Oleh:
Contents
1 DATA UMUM STRUKTUR..............................................................................................................6
Data Struktur 6
Metode Analisis 6
Acuan 6
Spesifikasi Material 7
Pembebanan 7
Beban Gravitasi.............................................................................................................................7
Beban Gempa................................................................................................................................ 8
Kombinasi Pembebanan................................................................................................................8
Dimensioning Stuktur...................................................................................................................9
2 PENULANGAN PELAT..................................................................................................................17
Penulangan Pelat Lantai & Atap.............................................................................................................................................17
Pelat dua arah..............................................................................................................................18
Pelat satu arah.............................................................................................................................20
3 ANALISIS GEMPA..........................................................................................................................22
Pemodelan Struktur..................................................................................................................22
Pembebanan Gravitasi Pada Struktur.......................................................................................22
Analisis Gempa........................................................................................................................22
Displacement Pusat Massa Dan Simpangan Antar Tingkat.....................................................27
Kesimpulan..............................................................................................................................29
4 PENULANGAN STRUKTUR..........................................................................................................30
Model struktur..........................................................................................................................30
Perencanaan Balok...................................................................................................................31
Perencanaan balok anak arah x...................................................................................................31
Beban rencana.............................................................................................................................31
Analisis struktur..........................................................................................................................32
Penulangan lentur........................................................................................................................ 32
Penulangan geser......................................................................................................................... 33
Perencanaan Portal...................................................................................................................34
Rencana portal............................................................................................................................ 34
Beban rencana.............................................................................................................................34
Hasil analisis struktur..................................................................................................................38
Analisis beban gravitasi..............................................................................................................40
Perhitungan balok.......................................................................................................................41
Hasil perhitungan penulangan balok portal.................................................................................43
Perencanaan Kolom.................................................................................................................44
Beban rencana kolom..................................................................................................................44
Kelangsingan kolom...................................................................................................................45
Perencanaan lentur kolom untuk kolom pendek..........................................................................47
Perencanaan geser.......................................................................................................................53
Perencanaan Tangga................................................................................................................54
Pemodelan tangga.......................................................................................................................54
Page 2 of 68
Dimensi & volume tangga..........................................................................................................54
Pembebanan................................................................................................................................ 54
Output gaya-gaya dalam.............................................................................................................55
Penulangan momen tangga..........................................................................................................55
Perhitungan Tulangan Geser.......................................................................................................57
Perencanaan Pondasi................................................................................................................58
Data perencanaan........................................................................................................................58
Dimensi pondasi..........................................................................................................................58
Tentang Penulis........................................................................................................................68
Daftar Tabel
Tabel 1 Daftar beda elevasi lantai.................................................................................6
Tabel 2Koefisien gempa dasar.......................................................................................8
Tabel 3Tipe Pelat.........................................................................................................17
Tabel 4 Batasan penulangan pelat/m2 (dengan asumsi tulangan Ø 10 mm)...............18
Tabel 5 Momen per meter lebar dalam jalur tengah akibat beban terbagi merata.....19
Tabel 6 Massa, pusat massa dan pusat kekakuan lantai..............................................23
Tabel 7 Mass Participation Factor..............................................................................23
Tabel 8 Gaya dinamik pada tiap lantai akibat spektrum gempa-x..............................25
Tabel 9 Gaya dinamik pada tiap lantai akibat spektrum gempa-y..............................25
Tabel 10 Distribusi gaya geser lantai statik ekivalen..................................................26
Tabel 11 Displacement titik terluar bangunan akibat gempa arah-x (cm)..................28
Tabel 12 Displacement titik terluar bangunan akibat gempa arah-y (cm)..................28
Tabel 13 Rasio inter story drift-x.................................................................................28
Tabel 14 Momen disain balok rangka di muka kolom.................................................40
Tabel 15 Resume penulangan balok............................................................................43
Tabel 16 Gaya yang bekerja pada kolom.....................................................................45
Tabel 17 I/Lc untuk balok............................................................................................45
Tabel 18 I/Lc untuk kolom sumbu x & y......................................................................45
Tabel 19 Tabel analisis dalam keadaan berimbang......................................................48
Tabel 20 Tabel analisis untuk c = 50 mm....................................................................49
Tabel 21 Tabel analisis untuk c = 100 mm..................................................................49
Tabel 22 Tabel analisis untuk c = 150 mm..................................................................50
Tabel 23 Tabel analisis untuk c = 200 mm..................................................................50
Tabel 24 Tabel analisis untuk c = 250 mm..................................................................50
Tabel 25 Tabel analisis untuk c = 300 mm..................................................................50
Tabel 26 Tabel analisis untuk c = 350 mm..................................................................51
Tabel 27 Tabel analisis untuk c = 400 mm..................................................................51
Tabel 28 Tabel analisis untuk c = 450 mm..................................................................51
Tabel 29 Tabel analisis untuk c = 500 mm..................................................................51
Tabel 30 Tabel analisis untuk kapasitas lentur murni..................................................52
Tabel 31 Output ETABS untuk tangga.........................................................................55
Tabel 32 Analisis geometri bidang..............................................................................59
Tabel 33 Nilai beban merata pada pelat pondasi........................................................59
Tabel 34 Tekanan pada pelat pondasi.........................................................................61
Tabel 35 Design koefisien momen................................................................................63
Tabel 36 Resume penulangan pelat pondasi................................................................67
Daftar Gambar
Gambar 1 Respons spektrum gempa rencana untuk Wilayah Gempa 3 (tanah lunak). .8
Gambar 2 Luasan dalam menghitung inersia...............................................................12
Gambar 3 Bagian pelat yang ditinjau...........................................................................12
Gambar 4 Model struktur 3 dimensi............................................................................22
Gambar 5 Bentuk deformasi struktur akibat ragam pola getar 1.................................24
Gambar 6 Bentuk deformasi struktur akibat ragam pola getar 2.................................24
Gambar 7Bentuk deformasi struktur akibat ragam pola getar 3..................................25
Gambar 8 Selimut gaya geser tingkat untuk gempa arah-x.........................................27
Gambar 9 Selimut gaya geser tingkat untuk gempa arah-x.........................................27
Gambar 10 Denah balok lantai atap.............................................................................30
Gambar 11 Denah balok lantai 2 s/d 4.........................................................................30
Gambar 12 Denah lantai 1...........................................................................................30
Gambar 13 Rencana balok anak arah x........................................................................31
Gambar 14 Gambar diagram momen dan geser balok anak (AS 2-3).........................32
Gambar 15 Rencana portal arah melintang..................................................................34
Gambar 16 Rencana portal arah memanjang...............................................................34
Gambar 17 Respon spectrum gempa (wilayah gempa 3).............................................35
Gambar 18 Input beban mati pada lantai (kg/m2)..............................................................35
Gambar 19 Input beban hidup pada lantai (kg/m2)............................................................36
Gambar 20 Input beban mati pada balok (kg/m).........................................................36
Gambar 21 Distribusi beban dari pelat ke balok (kg/m)..............................................36
Gambar 22 Input respon spektrum gempa...................................................................37
Gambar 23 Respon spektrum case gempa arah x dan arah y.......................................37
Gambar 24 Diagram momen portal melintang akibat beban mati (kN.m)...................38
Gambar 25 Diagram momen portal melintang akibat beban hidup (kN.m).................38
Gambar 26 Diagram momen portal melintang akibat beban gempa ex (kN.m)..........39
Gambar 27 Diagram gaya lintang portal melintang akibat beban mati (kN)...............39
Gambar 28 Diagram gaya lintang portal melintang akibat beban hidup (kN).............39
Gambar 29 Diagram gaya lintang portal melintang akibat beban gempa ex (kN).......40
Gambar 30 Momen Rencana kolom.............................................................................44
Gambar 31 Gaya Aksial kolom....................................................................................44
Gambar 32 Kondisi pengekangan kolom (a) arah sumbu x; (b) arah sumbu y............45
Gambar 33 Nomogram untuk kolom arah x................................................................46
Gambar 34 Nomogram kolom untuk arah y................................................................47
Gambar 35 Rencana penampang kolom......................................................................48
Gambar 36 Tegangan regangan pada kolom dalam keadaan berimbang.....................49
Gambar 37 Diagram interaksi kolom...........................................................................52
Gambar 38 Pemodelan tangga 3 dimensi....................................................................54
Gambar 39 Layout pondasi rakit (mat foundation)......................................................58
Gambar 40 Area geser pada pelat pondasi..................................................................62
1 DATA UMUM STRUKTUR
Data Struktur
1. Fungsi bangunan : Rumah 2 Lantai
2. Struktur : Struktur beton bertulang dengan balok kolom 3 dimensi
3. Jumlah lantai : 2 lantai
4. Elevasi lantai :
Tabel 1 Daftar beda elevasi lantai
Lantai Beda Elevasi (m)
Lantai Dasar 0.00
Lantai 2 + 4.00
5. Luas bangunan (per lantai)
Lantai dasar : ± 640 m2
Lantai 2 : ± 640 m2
6. Tebal pelat beton :12 cm
7. Tipe kolom : 25x25 cm2 & 15x15 cm2
8. Tipe balok : TB1 (Ring Balk) 20x35 cm2, TB2 (Balok Induk) 20x40 cm2
B1 (Balok Anak Bentang 3 m) 15 x 25 cm2
B2 (Balok Anak Bentang 4 m ) 20x35 cm2,
B3 (Balok Bordes ) 15x15 cm2,
B4 (Balok Sloof) 15x30 cm2
9. Pemberi Tugas :
Metode Analisis
Analisis struktur portal utama : metode kekakuan tiga dimensi dengan bantuan
program SAP 2000.
Acuan
1. Tata cara perencanaan struktur beton untuk bangunan gedung (SNI 03-2847-
2002)
2. Pedoman perencanaan pembebanan untuk rumah dan gedung (PPIUG-1983)
3. American Concrete Institute Building Code (ACI 318-99)
Spesifikasi Material
1. Mutu Baja :
▪ Tulangan : fy = 240 MPa (BJTP 24)
2. Mutu Beton :
▪ Pondasi telapak : K-200 (fc’=20 MPa)
▪ Pelat, Balok, Kolom : K-200 (fc’=20 MPa)
Pembebanan
Beban Gravitasi
Beban mati
Roof (atap) per 1 Titik
Beban = 907 kg/m2
Lantai
Beban = 150 kg/m2
Lantai dasar
Beban mati total (qSDL) = 1057 kg/m2
Beban hidup
1. Lantai Plat = 200 kg/m2
Beban mati total (qSDL) = 1057 kg/m2
Dimensioning Stuktur
Balok
B4 (Balok Sloof) 15x30 cm2 = L 4000 mm
h = L/12 = 4000/12 = 333,33 mm
b = 2/3 x 333,33 = 222,22 mm
Jadi, dimensi TB1 (sloof) = 300 x 200 mm
lemah).
2 PENULANGAN PELAT
Berdasarkan SNI 03-2847-2002 pasal 9.12 butir (2) mengenai tulangan susut
dan suhu, rasio tulangan susut dan suhu terhadap luas bruto penampang beton untuk
pelat yang menggunakan batang tulangan deform mutu 400 adalah 0,0018.
min = 0,0018
f'
0,003
= 0,85. β . c
b 1
fy f
+ 0,003
y
fc' E
s
600
= 0,85. β 1 f + 600
fy
y
= 0,85. 0,85. 25 600
400 400 + 600
= 0,0271
maks= 0,75.b
= 0,0203
As .b.d
min min
A .b.d
smaks maks
Tabel 4 Batasan penulangan pelat/m2 (dengan asumsi tulangan Ø 10 mm)
Nama pelat h (mm) Arah d (mm) As min (mm2) As max (mm2)
Arah x 100 180 2030
S1 120
Arah y 90 162 1827
Pelat satu arah
Bila perbandingan panjang dan lebar pelat lebih dari 2,5 maka analisa pelat
tersebut dilakukan sebagai pelat satu arah. Penulangan pada arah memanjang pelat
dipakai tulangan bagi.
Sesuai dengan SNI 03-2847-2002 pasal 9.12 butir (2) dalam arah tegak lurus
terhadap tulangan lentur harus disediakan tulangan penahan susut dan suhu (tulangan
pembagi).
Contoh perhitungan:
Pelat Tipe
lx
slab
ly ly
lx
Lx = 4000 mm
Ly = 4000 mm
β = Ly/Lx = 1,33 ≤ 2.5, maka termasuk kedalam pelat dua arah
Pembebanan
- Beban Mati
Berat sendiri pelat = 0.12 x 24 = 2.88 kN/m 2
Waterproofing = 1.00 x 0.15 = 0.15 kN/m2
Ducting + Ceiling = 1.00 x 0.30 = 0.30 kN/m2
= 3.33 kN/m2
- Beban hidup = 4 kN/m2
Beban terfaktor
qu = 1.2D + 1.6L = 1.2 (3.33) + 1.6 (4) = 10.40 kN/m2
Perhitungan momen
Tebal pelat = 120
mm Selimut beton= 20 mm
Ø tulangan = 10 mm
dx = h – selimut beton - Ø tulangan/2 = 120 – 20 – 10/2 = 95 mm
dy = h – sel. beton - Ø tulangan - Ø tulangan/2 = 120 – 20 – 10/2 = 95 mm
β = 1.33, sehingga diperoleh nilai sebagai berikut:
Mlx = 0.001 qu Lx2 x = 3.84 kNm
2
Mly = 0.001 qu Ly x = 1.87 kNm
2
Mtx = - 0.001 qu Lx x = -6.83 kNm
Mty = - 0.001 qu Ly2 x = -5.15 kNm
Batas rasio tulangan
β1 = 0.85
ρ minimum untuk pelat = 0.0018
0.85 f 'c 1 600
bal
fy 600 fy
ρ balance = 0.0271
ρ maksimum = 0.75 ρ balance = 0.0203
Penulangan pelat
Tulangan tumpuan, Mtx = 6.83 kNm
Mntx = Mtx/$ = Mtx/0.8 = 8.54 kNm
As perlu = Mntx/(fy 0.8 dx) = 280.85 mm2
As min = ρ min b dx = 171 mm2
As max = ρ max b dx = 1930.43 mm2
Ø10 mm, As = 78.53 mm2
S = 1000/(280.85/78.53) = 279.62 mm
Gunakan Ø10-150 mm
3 PENULANGAN STRUKTUR
Model struktur
Struktur dimodelkan seperti pada gambar berikut:
Beban rencana
Beban
mati Beban
trapesium:
Berat sendiri pelat tebal 12 cm = 0.12 m x 2400 kg/m3 = 288 kg/m2
Langit-langit dan penggantung = 17 kg/m2
Adukan dari semen tebal 2 cm = 0.02 m x 2100 kg/m3 = 42 kg/m2
Penutup lantai dari keramik = 24 kg/m2
Partisi = 100 kg/m2+
Jumlah = 471 kg/m2
Beban merata (lebar 3,725 m) = 1754.48 kg/m
Berat sendiri balok = 0.25 m x 0.23 m x 2400 kg/m3 = 138 kg/m
Beban hidup
Lanti tipikal 2 s/d 4 = 400 kg/m2
Beban merata (lebar 3,725 m) = 1490 kg/m
Kombinasi beban
1.2 D + 1.6L = 1.2 (1892.48) + 1.6 (1490) = 4654.98 kg/m
Analisis struktur
Gambar 14 Gambar diagram momen dan geser balok anak (AS 2-3)
Penulangan lentur
Perencanaan tulangan tumpuan balok anak B4-250 x 350 mm
Jarak dari beton tertekan ke tulangan tarik (d) = 310 mm
Momen rencana balok(Mu) = 82.33 kNm
Faktor reduksi momen ( ) = 0,80
As As '. fs '/ fy) fy
Mn ( As As '. fs '/ fy) fy d 1, 7 f '
c.b As ' fs '(d d ')
Tulangan tarik, As = 4 D 16, AS = 804.25 mm2
Tulangan tekan, As’ = 2 D 16, AS = 402.12 mm2
84.61 kNm > 82.33 kNm
$Mn > Mu €OK
Tulangan minimum :
0,85 f '
600
As max 0, 75 600 f
bwd
c
1 y
fy
0,85 25 600
A 0, 75
250 310 = 1574.83 mm2
600 400
s max 1
400
'
V c fbd 25 = 64.58 kN
c
6 6 250 310
Kuat geser yang disumbangkan oleh tulangan geser
Av 2 1
4 102 = 157.08 mm2
dipakai jarak 100
Av f ysd 157.08 400 310
V
= 194.77 kN
s
s 100
75 f 'bs 75 25 250 100
Av min c = 19.53 mm2
1200
1200 f y
400
Av min< Av €
OK
Vc Vs = 194.51 Kg
Vc Vs € OK
Vu
Perencanaan Portal
Rencana portal
Beban rencana
Beban mati
Berat sendiri pelat tebal 12 cm = 0.12 m x 2400 kg/m 3 = 288 kg/m2
Langit-langit dan penggantung = 17 kg/m2
Adukan dari semen tebal 2 cm = 0.02 m x 2100 kg/m3 = 42 kg/m2
Penutup lantai dari keramik = 24 kg/m2
Partisi = 100 kg/m2
Dinding setengah bata = 250 kg/m2
Beban Hidup (Lantai) = 400 kg/m2
=
4400
Hasil analisis struktur
Dari output program SAP 2000 didapat gaya rencana untuk masing-masing
tipe balok dari kombinasi beban yang menentukan dalam perencanaan:
Perhitungan balok
0.85 25 600
b = 0.85
400 600 400
b = 0.0271
0.75 b = 0.02030
' = 0.00430
Amin = f'
c
bd
4fy
Amin = 25 300589
= 552,19 mm2 < As rencana OK
4 400
3. Tulangan geser
Kuat geser rencana berdasarkan kapasitas
Dipakai kuat geser rencana berdasarkan gaya geser rencana dua kali beban gempa
karena lebih besar dari gaya geser berdasarkan kapasitas.
Digunakan Tulangan geser dia 10 dengan 2 kaki, Av = 157.08 mm2
Jarak maksimum tulangan geser d/4, smaks = 147.25 mm2
Dipakai jarak, S = 50 mm
Vc = f'
c
bd
6
25
= 300 589
6
= 147,25 kN
b. Kuat geser yang disumbangkan oleh tulangan geser
Av fysd
Vs =
s
157,08400589
=
50
= 740.16 kN
c. Kuat geser rencana balok
Vn = 0.75 (147,25+ 740.16)
Kelangsingan kolom
Gambar 32 Kondisi pengekangan kolom (a) arah sumbu x; (b) arah sumbu y
1. Arah sumbu x
∑ EI c
lc 1276552 2
A ∑ EI 858203,1 2 1.49
b
lb
∑ EI c
lc 1276552 3472222
B 2.77
∑ EI b 858203,1 2
lb
2. Arah sumbu y
A
∑ EI c
lc 1276552 2
2, 45
∑ EI b 520833,33x2
lb
1276552 3472222
B 520833,33x2
1.56
∑ EI c
lc
∑ EI b
lb
Gambar 34 Nomogram kolom untuk arah y
k = 0.84
klu/r = 0.84 (4080-650) / (0.3*500) = 19,21 < 40 Kolom pendek
2. Penampang
Lebar kolom, B = 500 mm
Tinggi kolom, H = 500 mm
Selimut beton = 40 mm
Diameter tulangan sengkang = 10 mm
Jarak tepi tertekan ke tulangan tarik (dx) = 439 mm
Jarak tepi tertekan ke tulangan tarik (dy) = 439 mm
Jari tepi tertekan ke tulangan tekan (d’) = 62 mm
Gambar 35 Rencana penampang kolom
1. Mencari nilai Pn0
Luas bruto penampang, Ag = b x h = 500 x 500 = 250,000.00 mm2
Dicoba tulangan 20 D 22, As = 7,602.65 mm2
Rasio tulangan terhadap penampang = (7,602.65/250,000.00) x 100% = 3 %
(sesuai dengan persyaratan yaitu 1% - 4%
Kuat aksial nominal penampang:
Pn0 fc ' Ag Ast( fy fc ')
Pn0 0.85 25 250, 000 7, 602.65(400 0.85 25) 8,192, 005.29 N
2. Mencari Pnb dan Mnb
600 600
Cb d 439 263.40mm
600 600
fy 400
ab 0.85Cb 0.85 263.40 223.89 mm
Tabel 19 Tabel analisis dalam keadaan berimbang
Diagram Interaksi
9,000.00
8,000.00
7,000.00
6,000.00
Pn (kN)
5,000.00
4,000.00
3,000.00
2,000.00
0.00 100.00 200.00300.00 400.00 500.00 600.00
1,000.00 Mn (kNm)
0.00
Vc 182,64 kN
Pemodelan tangga
tangga Pelat 1 = p x 2 2 3
4,00 +2,04 ×2,00×0,15=1,3471m
lxt=
Pelat 2 & 3 = p x l x t = 2 4,00 +2,04 ×2,00×0,15=2,6941m
2 2 3
Pembebanan
o Beban mati
As
b 1032.94 8.30x103
d 1000125
max
0.85 fc ' 1 600
0.75
fy 600 fy
max
0.85250.75 600
0.75
400 600 400
karena memenuhi syarat daktilitas, ρmin < ρ < ρmax, maka As dapat
digunakan.
Banyak Tulangan:
As 1032.94
max 7.78 813(tul.tarik)
1 tulangan 2 1 2
4 4 10
As’ = As = 8Ø13 tulangan tekan
Maka digunakan jarak = lebar balok / jumlah tulangan
= 1000 / 8
= 125 mm
Tulangan tangga menggunakan Ø10-150 mm
Perhitungan Tulangan Geser
Vu = 34.94 KN
Data perencanaan
Kuat tekan beton (f’c) = 25 mPa
Kuat tarik baja tulangan (fy) = 400 mPa
Daya dukung tanah (σ) = 60 kN/m2
Berat jenis tanah(γ) = 18 kN/m2
Dimensi pondasi
Pondasi yang digunakan adalah pondasi rakit (mat foundation).
Kedalaman pondasi (z) = 1,50
m
Tegangan efektif tanah (σ’) = σ – z γ = 40,20 kN/m2
Σ 685,867.08 321,371.76
h ln 7500 250mm
30 30
Tebal minimum pondasi telapak adalah 300 mm, oelh karena itu, coba h = 400
mm Selimut beton = 75 mm
d =400 – 75 = 325 mm
Qu maks = 37,44 kN/m2
Kekuatan geser penampang pondasi
Gambar 40 Area geser pada pelat pondasi
- Cek geser satu arah (one way shear)
Vu = 37,44 x (8/2 - c1/2 - d) x 6 = 37,44 x (4 - 0,5/2 - 0,325) x 6 = 769,40 kN
2 f ' b0 d
Vc1 1 c
6
c
= 2681,25 kN
2 25 3300 325
V 6
f'bd
d
s
V c0
c2 b 2 12
0
40 325 25 3300 325
V = 2654,17 kN
2
c2 3300 12
V 1 / 3 f ' cb d
c3 0
V 1 / 3 25 3300
325 = 1787,50 kN
c3
dipakai Vc min = 1787,50 kN
End span ;
Eksterior negatif 0.26 54.76 0.26 54.76 0.00 0.00
Eksterior positif 0.52 109.51 0.31 65.29 0.21 44.23
Interior negatif 0.70 147.42 0.53 111.62 0.17 35.80
Interior span ;
Positif 0.35 73.71 0.21 44.23 0.14 29.48
Negatif 0.65 136.89 0.49 103.19 0.16 33.70
0.85 25 600
b = 0.85
400 600 400
b = 0.02710
0.75 b = 0.02030
' = 0.00430
Mn As. f As. fy
y.d
1 1,
7bdfc '
As.400
(128.98x106 ) As.400.325 1
1,7x1000x325x25
(128.98x106) 130,000As 3.7647As2
Sehingga diperoleh As = 1022.43 mm2
Gunakan tulangan Ø13 mm, As = 132.73 mm2
132.73x1000
S 129,81125mm
1022, 43
Ø13 – 125 mm
End span ;
Eksterior negatif Ø13-200 mm -
Eksterior positif Ø13-200 mm Ø13-200 mm
Interior negatif Ø13-100 mm Ø13-200 mm
Interior span ;
Positif Ø13-200 mm Ø13-200 mm
Negatif Ø13-125 mm Ø13-200 mm
Tentang Penulis
www.LaporanTeknikSipil.wordpress.com
Kiranya buku ini masih jauh dari kesempurnaan, oleh karena itu, saran dan
kritik yang membangun sangat kami harapkan.