UNTUK PEMBANGUNAN JEMBATAN DI BERAU COAL KABUPATEN BERAU TAHUN 2014 Nego BCC No. POSISI VOLUME ( RATE (Rp.) TOTAL (Rp.) Ket RATE (Rp.) TOTAL (Rp.) Ket A Survey Geoteknik I Mob / Demob 24,320,000 12,000,000 Sewa Truck ke Berau 1 PP 8,000,000 8,000,000 8,000,000 8,000,000 Sewa Penginapan 1 LS 4,000,000 4,000,000 4,000,000 0 Sewa Base Camp dilokasi 1 5 LS 5,000,000 5,000,000 (X) 5,000,000 2,000,000 (X) Mob antar titik 6 x 5 HO 100,000 3,000,000 100,000 2,000,000 Nunggu induksi perusahaan 6 x 5 HO 100,000 3,000,000 (X) 100,000 0 (X) Jaga Alat 6 x 2 HO 110,000 1,320,000 (X) 110,000 0 (X)
II Peralatan 31,100,000 25,650,000
Sondir 4 Titik 1,500,000 6,000,000 1,500,000 6,000,000 1 Bor Mesin 2 x 40 METER 250,000 20,000,000 250,000 15,000,000 Standart Penetration Test 2 x 13 Titik 75,000 1,950,000 75,000 1,500,000 30 Pengambilan Sample 2 x 1 Sample 75,000 150,000 75,000 150,000 10 Laboratorium 2 x 1 Sample 1,500,000 3,000,000 1,500,000 3,000,000 * Attergberg Limit * Analisa Saringan * Berat Volume * Kadar Air dan Berat Isi * Berat Jenis * Direct Shear Test * Unconfined Test
III Laporan 2,000,000 1,500,000
Laporan Penyelidikan Tanah 1 x 1 SET 2,000,000 2,000,000 1,500,000 1,500,000 dan foto dokumentasi TOTAL 57,420,000 39,150,000 DP 20,000,000 SISA PEMBAYARAN 19,150,000 Ket : (X) Bila diperlukan
Nb : * Mohon segera ditransfer sisa pembayaran ke Rekening Bank Mandiri 148 000 4144 716 a/n Bapak Ir. I Putu Resika M, Sc * TTD