625
BASU BEY
-0,30
-0,25
-0,30
-0,25
-0,30
-0,25
132,8 20
PEMERINTAH PROVINSI JAWA TIMUR
10 80 10 Lantai kerja t.5cm 10 120 10 10 63,5 10 Lantai kerja t.5cm
20
20
Lantai kerja t.5cm 1.06
70 70
20
D13-150 Ø10-150 Ø10-150 NAMA PEKERJAAN
90
1.04 15
BELANJA MODAL GEDUNG DAN BANGUNAN
113
TUTUP PLAT
POTONGAN-A POTONGAN-B POTONGAN-C
150
PONDASI (P2) BETON BERTULANG STAINLESS STEEL PERENCANAAN ARSITEK DAN MEP ALIH FUNGSI
SKALA 1 : 25 SKALA 1 : 25 SKALA 1 : 25 DENGAN TEBAL COR BETON 25cm GEDUNG TERINTEGRASI
83
20
321
1.01 UNTUK BEBAN ±600kg 30 RUMAH SAKIT JIWA MENUR
PROVINSI JAWA TIMUR
25
220 46
77,2 120 30 15
70 80 70 LOKASI KEGIATAN
81
81
PONDASI (P3)
B C RUMAH SAKIT JIWA MENUR
1.05 UNTUK BEBAN ±350kg
600
600
15 JL. RAYA MENUR NO.120 SURABAYA
DINDING LAPIS PB 1.02
+FINISH PARTISI GYPSUMBOARD,t=12mm, 63,5
95
BERITA ACARA
81,3
100
rangka hollow galvalume.uk 40x40x0.4 CEILING X-RAY
83
TANGGAL/PARAF
SETINGGI PLAFOND CEILING X-RAY REVISI GAMBAR
334
120 63,5
225
179
A LAPISAN PB
DETAIL PONDASI (P2) MESIN CEILING X-RAY DETAIL PONDASI (P3) MESIN CEILING X-RAY SETINGGI PLAFOND
SKALA 1 : 25 SKALA 1 : 25
MENGETAHUI/MENYETUJUI
15
PONDASI (P2) BETON BERTULANG PONDASI (P3) BETON BERTULANG 1.03 294 15 PENGGUNA ANGGARAN
DENGAN TEBAL COR BETON 25cm DENGAN TEBAL COR BETON 25cm
UNTUK BEBAN ±600kg UNTUK BEBAN ±350kg
80
drg. VITRIA DEWI, M.Si.
R. OPERATOR
350
350
R. OPERATOR
DETAIL PONDASI (P1) MESIN CT SCAN -0.20 Selasar -0.20
Naik Ramp
Bordes
Pembina Tingkat I
NIP. 19670525 199203 2 007
±0.00 FFL +3.00
SKALA 1 : 25
R. GAS MEDIS
±0.00
-0.60
260 45
MUSHOLLAH EXIT -0.20
N
+0.15 ±0.00 Selasar MENUJU
EXIT
±0.00 IGD JIWA
LOBBY DOT -1.00
PONDASI (P1) BETON BERTULANG DENGAN TEBAL COR BETON 25cm SHAFT AIR PRESURE
(30X60)
EXIT
R.PANEL
POLI R.
R. NAKES
JN
+0.05
PASSENGER
1.09
SERVICE
LIFT
R.SERVICE BED LIFT DAPUR
KANTIN
15
RESUITASI ANTE ROOM
HYDRANT BOX POLI PARU POLI JANTUNG & BEDAH LOBBY LIFT
N R. USG
R. DOKTER JAGA
PANTRY
±0.00 GUDANG
BED LANTAI
LANTAI
GRANIT TILE
NURSE STATION BED LIFT
GUDANG
GRANIT TILE 60X60
LIFT 60X60
KM/WC
20
RODA
12,5
-0.05
R. POLI
SYARAF
EEC
MENUJU
IGD
RADIOLOGI
T. BRANKART
GRANIT TILE
40
LANTAI
60X60
R. PERIKSA
KM/WC
♀
♂
R. PONEK TRIASE MEDIS R.
TUNGGU
R. PERSIAPAN
+FINISH PARTISI GYPSUMBOARD,t=12mm,
POLI JANTUNG R.
SHAFT
DEPO FARMASI
PENDAFTARAN
R. OPERATOR
rangka hollow galvalume.uk 40x40x0.4 PEJABAT PEMBUAT KOMITMEN
MAIN HALL
±0.00
R.
PENDAFTARAN ♀
R. ADM R. UPS
CT SCAN
SETINGGI PLAFOND 1.10
R.TUNGGU R. PETUGAS
+ PALFOND LAPIS PB
POLI & MBCU R. GANTI
♂ APD
CT-SCAN
R. TUNGGU IGD
SHOWER
CT SCAN
-0.02
R. BACA
BASUNI,S.Kep.Ns,.MH.
CT SCAN
450
DROP OFF DROP OFF
Penata Tingkat I
KEYPLAN R. CEILLING X-RAY & CT-SCAN - LT.1
490
NIP. 19710516 199603 1 004
NS KONSULTAN PERENCANA
600
400 400 1.08 PT. TISAGA KONSULTAN
(1)
KANTOR : Jl. Kutisari Utara III, Kutisari Residence Kav. 39 - 40, Surabaya
Tlp. 0311-8421414 ; Fax. 031-8493488
E-mail : trngn@indo.net .id
,2
84
KOLOM WF 200 rangka hollow galvalume.uk 40x40x0.4 62,8 MENGETAHUI/MENYETUJUI
40
150
LEPAS APD LEPAS APD
321
321
100
SETINGGI PLAFOND
100
+ PALFOND LAPIS PB
30
600
600
100
60
179
179
95
- 1.04 : POLYDOROS - 1.10 : CONTROL SYSTEM - DENAH R. CEILLING X-RAY & R. CT-SCAN 1 : 50
35
- 1.05 : BUCKY WALL STAND - 1.11 : ELECTRICITY PANEL - DENAH PONDASI & JALUR KABEL 1 : 50
- 1.06 : ELECTRICITY PANEL - DETAIL 1 1 : 10
225
- DETAIL PONDASI 1 : 25
130
- POWER CONSUMPTION : 94 KVA ; 3ph - POWER CONNECTION : 72 kVA ; 3 phase
- TEMPERATURE : 20°C - 22°C - TEMPERATURE : 20°C - 22°C
- HUMIDITY : 55% - 60% - HUMIDITY : 55% - 60%
70 80 70 - GROUNDING : 0.2Ω -GROUNDING : 0.2Ω
220
DENAH BAJA PENGGANTUNG R. CEILING X-RAY DENAH TRAY KABEL ATAS PLAFOND R. CEILING X-RAY NOTE :
SKALA 1 : 50 SKALA 1 : 50 DETAIL 1 BERAT GANTRY 1350 KG KODE GAMBAR NOMOR LEMBAR JUMLAH LEMBAR