1 2 4 5 6
I UPAH
- Mandor Orang/Hari Rp. 110,000.000
- Kepala Tukang Orang/Hari Rp. 105,000.000
- Tukang Orang/Hari Rp. 100,000.000
- Pekerja Orang/Hari Rp. 90,000.000
- Operator Terlatih Orang/Hari Rp. 175,000.000
- Pembantu Operator Orang/Hari Rp. 125,000.000
II BAHAN
- U-DICTH 40.50.120 t 6 cm mesh 6 K. 350 bh Rp. 496,800.000
- COVER-DICTH 40.120 t 12 cm mesh 8 K. 350 bh Rp. 302,500.000
- BC 80 x 80 120 T 12 cm Mesh 10 K-350 bh Rp. 2,931,500.000
- Pasir Urug / Timbun m3 Rp. 212,500.000
- Semen ( PC ) kg Rp. 1,300.000
- Pasir Pasang m3 Rp. 305,000.000
- Paku Kg Rp. 20,000.000
- Pasir beton m3 Rp. 333,375.000
- Batu Pecah 2-3cm m3 Rp. 363,500.000
- Pudel m3 Rp. 133,375.000
- Besi beton Kg Rp. 11,000.000
- Kawat beton Kg Rp. 19,000.000
- Air tawar Liter Rp. 100.000
- Multiplek 8 mm 120 x 240 cm Lbr Rp. 105,000.000
KETERANGAN :
Harga tersebut di atas tidak termasuk PPN