Anda di halaman 1dari 37

REKAPITULASI RENCANA ANGGARAN BIAYA

NO Uraian Pekerjaan Jumlah Harga

I PEKERJAAN PENDAHULUAN Rp 663,565.50


II PEKERJAAN TANAH DAN PASIR Rp 4,600,446.12
III PEKERJAAN PASANGAN DAN PLESTERAN Rp 8,115,229.08
IV PEKERJAAN STRUKTUR BETON BERTULANG
Lantai 1 Rp 14,661,714.78
Lantai 2 Rp 13,438,461.82
Lantai atap Rp 2,501,154.12
V PEKERJAAN PASANGAN DAN PLESTERAN
Lantai 1 Rp 5,913,250.00
Lantai 2 Rp 560,470.80
Lantai atap Rp 1,646,248.80
VI PEKERJAAN LANTAI, PLAFOND DAN ATAP
Lantai 1 Rp 1,485,741.24
Lantai 2 Rp 24,581,122.20
VII PEKERJAAN PINTU JENDELA, KANOPI, PAGAR
Lantai 1 Rp 11,650,800.00
Lantai 2 Rp 10,206,800.00
Jumlah Total Rp 100,025,004.46
Dibulatkan Rp 100,000,000.00
Terbilang : Seratus Juta Rupiah
RINCIAN RENCANA ANGGARAN BIAYA

Harga
No Uraian Pekerjaan Volume Satuan satuan
( Rp )
I PEKERJAAN PENDAHULUAN

1 Unitset dan bouwplank 13.80 m' 32,310.00


2 Pembersihan lokasi 45.00 m2 4,837.50
Sub Jumlah
II PEKERJAAN TANAH DAN PASIR

1 Galian tanah 68.99 m3 27,180.00


2 Urug tanah kembali 44.78 m3 9,920.00
3 Urug tanah 18.00 m3 21,420.00
4 Urug pasir bawah pondasi & lantai 13.30 m3 142,500.00
Sub Jumlah
III PEKERJAAN PASANGAN DAN PLESTERAN

1 Pasangan batu belah camp 1pc:5psr 16.76 m3 484,260.00


Sub Jumlah

IV PEKERJAAN STRUKTUR BETON BERTULANG

Catatan :
Mutu beton : camp. 1: 2: 3 / setara fc' = 22,5 Mpa
Lantai 1
1 Beton fondasi P1 1.87 m³ 2,274,610.00
2 Beton fondasi P2 0.37 m³ 2,347,730.00
3 Betom sloof 15x20cm & ring balk 0.19 m³ 3,116,610.00
4 Beton kolom 30x30cm 1.89 m³ 3,990,760.00
5 Beton kolom praktis 15x15cm 0.28 m³ 2,420,660.00
6 Beton tangga 0.22 m³ 3,397,620.00
Sub Jumlah
Lantai 2
1 Beton balok 25x40 cm 1.61 m³ 3,349,580.00
2 Plat lantai tebal 12cm 2.10 m³ 2,678,800.00
3 Beton kolom praktis 15x15cm 0.68 m³ 2,420,660.00
4 Beton tangga 0.22 m³ 3,397,620.00
Sub Jumlah
Lantai atap
1 Beton balok 15x20 cm 0.70 m³ 3,116,610.00
3 Beton kolom praktis 15x15cm 0.13 m³ 2,420,660.00
Sub Jumlah

V PEKERJAAN PASANGAN DAN PLESTERAN


Lantai 1
1 Pasang dinding bata camp. 1pc:5psr 12.50 m³ 473,060.00
Sub Jumlah
Lantai 2
4 Sponengan 156.12 m1 3,590.00
Sub Jumlah
Lantai atap
1 Pasang dinding bata camp. 1pc:5psr 3.48 m³ 473,060.00
Sub Jumlah

VI PEKERJAAN LANTAI, PLAFOND DAN ATAP

Lantai 1
1 Keramik lantai km 20x20 (setara platinum) 1.62 m² 68,140.00
2 Keramik dinding km 20x25 cm (setara platinum) 6.88 m² 76,390.00
3 Plin keramik 10x30cm (setara platinum) 60.12 m' 14,140.00
Sub Jumlah
Lantai 2
1 Keramik lantai km 20x20 (setara platinum) 1.62 m² 68,140.00
2 Keramik dinding km 20x25 cm (setara platinum) 10.78 m² 76,390.00
6 List plank kayu (25 tebal 2cm) 33.60 m' 28,890.00
7 Rangka atap 80.47 m² 100,000.00
8 Penutup atap(genteng keramik KIA) 80.47 m² 96,930.00
9 Bubungan 23.46 m' 76,330.00
10 Talang jurai dalam 4.08 m' 32,500.00
11 Atap polycarbonat TWINLITE 0,6 mm rangka stainless stell 11.54 m' 425,000.00
Sub Jumlah
VII PEKERJAAN PINTU JENDELA, KANOPI, PAGAR
Lantai 1
1 Pek. Pintu utama masuk ruang tamu 1.000 unit 1,000,000.00
2 Pek. Pintu jendela kamar 4.000 unit 1,000,000.00
3 Boven 3.000 unit 231,000.00
4 Roaster kayu 12.000 unit 87,500.00
5 Pek. Pintu PVC WC/KM super vinyl 4.000 unit 400,000.00
6 Pagar besi hollow 4x4 & 4x2 cm finishing cat duco 5.300 m' 370,000.00
7 Railing tangga besi hollow 4x4 & 4x2 cm finishing cat duco 5.600 m' 240,500.00
Sub Jumlah
Lantai 2
1 Pek. Pintu jendela kamar 4.000 unit 1,000,000.00
2 Pek. Pintu ker ruang jemuran 1.000 unit 1,000,000.00
3 Boven 4.000 unit 231,000.00
5 Pek. Pintu PVC WC/KM super vinyl 2.000 unit 400,000.00
6 Jendela depan 3.000 unit 712,000.00
7 Railing tangga besi hollow 4x4 & 4x2 cm finishing cat duco 5.600 m' 240,500.00
Sub Jumlah
Harga 0.6 0.18
Jumlah Harga Volume
( Rp )

445,878.00 23.00 13.8


217,687.50 75.00 45
663,565.50

1,875,093.84 114.98 68.988


444,257.28 74.64 44.784
385,560.00 30.00 18
1,895,535.00 22.17 13.302
4,600,446.12

8,115,229.08 27.93 16.758


8,115,229.08

4,245,787.03 10.37 1.8666


862,086.46 2.04 0.3672
577,819.49 1.03 0.1854
7,535,353.03 10.49 1.8882
688,435.70 1.58 0.2844
752,233.07 1.23 0.2214
14,661,714.78

5,408,231.87 8.97 1.6146


5,622,265.44 11.66 2.0988
1,655,731.44 3.80 0.684
752,233.07 1.23 0.2214
13,438,461.82

2,181,627.00 1.66 0.996


319,527.12 0.22 0.132
2,501,154.12

5,913,250.00 38.60 23.16


5,913,250.00

560,470.80 260.20 156.12


560,470.80

1,646,248.80 5.80 3.48


1,646,248.80

110,386.80 2.70 1.62


525,257.64 11.46 6.876
850,096.80 100.20 60.12
1,485,741.24

110,386.80 2.70 0
823,178.64 17.96 0
970,704.00 56.00 0
8,047,200.00 134.12 0
7,800,150.96 134.12 0
1,790,701.80 39.10 0
132,600.00 6.80 0
4,906,200.00 19.24 0
24,581,122.20

1,000,000.00 1.000
4,000,000.00 4.000
693,000.00 3.000
1,050,000.00 38.000
1,600,000.00 4.000
1,961,000.00 5.300
1,346,800.00 5.600
11,650,800.00

4,000,000.00 8.000
1,000,000.00 1.000
924,000.00 8.000
800,000.00 8.000
2,136,000.00 3.000
1,346,800.00 5.600
10,206,800.00
ANALISA HARGA SATUAN PEKERJAAN

No Uraian

 1 M' Pasang Bouwplank 
- Kayu Sengon ( papan ) 3/20 0.006 m³ x Rp. 2,250,000 = Rp.
- Kayu Sengon ( usuk ) 5/7 0.004 m³ x Rp. 2,750,000 = Rp.
- Paku 0.020 kg x Rp. 9,500 = Rp.
Tukang Kayu 0.100 m' x Rp. 45,000.00 = Rp.
Pekerja 0.100 x Rp. 45,000.00 = Rp.
Kep. Tukang 0.010 x Rp. 65,000.00 = Rp.
Mandor 0.005 x Rp. 67,500.00 = Rp.
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an
 1 M² Pembersihan Lokasi 

- Pekerja 0.100 oh x Rp. 45,000 = Rp.


- Mandor 0.005 oh x Rp. 67,500 = Rp.
- Jasa
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an
 1 M³ Galian tanah biasa ( manual ) sedalam 0 s/d 2 m

- Pekerja 0.526 45,000 = Rp.


- Mandor 0.052 oh x Rp. 67,500 = Rp.
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an

 1 M³ Urugan tanah kembali  = Rp.
- Pekerja 0.192 oh x Rp. 45,000
- Mandor 0.019 67,500
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an
 1 M³ Urugan pasir urug

- Pasir Urug 1.100 m³ x Rp. 125,000 = Rp.


- Upah Urug + Pemadatan 1.000 m³ x Rp. 5,000 = Rp.
- Jasa
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an

 1 M³ Pas. Batu belah ( 1 Pc : 5 Ps )
- Batu belah 1.100 m³ x Rp. 145,000 = Rp.
- Semen Portland ( 1 zak @ 50 kg ) 2.720 zak x Rp. 52,500 = Rp.
- Pasir Pasang 0.544 m³ x Rp. 125,000 = Rp.
Pekerja 1.500 x Rp. 45,000 = Rp.
Tukang Batu 0.600 x Rp. 62,500 = Rp.
Kep. Tukang 0.060 x Rp. 65,000 = Rp.
Mandor 0.075 x Rp. 67,500 = Rp.
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an
 1 M² Pas. Batu Bata ( 1 Pc : 5 Ps ) ; t = 12 cm

- Batu bata 500.000 bh x Rp. 550 = Rp.


- Semen Portland ( 1 zak @ 50 kg ) 1.610 zak x Rp. 52,500 = Rp.
- Pasir Pasang 0.375 m³ x Rp. 125,000 = Rp.
- Upah pasang 1.000 m³ x Rp. 66,667 = Rp.
Jumlah = J umlah = Rp.
Dibulatkan = Dibulatkan = Rp.

No Uraian

 1 M² Plesteran ( 1 Pc : 5 Ps ) ; t = 1,5 cm

- Semen Portland ( 1 zak @ 50 kg ) 0.086 zak x Rp. 52,500 = Rp.


- Pasir Pasang 0.022 m³ x Rp. 125,000 = Rp.
- Upah Plester + Acian 1.000 m³ x Rp. 9,000 = Rp.
- Peralatan bantu ( steiger ) 1.000 m² x Rp. 300 = Rp.
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an

1 M'  Plesteran sudut / benangan sudut ( 1 Pc : 3 Ps ) 
- Semen Portland ( 1 zak @ 50 kg ) 0.016 zak x Rp 52,500 = Rp
- Pasir Pasang 0.002 m³ x Rp 125,000 = Rp
- Upah Plesteran Sudut / Benangan 1.000 m' x Rp 2,500 = Rp
- Jasa
Jumlah = Jumlah = Rp
Dibulatkan = Dibulatk = Rp
an

1 M² Lantai Keramik 30 x 30 ( Spesi 1 Pc : 3 Ps ; t = 2 cm ) - warna muda
- Keramik Lantai ( 30 x 30 ) 1.050 m² x Rp. 52,500 = Rp.
- Semen Portland ( 1 zak @ 50 kg ) 0.216 zak x Rp. 52,500 = Rp.
- Pasir Pasang 0.025 m³ x Rp. 125,000 = Rp.
- Upah pasang 1.000 m² x Rp. 9,000 = Rp.
- Peralatan bantu ( alat potong listrik ) 1.000 ls x Rp. 50 = Rp.
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an

1 M² Lantai Keramik 20 x 20 ( Spesi 1 Pc : 3 Ps ; t = 2 cm )  
- Keramik Lantai ( 20 x 20 ) 1.050 m² x Rp. 42,500 = Rp.
- Semen Portland ( 1 zak @ 50 kg ) 0.216 sak x Rp. 52,500 = Rp.
- Pasir Pasang 0.025 m³ x Rp. 125,000 = Rp.
- Upah pasang 1.000 m² x Rp. 9,000 = Rp.
- Peralatan bantu ( alat potong listrik ) 1.000 ls x Rp. 50 = Rp.
- Jasa
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an
1 M² Dinding Keramik 20 x 25 ( Spesi 1 Pc : 3 Ps ; t = 2 cm ), Warna Tua 
- Keramik Dinding ( 20 x 25 ) 1.050 m² x Rp. 48,500 = Rp.
- Semen Portland ( 1 zak @ 50 kg ) 0.216 zak x Rp. 52,500 = Rp.
- Pasir Pasang 0.025 m³ x Rp. 125,000 = Rp.
- Upah pasang 1.000 m² x Rp. 11,000 = Rp.
- Jasa
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an

1 M² Dinding Keramik 20 x 25 ( Spesi 1 Pc : 3 Ps ; t = 2 cm ), Warna Muda  

- Keramik Dinding ( 20 x 25 ) 1.050 m² x Rp. 46,000 = Rp.


- Semen Portland ( 1 zak @ 50 kg ) 0.216 zak x Rp. 52,500 = Rp.
- Pasir Pasang 0.025 m³ x Rp. 125,000 = Rp.
- Upah pasang 1.000 m² x Rp. 11,000 = Rp.
- Jasa
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an

No Uraian

1 M² pasang batu alam
- batu alam 1.050 m² x Rp. 82,500 = Rp.
- Semen Portland ( 1 zak @ 50 kg ) 0.216 zak x Rp. 52,500 = Rp.
- Pasir Pasang 0.045 m³ x Rp. 125,000 = Rp.
- Upah pasang 1.000 m² x Rp. 57,500 = Rp.
- coating batu alam 1.000 m² x Rp. 22,500 = Rp.
- Jasa
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an
1 M' plin kramik 10x30 ( Spesi 1pc : 3ps ; t = 2 cm )

- List keramik 8 x 20 3.330 bh x Rp. 1,926 = Rp.


- Semen Portland ( 1 zak @ 50 kg ) 0.022 sak x Rp. 52,500 = Rp.
- Pasir Pasang 0.003 m³ x Rp. 125,000 = Rp.
- Tile Grout 0.050 kg x Rp. 7,800 = Rp.
- Upah pasang 1.000 m' x Rp. 5,500 = Rp.
- Peralatan bantu ( alat potong listrik ) 1.000 ls x Rp. 315 = Rp.
- Jasa
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an

- Rangka ky Sengon ( balok ) 0.017 m3 x Rp. 2,750,000 = Rp.


- Paku 0.150 kg x Rp. 9,500 = Rp.
- Upah 1.000 m2 x Rp. 10,000 = Rp.
- Peralatan bantu ( steiger ) 1.000 ls x Rp. 500 = Rp.
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an
1 M³ Kuda - Kuda Ky Sengon
- Kayu glugu 1.150 m³ x Rp. 2,450,000 = Rp.
- Pelat begel , Mur baut dll. 50.000 kg x Rp. 9,500 = Rp.
- Upah kerja & pasang 1.000 m³ x Rp. 400,000 = Rp.
- Jasa
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an

1 M² pas genteng 
- genteng 1.0000 m2 x Rp. 85,500 = Rp.
upah
- pekerja 0.150 oh x Rp. 45,000 = Rp.
-tukang 0.075 oh x Rp. 62,500
kepala tukang mandor Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an
1 M' pas bubungan 

- genteng bubungan 3.0000 bh x Rp. 17,500 = Rp.


- semen abuabu 0.1600 zak x Rp. 52,500 = Rp.
- pasir pasang 0.0320 m3 x Rp. 125,000 = Rp.
upah
- pekerja 0.150 oh x Rp. 45,000 = Rp.
-tukang 0.075 oh x Rp. 62,500
kepala tukang mandor J umlah = Rp.
Dibulatkan = Dibulatkan = Rp.

No Uraian

1 M' Lisplank 3/30 
- Kayu Sengon 2/20 ( papan ) 0.005 m3 x Rp. 4,250,000 = Rp.
- Paku 0.015 kg x Rp. 9,500 = Rp.
- Upah 1.000 m' x Rp. 7,500 = Rp.
- Jasa
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatk = Rp.
an

 1 M' Saluran drainage pas bt kali U 20

- Galian tanah 0.27 m³ x Rp. 27,180 = Rp.


- Urugan tanah kembali 0.05 m³ x Rp. 9,920 = Rp.
- Pas.batu kali 1Pc: 4Ps 0.25 m³ x Rp. 450,750 = Rp.
- Plesteran 1Pc: 3Ps, t = 2 cm 0.53 m² x Rp. 3,590 = Rp.
- Benangan sudut 1Pc : 3Pc 4.00 m' x Rp. 3,590 = Rp.
- Buis beton U 20 1.00 m' x Rp. 12,500 = Rp.
Jumlah = Rp.
Dibulatk = Rp.
an

 1 M3 sloof 15/20
- Beton site mix (1 pc: 2 ps : 3pk) 1.00 m³ x Rp. 731,550 = Rp.
- Besi beton bjtp 24 133.12 kg x Rp. 11,190 = Rp.
- Bekisting 13.33 m³ x Rp. 54,030 = Rp.
- Upah cor 1.00 m³ x Rp. 175,000 = Rp.
Jumlah = Rp.
Dibulatk = Rp.
 1 M3 kolom praktis an
- Beton site mix (1 pc: 2 ps : 3pk) 1.00 m³ x Rp. 731,550 = Rp.
- Besi beton bjtp 24 123.51 kg x Rp. 11,190 = Rp.
- Bekisting 13.33 m³ x Rp. 9,900 = Rp.
- Upah cor 1.00 m³ x Rp. 175,000 = Rp.
Jumlah = Rp.
Dibulatk = Rp.
an
 1 M3 kolom 30x30

- Beton site mix (1 pc: 2 ps : 3pk) 1.00 m³ x Rp. 731,550 = Rp.


- Besi beton bjtd 390 135.88 kg x Rp. 11,190 = Rp.
- Besi beton bjtp 240 37.37 kg x Rp. 10,410 = Rp.
- Bekisting 13.33 m³ x Rp. 88,100 = Rp.
- Upah cor 1.00 m³ x Rp. 175,000 = Rp.
Jumlah = Rp.
Dibulatk = Rp.
an
 1 M3 balok 25x40

- Beton site mix (1 pc: 2 ps : 3pk) 1.00 m³ x Rp. 731,550 = Rp.


- Besi beton bjtd 390 80.73 kg x Rp. 11,190 = Rp.
- Besi beton bjtp 240 44.33 kg x Rp. 10,410 = Rp.
- Bekisting 8.10 m³ x Rp. 133,100 = Rp.
- Upah cor 1.00 m³ x Rp. 175,000 = Rp.
Jumlah = Rp.
Dibulatk = Rp.
an
 1 M3 plat beton t=12cm

- Beton site mix (1 pc: 2 ps : 3pk) 1.00 m³ x Rp. 731,550 = Rp.


- Besi beton bjtp 240 63.70 kg x Rp. 10,410 = Rp.
- Bekisting 8.33 m³ x Rp. 133,100 = Rp.
- Upah cor 1.00 m³ x Rp. 175,000 = Rp.
J umlah = Rp.
Dibulatkan = Rp.

No Uraian

 1 M3 plat atap t=10cm
- Beton site mix (1 pc: 2 ps 1.00 m³ x Rp. 731,550 = Rp.
: 3pk)
- Besi beton bjtp 240 76.43 kg x Rp. 10,410 = Rp.
- Bekisting 10.00 m³ x Rp. 133,100 = Rp.
- Upah cor 1.00 m³ x Rp. 175,000 = Rp.
Jumlah = Rp.
Dibulatk = Rp.
 1 M3 plat tangga t=12cm an
- Beton site mix (1 pc: 2 ps 1.00 m³ x Rp. 731,550 = Rp.
- Besi beton bjtp :240
3pk) 111.44 kg x Rp. 10,410 = Rp.
- Bekisting 10.00 m³ x Rp. 133,100 = Rp.
- Upah cor 1.00 m³ x Rp. 175,000 = Rp.
Jumlah = Rp.
Dibulatk = Rp.
 1 M3 fondasi P1 an

- Beton site mix (1 pc: 2 ps 1.00 m³ x Rp. 731,550 = Rp.


- Besi beton bjtd :390
3pk) 98.11 kg x Rp. 11,190 = Rp.
- Bekisting 5.00 m³ x Rp. 54,030 = Rp.
- Upah cor 1.00 m³ x Rp. 175,000 = Rp.
Jumlah = Rp.
Dibulatk = Rp.
an
 1 M3 fondasi P2

- Beton site mix (1 pc: 2 ps 1.00 m³ x Rp. 731,550 = Rp.


- Besi beton bjtd :390
3pk) 85.72 kg x Rp. 11,190 = Rp.
- Bekisting 8.92 m³ x Rp. 54,030 = Rp.
- Upah cor 1.00 m³ x Rp. 175,000 = Rp.
Jumlah = Rp.
Dibulatk = Rp.
an
Juml Hrg
( Rp )

13,500.00
9,625.00
190.00
4,500.00
4,500.00
650.00
337.50
32,315.00
32,310.00

4,500.00
337.50

4,837.50
4,830.00

23,670.00
3,510.00
27,180.00
27,180.00

8,640.00
1,282.50
9,922.50
9,920.00

137,500.00
5,000.00

142,500.00
142,500.00

159,500.00
142,800.00
68,000.00
67,500.00
37,500.00
3,900.00
5,062.50
484,262.50
484,260.00

275,000.00
84,525.00
46,875.00
66,666.67
473,066.67
473,060.00

Juml Hrg
( Rp )

4,515.00
2,750.00
9,000.00
300.00
16,565.00
16,560.00

840.00
250.00
2,500.00

3,590.00
3,590.00

55,125.00
11,340.00
3,125.00
9,000.00
50.00
78,640.00
78,640.00

44,625.00
11,340.00
3,125.00
9,000.00
50.00

68,140.00
68,140.00
50,925.00
11,340.00
3,125.00
11,000.00

76,390.00
76,390.00

48,300.00
11,340.00
3,125.00
11,000.00

73,765.00
73,760.00

Juml Hrg
( Rp )

86,625.00
11,340.00
5,625.00
57,500.00
22,500.00

161,090.00
161,090.00

6,413.33
1,155.00
375.00
390.00
5,500.00
315.00

14,148.33
14,140.00

46,750.00
1,425.00
10,000.00
500.00
58,675.00
58,670.00
2,817,500.00
475,000.00
400,000.00

3,692,500.00
3,692,500.00

85,500.00

6,750.00
4,687.50
96,937.50
96,930.00

52,500.00
8,400.00
4,000.00

6,750.00
4,687.50
76,337.50
76,330.00

Juml Hrg
( Rp )

21,250.00
142.50
7,500.00

28,892.50
28,890.00

7,338.60
496.00
112,687.50
1,902.70
14,360.00
12,500.00
149,284.80
149,300.00
731,550.00
1,489,646.90
720,400.00
175,000.00
3,116,596.90
3,116,610.00

731,550.00
1,382,130.52
131,967.00
175,000.00
2,420,647.52
2,420,660.00

731,550.00
1,520,532.72
388,999.56
1,174,666.67
175,000.00
3,990,748.95
3,990,760.00

731,550.00
903,410.26
461,494.93
1,078,110.00
175,000.00
3,349,565.19
3,349,580.00

731,550.00
663,067.43
1,109,166.67
175,000.00
2,678,784.10
2,678,800.00

Juml Hrg
( Rp )

731,550.00
795,680.91
1,331,000.00
175,000.00
3,033,230.91
3,033,250.00

731,550.00
1,160,050.09
1,331,000.00
175,000.00
3,397,600.09
3,397,620.00

731,550.00
1,097,894.42
270,150.00
175,000.00
2,274,594.42
2,274,610.00

731,550.00
959,207.90
481,957.75
175,000.00
2,347,715.65
2,347,730.00
hal.- 1

ANALISA HARGA SATUAN PEKERJAAN BETON

No Uraian

 1 M³ Beton Lt. Kerja ( 1 : 3 : 5 )
- Semen Portland 4.640 zak x Rp. 52,500.00 = Rp.
- Pasir Cor 0.680 m³ x Rp. 125,000.00 = Rp.
- Batu Pecah 2/3 1.045 m³ x Rp. 160,000.00 = Rp.
- Upah cor 1.000 m³ x Rp. 175,000.00 = Rp.
- Jasa
Jumlah Jumlah = Rp. #####
=
Dibulatkan = Dibulatkan = Rp.

1 M³ Beton Site mix ( 1 Pc : 2 Ps : 3 Bp ) 

- Semen Portland 6.720 zak x Rp. 52,500.00 = Rp.


- Pasir Cor 0.540 m³ x Rp. 125,000.00 = Rp.
- Batu Pecah 2/3 0.810 m³ x Rp. 160,000.00 = Rp.
Pekerja 2.000 m³ x Rp. 45,000.00 = Rp.
Tukang Batu 0.350 m³ x Rp. 62,500.00 = Rp.
Kep. Tukang 0.035 m³ x Rp. 65,000.00 = Rp.
Mandor 1.000 m³ x Rp. 67,500.00 = Rp.
Ju Jumlah = Rp.
Dibulatkan = mla Dibulatkan = Rp.
h
=

 1 Kg Pembesian BJTD - 40 / 24
- Besi Beton Ulir ( BJTD - 40 ) 1.050 kg x Rp. 9,750.00 = Rp.
- Bindrat 0.015 kg x Rp. 9,500.00 = Rp.
Pekerja 0.007 x Rp. 45,000.00 = Rp.
Tukang Besi 0.007 x Rp. 62,500.00 = Rp.
Kep. Tukang 0.0007 x Rp. 65,000.00 = Rp.
Mandor 0.0003 x Rp. 67,500.00 = Rp.
Ju Jumlah = Rp.
Dibulatkan = mla Dibulatkan = Rp.
h
=

 1 Kg Pembesian BJTP - 24
- Besi Beton Polos ( BJTP - 24 ) 1.050 kg x Rp. 9,000.00 = Rp.
- Bindrat 0.015 kg x Rp. 9,500.00 = Rp.
- Upah pembesian 1.000 kg x Rp. 818.25 = Rp.
Ju Jumlah = Rp.
Dibulatkan = mla Dibulatkan = Rp.
h
=

 1 M² Bekisting Beton Praktis ( 2 x Pakai ) 
- Kayu Meranti ( papan ) 0.003 m³ x Rp. 2,250,000.00 = Rp.
- Kayu Meranti ( balok / usuk ) 0.009 m³ x Rp. 2,750,000.00 = Rp.
- Paku 0.150 kg x Rp. 9,500.00 = Rp.
- Upah bekisting 1.000 m² x Rp. 5,000.00 = Rp.
- Jasa
Ju Jumlah = Rp.
Dibulatkan = mla Dibulatkan = Rp.
h
=
hal.- 1

AN BETON

Jumlah Harga
( Rp )

243,600.00
85,000.00
167,200.00
175,000.00

670,800.00

352,800.00
67,500.00
129,600.00
90,000.00
21,875.00
2,275.00
67,500.00
731,550.00
731,550.00

10,237.50
142.50
315.00
437.50
45.50
20.25
11,198.25
11,190.00

9,450.00
142.50
818.25
10,410.75
10,410.00

6,750.00
24,750.00
1,425.00
5,000.00

37,925.00
37,920.00
hal.- 2
ANALISA HARGA SATUAN PEKERJAAN BETON

No Uraian

 1 M² Bekisting Beton Pondasi ( Pas. Batako 1 Pc : 3 Ps )
- Batako 19 x 39 cm ; t =10 cm 18.750 bh x Rp. 1,300.00 = Rp.
- Semen Portland 0.338 zak x Rp. 52,500.00 = Rp.
- Pasir Pasang 0.026 m³ x Rp. 125,000.00 = Rp.
- Upah bekisting dgn pas. batako 1.500 m² x Rp. 5,500.00 = Rp.
- Peralatan bantu 1.000 kg x Rp. 410.00 = Rp.
- Jasa
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatkan = Rp.

 1 M² Bekisting Kolom ( 2 x Pakai )

- papan kayu sengon 1x20 0.004 m³ x Rp. 2,250,000.00 = Rp.


- Kayu sengon 5/7 ( balok / usuk ) 0.019 m³ x Rp. 2,750,000.00 = Rp.
- Paku 0.300 kg x Rp. 9,500.00 = Rp.
- Upah bekisting + perancah 1.000 m² x Rp. 15,000.00 = Rp.
- Peralatan bantu :
- Suport bambu ( sewa ) 1.000 set x Rp. 9,000.00 = Rp.
- Jasa
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatkan = Rp.

   Sewa 1 Set Stutwerk / Perancah Scaffolding 
- Main Frame ( MF-1219 / h = 190 cm ) 1.00 bh x Rp. 5,300.00 = Rp.
- Ladder Frame ( LF-1209 / h = 90 cm ) 1.00 bh x Rp. 5,300.00 = Rp.
- Joint Pin ( JP-42 ) 2.00 bh x Rp. 1,300.00 = Rp.
- Cross Brase ( CB-1218 / lg = 220 cm ) 1.00 bh x Rp. 2,700.00 = Rp.
- Cross Brase ( CB-0618 / lg = 193 cm ) 1.00 bh x Rp. 2,700.00 = Rp.
- U Head Jack ( HJ- 60 ) 2.00 bh x Rp. 2,700.00 = Rp.
- Jack Base ( JB- 60 ) 2.00 bh x Rp. 2,700.00 = Rp.
Jumlah = Rp.
Dibulatkan = Rp.

 1 M² Bekisting Balok Lantai ( 2 x Pakai )
- papan kayu sengon 1x20 0.006 m³ x Rp. 2,750,000.00 = Rp.
- Kayu sengon 5/7 ( balok / usuk ) 0.021 m³ x Rp. 2,750,000.00 = Rp.
- Paku 0.400 kg x Rp. 9,500.00 = Rp.
- Upah bekisting + perancah 1.000 m² x Rp. 25,000.00 = Rp.
- Peralatan bantu :
- perancah 1.000 set x Rp. 33,000.00 = Rp.
- Jasa
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatkan = Rp.
 1 M² Bekisting kolom paraktis 4x pakai
- papan kayu sengon 1x20 0.002 m³ x Rp. 2,750,000.00 = Rp.
- Paku 0.200 kg x Rp. 9,500.00 = Rp.
- Upah bekisting + perancah 1.000 m² x Rp. 2,500.00 = Rp.
- Jasa
Jumlah = Jumlah = Rp.
Dibulatkan = Dibulatkan = Rp.
hal.- 2
AN BETON

Jumlah Harga
( Rp )

24,375.00
17,745.00
3,250.00
8,250.00
410.00

54,030.00
54,030.00

9,000.00
52,250.00
2,850.00
15,000.00

9,000.00

88,100.00
88,100.00

5,300.00
5,300.00
2,600.00
2,700.00
2,700.00
5,400.00
5,400.00
29,400.00
29,400.00

16,500.00
57,750.00
3,800.00
25,000.00

33,000.00

136,050.00
136,050.00

5,500.00
1,900.00
2,500.00

9,900.00
9,900.00
DAFTAR HARGA SATUAN UPAH 

NO URAIAN SATUAN Harga Sat


( Rp )

1 Pekerja oh 45,000.00
2 Mandor oh 67,500.00
3 Kepala tukang oh 65,000.00
4 Tukang batu oh 62,500.00
5 Tukang kayu oh 65,000.00
6 Tukang besi oh 62,500.00
KETERANGAN
DAFTAR HARGA SATUAN BAHAN

NO URAIAN SATUAN HARGA SATUAN


( Rp )
1Sirtu m³
2 Pasir Urugan m³ 125,000.00
3 Pasir Pasang m³ 125,000.00
4 Pasir Cor m³ 125,000.00
5 Batu Kali belah m³ 145,000.00
6 Batu Pecah uk. 2/3 m³ 160,000.00
7 Batu Pecah uk. 1/2 m³ 175,000.00
8 Batu Kali belah m³ 145,000.00
9 Bata Merah bh 550.00
10 Batako 9 x 19 x 39 bh
10 Semen Portland zak 52,500.00
13 Besi Beton Ulir ( BJTD - 40 ) kg 9,750.00
14 Besi Beton Polos ( BJTP - 24 ) kg 9,000.00
15 Besi Wiremesh M4 rol ,
16 Bindrat kg 9,500.00
17 Paku kg 9,500.00
18 Paku triplex 1" kg 9,000.00
19 Kayu sengon ( papan ) m³ 2,250,000.00
20 Kayu segon ( balok / usuk ) m³ 2,750,000.00
21 Kayu Bangkirai ( papan ) m³ 4,250,000.00
22 Kayu Bangkirai ( balok / usuk ) m³ 4,250,000.00
30 Genteng kramik setara KIA 1m2 85,500.00
31 Nok atas genteng kramik KIA m' 148,500.00
35 Paku atap ( 1kg ~ 35 m2 ) kg 19,200.00
36 Keramik lantai 30 x 30 - setara platinum m² 52,500.00
37 Keramik lantai 30 x 30 - setara platinum m² 52,500.00
38 Keramik lantai 30 x 30 - type rock tile m² 50,000.00
39 Keramik lantai 20 x 20 ( utk km/wc ) m² 42,500.00
40 Keramik dinding 20 x 25, setara platinum m² 46,000.00
41 Keramik dinding 20 x 25, setara platinum m² 48,500.00
53 buis betom U 20 cm bh 12500.00
KETERANGAN

- 1 Zak = 50 kg
- Untuk dia. > 12 mm
- Untuk dia. < 12 mm
- Uk.per rol = 2.10 x 54 m

- Untuk Bekisting
- Idem

setara kia/m claass


setara kia/m claass

-Idem
-Idem
-Idem

-Idem
hiiiiit voool

no uraian dimensi pengurangan


p l t unit unit vol total

1 galian tanah fondasi


batu kali 100.2 0.675 0.7 1 18 0.567 10.206
footplate 1.55 1.55 1.8 18 18

2 fondasi
fondasi bk 100.2 0.4 0.7 1 18 0.084 1.512

3 fondasi potplat
fondasi FPL 1 1.2 1.2 0.4 18 0
fondasi FPL 2 1.2 2.13 0.4 2 0

4 urugan kembali tanah


fondasi FPL 1

5 urugan tanah
lantai 1 13 10 0.1 1 0
lantai 2 10 8.5 0.2 1 0

6 sloof 15x20
aloof 100.2 0.15 0.2 1 22 0.09 1.98

7 Kolom
30x30 0.3 0.3 5.3 22 0 0.09 0
15x15 0.15 0.15 3.7 19 0 0.09 0

7-1 lantai keramik


lantai 30x30 14 10 1 1 4 2.7 10.8
lantai km 20x20 1.5 1.8 1 1 0 0 0
lantai km 20x25 6.6 1 2.5 1 4 1.26 5.04

8 Psangan bata lantai 01


keliling luar 38 0.12 3.1 1 0 0 0
x 1 8 0.12 3.1 1 1 0.2376 0.2376
x 2 3.5 0.12 3.1 1 1 0 0
x 3 1.5 0.12 3.1 3 1 0.1584 0.1584
x 4 1.8 0.12 3.1 3 1 0.1584 0.1584
x 5 5 0.12 3.1 1 1 0 0
x 6 3.5 0.12 3.1 1 1 0 0
y 1 2.5 0.12 3.1 2 1 0 0
y 2 3 0.12 3.1 3 1 0 0
y 3 4 0.12 3.1 3 1 0.2376 0.2376
y 4 4 0.12 3.1 3 1 0 0

8-a plaster aci


keliling luar 38 1 3.1 1 0 0 0
x 1 8 1 3.1 1 1 0.2376 0.2376
x 2 3.5 1 3.1 1 1 0 0
x 3 1.5 1 3.1 3 1 0.1584 0.1584
x 4 1.8 1 3.1 3 1 0.1584 0.1584
x 5 5 1 3.1 1 1 0 0
x 6 3.5 1 3.1 1 1 0 0
y 1 2.5 1 3.1 2 1 0 0
y 2 3 1 3.1 3 1 0 0
y 3 4 1 3.1 3 1 0.2376 0.2376
y 4 4 1 3.1 3 1 0 0

8-b cat dinding luar


keliling luar 38 1 3.1 1 0 0 0
vol. pek

37.1385
77.841
114.98

27.929
27.929

10.368
2.0448
12.4128

74.6377
74.6377

13
17
30

1.026
1.026

10.494
1.58175
12.0758

129.2
2.7
11.46

14.136
2.7384
1.302
1.5156
1.8504
1.86
1.302
1.86
3.348
4.2264
4.464
38.6028

117.8
24.5624
10.85
13.7916
16.5816
15.5
10.85
15.5
27.9
36.9624
37.2
327.498

117,H8ii
Vol Page 1 of 3
no uraian dimensi pengurangan
p l t unit unit vol total

8-c cat dinding dalam


x 1 8 1 3.1 1 1 0.2376 0.2376
x 2 3.5 1 3.1 1 1 0 0
x 3 1.5 1 3.1 3 1 0.1584 0.1584
x 4 1.8 1 3.1 3 1 0.1584 0.1584
x 5 5 1 3.1 1 1 0 0
x 6 3.5 1 3.1 1 1 0 0
y 1 2.5 1 3.1 2 1 0 0
y 2 3 1 3.1 3 1 0 0
y 3 4 1 3.1 3 1 0.2376 0.2376
y 4 4 1 3.1 3 1 0 0

9 balok 25x40
balok 25x40 109.5 0.25 0.4 1 22 0.09 1.98

10 lantai tebal 12 cm
plat utama 10 13 0.12 1 1 3.285 3.285
1 0.6 0.6
1 0.84 0.84
balok 25x40 6.5 1 0.12 1 1 0 0

10-a finishing plat atap&balok


plat utama 10 13 1 1 1 0 0
1 0.6 0.6
1 0.84 0.84
balok 25x40 109.5 0.56 1 1 1 0 0

11 Kolom praktis lt02


15x15 0.15 0.15 3.25 52 0 0.09 0

13 Psangan bata lantai 02


keliling luar 38 0.12 3.05 1 0 0 0
x 1 1.5 0.12 3.05 3 1 0.1584 0.1584
x 2 3.5 0.12 3.05 3 2 0.2112 0.4224
x 3 3.5 0.12 3.05 4 1 0.2112 0.2112
x 4 1.8 0.12 3.05 3 3 0.1584 0.4752
x 5 1.5 0.12 3.05 1 1 0.1584 0.1584
y 1 3.5 0.12 3.05 4 1 0.2112 0.2112
y 2 3 0.12 3.05 2 1 0.2112 0.2112
y 3 3.5 0.12 3.05 5 1 0.2112 0.2112
y 4 1.8 0.12 3.05 4 1 0 0
y 5 1.5 0.12 3.05 4 3 0.1584 0.4752

13-a plaster aci


keliling luar 38 1 3.05 1 0 0 0
x 1 1.5 1 3.05 3 1 0.1584 0.1584
x 2 3.5 1 3.05 3 2 0.2112 0.4224
x 3 3.5 1 3.05 4 1 0.2112 0.2112
x 4 1.8 1 3.05 3 3 0.1584 0.4752
x 5 1.5 1 3.05 1 1 0.1584 0.1584
y 1 3.5 1 3.05 4 1 0.2112 0.2112
y 2 3 1 3.05 2 1 0.2112 0.2112
y 3 3.5 1 3.05 5 1 0.2112 0.2112
y 4 1.8 1 3.05 4 1 0 0
y 5 1.5 1 3.05 4 3 0.1584 0.4752

13-b cat dinding luar


keliling luar 38 1 3.05 1 0 0 0

13-c cat dinding dalam


vol. pek

117.8

24.5624
10.85
13.7916
16.5816
15.5
10.85
15.5
27.9
36.9624
37.2
209.698

8.97
8.97

10.875

0.78
11.655

128.56

61.32
189.88

3.8025
3.8025

13.908
1.4886
3.4206
4.9128
1.5012
0.3906
4.9128
1.9848
6.1938
2.6352
1.7208
43.0692

115.9
13.5666
31.6026
42.4888
15.9948
4.4166
42.4888
18.0888
53.1638
21.96
17.8248
377.496

115.9
115.9
Hii

Vol Page 2 of 3
no uraian dimensi pengurangan
p l t unit unit vol total
x 1 1.5 1 3.05 3 1 0.1584 0.1584
x 2 3.5 1 3.05 3 2 0.2112 0.4224
x 3 3.5 1 3.05 4 1 0.2112 0.2112
x 4 1.8 1 3.05 3 3 0.1584 0.4752
x 5 1.5 1 3.05 1 1 0.1584 0.1584
y 1 3.5 1 3.05 4 1 0.2112 0.2112
y 2 3 1 3.05 2 1 0.2112 0.2112
y 3 3.5 1 3.05 5 1 0.2112 0.2112
y 4 1.8 1 3.05 4 1 0 0
y 5 1.5 1 3.05 4 3 0.1584 0.4752

12 balok 15x20
15x20 63.1 0.15 0.2 1 52 0.0045 0.234

13 dak beton atap


atap 9.5 7.5 0.1 1 1 1.134 1.134

13-a fnishing dak atap


15x20 9.5 7.5 1 1 1 1.134 1.134

13-b plafond dibawah atap


plafond dibawah atap 14 3.5 1 1 1 0 0
plafond dibawah atap 7.5 3.5 1 1 1 0 0

14 Kolom praktis lt02


15x15 0.15 0.15 1.2 8 1 0 0

15 Psangan bata lantai atap


bawah atap 62 0.12 0.5 1 25 0.0113 0.2813
balustrade 17 0.12 1.2 1 8 0.0113 0.09

15-a plaster aci


bawah atap 62 1 0.5 1 25 0.0113 0.2813
balustrade 17 1 1.2 1 8 0.0113 0.09

15-b cat dinding luar


bawah atap 62 1 0.5 1 25 0.0113 0.2813
balustrade 17 1 1.2 1 8 0.0113 0.09

16 ring balk atap


15x20 69.5 0.15 0.2 1 25 0.0113 0.2813

17 atap(penutup dan rangka)


trapesium 11.2 2.8 0 2 0 0 0
segitiga 1.75 2.8 0 4 0 0 0
trapesium 1 7.5 2.8 0 2 0 0 0
segitiga 1.75 2.8 0 2 0 0 0
18 atap(penutup dan rangka)
bubungnan 39.1 1 0 1 0 0 0
jurai dalam 6.8 1 0 1 0 0 0

19 atap policarbonate
bubungnan 5.2 3.7 0 1 0 0 0

20 liast plank
bubungnan 56 1 0 1 0 0 0
vol. pek

13.5666
31.6026
42.4888
15.9948
4.4166
42.4888
18.0888
53.1638
21.96
17.8248
261.596

1.659
1.659

5.991
5.991

70.116
70.116

49
26.25
75.25

0.216
0.216

3.43875
2.358
5.79675

30.7188
20.31
51.0288

30.7188
20.31
51.0288

1.80375
1.80375

62.72
19.6
42
9.8
134.12

39.1
6.8

19.24
19.24

56
56

Anda mungkin juga menyukai