I PEKERJAAN PENDAHULUAN
I PEKERJAAN PERSIAPAN Rp 2,305,040.00
Rp 2,305,040.00
SUB TOTAL PEKERJAAN STRUKTUR Rp 2,305,040.00
II PEKERJAAN STRUKTUR
A LANTAI 1
I PEKERJAAN TANAH Rp 3,692,354.40
II PEKERJAAN PONDASI Rp 14,543,348.00
III PEKERJAAN BETON Rp 65,556,968.34
Rp 83,792,670.74
SUB TOTAL PEKERJAAN STRUKTUR Rp 83,792,670.74
III ARSITEKTUR
A LANTAI 1
I PEKERJAAN PASANGAN & PLESTERAN Rp 38,650,894.00
II PEKERJAAN LANTAI & DINDING KERAMIK Rp 61,338,348.00
III PEKERJAAN PENGECATAN Rp 5,066,714.20
IV PEKERJAAN PINTU DAN JENDELA Rp 9,595,800.00
V PEKERJAAN SANITASI Rp 11,698,000.00
VI PEKERJAAN LAIN LAIN Rp 52,326,840.00
Rp 178,676,596.20
SUB TOTAL PEKERJAAN ARSITEKTUR Rp 178,676,596.20
Terbilang : Dua Ratus Tujuh Puluh Empat Juta Tiga Ratus Empat Puluh Ribu Rupiah.
Fahrizal Ardiansyah
RENCANA ANGGARAN BIAYA
PEMBANGUNAN TEMPAT WUDHU PRIA & WANITA MASJID SAFIINATUN NAJAH
I PEKERJAAN PENDAHULUAN
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan dan Perataan Lapangan 102.40 m2 8,100.00 829,440.00
2 Pek. Pengukuran dan Pemasangan Bouwplank 34.00 m1 43,400.00 1,475,600.00
2,305,040.00
II PEKERJAAN STRUKTUR
A LANTAI 1
I PEKERJAAN TANAH
1 Galian tanah pondasi 15.80 m³ 36,600.00 578,294.64
2 Urugan Pasir bawah Lt. Kerja Plat Lt. t = 5 cm 1.80 m³ 130,000.00 234,000.00
3 Urugan Tanah Kembali 3.92 m³ 29,400.00 115,259.76
4 Urugan Sirtu t. 30 cm (Peninggian Site Bangunan) 30.72 m³ 90,000.00 2,764,800.00
3,692,354.40
II PEKERJAAN PONDASI
1 Pondasi batu kali 11.88 m³ 434,000.00 5,155,920.00
2 Beton K-225 Pilecap 60 x 60 x 20 (PC) 0.72 m³ 1,778,600.00 1,280,592.00
3 Beton K-225 Sloof 15 x 20 (S) 2.28 m³ 2,316,100.00 5,280,708.00
4 Beton K-225 Lantai Kerja bawah pondasi t: 5 cm 1.80 m³ 408,400.00 735,120.00
5 Beton Rabat Lt. 1, t: 5 cm 5.12 m³ 408,400.00 2,091,008.00
14,543,348.00
III PEKERJAAN BETON
1 Beton K-225 Kolom 15 x 30 cm (K1) 2.79 m³ 4,859,600.00 13,569,218.10
2 Beton K-225 Balok 15 x 25 (B1) 3.41 m³ 4,859,600.00 16,583,385.00
3 Beton K-225 Balok latei 15 x 15 (B2) 0.88 m³ 2,859,600.00 2,509,299.00
4 Beton K-225 Plat, t: 12 cm 11.53 m³ 2,852,800.00 32,895,066.24
65,556,968.34
III ARSITEKTUR
A LANTAI 1
I PEKERJAAN PASANGAN & PLESTERAN
1 Pek. Dinding Bata ringan 180.85 m2 130,000.00 23,510,500.00
2 Pek. Plesteran 361.70 m2 32,400.00 11,719,080.00
3 Pek. Acian 162.77 m2 15,600.00 2,539,134.00
4 Pek. Benangan 101.40 m' 8,700.00 882,180.00
38,650,894.00
II PEKERJAAN LANTAI & DINDING KERAMIK
1 Pek. Granit Lantai UK. 60 x 60 99.23 m2 311,600.00 30,918,510.00
3 Pek. Granit dinding UK. 60 x 60 91.87 m2 311,600.00 28,625,913.00
4 Pek. Dinding Keramik UK. 20 x 40 15.75 m2 113,900.00 1,793,925.00
61,338,348.00
NO URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN JUMLAH HARGA