Harga
No Uraian Pekerjaan Volume Satuan satuan
( Rp )
I PEKERJAAN PENDAHULUAN
Catatan :
Mutu beton : camp. 1: 2: 3 / setara fc' = 22,5 Mpa
Lantai 1
1 Beton fondasi P1 1.87 m³ 2,274,610.00
2 Beton fondasi P2 0.37 m³ 2,347,730.00
3 Betom sloof 15x20cm & ring balk 0.19 m³ 3,116,610.00
4 Beton kolom 30x30cm 1.89 m³ 3,990,760.00
5 Beton kolom praktis 15x15cm 0.28 m³ 2,420,660.00
6 Beton tangga 0.22 m³ 3,397,620.00
Sub Jumlah
Lantai 2
1 Beton balok 25x40 cm 1.61 m³ 3,349,580.00
2 Plat lantai tebal 12cm 2.10 m³ 2,678,800.00
3 Beton kolom praktis 15x15cm 0.68 m³ 2,420,660.00
4 Beton tangga 0.22 m³ 3,397,620.00
Sub Jumlah
Lantai atap
1 Beton balok 15x20 cm 0.70 m³ 3,116,610.00
3 Beton kolom praktis 15x15cm 0.13 m³ 2,420,660.00
Sub Jumlah
Lantai 1
1 Keramik lantai km 20x20 (setara platinum) 1.62 m² 68,140.00
2 Keramik dinding km 20x25 cm (setara platinum) 6.88 m² 76,390.00
3 Plin keramik 10x30cm (setara platinum) 60.12 m' 14,140.00
Sub Jumlah
Lantai 2
1 Keramik lantai km 20x20 (setara platinum) 1.62 m² 68,140.00
2 Keramik dinding km 20x25 cm (setara platinum) 10.78 m² 76,390.00
6 List plank kayu (25 tebal 2cm) 33.60 m' 28,890.00
7 Rangka atap 80.47 m² 100,000.00
8 Penutup atap(genteng keramik KIA) 80.47 m² 96,930.00
9 Bubungan 23.46 m' 76,330.00
10 Talang jurai dalam 4.08 m' 32,500.00
11 Atap polycarbonat TWINLITE 0,6 mm rangka stainless stell 11.54 m' 425,000.00
Sub Jumlah
VII PEKERJAAN PINTU JENDELA, KANOPI, PAGAR
Lantai 1
1 Pek. Pintu utama masuk ruang tamu 1.000 unit 1,000,000.00
2 Pek. Pintu jendela kamar 4.000 unit 1,000,000.00
3 Boven 3.000 unit 231,000.00
4 Roaster kayu 12.000 unit 87,500.00
5 Pek. Pintu PVC WC/KM super vinyl 4.000 unit 400,000.00
6 Pagar besi hollow 4x4 & 4x2 cm finishing cat duco 5.300 m' 370,000.00
7 Railing tangga besi hollow 4x4 & 4x2 cm finishing cat duco 5.600 m' 240,500.00
Sub Jumlah
Lantai 2
1 Pek. Pintu jendela kamar 4.000 unit 1,000,000.00
2 Pek. Pintu ker ruang jemuran 1.000 unit 1,000,000.00
3 Boven 4.000 unit 231,000.00
5 Pek. Pintu PVC WC/KM super vinyl 2.000 unit 400,000.00
6 Jendela depan 3.000 unit 712,000.00
7 Railing tangga besi hollow 4x4 & 4x2 cm finishing cat duco 5.600 m' 240,500.00
Sub Jumlah
Harga 0.6 0.18
Jumlah Harga Volume
( Rp )
110,386.80 2.70 0
823,178.64 17.96 0
970,704.00 56.00 0
8,047,200.00 134.12 0
7,800,150.96 134.12 0
1,790,701.80 39.10 0
132,600.00 6.80 0
4,906,200.00 19.24 0
24,581,122.20
1,000,000.00 1.000
4,000,000.00 4.000
693,000.00 3.000
1,050,000.00 38.000
1,600,000.00 4.000
1,961,000.00 5.300
1,346,800.00 5.600
11,650,800.00
4,000,000.00 8.000
1,000,000.00 1.000
924,000.00 8.000
800,000.00 8.000
2,136,000.00 3.000
1,346,800.00 5.600
10,206,800.00
ANALISA HARGA SATUAN PEKERJAAN
No Uraian
1 M' Pasang Bouwplank
- Kayu Sengon ( papan ) 3/20 0.006 m³ x Rp. 2,250,000 = Rp.
- Kayu Sengon ( usuk ) 5/7 0.004 m³ x Rp. 2,750,000 = Rp.
- Paku 0.020 kg x Rp. 9,500 = Rp.
Tukang Kayu 0.100 m' x Rp. 45,000.00 = Rp.
Pekerja 0.100 x Rp. 45,000.00 = Rp.
Kep. Tukang 0.010 x Rp. 65,000.00 = Rp.
Mandor 0.005 x Rp. 67,500.00 = Rp.
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an
1 M² Pembersihan Lokasi
1 M³ Urugan tanah kembali = Rp.
- Pekerja 0.192 oh x Rp. 45,000
- Mandor 0.019 67,500
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an
1 M³ Urugan pasir urug
1 M³ Pas. Batu belah ( 1 Pc : 5 Ps )
- Batu belah 1.100 m³ x Rp. 145,000 = Rp.
- Semen Portland ( 1 zak @ 50 kg ) 2.720 zak x Rp. 52,500 = Rp.
- Pasir Pasang 0.544 m³ x Rp. 125,000 = Rp.
Pekerja 1.500 x Rp. 45,000 = Rp.
Tukang Batu 0.600 x Rp. 62,500 = Rp.
Kep. Tukang 0.060 x Rp. 65,000 = Rp.
Mandor 0.075 x Rp. 67,500 = Rp.
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an
1 M² Pas. Batu Bata ( 1 Pc : 5 Ps ) ; t = 12 cm
No Uraian
1 M² Plesteran ( 1 Pc : 5 Ps ) ; t = 1,5 cm
1 M' Plesteran sudut / benangan sudut ( 1 Pc : 3 Ps )
- Semen Portland ( 1 zak @ 50 kg ) 0.016 zak x Rp 52,500 = Rp
- Pasir Pasang 0.002 m³ x Rp 125,000 = Rp
- Upah Plesteran Sudut / Benangan 1.000 m' x Rp 2,500 = Rp
- Jasa
Jumlah = Jumlah = Rp
Dibulatkan = Dibulatk = Rp
an
1 M² Lantai Keramik 30 x 30 ( Spesi 1 Pc : 3 Ps ; t = 2 cm ) - warna muda
- Keramik Lantai ( 30 x 30 ) 1.050 m² x Rp. 52,500 = Rp.
- Semen Portland ( 1 zak @ 50 kg ) 0.216 zak x Rp. 52,500 = Rp.
- Pasir Pasang 0.025 m³ x Rp. 125,000 = Rp.
- Upah pasang 1.000 m² x Rp. 9,000 = Rp.
- Peralatan bantu ( alat potong listrik ) 1.000 ls x Rp. 50 = Rp.
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an
1 M² Lantai Keramik 20 x 20 ( Spesi 1 Pc : 3 Ps ; t = 2 cm )
- Keramik Lantai ( 20 x 20 ) 1.050 m² x Rp. 42,500 = Rp.
- Semen Portland ( 1 zak @ 50 kg ) 0.216 sak x Rp. 52,500 = Rp.
- Pasir Pasang 0.025 m³ x Rp. 125,000 = Rp.
- Upah pasang 1.000 m² x Rp. 9,000 = Rp.
- Peralatan bantu ( alat potong listrik ) 1.000 ls x Rp. 50 = Rp.
- Jasa
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an
1 M² Dinding Keramik 20 x 25 ( Spesi 1 Pc : 3 Ps ; t = 2 cm ), Warna Tua
- Keramik Dinding ( 20 x 25 ) 1.050 m² x Rp. 48,500 = Rp.
- Semen Portland ( 1 zak @ 50 kg ) 0.216 zak x Rp. 52,500 = Rp.
- Pasir Pasang 0.025 m³ x Rp. 125,000 = Rp.
- Upah pasang 1.000 m² x Rp. 11,000 = Rp.
- Jasa
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an
1 M² Dinding Keramik 20 x 25 ( Spesi 1 Pc : 3 Ps ; t = 2 cm ), Warna Muda
No Uraian
1 M² pasang batu alam
- batu alam 1.050 m² x Rp. 82,500 = Rp.
- Semen Portland ( 1 zak @ 50 kg ) 0.216 zak x Rp. 52,500 = Rp.
- Pasir Pasang 0.045 m³ x Rp. 125,000 = Rp.
- Upah pasang 1.000 m² x Rp. 57,500 = Rp.
- coating batu alam 1.000 m² x Rp. 22,500 = Rp.
- Jasa
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an
1 M' plin kramik 10x30 ( Spesi 1pc : 3ps ; t = 2 cm )
1 M² pas genteng
- genteng 1.0000 m2 x Rp. 85,500 = Rp.
upah
- pekerja 0.150 oh x Rp. 45,000 = Rp.
-tukang 0.075 oh x Rp. 62,500
kepala tukang mandor Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an
1 M' pas bubungan
No Uraian
1 M' Lisplank 3/30
- Kayu Sengon 2/20 ( papan ) 0.005 m3 x Rp. 4,250,000 = Rp.
- Paku 0.015 kg x Rp. 9,500 = Rp.
- Upah 1.000 m' x Rp. 7,500 = Rp.
- Jasa
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an
1 M' Saluran drainage pas bt kali U 20
1 M3 sloof 15/20
- Beton site mix (1 pc: 2 ps : 3pk) 1.00 m³ x Rp. 731,550 = Rp.
- Besi beton bjtp 24 133.12 kg x Rp. 11,190 = Rp.
- Bekisting 13.33 m³ x Rp. 54,030 = Rp.
- Upah cor 1.00 m³ x Rp. 175,000 = Rp.
Jumlah = Rp.
Dibulatk = Rp.
1 M3 kolom praktis an
- Beton site mix (1 pc: 2 ps : 3pk) 1.00 m³ x Rp. 731,550 = Rp.
- Besi beton bjtp 24 123.51 kg x Rp. 11,190 = Rp.
- Bekisting 13.33 m³ x Rp. 9,900 = Rp.
- Upah cor 1.00 m³ x Rp. 175,000 = Rp.
Jumlah = Rp.
Dibulatk = Rp.
an
1 M3 kolom 30x30
No Uraian
1 M3 plat atap t=10cm
- Beton site mix (1 pc: 2 ps 1.00 m³ x Rp. 731,550 = Rp.
: 3pk)
- Besi beton bjtp 240 76.43 kg x Rp. 10,410 = Rp.
- Bekisting 10.00 m³ x Rp. 133,100 = Rp.
- Upah cor 1.00 m³ x Rp. 175,000 = Rp.
Jumlah = Rp.
Dibulatk = Rp.
1 M3 plat tangga t=12cm an
- Beton site mix (1 pc: 2 ps 1.00 m³ x Rp. 731,550 = Rp.
- Besi beton bjtp :240
3pk) 111.44 kg x Rp. 10,410 = Rp.
- Bekisting 10.00 m³ x Rp. 133,100 = Rp.
- Upah cor 1.00 m³ x Rp. 175,000 = Rp.
Jumlah = Rp.
Dibulatk = Rp.
1 M3 fondasi P1 an
13,500.00
9,625.00
190.00
4,500.00
4,500.00
650.00
337.50
32,315.00
32,310.00
4,500.00
337.50
4,837.50
4,830.00
23,670.00
3,510.00
27,180.00
27,180.00
8,640.00
1,282.50
9,922.50
9,920.00
137,500.00
5,000.00
142,500.00
142,500.00
159,500.00
142,800.00
68,000.00
67,500.00
37,500.00
3,900.00
5,062.50
484,262.50
484,260.00
275,000.00
84,525.00
46,875.00
66,666.67
473,066.67
473,060.00
Juml Hrg
( Rp )
4,515.00
2,750.00
9,000.00
300.00
16,565.00
16,560.00
840.00
250.00
2,500.00
3,590.00
3,590.00
55,125.00
11,340.00
3,125.00
9,000.00
50.00
78,640.00
78,640.00
44,625.00
11,340.00
3,125.00
9,000.00
50.00
68,140.00
68,140.00
50,925.00
11,340.00
3,125.00
11,000.00
76,390.00
76,390.00
48,300.00
11,340.00
3,125.00
11,000.00
73,765.00
73,760.00
Juml Hrg
( Rp )
86,625.00
11,340.00
5,625.00
57,500.00
22,500.00
161,090.00
161,090.00
6,413.33
1,155.00
375.00
390.00
5,500.00
315.00
14,148.33
14,140.00
46,750.00
1,425.00
10,000.00
500.00
58,675.00
58,670.00
2,817,500.00
475,000.00
400,000.00
3,692,500.00
3,692,500.00
85,500.00
6,750.00
4,687.50
96,937.50
96,930.00
52,500.00
8,400.00
4,000.00
6,750.00
4,687.50
76,337.50
76,330.00
Juml Hrg
( Rp )
21,250.00
142.50
7,500.00
28,892.50
28,890.00
7,338.60
496.00
112,687.50
1,902.70
14,360.00
12,500.00
149,284.80
149,300.00
731,550.00
1,489,646.90
720,400.00
175,000.00
3,116,596.90
3,116,610.00
731,550.00
1,382,130.52
131,967.00
175,000.00
2,420,647.52
2,420,660.00
731,550.00
1,520,532.72
388,999.56
1,174,666.67
175,000.00
3,990,748.95
3,990,760.00
731,550.00
903,410.26
461,494.93
1,078,110.00
175,000.00
3,349,565.19
3,349,580.00
731,550.00
663,067.43
1,109,166.67
175,000.00
2,678,784.10
2,678,800.00
Juml Hrg
( Rp )
731,550.00
795,680.91
1,331,000.00
175,000.00
3,033,230.91
3,033,250.00
731,550.00
1,160,050.09
1,331,000.00
175,000.00
3,397,600.09
3,397,620.00
731,550.00
1,097,894.42
270,150.00
175,000.00
2,274,594.42
2,274,610.00
731,550.00
959,207.90
481,957.75
175,000.00
2,347,715.65
2,347,730.00
hal.- 1
ANALISA HARGA SATUAN PEKERJAAN BETON
No Uraian
1 M³ Beton Lt. Kerja ( 1 : 3 : 5 )
- Semen Portland 4.640 zak x Rp. 52,500.00 = Rp.
- Pasir Cor 0.680 m³ x Rp. 125,000.00 = Rp.
- Batu Pecah 2/3 1.045 m³ x Rp. 160,000.00 = Rp.
- Upah cor 1.000 m³ x Rp. 175,000.00 = Rp.
- Jasa
Jumlah Jumlah = Rp. #####
=
Dibulatkan = Dibulatkan = Rp.
1 M³ Beton Site mix ( 1 Pc : 2 Ps : 3 Bp )
1 Kg Pembesian BJTD - 40 / 24
- Besi Beton Ulir ( BJTD - 40 ) 1.050 kg x Rp. 9,750.00 = Rp.
- Bindrat 0.015 kg x Rp. 9,500.00 = Rp.
Pekerja 0.007 x Rp. 45,000.00 = Rp.
Tukang Besi 0.007 x Rp. 62,500.00 = Rp.
Kep. Tukang 0.0007 x Rp. 65,000.00 = Rp.
Mandor 0.0003 x Rp. 67,500.00 = Rp.
Ju Jumlah = Rp.
Dibulatkan = mla Dibulatkan = Rp.
h
=
1 Kg Pembesian BJTP - 24
- Besi Beton Polos ( BJTP - 24 ) 1.050 kg x Rp. 9,000.00 = Rp.
- Bindrat 0.015 kg x Rp. 9,500.00 = Rp.
- Upah pembesian 1.000 kg x Rp. 818.25 = Rp.
Ju Jumlah = Rp.
Dibulatkan = mla Dibulatkan = Rp.
h
=
1 M² Bekisting Beton Praktis ( 2 x Pakai )
- Kayu Meranti ( papan ) 0.003 m³ x Rp. 2,250,000.00 = Rp.
- Kayu Meranti ( balok / usuk ) 0.009 m³ x Rp. 2,750,000.00 = Rp.
- Paku 0.150 kg x Rp. 9,500.00 = Rp.
- Upah bekisting 1.000 m² x Rp. 5,000.00 = Rp.
- Jasa
Ju Jumlah = Rp.
Dibulatkan = mla Dibulatkan = Rp.
h
=
hal.- 1
AN BETON
Jumlah Harga
( Rp )
243,600.00
85,000.00
167,200.00
175,000.00
670,800.00
352,800.00
67,500.00
129,600.00
90,000.00
21,875.00
2,275.00
67,500.00
731,550.00
731,550.00
10,237.50
142.50
315.00
437.50
45.50
20.25
11,198.25
11,190.00
9,450.00
142.50
818.25
10,410.75
10,410.00
6,750.00
24,750.00
1,425.00
5,000.00
37,925.00
37,920.00
hal.- 2
ANALISA HARGA SATUAN PEKERJAAN BETON
No Uraian
1 M² Bekisting Beton Pondasi ( Pas. Batako 1 Pc : 3 Ps )
- Batako 19 x 39 cm ; t =10 cm 18.750 bh x Rp. 1,300.00 = Rp.
- Semen Portland 0.338 zak x Rp. 52,500.00 = Rp.
- Pasir Pasang 0.026 m³ x Rp. 125,000.00 = Rp.
- Upah bekisting dgn pas. batako 1.500 m² x Rp. 5,500.00 = Rp.
- Peralatan bantu 1.000 kg x Rp. 410.00 = Rp.
- Jasa
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatkan = Rp.
1 M² Bekisting Kolom ( 2 x Pakai )
Sewa 1 Set Stutwerk / Perancah Scaffolding
- Main Frame ( MF-1219 / h = 190 cm ) 1.00 bh x Rp. 5,300.00 = Rp.
- Ladder Frame ( LF-1209 / h = 90 cm ) 1.00 bh x Rp. 5,300.00 = Rp.
- Joint Pin ( JP-42 ) 2.00 bh x Rp. 1,300.00 = Rp.
- Cross Brase ( CB-1218 / lg = 220 cm ) 1.00 bh x Rp. 2,700.00 = Rp.
- Cross Brase ( CB-0618 / lg = 193 cm ) 1.00 bh x Rp. 2,700.00 = Rp.
- U Head Jack ( HJ- 60 ) 2.00 bh x Rp. 2,700.00 = Rp.
- Jack Base ( JB- 60 ) 2.00 bh x Rp. 2,700.00 = Rp.
Jumlah = Rp.
Dibulatkan = Rp.
1 M² Bekisting Balok Lantai ( 2 x Pakai )
- papan kayu sengon 1x20 0.006 m³ x Rp. 2,750,000.00 = Rp.
- Kayu sengon 5/7 ( balok / usuk ) 0.021 m³ x Rp. 2,750,000.00 = Rp.
- Paku 0.400 kg x Rp. 9,500.00 = Rp.
- Upah bekisting + perancah 1.000 m² x Rp. 25,000.00 = Rp.
- Peralatan bantu :
- perancah 1.000 set x Rp. 33,000.00 = Rp.
- Jasa
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatkan = Rp.
1 M² Bekisting kolom paraktis 4x pakai
- papan kayu sengon 1x20 0.002 m³ x Rp. 2,750,000.00 = Rp.
- Paku 0.200 kg x Rp. 9,500.00 = Rp.
- Upah bekisting + perancah 1.000 m² x Rp. 2,500.00 = Rp.
- Jasa
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatkan = Rp.
hal.- 2
AN BETON
Jumlah Harga
( Rp )
24,375.00
17,745.00
3,250.00
8,250.00
410.00
54,030.00
54,030.00
9,000.00
52,250.00
2,850.00
15,000.00
9,000.00
88,100.00
88,100.00
5,300.00
5,300.00
2,600.00
2,700.00
2,700.00
5,400.00
5,400.00
29,400.00
29,400.00
16,500.00
57,750.00
3,800.00
25,000.00
33,000.00
136,050.00
136,050.00
5,500.00
1,900.00
2,500.00
9,900.00
9,900.00
DAFTAR HARGA SATUAN UPAH
1 Pekerja oh 45,000.00
2 Mandor oh 67,500.00
3 Kepala tukang oh 65,000.00
4 Tukang batu oh 62,500.00
5 Tukang kayu oh 65,000.00
6 Tukang besi oh 62,500.00
KETERANGAN
DAFTAR HARGA SATUAN BAHAN
- 1 Zak = 50 kg
- Untuk dia. > 12 mm
- Untuk dia. < 12 mm
- Uk.per rol = 2.10 x 54 m
- Untuk Bekisting
- Idem
-Idem
-Idem
-Idem
-Idem
hiiiiit voool
2 fondasi
fondasi bk 100.2 0.4 0.7 1 18 0.084 1.512
3 fondasi potplat
fondasi FPL 1 1.2 1.2 0.4 18 0
fondasi FPL 2 1.2 2.13 0.4 2 0
5 urugan tanah
lantai 1 13 10 0.1 1 0
lantai 2 10 8.5 0.2 1 0
6 sloof 15x20
aloof 100.2 0.15 0.2 1 22 0.09 1.98
7 Kolom
30x30 0.3 0.3 5.3 22 0 0.09 0
15x15 0.15 0.15 3.7 19 0 0.09 0
37.1385
77.841
114.98
27.929
27.929
10.368
2.0448
12.4128
74.6377
74.6377
13
17
30
1.026
1.026
10.494
1.58175
12.0758
129.2
2.7
11.46
14.136
2.7384
1.302
1.5156
1.8504
1.86
1.302
1.86
3.348
4.2264
4.464
38.6028
117.8
24.5624
10.85
13.7916
16.5816
15.5
10.85
15.5
27.9
36.9624
37.2
327.498
117,H8ii
Vol Page 1 of 3
no uraian dimensi pengurangan
p l t unit unit vol total
9 balok 25x40
balok 25x40 109.5 0.25 0.4 1 22 0.09 1.98
10 lantai tebal 12 cm
plat utama 10 13 0.12 1 1 3.285 3.285
1 0.6 0.6
1 0.84 0.84
balok 25x40 6.5 1 0.12 1 1 0 0
117.8
24.5624
10.85
13.7916
16.5816
15.5
10.85
15.5
27.9
36.9624
37.2
209.698
8.97
8.97
10.875
0.78
11.655
128.56
61.32
189.88
3.8025
3.8025
13.908
1.4886
3.4206
4.9128
1.5012
0.3906
4.9128
1.9848
6.1938
2.6352
1.7208
43.0692
115.9
13.5666
31.6026
42.4888
15.9948
4.4166
42.4888
18.0888
53.1638
21.96
17.8248
377.496
115.9
115.9
Hii
Vol Page 2 of 3
no uraian dimensi pengurangan
p l t unit unit vol total
x 1 1.5 1 3.05 3 1 0.1584 0.1584
x 2 3.5 1 3.05 3 2 0.2112 0.4224
x 3 3.5 1 3.05 4 1 0.2112 0.2112
x 4 1.8 1 3.05 3 3 0.1584 0.4752
x 5 1.5 1 3.05 1 1 0.1584 0.1584
y 1 3.5 1 3.05 4 1 0.2112 0.2112
y 2 3 1 3.05 2 1 0.2112 0.2112
y 3 3.5 1 3.05 5 1 0.2112 0.2112
y 4 1.8 1 3.05 4 1 0 0
y 5 1.5 1 3.05 4 3 0.1584 0.4752
12 balok 15x20
15x20 63.1 0.15 0.2 1 52 0.0045 0.234
19 atap policarbonate
bubungnan 5.2 3.7 0 1 0 0 0
20 liast plank
bubungnan 56 1 0 1 0 0 0
vol. pek
13.5666
31.6026
42.4888
15.9948
4.4166
42.4888
18.0888
53.1638
21.96
17.8248
261.596
1.659
1.659
5.991
5.991
70.116
70.116
49
26.25
75.25
0.216
0.216
3.43875
2.358
5.79675
30.7188
20.31
51.0288
30.7188
20.31
51.0288
1.80375
1.80375
62.72
19.6
42
9.8
134.12
39.1
6.8
19.24
19.24
56
56