + Ijuk
Suling-Suling PVC 2" 0,2000 m -
Ijuk 1,1000 Kg -
Tenaga Kerja 0,0540 Org -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
DAFTAR HARGA SATUAN PEKERJAAN MEKANIKAL

No. Item Pekerjaan Jumlah (Rp.)

1 1 M' Pipa PVC (AW) Rucika dia 1/2" -


2 1 M' PipaPVC (AW) Rucika dia 3/4" -
3 1 M' Pipa PVC (AW) Rucika dia 1" -
4 1 M' Pipa PVC (AW) Rucika dia 1 1/4" -
5 1 M' Pipa PVC (AW) Rucika dia 1 1/2" -
6 1 M' Pipa PVC (AW) Rucika dia 2" -
7 1 M' Pipa PVC (AW) Rucika dia 2 1/2" -
8 1 M' Pipa PVC (AW) Rucika dia 3" -
9 1 M' Pipa PVC (AW) Rucika dia 4" -
10 1 M' Pipa PVC (AW) Rucika dia 6" -
11 1 M' Pipa PVC (AW) Rucika dia 8" -
12 1 M' Pipa Header 4" (100 mm ) -
13 1 bh MEMASANG GATE VALVE DIA 3/4" (20 mm) -
14 1 bh MEMASANG GATE VALVE DIA 1" (25 mm) -
15 1 bh MEMASANG GATE VALVE DIA 1,5" (42 mm) -
16 1 bh MEMASANG GATE VALVE DIA 2" (50 mm) -
17 1 bh MEMASANG GATE VALVE DIA 2 1/2" (65 mm) -
18 1 bh MEMASANG GATE VALVE DIA3" (75 mm) -
19 1 bh MEMASANG GATE VALVE DIA 4" (100 mm) -
20 1 bh MEMASANG Check valve dia 2" (50 mm) -
21 1 bh MEMASANG Check valve dia 3" (75 mm) -
22 1 bh MEMASANG Check valve dia 4" (100 mm) -
23 1 bh MEMASANG FLOATING VALVE DIA. 2" -
24 1 bh Flexible Joint 50 mm -
25 1 bh Flexible Joint 80 mm -
26 1 bh Foot valve dia 3" (80 mm) -
27 1 bh Strainer dia 3" (80 mm) -
28 1 bh WLC -
29 1 bh Pressure switch -
30 1 M' Pipa HPDE diameter 2" -
31 1 M' Pipa Bsp class sch 40 A 53 3/4" -
32 1 M' Pipa Bsp class sch 40 A 53 1" -
33 1 M' Pipa Bsp class sch 40 A 53 40 1 1/4" -
34 1 M' Pipa Bsp class sch 40 A 53 40 1 1/2" -
35 1 M' Pipa Bsp class sch 40 A 53 40 2" -
36 1 M' Pipa Bsp class sch 40 A 53 40 2 1/2" -
37 1 M' Pipa Bsp class sch 40 A 53 3" -
38 1 M' Pipa Bsp class sch 40 A 53 4" -
39 1 M' Pipa Bsp class sch 40 A 53 5" -
40 1 M' Pipa Bsp class sch 40 A 53 6" -
41 1 unit Memasang pompa Booster 2 x 60 LPM - head 20 m -
42 1 bh Panel P Transfer -
43 1 unit MEMASANG POMPA TRANSFER 350 lpm - head 32 m -
44 1 unit Pas. IU VRV Wall Mounted Type Kapasitas :5.400 Btuh -
45 1 unit Pas. IU VRV Wall Mounted Type Kapasitas :7.200 Btuh -
46 1 unit Pas. IU VRV Wall Mounted Type Kapasitas :7.800 Btuh -
47 1 unit Pas. IU VRV Wall Mounted Type Kapasitas :8.500 Btuh -
48 1 unit Pas. IU VRV Wall Mounted Type Kapasitas :10.800 Btuh -
49 1 unit Pas. IU VRV Wall Mounted Type Kapasitas :12.000 Btuh -
50 1 unit Pas. IU VRV Wall Mounted Type Kapasitas :13.500 Btuh -
51 1 unit Pas. IU VRV Wall Mounted Type Kapasitas :18.000 Btuh -
52 1 unit IU VRV Split Cassette Type Kap.24.200 BTUH -
53 1 unit IU VRV Split Cassette Type Kap.30.700 BTUH -
54 1 unit IU VRV Split Cassette Type Kap.47.000 BTUH -
55 1 unit OU VRV Kap.268.000 BTUH (8.900 cfm) -
56 1 unit OU VRV Kap. 398.000 BTUH (13.250 cfm) -
57 1 unit OU VRV Kap. 141.000 BTUH (4.700 cfm) -
58 1 unit OU VRV Kap. 215.000 BTUH (7.250 cfm) -
59 1 m' Inst. Pipa refrigerant AC 1 PK -
60 1 m' Inst. Pipa refrigerant AC 1,5 PK - 2PK -
61 1 m' Inst. Pipa refrigerant AC 2,5 PK -
62 1 m' Drain Pipa pvc aw 3/4" ( 20 mm) -
63 1 m' Duct Inline Fan 450 CFM -
64 1 m' Wall Fan -
65 1 bh Pas. Exhaust Air Grille uk. 150 x 150 -
66 1 bh Pas. Exhaust Air Grille uk. 300 x 150 -
67 1 bh InDoor Hydrant Box -
68 1 bh CO2 kap 6 kg -
69 1 unit Pemasangan STP 8 m3 / day -
70 1 unit Pemasangan STP 4 m3 / day -
71 1 unit Pemasangan STP 1.8 m3 / day -
No. Item Pekerjaan Jumlah (Rp.)
72 1 M' Pipa Polypropelene PN.16 dia 1/2" -
73 1 M' Pipa PolypropelenePN.16 dia 3/4" -
74 1 M' Pipa Polypropelene PN.16 dia 1" -
75 1 M' Pipa Polypropelene PN.16 dia 1 1/4" -
76 1 M' Pipa Polypropelene dia 1 1/5" -
77 1 M' Pipa Polypropelene PN.16 dia 2" -
78 1 M' Pipa Polypropelene PN.16 dia 2 1/2" -
79 1 M' Pipa Polypropelene dia,3" -
80 1 M' Pipa Polypropelene PN.16 dia,4" -
81 1 M' Pipa Polypropelene PN.20 dia 1/2" -
82 1 M' Pipa PolypropelenePN.20 dia 3/4" -
83 1 M' Pipa Polypropelene PN.20 dia 1" -
84 1 M' Pipa Polypropelene PN.20 dia 1 1/4" -
85 1 M' Pipa Polypropelene PN.20 dia 1 1/5" -
86 1 M' Pipa Polypropelene PN.20 dia 2" -
87 1 M' Pipa Polypropelene PN.20 dia 2 1/2" -
88 1 M' Pipa Polypropelene PN.20 dia,3" -
89 1 M' Pipa Polypropelene PN.20 dia,4" -
90 1 M' Pipa GIP Medium A 1/2" ( 6 m1 ) -
91 1 M' Pipa GIP Medium A 3/4" ( 6 m1 ) -
92 1 M' Pipa GIP Medium A 1" ( 6 m1 ) -
93 1 M' Pipa GIP Medium A 1 1/4" ( 6 m1 ) -
94 1 M' Pipa GIP Medium A 1 1/2" ( 6 m1 ) -
95 1 M' Pipa GIP Medium A 2" ( 6 m1 ) -
96 1 M' Pipa GIP Medium A 2 1/2" ( 6 m1 ) -

97 1 unit PENGADAAN DAN PEMASANGAN LIFT PASSANGER (PENUMPANG)


I. PEKERJAAN PERSIAPAN -
II. PEKERJAAN PREPARASI HOISTWAY + PEKERJAAN PENUNJANG -
III. UNIT LIFT PASSANGER (PENUMPANG) LIFT No. -
IV. PEKERJAAN ARD (Auto Rescue Device) -
V. PEKERJAAN MEMASANG NYY 4 x 1C x 16 mm² + NYA 10 mm² -
VI. PEKERJAAN MEMASANG AES -
VII. PEKERJAAN MEMASANG CAR OPERATION PANEL -
VIII. PEKERJAAN MEMASANG HALL OPERATION PANEL -
IX. PEKERJAAN MEMASANG MCB -
X. PEKERJAAN MEMASANG AC SPLITH 1 PK -
XI. PEKERJAAN MEMASANG LED 21" -

Bogor, ..................... 2018


Kontraktor,
PT,.................................

Cap & Tanda Tangan

NAMA
Jabatan
ANALISA HARGA SATUAN PEKERJAAN MEKANIKAL

No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
1 Memasang 1 M¹ pipa Polivinyl Chloride Pipe (PVC) AW klas 10 Kg/cm²(Rucika) diameter 1/2"
Pipa PVC (AW) Rucika dia 1/2" m' 1,20 -
lem pvc kg 0,03 -
seal tape bh 0,10 -
sock pipa pvc 1/2" bh 0,25 -
fiting PVC 1/2" ls 0,25 -
elbow pvc 1/2" bh 0,25 -
Pekerja Oh 0,05 -
Tukang pipa Oh 0,09 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,03 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
2 Memasang 1 M¹ pipa Polivinyl Chloride Pipe (PVC) AW klas 10 Kg/cm²(Rucika)diameter 3/4"
PipaPVC (AW) Rucika dia 3/4" M¹ 1,20 -
lem pvc kg 0,03 -
seal tape bh 0,10 -
sock pipa pvc 3/4" bh 0,25 -
fiting PVC 3/4" ls 0,25 -
elbow pvc 3/4" bh 0,25 -
Pekerja Oh 0,05 -
Tukang pipa Oh 0,09 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,03 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
3 Memasang 1 M¹ pipa Polivinyl Chloride Pipe (PVC) AW klas 10 Kg/cm²(Rucika) diameter 1"
Pipa PVC (AW) Rucika dia 1" M¹ 1,20 -
lem pvc kg 0,03 -
seal tape bh 0,10 -
sock pipa pvc 1" bh 0,25 -
fiting PVC 1" ls 0,25 -
elbow pvc 1" bh 0,25 -
Pekerja Oh 0,05 -
Tukang pipa Oh 0,09 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,03 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
4 Memasang 1 M¹ pipa Polivinyl Chloride Pipe (PVC) AW klas 10 Kg/cm²(Rucika) diameter 1 1/4"
Pipa PVC (AW) Rucika dia 1 1/4" M¹ 1,20 -
lem pvc kg 0,03 -
seal tape bh 0,10 -
sock pipa pvc 1 1/4" bh 0,25 -
fiting PVC 1 1/4" ls 0,25 -
elbow pvc 1 1/4" bh 0,25 -
Pekerja Oh 0,11 -
Tukang pipa Oh 0,18 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
5 Memasang 1 M¹ pipa Polivinyl Chloride Pipe (PVC) AW klas 10 Kg/cm²(Rucika) diameter 1 1/5"
Pipa PVC (AW) Rucika dia 1 1/2" M¹ 1,20 -
lem pvc kg 0,03 -
seal tape bh 0,10 -
sock pipa pvc 1 1/2" bh 0,25 -
fiting PVC 1 1/2" ls 0,25 -
elbow pvc 1 1/2" bh 0,25 -
Pekerja Oh 0,11 -
Tukang pipa Oh 0,18 -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
6 Memasang 1 M¹ pipa Polivinyl Chloride Pipe (PVC) AW klas 10 Kg/cm²(Rucika) diameter 2"
Pipa PVC (AW) Rucika dia 2" M¹ 1,20 -
lem pvc kg 0,03 -
seal tape bh 0,10 -
sock pipa pvc 2" bh 0,25 -
fiting PVC 2" ls 0,25 -
elbow pvc 2" bh 0,25 -
Pekerja Oh 0,11 -
Tukang pipa Oh 0,18 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
7 Memasang 1 M¹ pipa Polivinyl Chloride Pipe (PVC) AW klas 10 Kg/cm²(Rucika) diameter 2 1/2"
Pipa PVC (AW) Rucika dia 2 1/2" M¹ 1,20 -
lem pvc kg 0,03 -
seal tape bh 0,10 -
sock pipa pvc 2 1/2" bh 0,25 -
fiting PVC 2 1/2 " ls 0,25 -
elbow pvc 2 1/2" bh 0,25 -
Pekerja Oh 0,11 -
Tukang pipa Oh 0,18 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
8 Memasang 1 M¹ pipa Polivinyl Chloride Pipe (PVC) AW klas 10 Kg/cm²(Rucika) diameter 3"
Pipa PVC (AW) Rucika dia 3" M¹ 1,20 -
lem pvc kg 0,03 -
seal tape bh 0,10 -
sock pipa pvc 3" bh 0,25 -
fiting PVC 3 " ls 0,25 -
elbow pvc 3" bh 0,25 -
Pekerja Oh 0,11 -
Tukang pipa Oh 0,18 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
9 Memasang 1 M¹ pipa Polivinyl Chloride Pipe (PVC) AW klas 10 Kg/cm²(Rucika) diameter 4"
Pipa PVC (AW) Rucika dia 4" M¹ 1,20 -
lem pvc kg 0,03 -
seal tape bh 0,10 -
sock pipa pvc 4" bh 0,25 -
fiting PVC 4 " ls 0,25 -
elbow pvc 4" bh 0,25 -
Pekerja Oh 0,14 -
Tukang pipa Oh 0,23 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
10 Memasang 1 M¹ PVC tipe AW diameter 6"
Pipa PVC (AW) Rucika dia 6" M¹ 1,20 -
lem pvc kg 0,03 -
seal tape bh 0,10 -
sock pipa pvc 6" bh 0,25 -
fiting PVC 6 " ls 0,25 -
elbow pvc 6" bh 0,25 -
Pekerja Oh 0,24 -
Tukang pipa Oh 0,23 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
11 Memasang 1 M¹ PVC tipe AW diameter 8"
Pipa PVC (AW) Rucika dia 8" M¹ 1,20 -
lem pvc kg 0,03 -
seal tape bh 0,10 -
sock pipa pvc 8" bh 0,25 -
fiting PVC 8 " ls 0,25 -
elbow pvc 8" bh 0,25 -
Pekerja Oh 0,24 -
Tukang pipa Oh 0,23 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
12 Pipa Header 4" (100 mm )
pipa gip medium class 4" btg 1,00 -
Flange 8 " kg 2,00 -
Flange buta 8 " bh 4,00 -
a.b & m.b pas pipa header bh 1,00 -
upah pas pipa header Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
13 MEMASANG GATE VALVE DIA 3/4" (20 mm)
gate valve dia 3/4 " bh 1,00 -
lem pvc kg 0,05 -
Seal tape bh 1,00 -
upah pas gate valve dia.3/4' Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
14 MEMASANG GATE VALVE DIA 1" (25 mm)
gate valve dia 1 " bh 1,00 -
lem pvc kg 0,05 -
Seal tape bh 1,00 -
upah pas gate valve dia.2' Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
15 MEMASANG GATE VALVE DIA 1,5" (42 mm)
gate valve dia 1,5 " bh 1,00 -
lem pvc kg 0,05 -
Seal tape bh 1,00 -
upah pas gate valve dia.2' Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
16 MEMASANG GATE VALVE DIA 2" (50 mm)
gate valve dia 2 " bh 1,00 -
lem pvc kg 0,05 -
Seal tape bh 1,00 -
upah pas gate valve dia.2' Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
17 MEMASANG GATE VALVE DIA 2 1/2" (65 mm) bh
gate valve dia 21/2 " bh 1,00 -
lem pvc kg 0,05 -
Seal tape bh 1,00 -
upah pas gate valve dia.2' Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
18 MEMASANG GATE VALVE DIA3" (75 mm) bh
gate valve dia 3 " bh 1,00 -
lem pvc kg 0,05 -
Seal tape bh 1,00 -
upah pas gate valve dia.3' Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
19 MEMASANG GATE VALVE DIA 4" (100 mm) bh
gate valve dia 4 " bh 1,00 -
lem pvc kg 1,00 -
Seal tape bh 1,00 -
upah pas gate valve dia 4 " Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
20 MEMASANG Check valve dia 2" (50 mm) bh
Check valve dia 2" bh 1,00 -
lem pvc kg 0,05 -
Seal tape bh 1,00 -
upah pas Check valve dia 2" Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
21 MEMASANG Check valve dia 3" (75 mm) bh
Check valve dia 3" bh 1,00 -
lem pvc kg 0,05 -
Seal tape bh 1,00 -
upah pas Check valve dia 3" Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
22 MEMASANG Check valve dia 4" (100 mm) bh
Check valve dia 4" bh 1,00 -
lem pvc kg 0,05 -
Seal tape bh 1,00 -
upah pas Check valve dia 3" Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
23 MEMASANG FLOATING VALVE DIA. 2" bh
Floating valve dia. 2" bh 1,00 -
lem pvc kg 0,05 -
Seal tape bh 1,00 -
upah pas Floating valve dia. 2" Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
24 Flexible Joint 50 mm bh
Flexible connection 50 mm bh 1,00 -
lem pvc kg 0,05 -
Seal tape bh 1,00 -
upah pas Flexible connection 50 mm Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
25 Flexible Joint 80 mm bh
Flexible connection 80 mm bh 1,00 -
lem pvc kg 0,05 -
Seal tape bh 1,00 -
upah pas Flexible connection 80 mm Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
26 Foot valve dia 3" (80 mm) bh
Foot valve dia 3" (80 mm) bh 1,00 -
lem pvc kg 0,05 -
Seal tape bh 1,00 -
Uph Foot valve dia 3" (80 mm) Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
27 Strainer dia 3" (80 mm) bh
Strainer dia 3" bh 1,00 -
lem pvc kg 0,05 -
Seal tape bh 1,00 -
upah pas Strainer dia 3" Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
28 WLC bh
Water Level Control bh 1,00 -
kabel NYMHY 2x1,5 mm2 m' 195,00 -
ab & mb pas kabel WLC bh 1,00 -
upah pas Water Level Control Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
29 Pressure switch bh
Pressure switch bh 1,00 -
kabel NYY 3 x 2.5 mm² m' 35,00 -
ab & mb pas kabel WLC bh 1,00 -
upah pas Pressure switch Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
30 Memasang 1 M¹ Pipa HPDE diameter 2"
Pipa HPDE diameter 2" M¹ 1,20 -
Perlengkapan ( 35% harga pipa ) Pkt 0,35 -
Upah Pemasangan Pipa ls 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
31 Memasang 1 M¹ Pipa Sch 40 3/4"
Pipa Bsp class sch 40 A 53 3/4" m' 1,20 -
Lem besi tube 0,05 -
seal tape bh 1,00 -
sock pipa gip 3/4" bh 0,18 -
a.b & m.b pas pipa gip med class 3/4" ls 1,00 -
upah pas pipa gip med class3/4" Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
32 Memasang 1 M¹ Pipa Sch 40 1"
Pipa Bsp class sch 40 A 53 1" m' 1,20 -
Lem besi tube 0,05 -
seal tape bh 1,00 -
sock pipa gip 1" bh 0,18 -
a.b & m.b pas pipa gip med class1" ls 1,00 -
upah pas pipa gip med class 1" Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
33 Memasang 1 M¹ Pipa Sch 40 1 1/4"
Pipa Bsp class sch 40 A 53 40 1 1/4" m' 1,20 -
Lem besi tube 0,05 -
seal tape bh 1,00 -
sock pipa gip 1 1/4" bh 0,18 -
a.b & m.b pas pipa gip med class 1 1/4" ls 1,00 -
upah pas pipa gip med class 1 1/4" Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
34 Memasang 1 M¹ Pipa Sch 40 1 1/2"
Pipa Bsp class sch 40 A 53 40 1 1/2" m' 1,20 -
Lem besi tube 0,05 -
seal tape bh 1,00 -
sock pipa gip 1 1/2" bh 0,18 -
a.b & m.b pas pipa gip med class 1 1/2" ls 1,00 -
upah pas pipa gip med class 1 1/2" Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
35 Memasang 1 M¹ Pipa Sch 40 2"
Pipa Bsp class sch 40 A 53 40 2" m' 1,20 -
Lem besi tube 0,05 -
seal tape bh 1,00 -
sock pipa gip 2" bh 0,18 -
a.b & m.b pas pipa gip med class 2" ls 1,00 -
upah pas pipa gip med class 2" Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
36 Memasang 1 M¹ Pipa Sch 40 2 1/2"
Pipa Bsp class sch 40 A 53 40 2 1/2" m' 1,20 -
Lem besi tube 0,05 -
seal tape bh 1,00 -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
sock pipa gip 2 1/2" bh 0,18 -
a.b & m.b pas pipa gip med class 2 1/2" ls 1,00 -
upah pas pipa gip med class 2 1/2" Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
37 Memasang 1 M¹ Pipa Sch 40 dia 3"
Pipa Bsp class sch 40 A 53 3" m' 1,20 -
Lem besi kg 0,05 -
seal tape bh 1,00 -
sock pipa gip 3" bh 0,18 -
a.b & m.b pas pipa gip med class 3" ls 1,00 -
upah pas pipa gip med class 3" m' 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
38 Memasang 1 M¹ Pipa Sch 40 4"
Pipa Bsp class sch 40 A 53 4" m' 1,20 -
Lem besi kg 0,05 -
seal tape bh 1,00 -
sock pipa gip 4" bh 0,18 -
Fitting pipa gip medium class 4" ls 1,00 -
a.b & m.b pas pipa gip med class 4" ls 1,00 -
upah pas pipa gip med class 4" Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
39 Memasang 1 M¹ Pipa Sch 40 5"
Pipa Bsp class sch 40 A 53 5" m' 1,20 -
Lem besi kg 0,05 -
seal tape bh 1,00 -
sock pipa gip 5" bh 0,18 -
Fitting pipa gip medium class 5" ls 1,00 -
a.b & m.b pas pipa gip med class 5" ls 1,00 -
upah pas pipa gip med class5" Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
40 Memasang 1 M¹ Pipa Sch 40 6"
Pipa Bsp class sch 40 A 53 6" m' 1,20 -
Lem besi kg 0,05 -
seal tape bh 1,00 -
sock pipa gip 6" bh 0,18 -
Fitting pipa gip medium class 6" ls 1,00 -
a.b & m.b pas pipa gip med class 6" ls 1,00 -
upah pas pipa gip med class b6" Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
41 Memasang pompa Booster 2 x 60 LPM - head 20 m unit
pompa Booster 2 x 60 LPM - head 20 m unit 1,00 -
Material bantu Alat bantu pas pompa Booster ls 1,00 -
Upah pas pompa Booster Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
42 Panel P Transfer unit
Panel P Transfer unit 1,00 -
Material bantu & Alat bantu pas pompa Transffer ls 1,00 -
Upah pas pompa Transfer Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
43 MEMASANG POMPA TRANSFER 350 lpm - head 32 m unit
Pengadaan dan Pemasangan Pompa Transfer type Centrifugal pump kap.346 l/m Head
32 m H2O daya Motor 5,5 kw unit 1,00 -
Material bantu pas pompa transfer 350 lpm - head 40 m ls 1,00 -
Upah pas pompa Booster Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
44 Pas. IU VRV Wall Mounted Type Kapasitas :5.400 Btuh unit
IU VRV Wall Mounted Type Kapasitas :5.400 Btuh unit 1,00 -
dynabolt 8 mm bh 4,00 -
Bracket AC bh 1,00 -
ab dan mb pasang U VRV Wall Mounted Type Kapasitas :5.400 Btuh ls 1,00 -
Upah pasang U VRV Wall Mounted Type Kapasitas :5.400 Btuh Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
45 Pas. IU VRV Wall Mounted Type Kapasitas :7.200 Btuh unit
IU VRV Wall Mounted Type Kapasitas :7.200 Btuh unit 1,00 -
dynabolt 8 mm bh 4,00 -
Bracket AC bh 1,00 -
ab dan mb pasang IU VRV Wall Mounted Type Kapasitas :7.200 Btuh ls 1,00 -
Upah pasang IU VRV Wall Mounted Type Kapasitas :7.200 Btuh Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
46 Pas. IU VRV Wall Mounted Type Kapasitas :7.800 Btuh unit
IU VRV Wall Mounted Type Kapasitas :7.800 Btuh unit 1,00 -
dynabolt 8 mm bh 4,00 -
Bracket AC bh 1,00 -
ab dan mb pasang IU VRV Wall Mounted Type Kapasitas :7.800 Btuh ls 1,00 -
Upah pasang IU VRV Wall Mounted Type Kapasitas :7.800 Btuh Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
47 Pas. IU VRV Wall Mounted Type Kapasitas :8.500 Btuh unit
IU VRV Wall Mounted Type Kapasitas :8.500 Btuh unit 1,00 -
dynabolt 8 mm bh 4,00 -
Bracket AC bh 1,00 -
ab dan mb pasang IU VRV Wall Mounted Type Kapasitas :8.500 Btuh ls 1,00 -
Upah pasang IU VRV Wall Mounted Type Kapasitas :8.500 Btuh Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
48 Pas. IU VRV Wall Mounted Type Kapasitas :10.800 Btuh unit
IU VRV Wall Mounted Type Kapasitas :10.800 Btuh unit 1,00 -
dynabolt 8 mm bh 4,00 -
Bracket AC bh 1,00 -
ab dan mb pasang IU VRV Wall Mounted Type Kapasitas :10.800 Btuh ls 1,00 -
Upah pasang IU VRV Wall Mounted Type Kapasitas :10.800 Btuh Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
49 Pas. IU VRV Wall Mounted Type Kapasitas :12.000 Btuh unit
IU VRV Wall Mounted Type Kapasitas :12.000 Btuh unit 1,00 -
dynabolt 8 mm bh 4,00 -
Bracket AC bh 1,00 -
ab dan mb pasang IU VRV Wall Mounted Type Kapasitas :12.000 Btuh ls 1,00 -
Upah pasang IU VRV Wall Mounted Type Kapasitas :12.000 Btuh Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
50 Pas. IU VRV Wall Mounted Type Kapasitas :13.500 Btuh unit
IU VRV Wall Mounted Type Kapasitas :13.500 Btuh unit 1,00 -
dynabolt 8 mm bh 4,00 -
Bracket AC bh 1,00 -
ab dan mb pasang IU VRV Wall Mounted Type Kapasitas :12.000 Btuh ls 1,00 -
Upah pasang IU VRV Wall Mounted Type Kapasitas :12.000 Btuh Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
51 Pas. IU VRV Wall Mounted Type Kapasitas :18.000 Btuh unit
IU VRV Wall Mounted Type Kapasitas :18.000 Btuh unit 1,00 -
dynabolt 8 mm bh 4,00 -
Bracket AC bh 1,00 -
ab dan mb pasang IU VRV Wall Mounted Type Kapasitas :18.000 Btuh ls 1,00 -
Upah pasang IU VRV Wall Mounted Type Kapasitas :18.000 Btuh Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
52 IU VRV Split Cassette Type Kap.24.200 BTUH unit
IU VRV Split Cassette Type Kap.24.000 BTUH unit 1,00 -
Besi siku 50 x 50 x 5 kg 40,00 -
dynabolt 8 mm bh 4,00 -
Bracket AC bh 1,00 -
ab dan mb pasang IU VRV Split Cassette Type Kap.24.000 BTUH ls 1,00 -
Upah pasang IU VRV Split Cassette Type Kap.24.000 BTUH Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
53 IU VRV Split Cassette Type Kap.30.700 BTUH unit
IU VRV Split Cassette Type Kap.30.700 BTUH unit 1,00 -
Besi siku 50 x 50 x 5 kg 40,00 -
dynabolt 8 mm bh 4,00 -
Bracket AC bh 1,00 -
ab dan mb pasang IU VRV Split Cassette Type Kap.24.000 BTUH ls 1,00 -
Upah pasang IU VRV Split Cassette Type Kap.24.000 BTUH Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
54 IU VRV Split Cassette Type Kap.47.000 BTUH unit
IU VRV Split Cassette Type Kap.47.000 BTUH unit 1,00 -
Besi siku 50 x 50 x 5 kg 40,00 -
dynabolt 8 mm bh 4,00 -
Bracket AC bh 1,00 -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
ab dan mb pasang IU VRV Split Cassette Type Kap.45.000 BTUH ls 1,00 -
Upah pasang IU VRV Split Cassette Type Kap.45.000 BTUH Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
55 OU VRV Kap.268.000 BTUH (8.900 cfm) unit
OU VRV Kap.268.000 BTUH (8.900 cfm) unit 1,00 -
dynabolt 8 mm bh 4,00 -
Bracket AC bh 1,00 -
ab dan mb pasang IU VRV Split Cassette Type Kap.45.000 BTUH ls 1,00 -
Upah pasang IU VRV Split Cassette Type Kap.45.000 BTUH Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
56 OU VRV Kap. 398.000 BTUH (13.250 cfm) unit
OU VRV Kap. 398.000 BTUH (13.250 cfm) unit 1,00 -
dynabolt 8 mm bh 4,00 -
Bracket AC bh 1,00 -
ab dan mb pasang IU VRV Split Cassette Type Kap.45.000 BTUH ls 1,00 -
Upah pasang IU VRV Split Cassette Type Kap.45.000 BTUH Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
57 OU VRV Kap. 141.000 BTUH (4.700 cfm) unit
OU VRV Kap. 141.000 BTUH (4.700 cfm) unit 1,00 -
dynabolt 8 mm bh 4,00 -
Bracket AC bh 1,00 -
ab dan mb pasang IU VRV Split Cassette Type Kap.45.000 BTUH ls 1,00 -
Upah pasang IU VRV Split Cassette Type Kap.45.000 BTUH Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
58 OU VRV Kap. 215.000 BTUH (7.250 cfm) unit
OU VRV Kap. 215.000 BTUH (7.250 cfm) unit 1,00 -
dynabolt 8 mm bh 4,00 -
Bracket AC bh 1,00 -
ab dan mb pasang IU VRV Split Cassette Type Kap.45.000 BTUH ls 1,00 -
Upah pasang IU VRV Split Cassette Type Kap.45.000 BTUH Oh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
59 Inst. Pipa refrigerant AC 1 PK ttk
Pipa refrigerant 1/4" + 3/8 " isolasi m 15,00 -
VINYL TAPE ADHESIVE roll 3,00 -
ab dan mb pasang AC split 1 PK ls 1,00 -
Upah pasang AC Split 1 PK ttk 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
60 Inst. Pipa refrigerant AC 1,5 PK - 2PK ttk
Pipa tembaga dia. 1/2" + 1/4 " isolasi m 15,00 -
VINYL TAPE ADHESIVE roll 3,00 -
ab dan mb pasang AC split 1 PK ls 1,00 -
Upah pasang AC Split 1 PK ttk 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
61 Inst. Pipa refrigerant AC 2,5 PK ttk
Pipa tembaga dia. 5/8" + 1/4 " isolasi m 22,00 -
VINYL TAPE ADHESIVE roll 2,00 -
ab dan mb pasang AC split 1 PK ls 1,00 -
Upah pasang AC Split 1 PK ttk 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
62 Drain Pipa pvc aw 3/4" ( 20 mm) ttk
pipa pvc aw 3/4" ljr 0,26 -
insuflex 3/4" (19.1 mm) m' 1,00 -
lem pvc kg 0,05 -
seal tape bh 0,05 -
sock pipa pvc 3/4" bh 0,26 -
bobokan & perapihan ls 1,00 -
ab dan mb pasang pipa PVC dia.3/4" + harmaflek ls 1,00 -
Upah pasang AC Split 1 PK ttk 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
63 Duct Inline Fan 450 CFM ttk
Duct In line Fan 450 CFM lot 1,00 -
ab dan mb pasang pipa PVC dia.3/4" + harmaflek ls 1,00 -
Upah pasang AC Split 1 PK ttk 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
64 Wall Fan ttk
wall Fan 1000 CFM lot 1,00 -
ab dan mb pasang pipa PVC dia.3/4" + harmaflek ls 1,00 -
Upah pasang AC Split 1 PK ttk 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
65 Pas. Exhaust Air Grille uk. 150 x 150 bh
Exhaust Air Grille uk. 150 x 150 bh 1,00 -
Duct tape roll 0,10 -
ab&mb pas. grile bh 1,00 -
Upah pasang grile bh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
66 Pas. Exhaust Air Grille uk. 300 x 150 bh
Exhaust Air Grille uk. 300 x 150 bh 1,00 -
Duct tape roll 0,10 -
ab&mb pas. grile bh 1,00 -
Upah pasang grile bh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
67 InDoor Hydrant Box bh
InDoor Hydrant Box bh 1,00 -
alat & material bantu bh 0,10 -
upah Hidrant indoor bh 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
68 CO2 kap 6 kg bh
Fire extinguisher type ABC- kap 6 kg lot 1,00 -
material & alat bantu Extinguser lot 1,00 -
upah Hidrant indoor lot 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
69 Pemasangan STP 8 m3 / day unit
STP Biotech 8 m3 / hari unit 1,00 -
AB & Material Bantu STP 8 m3 ls 1,00 -
Pemasangan STP 8 m3 / day ls 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
70 Pemasangan STP 4 m3 / day unit
STP Biotech 4 m3 / hari unit 1,00 -
AB & Material Bantu STP 4 m3 ls 1,00 -
Pemasangan STP 4 m3 / day ls 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
71 Pemasangan STP 1.8 m3 / day unit
STP Biotech 1.8 m3 / hari unit 1,00 -
AB & Material Bantu STP 3 m3 ls 1,00 -
Pemasangan STP 3 m3 / day ls 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
72 Memasang 1 M¹ pipa Polypropelene PN.16 diameter 1/2"
Pipa Polypropelene PN.16 dia 1/2" M¹ 1,20 -
Perlengkapan ( 35% harga pipa ) 1,00 -
Pekerja Oh 0,05 -
Tukang pipa Oh 0,09 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,03 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
73 Memasang 1 M¹ pipa Polypropelene PN.16 diameter 3/4"
Pipa PolypropelenePN.16 dia 3/4" M¹ 1,20 -
Perlengkapan ( 35% harga pipa ) -
Pekerja Oh 0,05 -
Tukang pipa Oh 0,09 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,03 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
74 Memasang 1 M¹ pipa Polypropelene PN.16 diameter 1"
Pipa Polypropelene PN.16 dia 1" M¹ 1,20 -
Perlengkapan ( 35% harga pipa ) -
Pekerja Oh 0,05 -
Tukang pipa Oh 0,09 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,03 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
75 Memasang 1 M¹ pipa Polypropelene PN.16 diameter 1 1/4"
Pipa Polypropelene PN.16 dia 1 1/4" M¹ 1,20 -
Perlengkapan ( 35% harga pipa ) -
Pekerja Oh 0,11 -
Tukang pipa Oh 0,18 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
76 Memasang 1 M¹ pipa Polypropelene PN.16 diameter 1 1/5"
Pipa Polypropelene dia 1 1/5" M¹ 1,20 -
Perlengkapan ( 35% harga pipa ) -
Pekerja Oh 0,11 -
Tukang pipa Oh 0,18 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
77 Memasang 1 M¹ pipa Polypropelene PN.16 diameter 2"
Pipa Polypropelene PN.16 dia 2" M¹ 1,20 -
Perlengkapan ( 35% harga pipa ) -
Pekerja Oh 0,11 -
Tukang pipa Oh 0,18 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
78 Memasang 1 M¹ pipa Polypropelene PN.16 diameter 2 1/2"
Pipa Polypropelene PN.16 dia 2 1/2" M¹ 1,20 -
Perlengkapan ( 35% harga pipa ) -
Pekerja Oh 0,11 -
Tukang pipa Oh 0,18 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
79 Memasang 1 M¹ pipa Polypropelene PN.16 diameter 3"
Pipa Polypropelene dia,3" M¹ 1,20 -
Perlengkapan ( 40% harga pipa ) -
Pekerja Oh 0,11 -
Tukang pipa Oh 0,18 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
80 Memasang 1 M¹ pipa Polypropelene diameter 4"
Pipa Polypropelene PN.16 dia,4" M¹ 1,20 -
Perlengkapan ( 40% harga pipa ) -
Pekerja Oh 0,14 -
Tukang pipa Oh 0,23 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
81 Memasang 1 M¹ pipa Polypropelene PN.20 diameter 1/2"
Pipa Polypropelene PN.20 dia 1/2" M¹ 1,20 -
Perlengkapan ( 35% harga pipa ) -
Pekerja Oh 0,05 -
Tukang pipa Oh 0,09 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,03 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -

82 Memasang 1 M¹ pipa Polypropelene PN.20 diameter 3/4"


Pipa PolypropelenePN.20 dia 3/4" M¹ 1,20 -
Perlengkapan ( 35% harga pipa ) -
Pekerja Oh 0,05 -
Tukang pipa Oh 0,09 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,03 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
83 Memasang 1 M¹ pipa Polypropelene PN.20 diameter 1"
Pipa Polypropelene PN.20 dia 1" M¹ 1,20 -
Perlengkapan ( 35% harga pipa ) -
Pekerja Oh 0,05 -
Tukang pipa Oh 0,09 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,03 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
84 Memasang 1 M¹ pipa Polypropelene PN.20 diameter 1 1/4"
Pipa Polypropelene PN.20 dia 1 1/4" M¹ 1,20 -
Perlengkapan ( 35% harga pipa ) -
Pekerja Oh 0,11 -
Tukang batu Oh 0,18 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
85 Memasang 1 M¹ pipa Polypropelene PN.20 diameter 1 1/5"
Pipa Polypropelene PN.20 dia 1 1/5" M¹ 1,20 -
Perlengkapan ( 35% harga pipa ) -
Pekerja Oh 0,11 -
Tukang pipa Oh 0,18 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
86 Memasang 1 M¹ pipa Polypropelene PN.20 diameter 2"
Pipa Polypropelene PN.20 dia 2" M¹ 1,20 -
Perlengkapan ( 35% harga pipa ) -
Pekerja Oh 0,11 -
Tukang pipa Oh 0,18 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
87 Memasang 1 M¹ pipa Polypropelene PN.20 diameter 2 1/2"
Pipa Polypropelene PN.20 dia 2 1/2" M¹ 1,20 -
Perlengkapan ( 35% harga pipa ) -
Pekerja Oh 0,11 -
Tukang pipa Oh 0,18 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
88 Memasang 1 M¹ pipa Polypropelene PN.20 diameter 3"
Pipa Polypropelene PN.20 dia,3" M¹ 1,20 -
Perlengkapan ( 40% harga pipa ) -
Pekerja Oh 0,11 -
Tukang pipa Oh 0,18 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
89 Memasang 1 M¹ pipa Polypropelene PN.20 diameter 4"
Pipa Polypropelene PN.20 dia,4" M¹ 1,20 -
Perlengkapan ( 40% harga pipa ) -
Pekerja Oh 0,14 -
Tukang pipa Oh 0,23 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
90 Memasang 1 M¹ Pipa GIP Medium A 1/2" ( 6 m1 )
Pipa GIP Medium A 1/2" ( 6 m1 ) M¹ 1,20 -
Perlengkapan ( 40% harga pipa ) -
Pekerja Oh 0,14 -
Tukang pipa Oh 0,23 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
91 Memasang 1 M¹ Pipa GIP Medium A 3/4" ( 6 m1 )
Pipa GIP Medium A 3/4" ( 6 m1 ) M¹ 1,20 -
Perlengkapan ( 40% harga pipa ) -
Pekerja Oh 0,14 -
Tukang pipa Oh 0,23 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
92 Memasang 1 M¹ Pipa GIP Medium A 1" ( 6 m1 )
Pipa GIP Medium A 1" ( 6 m1 ) M¹ 1,20 -
Perlengkapan ( 40% harga pipa ) -
Pekerja Oh 0,14 -
Tukang pipa Oh 0,23 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
93 Memasang 1 M¹ Pipa GIP Medium A 1 1/4" ( 6 m1 )
Pipa GIP Medium A 1 1/4" ( 6 m1 ) M¹ 1,20 -
Perlengkapan ( 40% harga pipa ) -
Pekerja Oh 0,14 -
Tukang pipa Oh 0,23 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
94 Memasang 1 M¹ Pipa GIP Medium A 1 1/2" ( 6 m1 )
Pipa GIP Medium A 1 1/2" ( 6 m1 ) M¹ 1,20 -
Perlengkapan ( 40% harga pipa ) -
Pekerja Oh 0,14 -
Tukang pipa Oh 0,23 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
95 Memasang 1 M¹ Pipa GIP Medium A 2" ( 6 m1 )
Pipa GIP Medium A 2" ( 6 m1 ) M¹ 1,20 -
Perlengkapan ( 40% harga pipa ) -
Pekerja Oh 0,14 -
Tukang pipa Oh 0,23 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
96 Memasang 1 M¹ Pipa GIP Medium A 2 1/2" ( 6 m1 )
Pipa GIP Medium A 2 1/2" ( 6 m1 ) M¹ 1,20 -
Perlengkapan ( 40% harga pipa ) -
Pekerja Oh 0,14 -
Tukang pipa Oh 0,23 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
DAFTAR HARGA SATUAN PEKERJAAN ELEKTRIKAL

No. Item Pekerjaan Jumlah (Rp.)

A ELEKTRIKAL
1 1 Unit Panel TR LT.1 -
2 1 Unit Panel SDP LT.1 -
3 1 Unit Panel LP/PP.LT.1 -
4 1 Unit Panel LP/PP.LT.2 -
5 1 Unit Panel LP/PP.LT.3A -
6 1 Unit Panel LP/PP.LT.3 -
7 1 Unit Panel LP/PP.R.M.LIFT -
8 1 Unit Panel PP. AC . LT.1 -
9 1 Unit Panel PP. AC . A LT.2 -
10 1 Unit Panel PP. AC . OUTDOR UNIT -
11 1 Ttk Tray 300 X 50 mm -
12 1 BH Lampu TL LED 2 x 20 Watt,TKI-Mirror -
13 1 BH Lampu RML (M1) 2 x 18 W -
14 1 BH MEMASANG DOWN LIGHT 18 W -
15 1 BH MEMASANG DOWN LIGHT 15 W -
16 1 BH MEMASANG LAMPU BARET 20 W -
17 1 BH MEMASANG LAMPU INDIRECT T.5 -
18 1 BH MEMASANG LAMPU TL T.8 -
19 1 BH MEMASANG STOP KONTAK -
20 1 BH MEMASANG SAKLAR SERI -
21 1 BH MEMASANG SAKLAR TUNGGAL -
22 1 BH MEMASANG SAKLAR TUKAR -
23 1 BH Grid Switch 10 Gang -
24 1 BH Penangkal petir konvensional -
25 1 BH Beam Clamp + Support -
26 1 BH Pentanahan (grounding system )
27 1 BH Down Cable BC 50 -
28 1 Ttk Memasang Titik nyala Lampu -
29 1 Ttk Memasang Titik Nyala Saklar -
30 1 Ttk Memasang Titik nyala Stop Kontak -
31 1 Ttk Instalasi kabel power AC 1 - 1 1/2PK -
32 1 Ttk Instalasi kabel power AC 3 - 4 PK -
33 1 Ttk Instalasi kabel power FAN -
34 1 M' Memasang Penggelaran kabel NYY 4 x 2,5 mm2 -
35 1 M' Memasang Penggelaran kabel NYY 4 x 4 mm2 -
36 1 M' Memasang Penggelaran kabel NYY 4 x 10 mm2 -
37 1 M' Memasang Penggelaran kabel NYY 4 x 6 mm2 -
38 1 M' Memasang Penggelaran kabel NYY 4 x 16 mm2 -
39 1 M' Memasang Penggelaran kabel NYY 4 x 25 mm2 -
40 1 M' Memasang Penggelaran kabel NYY 4 x 50 mm2 -
41 1 M' Memasang Penggelaran kabel NYFGBY 4 x 70 mm2 -
42 1 M' Memasang Penggelaran kabel NYFGBY 4 x 95 mm2 -
43 1 M' Memasang Penggelaran kabel NYFGBY 4 x 120 mm2 -
44 1 M' Memasang Penggelaran kabel NYFGBY 4 x 150 mm2 -
45 1 M' Memasang Penggelaran kabel NYFGBY 4 x 185 mm2 -
46 1 M' Memasang Penggelaran kabel NYFGBY 4 x 240 mm2 -
47 1 M' Memasang Penggelaran kabel NYFGBY 4 x 300 mm2 -

B FIRE ALARM
48 1 Ttk Memasang Titik nyala Fire Alarm -
49 1 unit Memasang Master Control Fire Alarm -
50 1 Bh MEMASANG PHOTO ELECTRIC SMOKE DETECTOR -
51 1 Bh Heat Detector -
52 1 Bh MANUAL BREAK GLASS PUSH BUTTON -
53 1 Bh MEMASANG ALARM BELL -
54 1 Bh MEMASANG INDICATOR LAMP -
55 1 Bh MEMASANG END OF LINE -
56 1 Bh JBFA -
57 1 Ttk Instalasi Fire alarm (NYA 16 x 2,5 mm) -
No. Item Pekerjaan Jumlah (Rp.)

C TATA SUARA
58 1 Ttk Memasang Titik nyala Tata Suara -
59 1 Bh AM/FM Tuner & CD Player -
60 1 Bh MEMASANG CD PLAYER -
61 1 Bh Paging remote mic -
62 1 Bh Mixer Power Amplifier 250 w -
63 1 Bh Selector Zone -
64 1 Bh MEMASANG RACK CABINET -
65 1 ttk Terminal Box - Tata Suara -
66 1 Bh Ceiling speaker -
67 1 Bh Wall speaker -
68 1 Bh Volume control -

D SISTEM TELEPHON
69 1 Bh Instalasi Microphone -
70 1 Bh Instalasi Kabel Microphone -
71 1 Bh Outlet Microphone -
72 1 Ttk Memasang Titik nyala Telephone -
73 1 unit Memasang M-type kx-tda0104x -
74 1 unit Memasang Digital console kx-t7640 -
75 1 unit Memasang D60 DSS Console kx - dt390x -
76 1 Bh MEMASANG TELEPON KX-T2371 -
77 1 Bh MEMASANG Handset Display -
78 1 Bh MEMASANG MDF - Telephone -
79 1 Ttk MEMASANG OUTLET TELEPONE -
80 1 Ttk MEMASANG KABEL OTC 10x2x0,6 MM2 -

E SISTEM DATA
81 1 Ttk Memasang Titik nyala Power Data Komputer -
82 1 Ttk Memasang Titik nyala Data Komputer -
83 1 Bh Memasang Outlet Data -
84 1 unit Memasang Wall mount 19"/12 U / ABBA 12 U -
85 1 Bh Memasang Switch Hub. 24 Ch -
86 1 m' Memasang KABEL Data Cat-6 -

F SISTEM CCTV
87 1 Ttk Memasang Titik CCTV -
88 1 Ttk Memasang Titik Power CCTV -
89 1 Ttk Memasang Instalasi kabel data Cat 5 CCTV -
90 1 Bh MEMASANG FIXED CAMERA -
91 1 unit Memasang PERALATAN UTAMA CCTV -
92 1 Bh Memasang MONITOR CCTV 32" -
93 1 Bh Memasang DOME CAMERA -

Bogor, ..................... 2018


Kontraktor,
PT,.................................

Cap & Tanda Tangan

NAMA
Jabatan
ANALISA HARGA SATUAN PEKERJAAN ELEKTRIKAL

No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6

A ELEKTRIKAL
1 Panel TR LT.1
Pengadaan dan Pemasangan Panel TR
terdiri dari : - 1 module box panel ukuran 80 x 180 x 60 cm unit 1,00 -
Pilot lamp/control fuse/Vss 3 pos bh 3,00 -
Amper Meter,Volt Meter, Freqwinsi meter Digital set 1,00 -
Trafo Arus CT bh 3,00 -
MCCB terdiri dari : -
600A. 3 P bh 1,00 -
CU busbar 5 ( 50 x 5 mm) bh 5,00 -
Grounding system bh 1,00 -
Perlengkapan lain dan peralatan bantu sesuai(20% Dari Peralatan) ls 1,00 -
Pekerja Oh 0,04 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
2 Panel SDP LT.1
Pengadaan dan Pemasangan Panel SDP
terdiri dari : - 1 module box panel ukuran 90 x 70 x 30 cm unit 1,00 -
Pilot lamp/control fuse/Vss 3 pos bh 3,00 -
Amper Meter,Volt Meter, Freqwinsi meter Digital set 1,00 -
Trafo Arus CT bh 3,00 -
MCCB terdiri dari : -
5000-630A. 3P Motoris bh 2,00 -
125A. 3 P bh 2,00 -
50A. 3P bh 2,00 -
32A. 3P bh 5,00 -
125A. 3 P bh 1,00 -
63A. 3P bh 1,00 -
Modul ATS set 1,00 -
CU busbar 5 ( 50 x 5 mm) bh 5,00 -
Grounding system bh 1,00 -
Perlengkapan lain dan peralatan bantu sesuai(20% Dari Peralatan) ls 1,00 -
Pekerja Oh 0,04 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
3 Panel LP/PP.LT.1
Pengadaan dan Pemasangan Panel LP/PP.LT.1
terdiri dari : - 1 module box panel ukuran 40 x 60 x 25 cm unit 1,00 -
Pilot lamp/control fuse/Vss 3 pos bh 3,00 -
Trafo Arus CT bh 3,00 -
MCCB 3 P terdiri dari : -
40-63 A. bh 1,00 -
MCB 1 Ph terdiri dari : -
10 A 1ph bh 17,00 -
Grounding system bh 1,00 -
Perlengkapan lain dan peralatan bantu sesuai(20% Dari Peralatan) ls 1,00 -
Pekerja Oh 0,04 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
4 Panel LP/PP.LT.2
Pengadaan dan Pemasangan Panel LP/PP.LT.2
terdiri dari : - 1 module box panel ukuran 40 x 60 x 25 cm unit 1,00 -
Pilot lamp/control fuse/Vss 3 pos bh 3,00 -
Trafo Arus CT bh 3,00 -
MCCB 3 P terdiri dari : -
40-63 A. bh 1,00 -
MCB 1 Ph terdiri dari : -
10 A 1ph bh 31,00 -
Grounding system bh 1,00 -
Perlengkapan lain dan peralatan bantu sesuai(20% Dari Peralatan) ls 1,00 -
Pekerja Oh 0,04 -
Tukang Listrik Oh 0,14 -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
5 Panel LP/PP.LT.3A
Pengadaan dan Pemasangan Panel LP/PP.LT.3
terdiri dari : - 1 module box panel ukuran 40 x 40 x 15 cm unit 1,00 -
MCB 1 Ph terdiri dari : -
6 A 1ph bh 1,00 -
10 A 1ph bh 3,00 -
Grounding system bh 1,00 -
Perlengkapan lain dan peralatan bantu sesuai(20% Dari Peralatan) ls 1,00 -
Pekerja Oh 0,04 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
6 Panel LP/PP.LT.3
Pengadaan dan Pemasangan Panel LP/PP.LT.3
terdiri dari : - 1 module box panel ukuran 40 x 60 x 25 cm unit 1,0000 -
Pilot lamp/control fuse/Vss 3 pos bh 3,0000 -
Trafo Arus CT bh 3,0000 -
MCB3 P terdiri dari : -
25-32 A. bh 3,0000 -
MCB 1 Ph terdiri dari : -
6 A 1ph bh 27,0000 -
Grounding system bh 1,0000 -
Perlengkapan lain dan peralatan bantu sesuai(20% Dari Peralatan) ls 1,0000 -
Pekerja Oh 0,0400 -
Tukang Listrik Oh 0,1350 -
Kepala tukang Oh 0,0135 -
Mandor Oh 0,0050 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
7 Panel LP/PP.R.M.LIFT
Pengadaan dan Pemasangan Panel LP/PP.LT.3
terdiri dari : - 1 module box panel ukuran 40 x 60 x 25 cm unit 1,00 -
Pilot lamp/control fuse/Vss 3 pos bh 3,00 -
Trafo Arus CT bh 3,00 -
MCB3 P terdiri dari : -
25-32 A. bh 1,00 -
16 A. bh 1,00 -
MCB 1 Ph terdiri dari : -
6 A 1ph bh 4,00 -
Grounding system bh 1,00 -
Perlengkapan lain dan peralatan bantu sesuai(20% Dari Peralatan) ls 1,00 -
Pekerja Oh 0,04 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
8 Panel PP. AC . LT.1
Pengadaan dan Pemasangan Panel PP.AC. LT.1
terdiri dari : - 1 module box panel ukuran 40 x 60 x 25 cm unit 1,00 -
Pilot lamp/control fuse/Vss 3 pos bh 3,00 -
Trafo Arus CT bh 3,00 -
MCCB terdiri dari : -
125A. 3P bh 1,00 -
40-63 A. bh 1,00 -
MCB terdiri dari : -
16 A. 1 P bh 32,00 -
Grounding system bh 1,00 -
Perlengkapan lain dan peralatan bantu sesuai(20% Dari Peralatan) ls 1,00 -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
Pekerja Oh 0,04 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
9 Panel PP. AC . A LT.2
Pengadaan dan Pemasangan Panel PP.AC. LT.1
terdiri dari : - 1 module box panel ukuran 40 x 60 x 25 cm unit 1,00 -
Pilot lamp/control fuse/Vss 3 pos bh 3,00 -
Trafo Arus CT bh 3,00 -
MCCB terdiri dari : -
40-63 A. bh 1,00 -
32-40 A. bh 3,00 -
MCB terdiri dari : -
16 A. 1 P bh 6,00 -
Grounding system bh 1,00 -
Perlengkapan lain dan peralatan bantu sesuai(20% Dari Peralatan) ls 1,00 -
Pekerja Oh 0,04 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
10 Panel PP. AC . OUTDOR UNIT
Pengadaan dan Pemasangan Panel PP.AC. OUTDOR UNIT
terdiri dari : - 1 module box panel ukuran 40 x 60 x 25 cm unit 1,00 -
Pilot lamp/control fuse/Vss 3 pos bh 3,00 -
Trafo Arus CT bh 3,00 -
MCCB terdiri dari : -
200-225A. 3P bh 1,00 -
125A. 3P bh 4,00 -
40-63 A. bh 2,00 -
MCB terdiri dari : -
16 A. 1 P bh 36,00 -
Grounding system bh 1,00 -
Perlengkapan lain dan peralatan bantu sesuai(20% Dari Peralatan) ls 1,00 -
Pekerja Oh 0,04 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
11 Tray 300 X 50 mm
Tray U 300 X 50 mm m' 0,33 -
Jointing tray 100 bh' 0,33 -
Elbow Tray U 300 x 50 bh' 0,10 -
Hanger beam bh' 0,50 -
Hanger Rood bh' 0,33 -
Material bantu Tray ls 1,00 -
Pekerja Oh 0,04 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
12 Lampu TL LED 2 x 20 Watt,TKI-Mirror
Lampu TL LED 2 x 20 Watt,TKI-Mirror bh' 1,00 -
material bantu pas lampu type 1 ls 1,00 -
Pekerja Oh 0,04 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
13 Lampu RML (M1) 2 x 18 W
Lampu RML (M1) 2 x 18 W bh' 1,00 -
material bantu pas lampu type 1 ls 1,00 -
Pekerja Oh 0,04 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
14 MEMASANG DOWN LIGHT 18 W
DL 18 W bh' 1,00 -
material bantu pas lampu type 1 ls 1,00 -
Pekerja Oh 0,04 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
15 MEMASANG DOWN LIGHT 15 W
DL 15 W bh' 1,00 -
material bantu pas lampu type 1 ls 1,00 -
Pekerja Oh 0,04 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
16 MEMASANG LAMPU BARET 20 W
Lampu Baret 20 W bh' 1,00 -
material bantu pas lampu type 1 ls 1,00 -
Pekerja Oh 0,04 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
17 MEMASANG LAMPU INDIRECT T.5
Lampu Indirect T.5 16 W bh' 1,00 -
material bantu pas lampu type 1 ls 1,00 -
Pekerja Oh 0,04 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
18 MEMASANG LAMPU TL T.8
Lampu TL. T.8 18 W bh' 1,00 -
material bantu pas lampu type 1 ls 1,00 -
Pekerja Oh 0,04 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
19 MEMASANG STOP KONTAK
Stop kontak bh' 1,00 -
inbouw doos bh' 1,00 -
alat bantu pas saklar/stop kontak ls 1,00 -
Pekerja Oh 0,04 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
20 MEMASANG SAKLAR SERI
saklar ganda bh' 1,00 -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
inbouw doos bh' 1,00 -
Material & alat bantu pas saklar/stop kontak ls 1,00 -
upah pas saklar / stop kontak ls 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
21 MEMASANG SAKLAR TUNGGAL
saklar tunggal bh' 1,00 -
inbouw doos bh' 1,00 -
Material & alat bantu saklar/stop kontak ls 1,00 -
upah pas saklar / stop kontak ls 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
22 MEMASANG SAKLAR TUKAR
saklar tukar bh' 1,00 -
inbouw doos bh' 1,00 -
Material & alat bantu pas saklar/stop kontak ls 1,00 -
upah pas saklar / stop kontak ls 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
23 Grid Switch 10 Gang
Grid Switch 10 Gang bh' 1,00 -
inbouw doos 12 gang bh' 1,00 -
Material & alat bantu pas saklar/stop kontak ls 1,00 -
upah pas saklar / stop kontak ls 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
24 Penangkal petir konvensional
spit tembaga 1 1/4" bh' 1,00 -
Material & alat bantu spit tembaga 1 1/4" ls 1,00 -
Upah Pasang Penangkal Petir konvensional ls 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
25 Beam Clamp + Support
Beam Clamp + Support bh' 1,00 -
Material & alat bantu Beam Clamp + Support ls 1,00 -
Upah Pasang Penangkal Petir konvensional ls 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
26 Pentanahan (grounding system )
Kabel BC 50 mm m' 10,00 -
pipa gip medium class 1 1/4" btg 1,00 -
sock pipa gip 1" bh 2,00 -
spit tembaga 1 1/4" bh 1,00 -
material bantu pas grounding ls 1,00 -
Upah Pasang Penangkal Petir konvensional ls 1,00
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
27 Down Cable BC 50
Kabel BC 50 mm m' 1,10 -
material bantu pas inst kabel sedang bh 1,00 -
upah pas inst kabel sedang ls 1,00 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
28 Memasang Titik nyala Lampu
NYM 3 x 2,5 mm2 m' 15,00 -
pipa conduit dia 20 mm btg 6,25 -
sock dia.20 mm bh 6,25 -
t dus dia. 20 mm bh 1,00 -
klem dia.20 mm bh 12,50 -
Isolasi bh 0,50 -
material bantu pas inst ttk lampu ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
29 Memasang Titik Nyala Saklar
NYM 3 x 2,5 mm2 m' 15,00 -
pipa conduit dia 20 mm btg 6,25 -
sock dia.20 mm bh 6,25 -
t dus dia. 20 mm bh 1,00 -
klem dia.20 mm bh 12,50 -
Isolasi bh 0,50 -
material bantu pas inst ttk lampu ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
30 Memasang Titik nyala Stop Kontak
NYM 3 x 2,5 mm2 m' 19,00 -
pipa conduit dia 20 mm btg 7,92 -
sock dia.20 mm bh 7,92 -
t dus dia. 20 mm bh 1,00 -
klem dia.20 mm bh 15,83 -
Isolasi bh 0,50 -
material bantu pas inst ttk Stop kontak ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
31 Instalasi kabel power AC 1 - 1 1/2PK
NYM 3 x 2,5 mm2 m' 30,00 -
pipa conduit dia 20 mm m' 17,00 -
sock dia.20 mm bh 17,00 -
t dus dia. 20 mm bh 1,00 -
klem dia.20 mm bh 23,00 -
ab dan mb pas kabel power AC ls 0,35 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
32 Instalasi kabel power AC 3 - 4 PK
kabel NYY 4 x 4 mm² m' 20,00 -
pipa conduit dia 20 mm m' 12,00 -
sock dia.20 mm bh 12,00 -
t dus dia. 20 mm bh 1,00 -
klem dia.20 mm bh 23,00 -
ab dan mb pas kabel power AC ls 0,35 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
33 Instalasi kabel power FAN
NYM 3 x 2,5 mm2 m' 30,00 -
pipa conduit dia 20 mm m' 10,34 -
sock dia.20 mm bh 10,34 -
t dus dia. 20 mm bh 1,00 -
klem dia.20 mm bh 20,69 -
ab dan mb pas kabel power AC ls 0,35 -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
34 Memasang Penggelaran kabel
NYY 4 x 2,5 mm2 M¹ 1,20 -
Perlengkapan ( 35% harga kabel ) Pkt 0,35 -
Pekerja Oh 0,02 -
Tukang Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
35 Memasang Penggelaran kabel
NYY 4 x 4 mm2 M¹ 1,20 -
Kabel BC 6 mm m' 1,00 -
Isolasi m' 0,07 -
material bantu pas inst kabel kecil ls 1,00 -
Pekerja Oh 0,02 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
36 Memasang Penggelaran kabel
NYY 4 x 10 mm2 m' 1,00 -
Kabel BC 6 mm m' 1,00 -
Isolasi m' 0,07 -
material bantu pas inst kabel kecil ls 1,00 -
Pekerja Oh 0,02 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
37 Memasang Penggelaran kabel
NYY 4 x 6 mm2 m' 1,00 -
Kabel BC 6 mm m' 1,00 -
Isolasi m' 0,07 -
material bantu pas inst kabel kecil ls 1,00 -
Pekerja Oh 0,02 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
38 Memasang Penggelaran kabel
NYY 4 x 16 mm2 m' 1,00 -
Kabel BC 10 mm m' 1,00 -
Isolasi bh 0,07 -
material bantu pas inst kabel sedang ls 1,00 -
Pekerja Oh 0,02 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
39 Memasang Penggelaran kabel
NYY 4 x 25 mm2 m' 1,00 -
Kabel BC 10 mm m' 1,00 -
Isolasi bh 0,07 -
material bantu pas inst kabel sedang ls 1,00 -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
Pekerja Oh 0,02 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
40 Memasang Penggelaran kabel
NYY 4 x 50 mm2 m' 1,00 -
Kabel BC 25 mm m' 1,00 -
klem dia.20 mm bh 1,00 -
Isolasi bh 0,07 -
material bantu pas inst kabel besar ls 1,00 -
Pekerja Oh 0,02 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
41 Memasang Penggelaran kabel
NYFGBY 4 x 70 mm2 m' 1,00 -
Kabel BC 25 mm m' 1,00 -
klem dia.20 mm bh 1,00 -
Isolasi bh 0,07 -
material bantu pas inst kabel besar ls 1,00 -
Pekerja Oh 0,02 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
42 Memasang Penggelaran kabel
NYFGBY 4 x 95 mm2 m' 1,00 -
Kabel BC 25 mm m' 1,00 -
klem dia.20 mm bh 1,00 -
Isolasi bh 0,07 -
material bantu pas inst kabel besar ls 1,00 -
Pekerja Oh 0,02 -
Tukang Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
43 Memasang Penggelaran kabel
NYFGBY 4 x 120 mm2 m' 1,00 -
Kabel BC 70 mm m' 1,00 -
Isolasi bh 0,07 -
material bantu pas inst kabel besar ls 1,00 -
Pekerja Oh 0,02 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
44 Memasang Penggelaran kabel
NYFGBY 4 x 150 mm2 m' 1,00 -
Kabel BC 70 mm m' 1,00 -
Isolasi bh 0,07 -
material bantu pas inst kabel besar ls 1,00 -
Pekerja Oh 0,02 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
45 Memasang Penggelaran kabel
NYFGBY 4 x 185 mm2 m' 1,00 -
Kabel BC 70 mm m' 1,00 -
Isolasi bh 0,07 -
material bantu pas inst kabel besar ls 1,00 -
Pekerja Oh 0,02 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
46 Memasang Penggelaran kabel
NYFGBY 4 x 240 mm2 m' 1,00 -
Kabel BC 70 mm m' 1,00 -
Isolasi bh 0,07 -
material bantu pas inst kabel besar ls 1,00 -
Pekerja Oh 0,02 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
47 Memasang Penggelaran kabel
NYFGBY 4 x 300 mm2 m' 1,00 -
Kabel BC 70 mm m' 1,00 -
Isolasi bh 0,07 -
material bantu pas inst kabel besar ls 1,00 -
Pekerja Oh 0,02 -
Tukang Listrik Oh 0,14 -
Kepala tukang Oh 0,01 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -

B FIRE ALARM
48 Memasang Titik nyala Fire Alarm
NYA 3 x 1,5 mm2 m' 16,00 -
pipa conduit dia 20 mm btg 2,76 -
t dus dia. 20 mm bh 1,00 -
sock dia.20 mm bh 6,00 -
klem kabel bh 14,00 -
Perlengkapan harga conduit,klem,isolasi Pkt 0,35 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
49 Memasang Master Control Fire Alarm
MCFA 25 Zone unit 1,00 -
material & alat bantu F.A ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
50 MEMASANG PHOTO ELECTRIC SMOKE DETECTOR
Photo electric Smoke Detector bh 1,00 -
material & alat bantu Smoke Detector ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
51 Heat Detector
R.O.R heat detector bh 1,00 -
material & alat bantu ROR ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
52 MANUAL BREAK GLASS PUSH BUTTON
Manual call point bh 1,00 -
material & alat bantu Manual call point ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
53 MEMASANG ALARM BELL
Alarm Bell bh 1,00 -
material & alat bantu alarm bell ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
54 MEMASANG INDICATOR LAMP
Indicator lamp bh 1,00 -
material & alat bantu lampu indicator ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
55 MEMASANG END OF LINE
End of Line bh 1,00 -
material & alat bantu End of Line ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
56 JBFA
Terminal box FA bh 1,00 -
material & alat bantu Terminal box FA ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
57 Instalasi Fire alarm (NYA 16 x 2,5 mm)
kabel NYA 1 x 2,5 mm² m' 16,00 -
pipa conduit dia 20 mm btg 2,76 -
t dus dia. 20 mm bh 1,00 -
sock dia.20 mm bh 6,00 -
klem kabel bh 14,00 -
material & alat bantu ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6

C TATA SUARA
58 Memasang Titik nyala Tata Suara
NYMHY 3 x 1,5 mm2 M¹ 15,00 -
pipa conduit dia 20 mm btg 2,76 -
t dus dia. 20 mm bh 1,00 -
sock dia.20 mm bh 6,00 -
klem kabel bh 14,00 -
material & alat bantu ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
59 AM/FM Tuner & CD Player
AM/FM Tuner + CD set 1,00 -
kabel RCA ls 1,00 -
material & alat bantu AM/FM Tuner & CD Player set 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
60 MEMASANG CD PLAYER
CD Player set 1,00 -
kabel RCA ls 1,00 -
material & alat bantu CD Player set 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
61 Paging remote mic
Paging Mic TOA 100 EC set 1,00 -
kabel RCA ls 1,00 -
material & alat bantu Paging Mic TOA 100 EC set 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
62 Mixer Power Amplifier 250 w
power amplifier TOA ZA 2240 set 1,00 -
kabel RCA ls 1,00 -
material & alat bantu power amplifier TOA ZA 2240 set 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
63 Selector Zone
Selector Zone set 1,00 -
kabel RCA ls 1,00 -
material & alat bantu r ECP set 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
64 MEMASANG RACK CABINET
kabel RCA set 1,00 -
cabinet rack tata suara ls 1,00 -
material & alat bantu rack S system set 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
65 Terminal Box - Tata Suara
Terminal box panel TS set 1,00 -
material & alat bantu Terminal box panel TS ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
66 Ceiling speaker
Ceiling speaker set 1,00 -
material & alat bantu speaker / volume control ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
67 Wall speaker
Wall speaker set 1,00 -
material & alat bantu box speaker ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
68 Volume control
Volume control bh 1,00 -
inbouw doos Volume control bh 1,00 -
material & alat bantu box speaker ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -

D SISTEM TELEPHON
69 Instalasi Microphone
kabel Mic canare m' 1,00 -
pipa conduit EGA dia 20 mm btg 1,00 -
sock EGA dia.20 mm bh 1,00 -
klem EGA dia.20 mm bh 1,33 -
alat & Mat. bantu pas inst ttk horn speaker ls 0,10 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
70 Instalasi Kabel Microphone
kabel Mic canare m' 35,00 -
pipa conduit EGA dia 20 mm btg 15,22 -
sock EGA dia.20 mm bh 15,22 -
klem EGA dia.20 mm bh 30,43 -
alat & Mat. bantu Mic canare lot 1,00 -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
71 Outlet Microphone
Outlet Microphone bh 1,00 -
inbouw doos bh 1,00 -
alat & Mat. Outlet Microphone ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
72 Memasang Titik nyala Telephone
ITC 1 x 2 x 0,6 mm2 M¹ 15,00 -
pipa conduit EGA dia 20 mm btg 15,22 -
sock EGA dia.20 mm bh 15,22 -
klem EGA dia.20 mm bh 30,43 -
alat & Mat. bantu ITC 1 x 2 x 0,6 mm2 lot 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
73 Memasang M-type kx-tda0104x
M-type kx-tda0104x unit 1,00 -
T-box 100 unit 1,00 -
alat bantu pasang programing PABX unit 1,00 -
UPS 2000 VA unit 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
74 Memasang Digital console kx-t7640
Headset RPTCA400 unit 1,00 -
KX DT333X unit 1,00 -
mat bantu pas Fax / telp bh 1,00 -
Perlengkapan harga conduit,klem,isolasi Pkt 1,00 -
alat bantu pas Fax / telp ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
75 Memasang D60 DSS Console kx - dt390x
60 DSS Console kx - dt390x unit 1,00 -
material & alat bantu DSS Console kx - dt390x ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
76 MEMASANG TELEPON KX-T2371
Analog Telp KX-T2371 unit 1,00 -
material & alat bantu Analog Telp KX-T2371 ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
77 MEMASANG Handset Display
Digital display KX-T7630 unit 1,00 -
material & alat bantu Digital display KX-T7630 ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -

78 MEMASANG MDF - Telephone


MDF bh 1,00 -
Wire Cord MDF 1 1,00 -
material & alat bantu MDF telp ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
79 MEMASANG OUTLET TELEPONE
Outlet Telephone bh 1,00 -
inbouw doos 1 1,00 -
material & alat bantu Outlet Telephone ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
80 MEMASANG KABEL OTC 10x2x0,6 MM2
kabel OTC 10 x 2 x 0,6 mm² m' 1,00 -
Isolasi bh 0,07 -
material & alat bantu OTC 10 x 2 x 0,6 mm² ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -

E SISTEM DATA
81 Memasang Titik nyala Power Data Komputer
Kabel NYM 3 x 2,5 mm M¹ 15,00 -
pipa conduit EGA dia 20 mm btg 15,22 -
sock EGA dia.20 mm bh 15,22 -
klem EGA dia.20 mm bh 30,43 -
alat & Mat. bantu pas inst ttk horn speaker lot 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
82 Memasang Titik nyala Data Komputer
Kabel Cad 5 M¹ 45,00 -
pipa conduit dia 20 mm M¹ 45,00 -
t dus dia. 20 mm bh 1,00 -
one way doos bh 1,00 -
sock dia.20 mm bh 15,52 -
klem dia.20 mm bh 31,03 -
Perlengkapan harga conduit,klem,isolasi Pkt 0,35 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
83 Memasang Outlet Data
Face Plate 1 Port bh 1,00 -
Modular Jack Cat 5e ls 1,00 -
inbouw doos bh 1,00 -
alat bantu pas outlet data ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
84 Memasang Wall mount 19"/12 U / ABBA 12 U
Wall mount 19"/12 U / ABBA 12 U bh 1,00 -
material & alat bantu Wall Mount Rack Data ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
85 Memasang Switch Hub. 24 Ch
Switchub 24 ch bh 1,00 -
material & alat bantu switch hub 16 ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
86 Memasang KABEL Data Cat-6
kabel data Cat-6 belden m' 1,00 -
pipa conduit dia 20 mm m' 1,00 -
sock dia.20 mm bh 1,00 -
t dus dia. 20 mm bh 1,00 -
klem dia.20 mm bh 0,34 -
Isolasi bh 0,70 -
material & alat bantu inst ttk data ls 0,40 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -

F SISTEM CCTV
87 Memasang Titik CCTV ttk
Kabel Coaxial RG 59 m' 85,00 -
BNC bh 4,00 -
pipa conduit dia 20 mm m' 30,36 -
t dus dia. 20 mm bh 1,00 -
sock dia.20 mm bh 30,36 -
klem kabel bh 60,71 -
elbow ega bh 2,00 -
material & alat bantu kabel RG 5 ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
88 Memasang Titik Power CCTV
kabel NYMHY 3x1,5 mm2 m' 85,00 -
pipa conduit dia 20 mm m' 30,00 -
t dus dia. 20 mm bh 1,00 -
sock dia.20 mm bh 1,00 -
klem kabel bh 60,00 -
elbow ega bh 4,00 -
material & alat bantu kabel RG 5 ls 1,00 -
No. Item Pekerjaan Volume Satuan Harga Satuan Jumlah Harga

1 2 3 4 5 6 = 3x6
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
89 Memasang Instalasi kabel data Cat 5 CCTV
kabel data Cat-5 belden m' 85,00 -
pipa conduit dia 20 mm btg 30,00 -
t dus dia. 20 mm bh 1,00 -
one way doos bh 1,00 -
sock dia.20 mm bh 60,00 -
klem dia.20 mm bh 4,00 -
material & alat bantu kabel RG 5 ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
90 MEMASANG FIXED CAMERA
Fixed dome camera unit 1,00 -
BNC bh 1,00 -
material & alat bantu Fixed dome camera ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
91 Memasang PERALATAN UTAMA CCTV
Divar 16 channel bh 1,00 -
BNC ls 16,00 -
material & alat bantu DVR ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
92 Memasang MONITOR CCTV 32"
Monitor LCD 32" bh 1,00 -
BNC ls 10,00 -
material & alat bantu Camera ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
93 Memasang DOME CAMERA
Dome camera MOVING bh 1,00 -
BNC ls 10,00 -
material & alat bantu Camera ls 1,00 -
Tukang Listrik Oh 0,24 -
Kepala tukang Oh 0,02 -
Mandor Oh 0,01 -
Jumlah -
Overhead + Profit -
Jumlah -
Dibulatkan -
ANALISA HARGA SATUAN

No. Item Pekerjaan Harga Satuan Rp. Harga Satuan Rp.

1 2 3 4

I. PEKERJAAN PERSIAPAN
1. Perizinan (Izin Prinsip dan Operasi) dari Instansi terkait
Biaya mobilisasi dan demobilisasi termasuk biaya ijin pemasukan peralatan @ Rp. = Rp. -
dan perlengkapan kerja kedalam lokasi proyek dan pemindahan dari satu
tempat ke tempat lainnya didalam lokasi pekerjaan serta mengeluarkannya
setelah penyelesaian pekerjaan

Jumlah = Rp. -

2. Manajemen dan Asuransi Personil


Kontraktor atas nama Pemberi Tugas wajib mengasuransikan, sebagai berikut :
a. Asuransi Construction All Risk (CAR), Third Party Liability (TPL) dan @ Rp. = Rp. -
Personal Accident (PA).
b. Asuransi Tenaga Kerja (ASTEK) untuk pekerja dan staff kontraktor yang @ Rp. = Rp. -
bekerja pada proyek ini.
c. Biaya-biaya yang dikeluarkan untuk pengurusan dan penyelesaian @ Rp. = Rp. -
tuntutan (klaim) termasuk mendapatkan data-data dan dokumen penunjang
yang diperlukan sehubungan dengan hal tersebut diatas.

Jumlah = Rp. -

3. Drawing
a. Pengadaan gambar pelaksanaan (construction drawing) sebanyak yang @ Rp. = Rp. -
diperlukan untuk keperluan kerja dilapangan termasuk 2 (dua) set
keperluan pengawasan.
b. Pembuatan gambar kerja (shop drawing) berikut perhitungan atau @ Rp. = Rp. -
kalkulasi yang terinci sebanyak 3 (tiga) set, hingga disetujui Manajemen
Konstruksi dan atau Pemberi Tugas.
c. Pembuatan gambar-gambar terlaksana (as built drawing) sebanyak 1 @ Rp. = Rp. -
(satu) set kalkir dan 4 (empat) set blue print.

Jumlah = Rp. -

4. 1 M2 Pembuatan Direksi Keet dan Gudang


Bahan : 0,1 m3 Kayu kelas III @ Rp. = Rp. -
0,25 Kg Paku Biasa @ Rp. = Rp. -
5 Kg Semen Portland @ Rp. = Rp. -
0,25 M3 Pasir Pasang @ Rp. = Rp. -
70 bh bata merah @ Rp. = Rp. -
1,1 Lbr Seng Gelombang Bjls 30 @ Rp. = Rp. -
0,5 Lbr Triplek 3 mm @ Rp. = Rp. -
1 Ls Ongkos Pasang @ Rp. = Rp. -

Jumlah = Rp. -
12 m2 -

5. Listrik Kerja
Setiap pembangkit tenaga listrik sementara atau penerangan sementara @ Rp. = Rp. -
termasuk pemasangan kabel-kabel dan meteran yang dipergunakan untuk
pekerjaan atau pengambilan daya dari sumber atau PLN yang sudah ada,
maka semua biaya pengadaan dan pemakaian daya selama pelaksanan
proyek termasuk izin yang diperlukan serta perapihan setelah pekerjaan
selesai sudah harus diperhitungkan oleh Kontraktor.

Jumlah = Rp. -

TOTAL PEKERJAAN PERSIAPAN = Rp. -


DIBULATKAN = Rp. -

II. PEKERJAAN PREPARASI HOISTWAY + PEKERJAAN PENUNJANG


a. Preparasi Hoistway + Pekerjaan Penunjang (Grouting sill, jamb & sill suport) @ Rp. = Rp. -
1. Pengeboran Angkur dan Pemasangan Braket
2. Pemasangan Rel Pemandu (Guide Rail)
3. Pemasangan Pintu Pemberhentian (Landing Door)
4. Pemasangan hall sill dan jamb.
b. Ongkos Kerja @ Rp. = Rp. -

TOTAL PEKERJAAN PREPARASI HOISTWAY + PEKERJAAN PENUNJANG = Rp. -


DIBULATKAN = Rp. -
No. Item Pekerjaan Harga Satuan Rp. Harga Satuan Rp.

1 2 3 4

III. UNIT LIFT PASSANGER (PENUMPANG) LIFT No.


Kapasitas : 6 Orang (3500 kg) @ Rp. = Rp. -
Tipe : Traction Drive AC Geared/Gearless/GETM/GeN2-MR
Pelayanan : Lt. 1 s/d Lt. 3 (3 stop/opening)
Kecepatan : 60 mpm
Interior @ Rp. = Rp. -
- Dinding Kiri & Kanan : Mirror Stainless Steel
- Dinding Tengah : Mirror Stainless Steel
- Pintu Dalam Lift : Mirror Stainless Steel
Lantai : Granit Tile Motif (by other)
Ceiling : Standar Type
Car Door : Mirror Stainless Steel
Front Return Walls : Mirror Stainless Steel
Entrance Coulomn : Mirror Stainless Steel
Jamb : Jamb Stainless Stell Wide Jamb

TOTAL PEKERJAAN UNIT LIFT PASSANGER (PENUMPANG) LIFT = Rp. -


DIBULATKAN = Rp. -

IV. PEKERJAAN ARD (Auto Rescue Device)


a. Pekerjaan ARD (Auto Rescue Device) @ Rp. = Rp. -
Seluruh Perijinan pada paket pekerjaan dimaksud, dengan instansi terkait
Paket Elevator sudah termasuk resiko-resiko lain yang berkaitan
dengan pelaksanaan, keamanan sampai dengan Elevator diserahterimakan
b. Ongkos Pasang @ Rp. = Rp. -

TOTAL PEKERJAAN ARD (Auto Rescue Device) = Rp. -


DIBULATKAN = Rp. -

V. PEKERJAAN MEMASANG NYY 4 x 1C x 16 mm² + NYA 10 mm²


Bahan : 1,2 m' NYY 4 x 1C x 16 mm² + NYA 10 mm² @ Rp. = Rp. -
m' Perlengkapan ( 20% harga conduit,klem,isolasi ) @ Rp. = Rp. -

Tenaga : 1,5 OH Pekerja @ Rp. = Rp. -


1 OH Tukang @ Rp. = Rp. -
0,1 OH Kepala tukang @ Rp. = Rp. -
0,05 OH Mandor @ Rp. = Rp. -

TOTAL PEKERJAAN MEMASANG NYY 4 x 1C x 16 mm² + NYA 10 mm² = Rp. -


DIBULATKAN = Rp. -
VI. PEKERJAAN MEMASANG AES
Bahan : 1 unit AES Monitoring System by PC Panel Control @ Rp. = Rp. -
Perlengkapan ( 20% harga conduit,klem,isolasi ) @ Rp. = Rp. -

Tenaga : 2 OH Pekerja @ Rp. = Rp. -


1 OH Tukang @ Rp. = Rp. -
0,1 OH Kepala tukang @ Rp. = Rp. -
0,05 OH Mandor @ Rp. = Rp. -

TOTAL PEKERJAAN MEMASANG AES = Rp. -


DIBULATKAN = Rp. -
VII. PEKERJAAN MEMASANG CAR OPERATION PANEL
Bahan : 1 unit Car Operation Panel @ Rp. = Rp. -
Perlengkapan ( 20% harga conduit,klem,isolasi ) @ Rp. = Rp. -

Tenaga : 2 OH Pekerja @ Rp. = Rp. -


1 OH Tukang @ Rp. = Rp. -
0,1 OH Kepala tukang @ Rp. = Rp. -
0,05 OH Mandor @ Rp. = Rp. -

TOTAL PEKERJAAN MEMASANG AES = Rp. -


DIBULATKAN = Rp. -
VIII. PEKERJAAN MEMASANG HALL OPERATION PANEL
Bahan : 8 set Hall Operation Panel @ Rp. = Rp. -
Perlengkapan ( 20% harga conduit,klem,isolasi ) @ Rp. = Rp. -

Tenaga : 2 OH Pekerja @ Rp. = Rp. -


1 OH Tukang @ Rp. = Rp. -
0,1 OH Kepala tukang @ Rp. = Rp. -
0,05 OH Mandor @ Rp. = Rp. -

TOTAL MEMASANG HALL OPERATION PANEL = Rp. -


DIBULATKAN = Rp. -
No. Item Pekerjaan Harga Satuan Rp. Harga Satuan Rp.

1 2 3 4

IX. PEKERJAAN MEMASANG MCB


Bahan : 1 bh MCB 60 Amp @ Rp. = Rp. -
Perlengkapan ( 20% harga conduit,klem,isolasi ) @ Rp. = Rp. -

Tenaga : 2 OH Pekerja @ Rp. = Rp. -


1 OH Tukang @ Rp. = Rp. -
0,1 OH Kepala tukang @ Rp. = Rp. -
0,05 OH Mandor @ Rp. = Rp. -

TOTAL PEKERJAAN MEMASANG MCB = Rp. -


DIBULATKAN = Rp. -
X. PEKERJAAN MEMASANG AC SPLITH 1 PK
Bahan : 1 unit AC Splith @ Rp. = Rp. -
m' @)Rp.
Perlengkapan ( 20% harga conduit,klem,isolasi,Instalasi = Rp. -

Tenaga : 2 OH Pekerja @ Rp. = Rp. -


1 OH Tukang @ Rp. = Rp. -
0,1 OH Kepala tukang @ Rp. = Rp. -
0,05 OH Mandor @ Rp. = Rp. -

TOTAL PEKERJAAN MEMASANG AC SPLITH 2 PK = Rp. -


DIBULATKAN = Rp. -
XI. PEKERJAAN MEMASANG LED 21"
Bahan : 1 unit LED 21" @ Rp. = Rp. -
m' Perlengkapan ( 20% harga Brecket ) @ Rp. = Rp. -

Tenaga : 2 OH Pekerja @ Rp. = Rp. -


1 OH Tukang @ Rp. = Rp. -
0,1 OH Kepala tukang @ Rp. = Rp. -
0,05 OH Mandor @ Rp. = Rp. -

TOTAL PEKERJAAN MEMASANG LED 21" = Rp. -


DIBULATKAN = Rp. -
DAFTAR HARGA UPAH

No. Item Pekerja Harga Satuan Satuan

1 Mandor O/H
2 Kepala tukang besi beton O/H
3 Tukang besi beton terampil O/H
4 Tukang besi beton setengah terampil O/H
5 Kepala tukang besi profil O/H
6 Tukang besi profil terampil O/H
7 Kepala tukang batu O/H
8 Tukang batu terampil O/H
9 Tukang batu setengah terampil O/H
10 Kepala tukang kayu O/H
11 Tukang kayu terampil O/H
12 Tukang kayu setengah terampil O/H
13 Kepala tukang cat O/H
14 Tukang cat terampil O/H
15 Tukang cat setengah terampil O/H
16 Pekerja terampil O/H
17 Pekerja setengah terampil O/H
18 Pekerja O/H
19 Kepala Tukang pipa O/H
20 Tukang pipa O/H
21 Kepala tukang listrik O/H
22 Tukang listrik O/H
23 Sopir O/H
24 Operator O/H
25 Mekanik O/H
26 Pembantu Sopir O/H
27 Pembantu Operator O/H
28 Pembantu Mekanik O/H

Bogor, ..................... 2018


Kontraktor,
PT,.................................

Cap & Tanda Tangan

NAMA
Jabatan
DAFTAR HARGA MATERIAL

No. Material Harga Satuan Satuan

1 Atap :
Genteng Metal ( Rainbow Roof ) M2
Nok Atas Metal ( Rainbow Roof ) M1
Wall Flasing ( Rainbow Roof ) M1
Genteng keramik glazur, setara M-Class/Kanmuri/KIA Bh
Bubungan Genteng keramik berglazur, setara M-Class/Kanmuri/KIA Bh
Akrilik tebal 6 mm M2
Bubungan Akrilik tebal 6 mm M2
Listplank dan talang Zam t=0,8mm powdercoating M1
Kalsiplank uk. 3000x300x12 mm Lbr
Panellux sun screen M'
Stringer SL-1 @3m Btg
Rangka atap baja ringan galvalume M2
Rangka atap baja ringan galvanize M2
Trusses coating galvalume UK75 t=0.8 ( Smartruss ) M1
Trusses coating galvalume UK75 t=0.5 ( Smartruss ) M1
Reng 16 - DB Roof Battens t=0.48 mm M1
Foot Plate t=1.22 mm M1
PLD - Diafragma Plate Bh
WIND Bracing M1
Tensioner (Pengaku Tali Angin) Bh
Baut Besar Pcs
Baut Kecil Pcs
Dynabolt Pcs
Alumunium foil satu muka M2
Allumunium Composite Panel (ACP), tebal 4 mm Lbr
2 Bata, bata ringan, batu & pasir :
Bata merah bakar kelas I Bh
Bata merah bakar kelas II Bh
Batako kecil 8x10x20 Bh
Hebel t. 10x20x60 Bh
Batu Pecah Mesin 1/2 M3
Batu Pecah Mesin 2/3 M3
Batu Pecah Mesin 3/5 M3
Batu Pecah Mesin 10-15 cm M3
Batu Belah Pondasi M3
Batu koral beton kali (sirtu) M3
Koral Beton M3
Pasir beton M3
Pasir pasang M3
Pasir urug M3
Pasir batu M3
Tanah merah/Tanah Urug Pilihan M3
3 Besi, kawat & paku :
Besi Beton U-24 Rata-rata Kg
Besi Beton U-40 Rata-rata Kg
Besi Strip/Plat Kg
Plat Baja t=2.3mm + zinkcromate Kg
Besi profil canal C Kg
Baja siku 45x45x5 Kg
Baja WF Kg
Kawat beton Kg
Kawat harmonika 4 cm Bh
Paku 1 s/d 3 cm Kg
Paku 5 s/d 7 cm Kg
Paku 8 s/d 15 cm Kg
Paku skrup 3" Bh
Baut dia.6mm Bh
Bondex M2
Kawat Las Kg
Metal flashing t=0.8mm M1
Delatasi metal t=1.2mm M1
Grill galvanis 0,45x0,70 m Bh
Besi Pipa Stainless steel 2,5" Btg
Besi Pipa Stainless steel 1,5" Btg
Besi Pipa Stainless steel 1" Btg
4 Cat Btg
Cat besi Kg
Cat kayu glotex Kg
Cat tembok ICI Interior Kg
Cat tembok ICI weathershield Kg
Cat Vinilex Kg
Cat dasar Kg
Cat Minyak Kg
Cat Marka/Spotlight Kg
Dempul kayu cap kucing Kg
Plamir tembok Kg
Plamir kayu Kg
Politur Ltr
Politur jadi Ltr
Meni kayu/besi Kg
Kuas 3" Bh
No. Material Harga Satuan Satuan

Rol cat tembok Bh


Amplas Lbr
Terpentin Ltr
Tiner A Ltr
Lem Kuning (Aibond) Ltr
Lem Kg
Kape set Bh
5 Kayu :
Kayu balok borneo super M3
Kayu balok kamper medan (kruing) M3
Kayu Balok Albasia M3
Kayu Papan Albasia M3
Multiplek 9 mm 120x240 Lbr
Multiplek 12 mm 120x240 Lbr
Multiplek 18 mm 120x240 Lbr
Triplek 4 mm 120 x 240 Lbr
Triplek 6 mm 120 x 240 Lbr
HPL 120 x 240 Lbr
Triplex 4 mm lapis melamin Lbr
Wallpaper Lbr
Rockwool tebal 5 cm m2
Membran Shield m2
Edging ex.Taco 34 mm m'
Screen 96"x96" Automatis MICROVISION/BRITE/D-LIGHT unit
Partisi folding gate kedap suara sliding lengkap acessories (Pabrikasi) m2
Dolken 7 s/d 10 Btg
Kayu terentang M3
Kayu 5/7 borneo M3
6 Kaca, kusen & penggantung :
Pintu Frameless (tempered 12 mm polos) floor hinge dorma BTS 84 M2
Kaca Polos 5 mm ( ASAHI ) M2
Kaca Polos 3 mm ( ASAHI ) M2
Kaca Rayband 5 mm ( ASAHI ) M2
Kaca Rayband 8 mm ( ASAHI ) M2
Kaca tempered 8 mm (ASAHI) M2
Kaca tempered 10 mm (ASAHI) M2
Kaca tempered 12 mm (ASAHI) M2
Kunci Solid (lockcase,handle,cylinder) Set
Kunci sliding Pcs
Kunci 2 slaag kuda terbang Bh
Handle Pintu Kaca 110 cm - Setara Dorma Psg
Roda Sliding Pcs
Rambuncis Gradino RMB 931 AC + AS Pcs
Engsel solid 4" Bh
Casement Solid 8" Set
Casement Solid 12" Set
Grendel sliding Solid Bh
Grendel jungkit Solid Bh
Grendel pintu Solid (flush bold) 6" Bh
Grendel pintu Solid (flush bold) 12" Bh
Springknip solid Bh
Stoper Set
Silikone M1
7 Kusen aluminium 4 " coating M1
Pintu plat Bh
Pintu Spandrel Bh
Pintu panel solid kamper samarinda awet oven besar L=1 m, finishing melamik Bh
Pintu dobel riplek 4 mm finishing HPL rk kamper samarinda awet oven besar L=1 m Bh
Pintu dobel riplek 4 mm finishing HPL rk kamper samarinda awet oven besar Bh
Pintu dobel riplek 4 mm finishing HPL rk kamper samarinda awet oven kecil Bh
Jendela sliding besar Bh
Jendela sliding kecil Bh
Jendela jungkit kecil Bh
Jendela jungkit besar Bh
8 Keramik :
Granite homogenous tile ukuran (40 x 40) polish Bh
Granite homogenous tile ukuran (40 x 40) unpolish Bh
Granite homogenous tile 60x60 cm polish Bh
Granite homogenous tile ukuran (60 x 60) polish, warna gelap Bh
Border granit ukuran (10 x 60) cm Bh
Step nosing/plint granito ukuran (8 x 60) cm Bh
Granite alam slab tebal 2 cm uk. 60x120 cm M2
Parkit kayu merbau ukuran 9 x 60 cm tebal 1,5 cm (kayu solid) M2
Step nosing granito 10 x 30 KW I Bh
Paving Block natural 6 cm M2
9 Plafond & Partisi :
Gyptile/akustik 600 x 1200 x 9 mm Lbr
Gypsum board 120 x 240 x 9 mm Lbr
GRC 120x240x4 mm Lbr
Rod tekuk/kait galvanized d. 3,5 mm Btg
Cliper/adjuster Bh
Main tee @ 3,6 mm galvanized Btg
Cross tee galvanized Btg
Wall angle 2020 colour Btg
Hollow galvalume 40x40 mm Btg
Hollow galvalume 20x40 mm Btg
Hollow galvanis 40x40 mm, tebal 1,5 mm Btg
No. Material Harga Satuan Satuan

Hollow galvanis 20x40 mm, tebal 1,2 mm Btg


Asbes plat 1m x 1m t. 4 mm M2
Paku skrup Bh
Paku Skrup 5 cm Bks
Skrup gypsum Bh
Paku gypsum Kg
Ramset/dinabolt Bh
Cotton plaster Bh
Coumpond acimex @ 20 kg Zak
Textile tape @ 30 m Rol
Metal stud 76x35x0,40 mm galvalume Btg
Metal runner 76x25x0,35 mm galvalume Btg
Profil alumunium T M1
Acustic 60x120x15 mm Lbr
Kawat pengikat M1
10 Readymix :
Readymix Beton K-250, Tanpa Pompa ( Selang ) M3
Readymix Beton K-300, Tanpa Pompa ( Selang ) M3
11 Semen :
PC (50 kg) Zak
PC Kg
Semen warna Kg
MU 380 - pas. Bata ringan/10 m2 (40 kg) Zak
MU 100 - plesteran/2,4 m2 (40 kg) Zak
MU 200 - acian plesteran/20 m2 (40 kg) Zak
MU 440 - perata lantai/1,2 m2 (40 kg) Zak
MU 450 - perekat keramik/8 m2 (40 kg) Zak
MU 400 - perekat keramik dinding/5 m2 (25 kg) Zak
MU 600 - pelapis kedap air/1,5 m2 (3 kg) Zak
MU 408 - pengisi nad/3 m2 (1 kg) Zak
12 Sanitair :
Closet Duduk (Flashing), setara TOTO Unit
Closet jongkok (Flashing), setara TOTO Unit
Closet jongkok TOTO CE - 7 Unit
Washtafel Toilet Pria/Wanita, setara TOTO Bh
Cermin TOTO TS 119 AS 5 Bh
Floordrain setainless steel SUN-EI Bh
Roofdrain setainless steel SUN-EI Bh
Floordrain TOTO TX 1 BN Bh
Kran bebek TOTO T30 ARQ 13N Bh
Kran dinding TOTO T23 B13 Bh
Shower spray TOTO TX 403 SV3 Bh
Kitchen Zink Stainless Standard Lokal ( 1 Lubang ) Bh
Bak KM Fiber 60 x 60 Bh
Urinoir TOTO U 57M Bh
Sekat urinoir TOTO Bh
Jet Whoser air Lengkap ACC, setara TOTO Bh
Stop kran air Lengkap ACC, setara TOTO Bh
Kran air Lengkap ACC, setara TOTO Bh
13 Seng :
Seng Plat BJLS 30 90 cm ( 100 m1 ) M1
Seng gelombang BJLS T=180 cm Lbr
Seng plat Fumira Lbr
14 Tiang pancang
Mini pile M25 ( Segi empat ) M1
Penyambungan dan pengelasan tiang pancang Ttk
Potong tiang pancang Ttk
Mobilisasi tiang pancang Ls
15 Wire mesh (2,10 x 5,4 m) :
MK 10 (2,10 x 5,4 m) Lbr
MK 8 (2,10 x 5,4 m) Lbr
MK 7 (2,10 x 5,4 m) Lbr
MK 6 (2,10 x 5,4 m) Lbr
MK 5 (2,10 x 5,4 m) Lbr
MK 4 (2,10 x 5,4 m) Lbr
16 Plastik
Plastik sheet M2

17 Material Mekanikal
Pengadaan dan Pemasangan Pompa Transfer type Centrifugal pump Unit
kap.346 l/m Head 32 m H2O daya Motor 5,5 kw
Tangki Air Kap. 2 m3 Unit
Biofil (BF-08) Unit
Biotech (BS-BF 3000) Unit
Resapan Unit
Meteran Air dia. 2" Bh
Pipa PVC RUCIKA type AW 1/2" M1
Pipa PVC RUCIKA type AW 3/4" M1
Pipa PVC RUCIKA type AW 1" M1
Pipa PVC RUCIKA type AW 1 1/4" M1
Pipa PVC RUCIKA type AW 1 1/2" M1
Pipa PVC RUCIKA type AW 2" M1
Pipa PVC RUCIKA type AW 2 1/2" M1
Pipa PVC RUCIKA type AW 3" M1
Pipa PVC RUCIKA type AW 4" M1
Pipa PVC RUCIKA type AW 5" M1
Pipa PVC RUCIKA type AW 6" M1
No. Material Harga Satuan Satuan

Pipa PVC RUCIKA type AW 8" M1

Pipa PVC WAVIN type AW 2" Btg


Pipa PVC WAVIN type AW 2 1/2" Btg
Pipa PVC WAVIN type AW 3" Btg
Pipa PVC WAVIN type AW 4" Btg
Pipa PVC WAVIN type AW 5" Btg
Pipa PVC WAVIN type AW 6" Btg
Pipa PVC WAVIN type AW 8" Btg

Polypropylene (PPR-Pipe) PN-16


Pipa PPR PN-16 1/2" Btg
Pipa PPR PN-16 3/4" Btg
Pipa PPR PN-16 1" Btg
Pipa PPR PN-16 1 1/4" Btg
Pipa PPR PN-16 1 1/2" Btg
Pipa PPR PN-16 2" Btg
Pipa PPR PN-16 2,5" Btg
Pipa PPR PN-16 3" Btg
Pipa PPR PN-16 4" Btg
Pipa PPR PN-16 5" Btg
Pipa PPR PN-16 6" Btg

Polypropylene (PPR-Pipe) PN-20


Pipa PPR PN-16 1/2" Btg
Pipa PPR PN-16 3/4" Btg
Pipa PPR PN-16 1" Btg
Pipa PPR PN-16 1 1/4" Btg
Pipa PPR PN-16 1 1/2" Btg
Pipa PPR PN-16 2" Btg
Pipa PPR PN-16 2,5" Btg
Pipa PPR PN-16 3" Btg
Pipa PPR PN-16 4" Btg

Pipa GIP Medium A 1/2" ( 6 m1 ) Btg


Pipa GIP Medium A 3/4" ( 6 m1 ) Btg
Pipa GIP Medium A 1" ( 6 m1 ) Btg
Pipa GIP Medium A 1 1/4" ( 6 m1 ) Btg
Pipa GIP Medium A 1 1/2" ( 6 m1 ) Btg
Pipa GIP Medium A 2" ( 6 m1 ) Btg
Pipa GIP Medium A 2 1/2" ( 6 m1 ) Btg
Pipa GIP Medium A 3" ( 6 m1 ) Btg
Pipa GIP Medium A 4" ( 6 m1 ) Btg

Pipa BSP ASTM A - 53 A Sch 40


Pipa Ǿ 1/2" M1
Pipa Ǿ 3/4" M1
Pipa Ǿ 1" M1
Pipa Ǿ 1 1/4" M1
Pipa Ǿ 1 1/2" M1
Pipa Ǿ 2" M1
Pipa Ǿ 2 1/2" M1
Pipa Ǿ 3" M1
Pipa Ǿ 4" M1
Pipa Ǿ 5" M1
Pipa Ǿ 6" M1
Pipa Ǿ 8" M1
Floating Valve Ø 1 1/2" Bh
Clean Out (CO) 4" Bh
Clean Out (CO) 2" Bh
Clean Out (CO) 1/2" Bh
Dop 6" Bh
Klem 6" Bh
Knie 6" Bh

Pek. Hydrant
Hydrant box (tipe indoor) Unit
Hose Unit
Nozzle Unit
Gantungan Selang (Sisir) Unit
Landing Valve dia 2,5" Unit
Gate Valve Ø 4" (150 Psi) Bh
Gate Valve Ø 3" (150 Psi) Bh
Gate Valve Ø 2.1/2" (150 Psi) Bh
Gate Valve Ø 2" (150 Psi) Bh
Gate Valve Ø 1 1/2" (150 Psi) Bh
Gate Valve Ø 1" Bh
Gate Valve Ø 3/4" Bh
Check Valve Ø 4" (125 Psi) Bh
Check Valve Ø 3" (150 Psi) Bh
Check Valve Ø 2" (125 Psi) Bh
Strainer Ø 4" (150 Psi) Bh
Strainer Ø 2" (150 Psi) Bh
Fleksible Joint Ø 4" (10 K)
Fleksible Joint Ø 2" (10 K) Bh
Foot Valve Ø 4" Bh
Foot Valve Ø 2" Bh
No. Material Harga Satuan Satuan

Pompa Hydran Elektrikal 750 USGPM, Head 70 m'.65 KW Unit


Pompa Jocky Hydran Elektrikal 50 GPM, Head 130 m' , 9,5 KW Unit
Pompa diesel Pump 750 USGPM, (110 HP at 2900 rpm) Komplit accesoris Unit
Tangki Hydropoor kap. tekanan 10 Atm Unit
lem pvc kg
seal tape bh
sock pipa pvc 1/2" bh
fiting PVC 1/2" bh
elbow pvc 1/2" bh

Pek. AC
IU VRV Wall Mounted Type Kapasitas :5.400 Btuh Unit
IU VRV Wall Mounted Type Kapasitas :7.000 Btuh Unit
IU VRV Wall Mounted Type Kapasitas :7.200 Btuh Unit
IU VRV Wall Mounted Type Kapasitas :7.800 Btuh Unit
IU VRV Wall Mounted Type Kapasitas : 8.100 Btuh Unit
IU VRV Wall Mounted Type Kapasitas : 8.500 Btuh Unit
IU VRV Wall Mounted Type Kapasitas :10.800 Btuh Unit
IU VRV Wall Mounted Type Kap.12.000 BTUH Unit
IU VRV Wall Mounted Type Kap.13.500 BTUH Unit
IU VRV Wall Mounted Type Kap.16.000 Btuh Unit
IU VRV Wall Mounted Type Kap.18.000 Btuh Unit
IU VRV Wall Mounted Type Kap.19.000 BTUH Unit
IU VRV Wall Mounted Type Kap.21.000 BTUH Unit
IU VRV Split Cassette Type Kap.24.200 BTUH Unit
IU VRV Split Cassette Type Kap.26.000 BTUH Unit
IU VRV Split Cassette Type Kap.27.000 BTUH Unit
IU VRV Split Cassette Type Kap.30.700 BTUH Unit
IU VRV Split Cassette Type Kap.36.000 BTUH Unit
IU VRV Split Cassette Type Kap.40.000 BTUH Unit
IU VRV Split Cassette Type Kap.45.000 BTUH Unit
IU VRV Split Cassette Type Kap.49.500 BTUH Unit
OU VRV Lt 1 Kap. 268.000 BTUH (8.900 cfm) Unit
OU VRV Lt 1 Kap. 524.000 BTUH (17.500 cfm) Unit
OU VRV Lt 2 Kap. 398.000 BTUH (13.250 cfm) Unit
OU VRV Lt 2 Kap. 141.000 BTUH (4.700 cfm) Unit
OU VRV Lt 3 Kap. 215.000 BTUH (7.250 cfm) Unit

Pek. Elektrikal
MCCB 630 A, 3P, 45kA Bh
MCCB 300-400 A, 3P, 45kA Bh
MCCB 225-250 A, 3P, 45kA Bh
MCCB 160-200 A, 3P, 36kA Bh
MCCB 100-125 A, 3P, 45kA Bh
MCCB 64-80 A, 3P, 25kA Bh
MCCB 50-63 A, 3P, 25kA Bh
MCCB 40-50 A, 3P, 25kA Bh
MCCB 32-40 A, 3P, 25kA Bh
MCCB 25-32 A, 3P, 25kA Bh
MCCB 20-25 A, 3P, 25kA Bh
MCCB 16-20 A, 3P, 25kA Bh
MCB 16 A, 1P, 6kA Bh
MCB 10 A, 1P, 6kA Bh
MCB 6 A, 1P, 6kA Bh
Pilot Lamp Bh
Kwh meter 3 Phase Bh
Start delta 3m7 kW Bh
Ampere Meter 0-200 A + CT 200/5A Bh
Volt Meter 0-500 V + Selector Switch 7 Posisi Bh
Frquensi Meter Bh
Kabel NYFGbY 4 x 300 mm2 M1
Kabel NYFGbY 4 x 240 mm2 M1
Kabel NYFGbY 4 x 185 mm2 M1
Kabel NYFGbY 4 x 150 mm2 M1
Kabel NYFGbY 4 x 120 mm2 M1
Kabel NYFGbY 4 x 95 mm2 M1
Kabel NYFGbY 4 x 70 mm2 M1
Kabel NYFGbY 4 x 50 mm2 M1
Kabel NYFGbY 4 x 35 mm2 M1
Kabel NYFGbY 4 x 25 mm2 M1
Kabel NYM 3x2,5 mm2 M1
Kabel NYM 3x4 mm2 M1
Kabel NYY 4 x 50 mm2 M1
Kabel NYY 4 x 25 mm2 M1
Kabel NYY 4 x 16 mm2 M1
Kabel NYY 4 x 10 mm2 M1
Kabel NYY 4 x 6 mm2 M1
Kabel NYY 4 x 4 mm2 M1
Kabel NYY 4 x 2,5 mm2 M1
Kabel NYY 3 x 4 mm2 M1
Kabel NYY 3 x 6 mm2 M1
Kabel NYA 1,5 mm2 M1
Kabel NYMHY 3 x 1,5 mm2 M1
ITC 1 x 2 x 0,6 mm2 M1
Kabel Cad 5 M1
Kabel RG 59 M1
No. Material Harga Satuan Satuan

Kabel Coaxial M1
BC 50 mm2 M1
BC 95 mm2 M1
BC 10 mm2 M1
BC 16 mm2 M1
Conduit dia. 20 mm2 Btg
Lampu TL 2x36 Watt, TKO + Mirror Bh
Lampu TL 2x18 Watt, TKO + Mirror Bh
Lampu Down Light 18 W, PLC Bh
Lampu Barret 20 W, TLC Bh
Saklar hotel Bh
Saklar Tunggal Bh
Saklar Ganda Bh
Stop kontak Bh
Stop Kontak, 200 W (lantai) set. Panasonic Bh
Kabel Tray ukuran 100 X 100 mm M'
Kabel Tray ukuran 300 X 100 mm M'
Under Floor Duct ukuran 100 x 80 mm M'
pipa conduit EGA dia 20 mm m'
sock EGA dia.20 mm Bh
t dus dia. 20 mm Bh
Isolasi Roll
klem EGA dia.20 mm Bh

Bogor, ..................... 2018


Kontraktor,
PT,.................................

Cap & Tanda Tangan

NAMA
Jabatan
DAFTAR HARGA SEWA ALAT
No. Peralatan Harga Satuan Satuan

Scaffolding:
1 Main frame MF-1215 sw/unit/2bln
2 Main frame MF-1217 sw/unit/2bln
3 Main frame MF-1219 sw/unit/2bln
4 Jack base BJ 60 sw/unit/2bln
5 Joint pin 42 sw/unit/2bln
6 Cross brace 1218 sw/unit/2bln
7 Head Jack 60 Bj-60 sw/unit/2bln
8 Pipe Suport Ps 2740 sw/unit/2bln
9 Form Work Sistem
a. Kolom
Girder GT-24 :
- Girder GT24 390cm sw/unit/2bln
Column Wale U100 SSRZ 116/151 :
- Column Wale U100 SSRZ 116/151 sw/unit/2bln
Accessories :
- Hook Strap HB 24-100/120 sw/unit/2bln
- Wedge KZ, Galv sw/unit/2bln
- Tie Yoke SKZ sw/unit/2bln
- Wingnut DW15, Galv sw/unit/2bln
- Girder Headpiece GT24,Galv sw/unit/2bln
- Wedge Headpiece sw/unit/2bln
- Base Plate For RSS sw/unit/2bln
- Push-Pull Prop RSS1 sw/unit/2bln
- Kicker AV sw/unit/2bln
- Wedge K, Galv sw/unit/2bln
- Scaffold Jack GB 80 sw/unit/2bln
Tie Rod Accessories :
- Tie Rod DW15, L=1m sw/unit/2bln
Pin Accessories :
- Pin 16x42, Galv sw/unit/2bln
- Cotter Pin FS 4/1 Galv. sw/unit/2bln
Consumable Part :
- TSS-TORX 6x60, galv. bh
- F.H Bolt M8x70 W.nut bh
- Bit Point TX30 bh
b. Balok
Girder GT-24 :
- Girder GT24 390cm sw/unit/2bln
- Girder GT24 300cm sw/unit/2bln
- Girder GT24 210cm sw/unit/2bln
- Girder GT24 150cm sw/unit/2bln
Main Scaffolding :
- Pola Frame 190 Galv sw/unit/2bln
- Pola Frame 170 Galv sw/unit/2bln
- Pola Frame H-90 Galv sw/unit/2bln
- Cross Brace 220 Galv sw/unit/2bln
- Cross Brace 193 Galv sw/unit/2bln
- Joint Pin 36 Galv sw/unit/2bln
- Jack Base S60 Galv CPL sw/unit/2bln
- U-Head Jack S60 Galv CPL sw/unit/2bln
- Cross Head Jack S.60 CPL sw/unit/2bln
c. Plat lantai
Hory Beam & Accesories :
- Hory Beam HB-14 sw/unit/2bln
- Hory Beam SX-14 sw/unit/2bln
- Boy Cadet sw/unit/2bln
10 Alat bantu (Concrete pump + Vibrator) Lot
A.4.2.1 Pekerjaan Besi & Aluminium

A.4.2.1.5 Pengerjaan 10 cm pengelasan dengan las listrik


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 OH 0,0400 -
2 Tukang Besi Konstruksi L.02 OH 0,0200 -
3 Kepala Tukang L.03 OH 0,0020 -
4 Mandor L.04 OH 0,0020 -
Jumlah Harga Tenaga Kerja -
B BAHAN
1 Kawat las listrik Kg 0,4000 -
2 Solar Ltr 0,3000 -
3 Minyak pelumas Ltr 0,0400 -
Jumlah Harga Bahan -
C PERALATAN
1 Sewa alat Jam 0,1700 -
Jumlah Harga Alat -

D Jumlah ( A + B + C ) -
E Overhead & Profit 0,1000 xD -
F Harga Satuan Pekerjaan ( D + E ) -