Anda di halaman 1dari 27

RENCANA ANGGARAN BIAYA

INSTANSI : DINAS PU, PENATAAN RUANG, PERUMAHAN dan KAWASAN PERMUKIMAN KAB. KONAWE
PEKERJAAN : PEMBANGUNAN MALL PELAYANAN PUBLIK
LOKASI : KABUPATEN KONAWE
TAHUN ANGGARAN : 2021

Harga Jumlah
No. Uraian Pekerjaan Volume Sat. Satuan Harga Presentase
(Rp) (Rp) %

A. PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lokasi/Pembongkaran/Landclearing/Leveling 1.00 Ls 17,000,000.00 17,000,000.00 0.35
2 Papan Nama Proyek 1.00 Ls 301,440.31 301,440.31 0.01
3 Pembuatan Direksi Keet, Gudang/barak Kerja 1.00 Ls 16,000,000.00 16,000,000.00 0.33
4 Pemasangan Bouwplank / Pengukuran Kembali 60.00 m' 37,552.68 2,253,160.50 0.05
5 Listrik & Penerangan Kerja 1.00 Ls 1,750,000.00 1,750,000.00 0.04
6 Air Kerja & Bak Penampung 1.00 Ls 1,400,000.00 1,400,000.00 0.03
7 Administrasi (Dokumentasi & Laporan Proyek) 1.00 Ls 9,000,000.00 9,000,000.00 0.18
8 Pembuatan Job Mix Desaign (JMD) dan Job Mix Formula (JMF) 1.00 Ls 5,000,000.00 5,000,000.00 0.10
9 Rencana Keselamatan Konstruksi (RKK) 1.00 Ls 3,954,600.00 3,954,600.00 0.08
- Topi Pelindung (safety Helmet)
- Sarung Tangan (Safety Gloves)
- Rompi Keselamatan (Safety Vest)
- Bendera K3 dan Rambu-rambu K3
- Tempat cuci tangan
- Hand Sanitiser
- Peralatan P3K (Kotak P3K, Tandu, Obat Luka, Perban)
Sub. Total 56,659,200.81
B. PEKERJAAN STRUKTUR
B.1 PEKERJAAN PONDASI
1 Pondasi Poer plat, 28 Bh
a. Galian Tanah 42.46 m³ 89,700.00 3,808,662.00 0.08
b. Urugan Tanah Kembali 29.15 m³ 64,400.00 1,877,260.00 0.04
c. Pasir Urug 1.80 m³ 163,530.00 294,354.00 0.01
d. Lantai Kerja 3.88 m³ 1,088,825.39 4,224,642.53 0.09
e. Poer Plat Beton
- Cor Beton Poer Plat 6.64 m³ 1,399,958.72 9,295,725.91 0.19
- Besi Beton 901.46 kg 26,953.70 24,297,682.40 0.50
- Bekisting Poor Plat 24.40 m² 168,624.50 4,114,437.80 0.08
2 Pondasi Garis
a. Galian Tanah 80.43 m³ 89,700.00 7,214,571.00 0.15
b. Urugan Tanah Kembali 11.47 m³ 64,400.00 738,668.00 0.02
c. Batu Kosong + Pasir Urug 24.41 m³ 533,301.00 13,017,877.41 0.27
d. Pondasi Batu Belah 1SP : 5PP 98.69 m³ 976,361.96 96,357,161.83 1.97
Sub. Total 165,241,042.88
B.2 PEKERJAAN SLOOF BETON
1 Pek. Beton Tumbuk Alas Sloof (SL.1) pengganti Bekisting Cam. 1:2:3
a. Cor Beton 1.11 m³ 1,088,825.39 1,208,596.19 0.02
2 Sloof Beton (SL.1) Uk. 20 x 40 cm
a. Cor Beton 7.12 m³ 1,399,958.72 9,967,706.10 0.20
b. Besi Beton 1,604.93 kg 26,953.70 43,258,801.74 0.88
c. Bekisting Sloef Beton 71.36 m² 176,062.13 12,563,793.24 0.26
3 Sloof Beton (SL.2) Uk. 20 x 30 cm
a. Cor Beton 3.68 m³ 1,399,958.72 5,151,848.10 0.11
b. Besi Beton 732.12 kg 26,953.70 19,733,342.84 0.40
c. Bekisting Sloef Beton 33.39 m² 176,062.13 5,878,714.35 0.12
4 Sloof Beton (SL.3) Uk. 15 x 20 cm
a. Cor Beton 0.77 m³ 1,399,958.72 1,077,968.22 0.02
Harga Jumlah
No. Uraian Pekerjaan Volume Sat. Satuan Harga Presentase
(Rp) (Rp) %
b. Besi Beton 134.69 kg 26,953.70 3,630,393.85 0.07
c. Bekisting Sloef Beton 10.07 m² 176,062.13 1,772,945.60 0.04
Sub. Total 104,244,110.23
Harga Jumlah
No. Uraian Pekerjaan Volume Sat. Satuan Harga Presentase
(Rp) (Rp) %
B.3 PEKERJAAN KOLOM BETON
1 Kolom Pedestal 1 18 BH Uk. 30 x 45 cm
a. Cor Beton 3.65 m³ 1,399,958.72 5,109,849.33 0.10
b. Besi Beton 836.27 kg 26,953.70 22,540,570.70 0.46
c. Bekisting Kolom Pedestal 1 ( 2 x pakai ) 20.25 m² 329,072.50 6,663,718.13 0.14
2 Kolom Pedestal 2 10 BH Uk. 20 x 20 cm
a. Cor Beton 0.50 m³ 1,399,958.72 699,979.36 0.01
b. Besi Beton 212.47 kg 26,953.70 5,726,852.64 0.12
c. Bekisting Kolom Pedestal 2 10.00 m² 329,072.50 3,290,725.00 0.07
3 Kolom Pedestal 3 24 BH Uk. 30 x 30 cm
a. Cor Beton 1.55 m³ 1,399,958.72 2,169,936.02 0.04
b. Besi Beton 111.17 kg 26,953.70 2,996,442.83 0.06
c. Bekisting Kolom Pedestal 3 ( 2 x pakai ) 10.35 m² 329,072.50 3,405,900.38 0.07
4 Kolom Bangunan PTSP 10 BH Uk. 20 x 20 cm
a. Cor Beton 0.94 m³ 1,399,958.72 1,315,961.20 0.03
b. Besi Beton 303.26 kg 26,953.70 8,173,979.06 0.17
c. Bekisting Kolom 26.00 m² 329,072.50 8,555,885.00 0.17
5 Kolom Bangunan PTSP 2 BH Uk. 15 x 60 cm
a. Cor Beton 0.44 m³ 1,399,958.72 615,981.84 0.01
b. Besi Beton 93.22 kg 26,953.70 2,512,623.91 0.05
c. Bekisting Kolom 8.97 m² 329,072.50 2,951,780.33 0.06
6 Kolom Praktis Uk. 11 x 11 cm
a. Cor Beton, Besi Beton, Bekisting 166.05 m' 115,820.64 19,232,017.27 0.39
Sub. Total 95,962,202.99
B.4 PEKERJAAN BALOK BETON
1 Pek. Blk. Gantung Teras (1) Uk. 12 x 40 cm
a. Cor Beton 0.59 m³ 1,399,958.72 825,975.65 0.02
b. Besi Beton 107.01 kg 26,953.70 2,884,315.44 0.06
c. Bekisting Balok 9.04 m² 337,311.10 3,049,292.34 0.06
2 Pek. Blk. Gantung Teras (2) Uk. 12 x 25 cm
a. Cor Beton 0.11 m³ 1,399,958.72 153,995.46 0.003
b. Besi Beton 17.78 kg 26,953.70 479,236.79 0.01
c. Bekisting Balok 2.17 m² 115,820.64 251,330.79 0.01
3 Pek. Blk Plat Atap Uk. 20 x 30 cm
a. Cor Beton 2.62 m³ 1,399,958.72 3,667,891.85 0.07
b. Besi Beton 469.15 kg 26,953.70 12,645,328.36 0.26
c. Bekisting Balok 33.84 m² 337,311.10 11,414,607.62 0.23
4 Ringbalk Bangunan Publik & PTUk. 10 x 15 cm
a. Cor Beton, Besi Beton, Bekisting 100.80 m' 145,037.89 14,619,818.81 0.30
5 Balok Latey/Tengah Uk. 10 x 15 cm
a. Cor Beton, Besi Beton, Bekisting 122.41 m' 145,037.89 17,754,087.50 0.36
Sub. Total 67,745,880.60
B.5 PEKERJAAN PLAT LANTAI BETON
1 Plat Meja Beton T = 8 cm
a. Cor Beton 0.09 m³ 1,346,928.79 121,223.59 0.002
b. Besi Beton 9.31 kg 26,953.70 250,938.95 0.01
c. Bekisting plat Beton 1.91 m² 383,812.50 733,081.88 0.01
2 Plat Beton Lantai Atap T = 12 cm
a. Cor Beton 5.13 m³ 1,399,958.72 7,181,788.24 0.15
b. Besi Beton 362.11 kg 26,953.70 9,760,204.31 0.20
c. Bekisting plat Beton 42.74 m² 383,812.50 16,404,146.25 0.33
Sub. Total 34,451,383.21
C. PEKERJAAN ARSITEKTUR
C.1 PEKERJAAN PINTU, JENDELA, VENTILASI dan KACA
1 Pekerjaan Kusen Pintu, Jendela dan Ventilasi UPVC 331.06 m' 283,043.75 93,704,463.88 1.91
2 Pekerjaan Bingkai Pintu,Jendela dan Ventilasi UPVC 139.52 m' 287,138.45 40,061,556.75 0.82
3 Pekerjaan Pas. Pintu UPVC Jadi, (Toilet Umum) P3 dan P4 13.53 m² 573,200.95 7,755,408.87 0.16
4 Pekerjaan Pas. Kaca Bening, T = 5 mm 65.13 m² 155,354.65 10,118,248.35 0.21
5 Pekerjaan Pas. Jendela Kaca Tempered 10 mm (Bening) + Lengkap Accessories 1.00 Unit 5,000,000.00 5,000,000.00 0.10
6 Pekerjaan Pas. Pintu Kaca Tempered 10 mm (Bening) + Lengkap Accessories 2.00 Unit 11,830,000.00 23,660,000.00 0.48
- Kaca Clear 10 Tempered
- Kunci Pintu Utama (Pintu Kaca)
- Hinge (Engsel)
- Handle
Harga Jumlah
No. Uraian Pekerjaan Volume Sat. Satuan Harga Presentase
(Rp) (Rp) %
- Pacth Fitting
Sub. Total 180,299,677.86
Harga Jumlah
No. Uraian Pekerjaan Volume Sat. Satuan Harga Presentase
(Rp) (Rp) %
C.2 PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pekerjaan Pas. Handle pintu+ lock set Pintu Utama 3.00 Bh 768,890.00 2,306,670.00 0.05
2 Pekerjaan Pas. Handle pintu+ lock set Kamar Mandi 8.00 Bh 514,510.00 4,116,080.00 0.08
3 Pekerjaan Pas. Engsel Pintu UPVC 42.00 Bh 130,635.40 5,486,686.80 0.11
4 Pekerjaan Pas. Engsel/cassemen 14" Jendela UPVC 68.00 Bh 142,135.40 9,665,207.20 0.20
5 Pekerjaan Pas. Engsel/cassemen 14" Ventilasi UPVC 6.00 Bh 116,380.00 698,280.00 0.01
6 Pekerjaan Pas. Grendel Jendela/Rambuncis 37.00 Bh 80,845.00 2,991,265.00 0.06
Sub. Total 25,264,189.00
C.3 PEKERJAAN DINDING BATA / PLESTERAN
1 Pekerjaan Pasangan Dinding Transram Camp. Adukan 1PC : 2PS 32.69 m² 156,761.73 5,124,541.04 0.10
2 Pekerjaan Pasangan Plasteran Transram Camp. Adukan 1PC : 2PS 20.69 m² 80,929.64 1,674,434.25 0.03
3 Pekerjaan Pasangan Dinding 1/2 Bata Adukan 1PC : 5PS 630.47 m² 141,905.98 89,467,460.06 1.83
4 Pekerjaan Plasteran Dinding Adukan 1PC : 5PS 1,140.91 m² 73,292.03 83,619,609.95 1.71
5 Pekerjaan Plasteran Beton Adukan 1PC : 2PS 99.32 m² 80,929.64 8,037,931.84 0.16
6 Pekerjaan Acian Plesteran Dinding dan Plesteran Beton Pasta Semen 1,159.74 m² 45,029.69 52,222,729.78 1.07
7 Pekerjaan Acian Pasta Semen Plat Atap 47.55 m² 45,029.69 2,141,161.64 0.04
Sub. Total 242,287,868.56
C.4 PEKERJAAN LANTAI
1 Pekerjaan Urugan tanah alas lantai 534.41 m³ 103,914.00 55,532,680.74 1.13
2 Pekerjaan Urugan pasir alas lantai 39.89 m³ 163,530.00 6,523,211.70 0.13
3 Pekerjaan Rabat Lantai Adukan (Slab Beton K-100) 40.78 m³ 1,088,825.39 44,402,299.55 0.91
4 Pekerjaan Pas. Tegel Granit, Uk. 60 x 60 cm 914.15 m² 303,697.18 277,624,772.53 5.66
5 Pek. Pas. Dinding Tegel Granit, Uk. 60 x 60 cm (gawang pintu PTSP) Warna Hit 3.78 m² 303,697.18 1,147,975.32 0.02
6 Pekerjaan Pas. Tegel Keramik 60 x 60 cm Meja Wastafel 1.29 m² 243,448.68 314,048.79 0.01
7 Pekerjaan Pas. Lantai Keramik Rg. Toilet 60 x 60 cm (anti sliip) 22.62 m² 243,448.68 5,506,809.03 0.11
8 Pekerjaan Pas. Lantai Keramik Rg. Toilet 40 x 40 cm (anti sliip) 11.00 m² 166,228.48 1,828,513.23 0.04
9 Pekerjaan Pas. Tegel Dinding Keramik KM/WC 40 x 40 cm, T=160 cm 45.60 m² 166,228.48 7,580,018.46 0.15
Sub. Total 400,460,329.34
C.5 PEKERJAAN PLAFOND
1 Pekerjaan Rangka Besi Hollow 1 x 40.40.2mm, modul 60 x 60 cm 888.11 m² 160,609.00 142,638,458.99 2.91
2 Pekerjaan Pas. Plafond PVC + List Plafond 888.11 m² 195,672.50 173,778,703.98 3.54
Sub. Total 316,417,162.97
C.6 PEKERJAAN RANGKA ATAP dan PENUTUP ATAP
1 Pekerjaan Baja WF 250.125.6,9 SNI (Tiang) 2,474.56 Kg 45,609.00 112,862,207.04 2.30
2 Pekerjaan Baja WF 250.125.6,9 SNI (Kuda-kuda) 2,778.55 Kg 45,609.00 126,726,886.95 2.59
3 Pekerjaan Baja WF 200.100.5,5.8 SNI (Ringbalk) 1,254.40 Kg 45,609.00 57,211,929.60 1.17
4 Pekerjaan Pas. Besi Plat 10 mm (Tumpuan Kuda-kuda Baja) 207.16 Kg 43,263.00 8,962,363.08 0.18
5 Pekerjaan Pas. Besi Plat 12 mm (Tumpuan Tiang Baja) 76.30 Kg 43,263.00 3,300,966.90 0.07
6 Pekerjaan Pas. Angkur Baut Dia. 22 mm. 400 mm 108.00 Bh 111,400.00 12,031,200.00 0.25
7 Pekerjaan Pas. Baut Baja 7/8" x 2 " (un. Pengunci) 364.00 Bh 14,200.00 5,168,800.00 0.11
8 Pekerjaan Pas. Jarum Keras (trackstank) Ø 10 mm lengkap dengan ulir dan baut 73.98 Kg 25,579.45 1,892,367.71 0.04
9 Pekerjaan Pas. Kait Angin Ø 12 mm lengkap dengan ulir dan spanskrup M22 191.76 Kg 25,579.45 4,905,115.33 0.10
10 Pekerjaan Gording Lips Chanel 125.50.20.2,3 SNI 3,259.23 Kg 45,609.00 148,650,221.07 3.03
11 Pekerjaan Sandaran Gording Besi Siku 80.80.6 120.46 Kg 44,143.44 5,317,518.78 0.11
12 Pekerjaan Pas. Baut Baja 5/8" x 2" (un. Sambungan gording) 616.00 Bh 13,100.00 8,069,600.00 0.16
13 Pekerjaan Pengecatan Baja 553.86 m² 36,120.35 20,005,617.05 0.41
14 Pekerjaan Pas. Rangka Atap Baja Ringan 273.95 m² 259,244.50 71,020,030.78 1.45
15 Pekerjaan Atap Spandek 0.30 mm 964.85 m² 188,010.05 181,401,496.74 3.70
16 Pekerjaan Nok Atap Spandek 32.90 m' 233,868.60 7,694,276.94 0.16
17 Pekerjaan Pas. Rangka Talang Besi Hollow Hitam 40.40.2mm 918.51 Kg 31,199.04 28,656,630.23 0.58
18 Pekerjaan Pas. Talang Datar , Seng BJLS 0,30 mm 65.80 m' 84,224.28 5,541,957.30 0.11
Sub. Total 809,419,185.50
C.7 PEKERJAAN ALUMINIUM COMPOSITE PANEL (ACP)
1 Pekerjaan Pas. besi siku penopang ACP 50.50.4 mm + Pengecatan Besi Siku 2,583.18 Kg 44,143.44 114,030,451.34 2.33
2 Pekerjaan Pas. Rangka Alucopan Besi Hollow 40.40.2 mm 1,470.50 m² 207,126.50 304,579,518.25 6.21
3 Pekerjaan Pas. Aluminium Composite Panel (ACP PVDF) 1,470.50 m² 685,105.46 1,007,447,581.87 20.55
Sub. Total 1,426,057,551.46
C.8 PEKERJAAN PAPAN NAMA MALL PELAYANAN PUBLIK
Papan Nama Terpasang di Atas dinding ACP
1 Pekerjaan Pas. Bingkai Papan Nama (Rangka Besi Holow Galvalum 40.40.2 mm) 27.90 m² 130,019.00 3,627,530.10 0.07
2 Pekerjaan Pas. Huruf Nama Bangunan Fin. Acrylic + Lampu LED, Uk. Sesuai Gambar
Text : MALL PELAYANAN PUBLIK Tinggi Huruf = 80 cm 1,520.00 Cm 25,000.00 38,000,000.00 0.78
Text : KABUPATEN KONAWE Tinggi Huruf = 50 cm 750.00 Cm 25,000.00 18,750,000.00 0.38
3 Pekerjaan Pas. Logo Kabupaten Fin. Acrylic + Lampu LED Uk. Sesuai Gambar
Harga Jumlah
No. Uraian Pekerjaan Volume Sat. Satuan Harga Presentase
(Rp) (Rp) %
Logo : KABUPATEN KONAWE 1.00 Unit 850,000.00 850,000.00 0.02
Sub. Total 61,227,530.10
Harga Jumlah
No. Uraian Pekerjaan Volume Sat. Satuan Harga Presentase
(Rp) (Rp) %
C.9 PEKERJAAN PENGECATAN
1 Pekerjaan Pengecatan Dinding Tembok 1,159.74 m² 49,599.50 57,522,524.13 1.17
2 Pekerjaan Pengecatan Plat Atap Rg. Toilet 47.55 m² 49,599.50 2,358,456.23 0.05
Sub. Total 59,880,980.36
C.10 PEKERJAAN PLUMBING
1 Pekerjaan Pas. Closed Duduk dan Akssesories 4.00 Bh 3,584,492.50 14,337,970.00 0.29
2 Pekerjaan Pas. Kran Air diameter ½” atau 3/4” 10.00 Bh 147,631.25 1,476,312.50 0.03
3 Pekerjaan Pas. Wastafel lengkap akssesories 3.00 Bh 1,612,059.65 4,836,178.95 0.10
4 Pekerjaan Pas. Cermin Bevel 2 bh disambung Uk. 80 x 110 cm/bh 2.00 Bh 1,990,000.00 3,980,000.00 0.08
5 Pekerjaan Pas. Floor Drain 5.00 Bh 131,215.00 656,075.00 0.01
6 Pekerjaan Instalasi Air Bersih
a. Pekerjaan Instalasi air bersih PVC AW 1/2" (distribusi) 48.00 m' 24,081.00 1,155,888.00 0.02
b. Pekerjaan Instalasi air bersih PVC AW 1" (dari mesin ke tower) 20.00 m' 31,211.00 624,220.00 0.01
7 Pekerjaan Instalasi Air Kotor
a. Pekerjaan Pas. Pipa PVC diameter 4" Saluran Tinja 12.00 m' 156,250.50 1,875,006.00 0.04
b. Pekerjaan Pas. Pipa PVC diameter 4" Saluran Air Kotor/Air Hujan 92.00 m' 156,250.50 14,375,046.00 0.29
c. Pekerjaan Instalasi air kotor PVC 3" (dari kamar mandi/toilet) 28.00 m' 107,588.25 3,012,471.00 0.06
d. Pekerjaan Pas. Pipa PVC diameter 6" (dari bak kontrol ke saluran kompleks) 40.00 m' 292,611.75 11,704,470.00 0.24
8 Pekerjaan Septictank + Resapan (200x150x150) 1.00 Unit 12,658,086.48 12,658,086.48 0.26
9 Pek. Bak Kontrol Limbah Air Kotor Uk. 70 x 90 x 100 cm + Accessories 1.00 Unit 3,180,266.64 3,180,266.64 0.06
10 Pekerjaan Sumur Bor 1.00 Ls 14,925,000.00 14,925,000.00 0.30
11 Pekerjaan Pas. Pompa celup ( 100 Watt) 1.00 Unit 1,492,500.00 1,492,500.00 0.03
12 Pekerjaan Pengadaan Water Tank Fiberglass 1200 L 2.00 Bh 2,487,500.00 4,975,000.00 0.10
13 Pekerjaan Pengadaan dan Pemasangan Tangga Monyet + Pengecatan 1.00 Unit 1,990,000.00 1,990,000.00 0.04
Sub. Total 97,254,490.57
C.11 PEKERJAAN INSTALASI LISTRIK
1 Pekerjaan Pas. Titik Instalasi (Inc. Kabel 1x2.5 + Pipa Instalasi/Acc) 112.00 Titik 312,800.00 35,033,600.00 0.71
2 Pekerjaan Pas. Kap RM dan Lampu RM 2x18 Watt Philips 26.00 Bh 529,759.00 13,773,734.00 0.28
3 Pekerjaan Pas. Lampu Downlight 40 watt Philips 22.00 Bh 188,784.00 4,153,248.00 0.08
4 Pekerjaan Pas. Lampu Downlight 25 watt Philips 33.00 Bh 137,264.00 4,529,712.00 0.09
5 Pekerjaan Pas. Lampu Downlight 10 watt Philips 9.00 Bh 114,379.00 1,029,411.00 0.02
6 Pek. Pas. Lampu Sorot/Tembak 20 mtr, LED 30 Watt 220 V (anti hujan)+besi p 6.00 Bh 772,524.00 4,635,144.00 0.09
7 Pekerjaan Pas. Saklar ganda ex. Philips 20.00 Bh 57,109.00 1,142,180.00 0.02
8 Pekerjaan Pas. Saklar tunggal ex. Philips 18.00 Bh 51,359.00 924,462.00 0.02
9 Pekerjaan Pas. Stop Kontak ex. Philips 55.00 Bh 42,159.00 2,318,745.00 0.05
10 Pekerjaan Pas. Stop Kontak AC ex. Philips 16.00 Bh 79,994.00 1,279,904.00 0.03
11 Pengadaan Exhause Fan (terpasang di Plafond Rg km/wc) 4.00 Bh 497,500.00 1,990,000.00 0.04
12 Pas. Kabel NYMHY 4 x 25 mm (dari KWH ke Panel Induk) 12.00 m' 69,700.00 836,400.00 0.02
13 Pas. Kabel NYMHY 4 x 25 mm (dari Panel Induk ke Panel AC) 100.00 m' 69,700.00 6,970,000.00 0.14
14 Pas. Kabel NYMHY 4 x 16 mm (dari Panel Induk ke Panel Lampu dan Stop Kont 1,000.00 m' 49,800.00 49,800,000.00 1.02
15 Pekerjaan Pas. Panel Box Induk Lengkap MCCB + Accessories 1.00 Set 3,778,670.00 3,778,670.00 0.08
- Panel Box Ukuran 40 x 60 cm
- MCCB 40 A, 3 Pass
- MCCB 25 A, 3 Pass
- Busbar (Netral dan Ground)
- Lampu Indikator (Merah, Kunig dan Hijau)
- Vius (R, S, T)
- Volt Meter (R, S, T)
16 Pekerjaan Pas. Panel Box AC Lengkap MCB + Accessories 1.00 Set 1,507,190.00 1,507,190.00 0.03
- Panel Box Ukuran 40 x 60 cm
- MCB 10 A, 1 Pass
- Busbar (Netral dan Ground)
- Lampu Indikator (Merah, Kunig dan Hijau)
- Vius (R, S, T)
- Volt Meter (R, S, T)
17 Pekerjaan Pas. Panel Box Lampu & Stop Kontak Lengkap MCB + Accessories 1.00 Set 1,850,465.00 1,850,465.00 0.04
- Panel Box Ukuran 40 x 60 cm
- MCB 10 A, 1 Pass
- Busbar (Netral dan Ground)
- Lampu Indikator (Merah, Kunig dan Hijau)
- Vius (R, S, T)
- Volt Meter (R, S, T)
Sub. Total 135,552,865.00
Harga Jumlah
No. Uraian Pekerjaan Volume Sat. Satuan Harga Presentase
(Rp) (Rp) %
C.12 PEKERJAAN BIAYA PENYAMBUNGAN LISTRIK KWH BARU
- Biaya Penyambungan Daya 23 KVA 1.00 Titik 22,089,000.00 22,089,000.00 0.45
- SLO (Sertifikat Like Operasi) 1 Ls 796,000.00 796,000.00 0.02
Sub. Total 22,885,000.00
D. PEKERJAAN INTERIOR
D.1 PEKERJAAN HIGH PRESSURE LAMINATE (HPL)
1 Pekerjaan Pas. Rangka Partisi Dinding HPL 160.41 m² 154,859.00 24,840,932.19 0.51
2 Pekerjaan Pas. Multipleks Rangkap Lapis HPL 330.51 m² 1,422,926.05 470,291,288.79 9.59
3 Pekerjaan Pembuatan dan Pemasangan Meja Kerja Tinggi 0,75 M - 0,85 M 34.80 m' 1,588,794.00 55,290,031.20 1.13
4 Pekerjaan Pembuatan dan Pemasangan Lemari Kerja 30.60 m' 1,588,794.00 48,617,096.40 0.99
Sub. Total 599,039,348.58
E. PEKERJAAN AKHIR
1 Pekerjaan Pembersihan Akhir 1.00 Ls 1,750,000.00 1,750,000.00 0.04
Sub. Total 1,750,000.00 100.00

Unaaha, 30 Juni 2021


-
Dibuat Oleh :
PENYEDIA JASA
PT. CIPTA ALAM KARYA BERSAMA

LAODE AYUB AZIZ R, S.Sos


Direktur
PROGRES PROGRES TOTAL PROGRES CHEK CHEK
LALU INPUT SAAT INI S/D SAAT INI IN OUT
% DATA % %

0.35 0.35 0.35 0.35 100% 0.35 SUDAH


0.01 0.01 0.01 0.01 100% 0.01 SUDAH
0.33 0.33 0.33 0.33 100% 0.33 SUDAH
0.05 0.05 0.05 0.05 100% 0.05 SUDAH
0.04 0.04 0.04 0.04 100% 0.04 SUDAH
0.03 0.03 0.03 0.03 100% 0.03 SUDAH
0.18 0.18 0.18 0.18 100% 0.18 SUDAH
0.10 0.10 0.10 0.10 100% 0.10 SUDAH
0.08 0.08 0.08 0.08 100% 0.08 SUDAH

1.16 OK

42.46 0.08 100% 0.08 SUDAH


29.15 0.04 100% 0.04 SUDAH
1.8 0.01 100% 0.01 SUDAH
3.88 0.09 100% 0.09 SUDAH

6.64 0.19 100% 0.19 SUDAH


901.46 0.50 100% 0.50 SUDAH
24.4 0.08 100% 0.08 SUDAH

80.43 0.15 100% 0.15 SUDAH


11.47 0.02 100% 0.02 SUDAH
24.41 0.27 100% 0.27 SUDAH
98.69 1.97 100% 1.97 SUDAH
3.37 OK

1.11 0.02 100% 0.02 SUDAH


SUDAH
7.12 0.20 100% 0.20 SUDAH
1,604.94 0.88 100% 0.88 BELUM
71.36 0.26 100% 0.26 SUDAH

3.68 0.11 100% 0.11 SUDAH


732.12 0.40 100% 0.40 SUDAH
33.39 0.12 100% 0.12 SUDAH

0.77 0.02 100% 0.02 SUDAH


PROGRES PROGRES TOTAL PROGRES CHEK CHEK
LALU INPUT SAAT INI S/D SAAT INI IN OUT
% DATA % %
134.69 0.07 100% 0.07 SUDAH
10.07 0.04 100% 0.04 SUDAH
2.13 TIDAK
PROGRES PROGRES TOTAL PROGRES CHEK CHEK
LALU INPUT SAAT INI S/D SAAT INI IN OUT
% DATA % %

0.00 0% #DIV/0! #DIV/0!


0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


#DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


#DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
#DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
PROGRES PROGRES TOTAL PROGRES CHEK CHEK
LALU INPUT SAAT INI S/D SAAT INI IN OUT
% DATA % %

#DIV/0! #DIV/0!
PROGRES PROGRES TOTAL PROGRES CHEK CHEK
LALU INPUT SAAT INI S/D SAAT INI IN OUT
% DATA % %

0.00 0% #DIV/0! #DIV/0!


0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
#DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
#DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
#DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


0.00 0% #DIV/0! #DIV/0!
#DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
#DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
#DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


SUDAH
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
PROGRES PROGRES TOTAL PROGRES CHEK CHEK
LALU INPUT SAAT INI S/D SAAT INI IN OUT
% DATA % %
0.00 0% #DIV/0! #DIV/0!
#DIV/0! #DIV/0!
PROGRES PROGRES TOTAL PROGRES CHEK CHEK
LALU INPUT SAAT INI S/D SAAT INI IN OUT
% DATA % %

0.00 0% #DIV/0! #DIV/0!


0.00 0% #DIV/0! #DIV/0!
#DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


0.00 0% #DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
#DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!

#DIV/0! #DIV/0!
PROGRES PROGRES TOTAL PROGRES CHEK CHEK
LALU INPUT SAAT INI S/D SAAT INI IN OUT
% DATA % %
#DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
#DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
0.00 0% #DIV/0! #DIV/0!
#DIV/0! #DIV/0!

0.00 0% #DIV/0! #DIV/0!


TIDAK
RENCANA ANGGARAN BIAYA

INSTANSI : DINAS PU, PENATAAN RUANG, PERUMAHAN dan KAWASAN PERMUKIMAN KAB. KONAWE
PEKERJAAN : PEMBANGUNAN MALL PELAYANAN PUBLIK
LOKASI : KABUPATEN KONAWE
TAHUN ANGGARAN : 2021

Harga Jumlah Total


No. Uraian Pekerjaan Volume Sat. Satuan Harga Harga
(Rp) (Rp) (Rp)

A. PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lokasi/Pembongkaran/Landclearing/Leveling 1.00 Ls 17,000,000.00 17,000,000.00
2 Papan Nama Proyek 1.00 Ls 301,440.31 301,440.31
3 Pembuatan Direksi Keet, Gudang/barak Kerja 1.00 Ls 16,000,000.00 16,000,000.00
4 Pemasangan Bouwplank / Pengukuran Kembali 60.00 m' 37,552.68 2,253,160.50
5 Listrik & Penerangan Kerja 1.00 Ls 1,750,000.00 1,750,000.00
6 Air Kerja & Bak Penampung 1.00 Ls 1,400,000.00 1,400,000.00
7 Administrasi (Dokumentasi & Laporan Proyek) 1.00 Ls 9,000,000.00 9,000,000.00
8 Pembuatan Job Mix Desaign (JMD) dan Job Mix Formula (JMF) 1.00 Ls 5,000,000.00 5,000,000.00
9 Rencana Keselamatan Konstruksi (RKK) 1.00 Ls 3,954,600.00 3,954,600.00
- Topi Pelindung (safety Helmet)
- Sarung Tangan (Safety Gloves)
- Rompi Keselamatan (Safety Vest)
- Bendera K3 dan Rambu-rambu K3
- Tempat cuci tangan
- Hand Sanitiser
- Peralatan P3K (Kotak P3K, Tandu, Obat Luka, Perban)
Sub. Total A. 56,659,200.81
B. PEKERJAAN STRUKTUR
B.1 PEKERJAAN PONDASI
1 Pondasi Poer plat, 28 Bh
a. Galian Tanah 42.46 m³ 89,700.00 3,808,662.00
b. Urugan Tanah Kembali 29.15 m³ 64,400.00 1,877,260.00
c. Pasir Urug 1.80 m³ 163,530.00 294,354.00
d. Lantai Kerja 3.88 m³ 1,088,825.39 4,224,642.53
e. Poer Plat Beton
- Cor Beton Poer Plat 6.64 m³ 1,399,958.72 9,295,725.91
- Besi Beton 901.46 kg 26,953.70 24,297,682.40
- Bekisting Poor Plat 24.40 m² 168,624.50 4,114,437.80
2 Pondasi Garis
a. Galian Tanah 80.43 m³ 89,700.00 7,214,571.00
b. Urugan Tanah Kembali 11.47 m³ 64,400.00 738,668.00
c. Batu Kosong + Pasir Urug 24.41 m³ 533,301.00 13,017,877.41
d. Pondasi Batu Belah 1SP : 5PP 98.69 m³ 976,361.96 96,357,161.83
Sub. Total B.1 165,241,042.88
B.2 PEKERJAAN SLOOF BETON
1 Pek. Beton Tumbuk Alas Sloof (SL.1) pengganti Bekisting Cam. 1:2:3
a. Cor Beton 1.11 m³ 1,088,825.39 1,208,596.19
2 Sloof Beton (SL.1) Uk. 20 x 40 cm
a. Cor Beton 7.12 m³ 1,399,958.72 9,967,706.10
b. Besi Beton 1,604.93 kg 26,953.70 43,258,801.74
c. Bekisting Sloef Beton 71.36 m² 176,062.13 12,563,793.24
3 Sloof Beton (SL.2) Uk. 20 x 30 cm
a. Cor Beton 3.68 m³ 1,399,958.72 5,151,848.10
b. Besi Beton 732.12 kg 26,953.70 19,733,342.84
c. Bekisting Sloef Beton 33.39 m² 176,062.13 5,878,714.35
4 Sloof Beton (SL.3) Uk. 15 x 20 cm
a. Cor Beton 0.77 m³ 1,399,958.72 1,077,968.22
Harga Jumlah Total
No. Uraian Pekerjaan Volume Sat. Satuan Harga Harga
(Rp) (Rp) (Rp)
b. Besi Beton 134.69 kg 26,953.70 3,630,393.85
c. Bekisting Sloef Beton 10.07 m² 176,062.13 1,772,945.60
Sub. Total B.2 104,244,110.23
Harga Jumlah Total
No. Uraian Pekerjaan Volume Sat. Satuan Harga Harga
(Rp) (Rp) (Rp)
B.3 PEKERJAAN KOLOM BETON
1 Kolom Pedestal 1 18 BH Uk. 30 x 45 cm
a. Cor Beton 3.65 m³ 1,399,958.72 5,109,849.33
b. Besi Beton 836.27 kg 26,953.70 22,540,570.70
c. Bekisting Kolom Pedestal 1 ( 2 x pakai ) 20.25 m² 329,072.50 6,663,718.13
2 Kolom Pedestal 2 10 BH Uk. 20 x 20 cm
a. Cor Beton 0.50 m³ 1,399,958.72 699,979.36
b. Besi Beton 212.47 kg 26,953.70 5,726,852.64
c. Bekisting Kolom Pedestal 2 10.00 m² 329,072.50 3,290,725.00
3 Kolom Pedestal 3 24 BH Uk. 30 x 30 cm
a. Cor Beton 1.55 m³ 1,399,958.72 2,169,936.02
b. Besi Beton 111.17 kg 26,953.70 2,996,442.83
c. Bekisting Kolom Pedestal 3 ( 2 x pakai ) 10.35 m² 329,072.50 3,405,900.38
4 Kolom Bangunan PTSP 10 BH Uk. 20 x 20 cm
a. Cor Beton 0.94 m³ 1,399,958.72 1,315,961.20
b. Besi Beton 303.26 kg 26,953.70 8,173,979.06
c. Bekisting Kolom 26.00 m² 329,072.50 8,555,885.00
5 Kolom Bangunan PTSP 2 BH Uk. 15 x 60 cm
a. Cor Beton 0.44 m³ 1,399,958.72 615,981.84
b. Besi Beton 93.22 kg 26,953.70 2,512,623.91
c. Bekisting Kolom 8.97 m² 329,072.50 2,951,780.33
6 Kolom Praktis Uk. 11 x 11 cm
a. Cor Beton, Besi Beton, Bekisting 166.05 m' 115,820.64 19,232,017.27
Sub. Total B.3 95,962,202.99
B.4 PEKERJAAN BALOK BETON
1 Pek. Blk. Gantung Teras (1) Uk. 12 x 40 cm
a. Cor Beton 0.59 m³ 1,399,958.72 825,975.65
b. Besi Beton 107.01 kg 26,953.70 2,884,315.44
c. Bekisting Balok 9.04 m² 337,311.10 3,049,292.34
2 Pek. Blk. Gantung Teras (2) Uk. 12 x 25 cm
a. Cor Beton 0.11 m³ 1,399,958.72 153,995.46
b. Besi Beton 17.78 kg 26,953.70 479,236.79
c. Bekisting Balok 2.17 m² 115,820.64 251,330.79
3 Pek. Blk Plat Atap Uk. 20 x 30 cm
a. Cor Beton 2.62 m³ 1,399,958.72 3,667,891.85
b. Besi Beton 469.15 kg 26,953.70 12,645,328.36
c. Bekisting Balok 33.84 m² 337,311.10 11,414,607.62
4 Ringbalk Bangunan Publik & PTUk. 10 x 15 cm
a. Cor Beton, Besi Beton, Bekisting 100.80 m' 145,037.89 14,619,818.81
5 Balok Latey/Tengah Uk. 10 x 15 cm
a. Cor Beton, Besi Beton, Bekisting 122.41 m' 145,037.89 17,754,087.50
Sub. Total B.4 67,745,880.60
B.5 PEKERJAAN PLAT LANTAI BETON
1 Plat Meja Beton T = 8 cm
a. Cor Beton 0.09 m³ 1,346,928.79 121,223.59
b. Besi Beton 9.31 kg 26,953.70 250,938.95
c. Bekisting plat Beton 1.91 m² 383,812.50 733,081.88
2 Plat Beton Lantai Atap T = 12 cm
a. Cor Beton 5.13 m³ 1,399,958.72 7,181,788.24
b. Besi Beton 362.11 kg 26,953.70 9,760,204.31
c. Bekisting plat Beton 42.74 m² 383,812.50 16,404,146.25
Sub. Total B.5 34,451,383.21
C. PEKERJAAN ARSITEKTUR
C.1 PEKERJAAN PINTU, JENDELA, VENTILASI dan KACA
1 Pekerjaan Kusen Pintu, Jendela dan Ventilasi UPVC 331.06 m' 283,043.75 93,704,463.88
2 Pekerjaan Bingkai Pintu,Jendela dan Ventilasi UPVC 139.52 m' 287,138.45 40,061,556.75
3 Pekerjaan Pas. Pintu UPVC Jadi, (Toilet Umum) P3 dan P4 13.53 m² 573,200.95 7,755,408.87
4 Pekerjaan Pas. Kaca Bening, T = 5 mm 65.13 m² 155,354.65 10,118,248.35
5 Pekerjaan Pas. Jendela Kaca Tempered 10 mm (Bening) + Lengkap Accessories 1.00 Unit 5,000,000.00 5,000,000.00
6 Pekerjaan Pas. Pintu Kaca Tempered 10 mm (Bening) + Lengkap Accessories 2.00 Unit 11,830,000.00 23,660,000.00
- Kaca Clear 10 Tempered
- Kunci Pintu Utama (Pintu Kaca)
- Hinge (Engsel)
- Handle
Harga Jumlah Total
No. Uraian Pekerjaan Volume Sat. Satuan Harga Harga
(Rp) (Rp) (Rp)
- Pacth Fitting
Sub. Total C.1 180,299,677.86
Harga Jumlah Total
No. Uraian Pekerjaan Volume Sat. Satuan Harga Harga
(Rp) (Rp) (Rp)
C.2 PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pekerjaan Pas. Handle pintu+ lock set Pintu Utama 3.00 Bh 768,890.00 2,306,670.00
2 Pekerjaan Pas. Handle pintu+ lock set Kamar Mandi 8.00 Bh 514,510.00 4,116,080.00
3 Pekerjaan Pas. Engsel Pintu UPVC 42.00 Bh 130,635.40 5,486,686.80
4 Pekerjaan Pas. Engsel/cassemen 14" Jendela UPVC 68.00 Bh 142,135.40 9,665,207.20
5 Pekerjaan Pas. Engsel/cassemen 14" Ventilasi UPVC 6.00 Bh 116,380.00 698,280.00
6 Pekerjaan Pas. Grendel Jendela/Rambuncis 37.00 Bh 80,845.00 2,991,265.00
Sub. Total C.2 25,264,189.00
C.3 PEKERJAAN DINDING BATA / PLESTERAN
1 Pekerjaan Pasangan Dinding Transram Camp. Adukan 1PC : 2PS 32.69 m² 156,761.73 5,124,541.04
2 Pekerjaan Pasangan Plasteran Transram Camp. Adukan 1PC : 2PS 20.69 m² 80,929.64 1,674,434.25
3 Pekerjaan Pasangan Dinding 1/2 Bata Adukan 1PC : 5PS 630.47 m² 141,905.98 89,467,460.06
4 Pekerjaan Plasteran Dinding Adukan 1PC : 5PS 1,140.91 m² 73,292.03 83,619,609.95
5 Pekerjaan Plasteran Beton Adukan 1PC : 2PS 99.32 m² 80,929.64 8,037,931.84
6 Pekerjaan Acian Plesteran Dinding dan Plesteran Beton Pasta Semen 1,159.74 m² 45,029.69 52,222,729.78
7 Pekerjaan Acian Pasta Semen Plat Atap 47.55 m² 45,029.69 2,141,161.64
Sub. Total C.3 242,287,868.56
C.4 PEKERJAAN LANTAI
1 Pekerjaan Urugan tanah alas lantai 534.41 m³ 103,914.00 55,532,680.74
2 Pekerjaan Urugan pasir alas lantai 39.89 m³ 163,530.00 6,523,211.70
3 Pekerjaan Rabat Lantai Adukan (Slab Beton K-100) 40.78 m³ 1,088,825.39 44,402,299.55
4 Pekerjaan Pas. Tegel Granit, Uk. 60 x 60 cm 914.15 m² 303,697.18 277,624,772.53
5 Pek. Pas. Dinding Tegel Granit, Uk. 60 x 60 cm (gawang pintu PTSP) Warna Hit 3.78 m² 303,697.18 1,147,975.32
6 Pekerjaan Pas. Tegel Keramik 60 x 60 cm Meja Wastafel 1.29 m² 243,448.68 314,048.79
7 Pekerjaan Pas. Lantai Keramik Rg. Toilet 60 x 60 cm (anti sliip) 22.62 m² 243,448.68 5,506,809.03
8 Pekerjaan Pas. Lantai Keramik Rg. Toilet 40 x 40 cm (anti sliip) 11.00 m² 166,228.48 1,828,513.23
9 Pekerjaan Pas. Tegel Dinding Keramik KM/WC 40 x 40 cm, T=160 cm 45.60 m² 166,228.48 7,580,018.46
Sub. Total C.4 400,460,329.34
C.5 PEKERJAAN PLAFOND
1 Pekerjaan Rangka Besi Hollow 1 x 40.40.2mm, modul 60 x 60 cm 888.11 m² 160,609.00 142,638,458.99
2 Pekerjaan Pas. Plafond PVC + List Plafond 888.11 m² 195,672.50 173,778,703.98
Sub. Total C.5 316,417,162.97
C.6 PEKERJAAN RANGKA ATAP dan PENUTUP ATAP
1 Pekerjaan Baja WF 250.125.6,9 SNI (Tiang) 2,474.56 Kg 45,609.00 112,862,207.04
2 Pekerjaan Baja WF 250.125.6,9 SNI (Kuda-kuda) 2,778.55 Kg 45,609.00 126,726,886.95
3 Pekerjaan Baja WF 200.100.5,5.8 SNI (Ringbalk) 1,254.40 Kg 45,609.00 57,211,929.60
4 Pekerjaan Pas. Besi Plat 10 mm (Tumpuan Kuda-kuda Baja) 207.16 Kg 43,263.00 8,962,363.08
5 Pekerjaan Pas. Besi Plat 12 mm (Tumpuan Tiang Baja) 76.30 Kg 43,263.00 3,300,966.90
6 Pekerjaan Pas. Angkur Baut Dia. 22 mm. 400 mm 108.00 Bh 111,400.00 12,031,200.00
7 Pekerjaan Pas. Baut Baja 7/8" x 2 " (un. Pengunci) 364.00 Bh 14,200.00 5,168,800.00
8 Pekerjaan Pas. Jarum Keras (trackstank) Ø 10 mm lengkap dengan ulir dan baut 73.98 Kg 25,579.45 1,892,367.71
9 Pekerjaan Pas. Kait Angin Ø 12 mm lengkap dengan ulir dan spanskrup M22 191.76 Kg 25,579.45 4,905,115.33
10 Pekerjaan Gording Lips Chanel 125.50.20.2,3 SNI 3,259.23 Kg 45,609.00 148,650,221.07
11 Pekerjaan Sandaran Gording Besi Siku 80.80.6 120.46 Kg 44,143.44 5,317,518.78
12 Pekerjaan Pas. Baut Baja 5/8" x 2" (un. Sambungan gording) 616.00 Bh 13,100.00 8,069,600.00
13 Pekerjaan Pengecatan Baja 553.86 m² 36,120.35 20,005,617.05
14 Pekerjaan Pas. Rangka Atap Baja Ringan 273.95 m² 259,244.50 71,020,030.78
15 Pekerjaan Atap Spandek 0.30 mm 964.85 m² 188,010.05 181,401,496.74
16 Pekerjaan Nok Atap Spandek 32.90 m' 233,868.60 7,694,276.94
17 Pekerjaan Pas. Rangka Talang Besi Hollow Hitam 40.40.2mm 918.51 Kg 31,199.04 28,656,630.23
18 Pekerjaan Pas. Talang Datar , Seng BJLS 0,30 mm 65.80 m' 84,224.28 5,541,957.30
Sub. Total C.6 809,419,185.50
C.7 PEKERJAAN ALUMINIUM COMPOSITE PANEL (ACP)
1 Pekerjaan Pas. besi siku penopang ACP 50.50.4 mm + Pengecatan Besi Siku 2,583.18 Kg 44,143.44 114,030,451.34
2 Pekerjaan Pas. Rangka Alucopan Besi Hollow 40.40.2 mm 1,470.50 m² 207,126.50 304,579,518.25
3 Pekerjaan Pas. Aluminium Composite Panel (ACP PVDF) 1,470.50 m² 685,105.46 1,007,447,581.87
Sub. Total C.7 1,426,057,551.46
C.8 PEKERJAAN PAPAN NAMA MALL PELAYANAN PUBLIK
Papan Nama Terpasang di Atas dinding ACP
1 Pekerjaan Pas. Bingkai Papan Nama (Rangka Besi Holow Galvalum 40.40.2 mm) 27.90 m² 130,019.00 3,627,530.10
2 Pekerjaan Pas. Huruf Nama Bangunan Fin. Acrylic + Lampu LED, Uk. Sesuai Gambar
Text : MALL PELAYANAN PUBLIK Tinggi Huruf = 80 cm 1,520.00 Cm 25,000.00 38,000,000.00
Text : KABUPATEN KONAWE Tinggi Huruf = 50 cm 750.00 Cm 25,000.00 18,750,000.00
3 Pekerjaan Pas. Logo Kabupaten Fin. Acrylic + Lampu LED Uk. Sesuai Gambar
Harga Jumlah Total
No. Uraian Pekerjaan Volume Sat. Satuan Harga Harga
(Rp) (Rp) (Rp)
Logo : KABUPATEN KONAWE 1.00 Unit 850,000.00 850,000.00
Sub. Total C.8 61,227,530.10
Harga Jumlah Total
No. Uraian Pekerjaan Volume Sat. Satuan Harga Harga
(Rp) (Rp) (Rp)
C.9 PEKERJAAN PENGECATAN
1 Pekerjaan Pengecatan Dinding Tembok 1,159.74 m² 49,599.50 57,522,524.13
2 Pekerjaan Pengecatan Plat Atap Rg. Toilet 47.55 m² 49,599.50 2,358,456.23
Sub. Total C.9 59,880,980.36
C.10 PEKERJAAN PLUMBING
1 Pekerjaan Pas. Closed Duduk dan Akssesories 4.00 Bh 3,584,492.50 14,337,970.00
2 Pekerjaan Pas. Kran Air diameter ½” atau 3/4” 10.00 Bh 147,631.25 1,476,312.50
3 Pekerjaan Pas. Wastafel lengkap akssesories 3.00 Bh 1,612,059.65 4,836,178.95
4 Pekerjaan Pas. Cermin Bevel 2 bh disambung Uk. 80 x 110 cm/bh 2.00 Bh 1,990,000.00 3,980,000.00
5 Pekerjaan Pas. Floor Drain 5.00 Bh 131,215.00 656,075.00
6 Pekerjaan Instalasi Air Bersih
a. Pekerjaan Instalasi air bersih PVC AW 1/2" (distribusi) 48.00 m' 24,081.00 1,155,888.00
b. Pekerjaan Instalasi air bersih PVC AW 1" (dari mesin ke tower) 20.00 m' 31,211.00 624,220.00
7 Pekerjaan Instalasi Air Kotor
a. Pekerjaan Pas. Pipa PVC diameter 4" Saluran Tinja 12.00 m' 156,250.50 1,875,006.00
b. Pekerjaan Pas. Pipa PVC diameter 4" Saluran Air Kotor/Air Hujan 92.00 m' 156,250.50 14,375,046.00
c. Pekerjaan Instalasi air kotor PVC 3" (dari kamar mandi/toilet) 28.00 m' 107,588.25 3,012,471.00
d. Pekerjaan Pas. Pipa PVC diameter 6" (dari bak kontrol ke saluran kompleks) 40.00 m' 292,611.75 11,704,470.00
8 Pekerjaan Septictank + Resapan (200x150x150) 1.00 Unit 12,658,086.48 12,658,086.48
9 Pek. Bak Kontrol Limbah Air Kotor Uk. 70 x 90 x 100 cm + Accessories 1.00 Unit 3,180,266.64 3,180,266.64
10 Pekerjaan Sumur Bor 1.00 Ls 14,925,000.00 14,925,000.00
11 Pekerjaan Pas. Pompa celup ( 100 Watt) 1.00 Unit 1,492,500.00 1,492,500.00
12 Pekerjaan Pengadaan Water Tank Fiberglass 1200 L 2.00 Bh 2,487,500.00 4,975,000.00
13 Pekerjaan Pengadaan dan Pemasangan Tangga Monyet + Pengecatan 1.00 Unit 1,990,000.00 1,990,000.00
Sub. Total C.10 97,254,490.57
C.11 PEKERJAAN INSTALASI LISTRIK
1 Pekerjaan Pas. Titik Instalasi (Inc. Kabel 1x2.5 + Pipa Instalasi/Acc) 112.00 Titik 312,800.00 35,033,600.00
2 Pekerjaan Pas. Kap RM dan Lampu RM 2x18 Watt Philips 26.00 Bh 529,759.00 13,773,734.00
3 Pekerjaan Pas. Lampu Downlight 40 watt Philips 22.00 Bh 188,784.00 4,153,248.00
4 Pekerjaan Pas. Lampu Downlight 25 watt Philips 33.00 Bh 137,264.00 4,529,712.00
5 Pekerjaan Pas. Lampu Downlight 10 watt Philips 9.00 Bh 114,379.00 1,029,411.00
6 Pek. Pas. Lampu Sorot/Tembak 20 mtr, LED 30 Watt 220 V (anti hujan)+besi p 6.00 Bh 772,524.00 4,635,144.00
7 Pekerjaan Pas. Saklar ganda ex. Philips 20.00 Bh 57,109.00 1,142,180.00
8 Pekerjaan Pas. Saklar tunggal ex. Philips 18.00 Bh 51,359.00 924,462.00
9 Pekerjaan Pas. Stop Kontak ex. Philips 55.00 Bh 42,159.00 2,318,745.00
10 Pekerjaan Pas. Stop Kontak AC ex. Philips 16.00 Bh 79,994.00 1,279,904.00
11 Pengadaan Exhause Fan (terpasang di Plafond Rg km/wc) 4.00 Bh 497,500.00 1,990,000.00
12 Pas. Kabel NYMHY 4 x 25 mm (dari KWH ke Panel Induk) 12.00 m' 69,700.00 836,400.00
13 Pas. Kabel NYMHY 4 x 25 mm (dari Panel Induk ke Panel AC) 100.00 m' 69,700.00 6,970,000.00
14 Pas. Kabel NYMHY 4 x 16 mm (dari Panel Induk ke Panel Lampu dan Stop Kont 1,000.00 m' 49,800.00 49,800,000.00
15 Pekerjaan Pas. Panel Box Induk Lengkap MCCB + Accessories 1.00 Set 3,778,670.00 3,778,670.00
- Panel Box Ukuran 40 x 60 cm
- MCCB 40 A, 3 Pass
- MCCB 25 A, 3 Pass
- Busbar (Netral dan Ground)
- Lampu Indikator (Merah, Kunig dan Hijau)
- Vius (R, S, T)
- Volt Meter (R, S, T)
16 Pekerjaan Pas. Panel Box AC Lengkap MCB + Accessories 1.00 Set 1,507,190.00 1,507,190.00
- Panel Box Ukuran 40 x 60 cm
- MCB 10 A, 1 Pass
- Busbar (Netral dan Ground)
- Lampu Indikator (Merah, Kunig dan Hijau)
- Vius (R, S, T)
- Volt Meter (R, S, T)
17 Pekerjaan Pas. Panel Box Lampu & Stop Kontak Lengkap MCB + Accessories 1.00 Set 1,850,465.00 1,850,465.00
- Panel Box Ukuran 40 x 60 cm
- MCB 10 A, 1 Pass
- Busbar (Netral dan Ground)
- Lampu Indikator (Merah, Kunig dan Hijau)
- Vius (R, S, T)
- Volt Meter (R, S, T)
Sub. Total C.11 135,552,865.00
Harga Jumlah Total
No. Uraian Pekerjaan Volume Sat. Satuan Harga Harga
(Rp) (Rp) (Rp)
C.12 PEKERJAAN BIAYA PENYAMBUNGAN LISTRIK KWH BARU
- Biaya Penyambungan Daya 23 KVA 1.00 Titik 22,089,000.00 22,089,000.00
- SLO (Sertifikat Like Operasi) 1 Ls 796,000.00 796,000.00
Sub. Total C.12 22,885,000.00
D. PEKERJAAN INTERIOR
D.1 PEKERJAAN HIGH PRESSURE LAMINATE (HPL)
1 Pekerjaan Pas. Rangka Partisi Dinding HPL 160.41 m² 154,859.00 24,840,932.19
2 Pekerjaan Pas. Multipleks Rangkap Lapis HPL 330.51 m² 1,422,926.05 470,291,288.79
3 Pekerjaan Pembuatan dan Pemasangan Meja Kerja Tinggi 0,75 M - 0,85 M 34.80 m' 1,588,794.00 55,290,031.20
4 Pekerjaan Pembuatan dan Pemasangan Lemari Kerja 30.60 m' 1,588,794.00 48,617,096.40
Sub. Total D.1 599,039,348.58
E. PEKERJAAN AKHIR
1 Pekerjaan Pembersihan Akhir 1.00 Ls 1,750,000.00 1,750,000.00
Sub. Total E. 1,750,000.00

Unaaha, 30 Juni 2021


-
Dibuat Oleh :
PENYEDIA JASA
PT. CIPTA ALAM KARYA BERSAMA

LAODE AYUB AZIZ R, S.Sos


Direktur
JADWAL PELAKSANAAN PEKERJAAN

PEKERJAAN :PEMBANGUNAN MALL PELAYANAN PUBLIK


LOKASI :KABUPATEN KONAWE
TAHUN ANGGARAN :2021

Waktu Pelaksanaan Pekerjaan adalah 150 (Seratus Lima Puluh ) Hari Kalender
JUMLAH HARGA BOBOT
NO ITEM PEKERJAAN Minggu Ke - KET
(Rp)
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A. PEKERJAAN PERSIAPAN 56,659,200.81 1.16 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 100
B. PEKERJAAN STRUKTUR
B.1 PEKERJAAN PONDASI 165,241,042.88 3.37 0.5 1.50 1.37
B.2 PEKERJAAN SLOOF BETON 104,244,110.23 2.13 0.50 0.75 0.88
B.3 PEKERJAAN KOLOM BETON 95,962,202.99 1.96 0.75 1.00 0.21
B.4 PEKERJAAN BALOK BETON 67,745,880.60 1.38 1.00 0.38
B.5 PEKERJAAN PLAT LANTAI BETON 34,451,383.21 0.70 0.50 0.20
C. PEKERJAAN ARSITEKTUR
C.1 PEKERJAAN PINTU, JENDELA, VENTILASI dan KACA 180,299,677.86 3.68 1.00 1.00 1.00 0.68
C.2 PEKERJAAN PENGGANTUNG DAN PENGUNCI 25,264,189.00 0.52 0.20 0.32
C.3 PEKERJAAN DINDING BATA / PLESTERAN 242,287,868.56 4.94 1.00 2.00 1.94
C.4 PEKERJAAN LANTAI 400,460,329.34 8.17 1.00 2.00 3.00 2.17 50
C.5 PEKERJAAN PLAFOND 316,417,162.97 6.45 3.00 3.00 0.45
C.6 PEKERJAAN RANGKA ATAP dan PENUTUP ATAP 809,419,185.50 16.51 1.50 3.00 5.00 5.00 2.01
C.7 PEKERJAAN ALUMINIUM COMPOSITE PANEL (ACP) 1,426,057,551.46 29.09 1.00 4.00 7.50 7.50 6.00 3.09
C.8 PEKERJAAN PAPAN NAMA MALL PELAYANAN PUBLIK 61,227,530.10 1.25 0.60 0.65
C.9 PEKERJAAN PENGECATAN 59,880,980.36 1.22 0.75 0.47
C.10 PEKERJAAN PLUMBING 97,254,490.57 1.98 1.00 0.98
C.11 PEKERJAAN INSTALASI LISTRIK 135,552,865.00 2.77 0.50 1.00 1.27
C.12 PEKERJAAN BIAYA PENYAMBUNGAN LISTRIK KWH BARU 22,885,000.00 0.47 0.47
D. PEKERJAAN INTERIOR -
D.1 PEKERJAAN HIGH PRESSURE LAMINATE (HPL) 599,039,348.58 12.22 2.00 2.00 2.00 3.00 3.22
E. PEKERJAAN AKHIR 1,750,000.00 0.04 0.04 0

A Jumlah Nilai Pekerjaaan 4,902,100,000.00 100.00


B Rencana Kemajuan 0.56 2.06 2.93 3.93 4.65 5.20 6.06 6.06 7.07 7.74 8.01 8.56 8.06 6.65 5.23 4.32 4.39 4.38 3.59 0.56
C Komulatif Rencana 0.56 2.62 5.54 9.48 14.13 19.33 25.39 31.44 38.51 46.25 54.26 62.8 70.88 77.53 82.75 87.08 91.47 95.85 99.44 100.0

Unaaha, 30 Juni 2021


Dibuat Oleh :
PENYEDIA JASA
PT. CIPTA ALAM KARYA BERSAMA

LAODE AYUB AZIZ R, S.Sos


Direktur
JADWAL RENCANA PELAKSANAAN KEGIATAN (TIME SCHEDULE ) "KURVA S"

Pekerjaan : PEMBANGUNAN GEDUNG KANTOR BAPPEDA ( TAHAP III ) KAB. KONAWE Nomor Kontrak : 640/02, Tanggal 29 April 2015

Lokasi : KOMPLEKS PERKANTORAN PEMDA KAB. KONAWE Tanggal Kontrak : 29 April 2015

Tahun Anggaran : 2015 Nomor kontrak ADD : 640/02, Tanggal 12 Juni 2015

Kontraktor Pelaksana : CV. PUTRA KAJANG PRATAMA Tanggal kontrak ADD : 12 Juni 2015

WAKTU PELAKSANAAN
Bobot
No. Uraian Pekerjaan MINGGU Ket.
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

I. PEKERJAAN PERSIAPAN 0.46 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 100

II. PEKERJAAN LANTAI 01


II.a PEK. BETON, DINDING & PLESTERAN 4.98 1.24 1.24 1.24 1.24 80

PEK. DINDING PARTISI, PINTU,


II.b 15.08 3.02 3.02 3.02 3.02 3.02
JENDELA DAN ALAT PENGGANTUNG
PEKERJAAN PENUTUP LANTAI & LIST
II.c 15.92 3.18 3.18 3.18 3.18 3.18 70
PLAFOND GYPSUM

Waktu pelaksanaan 210 hari kalender


II.d PEK. FINISHING DAN PENGECATAN 1.55 0.52 0.52 0.52
60
III. PEKERJAAN LANTAI 02
III.a PEKERJAAN BETON & PLESTERAN 4.17 1.04 1.04 1.04 1.04 50
III.b PEK. RANGKA DAN PLAFOND GYPSUM 10.65 1.33 1.33 1.33 1.33 1.33 1.33 1.33 1.33

PEK. DINDING PARTISI, PINTU,


III.c 24.09 4.82 4.82 4.82 4.82 4.82 40
JENDELA DAN ALAT PENGGANTUNG

III.d PEKERJAAN INSTALASI LISTRIK 2.51 0.50 0.50 0.50 0.50 0.50
III.e PEKERJAAN PENUTUP LANTAI 12.20 2.44 2.44 2.44 2.44 2.44 30
PEK. PLUMBING DAN INSTALASI AIR
III.f 0.58 0.29 0.29
BERSIH ( LANTAI 01 & 02 )
III.g PEK. FINISHING DAN PENGECATAN 7.68 1.92 1.92 1.92 1.92 20

PEKERJAAN PEMBERSIHAN AKHIR 0.15 0.04 0.04 0.04 0.04 10


IV.
PEKERJAAN

Jumlah 100.0 0.02 0.02 1.26 1.26 0.02 0.52 2.80 2.30 1.35 8.61 7.31 7.31 7.27 10.46 4.53 5.03 5.03 5.03 4.36 4.36 4.36 4.36 3.55 2.45 2.45 1.94 1.97 0.05

Kumulatif Rencana Pelaksanaan 0 0.02 0.03 1.29 2.55 2.57 3.09 5.89 8.19 9.54 18.15 25.46 32.77 40.04 50.50 55.03 60.07 65.10 70.13 74.50 78.86 83.22 87.58 91.13 93.58 96.04 97.97 99.95 100.0

Kumulatif Realisasi Pelaksanaan 0 0.02 0.23 3.31 7.85 11.60 15.99 20.99 22.98 25.35 30.33 39.90 3.00 7.00

Deviasi - 0.20 2.02 5.30 9.03 12.90 15.10 14.78 15.81 12.18 14.44

DiBuat Oleh :
KONSULTAN PENGAWAS
CV. LAKIDENDE KONSULTAN

RULI CAHYADI, ST
Direktur
RULI CAHYADI, ST
Direktur

Anda mungkin juga menyukai