PEKERJAAN

HARGA PEKERJAAN PENUNJANG ( PERSIAPAN / BONGKAR / PERANCAH / RAPIH )


HARGA PEKERJAAN PEMASANGAN 1 KG BESI PROFIL WF 250 / 200 / 150
HARGA PEKERJAAN PEMASANGAN 1 M2 BESI HOLLOW 40 x 80 x 14 / MULTIPLEK / VINYL ( LANTAI 1 )
HARGA PEKERJAAN PEMASANGAN 1 M2 BESI HOLLOW 40 x 80 x 14 / MULTIPLEK / VINYL ( LANTAI 2 )
HARGA PEKERJAAN PEMASANGAN 1 M2 BESI HOLLOW 40 x 80 x 14 / MULTIPLEK / VINYL ( LANTAI 3 )
HARGA PEKERJAAN PEMASANGAN BESI HOLLOW 40 x 80 x 12 /TEMP. GLASS ( KANOPI ) Lt.1
HARGA PEKERJAAN PEMASANGAN BESI HOLLOW 40 x 80 x 12 / TEMP. GLASS ( KANOPI ) Lt.Roof Top
HARGA PEKERJAAN PEMASANGAN BESI HOLLOW 40 x 80 x 12 / TEMP. GLASS ( KANOPI ) Lt.2
HARGA PEKERJAAN PEMASANGAN TEMP. GLASS
HARGA PEKERJAAN PEMASANGAN BESI HOLLOW GALVANUM 40 X 40 X 0,3 & GYPSUM ( DINDING DALAM )
HARGA PEKERJAAN PEMASANGAN BESI HOLLOW GALVANUM 40 X 40 X 0,3 & GYPSUM ( PLAFON ) Lt.1
HARGA PEKERJAAN PEMASANGAN PVC ( PLAFON ) Lt.1
HARGA PEKERJAAN PEMASANGAN BESI HOLLOW GALVANUM 40 X 40 X 0,3 & GYPSUM ( PLAFON ) Lt.Atap
HARGA PEKERJAAN PEMASANGAN BESI HOLLOW 40 X 40 X 0,9 & ACP PVDF ( DINDING LUAR )
HARGA PEKERJAAN PEMASANGAN BESI HOLLOW & ACP LASER CUTTING ( DINDING LUAR )
HARGA PEKERJAAN PEMASANGAN CONWOOD ( DINDING LUAR )
HARGA PEKERJAAN PEMASANGAN BESI HOLLOW 40 X 40 X 0,7 For CONWOOD ( DINDING LUAR )
HARGA PEKERJAAN PEMASANGAN ATAP ( BESI CNP / SPANDEK / LISTPLANK / TALANG )
HARGA PEKERJAAN PEMASANGAN FURNITURE & MATRIAL
HARGA PEKERJAAN PEMASANGAN TANGGA, RAILING & MATRIAL
HARGA PEKERJAAN PEMASANGAN PINTU, JENDELA & MATRIAL
HARGA PEKERJAAN PEMASANGAN ELEKTRIKAL & LAMPU
HARGA PEKERJAAN PEMASANGAN LANTAI KAMAR MANDI
HARGA MATRIAL KAMAR MANDI
HARGA MATRIAL PENGECATAN

TOTAL HARGA SELURUHAN

15%

Total + Overhead &


Nama Pekerjaan :
Lokasi Pekerjaan :

Februari Maret
HARGA Bobot %
1 2 3 4 1 2 3
Rp49,492,400.00 11.42 5.7103
Rp105,902,700.00 24.44 8.15 8.15 8.15
Rp14,767,901.52 3.41 3.41
Rp13,023,337.66 3.01 3.01
Rp8,358,517.32 1.93 1.93
Rp9,611,956.67 2.22 2.22
Rp6,463,298.67 1.49
Rp7,710,984.67 1.78
Rp4,000,000.00 0.92 0.92
Rp7,934,636.11 1.83 1.83
Rp938,430.56 0.22
Rp374,500.00 0.09
Rp3,398,395.03 0.78 0.78
Rp69,723,333.33 16.09 16.09
Rp4,692,555.56 1.08 1.08
Rp15,942,770.54 3.68 3.68
Rp17,154,000.00 3.96 3.96
Rp9,356,195.00 2.16 2.16
Rp26,000,000.00 6.00
Rp25,000,000.00 5.77 1.92
Rp20,323,520.00 4.69 4.69
Rp3,612,806.10 0.83 0.83
Rp2,764,000.00 0.64 0.64
Rp4,098,240.00 0.95 0.95
Rp2,716,300.00 0.63
13.86 8.15 8.15 6.35 23.41 6.83 13.50
Rp433,360,778.72 100.00 13.86 22.00 30.15 36.50 59.91 66.74 80.24
Rp65,004,116.81

Rp498,364,895.53
Maret April
4 1 2 3 4
5.71029987367 100.00

90.00

80.00

1.49
1.78 70.00

60.00
0.22
0.09

50.00

40.00

30.00

3.00 3.00
1.92 1.92
20.00

10.00

0.31 0.31
0.00
8.81 5.24 5.71
89.05 94.29 100.00
KETERANGAN

Rp6.500,-/kg
RP165.000,-/m2
RP165.000,-/m2
RP165.000,-/m2
RP165.000,-/m2
RP165.000,-/m2
RP165.000,-/m2
RP15.000,-/m2
RP25.000,-/m2
RP25.000,-/m2
Rp75.000,-/m2
RP50.000,-/m2
Rp350.000,-/m2
RP165.000,-/m2
RP250.000,-/m2
Rp100.000,-/m2
Rp50.000,-/m2
n/y
n/y
Aplikator

Pak. Aceng 0812-1452-2002


Pak. Dani 0812-9628-9401
Pak. Dani 0812-9628-9401
Pak. Dani 0812-9628-9401
Pak. Dani 0812-9628-9401
Pak. Dani 0812-9628-9401
Pak. Dani 0812-9628-9401
Pak. Dani 0812-9628-9401
Pak. Agus
Pak. Agus
Pak. Agus
Pak. Aceng 0812-1452-2002
Pak. Ekiw 0813-8095-5230 / Tawakal-Workshop 0857-2221-5411
Pak. Dani 0812-9628-9401
Distributor 0818-0944-8400
Distributor 0818-0944-8400
Pak. Aceng 0812-1452-2002

Pak. Ekiw 0813-8095-5230

-
HARGA SATUAN PEKERJAAN PEMASANGAN 1 KG BESI PROFIL WF 250 / 200 / 150
Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Baja WF
Pekerja L.01 kg 6,500.00 6,500.00 2 Plat Besi
JUMLAH TENAGA KERJA 6,500.00 3 Baja WF
B BAHAN 4 Plat Besi
5 Baja WF
JUMLAH HARGA BAHAN 6 Plat Besi
C PERALATAN
Alat Bantu Lainnya Kg 2,000.00 2,000.00 JUMLAH HARG
JUMLAH HARGA P
JUMLAH HARGA ALAT 2,000.00
D Jumlah (A+B+C) 8,500.00 Juml
E Overhead & Profit 15%xD 1,275.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 9,775.00 Harga Keseluruhan Pekerjaan

HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW 40 x 80 x 14 / MULTIPLEK / VINYL ( LANTAI 1


Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Besi Hollow
Pekerja L.01 m2 165,000.00 165,000.00
JUMLAH TENAGA KERJA 165,000.00 2 Multiplek
B BAHAN
- 3 Vinyl Taco

JUMLAH HARGA BAHAN -


C PERALATAN
Alat Bantu Lainnya Kg 10,000.00 10,000.00 JUMLAH HARG
JUMLAH HARGA P
JUMLAH HARGA ALAT 10,000.00
D Jumlah (A+B+C) 175,000.00 Juml
E Overhead & Profit 15%xD 26,250.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 201,250.00 Harga Keseluruhan Pekerjaan

HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW 40 x 80 x 14 / MULTIPLEK / VINYL ( LANTAI 2


Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Besi Hollow
Pekerja L.01 m2 165,000.00 165,000.00
JUMLAH TENAGA KERJA 165,000.00 2 Multiplek
B BAHAN
- 3 Vinyl Taco

JUMLAH HARGA BAHAN -


C PERALATAN
Alat Bantu Lainnya Kg 10,000.00 10,000.00 JUMLAH HARG
JUMLAH HARGA P
JUMLAH HARGA ALAT 10,000.00
D Jumlah (A+B+C) 175,000.00 Juml
E Overhead & Profit 15%xD 26,250.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 201,250.00 Harga Keseluruhan Pekerjaan

HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW 40 x 80 x 14 / MULTIPLEK / VINYL ( LANTAI 3


Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Besi Hollow
Pekerja L.01 m2 165,000.00 165,000.00
JUMLAH TENAGA KERJA 165,000.00 2 Multiplek
B BAHAN
- 3 Vinyl Taco

JUMLAH HARGA BAHAN -


C PERALATAN
Alat Bantu Lainnya Kg 10,000.00 10,000.00 JUMLAH HARG
JUMLAH HARGA P
JUMLAH HARGA ALAT 10,000.00
D Jumlah (A+B+C) 175,000.00 Juml
E Overhead & Profit 15%xD 26,250.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 201,250.00 Harga Keseluruhan Pekerjaan

HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW 40 x 80 x 12 /TEMP. GLASS ( KANOPI ) Lt.1
Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Besi Hollow
Pekerja L.01 m2 165,000.00 165,000.00
JUMLAH TENAGA KERJA 165,000.00 2 Temp. Glass
B BAHAN
-

JUMLAH HARGA BAHAN -


C PERALATAN
Alat Bantu Lainnya Kg 10,000.00 10,000.00 JUMLAH HARG
JUMLAH HARGA P
JUMLAH HARGA ALAT 10,000.00
D Jumlah (A+B+C) 175,000.00 Juml
E Overhead & Profit 15%xD 26,250.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 201,250.00 Harga Keseluruhan Pekerjaan

HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW 40 x 80 x 14 / TEMP. GLASS ( KANOPI ) Lt.Ro
Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Besi Hollow
Pekerja L.01 m2 165,000.00 165,000.00
JUMLAH TENAGA KERJA 165,000.00 2 Temp. Glass
B BAHAN
-

JUMLAH HARGA BAHAN -


C PERALATAN
Alat Bantu Lainnya Kg 10,000.00 10,000.00 JUMLAH HARG
JUMLAH HARGA P
JUMLAH HARGA ALAT 10,000.00
D Jumlah (A+B+C) 175,000.00 Juml
E Overhead & Profit 15%xD 26,250.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 201,250.00 Harga Keseluruhan Pekerjaan

HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW 40 x 80 x 12 / TEMP. GLASS ( KANOPI ) Lt.2
Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Besi Hollow
Pekerja L.01 m2 165,000.00 165,000.00
JUMLAH TENAGA KERJA 165,000.00 2 Temp. Glass
B BAHAN
-

JUMLAH HARGA BAHAN -


C PERALATAN
Alat Bantu Lainnya Kg 10,000.00 10,000.00 JUMLAH HARG
JUMLAH HARGA P
JUMLAH HARGA ALAT 10,000.00
D Jumlah (A+B+C) 175,000.00 Juml
E Overhead & Profit 15%xD 26,250.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 201,250.00 Harga Keseluruhan Pekerjaan
HARGA SATUAN PEKERJAAN PEMASANGAN TEMP. GLASS
Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Temp. Glass
Pekerja L.01 m2 15,000.00 15,000.00
JUMLAH TENAGA KERJA 15,000.00
B BAHAN
-

JUMLAH HARGA BAHAN -


C PERALATAN
Alat Bantu Lainnya Kg 10,000.00 10,000.00 JUMLAH HARG
JUMLAH HARGA P
JUMLAH HARGA ALAT 10,000.00
D Jumlah (A+B+C) 25,000.00 Juml
E Overhead & Profit 15%xD 3,750.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 28,750.00 Harga Keseluruhan Pekerjaan

HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW GALVANUM 40 X 40 X 0,3 & GYPSUM ( DINDIN
Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Besi Hollo Gal
Pekerja L.01 m2 25,000.00 25,000.00
JUMLAH TENAGA KERJA 25,000.00 2 Gypsum
B BAHAN
- 3 Compound

JUMLAH HARGA BAHAN -


C PERALATAN
Alat Bantu Lainnya Kg 10,000.00 10,000.00 JUMLAH HARG
JUMLAH HARGA P
JUMLAH HARGA ALAT 10,000.00
D Jumlah (A+B+C) 35,000.00 Juml
E Overhead & Profit 15%xD 5,250.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 40,250.00 Harga Keseluruhan Pekerjaan

HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW GALVANUM 40 X 40 X 0,3 & GYPSUM ( PLAFO
Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Besi Hollo Gal
Pekerja L.01 m2 25,000.00 25,000.00
JUMLAH TENAGA KERJA 25,000.00 2 Gypsum
B BAHAN
-

JUMLAH HARGA BAHAN -


C PERALATAN
Alat Bantu Lainnya Kg 10,000.00 10,000.00 JUMLAH HARG
JUMLAH HARGA P
JUMLAH HARGA ALAT 10,000.00
D Jumlah (A+B+C) 35,000.00 Juml
E Overhead & Profit 15%xD 5,250.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 40,250.00 Harga Keseluruhan Pekerjaan

HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW GALVANUM 40 X 40 X 0,3 & GYPSUM ( PLAFO
Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Besi Hollo Gal
Pekerja L.01 m2 50,000.00 50,000.00
JUMLAH TENAGA KERJA 50,000.00 2 Gypsum
B BAHAN
-

JUMLAH HARGA BAHAN -


C PERALATAN
Alat Bantu Lainnya Kg 10,000.00 10,000.00 JUMLAH HARG
JUMLAH HARGA P
JUMLAH HARGA ALAT 10,000.00
D Jumlah (A+B+C) 60,000.00 Juml
E Overhead & Profit 15%xD 9,000.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 69,000.00 Harga Keseluruhan Pekerjaan

HARGA SATUAN PEKERJAAN PEMASANGAN BESI HOLLOW 40 X 40 X 0,9 & ACP PVDF ( DINDING LUAR )
Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Besi Hollow
Pekerja L.01 m2 350,000.00 350,000.00
JUMLAH TENAGA KERJA 350,000.00 2 ACP PVDF
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
Alat Bantu Lainnya Kg - JUMLAH HARG
JUMLAH HARGA P
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 350,000.00 Juml
E Overhead & Profit 15%xD 52,500.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 402,500.00 Harga Keseluruhan Pekerjaan

HARGA SATUAN PEKERJAAN PEMASANGAN PVC ( PLAFON ) Lt.1


Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Plafon PVC
Pekerja L.01 m2 75,000.00 75,000.00
JUMLAH TENAGA KERJA 75,000.00
B BAHAN
-

JUMLAH HARGA BAHAN -


C PERALATAN
Alat Bantu Lainnya Kg 10,000.00 10,000.00 JUMLAH HARG
JUMLAH HARGA P
JUMLAH HARGA ALAT 10,000.00
D Jumlah (A+B+C) 85,000.00 Juml
E Overhead & Profit 15%xD 12,750.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 97,750.00 Harga Keseluruhan Pekerjaan

HARGA HARIAN PEKERJAAN PENUNJANG ( BONGKAR / RAPIH / PERANCAH )


Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Koef Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Perancah Kayu
Pengawas i OH 200,000.00 200,000.00 2 Perancah Bambu
Pengawas II OH 200,000.00 200,000.00 3 Kuas
Pekerja OH 165,000.00 165,000.00 4 Palu Beton
Tukang OH 165,000.00 165,000.00 5 Pahat Beton
7 Multiplek Bekas
JUMLAH TENAGA KERJA 730,000.00 8 Gerinda
B BAHAN 9 Mata Gerinda
- 10 Ikat Ijuk
11 Paku
JUMLAH HARGA BAHAN -
C PERALATAN
Alat Bantu Lainnya Kg - JUMLAH HARG
JUMLAH HAR
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 730,000.00 Juml
E Overhead & Profit 15%xD 109,500.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 839,500.00 Harga Keseluruhan Pekerjaan

HARGA PEKERJAAN PEMASANGAN CONWOOD ( DINDING LUAR )


Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Conwood EPC
Pekerja L.01 m2 250,000.00 250,000.00
JUMLAH TENAGA KERJA 250,000.00 2 Conwood BG
B BAHAN
-

JUMLAH HARGA BAHAN -


C PERALATAN
Alat Bantu Lainnya Kg 10,000.00 10,000.00 JUMLAH HARG
JUMLAH HARGA P
JUMLAH HARGA ALAT 10,000.00
D Jumlah (A+B+C) 260,000.00 Juml
E Overhead & Profit 15%xD 39,000.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 299,000.00 Harga Keseluruhan Pekerjaan

HARGA PEKERJAAN PEMASANGAN BESI HOLLOW 40 X 20 X 0,7 For CONWOOD ( DINDING LUAR )
Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Besi Hollow
Pekerja L.01 m2 100,000.00 100,000.00
JUMLAH TENAGA KERJA 100,000.00 2 Conwood BG
B BAHAN
-

JUMLAH HARGA BAHAN -


C PERALATAN
Alat Bantu Lainnya Kg 10,000.00 10,000.00 JUMLAH HARG
JUMLAH HARGA P
JUMLAH HARGA ALAT 10,000.00
D Jumlah (A+B+C) 110,000.00 Juml
E Overhead & Profit 15%xD 16,500.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 126,500.00 Harga Keseluruhan Pekerjaan

HARGA PEKERJAAN PEMASANGAN ATAP ( BESI CNP / SPANDEK / LISTPLANK / TALANG )


Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Besi CNP
Pekerja L.01 m2 50,000.00 50,000.00 2 Besi CNP
JUMLAH TENAGA KERJA 50,000.00 3 Spandek Pasir
B BAHAN 4 List Plank GRC
- 5 Talang Air PVC

JUMLAH HARGA BAHAN -


C PERALATAN
Alat Bantu Lainnya Kg 10,000.00 10,000.00 JUMLAH HARG
JUMLAH HARGA P
JUMLAH HARGA ALAT 10,000.00
D Jumlah (A+B+C) 60,000.00 Juml
E Overhead & Profit 15%xD 9,000.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 69,000.00 Harga Keseluruhan Pekerjaan

HARGA PEKERJAAN PEMASANGAN PINTU, JENDELA & MATRIAL


Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Kusen
Pekerja L.01 m2 - 2 Pintu
JUMLAH TENAGA KERJA - 3 Jendela
B BAHAN 4 Kaca
- 5 Jalusi
6 List
JUMLAH HARGA BAHAN - 7 Lem
C PERALATAN
Alat Bantu Lainnya Kg 10,000.00 10,000.00 JUMLAH HARG
JUMLAH HARGA P
JUMLAH HARGA ALAT 10,000.00
D Jumlah (A+B+C) 10,000.00 Juml
E Overhead & Profit 15%xD 1,500.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 11,500.00 Harga Keseluruhan Pekerjaan

HARGA PEKERJAAN PEMASANGAN ELEKTRIKAL & LAMPU


Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Skop Kontak
Pekerja L.01 m2 25,000.00 25,000.00 2 Saklar Tunggal
JUMLAH TENAGA KERJA 25,000.00 3 Saklar Double
B BAHAN 4 Pipa PVC Conduit
- 5 Acc. Stop Kontak
6 Acc. Stop Saklar
JUMLAH HARGA BAHAN - 7 Fiting Lampu
C PERALATAN 8 Lampu Down Light
9 Lampu LED 15 Watt
Alat Bantu Lainnya Kg 10,000.00 10,000.00 10 Lampu LED Strip
11 Lampu Dinding
JUMLAH HARGA ALAT 10,000.00 12 Lampu Gantung
D Jumlah (A+B+C) 35,000.00 13 Lampu Spot Light
E Overhead & Profit 15%xD 5,250.00 14 Instalasi Listrik
F Harga Satuan Pekerjaan (D+E) 40,250.00 JUMLAH HARG
JUMLAH HARGA P

Juml
Overhead & Profit
Harga Keseluruhan Pekerjaan

HARGA PEKERJAAN PEMASANGAN LANTAI KAMAR MANDI


Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Semen
Pekerja L.01 m2 250,000.00 250,000.00 2 Pasir Beton
JUMLAH TENAGA KERJA 250,000.00 3 Bondek
B BAHAN 4 Wiremesh
- 5 Air
6 Keramik
JUMLAH HARGA BAHAN -
C PERALATAN
Alat Bantu Lainnya Kg 10,000.00 10,000.00 JUMLAH HARG
JUMLAH HARGA P
JUMLAH HARGA ALAT 10,000.00
D Jumlah (A+B+C) 260,000.00 Juml
E Overhead & Profit 15%xD 39,000.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 299,000.00 Harga Keseluruhan Pekerjaan

HARGA MATRIAL KAMAR MANDI


Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Material
(Rp)
(Rp)
A TENAGA 1 Floor Drain
Pekerja L.01 m2 - 2 Closet Duduk
JUMLAH TENAGA KERJA - 3 Wastafel
B BAHAN 4 Kran Shower
- 5 Pipa PVC 3"
6 Pipa PVC 4"
JUMLAH HARGA BAHAN - 7 Pipa PVC 3/4"
C PERALATAN 8 Pipa PVC 1/2"
Alat Bantu Lainnya Kg 10,000.00 10,000.00 JUMLAH HARG
JUMLAH HARGA P
JUMLAH HARGA ALAT 10,000.00
D Jumlah (A+B+C) 10,000.00 Juml
E Overhead & Profit 15%xD 1,500.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 11,500.00 Harga Keseluruhan Pekerjaan

HARGA MATRIAL PENGECATAN


Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Item Pekerjaan
(Rp)
(Rp)
A TENAGA 1 Dinding Dalam
Pekerja L.01 m2 -
JUMLAH TENAGA KERJA - 2 Plafon
B BAHAN
- 3 Rangka Besi

JUMLAH HARGA BAHAN -


C PERALATAN
Alat Bantu Lainnya Kg 10,000.00 10,000.00 JUMLAH HARG
JUMLAH HARGA P
JUMLAH HARGA ALAT 10,000.00
D Jumlah (A+B+C) 10,000.00 Juml
E Overhead & Profit 15%xD 1,500.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 11,500.00 Harga Keseluruhan Pekerjaan

HARGA PEKERJAAN PEMASANGAN BESI HOLLOW & ACP CUTTING


Harga Upah Harga Matrial Satuan di Jumlah Harga Upah
Jumlah
Harga Satuan
No Uraian Kode Satuan Harga No Item Pekerjaan
(Rp)
(Rp)
A TENAGA 1 ACP Cutting
Pekerja L.01 m2 150,000.00 150,000.00
JUMLAH TENAGA KERJA 150,000.00 2 ACP Cutting
B BAHAN
- 3 Besi Hollow

JUMLAH HARGA BAHAN -


C PERALATAN
Alat Bantu Lainnya Kg - JUMLAH HARG
JUMLAH HARGA P
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 150,000.00 Juml
E Overhead & Profit 15%xD 22,500.00 Overhead & Profit
F Harga Satuan Pekerjaan (D+E) 172,500.00 Harga Keseluruhan Pekerjaan
n di Jumlah Harga Upah
Jumlah Harga
Dimensi Volume Satuan Harga Satuan Detail Satuan
Rupiah

250 x 125 x 6 x 9 1686.00 kg 16,500.00 27,819,000.00 12 m


12 127.90 kg 16,500.00 2,110,350.00
200 x 100 x 5,5 x 8 1536.00 kg 16,500.00 25,344,000.00 12 m
10 346.20 kg 16,500.00 5,712,300.00
150 x 75 x 5 x 7 492.00 kg 16,500.00 8,118,000.00 12 m
6 141.20 kg 16,500.00 2,329,800.00
TOTAL 4329.30 kg
JUMLAH HARGA MATERIAL 69,103,650.00
JUMLAH HARGA PEMASANGAN KG 36,799,050.00

Jumlah Keseluruhan 105,902,700.00


& Profit 15%xD 15,885,405.00
eluruhan Pekerjaan 121,788,105.00

EK / VINYL ( LANTAI 1 )
n di Jumlah Harga Upah
Jumlah Harga
Dimensi Volume Satuan Harga Satuan Detail Satuan
Rupiah

40 x 80 x 14 93 m 49,666.67 4,619,000.00 6 m

1200 x 2400 x 15 20.300 m2 300,000.00 2,114,583.33 2.88 m2


7.0486111
172 x 1210 x 4 20.300 m2 46,363.64 4,481,818.18 0.21 m2
96.666667

JUMLAH HARGA MATERIAL 11,215,401.52


JUMLAH HARGA PEMASANGAN M2 3,552,500.00

Jumlah Keseluruhan 14,767,901.52


& Profit 15%xD 2,215,185.23
eluruhan Pekerjaan 16,983,086.74

EK / VINYL ( LANTAI 2 )
n di Jumlah Harga Upah
Jumlah Harga
Dimensi Volume Satuan Harga Satuan Detail Satuan
Rupiah

40 x 80 x 14 77 m 49,666.67 3,824,333.33 6 m
1200 x 2400 x 15 18.4 m2 300,000.00 1,916,666.67 2.88 m2
6.3888889
172 x 1210 x 4 18.4 m2 46,363.64 4,062,337.66 0.21 m2
87.619048

JUMLAH HARGA MATERIAL 9,803,337.66


JUMLAH HARGA PEMASANGAN M2 3,220,000.00

Jumlah Keseluruhan 13,023,337.66


& Profit 15%xD 1,953,500.65
eluruhan Pekerjaan 14,976,838.31

EK / VINYL ( LANTAI 3 )
n di Jumlah Harga Upah
Jumlah Harga
Dimensi Volume Satuan Harga Satuan Detail Satuan
Rupiah

40 x 80 x 14 47.5 m 49,666.67 2,359,166.67 6 m

1200 x 2400 x 15 12 m2 300,000.00 1,250,000.00 2.88 m2


4.1666667
172 x 1210 x 4 12 m2 46,363.64 2,649,350.65 0.21 m2
57.142857

JUMLAH HARGA MATERIAL 6,258,517.32


JUMLAH HARGA PEMASANGAN M2 2,100,000.00

Jumlah Keseluruhan 8,358,517.32


& Profit 15%xD 1,253,777.60
eluruhan Pekerjaan 9,612,294.91

ASS ( KANOPI ) Lt.1


n di Jumlah Harga Upah
Jumlah Harga
Dimensi Volume Satuan Harga Satuan Detail Satuan
Rupiah

40 x 80 x 12 35.53 m 39,666.67 1,409,356.67 6 m

10 10.584 m2 600,000.00 6,350,400.00 / m2


JUMLAH HARGA MATERIAL 7,759,756.67
JUMLAH HARGA PEMASANGAN M2 1,852,200.00

Jumlah Keseluruhan 9,611,956.67


& Profit 15%xD 1,441,793.50
eluruhan Pekerjaan 11,053,750.17

LASS ( KANOPI ) Lt.Roof Top


n di Jumlah Harga Upah
Jumlah Harga
Dimensi Volume Satuan Harga Satuan Detail Satuan
Rupiah

40 x 80 x 14 27 m 49,666.67 1,318,848.67 6 m

10 6.638 m2 600,000.00 3,982,800.00 / m2

JUMLAH HARGA MATERIAL 5,301,648.67


JUMLAH HARGA PEMASANGAN M2 1,161,650.00

Jumlah Keseluruhan 6,463,298.67


& Profit 15%xD 969,494.80
eluruhan Pekerjaan 7,432,793.47

LASS ( KANOPI ) Lt.2


n di Jumlah Harga Upah
Jumlah Harga
Dimensi Volume Satuan Harga Satuan Detail Satuan
Rupiah

40 x 80 x 12 41.941 m 39,666.67 1,663,659.67 6 m

10 7.803 m2 600,000.00 4,681,800.00 / m2

JUMLAH HARGA MATERIAL 6,345,459.67


JUMLAH HARGA PEMASANGAN M2 1,365,525.00

Jumlah Keseluruhan 7,710,984.67


& Profit 15%xD 1,156,647.70
eluruhan Pekerjaan 8,867,632.37
n di Jumlah Harga Upah
Jumlah Harga
Dimensi Volume Satuan Harga Satuan Detail Satuan
Rupiah

10 4.700 m2 / m2
1.700 m2
total 6.400 m2 600,000.00 3,840,000.00

JUMLAH HARGA MATERIAL 3,840,000.00


JUMLAH HARGA PEMASANGAN M2 160,000.00

Jumlah Keseluruhan 4,000,000.00


& Profit 15%xD 600,000.00
eluruhan Pekerjaan 4,600,000.00

0,3 & GYPSUM ( DINDING )


n di Jumlah Harga Upah
Jumlah Harga
Dimensi Volume Satuan Harga Satuan Detail Satuan
Rupiah

40 x 40 x 0,3 332.7 m 5,750.00 1,913,025.00 4 m

1200 x 2400 x 9 101.800 m2 68,000.00 2,403,611.11 2.88 m2


35.347222
A-Plus 1 zak 55,000.00 55,000.00 20 kg

JUMLAH HARGA MATERIAL 4,371,636.11


JUMLAH HARGA PEMASANGAN M2 3,563,000.00

Jumlah Keseluruhan 7,934,636.11


& Profit 15%xD 1,190,195.42
eluruhan Pekerjaan 9,124,831.53

0,3 & GYPSUM ( PLAFON ) Lt.1


n di Jumlah Harga Upah
Jumlah Harga
Dimensi Volume Satuan Harga Satuan Detail Satuan
Rupiah
40 x 40 x 0,3 20.5 m 5,750.00 117,875.00 4 m

1200 x 2400 x 9 14 m2 68,000.00 330,555.56 2.88 m2


4.8611111

JUMLAH HARGA MATERIAL 448,430.56


JUMLAH HARGA PEMASANGAN M2 490,000.00

Jumlah Keseluruhan 938,430.56


& Profit 15%xD 140,764.58
eluruhan Pekerjaan 1,079,195.14

0,3 & GYPSUM ( PLAFON ) Lt.Atap


n di Jumlah Harga Upah
Jumlah Harga
Dimensi Volume Satuan Harga Satuan Detail Satuan
Rupiah

40 x 40 x 0,3 123 m 5,750.00 706,117.25 4 m

1200 x 2400 x 9 32.2 m2 68,000.00 760,277.78 2.88 m2


11.180556

JUMLAH HARGA MATERIAL 1,466,395.03


JUMLAH HARGA PEMASANGAN M2 1,932,000.00

Jumlah Keseluruhan 3,398,395.03


& Profit 15%xD 509,759.25
eluruhan Pekerjaan 3,908,154.28

DF ( DINDING LUAR )
n di Jumlah Harga Upah
Jumlah Harga
Dimensi Volume Satuan Harga Satuan Detail Satuan
Rupiah

40 x 40 x 0,9 401 m 17,083.33 6,850,416.67 6 m

1200 x 2400 x 0,5 103 m2 750,000.00 26,822,916.67 2.88 m2


35.763889
JUMLAH HARGA MATERIAL 33,673,333.33
JUMLAH HARGA PEMASANGAN M2 36,050,000.00

Jumlah Keseluruhan 69,723,333.33


& Profit 15%xD 10,458,500.00
eluruhan Pekerjaan 80,181,833.33

n di Jumlah Harga Upah


Jumlah Harga
Dimensi Volume Satuan Harga Satuan Detail Satuan
Rupiah

4000 x 200 3.5 m2 22,000.00 77,000.00 0.8 m2

JUMLAH HARGA MATERIAL 77,000.00


JUMLAH HARGA PEMASANGAN M2 297,500.00

Jumlah Keseluruhan 374,500.00


& Profit 15%xD 56,175.00
eluruhan Pekerjaan 430,675.00

n di Jumlah Harga Upah


Jumlah Harga
Keterangan Volume Satuan Harga Satuan Detail Satuan
Rupiah

10 m2 300,000.00 3,000,000.00
10 m2 157,000.00 1,570,000.00
5 pcs 12,000.00 60,000.00
2 pcs 60,000.00 120,000.00
1 pcs 20,000.00 20,000.00
3 pcs 75,000.00 225,000.00
Bosch 1 pcs 375,000.00 375,000.00
4 pcs 10,600.00 42,400.00
50 m 5,000.00 250,000.00
2 kg 15,000.00 30,000.00
60 hr
JUMLAH HARGA MATERIAL 5,692,400.00
JUMLAH HARGA HARIAN 43,800,000.00

Jumlah Keseluruhan 49,492,400.00


& Profit 15%xD 7,423,860.00
eluruhan Pekerjaan 56,916,260.00

n di Jumlah Harga Upah


Jumlah Harga
Dimensi Volume Satuan Harga Satuan Detail Satuan
Rupiah

600 x 1200 x 11 5.697 m2 187,000.00 1,479,637.50 0.72 m2


7.913
150 x 3050 x 11 62.4 m2 95,700.00 12,981,913.04 0.46 m2
135.65217

JUMLAH HARGA MATERIAL 14,461,550.54


JUMLAH HARGA PEMASANGAN M2 1,481,220.00

Jumlah Keseluruhan 15,942,770.54


& Profit 15%xD 2,391,415.58
eluruhan Pekerjaan 18,334,186.13

INDING LUAR )
n di Jumlah Harga Upah
Jumlah Harga
Dimensi Volume Satuan Harga Satuan Detail Satuan
Rupiah

40 x 40 x 0,75 630 m 16,333.33 10,290,000.00 6 m


16,333.33
62.4 m2

JUMLAH HARGA MATERIAL 10,290,000.00


JUMLAH HARGA PEMASANGAN M2 6,864,000.00

Jumlah Keseluruhan 17,154,000.00


& Profit 15%xD 2,573,100.00
eluruhan Pekerjaan 19,727,100.00

LANG )
n di Jumlah Harga Upah
Jumlah Harga
Dimensi Volume Satuan Harga Satuan Detail Satuan
Rupiah

150 x 50 x 2,3 33.825 m 40,000.00 1,353,000.00 6 m


100 x 50 x 2,3 66.000 m 31,500.00 2,079,000.00 6 m
1000 x 3000 x 0,45 32.73 m2 64,000.00 2,094,720.00 1 m
200 x 2440 x 8 24.5 m 52,000.00 1,274,000.00 1 m
24.15 m 24,500.00 591,675.00 1 m

JUMLAH HARGA MATERIAL 7,392,395.00


JUMLAH HARGA PEMASANGAN M2 1,963,800.00

Jumlah Keseluruhan 9,356,195.00


& Profit 15%xD 1,403,429.25
eluruhan Pekerjaan 10,759,624.25

n di Jumlah Harga Upah


Jumlah Harga
Dimensi Volume Satuan Harga Satuan Detail Satuan
Rupiah

48.85 110,000.00 5,373,500.00


3.000 2,000,000.00 6,000,000.00
6 600,000.00 3,600,000.00
12.87 170,000.00 2,187,900.00
2 600,000.00 1,200,000.00
26.28 30,000.00 788,400.00
195.62 6,000.00 1,173,720.00

JUMLAH HARGA MATERIAL 20,323,520.00


JUMLAH HARGA PEMASANGAN M2

Jumlah Keseluruhan 20,323,520.00


& Profit 15%xD 3,048,528.00
eluruhan Pekerjaan 23,372,048.00

n di Jumlah Harga Upah


Jumlah Harga
Keterangan Volume Satuan Harga Satuan Detail Satuan
Rupiah

Broco 14 pcs 30,000.00 420,000.00


Broco 4.000 pcs 13,162.00 52,648.00
Broco 5 pcs 16,973.00 84,865.00
Broco 178.6 m 5,172.41 923,793.10 2.9 m
Broco 14 pcs 12,250.00 171,500.00
Broco 9 pcs 12,418.00 111,762.00
Broco 4 pcs 10,000.00 40,000.00
Philips 7 pcs 151,000.00 1,057,000.00
Philips 16 pcs 33,900.00 542,400.00
Philips 7.2 m 398,000.00 796,000.00 5 m
Informa 2 pcs 300,000.00 600,000.00
Informa 2 pcs 150,000.00 300,000.00
Informa 2 pcs 30,000.00 60,000.00
Eterna 56 titk
JUMLAH HARGA MATERIAL 1,652,806.10
JUMLAH HARGA PEMASANGAN M2 1,960,000.00

Jumlah Keseluruhan 3,612,806.10


& Profit 15%xD 541,920.92
eluruhan Pekerjaan 4,154,727.02

n di Jumlah Harga Upah


Jumlah Harga
Keterangan Volume Satuan Harga Satuan Detail Satuan
Rupiah

150 kg 1,160.00 174,000.00 1 kg


0.600 m3 300,000.00 180,000.00 1 m3
0.76 mm 3 m2 136,000.00 408,000.00 1 m
0.5 mm 3 m2 329,000.00 987,000.00 1 m
lt 10,000.00 10,000.00 1 lt
40x40 3 m2 75,000.00 225,000.00 6 pcs

JUMLAH HARGA MATERIAL 1,984,000.00


JUMLAH HARGA PEMASANGAN M2 780,000.00

Jumlah Keseluruhan 2,764,000.00


& Profit 15%xD 414,600.00
eluruhan Pekerjaan 3,178,600.00

n di Jumlah Harga Upah


Jumlah Harga
Keterangan Volume Satuan Harga Satuan Detail Satuan
Rupiah

Toto 1 pcs 326,200.00 326,200.00


Toto 1 pcs 850,000.00 850,000.00
Toto 2 pcs 538,000.00 1,076,000.00
Toto 1 pcs 1,183,000.00 1,183,000.00
Rucika 11.2 m 59,200.00 663,040.00 4 m
Rucika 16.3 m 98,075.00 1,598,622.50 4 m
Rucika 26 m 9,600.00 249,600.00 4 m
Rucika 8.5 m 7,075.00 60,137.50 4 m
JUMLAH HARGA MATERIAL 4,098,240.00
JUMLAH HARGA PEMASANGAN M2

Jumlah Keseluruhan 4,098,240.00


& Profit 15%xD 614,736.00
eluruhan Pekerjaan 4,712,976.00

n di Jumlah Harga Upah


Jumlah Harga
Keterangan Volume Satuan Harga Satuan Detail Satuan
Rupiah
Jotun Majestic
Perfect Beauty & 73.8 m2 87,200.00 697,600.00 2.5 lt
Care 8 lt
Jotun Jotaplast 47.87 m2 50,040.00 250,200.00 2.5 lt
5 lt
Jotun Gardex 242.42 m2 70,740.00 1,768,500.00 5 lt
Premium Gloss 25 lt

JUMLAH HARGA MATERIAL 2,716,300.00


JUMLAH HARGA PEMASANGAN M2

Jumlah Keseluruhan 2,716,300.00


& Profit 15%xD 407,445.00
eluruhan Pekerjaan 3,123,745.00

n di Jumlah Harga Upah


Jumlah Harga
Keterangan Volume Satuan Harga Satuan Detail Satuan
Rupiah

2850 x 3150 9 m2 800,000.00 2,500,000.00 2.88 m2


3.125
2850 x 1750 5 m2 800,000.00 1,388,888.89 2.88 m2
1.7361111
40 x 40 x 0,9 31.8 m 17,083.33 543,250.00 6 m

JUMLAH HARGA MATERIAL 4,432,138.89


JUMLAH HARGA PEMASANGAN M2 260,416.67

Jumlah Keseluruhan 4,692,555.56


& Profit 15%xD 703,883.33
eluruhan Pekerjaan 5,396,438.89
Total Satuan Jumlah
Weight (kg) Jenis Dimensi
Volume Barang Batang

355 Galvanis 4x8x12 77.47 m 6 12.9


16,500.00 Galvanis 4x8x14 244.05 m 6 40.7
256 Galvanis 4x4x0,9 401.00 m 6 66.8
16,500.00 Galvanis 4x4x0,75 630.00 m 6 105.0
168 Galvanum 4x4x0,35 476.00 m 6 79.3
16,500.00 Besi 150x50x2,3 33.83 m 6 5.6
Besi 100x50x2,3 66.00 m 6 11.0

Price (Rp)

298,000.00

300,000.00

510,000.00 /box isi 11


46,363.64

Price (Rp)

298,000.00
300,000.00

510,000.00 /box isi 11


46,363.64

Price (Rp)

298,000.00

300,000.00

510,000.00 /box isi 11


46,363.64

Price (Rp)

238,000.00

600,000.00
Price (Rp)

298,000.00

600,000.00

Price (Rp)

238,000.00

600,000.00
Price (Rp)

600,000.00

Price (Rp)

23,000.00

68,000.00

55,000.00

Price (Rp)
23,000.00

68,000.00

Price (Rp)

23,000.00

68,000.00

Price (Rp)

102,500.00

750,000.00
Price (Rp)

22,000.00

Price (Rp)
Price (Rp)

187,000.00

95,700.00

Price (Rp)

98,000.00
Price (Rp)

240,000.00 4.967 kg/m 29.8 kg 168 5.638 33.825503356


189,000.00 4.067 kg/m 24.4 kg 268.4 11 66.000
64,000.00
52,000.00
24,500.00

Price (Rp)
Price (Rp)

15,000.00

398,000.00

1 sak = 50 kg = 0.024

Price (Rp)

1,160.00 0.00048 1.25 2.4 0.2 0.6 0.012


300,000.00
136,000.00
329,000.00
50.00
75,000.00
Price (Rp)

236,800.00
392,300.00
38,400.00
28,300.00

Price (Rp)

218,000.00 7.38 10

125,100.00 4.787 10

353,700.00 24.24 10

Price (Rp)

800,000.00

800,000.00
102,500.00
m3 0.00048 kg/m3
No BAHAN KETERANGAN HARGA

1 Tukang Rp 200,000
2 Laden Rp 180,000
3 Perancah Kayu
4 Perancah Bambu
5 Paku Rp 15,000
6 Ikat Ijuk Rp 5,000
7 Kuas Rp 12,000
8 Palu Beton Rp 60,000
9 Pahat Beton Rp 20,000
10 Multiplek Bekas Rp 75,000
11 Gerinda Bosch Rp 375,000
12 Mata Gerinda Rp 10,600
13 Baja WF 250 x 125 x 6 x 9 Rp 16,500
14 Baja WF 200 x 100 x 5,5 x 8 Rp 16,500
15 Baja WF 150 x 75 x 5 x 7 Rp 16,500
16 Plat Besi (Base Plate Kolom) 12 Rp 16,500
17 Plat Besi (Plate Body) 10 Rp 16,500
18 Plat Besi (Stifner) 6 Rp 16,500
19 Besi Hollow Galvanis 40 x 80 x 14 Rp 298,000
20 Besi Hollow Galvanis 40 x 80 x 12 Rp 238,000
21 Besi Hollow Galvanis 40 x 40 x 0,9 Rp 102,500
22 Besi Hollow Galvanis 40 x 40 x 0,75
23 Besi Hollow Galvanum 40 x 40 x 0,3 Rp 23,000
24 Besi CNP 150 x 50 x 2,3 Rp 240,000
25 Besi CNP 100 x 50 x 2,3 Rp 189,000
26 Multiplek 1200 x 2400 x 15 Rp 300,000
27 Gypsum 1200 x 2400 x 9 Rp 68,000
28 Alumunium Composit Panel (APC) PVFD 1200 x 2400 x 0,5 Rp 705,000
29 Alumunium Composit Panel (APC) Cutting Laser 1200 x 2400 x 0,5 Rp 800,000
30 Conwood Panel EPC 600 x 1200 x 11 Rp 187,000
31 Conwood Slide BG 150 x 3050 x 11 Rp 95,700
32 Vinyl Taco 172 x 1210 x 4 Rp 510,000
33 Temp. Glass 10 Rp 600,000
34 Plafon PVC 4000 x 200 Rp 22,000
35 List Plank GRC 200 x 2440 x 8 Rp 52,000
36 Spandek Pasir 1000 x 3000 x 0,45 Rp 64,000
37 Talang Air PVC Rp 24,500
38 Skop Kontak Broco Rp 30,000
39 Saklar Tunggal Broco Rp 13,162
40 Saklar Double Broco Rp 16,973
41 Pipa PVC Conduit Broco Rp 15,000
42 Acc. Stop Kontak Broco Rp 12,250
43 Acc. Stop Saklar Broco Rp 12,418
44 Fiting Lampu Broco Rp 10,000
45 Lampu Down Light Philips Rp 151,000
46 Lampu LED 15 Watt Philips Rp 33,900
47 Lampu LED Strip Philips Rp 398,000
48 Lampu Dinding Informa Rp 300,000
49 Lampu Gantung Informa Rp 150,000
50 Lampu Spot Light Informa Rp 30,000
51 Semen Rp 1,160
52 Pasir Beton Rp 300,000
53 Bondek Rp 136,000
54 Wiremesh Rp 329,000
55 Keramik 40x40 Rp 75,000
56 Floor Drain Toto Rp 326,200
57 Closet Duduk Toto Rp 850,000
58 Wastafel Toto Rp 538,000
59 Kran Shower Toto Rp 1,183,000
60 Pipa PVC 3" Rucika Rp 236,800
61 Pipa PVC 4" Rucika Rp 392,300
62 Pipa PVC 3/4" Rucika Rp 38,400
63 Pipa PVC 1/2" Rucika Rp 28,300
64 Jotun Majestic Perfect Beauty & Care Rp 218,000
65 Jotun Jotaplast Rp 125,100
66 Jotun Gardex Premium Gloss Rp 353,700
67 Sofa Puff Informa Rp 4,500,000
68 Bar Stool Informa Rp 875,000
Volume Satuan Shop

1 Hari
Hari

1 kg
1 m
1 pcs
1 pcs
1 pcs
1 pcs
1 pcs
1 pcs
1 kg Jl.Bojong-Koneng
1 kg Jl.Bojong-Koneng
1 kg Jl.Bojong-Koneng
1 kg Jl.Bojong-Koneng
1 kg Jl.Bojong-Koneng
1 kg Jl.Bojong-Koneng
6 m Sultan-Marga-Baja Jl.Raya-Bojong-Soang 0822-1000-0200
6 m Sultan-Marga-Baja Jl.Raya-Bojong-Soang 0822-1000-0200
6 m Sultan-Marga-Baja Jl.Raya-Bojong-Soang 0822-1000-0200

4 m Sultan-Marga-Baja Jl.Raya-Bojong-Soang 0822-1000-0200


6 m Sultan-Marga-Baja Jl.Raya-Bojong-Soang 0822-1000-0200
6 m Sultan-Marga-Baja Jl.Raya-Bojong-Soang 0822-1000-0200
2.88 m2 Sumber-Bangun Jl.Ahmad-Yani
2.88 m2 Gypsum-Jayaboard Jl.Rajawali-Timur 022-6010580
2.88 m2 Tawakal-Workshop Jl.Cikoneng 0827-2221-5411
2.88 m2 Paneru Jl.Gg-Suniaraja 0812-2390-9619
0.72 m2 Distributor 0818-0944-8400
0.46 m2 Distributor 0818-0944-8400
11 pcs PD.Kawan-Kita Jl.Gg-Suniaraja 022-4238506
1 m2 Sumber-Daya-Toko Jl.Gg-Suniaraja 0811-2188-097
0.8 m2 Shunda-Plafon-Paskal Jl.Pasir-Kaliki 0877-8853-3787
1 m
1 m Sultan-Marga-Baja Jl.Raya-Bojong-Soang 0822-1000-0200
1 m
1 pcs
1 pcs
1 pcs
2.9 m
1 pcs
1 pcs
1 pcs
1 pcs
1 pcs
5 m
1 pcs Informa
1 pcs Informa
1 pcs Informa
1 kg
1 m3
1 m2
1 m2 Sultan-Marga-Baja Jl.Raya-Bojong-Soang 0822-1000-0200
6 pcs
1 pcs
1 pcs
1 pcs
1 pcs
4 m
4 m
4 m
4 m
2.5 lt
2.5 lt
5 lt
Informa
Informa
Shop

Toko-Besi-Barkah Jl.Gn-Batu 0821-2178-5782


Toko-Besi-Barkah Jl.Gn-Batu 0821-2178-5782
Toko-Besi-Barkah Jl.Gn-Batu 0821-2178-5782

Toko-Besi-Barkah Jl.Gn-Batu 0821-2178-5782


Toko-Besi-Barkah Jl.Gn-Batu 0821-2178-5782
Toko-Besi-Barkah Jl.Gn-Batu 0821-2178-5782

Toko-Besi-Barkah Jl.Gn-Batu 0821-2178-5782


Toko-Besi-Barkah Jl.Gn-Batu 0821-2178-5782
TAHAPAN PEKERJAAN

TAHAP 1
Pekerjaan Persiapan
Pekerjaan Pembongkarann
TAHAP 2
Struktur Lantai 1
Struktur Lantai 2
Struktur Lantai 3
Pekerjaan Rangka Atap & Penutup Atap
Pekerjaan Talang Air, List Plank & Plafon
TAHAP 3
Pekerjaan Lantai 1
Pekerjaan Lantai 2 + Lantai Kamar Mandi
Pekerjaan Lantai 3
Pekerjaan Sanitasi
TAHAP 4
Pekerjaan Rangka Dinding Luar
Pekerjaan Penutup Dinding Luar (ACP)
Pekerjaan Rangka Dinding Decorative
Pekerjaan Penutup Dinding Decorative (Conwood)
Pekerjaan Elektrikal
Pekerjaan Rangka Dinding Dalam & Plafon
Pekerjaan Penutup Dinding Dalam & Plafon
TAHAP 5
Pekerjaan Pintu, Jendela & Kaca
Pekerjaan Kanopi & ACP Cutting
Pekerjaan Tangga
Pekerjaan Furniture
TAHAP 6
Pekerjaan Finishing Lantai
Pekerjaan Finishing Tembok & Plafon
Pekerjaan Perapihan & Pembersihan
Harga Satuan Bobot Februari
(Rp) (%) 1 2 3 4

-
-
Maret April
1 2 3 4 1 2 3 4

Anda mungkin juga menyukai