Anda di halaman 1dari 1

HARGA & JARAK RATA-RATA

DARI SUMBER BAHAN (QUARRY)


HARGA JARAK
No. URAIAN SATUAN ROYALTY QUARRY KET.
(Rp) ( Km ) =K8*20%
SSH =J8*(100/120) 20%
1. M01a - P a s i r Pasang M3 44.697,00 62,25 Ke Base Camp 268.182,00 223.485,00 44.697,00 475.800,00
M01b - P a s i r Beton M3 25.000,00 62,20 Ke Lokasi Pek. 150.000,00 125.000,00 25.000,00 455.100,00
M01c - Pasir Halus M3 38.454,83 62,25 Ke Base Camp 230.729,00 192.274,17 38.454,83 469.600,00
2. M02 - Batu Kali M3 76.848,50 62,20 Ke Lokasi Pek. 461.091,00 384.242,50 76.848,50 520.500,00
-
3. M06 - Boulder (Berangkal) Batu Belah 15/20 M3 47.166,67 62,25 Ke Base Camp 283.000,00 235.833,33 47.166,67 491.100,00
-
4. M07 - G r a v e l M3 40.424,17 62,25 Ke Base Camp 242.545,00 202.120,83 40.424,17 470.100,00
-
5. M10 - Aspal Cement KG 190,00 Ke Base Camp -
-
6. M16 - S i r t u M3 31.060,67 62,20 Ke Lokasi Pek. 186.364,00 155.303,33 31.060,67 461.600,00
-
7. M44 - Pasir Urug M3 36.630,83 62,20 Ke Lokasi Pek. 219.785,00 183.154,17 36.630,83 467.400,00
-
8 M08 - Bahan Timbunan Biasa (Tanah Urug) M3 17.786,67 2,00 Ke Lokasi Pek. 106.720,00 88.933,33 17.786,67 42.600,00
-
9 M09 - Bahan Timbunan Pilihan M3 21.735,83 10,00 Ke Lokasi Pek. 130.415,00 108.679,17 21.735,83 99.700,00

Anda mungkin juga menyukai