Kementrian :
Satuan Kerja :
Kegiatan : PELEBARAN APRON TAXIWAY DENGAN HOTMIX TEBAL RATA
Pekerjaan :
NO
A.
B.
C.
D.
E.
F.
G.
JUMLAH HARGA
PAJAK PERTAMBAHAN NILAI ( PPN 10% )
TOTAL
PEMBULATAN
RENCANA ANGGARAN BIAYA - RATA 5 CM TERMASUK MARKING
Kementrian :
Satuan Kerja :
Kegiatan : PELEBARAN APRON TAXIWAY DENGAN HOTMIX TEBAL RATA
Pekerjaan :
JUMLAH HARGA
URAIAN PEKERJAAN
(Rp)
PEKERJAAN PERSIAPAN Rp
PEKERJAAN TANAH Rp
KONTRUKSI APRON Rp
SAMBUNGAN APRON Rp
PEMBUATAN TAXIWAY Rp
SAMBUNGAN TAXIWAY Rp
PEKERJAAN MARKING Rp
JUMLAH HARGA Rp
PAJAK PERTAMBAHAN NILAI ( PPN 10% )
Rp
TOTAL
Rp
PEMBULATAN Rp
MARKING
JUMLAH HARGA
(Rp)
195,000,000.00
235,300,394.30
5,657,714,430.32
94,344,113.17
280,155,533.79
58,056,976.25
19,203,640.68
6,539,775,088.51
653,977,508.85
7,193,752,597.36
7,193,750,000.00
RENCANA ANGGARAN BIAYA APRON
Kementrian :
Satuan Kerja :
Kegiatan :
Pekerjaan :
NO URAIAN PEKERJAAN
A. PEKERJAAN PERSIAPAN
1 Fasilitas Penunjang
2 Mobilisasi
3 Demobilisasi
4 Akomodasi dan Fasilitas Kantor
5 Quality Control
6 Pemeliharaan terhadap arus lalu lintas
7 Pemeliharaan Jalan Kerja
8 Pengukuran Profil design
B. PEKERJAAN TANAH
1 Galian Tanah (Konstruksi) + Pembuangan
2 Penyiapan badan / dasar runway
3 Bongkar Runway Eksisting
C. KONTRUKSI APRON
1 Sub Base Course Tebal 35 cm. CBR ≥ 30%
2 Concrete Treated Base Course (CTBC) tebal 25 cm
3 Prime Coating
4 Asphalt Treated Base (ATB) Tebal 5 cm
5 Tack Coating
6 Asphalt Concrete (AC) Tebal 5 cm
D. SAMBUNGAN APRON
1 Concrete Treated Base Course (CTBC) tebal 25 cm
2 Prime Coating
3 Asphalt Treated Base (ATB) Tebal 5 cm
4 Tack Coating
5 Asphalt Concrete (AC) Tebal 5 cm
E. PEMBUATAN TAXIWAY
1 Sub Base Course Tebal 35 cm. CBR ≥ 30%
2 Concrete Treated Base Course (CTBC) tebal 25 cm
3 Prime Coating
4 Asphalt Treated Base (ATB) Tebal 5 cm
5 Tack Coating
6 Asphalt Concrete (AC) Tebal 5 cm
F. SAMBUNGAN TAXIWAY
1 Concrete Treated Base Course (CTBC) tebal 25 cm
2 Prime Coating
3 Asphalt Treated Base (ATB) Tebal 5 cm
4 Tack Coating
5 Asphalt Concrete (AC) Tebal 5 cm
G. PEKERJAAN MARKING
1 Cat Marking ( Putih )
2 Cat Marking ( Hitam )
HARGA
SAT QTY SATUAN (Rp) HARGA SATUAN (Rp)
Rp 195,000,000.00
M3 3,150.00
Rp 63,475.20 Rp 199,946,880.00
M3 5,250.00
Rp 6,101.91 Rp 32,035,007.06
M3 49.73 Rp 66,730.49 Rp 3,318,507.24
Rp 235,300,394.30
M2 1,898.75
Rp 212,363.40 Rp 403,225,017.15
M3 1,356.25
Rp 305,353.73 Rp 414,136,001.43
M2 5,425.00
Rp 15,765.58 Rp 85,528,273.21
M2 5,425.00
Rp 471,661.68 Rp 2,558,764,604.15
M2 5,425.00
Rp 15,048.36 Rp 81,637,360.13
M2 5,425.00
Rp 389,755.42 Rp 2,114,423,174.25
Rp 5,657,714,430.32
Rp 94,344,113.17
Rp 280,155,533.79
Rp 58,056,976.25
Rp 19,203,640.68
JUMLAH PEKERJA, KEPALA TUKANG, TUKANG DAN MANDOR
Material Sirtu
Aspal 0.6417
Material Kerosene
0.4889
5 Tack Coating M2
Pekerja / Buruh 0.0301
Upah
Mandor 0.006
Aspal
- 0.8880
Material
Kerosene 0.2530
6 Asphalt Concrete (AC) Tebal 5 cm M2
Pekerja / Buruh 0.6506
Upah
Mandor 0.0542
Agregat Kasar 0.0420
Agregat Halus 0.6188
Material
Filter 0.0030
Aspal 8.2688
C SAMBUNGAN APRON SATUAN
1 Concrete Treated Base Course (CTBC) tebal 25 cm
Pekerja / Buruh 0.4373 M3
Upah
Mandor 0.0625
Aggregat pecah mesin 10-20 mm 0.0610
Material Aggregat pecah mesin 5-10 mm 0.0624
semen 100.8000
Prime Coating
2 M2
Pekerja / Buruh 0.0301
Upah
Mandor 0.006
Aspal 0.6417
Material
Kerosene 0.4889
3 Asphalt Treated Base (ATB) Tebal 5 cm
Pekerja / Buruh 0.388 M2
Upah
Mandor 0.0554
Agregat Kasar 0.0351
Agregat Halus 0.0267
Material
Filter 0.0035
Aspal 7.85
4 Tack Coating M2
Pekerja / Buruh 0.0301
Upah
Mandor 0.006
Aspal 0.888
Material
Kerosene 0.253
5 Asphalt Concrete (AC) Tebal 5 cm M2
Pekerja / Buruh 0.6506
Upah
Mandor 0.0542
Agregat Kasar 0.0420
Agregat Halus 0.6188
Material
Filter 0.0030
Aspal 8.2688
D PEKERJAAN MARKING SATUAN
1 Cat Marking ( Putih ) M2
Pekerja / Buruh 0.1000
Upah
Mandor 0.0220
Cat marka (thermoplast) 1.0500
Material
Thinner 0.21
2 Cat Marking ( Hitam ) M2
M2 Pekerja / Buruh 0.1000
Upah
Mandor 0.0220
Material Cat marka (thermoplast) 1.0500
Thinner 0.2100
VOLUME
HARI ORANG UPAH HARGA HARGA TOTAL
3150.00
350.00 50 15.00 150,000.00 112,500,000.00
175.00 50 1.00 200,000.00 10,000,000.00
5,250.00
221.39 60 10.00 150,000.00 90,000,000.00
55.35 60 1.00 200,000.00 12,000,000.00
49.73
5.8939199828 30 3.00 150,000.00 13,500,000.00
2.94696869415 30 200,000.00 -
1,898.75
1,356.25
5,425.00
5,425.00
5,425.00
163.40 7 5.00 150,000.00 5,250,000.00
12.68
5.55 7 15.00 150,000.00 15,750,000.00
101.40
39.34 15 7.00 150,000.00 15,750,000.00
5.62 15 1.00 200,000.00 3,000,000.00
3.56 400,000.00 1,425,232.97
2.71 400,000.00 1,083,177.51
0.35 475,000.00 167,614.20
5.31 1,700,000.00 9,021,219.97
101.40
7.80
3.41 1 5.00 150,000.00 750,000.00
0.49 1 1.00 200,000.00 200,000.00
0.48 400,000.00 190,195.20
0.49 400,000.00 194,688.00
15.72 75,000.00 1,179,360.01
62.40
1.88 2 5.00 150,000.00 1,500,000.00
0.38 2 1.00 200,000.00 400,000.00
0.27 1,700,000.00 453,823.11
30.51 12,000.00 366,084.83
5,250.00
221.39 60 10.00 150,000.00
55.35 60 1.00 200,000.00
49.73
5.8939199828 30 3.00 150,000.00
2.94696869415 30 200,000.00
1,898.75
1,898.75 225,000.00
1,356.25
593.09 80 9.00 150,000.00
84.73 80 1.00 200,000.00
82.68 400,000.00
84.63 400,000.00
2,734.20 75,000.00
5,425.00
163.40 7 5.00 150,000.00
32.68 7 1.00 200,000.00
23.21 1,700,000.00
2,652.26 12,000.00
5,425.00
2,104.64 60 25.00 150,000.00
300.66 60 1.00 200,000.00
190.63 400,000.00
144.88 400,000.00
18.88 475,000.00
283.91 1,700,000.00
5,425.00
163.40 7 5.00 150,000.00
32.68 7 1.00 200,000.00
harga total
112,500,000.00
10,000,000.00
90,000,000.00
12,000,000.00
13,500,000.00
-
180,000,000.00
12,000,000.00
427,218,762.08
108,000,000.00
16,000,000.00
33,070,800.41
33,852,000.42
205,065,002.53
5,250,000.00
1,400,000.00
39,454,973.67
31,827,086.84
225,000,000.00
12,000,000.00
76,251,369.31
57,951,064.98
8,967,524.97
482,644,164.81
5,250,000.00
1,400,000.00
32.11 1,700,000.00
1,372.53 12,000.00
5,425.00
3,529.52 30 25.00 150,000.00
294.13 30 1.00 200,000.00
228.07 400,000.00
3,356.72 400,000.00
16.28 475,000.00
299.05 1,700,000.00
12.68
0.77 400,000.00
0.79 400,000.00
25.56 75,000.00
101.40
3.05 1 5.00 150,000.00
0.61 1 1.00 200,000.00
0.43 1,700,000.00
49.57 12,000.00
101.40
39.34 15 7.00 150,000.00
5.62 15 1.00 200,000.00
3.56 400,000.00
2.71 400,000.00
0.35 475,000.00
5.31 1,700,000.00
101.40
3.05 2 5.00 150,000.00
0.61 2 1.00 200,000.00
0.60 1,700,000.00
25.65 12,000.00
101.40
65.97 15 15.00 150,000.00
5.50 15 1.00 200,000.00
4.26 400,000.00
62.74 400,000.00
0.30 475,000.00
5.59 1,700,000.00
7.80
0.48 400,000.00
0.49 400,000.00
15.72 75,000.00
62.40
1.88 2 5.00 150,000.00
0.38 2 1.00 200,000.00
0.27 1,700,000.00
30.51 12,000.00
62.40
24.21 7 10.00 150,000.00
3.46 7 1.00 200,000.00
2.19 400,000.00
1.67 400,000.00
0.22 475,000.00
3.27 1,700,000.00
62.40
1.88 3 5.00 150,000.00
0.38 3 1.00 200,000.00
0.37 1,700,000.00
15.79 12,000.00
62.40
40.60 7 15.00 150,000.00
3.38 7 1.00 200,000.00
2.62 400,000.00
38.61 400,000.00
0.19 475,000.00
3.44 1,700,000.00
222.93
234.08 75,000.00
54,594,984.57
16,470,306.13
112,500,000.00
6,000,000.00
91,228,146.30
1,342,687,513.18
7,733,066.33
508,390,317.49
15,750,000.00
1,400,000.00
309,189.12
316,492.80
1,917,216.02
750,000.00
200,000.00
737,462.55
594,887.85
15,750,000.00
3,000,000.00
1,425,232.97
1,083,177.51
167,614.20
9,021,219.97
1,500,000.00
400,000.00
1,020,448.19
307,850.52
33,750,000.00
3,000,000.00
1,705,167.56
25,096,500.25
144,540.63
9,502,447.59
750,000.00
200,000.00
190,195.20
194,688.00
1,179,360.01
1,500,000.00
400,000.00
453,823.11
366,084.83
10,500,000.00
1,400,000.00
877,066.44
666,570.78
103,147.20
5,551,519.98
2,250,000.00
600,000.00
627,968.12
189,446.47
15,750,000.00
1,400,000.00
1,049,333.89
15,444,000.15
88,948.08
5,847,660.06
12,600,000.00
2,800,000.00
17,555,737.50
46.82 25,000.00
43.98
4.40 14 6.00 150,000.00
0.97 14 1.00 200,000.00
46.18 - 75,000.00
9.24 - 25,000.00
unit 4 225,000,000.00
Total
ppN
PPh
Total
1,170,382.50
12,600,000.00
2,800,000.00
3,463,425.00
230,895.00
4,589,856,784.05
900,000,000.00
5,489,856,784.05
548,985,678.41
148,226,133.17
6,187,068,595.63
1,006,681,404.37
JUMLAH PEKERJA, KEPA
A
PEKERJAAN TANAH Satuan
1
Galian Tanah (Konstruksi) + Pembuangan M3
- Upah Pekerja / Buruh
0.1111
Mandor
0.0556
2
Penyiapan badan / dasar runway M3
- Upah Pekerja / Buruh
0.0422
Mandor
0.0105
3
Bongkar Runway Eksisting M3
- Upah Pekerja / Buruh
0.1185
Mandor
0.0593
B KONTRUKSI APRON
Sub Base Course Tebal 35 cm. CBR ≥ 30%
- Upah Pekerja / Buruh
0.4373
Mandor
0.0625
- Material
Sirtu
Prime Coating
- Upah Pekerja / Buruh
0.0301
Mandor
0.0060
- Material
Aspal 0.6417
Kerosene 0.4889
Tack Coating
- Upah Pekerja / Buruh
0.0301
Mandor
0.0060
uan
M3
M3
M3
M2
M3
M2
M2
M2
- Material Aspal 0.8880
Kerosene 0.2530
Mandor
0.0625
- Material
Aggregat pecah mesin 10-20 mm 0.0610
Prime Coating
- Upah Pekerja / Buruh
0.0301
Mandor
0.0060
- Material
Aspal 0.6417
Kerosene 0.4889
Tack Coating
- Upah Pekerja / Buruh
0.0301
Mandor
0.0060
- Material
Aspal 0.8880
Kerosene 0.2530
M3
M2
M2
M2
M2
Agregat Halus 0.6188
Filter 0.0030
Aspal 8.2688
D SAMBUNGAN TAXIWAY
Concrete Treated Base Course (CTBC) tebal 25 cm
- Upah Pekerja / Buruh
0.4373
Mandor
0.0625
- Material
Aggregat pecah mesin 10-20 mm 0.0610
Prime Coating
- Upah Pekerja / Buruh
0.0301
Mandor
0.0060
- Material
Aspal 0.6417
Kerosene 0.4889
Mandor
0.0554
- Material
Agregat Kasar 0.0351
Tack Coating
- Upah Pekerja / Buruh
0.0301
Mandor
0.0060
- Material
Aspal 0.8880
Kerosene 0.2530
Mandor
0.0220
M3
M2
M2
M2
M2
M2
- Material Cat marka (thermoplast)
Thinner
Thinner
M2
1.0500
0.2100
0.1000
0.0220
1.0500
0.2100
M2
LA TUKANG, TUKANG DAN MANDOR
Volume hari orang upah
3,150.00
350.00 50 15.00 150,000.00
175.00 50 1.00 200,000.00
5,250.00
221.39 60 10.00 150,000.00
55.35 60 1.00 200,000.00
49.73
5.8939199828 30 3.00 150,000.00
2.94696869415 30 1.00 200,000.00
1,898.75
949.38
1,356.25
593.09 80 5.00 150,000.00
84.73 80 1.00 200,000.00
82.68
84.63
2,734.20
5,425.00
163.40 7 5.00 150,000.00
32.68 7 1.00 200,000.00
23.21
2,652.26
5,425.00
2,104.64 60 10.00 150,000.00
300.66 60 1.00 200,000.00
190.63
144.88
18.88
283.91
5,425.00
163.40 7 5.00 150,000.00
32.68 7 1.00 200,000.00
harga
225,000.00
400,000.00
400,000.00
75,000.00
1,700,000.00
12,000.00
400,000.00
400,000.00
475,000.00
1,700,000.00
32.11
1,372.53
5,425.00
3,529.52 30 15.00 150,000.00
294.13 30 1.00 200,000.00
228.07
3,356.72
16.28
299.05
12.68
0.77
0.79
25.56
101.40
3.05 1 5.00 150,000.00
0.61 1 1.00 200,000.00
0.43
49.57
101.40
39.34 15 7.00 150,000.00
5.62 15 1.00 200,000.00
3.56
2.71
0.35
5.31
101.40
3.05 2 5.00 150,000.00
0.61 2 1.00 200,000.00
0.60
25.65
101.40
65.97 15 15.00 150,000.00
5.50 15 1.00 200,000.00
4.26
62.74
0.30
5.59
7.80
0.48
0.49
15.72
62.40
1.88 2 5.00 150,000.00
0.38 2 1.00 200,000.00
0.27
30.51
62.40
24.21 7 10.00 150,000.00
3.46 7 1.00 200,000.00
2.19
1.67
0.22
3.27
62.40
1.88 3 5.00 150,000.00
0.38 3 1.00 200,000.00
0.37
15.79
62.40
40.60 7 15.00 150,000.00
3.38 7 1.00 200,000.00
2.62
38.61
0.19
3.44
222.93
46.18 -
9.24 -
1,700,000.00
12,000.00
400,000.00
400,000.00
475,000.00
1,700,000.00
400,000.00
400,000.00
75,000.00
1,700,000.00
12,000.00
400,000.00
400,000.00
475,000.00
1,700,000.00
1,700,000.00
12,000.00
400,000.00
400,000.00
475,000.00
1,700,000.00
400,000.00
400,000.00
75,000.00
1,700,000.00
12,000.00
400,000.00
400,000.00
475,000.00
1,700,000.00
1,700,000.00
12,000.00
400,000.00
400,000.00
475,000.00
1,700,000.00
75,000.00
25,000.00
75,000.00
25,000.00
sirtu 1000 225,000.00
Aggregat pecah mesin 10-20 mm 100.00 400,000.00
Aggregat pecah mesin 5-10 mm 85.91 400,000.00
Semen 3,330.59 75,000.00
Aspal 789.06846 1,700,000.00
Kerosene 4975.5663 12,000.00
Agregat Kasar 517.61 400,000.00
Agregat Halus 4,328.79 400,000.00
Filler 43.46 475,000.00
Cat marka 336.3066 75,000.00
Tinner 56.05 25,000.00
ppn
pph
225,000,000.00
40,000,000.00
34,363,181.22
249,793,894.28
1,341,416,388.12
59,706,795.17
207,043,579.75
1,731,514,592.21
20,645,809.68
25,222,995.00
1,401,277.50
-
702,450,000.00
94,400,000.00
900,000,000.00
5,632,958,512.94
563,295,851.29
5,069,662,661.65
152,089,879.85
6,348,344,244.08
7,193,750,000.00
845,405,755.92
170 hari 12 juli 2017 24.28571
harga total 12-15 Juli 16-22 Juli 23-29 Juli 30-5 Agts 6-12 Agsts 13-19 agts 20-26 Agts
1 2 3 4 5 6 7
112,500,000.00 15 15 15 15 15 15
10,000,000.00 1.00 1.00 1 1 1 1
90,000,000.00 10 10 10
12,000,000.00 1 1 1
13,500,000.00
6,000,000.00
135,000,000.00
12,000,000.00
213,609,381.04
60,000,000.00
16,000,000.00
33,070,800.41
33,852,000.42
205,065,002.53
5,250,000.00
1,400,000.00
39,454,973.67
31,827,086.84
90,000,000.00
12,000,000.00
76,251,369.31
57,951,064.98
8,967,524.97
482,644,164.81
5,250,000.00
1,400,000.00
54,594,984.57
16,470,306.13
67,500,000.00
6,000,000.00
91,228,146.30
1,342,687,513.18
7,733,066.33
508,390,317.49
15,750,000.00
1,400,000.00
309,189.12
316,492.80
1,917,216.02
750,000.00
200,000.00
737,462.55
594,887.85
15,750,000.00
3,000,000.00
1,425,232.97
1,083,177.51
167,614.20
9,021,219.97
1,500,000.00
400,000.00
1,020,448.19
307,850.52
33,750,000.00
3,000,000.00
1,705,167.56
25,096,500.25
144,540.63
9,502,447.59
750,000.00
200,000.00
190,195.20
194,688.00
1,179,360.01
1,500,000.00
400,000.00
453,823.11
366,084.83
10,500,000.00
1,400,000.00
877,066.44
666,570.78
103,147.20
5,551,519.98
2,250,000.00
600,000.00
627,968.12
189,446.47
15,750,000.00
1,400,000.00
1,049,333.89
15,444,000.15
88,948.08
5,847,660.06
12,600,000.00
2,800,000.00
17,555,737.50
1,170,382.50
-26 Agts
7
15
1
10
1
12,600,000.00
2,800,000.00
3,463,425.00
230,895.00
jumlah pekerja 15 15 15 25 25 25
jumlah mandor 1.00 1.00 1 2 2 2
25
2
27-2 Sept 3-9 Sept 10-16 Sept17-23 Sept24-30 Sep 1-7 Okt 8-14 Okt 15-21 Okt 22-28 Okt 29-4 Nov
8 9 10 11 12 13 14 15 16 17
10 10 10 10 10
1 1 1 1 1
3 3 3 3 3
1 1 1 1 1
20 20 20 20 20 20 20 20 20
1 1 1 1 1 1 1 1 1
9 9 9 9 9 9 9
1 1 1 1 1 1 1
25 25 25
1 1 1
29-4 Nov
17
13 33 33 42 42 29 29 54 54
2 3 3 4 4 2 2 3 3
54
3
5-11 Nov 12-18 Nov 19-25 Nov 26-2 Des 3-9 Des 10-16 Des 17-21 Des
18 19 20 21 22 23 24
9 9 9 9 9
1 1 1 1 1
5
1
25 25 25 25 25 25
1 1 1 1 1 1
5
1
-2 Des 3-9 Des 10-16 Des 17-21 Des
21 22 23 24
25 25 25 25 25
1 1 1 1 1
15
1
5
1
15 15 15
1 1 1
5
1
15 15 15 15 15
1 1 1 1 1
5
1
5
1
10
1
5
1
15
1
6 6
1 1
6 6
1 1
34 34 74 89 124 117
2 2 4 5 5 5
67
4
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
Pekerjaan :
Lokasi :
Seumber Dana :
Item Pembayaran :
Jenis Pekerjaan :
Galian Tanah (Konstruksi) + Pembuangan
Sat. Pembayaran :
Tahun Anggaran :
No. URAIAN KOMPONEN Kode SATUAN KOEFISIEN HARGA SATUAN JUMLAH (Rp)
(Rp)
A. TENAGA (LABOUR)
B. PERALATAN
1,587.30
1,269.84
2,857.14
30,555.56
30,062.50
60,618.06
63,475.20
.
aran. Harga Satuan yang disampaikan
elang
Pekerjaan :
Lokasi :
Seumber Dana :
Item Pembayaran :
Jenis Pekerjaan :
Penyiapan Badan/Dasar Runway
Sat. Pembayaran :
Tahun Anggaran :
No. URAIAN KOMPONEN Kode SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH (Rp)
A. TENAGA (LABOUR)
B. PERALATAN
602.41
240.96
843.37
1,380.52
1,927.71
1,950.30
5,258.53
6,101.91
Pekerjaan :
Lokasi :
Seumber Dana :
Item Pembayaran :
Jenis Pekerjaan :
Bongkar Runway Eksisting
Sat. Pembayaran :
Tahun Anggaran :
A. TENAGA (LABOUR)
B. PERALATAN
14,285.71
22,857.14
550,000.00
185,000.00
Rp 1,693.12
Rp 1,354.50
Rp 3,047.62
Rp 32,592.59
Rp 31,090.28
Rp 63,682.87
Rp 66,730.49
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
Pekerjaan :
Lokasi :
Seumber Dana :
Item Pembayaran :
Jenis Pekerjaan :
Concrete Treated Base course (CTBC) tebal 25cm
Sat. Pembayaran :
Tahun Anggaran :
A. TENAGA (LABOUR)
C. PERALATAN
14,285.71
22,857.14
375,000.00
550,000.00
185,000.00
550,000.00
480,000.00
145,000.00
185,000.00
6,247.21
Rp Rp
1,427.93
Rp 7,675.14
Rp 157,500.00
Rp 157,500.00
Rp 34,359.66
Rp 2,228.92
Rp 2,761.04
Rp 3,671.83
Rp 266.21
Rp 3,900.60
Rp 47,188.26
Rp 212,363.40
2761.04 Rp
3671.83 Rp
266.21 Rp
0.01
0.01
0.00
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
Pekerjaan :
Lokasi :
Seumber Dana :
Item Pembayaran :
Jenis Pekerjaan :
Concrete Treated Base course (CTBC) tebal 25cm
Sat. Pembayaran :
Tahun Anggaran :
A. TENAGA (LABOUR)
1 Pekerja / Buruh Mandor
2 0.4373
L.01 L.03 jam jam
0.0625
Rp 14,285.71
Rp 22,857.14
500,000.00
500,000.00
1,800.00
B)
550,000.00
185,000.00
550,000.00
480,000.00
145,000.00
185,000.00
C)
C)
tor.
k termasuk PPN yang dibayar dari kontrak) dan
JUMLAH (Rp)
6,247.21
Rp Rp
1,427.93
Rp 7,675.14
Rp Rp 30,480.00
Rp 31,200.00
181,440.00
Rp 243,120.00
Rp 34,359.66
Rp 2,228.92
Rp 8,556.16
Rp 5,140.56
Rp 372.69
Rp 3,900.60
Rp 54,558.59
Rp 305,353.73
6247.21 Rp
1427.93 Rp
30480 Rp
31200 Rp
181440 Rp100.80
34359.66 Rp
2228.92 Rp
8556.16 Rp
5140.56 Rp
372.69 Rp
3900.6 Rp
305353.73
Rp -
0
0.44
0.06
0.06
0.06
181440 Rp100.80
0.06
0.01
0.02
0.01
0.00
0.02
0
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
Pekerjaan :
Lokasi :
Seumber Dana :
Item Pembayaran :
Jenis Pekerjaan :
Prime Coating
Sat. Pembayaran :
Tahun Anggaran :
A. TENAGA (LABOUR)
C. PERALATAN
0.0301
0.0060
0.6417
0.4889
0.0030
0.0031
0.0030
Rp 14,285.71 Rp 430.29
Rp 22,857.14 Rp 137.69
Rp 567.98
11,000.00 Rp 7,058.90
15,000.00 Rp 7,333.43
Rp 14,392.33
45,000.00 Rp 135.54
36,000.00 Rp 112.50
185,000.00 Rp 557.23
Rp 805.27
Rp 15,765.58
430.29 Rp
137.69 Rp
7058.9 Rp
7333.43 Rp
#DIV/0!
135.54 Rp
112.5 Rp
557.23 Rp
an/atau ukuran
tuan pekerjaan diubah kecuali a Peserta Lelang tor.
k termasuk PPN
0.03
0.01
0.64
0.49
#DIV/0!
0.00
0.00
0.00
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
Pekerjaan :
Lokasi :
Seumber Dana :
Item Pembayaran :
Jenis Pekerjaan :
Asphalt Treated Base (ATB) Tebal 5cm
Sat. Pembayaran :
Tahun Anggaran :
A. TENAGA (LABOUR)
1 Pekerja / Buruh Mandor
2 0.3880
L.01 L.03 jam jam
0.0554
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
26 10
HARGA SATUAN (Rp)
Rp 14,285.71
Rp 22,857.14
500,000.00
500,000.00
475,000.00
11,000.00
B)
550,000.00
4,500,000.00
45,000.00
185,000.00
145,000.00
145,000.00
145,000.00
C)
C)
tor.
5,542.17
Rp Rp
1,266.78
Rp 6,808.95
Rp 17,569.44
Rp 13,352.78
Rp 1,653.00
Rp 86,350.00
Rp 118,925.22
Rp 20,906.67
Rp 249,397.59
Rp 2,493.98
Rp 53,294.30
Rp 11,116.67
Rp 4,991.39
Rp 3,726.91
Rp 345,927.51
Rp 471,661.68
5542.17 Rp
1266.78 Rp
17569.44 Rp
13352.78 Rp
1653 Rp
86350 Rp
20906.67 Rp
249397.59 Rp
2493.98 Rp
53294.3 Rp
11116.67 Rp
4991.39 Rp
3726.91 Rp
0.39
0.06
0.04
0.03
0.00
7.85
0.04
0.06
0.06
0.29
0.08
0.03
0.03
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
Pekerjaan :
Lokasi :
Seumber Dana :
Item Pembayaran :
Jenis Pekerjaan :
Tack Coating
Sat. Pembayaran :
Tahun Anggaran :
A. TENAGA (LABOUR)
C. PERALATAN
Rp 14,285.71
Rp 22,857.14
11,000.00
15,000.00
B)
45,000.00
36,000.00
185,000.00
C)
(C)
erator.
dak termasuk PPN yang dibayar dari kontrak)
JUMLAH (Rp)
Rp 430.29
Rp 137.69
Rp 567.99
Rp 9,767.60
Rp 3,795.00
Rp 13,562.60
Rp 135.54
Rp 225.00
Rp 557.23
Rp 917.77
Rp 15,048.36
430.29 Rp
137.69 Rp
9767.6 Rp
3795 Rp
135.54 Rp
225 Rp
557.23 Rp
0.03
0.01
0.89
0.25
0.00
0.01
0.00
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
Pekerjaan :
Lokasi :
Seumber Dana :
Item Pembayaran :
Jenis Pekerjaan :
Asphalt Concrete (AC) Tebal 5cm
Sat. Pembayaran :
Tahun Anggaran :
A. TENAGA (LABOUR)
1 Pekerja / Buruh Mandor
2 0.6506
L.01 L.03 jam jam
0.0542
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
26 10
HARGA SATUAN (Rp)
Rp 14,285.71
Rp 22,857.14
500,000.00
15,000.00
475,000.00
11,000.00
B)
550,000.00
4,500,000.00
45,000.00
185,000.00
145,000.00
145,000.00
145,000.00
C)
C)
tor.
9,294.32
Rp Rp
1,239.24
Rp 10,533.56
Rp 21,020.31
Rp 9,281.25
Rp 1,425.45
Rp 90,956.25
Rp 122,683.26
Rp 1,022.61
Rp 243,975.90
Rp 2,439.76
Rp 8,043.30
Rp 491.34
Rp 232.93
Rp 332.76
Rp 256,538.60
Rp 389,755.42
9294.32 Rp
1239.24 Rp
21020.31 Rp
9281.25 Rp
1425.45 Rp
90956.25 Rp
1022.61 Rp
243975.9 Rp
2439.76 Rp
8043.3 Rp
491.34 Rp
232.93 Rp
332.76 Rp
0.65
0.05
0.04
0.62
0.00
8.27
0.00
0.05
0.05
0.04
0.00
0.00
0.00
DAFTAR ANALISA
HARGA SATUAN PEKERJAAN
Pekerjaan :
Lokasi :
Seumber Dana :
Item Pembayaran :
Jenis Pekerjaan :
Cat Marka
Sat. Pembayaran :
Tahun Anggaran :
A. TENAGA (LABOUR)
1 Pekerja / Buruh Mandor
2 oh 0.1000
L.01 L.03
oh 0.0220
Rp 100,000.00
Rp 160,000.00
45,000.00
45,000.00
B)
36,000.00
C)
(C)
erator.
dak termasuk PPN yang dibayar dari kontrak)
JUMLAH (Rp)
Rp 10,000.00
Rp 3,520.00
Rp 13,520.00
Rp 47,250.00
Rp 9,450.00
Rp 56,700.00
Rp 1,728.00
Rp 1,728.00
Rp 71,948.00
DAFTAR KOMPONEN UPAH BERDASARKAN
SATUAN MASING-MASING
A TENAGA
1 Juru Ukur Rp 250,000.00
2 Pembantu juru ukur Rp 150,000.00
3 Kepala tukang Rp 170,000.00
4 Oprator Rp 250,000.00
5 Pembantu Oprator Rp 120,000.00
6 Mandor Rp 160,000.00
7 Pekerja Rp 100,000.00
8 Tukang Rp 150,000.00
9 Surveyor Rp 35,714.29
10 Asisten Surveyor Rp 21,428.57
11 Kepala tukang Rp 24,285.71
12 Oprator Rp 35,714.29
13 Pembantu Oprator Rp 17,142.86
14 Mandor Rp 22,857.14
15 Pekerja Rp 14,285.71
16 Tukang Rp 21,428.57
B BAHAN
C PERALATAN
SATUAN (Per)
oh
oh
oh
oh
oh
oh
oh
oh jam jam jam jam jam jam
jam jam
Kg M3 M3 M3 M3 M3 M3
kg M3
Liter Liter Kg M3 M3
Liter Liter Kg jam jam jam
jam
jam jam jam jam jam jam jam
jam jam jam jam jam
jam