15%
Februari Maret
HARGA Bobot %
1 2 3 4 1 2 3
Rp49,492,400.00 11.42 5.7103
Rp105,902,700.00 24.44 8.15 8.15 8.15
Rp14,767,901.52 3.41 3.41
Rp13,023,337.66 3.01 3.01
Rp8,358,517.32 1.93 1.93
Rp9,611,956.67 2.22 2.22
Rp6,463,298.67 1.49
Rp7,710,984.67 1.78
Rp4,000,000.00 0.92 0.92
Rp7,934,636.11 1.83 1.83
Rp938,430.56 0.22
Rp374,500.00 0.09
Rp3,398,395.03 0.78 0.78
Rp69,723,333.33 16.09 16.09
Rp4,692,555.56 1.08 1.08
Rp15,942,770.54 3.68 3.68
Rp17,154,000.00 3.96 3.96
Rp9,356,195.00 2.16 2.16
Rp26,000,000.00 6.00
Rp25,000,000.00 5.77 1.92
Rp20,323,520.00 4.69 4.69
Rp3,612,806.10 0.83 0.83
Rp2,764,000.00 0.64 0.64
Rp4,098,240.00 0.95 0.95
Rp2,716,300.00 0.63
13.86 8.15 8.15 6.35 23.41 6.83 13.50
Rp433,360,778.72 100.00 13.86 22.00 30.15 36.50 59.91 66.74 80.24
Rp65,004,116.81
Rp498,364,895.53
Maret April
4 1 2 3 4
5.71029987367 100.00
90.00
80.00
1.49
1.78 70.00
60.00
0.22
0.09
50.00
40.00
30.00
3.00 3.00
1.92 1.92
20.00
10.00
0.31 0.31
0.00
8.81 5.24 5.71
89.05 94.29 100.00
KETERANGAN
Rp6.500,-/kg
RP165.000,-/m2
RP165.000,-/m2
RP165.000,-/m2
RP165.000,-/m2
RP165.000,-/m2
RP165.000,-/m2
RP15.000,-/m2
RP25.000,-/m2
RP25.000,-/m2
Rp75.000,-/m2
RP50.000,-/m2
Rp350.000,-/m2
RP165.000,-/m2
RP250.000,-/m2
Rp100.000,-/m2
Rp50.000,-/m2
n/y
n/y
Aplikator
-
HARGA SATUAN PEKERJAAN PEMASANGAN 1 KG BESI PROFIL WF 250 / 200 / 150
Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Baja WF
Pekerja L.01 kg 6,500.00 6,500.00 2 Plat Besi
JUMLAH TENAGA KERJA 6,500.00 3 Baja WF
B BAHAN 4 Plat Besi
5 Baja WF
JUMLAH HARGA BAHAN 6 Plat Besi
C PERALATAN
Alat Bantu Lainnya Kg 2,000.00 2,000.00 JUMLAH HARG
JUMLAH HARGA P
JUMLAH HARGA ALAT 2,000.00
D Jumlah (A+B+C) 8,500.00 Juml
E Overhead & Profit 15%xD 1,275.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 9,775.00 Harga Keseluruhan Pekerjaan
HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW 40 x 80 x 12 /TEMP. GLASS ( KANOPI ) Lt.1
Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Besi Hollow
Pekerja L.01 m2 165,000.00 165,000.00
JUMLAH TENAGA KERJA 165,000.00 2 Temp. Glass
B BAHAN
-
HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW 40 x 80 x 14 / TEMP. GLASS ( KANOPI ) Lt.Ro
Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Besi Hollow
Pekerja L.01 m2 165,000.00 165,000.00
JUMLAH TENAGA KERJA 165,000.00 2 Temp. Glass
B BAHAN
-
HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW 40 x 80 x 12 / TEMP. GLASS ( KANOPI ) Lt.2
Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Besi Hollow
Pekerja L.01 m2 165,000.00 165,000.00
JUMLAH TENAGA KERJA 165,000.00 2 Temp. Glass
B BAHAN
-
HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW GALVANUM 40 X 40 X 0,3 & GYPSUM ( DINDIN
Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Besi Hollo Gal
Pekerja L.01 m2 25,000.00 25,000.00
JUMLAH TENAGA KERJA 25,000.00 2 Gypsum
B BAHAN
- 3 Compound
HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW GALVANUM 40 X 40 X 0,3 & GYPSUM ( PLAFO
Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Besi Hollo Gal
Pekerja L.01 m2 25,000.00 25,000.00
JUMLAH TENAGA KERJA 25,000.00 2 Gypsum
B BAHAN
-
HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW GALVANUM 40 X 40 X 0,3 & GYPSUM ( PLAFO
Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Besi Hollo Gal
Pekerja L.01 m2 50,000.00 50,000.00
JUMLAH TENAGA KERJA 50,000.00 2 Gypsum
B BAHAN
-
HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW 40 X 40 X 0,9 & ACP PVDF ( DINDING LUAR )
Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Besi Hollow
Pekerja L.01 m2 350,000.00 350,000.00
JUMLAH TENAGA KERJA 350,000.00 2 ACP PVDF
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
Alat Bantu Lainnya Kg - JUMLAH HARG
JUMLAH HARGA P
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 350,000.00 Juml
E Overhead & Profit 15%xD 52,500.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 402,500.00 Harga Keseluruhan Pekerjaan
HARGA PEKERJAAN PEMASANGAN BESI HOLLOW 40 X 20 X 0,7 For CONWOOD ( DINDING LUAR )
Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Besi Hollow
Pekerja L.01 m2 100,000.00 100,000.00
JUMLAH TENAGA KERJA 100,000.00 2 Conwood BG
B BAHAN
-
Juml
Overhead & Profit
Harga Keseluruhan Pekerjaan
EK / VINYL ( LANTAI 1 )
n di Jumlah Harga Upah
Jumlah Harga
Dimensi Volume Satuan Harga Satuan Detail Satuan
Rupiah
40 x 80 x 14 93 m 49,666.67 4,619,000.00 6 m
EK / VINYL ( LANTAI 2 )
n di Jumlah Harga Upah
Jumlah Harga
Dimensi Volume Satuan Harga Satuan Detail Satuan
Rupiah
40 x 80 x 14 77 m 49,666.67 3,824,333.33 6 m
1200 x 2400 x 15 18.4 m2 300,000.00 1,916,666.67 2.88 m2
6.3888889
172 x 1210 x 4 18.4 m2 46,363.64 4,062,337.66 0.21 m2
87.619048
EK / VINYL ( LANTAI 3 )
n di Jumlah Harga Upah
Jumlah Harga
Dimensi Volume Satuan Harga Satuan Detail Satuan
Rupiah
40 x 80 x 14 27 m 49,666.67 1,318,848.67 6 m
10 4.700 m2 / m2
1.700 m2
total 6.400 m2 600,000.00 3,840,000.00
DF ( DINDING LUAR )
n di Jumlah Harga Upah
Jumlah Harga
Dimensi Volume Satuan Harga Satuan Detail Satuan
Rupiah
10 m2 300,000.00 3,000,000.00
10 m2 157,000.00 1,570,000.00
5 pcs 12,000.00 60,000.00
2 pcs 60,000.00 120,000.00
1 pcs 20,000.00 20,000.00
3 pcs 75,000.00 225,000.00
Bosch 1 pcs 375,000.00 375,000.00
4 pcs 10,600.00 42,400.00
50 m 5,000.00 250,000.00
2 kg 15,000.00 30,000.00
60 hr
JUMLAH HARGA MATERIAL 5,692,400.00
JUMLAH HARGA HARIAN 43,800,000.00
INDING LUAR )
n di Jumlah Harga Upah
Jumlah Harga
Dimensi Volume Satuan Harga Satuan Detail Satuan
Rupiah
LANG )
n di Jumlah Harga Upah
Jumlah Harga
Dimensi Volume Satuan Harga Satuan Detail Satuan
Rupiah
Price (Rp)
298,000.00
300,000.00
Price (Rp)
298,000.00
300,000.00
Price (Rp)
298,000.00
300,000.00
Price (Rp)
238,000.00
600,000.00
Price (Rp)
298,000.00
600,000.00
Price (Rp)
238,000.00
600,000.00
Price (Rp)
600,000.00
Price (Rp)
23,000.00
68,000.00
55,000.00
Price (Rp)
23,000.00
68,000.00
Price (Rp)
23,000.00
68,000.00
Price (Rp)
102,500.00
750,000.00
Price (Rp)
22,000.00
Price (Rp)
Price (Rp)
187,000.00
95,700.00
Price (Rp)
98,000.00
Price (Rp)
Price (Rp)
Price (Rp)
15,000.00
398,000.00
1 sak = 50 kg = 0.024
Price (Rp)
236,800.00
392,300.00
38,400.00
28,300.00
Price (Rp)
218,000.00 7.38 10
125,100.00 4.787 10
353,700.00 24.24 10
Price (Rp)
800,000.00
800,000.00
102,500.00
m3 0.00048 kg/m3
No BAHAN KETERANGAN HARGA
1 Tukang Rp 200,000
2 Laden Rp 180,000
3 Perancah Kayu
4 Perancah Bambu
5 Paku Rp 15,000
6 Ikat Ijuk Rp 5,000
7 Kuas Rp 12,000
8 Palu Beton Rp 60,000
9 Pahat Beton Rp 20,000
10 Multiplek Bekas Rp 75,000
11 Gerinda Bosch Rp 375,000
12 Mata Gerinda Rp 10,600
13 Baja WF 250 x 125 x 6 x 9 Rp 16,500
14 Baja WF 200 x 100 x 5,5 x 8 Rp 16,500
15 Baja WF 150 x 75 x 5 x 7 Rp 16,500
16 Plat Besi (Base Plate Kolom) 12 Rp 16,500
17 Plat Besi (Plate Body) 10 Rp 16,500
18 Plat Besi (Stifner) 6 Rp 16,500
19 Besi Hollow Galvanis 40 x 80 x 14 Rp 298,000
20 Besi Hollow Galvanis 40 x 80 x 12 Rp 238,000
21 Besi Hollow Galvanis 40 x 40 x 0,9 Rp 102,500
22 Besi Hollow Galvanis 40 x 40 x 0,75
23 Besi Hollow Galvanum 40 x 40 x 0,3 Rp 23,000
24 Besi CNP 150 x 50 x 2,3 Rp 240,000
25 Besi CNP 100 x 50 x 2,3 Rp 189,000
26 Multiplek 1200 x 2400 x 15 Rp 300,000
27 Gypsum 1200 x 2400 x 9 Rp 68,000
28 Alumunium Composit Panel (APC) PVFD 1200 x 2400 x 0,5 Rp 705,000
29 Alumunium Composit Panel (APC) Cutting Laser 1200 x 2400 x 0,5 Rp 800,000
30 Conwood Panel EPC 600 x 1200 x 11 Rp 187,000
31 Conwood Slide BG 150 x 3050 x 11 Rp 95,700
32 Vinyl Taco 172 x 1210 x 4 Rp 510,000
33 Temp. Glass 10 Rp 600,000
34 Plafon PVC 4000 x 200 Rp 22,000
35 List Plank GRC 200 x 2440 x 8 Rp 52,000
36 Spandek Pasir 1000 x 3000 x 0,45 Rp 64,000
37 Talang Air PVC Rp 24,500
38 Skop Kontak Broco Rp 30,000
39 Saklar Tunggal Broco Rp 13,162
40 Saklar Double Broco Rp 16,973
41 Pipa PVC Conduit Broco Rp 15,000
42 Acc. Stop Kontak Broco Rp 12,250
43 Acc. Stop Saklar Broco Rp 12,418
44 Fiting Lampu Broco Rp 10,000
45 Lampu Down Light Philips Rp 151,000
46 Lampu LED 15 Watt Philips Rp 33,900
47 Lampu LED Strip Philips Rp 398,000
48 Lampu Dinding Informa Rp 300,000
49 Lampu Gantung Informa Rp 150,000
50 Lampu Spot Light Informa Rp 30,000
51 Semen Rp 1,160
52 Pasir Beton Rp 300,000
53 Bondek Rp 136,000
54 Wiremesh Rp 329,000
55 Keramik 40x40 Rp 75,000
56 Floor Drain Toto Rp 326,200
57 Closet Duduk Toto Rp 850,000
58 Wastafel Toto Rp 538,000
59 Kran Shower Toto Rp 1,183,000
60 Pipa PVC 3" Rucika Rp 236,800
61 Pipa PVC 4" Rucika Rp 392,300
62 Pipa PVC 3/4" Rucika Rp 38,400
63 Pipa PVC 1/2" Rucika Rp 28,300
64 Jotun Majestic Perfect Beauty & Care Rp 218,000
65 Jotun Jotaplast Rp 125,100
66 Jotun Gardex Premium Gloss Rp 353,700
67 Sofa Puff Informa Rp 4,500,000
68 Bar Stool Informa Rp 875,000
Volume Satuan Shop
1 Hari
Hari
1 kg
1 m
1 pcs
1 pcs
1 pcs
1 pcs
1 pcs
1 pcs
1 kg Jl.Bojong-Koneng
1 kg Jl.Bojong-Koneng
1 kg Jl.Bojong-Koneng
1 kg Jl.Bojong-Koneng
1 kg Jl.Bojong-Koneng
1 kg Jl.Bojong-Koneng
6 m Sultan-Marga-Baja Jl.Raya-Bojong-Soang 0822-1000-0200
6 m Sultan-Marga-Baja Jl.Raya-Bojong-Soang 0822-1000-0200
6 m Sultan-Marga-Baja Jl.Raya-Bojong-Soang 0822-1000-0200
TAHAP 1
Pekerjaan Persiapan
Pekerjaan Pembongkarann
TAHAP 2
Struktur Lantai 1
Struktur Lantai 2
Struktur Lantai 3
Pekerjaan Rangka Atap & Penutup Atap
Pekerjaan Talang Air, List Plank & Plafon
TAHAP 3
Pekerjaan Lantai 1
Pekerjaan Lantai 2 + Lantai Kamar Mandi
Pekerjaan Lantai 3
Pekerjaan Sanitasi
TAHAP 4
Pekerjaan Rangka Dinding Luar
Pekerjaan Penutup Dinding Luar (ACP)
Pekerjaan Rangka Dinding Decorative
Pekerjaan Penutup Dinding Decorative (Conwood)
Pekerjaan Elektrikal
Pekerjaan Rangka Dinding Dalam & Plafon
Pekerjaan Penutup Dinding Dalam & Plafon
TAHAP 5
Pekerjaan Pintu, Jendela & Kaca
Pekerjaan Kanopi & ACP Cutting
Pekerjaan Tangga
Pekerjaan Furniture
TAHAP 6
Pekerjaan Finishing Lantai
Pekerjaan Finishing Tembok & Plafon
Pekerjaan Perapihan & Pembersihan
Harga Satuan Bobot Februari
(Rp) (%) 1 2 3 4
-
-
Maret April
1 2 3 4 1 2 3 4