Anda di halaman 1dari 255

REKAPITULASI DAFTAR HARGA SATUAN BAHAN

TAHUN 2021

NO NAMA BARANG SATUAN HARGA 2021

1 2 3 4

1 Air (Harga Air Industri PDAM 2021) Ltr 15.68


2 Alang - Alang Kelas 1 Lbr 35,000.00
3 Aspal PEN 60/70 Ltr 10,700.00
4 Aluminium Foil 2 sisi engkel/Insulasi m2 3,660.00
5 Aluminium Rollingdoor atur kertas kerja m2 388,000.00
6 Aluminium Profil m1 107,000.00
7 Amplas Halus atur kertas kerja Lbr 4,930.00
8 Amplas Kasar ok Lbr 4,820.00
9 Asbes Gelombang 180 x 80 x 5 mm hilang Lbr 30,200.00
10 Asbes Gelombang 2,5 M x 0,92 M x 5mm hilang Lbr 30,000.00
11 Asbes Rata 2 x 1 m x 4 mm hilang Lbr 46,500.00
12 Plat asbes 6 mm hilang Lbr
13 Bambu Besar (d=10-12 cm) ok Bt 12,630.00
14 Bambu Sedang (d=6-9 cm) ok Bt 8,490.00
15 Bambu Kecil (d=<5 cm) ok Bt 7,750.00
16 Batako Kualitas I (10x20x40 Buntu) ok Bh 2,650.00
17 Bata Ringan 7,5/60/20 cm ok Bh 9,660.00
18 Bata Ringan 10/60/20 cm ok Bh 10,800.00
19 Kanstein Jumbo K300 (15x30x50) ok m1 90,000.00
20 Kanstein Segilima K300 (15x20x50) ok m1 74,400.00
21 Kanstein Kursi K300 (15x40x50) ok m1 100,800.00
22 Bak cuci piring (royal) Ok Bh 260,480.00
23 Batu Bata Pasangan Kelas I ok Bh 1,500.00
24 Batu Bata Gosok sidi 88 ok Bh 2,500.00
25 Bata Pelapis/Expose ukuran 5x10x22 ok Bh 3,300.00
26 Batu Kali/Batu Belah ok M3 251,630.00
27 Batu Hitam Karangasem tambahkan harga m2 1,225,000.00
28 Bathcuip porselen hilang Bh
29 Besi Siku L.30.30.3 hilang Kg
30 Besi Ulir U35 (fy=320 kg/mm2) ok Kg 9,230.00
31 Besi Strip / Plat Jepit Kuda-Kuda hilang Btg
32 Baja Profil IWF ok Kg 13,380.00
33 Bentala 60 cm ok Bh 85,000.00
34 Bentala 50 cm ok Bh 60,000.00
35 Bentala 40 cm ok Bh 45,000.00
36 Bubungan Asbes hilang Bh
37 Buis Beton 25 x 75 Cm ok Bh 69,500.00
38 Buis Beton 30x75 Cm ok Bh 85,860.00
39 Buis Beton 50x75 Cm ok Bh 109,660.00
40 Buis Beton 60 x 50 cm ok Bh 116,420.00
41 Buis Beton 80 x 50 Cm ok Bh 163,930.00
42 Buis Beton 100 x 50 Cm ok Bh 203,000.00
43 Bubungan Stel gelombang hilang Lbr
44 Tutup Buis Beton 80 x 50 Cm k Bh 153,500.00
45 Tutup Buis Beton 100 x 50 Cm ok Bh 180,700.00
46 Calsiboard 120 X 240 X 3,5 mm ok lbr 65,930.00
47 Cat Dasar Vinilex cek produk cat Kg 30,600.00
48 Cat kayu Emco ok Kg 65,440.00
49 Cat Besi (exs: avian) OK/ Tambahan untuk cat sesuai merek di baw Kg 61,570.00
50 Cat Meni kayu (exs : altec) OK/ Tambahan untuk cat sesuai merek di baw Kg 40,700.00
51 Cat Meni besi OK/ Tambahan untuk cat sesuai merek di baw Kg 37,840.00
52 Cat Tembok Vinilex OK/ Tambahan untuk cat sesuai merek di baw Kg 27,600.00
53 Cat Tembok mowilex OK/ Tambahan untuk cat sesuai merek di baw ltr 72,600.00
54 Cat Tembok catylax OK/ Tambahan untuk cat sesuai merek di baw Kg 25,620.00
55 Cat Tembok dulux interior OK/ Tambahan untuk cat sesuai merek di baw ltr 72,420.00
56 Cat Tembok dulux weathersield OK/ Tambahan untuk cat sesuai merek di baw ltr 114,520.00
57 Cat waterproofing exs no drop Kg 46,330.00
58 Cat waterproofing exs bitumen Kg 38,000.00
NO NAMA BARANG SATUAN HARGA 2021

1 2 3 4
59 Clear Gloss Kg 71,930.00
60 Closet duduk Toto CW 421J/SW420JP/TC505S set 2,193,300.00
61 Closet Jongkok toto CE 7 set 244,980.00
62 Door stoper solid ok Bh 77,670.00
63 Door closer solid ok Bh 247,500.00
64 Door holder solid ok Bh 40,000.00
65 Engsel Pintu solid ok Bh 84,460.00
66 Engsel jendela solid ok Bh 49,500.00
67 Engsel Nilon solid ok Bh 40,000.00
68 Engsel angin solid ok Bh 35,000.00
69 Expagnolet solid ok Bh 75,000.00
70 Fiber Glass (bak ) ok Bh 230,000.00
71 Floor Drain (Exs : Onda) ok Bh 108,350.00
72 Formite hilang Bh
73 Gedeg Klas I ok M2 35,000.00
74 Genteng pelentong kecil ( Exs : Pejaten) ok Biji 1,610.00
75 Genteng Kaca ok Biji 26,670.00
76 Genteng Plentong besar ok Biji 2,650.00
77 Genteng Beton ok Biji 8,880.00
78 Genteng Kodok(exs good year) ok Biji 5,170.00
78 Genteng Kodok(exs Lestari) ok Biji 2,430.00
79 Genteng glazur(exs : Mclass, KIA) ok Biji 12,000.00
80 Genteng Gemini (exs good year) ok Biji 6,400.00
81 Genteng Metal t = 0.25 mm berpasir ok Lbr 38,000.00
82 Genteng Metal t = 0.3 mm ok Lbr 36,000.00
83 Genteng Bubungan pelentong kecil ok Biji 4,000.00
84 Genteng Bubungan/Nok Beton ok Biji 25,000.00
85 Genteng Bubungan Plentong besar/super ok Biji 7,000.00
86 Genteng Bubungan kodok (exs. Good year) ok Biji 18,380.00
86 Genteng Bubungan kodok (exs. Lestari) ok Biji 10,250.00
87 Genteng Bubungan Glazur (Mclass, KIA) ok Biji 30,000.00
88 Glass Block ok Biji 26,800.00
89 Grendel ok Bh 28,850.00
90 Gypsum Elephant ok Lbr 61,250.00
91 Granit tile 60 x 60 Niro Granite Type White Swan GG 645 Ok Bh 181,970.00
92 Granit Plin 10 x 60 cm Ok Bh
93 Ijuk ok Kg 10,750.00
94 Kaca Bening 3 MM ok M2 101,830.00
95 Kaca Bening 5 MM ok M2 145,130.00
96 Kaca Bening 8 MM ok M2 240,000.00
97 Kaca Buram12 MM ok M2 440,000.00
98 Kaca Cermin 5 MM ok M2 275,000.00
99 Kaca Cermin 8 MM ok M2 335,000.00
100 Kaca Nako ok M2 150,000.00
101 Kaca Ryben 3 MM ok M2 117,500.00
102 Kaca Ryben 5 MM ok M2 141,830.00
103 Kaca Ryben 5 MM ok Ps 141,830.00
104 Karung Plastik ok Bh 3,500.00
105 Kawat Baja Bindrat ok Kg 19,560.00
106 Kawat Beton ok Kg 19,740.00
107 Kawat Berduri ok M1 23,490.00
108 Kawat jaring m2 20,000.00
109 Kayu Bingkirai Balok M3 10,300,000.00
110 Kayu Bingkirai Papan / Usuk / Reng M3 10,942,860.00
111 Kayu Jati Balok M3 11,000,000.00
112 Kayu Jati Papan M3 12,166,670.00
112 Kayu Jati Balok (perhutani) M3 10,000,000.00
112 Kayu Jati Papan (perhutani) M3
112 Kayu Kamper Balok ok M3 7,693,750.00
114 Kayu Kamper Papan/ Usuk / Reng ok M3 8,442,500.00
115 Kayu Kruing Balok ok M3 6,443,440.00
NO NAMA BARANG SATUAN HARGA 2021

1 2 3 4
116 Kayu Kruing Papan / Usuk / Reng ok M3 6,939,110.00
117 Kayu Meranti Balok ok M3 4,083,380.00
118 Kayu Meranti Papan / Usuk / Reng ok M3 4,825,600.00
119 Kayu Dolken (Pekerjaan Sementara) ok Btng 204,440.00
120 Kayu Merbau Balok ok M3 20,600,000.00
121 Kayu Merbau Papan ok M3 22,100,000.00
122 Kayu Terentang/Begesting ok M3 1,925,000.00
123 Kayu Albesia Balok ok M3 2,813,750.00
124 Kayu Albesia Papan / Usuk ok M3 2,827,140.00
125 Kayu Nangka Balok ok M3 5,833,330.00
126 Kayu Cempaka Balok ok M3 5,933,330.00
127 Kayu Profil (List) ok M1 12,500.00
128 Homogenius Tile (Ggranite Tile) 60cmx60cm warna (exs. Granito) Bh 147,000.00
129 Kaca Bening 3 MM ok Tambahkan produk lain dibawah Bh 101,830.00
129 Kaca Bening 8 MM ok Tambahkan produk lain dibawah Bh 240,000.00
130 Kaca Cermin 5 MM ok Tambahkan produk lain dibawah Doos 275,000.00
131 Kaca Nako ok Tambahkan produk lain dibawah Doos 150,000.00
132 Kaca Ryben 5 MM ok Tambahkan produk lain dibawah Doos 141,830.00
133 Kaca Tempered 12 mm ok Tambahkan produk lain dibawah Bh 603,750.00
134 Keramik 33 cm x 33 cm Polos ok Tambahkan produk lain dibawah Doos 102,500.00
135 Keramik 33 cm x 33 cm warna ok Tambahkan produk lain dibawah Doos 102,500.00
136 Keramik dinding 20 cm x 25 cm warna (exs: KIA) ok Tambahkan produk lain dibawah Doos 53,000.00
137 Keramik 20 cm x 20 cm tekstur ok Doos 52,000.00
138 Keramik 25 x 25 tekstur ok Doos 52,170.00
139 Kerawang /roster PC ok Bh 63,330.00
140 Kerikil Beton ok M3 259,290.00
141 Kuas besar ok Set 19,440.00
142 Kunci antik/ handle style Bali ok Bh 90,000.00
143 Kunci tanam ok Set 110,730.00
144 Kunci Slot ok Bh 100,000.00
145 Kuas kecil ok Bh 6,270.00
146 Keran Air Onda ok Bh 37,290.00
147 Lampu TL 20 Watt komplit philips Bh 123,900.00
148 Lampu TL 40 Watt komplit philips Bh 155,000.00
149 Lampu Pijar 40 Watt philips Bh 11,000.00
150 Keran / Ledang (exs : onda) ok Bh 36,240.00
151 Keran Sink (exs : onda) ok Bh 257,360.00
152 Keran wastafel (exs : onda) ok Bh 180,440.00
153 List Gypsum 7/7 ok M1 20,000.00
154 Lem Kayu ok Ltr 24,070.00
155 Lem Pipa ok Kg 87,020.00
156 Hollow Galvanis 40/40/0,4 mm ok m1
157 Minyak Olie Meditran S10W ok Meditran S10W Ltr 15,580.00
158 Minyak Bekisting Meditran S10W ok Meditran S10W Ltr 15,580.00
159 Murda 30 cm (paras cor) ok Bh
160 Murda 25 cm ok Bh 68,330.00
161 Murda 20 cm ok Bh 57,670.00
162 Melamic hilang Kg
163 Mortar siap pakai MU 400 kg 2,280.75
164 Paku List ok kg 22,000.00
165 Parquet kayu Shera ok M2 180,000.00
166 Paku 5 -12 cm ok Kg 18,450.00
167 Paku Seng ok Kg 38,240.00
168 Paku Skrup 1/2 ok bh 28,000.00
169 Paku Skrup 2" ok bh 300.00
170 Paku Skrup 3" ok Bh 900.00
171 Paku Skrup fisher S8 Bh 6,430.00
172 Paku 5 -12 cm ok Kg 18,450.00
173 Paku pancing 60 x 230 pakai di asbes (hilang) Kg 300.00
174 Pasir Beton ok M3 234,200.00
175 Pasir Pasang ok (Tambahkan pasir halus) M3 245,810.00
176 Pasir Urug ok M3 160,690.00
NO NAMA BARANG SATUAN HARGA 2021

1 2 3 4
177 Saluran Beton Pracetak Tipe U60/80X120 (K350) Gadar 10 To ok M2 1,216,380.00
178 Tutup Beton Pracetak Tipe U60X120 (K350) Gadar 10 Ton ok M2 540,600.00
179 Saluran Beton Pracetak Tipe U80/80X120 (K350) Gadar 10 To ok M2 1,527,350.00
180 Saluran Beton Pracetak Tipe U80/100X120 (K350) Gadar 10 T ok M2 1,837,510.00
181 Plamir Tembok Dulux Kg 23,580.00
182 Plywood 3 MM ok Lbr 54,670.00
183 Plywood 4 MM ok Lbr 57,130.00
184 Plywood 6 MM ok Lbr 70,280.00
185 Plywood 9 MM ok Lbr 103,570.00
186 Plywood 12 MM ok Lbr 140,580.00
187 Plywood 18 MM ok Lbr 235,390.00
188 Politure Propan ok Kg 77,370.00
189 Rel Pintu sorong ok M 240,000.00
190 Sanding ok Kg 68,460.00
191 Semen PC Gresik ok Kg 1,320.00
192 Semen warna/semen grouting( MU, Sika) ok Kg 16,000.00
193 Seng Bjls 0,32 ok Lbr 55,000.00
194 Seng plat 3" x 6" BJLS 28 ok Lbr 44,500.00
195 Seng plat (0,30 mm) 180 x 90 cm ok Lbr 49,500.00
196 Seng Gelombang 3" x 6" ok Lbr 52,500.00
197 Seseh Balok Dolken 3 m ok Bt 77,500.00
198 Seal tape ok Bh 5,260.00
199 Sealant Dextone 300ml ok Bh 44,000.00
200 SIrtu ok M3 141,290.00
201 Spandek (0,25x620x67)cm ok lbr 193,330.00
202 Trimdek warna (0,25x620x75)cm ok lbr 213,840.00
203 Trimdek biasa (0,25x620x75)cm ok lbr 208,750.00
204 Soda Api Ltr 22,300.00
205 Spring Knip spring knip/grendel Bh 28,850.00
206 Tali Ijuk kg 12,430.00
207 Tanah Timbun M3 121,670.00
208 Teak Oil Ltr 52,950.00
209 Teak wood 4 mm (120 x 240 cm) Lbr 108,730.00
210 Tegel PC 20 x 20 Cm polos hilang Bh
211 Tegel PC 20/20 Cm warna Bh
212 Thinner Polyurethane Propan Ltr 37,350.00
213 Genteng Bubungan pelentong kecil ok Biji 4,000.00
214 Genteng Metal t = 0.3 mm ok Biji 36,000.00
215 Genteng Metal t = 0.25 mm berpasir ok Biji 38,000.00
216 Urinoir exs. Toto u57 ok Bh 1,500,000.00
217 Vernis (exs : ultran, Imra) ok Kg 73,330.00
218 Wood Filer (exs. mowilek, ultran, impra) ok Kg 47,150.00
219 Washtafel Toto ok Bh 532,900.00
220 Waterdrain ok Bh 168,300.00
221 woodstain cek dengan wood filler Kg 72,500.00
222 Solar Industri ok Ltr 16,500.00
223 Saka Kamper ukir 11/11 cm tambahkan ukiran merbau & Cepaka Bh 950,000.00
224 Saka Bingkirai ukir 11/11 cm tambahkan ukiran merbau & Cepaka Bh 1,300,000.00
225 Saka Jati ukir11/11 cm tambahkan ukiran merbau & Cepaka/Cek har Bh 1,650,000.00
226 Pementang Kamper ukir 10 x 20 cm tambahkan ukiran merbau & Cepaka m1 1,800,000.00
227 Pementang Jati ukir 10 x 20 cm tambahkan ukiran merbau & Cepaka m1 1,950,000.00
228 Dedeleg Jati Ukir tambahkan ukiran merbau & Cepaka m1 1,275,000.00
229 Canggah wang Jati Ukir tambahkan ukiran merbau & Cepaka psg 350,000.00
230 Ring - ring ukir Kamper m1 663,330.00
231 Kencut Saka Bh 250,000.00
232 Ukiran Penyambung Tapel Lis Plang/Ris M1 135,500.00
233 Tapel Lis Plang/Ris Set 250,000.00
234 Tapel Ring - ring Bh 50,000.00
235 Dupak Saka Bh 75,000.00
236 Paras Ornamen (20 x 60 x 5 cm) cek spek baha (klas I&super) paras silakarang BH
237 Paduraksa batu hitam t = 1,5(cek tinggi dg harga) Unit 2,000,000.00
238 Bataran batu hitam cek harga (batu karangasem) m2 1,800,000.00
NO NAMA BARANG SATUAN HARGA 2021

1 2 3 4
239 Candi Bentar batu hitam t = 3,5 m Batu Hitam karangasem Unit 35,000,000.00
240 Candi Bentar paras bata t = 3,7 m Unit 40,000,000.00
241 Candi Bentar paras bata t = 2,5 m Unit 25,000,000.00
242 Paduraksa paras bata (lbr. kepala bag.tengah max 0.4 cm) Unit 2,500,000.00
243 Pipa Galvanis 1/2 " OK M1 23,420.00
244 Pipa Galvanis 3/4 " OK M1 30,530.00
245 Pipa Galvanis 1 " OK M1 43,360.00
246 Pipa Galvanis 1 1/2" OK M1 65,750.00
247 Pipa Galvanis 3" OK M1 148,560.00
248 Pipa Galvanis 4" OK M1 197,560.00
249 Clean Out dia 4" Stainless ok M1 105,000.00
250 Clean Out dia 3" PVC ok M1 12,000.00
251 Clean Out dia 3" Stainless ok M1 97,000.00
252 Stop Valve Besi dia 1/2" Toro ok M1 266,000.00
253 Stop Valve TX 277 SV1 ok M1
254 Gate Valve Besi dia 1" Toro ok M1 384,000.00
255 Gate Valve Besi dia 3/4" Toro ok M1 360,000.00
256 Pipa PVC tipe AW Ø 0,5" P = 4 m Maspion M1 8,600.00
257 Pipa PVC R-R OD dia OD 63 mm, S12,5 pakai langgeng M1 36,830.00
258 Pipa PVC R-R OD dia OD 75 mm, S12,5 pakai langgeng M1 57,600.00
259 Pipa PVC R-R OD dia OD 90 mm, S12,6 pakai langgeng M2 84,070.00
260 Pipa PVC R-R OD dia OD 110 mm, S12,7 pakai langgeng M3 119,510.00
261 Minyak Bekisting Meditran S10W Liter 15,580.00

BATU ALAM
261 Paras Abu-abu M2 106,490.00
262 Paras Kerobokan M2 59,380.00
263 Paras Kelating M2 80,000.00
264 Paras Jogja M2 225,830.00
265 Batu Palimanan M2 114,100.00
266 Batu Jogja M2 158,900.00
267 Batu Candi T = 2 cm M2 113,950.00
268 Batu Candi T = 3 cm M2 162,600.00
269 Batu Candi T = 5 cm M2 243,000.00
269 Batu Hitam Karangasem M2 1,225,000.00
270 Batu Andesite T = 2 cm M2 126,750.00
271 Batu Andesite T = 3 cm M2 253,330.00
272 Bata Press Pejaten T = 5cm Bh 6,300.00
273 Bata Press Pejaten T = 6cm Bh 6,400.00
274 Bata Pasang Bh 1,300.00
275 Batu Bata Gosok sidi 88 Bh 2,500.00

BESI DAN BAJA


Baja Ringan Canai Dingin
276 Besi Polos U28 (fy=240 kg/mm2) ok Kg 9,180.00
277 Besi Ulir U35 (fy=320 kg/mm2) ok Kg 9,230.00
278 Besi Ulir U42 (fy=400 kg/mm2) ok Kg 9,740.00
279 Baja Profil IWF ok Kg 13,380.00
280 Baja Profil CNP ok Kg 7,090.00
281 Wiremesh M5 ukuran : 2,1 x 5,4 m ok Kg 232,500.00
282 Wiremesh M6 ukuran : 2,1 x 5,4 m ok Kg 320,300.00
283 Wiremesh M7 ukuran : 2,1 x 5,4 m ok Kg 481,950.00
284 Wiremesh M8 ukuran : 2,1 x 5,4 m ok Kg 623,280.00
285 Wiremesh M9 ukuran : 2,1 x 5,4 m ok Kg 950,000.00
286 Wiremesh M10 ukuran : 2,1 x 5,4 m ok Kg 1,024,890.00
287 Wiremesh M12 ukuran : 2,1 x 5,4 m ok Kg

288 Koral Sikat Hitam (1 sak = 8 kg) Sak 80,000.00


289 Koral Sikat Warna Sak 103,330.00
290 Bambu D=8-10 cm Panjang 4 m ok Btg 9,850.00

ELEKTRIKAL
NO NAMA BARANG SATUAN HARGA 2021

1 2 3 4
291 Kabel NYM 3 X 2,5 mm (exs. Eterna) ok m' 12,860.00
292 Kabel NYM 3 X 1,5 mm ok m' 10,650.00
293 Kabel NYM 2 X 2,5 mm ok m' 11,490.00
294 Kabel NYM 2 X 1,5 mm ok m' 8,050.00
295 Saklar Tunggal isi merek dan type Bh 16,500.00
296 Saklar Ganda isi merek dan type Bh 26,300.00
297 Stop Kontak isi merek dan type Bh 26,630.00
298 Stop Kontak Outdoor isi merek dan type Bh 42,980.00
299 Saklar Tunggal Outdoor isi merek dan type Bh 64,580.00
300 Saklar Ganda Outdoor isi merek dan type Bh 56,180.00
301 T Dus isi merek dan type (samakan merek diatas) Bh 6,420.00
302 Klem Kabel Cek harga> Bh 2,790.00
303 Pipa Listrik merek pipa m' 11,090.00
304 L Bow isi merek dan type Bh 3,200.00
305 Inbow Dus isi merek dan type Bh 5,440.00
306 Stop Kontak AC isi merek dan type Bh 60,730.00
307 MCB isi merek jika ada Unit 47,110.00
308 Isolasi bh 8,780.00
309 sock bh 1,700.00
310 M dus isi merek bh 3,380.00
311 Downlight 4 " isi merek bh 55,820.00
312 Lampu xl 18 watt isi merek bh 29,970.00

HOLLOW GALVANIS
308 Hollow Galvanis 35/35/0.6 mm ok M' 12,000.00
309 Hollow Galvanis 20/20/0.8 mm ok M' 10,000.00
310 Hollow Galvanis 60/60/1.0 mm ok M' 37,000.00
311 Spandek 0.25 mm silver ok M2 37,000.00
312 Spandek 0.25mm biru ok M2 37,250.00

HOLLOW ALLUMINIUM
313 Hollow Alluminium 40 x 40 mm tambah harga M 6,700.00
314 Hollow Alluminium 20 x 40 mm tambah harga M 5,500.00

PIPA GALVANIS
315 Pipa Galvanis 1/2 " M 23,420.00
316 Pipa Galvanis 3/4 " M 30,530.00
317 Pipa Galvanis 1 " M 43,360.00
318 Pipa Galvanis 1 1/4 " M
319 Pipa Galvanis 1 1/2" M 65,750.00
320 Pipa Galvanis 2" M
321 Pipa Galvanis 2 1/2" M
322 Pipa Galvanis 3" M 148,560.00
323 Pipa Galvanis 3" M 148,560.00

289 Aluminium Jeruk Lbr 96,000.00


290 Main trus C75-0,75 m' 61,830.00
291 Main trus UK 75-0,75 m'
292 Diafragma bh
293 Sepatu UK bh
294 Reng AA 0,45 m' 37,000.00
295 Sekrup reng bh 240.00
296 Sekrup main trus bh
297 Dynabol 10 x 65 bh 4,750.00
298 Hollow galvalume 3,5 x 3,5 m' 30,000.00
299 wall angle m' 6,150.00
300 Paku Beton bh 178.40
301 Grendel espagnolet bh
302 Isolasi bh 8,780.00
303 sock bh 1,700.00
304 M dus bh 3,380.00
NO NAMA BARANG SATUAN HARGA 2021

1 2 3 4
305 Downlight 4 " bh 55,820.00
306 Lampu xl 18 watt bh 29,970.00
307 Cat KCA Kg 34,280.00
308 Coumpond Kg 40,000.00
309 Box panel uk. 80x60x25 cm cek merek ok Bh 1,266,670.00
310 box panel 60x40x25 cm cek merek ok Bh 750,000.00
311 MCCB 3 phase 63 ampere ok Bh 522,500.00
312 MCCB 3 phase 40 ampere ok Bh 334,970.00
313 MCB 3 phase 25 ampere ok Bh 206,500.00
314 MCB 3 phase 16 ampere ok Bh 203,070.00
315 MCB 1 phase 6 ampere ok Bh 49,730.00
316 MCB 1 phase 10 ampere ok Bh 52,450.00
317 MCB 1 phase 16 ampere ok Bh 52,850.00
318 lampu pilot ok Bh 36,000.00
319 fuse ok Bh 10,000.00
320 rel MCB ok M1 25,000.00
321 busbar RST ok M1 90,750.00
322 busbar netral dan nol ok Bh 90,750.00
323 Grounding BC 70 mm2 ok M1 99,000.00
324 Splitzen 1' ok Bh 77,000.00
325 kabel NYY 4x16 mm2 ok M1
326 BC 16 mm2 ok M1 122,100.00
327 ITC 2x2x0,6 mm2 ok M1 20,350.00
328 Outlet Telepon ok Bh 38,500.00
329 Pesawat Telepon ok Bh 55,000.00
330 Celing Speaker ok Bh 192,500.00
331 Kabel Data UTP 6 ok M1 220,000.00
332 Outlet Data Bh 80,000.00
333 Kabel NYMHM 2X1,5mm M1 18,000.00
334 Jet Shower Bh
335 Angkur D 19 Bh 45,000.00
336 Baut M16 Bh 11,000.00

Pipa
Harga dari Vendor

337 Pipa PVC tipe AW Ø 0,5" P = 4 m Maspion ok M1 8,600.00


338 Pipa PVC tipe AW Ø 0,75" P = 4 m Maspion ok M1 10,310.00
339 Pipa PVC tipe AW Ø 1" P = 4 m Maspion ok M1 12,750.00
340 Pipa PVC tipe AW Ø 1,5" P = 4 m Maspion ok M1 22,320.00
341 Pipa PVC tipe AW Ø 2" P = 4 m Maspion ok M1 32,640.00
342 Pipa PVC tipe AW Ø 3" P = 4 m Maspion ok M1 59,110.00
343 Pipa PVC tipe AW Ø 4" P = 4 m Maspion ok M1 84,390.00
344 Pipa PVC tipe AW Ø 5" P = 4 m Maspion ok M1 141,090.00
345 Pipa PVC tipe AW Ø 6" P = 4 m Maspion ok M1 176,450.00
346 Pipa PVC tipe AW Ø 12" P = 4 m Maspion ok M1 642,650.00
347 Pipa Maspion D 1-1/2 ok M1 12,660.00
348 Pipa Maspion D 1-1/4 ok M1 10,870.00
349 Pipa Maspion D 2 ok M1 15,400.00
350 Pipa Maspion D 2-1/2 ok M1 24,100.00
351 Pipa Maspion D 3 ok M1 34,300.00
352 Pipa Maspion D 4 ok M1 47,570.00
353 Pipa Maspion D 5 ok M1 86,200.00
354 Pipa Maspion D 6 ok M1 104,710.00
355 Pipa Maspion D 12 ok M1 440,380.00
356 Pipa PVC tipe AW Ø 1/2" Wavin ok M1 7,670.00
357 Pipa PVC tipe AW Ø 3/4" Wavin ok M1 10,670.00
358 Pipa PVC tipe AW Ø 1" Wavin ok M1 14,670.00
359 Pipa PVC tipe AW Ø 1 1/4" Wavin ok M1 21,670.00
360 Pipa PVC tipe AW Ø 1 1/2" Wavin ok M1 25,000.00
NO NAMA BARANG SATUAN HARGA 2021

1 2 3 4
361 Pipa PVC tipe AW Ø 2" Wavin ok M1 32,330.00
362 Pipa PVC tipe AW Ø 2 1/2" Wavin ok M1 46,670.00
363 Pipa PVC tipe AW Ø 3" Wavin ok M1 66,000.00
364 Pipa PVC tipe AW Ø 4" Wavin ok M1 108,330.00
365 Pipa PVC tipe AW Ø 5" Wavin ok M1 101,470.00
366 Pipa PVC tipe AW Ø 6" Wavin ok M1 155,670.00
367 Pipa PVC tipe AW Ø 12" Wavin ok M1
368 Pipa PVC tipe D Ø 1 1/4" Wavin ok M1 14,000.00
369 Pipa PVC tipe D Ø 1 1/2" Wavin ok M1 16,000.00
370 Pipa PVC tipe D Ø 2" Wavin ok M1 19,480.00
371 Pipa PVC tipe D Ø 2 1/2" Wavin ok M1 26,530.00
372 Pipa PVC tipe D Ø 3" Wavin ok M1 34,400.00
373 Pipa PVC tipe D Ø 4" Wavin ok M1 53,330.00
374 Pipa PVC tipe D Ø 12" Wavin ok M1
375 Lem pipa ok Kg 87,020.00

Vinilon

376 Pipa PVC 3/4 SNI S-8 SCJ M1


377 Pipa PVC 1 SNI S-8 SCJ M1
378 Pipa PVC 1 1/4 SNI S-8 SCJ M1
379 Pipa PVC 1 1/2 SNI S-8 SCJ M1
380 Pipa PVC 2 SNI S-8 SCJ M1
381 Pipa PVC 3 SNI S-8 SCJ M1
382 Pipa PVC 4 SNI S-8 SCJ M1
383 Pipa PVC 4 SNI S-8 SCJ M1

384 Pipa PVC 2 SNI S-8 RRJ M1


385 Pipa PVC 3 SNI S-8 RRJ M1
386 Pipa PVC 4 SNI S-8 RRJ M1
387 Pipa PVC 6 SNI S-8 RRJ M1
388 Pipa PVC 8 SNI S-8 RRJ M1
389 Pipa PVC 10 SNI S-8 RRJ M1
390 Pipa PVC 12 SNI S-8 RRJ M1
391 Pipa PVC 14 SNI S-8 RRJ M1
392 Pipa PVC 16 SNI S-8 RRJ M1
393 Pipa PVC 18 SNI S-8 RRJ M1
394 Pipa PVC 20 SNI S-8 RRJ M1

395 Pipa PVC 1/2 SNI S-10 SCJ M1 7,910.00


396 Pipa PVC 3/4 SNI S-10 SCJ M1 9,950.00
397 Pipa PVC 1 SNI S-10 SCJ M1 13,800.00
398 Pipa PVC 1 1/4 SNI S-10 SCJ M1 19,470.00
399 Pipa PVC 1 1/2 SNI S-10 SCJ M1 26,580.00
400 Pipa PVC 2 SNI S-10 SCJ M1 39,380.00
401 Pipa PVC 3 SNI S-10 SCJ M1 71,480.00
402 Pipa PVC 4 SNI S-10 SCJ M1 103,370.00
403 Pipa PVC 6 SNI S-10 SCJ M1 233,570.00

404 Pipa PVC 2 SNI S-10 RRJ M1 36,830.00


405 Pipa PVC 3 SNI S-10 RRJ M1 84,070.00
406 Pipa PVC 4 SNI S-10 RRJ M1 119,510.00
407 Pipa PVC 6 SNI S-10 RRJ M1 215,350.00
408 Pipa PVC 8 SNI S-10 RRJ M1 338,820.00
409 Pipa PVC 10 SNI S-10 RRJ M1 507,940.00
410 Pipa PVC 12 SNI S-10 RRJ M1 767,200.00
411 Pipa PVC 14 SNI S-10 RRJ M1 1,195,440.00
412 Pipa PVC 16 SNI S-10 RRJ M1 1,344,410.00
413 Pipa PVC 18 SNI S-10 RRJ M1
414 Pipa PVC 20 SNI S-10 RRJ M1
415 Pipa PVC 24 SNI S-10 RRJ M1
NO NAMA BARANG SATUAN HARGA 2021

1 2 3 4
416 saka 11/11/200 kayu jati (kupak) bh 700,000.00
417 Canggah wang kayu jati (kupak) ps
418 Pementang kayu jati (kupak) m1
419 Papan petaka kayu kamper m1 1,275,000.00
420 sendi marmer bh 325,000.00
421 Apit-apit kayu profil m1 47,500.00
422 List kayu 3/5 profil m1 20,000.00
423 sika top seal kg 13,240.00
424 Genteng Karang pilang Bisma bh 4,770.00
HARGA SATUAN BAHAN KRITERIA KHUSUS TAHUN 2021

HARGA SATUAN
NO NAMA BARANG SATUAN
TAHUN 2021
1 2 3 4

MORTAR SIAP PAKAI


Mortar Utama (MU-380) 40 kg untuk Perekat Bata Ringan zak 163,040.00
1
2 Mortar Utama (MU-100) 40 kg untuk Plesteran Premium zak 106,000.00
Mortar Utama (MU-200) 40 kg untuk Acian plester beton dan
zak 148,320.00
3 dinding
Mortar Utama (MU-450)40 kg untuk pasang Keramik Lantai
zak 171,650.00
4 Dan Dinding
5 Mortar Utama (MU-440) 40 kg untuk perata Lantai zak 91,230.00
6 Waterproofing Semen Base AM 110 Kg 39,170.00
7 Semen AM 40 Kg 11,870.00
8 Semen AM-70 kg 15,500.00

CAT 57,540.00
1 Prime Coat AR-300 Propan Kg 475,880.00
2 Prime Coat EPG-4049 Propan Kg 21,490.00
3 Top Coat Decorshield DW-500 Propan Kg 89,200.00
4 Top Coat Decorlotus DLI-480 Propan Kg 68,600.00
5 Cat Exterior Propan Decorsheild litter 94,640.00
6 Politure Propan litter 77,370.00
7 Propan Cat Dasar Alkali Resisting Interior Litter 43,460.00
8 Propan Cat Plafon Interior kg 48,240.00
9 Cat Interior Propan litter 65,600.00
12 Cat Propan Eco Gypsum Primer EPG-4049 L 21,490.00
13 Top Coat Eco EE-4010 Propan Kg 52,890.00
14 Primer Fiberkote FPS-820 Propan Kg 114,550.00
15 Top Coat Fiberkote FBK-889 (color) Kg 156,870.00
16 Coating Batu alam Merk Propan Kg 98,800.00
17 Coating Batu Propan Stone Care SC - 80SB m' 88,560.00
18 Drymix Plester kg 1,680.00
19 Drymix Acian kg 2,530.00
20 Propan Polyfloor PFP-241 m2 95,850.00
21 Propan Polyfloor PFT-253 3K m2 58,500.00
22 Propan Polyfloor PFT-253 2K m2 105,930.00
23 Cat Zincromate kg 57,500.00

MATERIAL FINISHING LANTAI


Granit tile 60 x 60 Niro Granite Type White Swan GG 645 M2 181,970.00
1
Granite tile 60 x 60 Niro Granite Lantai KM/WC Type GG 042
M2 147,000.00
2 Splas Beige

Granit tile 30 x 60 Niro Granite Type White Swan GG 645 M2 150,000.00


3
4 Niro Granite 60 x 60 Splash Grey m2 155,000.00
5 Niro Granite 60 x 60 Estilo Celia m2 200,000.00
VID Granite Namdinh uk 30x30x1,05 cm (Jalur Pengarah Dan
BH 57,800.00
7 Peringatan
8 Granite Tile 60/60 cm Motreal ; Light Grey; Matt; Valentino Gress M2 215,000.00
9 Granite Tile 60/60 cm Beige Polished; Valentino Gress M2 320,000.00
11 Granite Tile 60/60 cm Polished; Sedona ; Black ; Valentino Gress M2 375,000.00
12 Granit Tile 60/60 cm Sedona; Light Grey; Valentino Gress M2 350,000.00
13 Keramik 20/20 ; Asia Tile; Anti Slip M2 53,630.00
14 Keramik 20/25; Asia Tile M2 54,500.00
15 Granit Tile 30x60 M2 120,000.00
17 Granit ; Pinoso Crema, Slab, Quadra M2 1,980,000.00
18 Granit; Statuario Bianco, Square, Quadra M2 2,340,000.00
19 Granit; Marquina Nero, Slab, Quadra M2 2,250,000.00
20 Granit; Travertine Classico (matte), Slab, Quadra M2 1,485,000.00
21 Granit ; Savoie Grigio, Slab, Quadra M2 1,980,000.00
22 Granit; Travertine Classico (matte), Square, Quadra M2 1,485,000.00
23 Granit ; Pietra Crema (matte),Slab, Quadra M2 1,782,000.00
24 Granit ; Daino Naturale,Slab, Quadra M2 1,980,000.00
25 Granit ; Kripton White (matte),Slab, Quadra M2 1,935,000.00
26 Granit ; Sandstone Grigio (matte),Slab, Quadra M2 1,485,000.00
27 Granit ; Bronze Oxide (matte),Slab, Quadra M2 2,277,000.00
28 Granit ; Fantasia Bruno,Slab, Quadra M2 1,485,000.00
29 Granit; Madera Crema,Slab, Quadra M2 1,485,000.00
30 Granit ; Statuario Bianco,Slab, Quadra M2 2,385,000.00
31 Granit ; Serpegiante Zetta,Slab, Quadra M2 1,935,000.00
32 Granit ; Woodland Naturalle (matte),Slab, Quadra M2 1,485,000.00
33 Granit ; Purezza Bianco,Slab, Quadra M2 1,935,000.00
34 Granit ; Sandstone Grigio (matte),Square, Quadra M2 1,485,000.00
35 Granit ; Calro Bruno,Square, Quadra M2 1,350,000.00
36 Granit ; Daino Reale,Slab, Quadra M2 1,485,000.00
37 Granit ; Ardesia Noir,Square, Quadra M2 1,485,000.00
38 Granit ; Ardesia Noir,Slab, Quadra M2 1,935,000.00
39 Granit ; Classic Gris,Square, Quadra M2 1,350,000.00
40 Granit ; Galaxia Grigio,Square, Quadra M2 1,350,000.00
41 Granit ; Righe Grey,Square, Quadra M2 1,350,000.00
42 Granit ; Imperial Bruno,Square, Quadra M2 1,350,000.00
44 Keramik 40x40 cm, Anti Slip Bh 9,150.00
45 Keramik 25x40 cm, Platinum M2 65,580.00
46 Keramik 30x30 cm, Anti Slip; Platinum M2 51,330.00
47 Keramik 30x60 cm; Platinum Bh 12,250.00
49 Valentino Gress 60 x 60 Amazon Black m2 303,000.00
50 Valentino Gress 60 x 60 Antium Dark Grey m2 387,000.00
51 Valentino Gress 60 x 60 Crystalion White m2 194,330.00
52 Valentino Gress 60 x 60 Mozart Dark Grey Antislip m2 199,830.00
53 Valentino Gress 60 x 60 Pluto Light Cream m2 387,000.00
54 Valentino Gress 60 x 60 New Norway Brown m2 477,580.00

PAKU
1 Paku tembak f 20 mm Box 43,520.00
2 Paku tembak f 30 mm Box 52,050.00
3 Skrup kg 51,670.00
5 Baut M16 bh 11,000.00
6 BAUT HTB Dia.16 bh 6,000.00
7 BAUT HTB Dia.12 bh 7,000.00

LEM
1 Lem Putih kg 18,360.00
2 Lem Kuning Fox kg 38,180.00
3 Lem Aica Aibond kg 55,000.00
4 Lem Rajawali kg 42,840.00

BATU ALAM
1 Batu Cobble Andesit Flamed 20 x 20 x 5 cm M2 435,000.00
2 Batu Cobble Andesit Flamed 10 x 10 x 5 cm M2 310,000.00
3 Batu Andesit 30 x 30 x 3 cm (Black Absolute Flamed) m2 330,000.00
4 Batu Palimanan 30 x 30 t 1,5 cm m2 86,890.00

BETON
1 Beton Ready Mix K 100 m3 705,000.00
2 Beton Ready Mix K 125 m3 728,750.00
3 Beton Ready Mix K 175 m3 773,750.00
4 Beton Ready Mix K 225 m3 827,500.00
5 Beton Ready Mix K 250 m3 866,250.00
6 Beton Readymix K 300 m3 915,000.00
7 Tiang Pancang Prestress Mutu Beton K-450 m1
8 Plat Sambung Tbl. 6mm Angker 4D13mm titik

AKSESORIS PENGGANTUNG DAN PENGUNCI


1 Lokset MTS L Dks 84030 SN, CYL Dekson Bh
2 Handle LHTR Dks 84030 Oval SN Dekson Bh
3 Kunci Bulat KCBL 8587 BK SSS setara Dekson Bh
4 Engsel pintu 4" 4x3x3, 2BB ES/EL Dekson Bh 152,000.00
5 DOOR CLOSER CLD CLD 08320-4 S pcs 322,250.00
6 Door Closer DCL 529 HO Dekson Unit
7 Door Closer DCL 529 HO Dekson Unit
8 Kusen + Pintu Besi Produksi Bostinco uk 2 x 240 cm unit
9 Kusen + Pintu Besi Produksi Bostinco uk 1,5 x 240 cm unit
10 Engsel St. Steel Sel0010 4x3x3 2BBNRP US32D (Pintu) ps 280,000.00
11 Glass D.Handle GHD0003 I US32 ps 630,000.00
12 HRE 75.58 US32 ps 480,000.00
13 Kunci D CYLINDER 08610-10 US14 bh 262,450.00
14 BDN PELOR K87738-40 US32D bh 168,950.00
15 BDN SWING K87735-40 US32D bh 268,000.00
16 BDN PELOR K87738-60 US32D pcs 293,500.00
17 BDN SLIDING K87720-40 US32D pcs 156,450.00
18 BDN SWING K87735-60 US32D pcs 384,950.00
19 K CYLINDER K2541-65K US14 pcs 300,000.00
20 D CYLINDER 08610-10 US14 pcs 220,000.00
21 ESCUTCHEON E.73.05 US32D (Tutup Kunci) ps 63,450.00
22 DOOR CLOSER HO DCL 83210.2-4 HO S bh 920,000.00
23 DOOR STOP 75-016 US32D pcs 85,000.00
24 DOOR STOP 75-014 US14D bh 60,000.00
25 GRENDEL TANAM 314 6" X 19 MM US26 bh 190,000.00
26 GRENDEL TANAM 314 12" X 19 MM US26 bh 285,000.00
27 GRENDEL TANAM 306 6* US26D pcs 166,450.00
28 GRENDEL TANAM 306 12* US26D pcs 222,450.00
29 FLOOR HINGE FH 08323 - bh 2,090,000.00
30 SECURITY BOLT 5072 + KEY US32D bh 140,000.00
31 FLUSH HANDLE FRP.75.01 US32D (handle tanam sliding) ps 350,000.00
32 FLUSH HENDLE FPP 75.07 US32D ps 330,000.00
33 ENGSEL ST.STEEL SEL0011 5X4X4 4BBNRP US32D (Jendela) ps 610,000.00
34 SPRING KNIP 75-378 US26D bh 150,000.00
35 RAMSKAR 76-032 US32D (Kait Angin) bh 257,500.00
36 DIGITAL D.LOCK K 7800FYS BLACK ( Hendle Pintu Electronic) set 10,400,000.00
37 SLIDING SET P85-2M - set 933,000.00
38 REL ATAS AL 1-12-3M AL - btng 360,000.00
39 RODA ATAS 1-246 I GALVANIS bh 230,000.00
40 REL BAWAH AL. 33-2-3M ANODISED btng 250,000.00
41 RODA BAWAH 44-345 GALVANIS bh 320,000.00
42 KARET SETOPAN 1-719 I BLACK bh 65,000.00
43 GLASS D.HANDLE GHD4504 D38x600x800MM US32D+US32 ps 1,330,000.00
44 PENAHAN BAWAH 42-371 GALVANIS bh 30,000.00
45 ENSEL KOBOY KOBOY 2062 4* US32D ps 303,750.00
46 BDN DEADLOCK K87700-40 US32D ps 392,500.00
47 PATCH FITTING PT 2210/D US32 bh 320,000.00
48 PATCH FITTING PT 2220 US32 bh 557,500.00
49 PATCH LOCK T/C. US 2210 US32 bh 992,500.00
50 FIXED TOP PIN PT 2224 US32 bh 96,250.00
51 BDN SLIDING K87720-40 US32D bh 156,450.00
53 ENGSEL COBOI KEND US32D pairs 460,000.00
54 SET RODA 1-206 U/ Soft Close - set 760,000.00
55 SOFT CLOSER 30-637 set 520,000.00
56 SELF CLOSER 30-701 - set 1,900,000.00
57 REL ATAS 1-23-2M batang 420,000.00
58 PENAHAN BAWAH 42-371 GALVANIS pcs 30,000.00
59 REL ATAS 3-20-4M GALVANIS batang 1,200,000.00
60 REL ATAS 3-20-3M GALVANIS batang 960,000.00
61 REL BAWAH AL. SERIE 100-1M batang 50,000.00
62 REL BAWAH AL. 33-2-4M ANODISED batang 330,000.00
63 REL BAWAH AL. 33-2-3M ANODISED batang 250,000.00
64 RODA ATAS TGL 3-240 GALVANIS pcs 1,000,000.00
65 RODA BAWAH 44-340 GALVANIS pcs 280,000.00
66 BREKET ATAS 3-150 GALVANIS pcs 210,000.00
67 SEKRUP BREKET 12 MM - pcs 4,000.00
68 GLASS D.HANDLE GHD0033 D38X47.5CM US32D+US32 pairs 1,460,000.00
69 GLASS D.HANDLE GHD0003 I US32 pairs 630,000.00
70 GLASS D.HANDLE GHD9602 38X800MM US32D+WOOD pairs 1,600,000.00
71 FLUSH HANDLE FPP.75.07 US32D pairs 330,000.00
72 FLUSH HANDLE FPP.75.01 US32D pairs 270,000.00
73 LEVER HANDLE HRE.75.58 US32D pairs 480,000.00
74 LEVER HANDLE HRE.75.45 pairs 1,080,000.00
75 GLASS D.HANDLE GHD9605 32X600MM US15+WOOD pairs 1,600,000.00
76 GLASS D.HANDLE GHD0007 I US32 pairs 810,000.00
77 DIGITAL D.LOCK K 6000 BLACK set 3,600,000.00
78 SHOWER HINGE GG E 572 180° ( 12MM ) US26 pairs 1,840,000.00
79 SYNCRO KIT 61-405 - pcs 1,700,000.00
80 SLIDING SET P85-2M - set 933,000.00
81 RAMSKAR 76-032 US32D pcs 340,000.00
82 SPRING KNIP 75-378 US26D pcs 150,000.00
83 Dust Proof Strike 013/12 US26; Kend pcs 90,000.00
84 D.PROOF STRIKE 013/17 (Ø32 X Ø17) US26; Kend pcs 110,000.00
85 Engsel INVISIBLE HINGE 1131 US32D Pairs 2,010,000.00
86 Handle Digital D.Lock K 6000 Black; Kend Set 3,600,000.00
87 SECURITY BOLT SC-5072 pcs 290,000.00
88 Kaca Tempered 12 mm M2 603,750.00
89 Tempered Glass 8mm M2 442,750.00

PIPA
3 Pipa PVC AW dia 8" Maspion M1 301,480.00
4 Pipa PPR-PN 10 dia 3/4" Toro m1 71,510.00
5 Pipa PPR-PN 10 dia 1" Toro m1 46,450.00
6 Pipa PPR-PN 10 dia 1-1/2" Toro m1 59,620.00
7 Pipa PPR-PN 10 dia 1-1/4" Toro m1 47,010.00
8 Pipa PPR-PN 10 dia 2" Toro m1 107,010.00
9 Pipa PPR-PN 10 dia 2 1/2" Toro m1 167,740.00
10 Pipa Magnaplast dia 50 mm pj. 3 m ljr
11 Pipa Magnaplast dia 75 mm pj. 3 m ljr
12 Pipa Magnaplast dia 110 mm pj. 3 m ljr
13 Pipa Magnaplast dia 125 mm pj. 3 m ljr
14 Pipa Magnaplast dia 160 mm pj. 3 m ljr
15 Roof Drain dia.150 mm Bh
16 Clean Out dia 4" PVC Bh 28,500.00
17 Clean Out dia 4" Stainless Bh 105,000.00
18 Clean Out dia 3" PVC Bh 12,000.00
19 Clean Out dia 3" Stainless Bh 97,000.00
20 Stop Valve Besi dia 1/2" Toro Bh 266,000.00
22 Gate Valve Besi dia 1" Toro Bh 384,000.00
23 Gate Valve Besi dia 3/4" Toro Bh 360,000.00
24 Body LW 103 JT1 W/F White Bh
25 Lavatory Faucet T 205 QN (Cold only) Bh
26 P-Trap TX 709 AV4N Bh
27 Stop Valve TX 277 S Bh
28 Body LW 647 CJ W/F White Bh
29 Lavatory Faucet TX 115 LRS Bh
30 P-Trap THX 1A-5N Bh
31 Stop Valve TX 277 SV1 Bh

SANITAIR
1 Closet Duduk Toto Type CW 896 JP White Comp Unit 5,391,500.00
2 Closet CW 425JW : Children Toilet Unit 8,090,000.00
3 Urinal Partition A 100 white Bh 1,112,800.00
6 Floor Drain TX 1 BN Bh 287,950.00
8 Mixing Shower TX 443 SRS Bh 1,010,000.00
9 Head Shower TX 465 SEN Bh 1,170,000.00
10 Kran air 1/2" atau 3/4" merk Onda Bh 35,510.00
11 Kran Dapur/Angsa merk Toto type TX609K Bh 72,300.00
15 Urinoir Toto Type U57/T60P Unit 2,144,950.00
19 Closet duduk Toto CW 421J/SW420JP/TC505S Unit 2,193,300.00
Closet duduk Toto Type SUPERIOR C436N/TX436C1-2WS 5,330,000.00
20 Unit
21 Closet Duduk Toto Type C51 T150NL Unit 2,873,000.00
26 One Piece Toilet Bh 3,060,600.00
31 Jet Washer (White) Bh 194,950.00
32 TP 1006 Angle Valve Bh 54,000.00
33 Lineare Two-hole basin mixer M-Size Bh
34 Single-lever mixer 1/2", universal concealed body Bh
35 AMSTAD Bh
36 Waste fitting Bh
37 Trap Bh
38 Euphoria System 260 Shower system with thermostat for wall mounting Bh
39 Allure Three-hole basin mixer 1/2" M-Size Bh
40 Two-handle basin mixer concealed body,1/2" Bh
41 Eurostyle Vessel basin 50 Bh
42 Grohtherm SmartControl Perfect shower set with Rainshower 310 SmartActive Bh
43 Zenistone Floor Standing Tub Round Bh
44 Allure Single-lever bath mixer 1/2", floor mounted Bh
45 Rough-in set ½" Bh
46 Winston Deck Mount Kitchen Bh
47 IN 305 Flexible Hose 50cm Bh
48 Stop Valve A4400 Bh 46,400.00
51 Plat Baja 0,3 mm M2 275,000.00
55 Sekrup Pas. Baja Ringan pcs 180.00
59 Floor Drain Type TX1BN Unit 287,950.00
60 Paper Holder Type TX720ACR Unit 266,600.00
61 Grab Bar Toto Type TX3A2 Unit 553,150.00
63 Shower Toto Type TX420SPN Unit 468,650.00
64 Shower Toto TX492SRS Unit 4,128,970.00
66 Tempat Sabun Toto Type TS125R Unit 57,900.00
68 Jet Washer Toto Type THX20MCRB Unit 205,870.00

MEP
27 Kabel BC 25 mm M1 36,020.00
28 Kabel BC 6 mm M1 12,900.00
29 Kabel NYYHY 2 x 1,5 mm2 M1 11,120.00
30 Kabel NYYHY 2 x 2,5 mm2 M1 9,440.00
31 Kabel NYYHY 2 x 4 Sqmm + HIC 20mm M1 23,000.00
32 Kabel NYMHY 3 x 2,5 mm2 M1 16,200.00
33 Kabel NYYHY 2 x 4 mm2 M1 26,370.00
34 Kabel NYY 4 x 4 mm2 M1 33,600.00
35 Kabel NYY 4x50 mm2 +1E M1 286,000.00
36 Kabel NYY 4x35 mm2 +1E M1 215,200.00
37 Kabel NYY 4x25 mm2 +1E M1 141,500.00
38 Kabel NYFGbY 4x240 mm2 M1 1,453,600.00
39 Kabel NYFGbY 4x35 mm M1 231,200.00
40 Kabel NYFGbY 4x16 mm M1 115,600.00
41 Kabel NYFGbY 4x6 mm M1 68,960.00
42 Kabel NYFGbY 3x6 mm M1 56,320.00
43 Kabel NYFGbY 3x4 mm M1 42,560.00
44 Kabel NYFGbY 3x2.5 mm M1 31,040.00
45 Kabel Data Cat 6 M1 8,000.00
46 Pipa Clipsal 20 mm warna hitam m1 9,420.00
47 Tee Clipsal 20 mm warna hitam Bh 3,900.00
48 Klem Clipsal 20 mm warna hitam Bj 1,400.00
49 Sock Clipsal 20 warna hitam Bh 800.00
50 Fisher Bh 330.00
51 PVC Conduit 20 mm m 6,220.00
52 Saklar Tukar Bh 275,000.00
53 Exhaust Fan Axial Inline type Kap.100 CPM Panasonic Bh 355,200.00
unit
Lampu Down Light Saka 501 2 Kaki Adjustable 5" White
240,000.00
Komponen Philips (LED Bulb 10-85 W E27 6500 K/3000K
54
unit
Lampu Down Light Saka 501 2 Kaki Adjustable 3" White
190,000.00
Komponen Philips (LED Bulb 10-85 W E27 6500 K/3000K
55
Lampu Eseential LED Tube 600 mm 8 W/865 T8 AP I G, unit
Philips (RMI Platinium setara SAKA Powder Coating 2 x 18 W 840,000.00
56 Fitting BJB)
57 Lampu LED 12 volt 36 w ( RGB light ) unit 44,000.00
58 Lampu Lantai Water Proof LED 10 Watt/220 Volt unit 56,000.00
unit
Lampu Tangga Tanam ukuran 24 x 10 x 8,3 Cm LED 5 Watt 160,000.00
60
unit
Lampu Tangga Tanam ukuran 24 x 10 x 8,3 Cm LED 5 Watt 160,000.00
61
Lampu Spot kotak LED 50 watt/220 volt IP 66 Water Proof unit
214,950.00
63 warm white
Lampu Spot kotak LED 100 watt/220 volt IP 66 Water Proof unit
307,450.00
64 warm white
67 Lampu Kolam Underwater 10 W ( Kolam Depan ) unit 175,000.00
70 Lampu Spot Tancap Taman 6 Watt LED unit 77,500.00
131 Ground Tank Kapasitas 30 m3 Produksi Sam Tung unit 109,300,000.00
132 Ground Tank Kapasitas 12 m3 Produksi Sam Tung unit 60,175,000.00
133 Ground Tank Kapasitas 2 m3 Produksi Sam Tung unit 10,925,000.00
134 STP Tank System Kapasitas 5 m3 Produksi Sam Tung unit 42,600,000.00
135 STP Type: BCR-140 Unit 82,800,000.00
136 Bioseptic Tank, Kap 0,8 m3/hari Unit 5,850,000.00
137 AC New Smile Inverter STKC50TV 2 PK Daikin Unit 10,950,000.00
138 AC New Smile Inverter STKC35TV 1,5 PK Daikin Unit 7,200,000.00
139 AC New Smile Inverter STKC20TV 3/4 PK Daikin Unit 5,380,000.00
140 AC New Smile Inverter STKC15TV 1/2 PK Daikin Unit 5,150,000.00

LANGIT-LANGIT / PLAFOND
142 Gypsum Jayaboard Sheetrock 9mm Lbr 60,000.00
144 Kalsiboard 4,5 mm Lbr 70,000.00
145 List Gypsum 7/7 M1 20,000.00
150 Smart Drain - Square Drain Bh 302,450.00
152 Shower-TX488SM; Toto Bh 135,000.00
153 Keran Shower Bh 129,580.00

BESI DAN ALUMINIUM


2 Alluminium Foil M2 31,500.00
3 Rangka besi Hollow besi alucobond 40 x 40 x 2 mm M1 47,000.00
4 Hollow plafon 4x4x0.4 mm M1 7,640.00
5 Hollow plafon 2x4x0.4 mm M1 5,630.00
11 Plat besi 5mm M2 1,415,000.00
12 Rangka Hollow Galvanis 4x4 cm ,Modul 60x60 M2 106,700.00
15 Reng AA 0,45 M1 37,000.00
17 Skrup SDS 12 x 20 Bh 300.00
19 Dynabol 10 x 65 Bh 4,750.00
23 Sekrup kg 25,000.00
26 Spandek tebal 0.35 mm m2 106,840.00
28 Besi Siku L 40 x 40 x 4 mm m' 24,000.00
34 Besi Hollow 40 x 60 x 1,4 mm m' 222,000.00
35 Besi Hollow 60 x 60 x 1,4 mm m' 289,000.00
36 Besi Hollow 75 x 75 x 1,7 mm m' 330,000.00
37 Besi siku 50.50.2,5 mm m' 209,500.00
38 Besi plat siku 60.60.6 mm m' 471,500.00
39 Besi plat siku 70.70.7 mm m' 603,500.00

PRECAST / PRA CETAK


1 Shera Plank 200x3000x8 pcs
2 Beton Ready Mix K 100 pcs 705,000.00
3 Beton Ready Mix K 125 pcs 728,750.00
Pek. Pas. Floor Plank 25x200x3000 mm; Tropical Oak; Shera pcs
4
5 Beton Ready Mix K 175 pcs 773,750.00
pcs
6 Shera Strip Smooth Texture V-Cut Edge (8 x 75 x 3000 mm)

Tutup Beton Pracetak Tipe U60X120 (K350) Gadar 10 Ton pcs 540,600.00
7
8 Frame Manhole 800x800 (K350) pcs 756,370.00
9 Buis Beton 25 x 75 Cm pcs 69,500.00
10 Bak Tangkapan Air (BTA) 42 x 37 x 40 tebal 8,5 cm pcs 473,220.00
Griil Besi Tangkapan Air (BTA) 63 x 51 cm (Gandar 20 T) pcs 1,873,080.00
11
12 SECURITY BOLT SC-5072 pcs 290,000.00
Spider Fitting SUS 316, SP-2001 Kaki 1 (Konektor Kaca) pcs
13
14 Daun Pintu Duma Door WPC BB Khusus pcs

ATAP DAN AKSESORIS


1 Murda t= 1 m Bh 3,000,000.00
2 Murda t= 50 cm Bh 1,650,000.00
3 ikut celedu L=1 m Bh 700,000.00
4 Ikut Celedu L= 0,8 m Bh 550,000.00
6 Genteng Keramik Glazur Kanmuri bh 17,500.00
8 Nok genteng metal m' 127,500.00
9 Ikut celedu P = 1.2 M fiber glass inc. bahan dan alat bantu lain bh 2,700,000.00
13 Sirap Kwalitas Super Ikat 200,000.00
14 Bubungan Genteng Keramik ; Kanmuri Espanica Bh 35,000.00
15 Atap spandek 0.40 mm M2 84,080.00

DINDING
3 Jendela Nako Kaca Bening + Tralis set 350,000.00
4 Jendela naco set 300,000.00

LAIN-LAIN
1 Ijuk m3 10,750.00
4 Pagar BRC T.120 diameter 6mm m' 402,500.00
13 Koral Pipih Zak 216,670.00
18 Engsel set 41,630.00
19 Kunci Slot pcs 100,000.00
34 Roll Bh 31,640.00
35 Kapi Bh 6,040.00
40 Glass Block bh 26,800.00
42 Kaca Akrilik marga cipta inklud pasang t 2mm putih susu m2 505,000.00
43 Akrilik 2mm putih m2 209,500.00
44 Akrilik 5mm bening m2 480,000.00
DAFTAR HARGA SATUAN UPAH TAHUN 2021

NO NAMA BARANG SATUAN HARGA DASAR


(Rp.)
1 2 3 5

1 Mandor Hari 166,000.00


2 Kepala Tukang Besi Hari 132,800.00
3 Kepala Tukang batu Hari 132,800.00
4 Kepala Tukang kayu Hari 132,800.00
5 Kepala Tukang Cat Hari 132,800.00
6 Tukang Politur Hari 119,520.00
7 Tukang Batu Hari 119,520.00
8 Tukang kayu Hari 119,520.00
9 Tukang Besi Hari 119,520.00
10 Tukang cat Hari 119,520.00
11 Tukang Listrik Hari 119,520.00
12 Tukang Pipa/ Tukang Ledeng Hari 119,520.00
13 Tukang Aspal Hari 119,520.00
14 Tukang masak Aspal Hari 119,520.00
15 Pekerja Hari 106,240.36
16 Upah Serut Profil Kayu M3 2,627,270.00
REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN
TAHUN 2020
NO URAIAN PEKERJAAN HARGA
1 2 3
I A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
1 A. 2.2.1.1 (K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter Rp. 327,529.77
2 A. 2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter Rp. 191,439.18
3 A. 2.2.1.3. (K3) Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter Rp. 732,678.85
4 A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank Rp. 86,523.82
5 A. 2.2.1.5. (K3) Pembuatan 1 m2 kantor sementara lantai plesteran Rp. 1,504,181.71
6 A. 2.2.1.6. (K3) Pembuatan 1 m2 rumah jaga (konstruksi kayu ) Rp. 1,328,217.40
7 A. 2.2.1.7. (K3) Pembuatan 1 m2 gudang semen dan peralatan Rp. 1,226,193.50
8 A. 2.2.1.8. (K3) Pembuatan 1 m2 bedeng pekerja Rp. 1,231,198.50
9 A. 2.2.1.9. (K3) Pembersihan 1 m2 lapangan dan perataan Rp. 16,302.00
10 A. 2.2.1.10. (K3) Pembuatan 1 m2 steger/perancah dari bambu Rp. 432,371.32
11 A. 2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm Rp. 200,734.09
12 A. 2.2.1.12. Pembuatan 1 m2 jalan sementara Rp. 161,369.23
13 A. 2.2.1.13. Pembongkaran 1 m3 beton bertulang Rp. 1,315,565.68
14 A. 2.2.1.14. Pembongkaran 1 m3 dinding tembok bata Rp. 657,782.84
15 A. 2.2.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm Rp. 16,550.35

II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


1 A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m Rp. 92,213.30
2 A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m Rp. 113,394.96
3 A.2.3.1.3. Menggali 1 m3 tanah biasa sedalam 3 m Rp. 134,941.82
4 A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m Rp. 122,707.60
5 A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m Rp. 186,252.59
6 A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m Rp. 148,454.28
7 A.2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter Rp. 6,756.22
8 A.2.3.1.8. (K3) Pembuangan 1 m3 tanah sejauh 30 meter Rp. 40,391.25
9 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah Rp. 67,562.20
10 A.2.3.1.10. (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm) Rp. 67,562.20
11 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug Rp. 248,996.12
12 A.2.3.1.12. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan Rp. 91,218.66
13 A.2.3.1.13. Pengurugan 1 m3 sirtu padat Rp. 220,283.90
14 A.2.3.1.14. Pengurugan 1 m3 Tanah Urug Rp. 197,489.72

III A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


1 A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP Rp. 1,055,146.83
2 A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP Rp. 1,007,982.51
3 A.3.2.1.3. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP Rp. 975,267.90
4 A.3.2.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP Rp. 952,276.55
5 A.3.2.1.5. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP Rp. 920,743.54
6 A.3.2.1.9. (K3) Pemasangan 1 m3 batu kosong (anstamping) Rp. 563,758.32
7 A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah Rp. 2,457,214.04
8 A.3.2.1.11. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm Rp. 1,039,172.73

IV A.4.1.1 HARGA SATUAN PEKERJAAN BETON (TANPA ALAT)


1 A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 MPa Rp. 981,549.89
2 A.4.1.1.2 Membuat 1 m3 beton mutu f’c = 9,8 MPa Rp. 1,018,859.86
3 A.4.1.1.3 Membuat 1 m3 beton mutu f’c = 12,2 MPa Rp. 1,047,975.81
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87
4 Rp. 899,121.35
5 A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm Rp. 1,082,538.53
6 A.4.1.1.6 Membuat 1 m3 beton mutu f’c = 16,9 Mpa Rp. 1,115,376.66
7 A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 MPa Rp. 1,140,272.56
8 A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 MPa Rp. 1,156,354.29
9 A.4.1.1.9. Membuat 1 m3 beton mutu f’c = 24,0 Mpa Rp. 1,184,079.62
10 A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 MPa Rp. 1,192,635.22
11 A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 MPa Rp. 1,292,683.10
NO URAIAN PEKERJAAN HARGA
1 2 3
12 A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm Rp. 1,303,931.41

A.4.1.1.B HARGA SATUAN PEKERJAAN BETON DENGAN MOLEN


13 A.4.1.1.B.1 Membuat 1 m3 beton mutu f’c = 7,4 MPa Rp. 960,201.76
14 A.4.1.1.B.2 Membuat 1 m3 beton mutu f’c = 9,8 MPa Rp. 997,511.73
15 A.4.1.1.B.3 Membuat 1 m3 beton mutu f’c = 12,2 MPa Rp. 1,026,627.68
A.4.1.1.B.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87
16 Rp. 919,661.79
17 A.4.1.1.B.5 Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm Rp. 1,061,190.40
18 A.4.1.1.B.6 Membuat 1 m3 beton mutu f’c = 16,9 Mpa Rp. 1,094,028.53
19 A.4.1.1.B.7 Membuat 1 m3 beton mutu f’c = 19,3 MPa Rp. 1,118,924.44
20 A.4.1.1.B.8 Membuat 1 m3 beton mutu f’c = 21,7 MPa Rp. 1,135,006.16
21 A.4.1.1.B.9 Membuat 1 m3 beton mutu f’c = 24,0 Mpa Rp. 1,162,731.50
22 A.4.1.1.B.10 Membuat 1 m3 beton mutu f’c = 26,4 MPa Rp. 1,171,287.09
23 A.4.1.1.B.11 Membuat 1 m3 beton mutu f’c = 28,8 MPa Rp. 1,259,575.49
24 A.4.1.1.B.12 Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm Rp. 1,270,823.81
`
A.4.1.1.C HARGA SATUAN PEKERJAAN BETON READY MIX
25 A.4.1.1.C.1 Membuat 1 m3 beton mutu K 100 Rp. 966,090.73
26 A.4.1.1.C.2 Membuat 1 m3 beton mutu K 125 Rp. 992,738.23
27 A.4.1.1.C.3 Membuat 1 m3 beton mutu K 175 Rp. 1,043,228.23
28 A.4.1.1.C.4 Membuat 1 m3 beton mutu K 225 Rp. 1,103,535.73
29 A.4.1.1.C.5 Membuat 1 m3 beton mutu K 250 Rp. 1,147,013.23
30 A.4.1.1.C.6 Membuat 1 m3 beton mutu K 300 Rp. 1,201,710.73
`
31 A.4.1.1.13a Pembesian 10 kg dengan besi polos (U-24) Rp. 128,422.61
32 A.4.1.1.13a Pembesian 1 kg dengan besi polos (U-24) Rp. 12,842.26
33 A.4.1.1.13b Pembesian 10 kg dengan besi besi ulir U-35, (fy=320 kg/mm2) Rp. 129,000.11
34 A.4.1.1.13b Pembesian 1 kg dengan besi besi ulir U-35, (fy=320 kg/mm2) Rp. 12,900.01
35 A.4.1.1.13c Pembesian 10 kg dengan besi besi ulir U-40, (fy=400 kg/mm2) Rp. 134,890.61
36 A.4.1.1.13c Pembesian 1 kg dengan besi besi ulir U-40, (fy=400 kg/mm2) Rp. 13,489.06
37 A.4.1.1.14 Pemasangan 10 kg kabel prategang (prestressed) polos/strands Rp. 121,895.42
38 A.4.1.1.15 Pemasangan 10 kg jaring kawat baja (wiremesh m5) Rp. 134,099.91
39 A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi Rp. 235,694.35
40 A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof Rp. 251,243.62
41 A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom Rp. 432,171.67
42 A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok Rp. 453,435.02
43 A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai Rp. 469,527.67
44 A.4.1.1.25 (K3) Pemasangan 1 m2 bekisting untuk dinding Rp. 445,851.05
45 A.4.1.1.26 (K3) Pemasangan 1 m2 bekisting untuk tangga Rp. 400,216.23
46 A.4.1.1.B.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi 2X Pakai Rp. 169,596.12
47 A.4.1.1.B.21 (K3) Pemasangan 1 m2 bekisting untuk sloof 2X Pakai Rp. 177,370.75
48 A.4.1.1.B.22 (K3) Pemasangan 1 m2 bekisting untuk kolom 2X Pakai Rp. 281,767.19
49 A.4.1.1.B.23 (K3) Pemasangan 1 m2 bekisting untuk balok 2X Pakai Rp. 292,398.86
50 A.4.1.1.B.24 (K3) Pemasangan 1 m2 bekisting untuk lantai 2X Pakai Rp. 300,445.19
51 A.4.1.1.B.25 (K3) Pemasangan 1 m2 bekisting untuk dinding 2X Pakai Rp. 288,606.88
52 A.4.1.1.B.26 (K3) Pemasangan 1 m2 bekisting untuk tangga 2X Pakai Rp. 265,789.47
53 A.4.1.1.27 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm Rp. 87,852.44
54 A.4.1.1.28 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm Rp. 113,681.08
55 A.4.1.1.29 Pemasangan 10 kg jaring kawat baja (wiremesh m8) Rp. 7,004,330.31
56 A.4.1.1.29 Pemasangan 1 kg jaring kawat baja (wiremesh m8) Rp. 700,433.03
A.4.1.1.30 Membuat 1 m3 Beton Pengisi/Pengresek
57 Rp. 721,139.23

V A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


1 A.4.2.1.1. Pemasangan 1 kg rangka kuda-kuda baja IWF Rp. 33,250.16
2 A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja CNP Rp. 25,293.31
3 A.4.2.1.2. Pemasangan 1 m2 rolling door alluminium Rp. 698,874.40
4 A.4.2.1.3. Pemasangan 1 m kusen pintu alluminium Rp. 158,210.07
5 A.4.2.1.4. Pemasangan 1 m2 pintu kaca rangka alluminium Rp. 554,284.31
NO URAIAN PEKERJAAN HARGA
1 2 3
6 A.4.2.1.5. Pemasangan 1 m2 kawat nyamuk Rp. 68,735.61
7 A.4.2.1.6. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm Rp. 163,619.21
A.4.2.1.7.Pemasangan 1 m2 rangka besi hollow 1x35.35.0,6mm, modul 60 x 120 cm, untuk partisi
8 Rp. 127,509.90
9 A.4.2.1.8. Pemasangan 1 m2 rangka besi hollow 1x35.35.0,6mm, modul 60 x 60 cm, untuk plafon Rp. 161,317.34
10 A.4.2.1.9. Pemasangan 1 m2 rangka besi Hollow Galvanis 60/60/1.0 mm, untuk Grill sunscreen Rp. 554,669.28
11 A.4.2.1.10. Pemasangan 1 Bh Angkur Diameter 19 Rp. 53,477.78
12 A.4.2.1.11. Pemasangan 1 M2 Usuk Baja Ringan UK - 75 Dan Reng baja ringan Rp. 103,261.21
13 A.4.2.1.11. Pemasangan 1 M Relling Besi Galvanis Rp. 510,669.28

VI A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP
1 Rp. 420,605.92
A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
2 Rp. 408,261.62
A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
3 Rp. 399,509.60
A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP
4 Rp. 395,626.92
A. 4.4.1.3 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP
5 Rp. 395,662.34
A. 4.4.1.4 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
6 Rp. 205,696.58
A. 4.4.1.5 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
7 Rp. 199,587.20
A.4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
8 Rp. 196,231.13
A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :5PP
9 Rp. 194,129.27
A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 6PP
10 Rp. 193,236.12
A. 4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP
11 Rp. 190,863.87
12 A. 4.4.1.10 Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :3PP Rp. 212,105.90
13 A. 4.4.1.11 Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP : 4PP Rp. 214,195.73
14 A. 4.4.1.12 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai Rp. 359,196.02
A. 4.4.1.13 Pemasangan 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
15 Rp. 368,817.87
16 A. 4.4.1.14 Pemasangan 1 m2 dinding Batako campuran 1SP : 4PP Rp. 119,775.19
17 A. 4.4.1.15 Pemasangan 1 m2 Batako Rebah campuran 1SP : 4PP Rp. 176,796.52

VII A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


1 A.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm Rp. 86,548.38
2 A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm Rp. 79,963.39
3 A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm Rp. 77,220.06
4 A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm Rp. 75,260.18
5 A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm Rp. 74,267.65
6 A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm Rp. 73,422.91
7 A.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm Rp. 72,996.34
8 A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm Rp. 72,569.77
9 A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm Rp. 107,073.18
10 A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm Rp. 85,411.00
11 A.4.4.2.11. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm Rp. 100,712.11
12 A.4.4.2.12. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm Rp. 99,478.87
13 A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm Rp. 98,262.41
14 A.4.4.2.14. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm (plesteran kasar) Rp. 44,576.83
15 A.4.4.2.15. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm Rp. 72,752.63
16 A.4.4.2.16. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP Rp. 60,301.30
17 A.4.4.2.17 Pemasangan 1 m2 finishing siar pasangan bata merah Rp. 34,532.32
18 A.4.4.2.18. Pemasangan 1 m2 finishing siar pasangan conblock ekspose Rp. 16,419.95
19 A.4.4.2.19. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP Rp. 72,160.69
20 A.4.4.2.20. Pemasangan 1 m2 acian Rp. 44,525.88
21 A.4.4.2.21. Pemasangan 1 m2 plesteran dengan mortar siap pakai (MSP) Rp. 47,960.56

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


VIII
1 A.4.4.3.1. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 20 cm x 20 cm Rp. 145,302.02
2 A.4.4.3.2. Pemasangan 1 m2 lantai ubin warna ukuran 20 cm x 20 cm Rp. 192,052.02
3 A.4.4.3.3.a Pemasangan 1m2 lantai keramik ukuran 30 cm x 30 cm Rp. 348,061.67
4 A.4.4.3.3.b Pemasangan 1m2 lantai keramik warna ukuran 30 cm x 30 cm Rp. 338,625.32
5 A.4.4.3.4. Pemasangan 1m2 lantai keramik ukuran 20 cm x 20 cm Rp. 235,452.47
6 A.4.4.3.5. Pemasangan 1m2 lantai keramik mozaik ukuran 30 cm x 30 cm Rp. 8,088,778.88
NO URAIAN PEKERJAAN HARGA
1 2 3
7 A.4.4.3.6.Pemasangan 1 m2 dinding keramik 20 cm x 20 cm Rp. 292,277.59
8 A.4.4.3.7. Pemasangan 1 m2 dinding batu paras kerobokan Rp. 237,698.56
9 A.4.4.3.8. Pemasangan 1 m2 dinding batu tempel candi hitam tebal 2cm Rp. 303,728.26
10 A.4.4.3.9. Pemasangan 1 m’ plint kayu kamper tebal 2 cm lebar 10 cm Rp. 61,523.93
11 A.4.4.3.10. Pemasangan 1 m2 paving block natural tebal 6 cm Rp. 1,603,200.58
12 A.4.4.3.11. Pemasangan 1 m2 paving block natural tebal 8 cm Rp. 2,012,453.11
13 A.4.4.3.12. Pemasangan 1 m2 paving block berwarna tebal 6 cm Rp. 777,329.84
14 A.4.4.3.13. Pemasangan 1 m2 paving block berwarna tebal 8 cm Rp. 2,391,499.65
15 A.4.4.3.14 Pemasangan 1m2 lantai keramik ukuran 40 cm x 40 cm Rp. 931,247.46
16 A.4.4.3.15 Pemasangan 1m Plin keramik warna ukuran 10 cm x 40 cm Rp. 103,013.06
17 A.4.4.3.16 Pemasangan 1m2 lantai keramik ukuran 25 cm x 25 cm Rp. 235,648.82
18 A.4.4.3.17 Pemasangan 1m keramik Dinding warna ukuran 25 cm x 40 cm Rp. 548,357.59
19 A.4.4.3.18 Pemasangan 1 m2 lantai Homogeneus Tile ukuran 60 cm x 60 cm ex. Granito Rp. 569,638.45
20 A.4.4.3.19 Pemasangan 1m Plin Homogeneus Tile ukuran 10 cm x 60 cm Rp. 78,122.95
21 A.4.4.3.20 Pemasangan 1 m2 Keramik Dinding Homogeneus Tile ukuran 60 cm x 60 cm ex. Granito Rp. 724,830.59
22 A.4.4.3.21 Pemasangan 1m2 lantai keramik ukuran 50 cm x 50 cm Rp. 1,297,401.27
23 A.4.4.3.22 Pemasangan 1m2 lantai keramik ukuran 40 cm x 40 cm Motif Batu Sikat Rp. 4,556,496.73

IX A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


A.4.5.1.2. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm
2 Rp. 51,499.56
3 A.4.5.1.3. Pemasangan 1 m2 langit-langit lambrisering kayu kamper, tebal 9 mm Rp. 357,202.77
4 A.4.5.1.4. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm Rp. 47,089.94
5 A.4.5.1.5. Pemasangan 1 m’ list langit-langit kayu profil Rp. 28,374.52
6 A.4.5.1.6. Pemasangan 1 m2 Rangka Plafond hollow 3,5 x 3,5 galvalume Rp. 188,592.01
7 A.4.5.1.7. Pemasangan 1 m’ list langit-langit Gypsum S7 Rp. 31,976.13
8 A.4.5.1.8. Pemasangan 1 m2 langit - langit Gedeg Rp. 56,761.33

X A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil Rp. 74,221.46
2 A.4.5.2.2. Pemasangan 1 m2 atap genteng glazuur Rp. 214,819.50
3 A.4.5.2.3. Pemasangan 1 m2 atap genteng Kodok ex Good year Rp. 206,019.50
4 A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong kecil Rp. 118,595.47
5 A.4.5.2.5. Pemasangan 1 m’ bubung genteng glazuur Rp. 195,595.47
6 A.4.5.2.6. Pemasangan 1 m’ bubung genteng Kodok Rp. 197,685.47
7 A.4.5.2.7. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 1,80 m x 5 mm Rp. 57,827.50
8 A.4.5.2.8. Pemasangan 1 m2 genteng beton Rp. 147,863.73
9 A.4.5.2.9. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana Rp. 94,483.48
10 A.4.5.2.10. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai Rp. 122,203.48
11 A.4.5.2.11. Pemasangan 1 m’ nok genteng beton Rp. 219,007.87
12 A.4.5.2.12. Pemasangan 1 m2 atap seng gelombang Rp. 65,150.41
13 A.4.5.2.13. Pemasangan 1 m’nok atap seng Rp. 44,503.86
14 A.4.5.2.14. Pemasangan 1 m2 alumunium foil/sisalation Rp. 30,521.76
15 A.4.5.2.15. Pemasangan 1 m2 atap Spandex Rp. 69,495.41

XI A.4.6.1. HARGA SATUAN PEKERJAAN KAYU


1 A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I bengkirai Rp. 16,464,486.52
2 A.4.6.1.2.Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III kamper Rp. 13,593,002.13
3 A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II Rp. 570,058.09
4 A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II kamper Rp. 948,942.90
5 A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II kamper Rp. 682,212.62
6 A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi, kayu kelas I atau II kamper Rp. 1,171,824.90
7 A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II kruing tertutup (lebar sampai Rp. 662,597.10
8 A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II kamper Rp. 765,935.82
9 A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II kamper Rp. 992,465.15
10 A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I kamper Rp. 811,828.37
11 A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter Rp. 11,831,497.08
12 A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I kamper Rp. 14,201,242.45
13 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II kruing Rp. 11,789,287.85
NO URAIAN PEKERJAAN HARGA
1 2 3
14 A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II Rp. 496,618.69
15 A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II Rp. 691,640.44
16 A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III Rp. 222,123.61
17 A.4.6.1.20.Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III kamper Rp. 225,470.65
18 A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II kamper Rp. 144,141.84
19 A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II kruing Rp. 126,793.42
20 A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III Kamper Rp. 324,738.21
21 A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II kamper Rp. 421,730.73
22 A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I kruing Rp. 397,045.53
23 A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm Rp. 40,480.45
24 A.4.6.1.28. Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV albesia Rp. 144,334.00
25 A.4.6.1.29. Pemasangan 1 M2 Pasang Usuk expose diprofil + Reng kayu kamper , atap genteng keramik Rp. 195,727.99
26 A.4.6.1.30. Pemasangan 1 M2 Pasang Usuk expose diprofil, atap genteng keramik Rp. 125,723.63
27 A.4.6.1.31. Pemasangan 1 M2 Pasang Reng kayu kamper , atap genteng keramik Rp. 46,852.15
28 A.4.6.1.32. Pemasangan 1 m’ lisplank ukuran 3 x 10 cm, kayu kelas I atau kelas II kruing Rp. 84,048.50
29 A.4.6.1.33. Pemasangan 1 m’ lisplank ukuran 3 x 15 cm, kayu kelas I atau kelas II kruing Rp. 84,811.81
30 A.4.6.1.34. Pemasangan 1 m’ lisplank ukuran 2 x (3 x 20) cm, kayu kelas I atau kelas II kruing Rp. 210,747.69
31 A.4.6.1.35. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I Merbau Rp. 28,927,486.52
32 A.4.6.1.36. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu Merbau Rp. 1,549,872.90

XII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


1 A.4.6.2.1. Pemasangan 1 buah kunci tanam biasa Rp. 196,924.64
2 A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi Rp. 184,172.12
3 A.4.6.2.2. Pemasangan 1 buah engsel pintu Rp. 116,717.05
4 A.4.6.2.3. Pemasangan 1 buah engsel jendela kupu-kupu Rp. 70,317.94
5 A.4.6.2.4. Pemasangan 1 buah engsel angin Rp. 79,493.74
6 A.4.6.2.5. Pemasangan 1 buah spring knip Rp. 56,860.77
7 A.4.6.2.6. Pemasangan 1 buah kait angin Rp. 63,625.77
8 A.4.6.2.7. Pemasangan 1 buah door closer Rp. 351,681.02
9 A.4.6.2.8. Pemasangan 1 buah kunci slot Rp. 141,735.89
10 A.4.6.2.9. Pemasangan 1 buah door holder Rp. 123,431.02
11 A.4.6.2.10. Pemasangan 1 buah door stop Rp. 102,126.64
12 A.4.6.2.11. Pemasangan 1 m rel pintu sorong Rp. 359,207.66
13 A.4.6.2.12. Pemasangan 1 m2 kaca tebal 3 mm Rp. 149,445.35
14 A.4.6.2.13. Pemasangan 1 m2 kaca tebal 5 mm Rp. 201,838.35
15 A.4.6.2.14. Pemasangan 1 m2 kaca tebal 8 mm Rp. 320,772.63
16 A.4.6.2.15. Pemasangan 1 m2 kaca cermin tebal 5 mm Rp. 357,875.77
17 A.4.6.2.16. Pemasangan 1 Set Gerendel Expagnolet Rp. 188,811.05

XIII A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


1 A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama Rp. 19,303.96
2 A.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat Rp. 18,077.46
3 A.4.7.1.3. 1 m2 Pengerokan karat pada permukaan baja cara manual Rp. 18,990.46
4 A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Rp. 50,601.77
5 A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) Rp. 69,409.48
6 A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil Rp. 43,676.35
7 A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur Rp. 70,719.83
8 A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan vernis Rp. 57,853.90
9 A.4.7.1.9. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Rp. 25,941.53
10 A.4.7.1.10. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) Rp. 19,459.36
11 A.4.7.1.11. Pengecatan 1 m2 permukaan baja dengan menie besi Rp. 36,241.16
12 A.4.7.1.12. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah Rp. 68,960.56

XVI A.5.3.1 HARGA SATUAN PEKERJAAN STYLE BALI


1 A.5.3.1 1. Pemasangan 1 M2 Pas. Style Bali Paras Bata Rp. 1,568,215.00
2 A.5.3.1 2. Pemasangan 1 M2 Pas. Style Bali Batu Candi Rp. 670,494.00
3 A.5.3.1 3. Pemasangan 1 M2 Pas. Style Bali Batu Hitam Karangasem Rp. 1,913,714.00
4 A.5.3.1 4. Pemasangan 1 M2 Pas. Style Bali Keramik Rp. 875,699.64
NO URAIAN PEKERJAAN HARGA
1 2 3
5 A.5.3.1 5. Pemasangan 1 Bh Pasang Saka Jati Ukir Rp. 1,980,000.00
6 A.5.3.1 6. Pemasangan 1 Bh Pasang Kencut Saka Rp. 302,500.00
7 A.5.3.1 7. Pemasangan 1 Pasang Cangah Wang Rp. 440,000.00
8 A.5.3.1 8. Pemasangan 1 M' Pementang kayu jati ukir Rp. 2,365,000.00
9 A.5.3.1 9. Pemasangan 1 M' dedeleg kayu jati ukir Rp. 1,512,500.00
10 A.5.3.1 10. Pemasangan 1 M' Ring-ring Ukir Rp. 780,083.17
11 A.5.3.1 11. Pemasangan 1 Ps Tapel Ring-ring Ukir Rp. 68,937.02
12 A.5.3.1 12. Pemasangan 1 M' Ukiran Penyambung Tapel Lis Plang/Ris Rp. 170,439.52
13 A.5.3.1 13. Pemasangan 1 Set Tapel Lis Plang/Ris Rp. 385,242.00

XVII A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA DI LUAR GEDUNG


1 A.8.4.1.1 (K3) Pemasangan 1 m pipa PVC 1/2 SNI S-10 SCJ Rp. 25,018.17
2 A.8.4.1.1 (K3) Pemasangan 1 m pipa PVC 3/4 SNI S-10 SCJ Rp. 27,262.17
3 A.8.4.1.1 (K3) Pemasangan 1 m pipa PVC 1 SNI S-10 SCJ Rp. 31,497.17
LAMPIRAN PERMEN PUPR NO 28 TAHUN 2016
TABEL A.2.a – Berat isi dan penyerapan agregat kasar dan halus
No. Nama Bahan Berat Isi Padat (BiP) Berat Isi Lepas (BiL)
(T/m³) (T/m³)
Min Maks Min Maks
1 Agregat kasar 1.36 1.45 1.236 1.283
1.32 1.38 1.2 1.221
2 Agregat halus 1.38 1.54 1.255 1.363

Batu Kali/Batu Belah M3 251,630.00


kg 196.13
Kerikil Beton M3 259,290.00
kg 192.07
Pasir Beton M3 234,200.00
kg 167.29
Pasir Pasang M3 245,810.00
kg 180.34
Pasir Urug M3 160,690.00
kg 117.89
Penyerapan

1,94 - 2,02
2,50 - 2,65
1,65 - 1,93
ENGINEERING ESTIMATE (EE)
KEGIATAN : PERENCANAAN TEKNIS III PEMBANGUNAN FASILITAS UMUM / FASILITAS IBADAH KECAMATAN SUKAWATI
PEKERJAAN : PEMBANGUNAN BALAI SERBA GUNA BANJAR ADAT KALAH DESA PAKRAMAN DELOD TUKAD, BANJAR KALAH DESA
BATUBULAN KECAMATAN SUKAWATI
LOKASI : DESA BATUBULAN KECAMATAN SUKAWATI GIANYAR
TAHUN ANGGARAN : 2020

TINGGI
PANJANG LEBAR
NO. URAIAN PEKERJAAN Hasil JUMLAH
Valume Sat. (m) (m)
(m)
1 2 3=4x5x6x7 4 5 6.00 7

I PEKERJAAN PERSIAPAN
1 Pek. Pembongkaran 1.00 ls
2 Pek. Pengukuran dan pas. bowplank 52.00 m1 52.00 52.00
(Jarak bowplank diambil 1 m dari as bangunan)
3 Pek. Pas. Papan nama proyek 1.00 bh

A PEKERJAAN LANTAI 1

II PEKERJAAN GALIAN DAN URUGAN


1 Pek. Galian pondasi setempat 62.72 m3 Panjang Lebar Tinggi Jmlh
P1 62.72 1.40 X 1.40 X 2.00 X 16.00
ditambah bekisting batako
Total 62.72

2 Pek. Galian pondasi menerus 3.78 m3 Panjang Lebar Tinggi Jmlh

Grid A,B,C,D,E dan F 1.26 1.00 X 0.6 X 0.70 X 3.00


Grid 1 ,2,3,4 2.52 3.00 X 0.6 X 0.70 X 2.00

Pek. Galian pondasi bataran


0.00 16.00 x 0.4 x 0.30 x 0.00
0.00 16.00 x 0.4 x 0.30 x 0.00
0.00 9.20 x 0.4 x 0.30 x 0.00
0.00 9.20 x 0.4 x 0.30 x 0.00
0.00 9.20 x 0.4 x 0.30 x 0.00
0.00 16.00 x 0.3 x 0.20 x 0.00
0.00 9.20 x 0.3 x 0.20 x 0.00

3 Pek. Urugan tanah kembali Panjang Lebar Tinggi Jmlh


P. Menerus 13.30 m3 urugan tanah kembali 20% dari vol. galian
p setempat m3
Total 13.30

4 Pek. Urugan tanah peninggian lantai


lantai 0.00 0.00 8.60 X 7.50 X -
0.00 8.60 X 6.00 X -

sisa galian (( P. Menerus + P. Pile cap) - Urugan kembali) 53.20


Total m3
5 Pek. Urugan pasir bawah poer
P1 1.57 1.57 1.40 X 1.40 X 0.05 X 16.00
Total 1.57 m3
6 Pek. Urugan pasir bawah pondasi Menerus 0.27
Grid A,B,C,D,E dan F 0.09 1.00 X 0.6 X 0.05 X 3.00
Grid 1 ,2,3,4 0.18 3.00 X 0.6 X 0.05 X 2.00

Bataran 0.00 16.00 X 0.4 X 0.05 X 0.00


0.00 16.00 X 0.4 X 0.05 X 0.00
0.00 9.20 X 0.4 X 0.05 X 0.00
0.00 9.20 X 0.4 X 0.05 X 0.00
0.00 9.20 X 0.4 X 0.05 X 0.00
Total 0.27 m3
7 Pek. Urugan pasir bawah lantai
Lantai ±
0.00
lantai wantilan 0.00 0.00 8.60 X 7.50 X -
0.00 8.60 X 6.00 X -
Total 0.00 m3

III PEKERJAAN PONDASI


1 Pek. Pasangan batu kosong 1.08

Grid A,B,C,D,E dan F 0.36 1.00 X 0.6 X 0.20 X 3.00


Grid 1 ,2,3,4 0.72 3.00 X 0.6 X 0.20 X 2.00

Bataran 0.00 16.00 X 0.35 X 0.20 X 0.00


0.00 16.00 X 0.35 X 0.20 X 0.00
0.00 9.20 X 0.35 X 0.20 X 0.00
0.00 9.20 X 0.35 X 0.20 X 0.00
0.00 9.20 X 0.35 X 0.20 X 0.00
1.08

2 Pek. Pasangan batu kali 1pc : 6ps 2.00 Panjang L. Rata2 Tinggi

Grid A,B,C,D,E dan F 0.67 1.00 X 0.45 X 0.50 X 3.00


Grid 1 ,2,3,4 1.34 3.00 X 0.45 X 0.50 X 2.00

Bataran 0.00 9.10 X 0.325 X 0.50 X 0.00


0.00 6.36 X 0.325 X 1.30 X 0.00
0.00 9.20 X 0.325 X 1.35 X 0.00
0.00 9.20 X 0.325 X 1.35 X 0.00
0.00 9.20 X 0.325 X 0.50 X 0.00
2.00

IV PEKERJAAN BETON
1 Pek. Beton Poer (P1) 8.06 m3 8.06 1.20 X 1.20 X 0.35 X 16.00

Panjang Berat Besi Jmlh Jmlh


Pek. Pembesian pile cap (P1) besi ulir Ts 40 1268.23 kg Hasil
Besi kg/m Batang Bentang
Tul pokok bawah 808.43 808.43 2.00 X 1.579 X 8.00 X 32.00

Tul pokok atas 459.80 459.80 1.40 X 1.283 X 8.00 X 32.00

Pek. Begesting batako pile cap P1 ( pas.batako) 41.60 m2 Panjang Lebar Tinggi Jmlh
41.60 5.20 X 0.50 X 16.00

2 Pek. Beton rabat bawah sloof cm (t = 5 cm) K 125 m3 Panjang Lebar Tinggi Jmlh

3 Pek. Beton rabat bawah pondasi pilecap (t = 5 cm) fc 7,4 Mpa 1.15 m3
bawah pond. Poer (P1) 1.15 1.20 X 1.20 X 0.05 X 16.00

4 Pek. Beton rabat lantai fc 9,8 Mpa 0.00 m3 0.00 8.60 X 7.50 X 0.06 X 0.00
0.00 8.60 X 6.00 X 0.06 X 0.00

Total 0.00 m3

5 Pek. Beton sloof 25/35 fc 21,7 Mpa


Grid A, B, C, D, E, dan F 1.60 6.10 X 0.25 X 0.35 X 3.00
Grid 1, 2, 3, 4 2.19 12.50 X 0.25 X 0.35 X 2.00
Total 3.79 m3

Panjang
Berat Besi Jmlh Jmlh
Pek. Pembesian sloof 25/35 cm besi ulir Ts 40 322.09 kg Hasil Besi +
kg/m Batang Bentang
Overlap
TULANGAN POKOK 6d 13 322.09 kg
Grid A, B, C, D, E, dan F 140.72 7.50 X 1.042 X 6.00 X 3.00
Grid 1, 2, 3, 4 181.37 14.50 X 1.042 X 6.00 X 2.00

Pek. Pembesian sloof 25/35 cm besi polos Ts 24


Sengkang ∅8 - 15
Grid A, B, C, D, E, dan F 127.66 kg 54.71 1.10 X 0.395 X 42.00 X 3.00
72.95 1.10 X 0.395 X 84.00 X 2.00
Pek. Begesting sloof 25/35 cm (2 x pakai) 15.86 m2 Panjang Lebar Tinggi Jmlh
Grid A, B, C, D, E, dan F 13.16 6.10 0.35 0.70 3.00
Grid 1, 2, 3, 4 18.55 12.50 0.35 0.70 2.00
31.71

6 Pek. Beton kolom pedestal 25/25 cm fc 21,7 Mpa 1.65 m3 1.65 0.25 X 0.25 X 1.65 X 16.00

Panjang Berat Besi Jmlh Jmlh


Pek. Pembesian kolom Pedestal25/25 cm (K1) besi ulir Ts 40 Hasil
Besi kg/m Batang Bentang
TUL POKOO 10 D13 366.91 kg 366.91 2.20 X 1.042 X 10.00 X 16.00

Pek. Pembesian kolom Pedestal 25/25 cm (K1)besi polos Ts 24 kg


Sengkang Tumpuan ∅10 - 150 106.58 kg 106.58 0.90 X 0.617 X 12.00 X 16.00
106.58
Pek. Begesting kolom 25/25 cm K1 (2 x pakai) m2 Panjang Lebar Tinggi Jmlh
18.48 36.96 1.40 X 1.65 X 16.00

7 Pek. Beton kolom 25/25 cm fc 21,7 Mpa 4.45 m3 0.25 X 0.25 X 4.45 X 16.00

4.45

Panjang Berat Besi Jmlh Jmlh


Pek. Pembesian kolom Pedestal 25/25 cm (K1) besi ulir Ts 40 Hasil
Besi kg/m Batang Bentang
TUL POKOO 10 D13 742.17 kg 742.17 4.45 X 1.042 X 10.00 X 16.00

742.17 kg

Pek. Pembesian kolom Pedestal 25/25 cm (K1)besi polos Ts 24 222.04 kg


Sengkang Tumpuan ∅10 - 150 222.04 kg 222.04 0.90 X 0.617 X 25.00 X 16.00

222.04

Pek. Begesting kolom 25/25 cm K1 (2 x pakai) 34.08 m2 Panjang Lebar Tinggi Jmlh
68.16 1.20 X 3.55 X 16.00

68.16

8 Pek. Beton balok BS 10/25 cm (blk sunduk)fc 21,7 Mpa 1.10 m3


Grid A, grid F 0.36 7.20 X 0.10 X 0.25 X 2.00
Grid 1, grid 4 0.74 14.70 X 0.10 X 0.25 X 2.00
1.10

Panjang
Berat Besi Jmlh Jmlh
Pek. Pembesian balok 10/25 cm BS besi ulir Ts 40 248.08 kg Hasil Besi +
kg/m Batang Bentang
Overlap

-Tul. Pokok Menerus


Grid A, grid F
4D13 70.05 8.40 X 1.042 X 4.00 X 2.00
-Tul. Tumpuan 2
D13 17.51 4.20 X 1.042 X 2.00 X 2.00
-Tul. Pokok Menerus
Grid 1, grid 4
4 D13 128.42 15.40 X 1.042 X 4.00 X 2.00
-Tul. Tumpuan 2
D13 32.10 7.70 X 1.042 X 2.00 X 2.00
248.08
Pek. Pembesian balok 10/25 cm BS besi polos Ts 24 114.82 kg
Sengkang Tumpuan
Grid A, grid F 24.44
∅8 - 10 24.44 kg 0.72 X 0.395 X 43.00 X 2.00
Sengkang Lapangan
16.48
∅8 - 15 16.48 kg 0.72 0.395 X 29.00 X 2.00
Sengkang Tumpuan
Grid 1, grid 4 44.34
∅8 - 10 44.34 kg 0.72 X 0.395 X 78.00 X 2.00
Sengkang Lapangan
29.56
∅8 - 15 29.56 kg 0.72 0.395 X 52.00 X 2.00

Pek. Begesting balok 15/25 cm (BS) dua kali pakai 15.33 m2 Panjang Lebar Tinggi Jmlh
Grid A, grid F Sisi Kanan Kiri 7.20 7.20 X 0.25 X 4.00
Sisi Bawah 2.88 7.20 X 0.20 X 2.00

Grid 1, grid 4 Sisi Kanan Kiri 14.70 14.70 X 0.25 X 4.00


Sisi Bawah 5.88 14.70 X 0.20 X 2.00
30.66
9 Pek. Beton balok B1 20/30 cm fc 21,7 Mpa 2.40 m3
Grid A, grid G 0.75 6.25 X 0.20 X 0.30 X 2.00
Grid 1, grid 4 1.65 13.75 X 0.20 X 0.30 X 2.00
2.40

Panjang
Berat Besi Jmlh Jmlh
Pek. Pembesian balok 20/30 cm B1 besi ulir Ts 40 506.22 kg Hasil Besi +
kg/m Batang Bentang
Overlap

-Tul. Pokok Menerus


Grid A, grid G
6 D16 141.16 7.45 X 1.579 X 6.00 X 2.00
-Tul. Tumpuan 2
D16 23.53 3.73 X 1.579 X 2.00 X 2.00
-Tul. Pokok Menerus
Grid 1, grid 4
6 D16 292.74 15.45 X 1.579 X 6.00 X 2.00
-Tul. Tumpuan 2
D16 48.79 7.73 X 1.579 X 2.00 X 2.00
506.22
Pek. Pembesian balok 20/30 cm B1 besi polos Ts 24 215.38 kg

Sengkang Tumpuan
Grid A, grid G 35.53
∅10 - 10
kg 0.90 X 0.617 X 32.00 X 2.00

Sengkang Lapangan
24.42
∅10 - 15
kg 0.90 0.617 X 22.00 X 2.00

Sengkang Tumpuan
Grid 1, grid 4 77.72
∅10 - 10
kg 0.90 X 0.617 X 70.00 X 2.00

Sengkang Lapangan
77.72
∅10 - 15
kg 0.90 0.617 X 70.00 X 2.00

Pek. Begesting balok 20/30 cm (B1) 36.00 m2 Panjang Lebar Tinggi Jmlh
Grid A, grid G Sisi Kanan Kiri 7.50 6.25 X 0.60 X 2.00
Sisi Bawah 3.75 6.25 X 0.30 X 2.00

Grid 1, grid 4 Sisi Kanan Kiri 16.50 13.75 X 0.60 X 2.00


Sisi Bawah 8.25 13.75 X 0.30 X 2.00
36.00

10 Pek. Beton balok B2 20/30 cm fc 21,7 Mpa 1.63 m3


Grid 2,3 1.25 10.40 X 0.20 X 0.30 X 2.00
Grid B, E 0.38 3.16 X 0.20 X 0.30 X 2.00
1.63

Panjang
Berat Besi Jmlh Jmlh
Pek. Pembesian balok 20/30 cm B2 besi ulir Ts 40 200.80 kg Hasil Besi +
kg/m Batang Bentang
Overlap

-Tul. Pokok Menerus


Grid 2,3
6 D13 131.34 10.50 X 1.042 X 6.00 X 2.00
-Tul. Tumpuan 2
D13 21.89 5.25 X 1.042 X 2.00 X 2.00
-Tul. Pokok Menerus
Grid B, E
6 D13 40.78 3.26 X 1.042 X 6.00 X 2.00
-Tul. Tumpuan 2
D13 6.80 1.63 X 1.042 X 2.00 X 2.00
200.80
Pek. Pembesian balok 20/30 cm B2 besi polos Ts 24 83.82 kg
Sengkang Tumpuan
Grid 2,3 37.66
∅8 - 10 kg 0.90 X 0.395 X 53.00 X 2.00
Sengkang Lapangan
25.57
∅8 - 15 0.90 X 0.395 X 36.00 X 2.00
Sengkang Tumpuan
Grid B, E 12.07
∅8 - 10 kg 0.90 X 0.395 X 17.00 X 2.00
Sengkang Lapangan
8.52
∅8 - 15 0.90 X 0.395 X 12.00 X 2.00
83.82
Pek. Begesting balok 20/30 cm (B2) 24.41 m2 Panjang Lebar Tinggi Jmlh
Grid 2,3 Sisi Kanan Kiri 12.48 10.40 X 0.60 X 2.00
Sisi Bawah 6.24 10.40 X 0.30 X 2.00

Grid B, E Sisi Kanan Kiri 3.79 3.16 X 0.60 X 2.00


Sisi Bawah 1.90 3.16 X 0.30 X 2.00
24.41
11 Pek. Beton balok B3 20/25 cm fc 21,7 Mpa 1.36 m3
Grid 2,3 1.04 10.40 X 0.20 X 0.25 X 2.00
Grid B, E 0.32 3.20 X 0.20 X 0.25 X 2.00
1.36

Panjang
Berat Besi Jmlh Jmlh
Pek. Pembesian balok B3 besi ulir Ts 40 143.85 kg Hasil Besi +
kg/m Batang Bentang
Overlap

-Tul. Pokok Menerus


Grid 2,3
4 D13 87.56 10.50 X 1.042 X 4.00 X 2.00
-Tul. Tumpuan 2
D13 21.89 5.25 X 1.042 X 2.00 X 2.00
-Tul. Pokok Menerus
Grid B, E
4 D13 27.52 3.30 X 1.042 X 4.00 X 2.00
-Tul. Tumpuan 2
D13 6.88 1.65 X 1.042 X 2.00 X 2.00
143.85
Pek. Pembesian balok B3 besi polos Ts 24 74.51 kg
Sengkang Tumpuan
Grid 2,3 33.47
∅8 - 10 kg 0.80 X 0.395 X 53.00 X 2.00
Sengkang Lapangan
Grid B, E 22.73
∅8 - 15 0.80 X 0.395 X 36.00 X 2.00
Sengkang Tumpuan
10.73
∅8 - 10 kg 0.80 X 0.395 X 17.00 X 2.00
Sengkang Lapangan
7.58
∅8 - 15 0.80 X 0.395 X 12.00 X 2.00
74.51
Pek. Begesting balok B3 21.76 m2 Panjang Lebar Tinggi Jmlh
Grid 2,3 Sisi Kanan Kiri 10.40 10.40 X 0.50 X 2.00
Sisi Bawah 6.24 10.40 X 0.30 X 2.00

Grid B, E Sisi Kanan Kiri 3.20 3.20 X 0.50 X 2.00


Sisi Bawah 1.92 3.20 X 0.30 X 2.00
21.76

12 Pek. Beton balok BN 15/25 cm fc 21,7 Mpa 0.00 m3


0.00 7.10 X 0.15 X 0.25 X 0.00
0.00

Panjang
Berat Besi Jmlh Jmlh
Pek. Pembesian balok BN 15/25 cm B8 besi ulir Ts 40 0.00 kg Hasil Besi +
kg/m Batang Bentang
Overlap

-Tul. Pokok Menerus


4 D13 0.00 7.20 X 1.042 X 4.00 X 0.00
-Tul. Tumpuan 2
D13 0.00 3.60 X 1.042 X 2.00 X 0.00
0.00
Pek. Pembesian balok 15/25 cm BN besi polos Ts 24 0.00 kg
Sengkang Tumpuan
0.00
∅8 - 10 kg 0.80 X 0.395 X 37.00 X 0.00
Sengkang Lapangan
0.00
∅8 - 15 0.80 X 0.395 X 25.00 X 0.00

Pek. Begesting balok 15/25 cm (BN) 0.00 m2 Panjang Lebar Tinggi Jmlh
Sisi Kanan Kiri 0.00 7.10 X 0.50 X 0.00
Sisi Bawah 0.00 7.10 X 0.25 X 0.00
0.00

13 Pek. Beton kolom 20/30 cm (k2) fc 21,7 Mpa 0.84 m3 0.20 X 0.30 X 1.75 X 8.00

Panjang Berat Besi Jmlh Jmlh


Pek. Pembesian kolom 20/30 cm (K2) besi ulir Ts 40 Hasil
Besi kg/m Batang Bentang
TUL POKOO 12 D16 123.42 kg 123.42 1.85 X 1.042 X 8.00 X 8.00

Pek. Pembesian kolom 20/30 cm (K2)besi polos Ts 24 36.95 kg


Sengkang Tumpuan ∅8 - 10 36.95 kg 36.95 0.90 X 0.395 X 13.00 X 8.00

36.95
Pek. Begesting kolom 20/30cm K2 (2 x pakai) 7.44 m2 Panjang Lebar Tinggi Jmlh
14.88 1.20 X 1.55 X 8.00
14 Pek. Beton balok BKB 20/30 cm (rata-rata) fc 21,7 Mpa 2.38 m3
Grid B, C, D, E 1.58 3.30 X 0.20 X 0.30 X 8.00
Grid 2, grid 3 0.79 3.30 X 0.20 X 0.30 X 4.00
Beton Jurai bawah 1.20 5.00 X 0.20 X 0.30 X 4.00
3.58

Panjang
Berat Besi Jmlh Jmlh
Pek. Pembesian balok 20/30 cm BKB besi ulir Ts 40 469.90 kg Hasil Besi +
kg/m Batang Bentang
Overlap

-Tul. Pokok Menerus


Grid B, C, D, E 3.60
6 D13 180.12 X 1.042 X 6.00 X 8.00
-Tul. Tumpuan 2
1.80
D13 30.02 X 1.042 X 2.00 X 8.00
-Tul. Pokok Menerus
Grid 2, grid 3 3.60
6 D13 90.06 X 1.042 X 6.00 X 4.00
-Tul. Tumpuan 2
1.80
D13 15.01 X 1.042 X 2.00 X 4.00
-Tul. Pokok Menerus
Beton Jurai bawah 5.30
6 D16 132.59 x 1.042 X 6.00 X 4.00
-Tul. Tumpuan 2
2.65
D16 22.10 x 1.042 X 2.00 X 4.00
469.90
Pek. Pembesian balok 20/30 cm BKB besi polos Ts 24 208.42 kg
Sengkang Tumpuan
Grid B, C, D, E 55.26
∅8 - 10 kg 1.00 X 0.395 X 17.50 X 8.00
Sengkang Lapangan
37.90
∅8 - 15 kg 1.00 0.395 X 12.00 X 8.00
Sengkang Tumpuan
Grid 2, grid 3 26.84
∅8 - 10 kg 1.00 X 0.395 X 17.00 X 4.00
Sengkang Lapangan
18.95
∅8 - 15 kg 1.00 0.395 X 12.00 X 4.00
Sengkang Tumpuan
Beton Jurai bawah 41.05
∅8 - 10 kg 1.00 X 0.395 X 26.00 X 4.00
Sengkang Lapangan
28.42
∅8 - 15 kg 1.00 0.395 X 18.00 X 4.00

Pek. Begesting balok 20/30 cm (BKB) 113.24 m2 Panjang Lebar Tinggi Jmlh
Grid B, C, D, E Sisi Kanan Kiri 15.84 3.30 X 0.60 X 8.00
Sisi Bawah 9.24 3.30 X 0.35 X 8.00

Grid 2, grid 3 Sisi Kanan Kiri 7.92 3.30 X 0.60 X 4.00


Sisi Bawah 4.62 3.30 X 0.35 X 4.00

Beton Jurai bawah Sisi Kanan Kiri 12.00 5.00 X 0.60 X 4.00
Sisi Bawah 7.00 5.00 X 0.35 X 4.00
56.62
113.24

15 Pek. Beton balok BKA 20/25 cm (rata-rata) fc 21,7 Mpa 0.00 m3


Grid C, D 0.00 3.00 X 0.15 X 0.25 X 0.00
Beton Jurai atas 0.00 4.50 X 0.15 X 0.25 X 0.00
0.00

Panjang
Berat Besi Jmlh Jmlh
Pek. Pembesian balok 20/30 cm BKA besi ulir Ts 40 0.00 kg Hasil Besi +
kg/m Batang Bentang
Overlap

-Tul. Pokok Menerus


Grid C, D 3.20
6 D13 0.00 X 1.042 X 4.00 X 0.00
-Tul. Tumpuan 2
1.60
D13 0.00 X 1.042 X 2.00 X 0.00
-Tul. Pokok Menerus
Beton Jurai atas 4.80
6 D16 0.00 x 1.042 X 4.00 X 0.00
-Tul. Tumpuan 2
2.40
D16 0.00 x 1.042 X 2.00 X 0.00
0.00
Pek. Pembesian balok 20/30 cm BKA besi polos Ts 24 0.00 kg
Sengkang Tumpuan
Grid C, D 0.00
∅8 - 10 kg 0.70 X 0.395 X 16.00 X 0.00
Sengkang Lapangan
0.00
∅8 - 15 kg 0.70 x 0.395 X 11.00 X 0.00
Sengkang Tumpuan
Beton Jurai atas 0.00
∅8 - 10 kg 0.70 X 0.395 X 24.00 X 0.00
Sengkang Lapangan
0.00
∅8 - 15 kg 0.70 x 0.395 X 16.00 X 0.00
Pek. Begesting balok 20/30 cm (BKA) 0.00 m2 Panjang Lebar Tinggi Jmlh
Grid C, D Sisi Kanan Kiri 0.00 3.00 X 0.50 X 0.00
Sisi Bawah 0.00 3.00 X 0.25 X 0.00

Beton Jurai atas Sisi Kanan Kiri 0.00 4.50 X 0.50 X 0.00
Sisi Bawah 0.00 4.50 X 0.25 X 0.00
0.00
0.00

V PEKERJAAN PASANGAN DAN PLESTERAN


Pek. Dinding bta merah (5X11X22)cm tebal 1/2 batu camp. 1sp : 5 pp 15.60 m2 11.76 9.80 x 0.60 x 2.00
3.84 3.20 x 0.60 x 2.00
15.60

Pek. Plesteran 1sp : 4pp tebal 15 mm 31.20 m2


Pek acian 31.20 m2

VI PEKERJAAN KAYU
A Atap bagian bawah
Pekerjaan gording expose kayu kruing Atap Bawah 1.34 m3
1 0.26 11.80 0.08 0.15 2.00
2 0.08 3.80 0.08 0.15 2.00
3 0.31 14.10 0.08 0.15 2.00
4 0.13 6.10 0.08 0.15 2.00
0.37 16.80 0.08 0.15 2.00
0.19 8.80 0.08 0.15 2.00

Pek. Jurai Expose kayu kruing 0.29 m3


tumpang bawah
jurai 0.20 5.75 0.08 0.12 4.00
jurai grantang 0.09 2.60 0.08 0.12 4.00

Pemasangan rangka atap genteng keramik kayu kruing 181.46 m2


Tumpang bawah 54.18 6.30 4.30 2.00
127.28 14.80 4.30 2.00

Pas Usuk maling


Tumpang bawah 88.20 m2 58.10 16.60 1.75 2.00
30.10 8.60 1.75 2.00

Pek pas lambersiring di atas usuk 181.46 m2 54.18 6.30 4.30 2.00
127.28 14.80 4.30 2.00

Pemasangan 1 m’ lisplank ukuran 2 x (3 x 20) cm, kayu kelas I atau kelas II kruin 59.20 m
Tumpang bawah 37.60 18.80 2.00
21.60 10.80 2.00
Pemasangan 1 m’ lisplank ukuran 3 x 15 cm, kayu kelas I atau kelas II kruing 53.80 m
Tumpang bawah 34.80 17.40 2.00
19.00 9.50 2.00

Pek ring ring ukuran 3/10 kayu kruing 59.20 m 37.60 18.80 2.00
21.60 10.80 2.00

Pek tatab ukuran 3/10 kayu kruing 59.20 m 37.60 18.80 2.00
21.60 10.80 2.00

Pek pas baut goeding &Jurai 120.00

B Atap bagian atas


Pekerjaan gording expose kayu kruing Atap Atas 0.26 m3
Pek. Lambang 0.19 11.25 0.08 0.12 2.00
0.06 3.60 0.08 0.12 2.00
0.79 m3
Pek. Pemucu 0.17 4.80 0.08 0.12 4.00
Pek. Pemade 0.31 3.60 0.08 0.12 10.00
Pek. Dedeleg 0.32 9.20 0.08 0.12 4.00

Pek. Papan 3/20 penutup dedeleg 9.20 m 9.20

Pek. Apit-apit 24.00 m 20.00 10.00 2.00


4.00 2.00 2.00

Pemasangan rangka atap genteng keramikmkayu kruing 102.34 m2


Tumpang atas 81.26 11.95 3.40 2.00
21.08 3.10 3.40 2.00

Pek. Grantang 50.70 m2


Tumpang atas 36.45 12.15 1.50 2.00
14.25 4.75 1.50 2.00

Pek pas lambersiring di atas usuk 102.34 m2


21.08 3.10 3.40 2.00
81.26 11.95 3.40 2.00

Pemasangan 1 m’ lisplank ukuran 2 x (3 x 20) cm, kayu kelas I atau kelas II kruing
Tumpang atas 40.40 m 28.20 14.1 2.00
12.20 6.10 2.00

Pemasangan 1 m’ lisplank ukuran 3 x 15 cm, kayu kelas I atau kelas II kruing 37.20 m
Tumpang atas 26.60 13.30 2.00
10.60 5.30 2.00

Pek ring ring ukuran 3/10 kayu kruing 40.40 m 28.20 14.1 2.00
12.20 6.10 2.00

Pek tatab ukuran 3/10 kayu kruing 40.40 m 28.20 14.10 2.00
12.20 6.10 2.00

VII PEKERJAAN PENUTUP ATAP


Pek. Pemasangan atap genteng kodok goodyear 283.80 m2
Pek. Pemasanganbubung kodok goodyear 81.80 m2
Pek pas murda paras 2.00 bh
Pek pas ikut celedu paras 8.00 bh
A.4.6.1.14. Pemasangan 1 m1 lambang
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.4720
Tukang kayu L.02 OH 1.4180
Kepala tukang L.03 OH 0.1410
Mandor L.04 OH 0.0230
JUMLAH
TENAGA
KERJA
B BAHAN
Pementang Kayu Jati ukir 10 x 20 cm M 1.0000

JUMLAH
HARGA BAHAN

C PERALATAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng expose , kayu kelas II kruing
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 6.7000
Tukang kayu L.02 OH 20.1000
Kepala tukang L.03 OH 2.0100
Mandor L.04 OH 0.3350
Upah Serut profil Kayu M3 1.0000
JUMLAH
TENAGA
KERJA
B BAHAN
Balok kayu M3 1.2000
Besi strip tebal 5 Kg 15.0000
mm
Paku 12 cm Kg 3.0000
JUMLAH
HARGA BAHAN

C PERALATAN

JUMLAH
HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.15. Pemasangan 1 m3 bale bale (pelangkan)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 6.7000
Tukang kayu L.02 OH 20.1000
Kepala tukang L.03 OH 2.0100
Mandor L.04 OH 0.3350
Upah Serut profil Kayu M3 1.0000
JUMLAH
TENAGA
KERJA
B BAHAN
Kayu kamper (sunduk,waton,galar ,dll) M3 1.2000
Paku 12 cm Kg 3.0000
JUMLAH
HARGA BAHAN

C PERALATAN

JUMLAH
HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.14. Pemasangan 1 m1 lambang


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.4720
Tukang kayu L.02 OH 1.4180
Kepala tukang L.03 OH 0.1410
Mandor L.04 OH 0.0230
JUMLAH
TENAGA
KERJA
B BAHAN
Rong Ukir pada empat sisi unit 1.0000
Uk. 81 cm x 81 cm x 93 cm
JUMLAH
HARGA BAHAN

C PERALATAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.5.1.5. Pemasangan 1 m2 ijuk


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja OH 0.6000
Tukang kayu OH 0.4000
Kepala tukang OH 0.0400
Mandor OH 0.0080

JUMLAH
TENAGA
KERJA
B BAHAN
Ijuk kg 245.0000
JUMLAH
HARGA BAHAN

C PERALATAN

JUMLAH
HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.5.1.5. Pemasangan 1 m’Apit-apit kayu profil


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0500
Tukang kayu L.02 OH 0.0500
Kepala tukang L.03 OH 0.0050
Mandor L.04 OH 0.0030
JUMLAH
TENAGA
KERJA
B BAHAN
Apit-apit kayu profil m 1.0500
Paku kg 0.0100
JUMLAH
HARGA BAHAN

C PERALATAN

JUMLAH
HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan Jumlah Harga
(Rp) (Rp)

106,240.36 50,145.45
119,520.00 169,479.36
132,800.00 18,724.80
166,000.00 3,818.00
242,167.61

2,216,670.00 2,216,670.00

2,216,670.00

2,458,837.61
245,883.76
2,704,721.37

Harga Satuan Jumlah Harga


(Rp) (Rp)

106,240.36 711,810.41
119,520.00 2,402,352.00
132,800.00 266,928.00
166,000.00 55,610.00
2,166,300.00 2,166,300.00
5,603,000.41

6,443,440.00 7,732,128.00
9,180.00 137,700.00

18,450.00 55,350.00
7,925,178.00

13,528,178.41
1,352,817.84
14,880,996.25

Harga Satuan Jumlah Harga


(Rp) (Rp)
106,240.36 711,810.41
119,520.00 2,402,352.00
132,800.00 266,928.00
166,000.00 55,610.00
2,166,300.00 2,166,300.00
5,603,000.41

6,443,440.00 7,732,128.00
18,450.00 55,350.00
7,787,478.00

13,390,478.41
1,339,047.84
14,729,526.25

Harga Satuan Jumlah Harga


(Rp) (Rp)

87,600.00 41,347.20
98,550.00 139,743.90
109,500.00 15,439.50
136,875.00 3,148.13
199,678.73

5,800,000.00 5,800,000.00

5,800,000.00

5,999,678.73
599,967.87
6,599,646.60

Harga Satuan Jumlah Harga


(Rp) (Rp)

87,600.00 52,560.00
98,550.00 39,420.00
109,500.00 4,380.00
136,875.00 1,095.00

97,455.00

8,000.00 1,960,000.00
1,960,000.00

2,057,455.00
205,745.50
2,263,200.50

Harga Satuan Jumlah Harga


(Rp) (Rp)

106,240.36 5,312.02
119,520.00 5,976.00
132,800.00 664.00
166,000.00 498.00
12,450.02

47,500.00 49,875.00
22,000.00 220.00
50,095.00

62,545.02
6,254.50
68,799.52
REKAPITULASI HARGA SATUAN K3
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN GIANYAR 2020

SEWA ALAT

1 MOLEN KAPASITAS 0,3 M3 HARI Rp. 62,196.76


2 CONCRETE VIBRATOR JAM Rp. 10,378.53
3 Bar Bender JAM Rp. 52,838.29
4 Bar Cutter JAM Rp. 52,838.29
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
A. 2.2.1.1 (K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 0.4000 106,240.36
Tukang kayu L.02 OH 0.2000 119,520.00
Kepala tukang L.03 OH 0.0200 132,800.00
Mandor L.04 OH 0.0200 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu d 8-10/400 cm Batang 1.2500 8,490.00
Semen portland Kg 5.0000 1,320.00
Pasir beton M3 0.0050 234,200.00
Koral beton M3 0.0090 259,290.00
Kayu 5/7 M3 0.0720 2,827,140.00
Paku biasa 2” – 5” Kg 0.0600 18,450.00
Residu Liter 0.4000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 0.2000 106,240.36
Tukang kayu L.02 OH 0.4000 119,520.00
Kepala tukang L.03 OH 0.0200 132,800.00
Mandor L.04 OH 0.0200 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu d 8-10/400 cm Batang 1.2500 8,490.00
Semen portland Kg 2.5000 1,320.00
Seng gelombang Lbr 1.2000 52,500.00
Pasir beton M3 0.0050 234,200.00
Koral beton M3 0.0090 259,290.00
Kayu 5/7 M3 0.0720 6,270.00
Paku biasa 2” – 5” Kg 0.0600 18,450.00
Meni besi Liter 0.4500 37,840.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.3. (K3) Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 0.2000 106,240.36
Tukang kayu L.02 OH 0.3000 119,520.00
Kepala tukang L.03 OH 0.0200 132,800.00
Mandor L.04 OH 0.0200 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu  Batang 1.0000 8,490.00
8-10/400 cm
Semen portland Kg 2.0000 1,320.00
Kawat duri Lbr 25.0000 23,490.00
Pasir beton M3 0.0050 234,200.00
Koral beton M3 0.0090 259,290.00
Paku biasa 2” – 5” Kg 0.0600 18,450.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 106,240.36
Tukang kayu L.02 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0050 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu balok 5/7 M3 0.0120 2,813,750.00
Paku 2”-3” Kg 0.0200 18,450.00
Kayu papan 3/20 M3 0.0070 2,827,140.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.5. (K3) Pembuatan 1 m2 kantor sementara lantai plesteran


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 2.0000 106,240.36
Tukang kayu L.02 OH 2.0000 119,520.00
Tukang batu L.02 OH 1.0000 119,520.00
Kepala tukang L.03 OH 0.3000 132,800.00
Mandor L.04 OH 0.0500 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu Batang 1.2500 8,490.00
diameter 8-
Kayu M3 0.1800 2,813,750.00
10/400 cm
Paku biasa Kg 0.0800 18,450.00
Besi strip Kg 1.1000
Semen Portland Kg 35.0000 1,320.00
Pasir pasang M3 0.1500 245,810.00
Pasir beton M3 0.1000 234,200.00
Koral beton M3 0.1500 259,290.00
Bata merah Bh 30.0000 1,500.00
Seng pelat Lbr 0.2500 44,500.00
Jendela naco Bh 0.2000
Kaca polos M2 0.0800 101,830.00
Kunci tanam Bh 0.1500 110,730.00
Plywood 4mm Lbr 0.0600 57,130.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 2.2.1.6. (K3) Pembuatan 1 m2 rumah jaga (konstruksi kayu )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 106,240.36
Tukang kayu L.02 OH 1.5000 119,520.00
Kepala tukang L.03 OH 0.1500 132,800.00
Mandor L.04 OH 0.0500 166,000.00
JUMLAH
B BAHAN TENAGA
Dolken kayu  Batang KERJA 3.0000 8,490.00
8-10/400 cm
Kayu M3 0.2760 2,813,750.00
Paku biasa Kg 0.7000 18,450.00
Seng gelombang Lbr 1.5000 52,500.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.7. (K3) Pembuatan 1 m2 gudang semen dan peralatan


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 106,240.36
Tukang kayu L.02 OH 2.0000 119,520.00
Kepala tukang L.03 OH 0.2000 132,800.00
Mandor L.04 OH 0.0500 166,000.00
JUMLAH
B BAHAN TENAGA
Dolken kayu diameter 8-10/400 Batang KERJA 1.7000 8,490.00
cm
Kayu M3 0.2100 2,813,750.00
Paku biasa Kg 0.3000 18,450.00
Semen Portland Kg 10.5000 1,320.00
Pasir beton Kg 0.0300 234,200.00
Koral beton M3 0.0500 259,290.00
Seng gelombang Lbr 1.5000 52,500.00
Seng pelat Lbr 0.2500 44,500.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
D Jumlah (A+B+C) HARGA ALAT
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 2.2.1.8. (K3) Pembuatan 1 m2 bedeng pekerja
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 106,240.36
Tukang kayu L.02 OH 2.0000 119,520.00
Kepala tukang L.03 OH 0.2000 132,800.00
Mandor L.04 OH 0.0500 166,000.00
JUMLAH
B BAHAN TENAGA
Dolken kayu diameter 8-10/400 Batang KERJA 1.2500 8,490.00
cm
Kayu M3 0.1860 2,813,750.00
Paku biasa Kg 0.3000 18,450.00
Semen Portland Kg 18.0000 1,320.00
Pasir beton Kg 0.0300 234,200.00
Koral beton M3 0.0500 259,290.00
Seng gelombang Lbr 1.5000 52,500.00
Plywood 4mm Lbr 1.3500 57,130.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
D Jumlah (A+B+C) HARGA ALAT
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.9. (K3) Pembersihan 1 m2 lapangan dan perataan


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 83,200.00
Mandor L.04 OH 0.0500 130,000.00
JUMLAH
B BAHAN TENAGA
KERJA
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
D Jumlah (A+B+C) HARGA ALAT
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.10. (K3) Pembuatan 1 m2 steger/perancah dari bambu


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 1.0000 106,240.36
Tukang kayu L.02 OH 2.0000 119,520.00
Kepala tukang L.03 OH 0.2000 132,800.00
Mandor L.04 OH 0.0500 166,000.00
JUMLAH
B BAHAN TENAGA
Bambu diameter 6-8/600 cm Batang KERJA 1.2500 8,490.00
Tali ijuk Kg 0.1860 12,430.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Tukang kayu L.02 OH 0.3000 119,520.00
Kepala tukang L.03 OH 0.0300 132,800.00
JUMLAH
B BAHAN TENAGA
Kayu papan kelas III M3 KERJA 0.0360 2,827,140.00
Kayu balok 5/7 kelas III M3 0.0140 2,813,750.00
Paku biasa Kg 0.0800 18,450.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.12. Pembuatan 1 m2 jalan sementara


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 83,200.00
Mandor L.04 OH 0.0050 130,000.00
JUMLAH
B BAHAN TENAGA
Batu belah M3 KERJA 0.1500 251,630.00
Batu pecah M3 0.0900 251,630.00
Pasir pasang M3 0.0100 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.13. Pembongkaran 1 m3 beton bertulang


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 13.3340 83,200.00
Mandor L.04 OH 0.6660 130,000.00
JUMLAH
B BAHAN TENAGA
KERJA
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 2.2.1.14. Pembongkaran 1 m3 dinding tembok bata
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 6.6670 83,200.00
Mandor L.04 OH 0.3330 130,000.00
JUMLAH
B BAHAN TENAGA
KERJA
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 0.042 106,240.36
Tukang L.02 0.004 119,520.00
Kepala Tukang L.03 0.002 132,800.00
Mandor L.04 0.042 166,000.00
JUMLAH
B BAHAN TENAGA
Kawat jaring Lbr KERJA
0.1434 20,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)

42,496.14
23,904.00
2,656.00
3,320.00
72,376.14

10,612.50
6,600.00
1,171.00
2,333.61
203,554.08
1,107.00
-
225,378.19

297,754.33
29,775.43
327,529.77

Jumlah Harga
(Rp)

21,248.07
47,808.00
2,656.00
3,320.00
75,032.07

10,612.50
3,300.00
63,000.00
1,171.00
2,333.61
451.44
1,107.00
17,028.00
99,003.55

174,035.62
17,403.56
191,439.18

Jumlah Harga
(Rp)

21,248.07
35,856.00
2,656.00
3,320.00
63,080.07

8,490.00
2,640.00
587,250.00
1,171.00
2,333.61
1,107.00
602,991.61

666,071.68
66,607.17
732,678.85

Jumlah Harga
(Rp)

10,624.04
11,952.00
1,328.00
830.00
24,734.04

33,765.00
369.00
19,789.98
53,923.98

78,658.02
7,865.80
86,523.82

Jumlah Harga
(Rp)

212,480.72
239,040.00
119,520.00
39,840.00
8,300.00
619,180.72

10,612.50
506,475.00
1,476.00
-
46,200.00
36,871.50
23,420.00
38,893.50
45,000.00
11,125.00
-
8,146.40
16,609.50
3,427.80
748,257.20

1,367,437.92
136,743.79
1,504,181.71
Jumlah Harga
(Rp)

106,240.36
179,280.00
19,920.00
8,300.00
313,740.36

25,470.00
776,595.00
12,915.00
78,750.00
893,730.00

1,207,470.36
120,747.04
1,328,217.40

Jumlah Harga
(Rp)

106,240.36
239,040.00
26,560.00
8,300.00
380,140.36

14,433.00
590,887.50
5,535.00
13,860.00
7,026.00
12,964.50
78,750.00
11,125.00
734,581.00

1,114,721.36
111,472.14
1,226,193.50
Jumlah Harga
(Rp)

106,240.36
239,040.00
26,560.00
8,300.00
380,140.36

10,612.50
523,357.50
5,535.00
23,760.00
7,026.00
12,964.50
78,750.00
77,125.50
739,131.00

1,119,271.36
111,927.14
1,231,198.50

Jumlah Harga
(Rp)

8,320.00
6,500.00
14,820.00

14,820.00
1,482.00
16,302.00

Jumlah Harga
(Rp)

106,240.36
239,040.00
26,560.00
8,300.00
380,140.36

10,612.50
2,311.98
12,924.48

393,064.84
39,306.48
432,371.32
Jumlah Harga
(Rp)

35,856.00
3,984.00
39,840.00

101,777.04
39,392.50
1,476.00
142,645.54

182,485.54
18,248.55
200,734.09

Jumlah Harga
(Rp)

83,200.00
650.00
83,850.00

37,744.50
22,646.70
2,458.10
62,849.30

146,699.30
14,669.93
161,369.23

Jumlah Harga
(Rp)

1,109,388.80
86,580.00
1,195,968.80

1,195,968.80
119,596.88
1,315,565.68
Jumlah Harga
(Rp)

554,694.40
43,290.00
597,984.40

597,984.40
59,798.44
657,782.84

Jumlah Harga
(Rp)

4,462.10
478.08
265.60
6,972.00
12,177.78

2,868.00
2,868.00

15,045.78
1,504.58
16,550.35
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 0.7500 106,240.36
Mandor L.04 OH 0.0250 166,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 0.9000 106,240.36
Mandor L.04 OH 0.0450 166,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.3. Menggali 1 m3 tanah biasa sedalam 3 m


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 1.0500 106,240.36
Mandor L.04 OH 0.0670 166,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 1.0000 106,240.36
Mandor L.04 OH 0.0320 166,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 1.5000 106,240.36
Mandor L.04 OH 0.0600 166,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 1.2000 106,240.36
Mandor L.04 OH 0.0450 166,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 0.0500 106,240.36
Mandor L.04 OH 0.0050 166,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.8. (K3) Pembuangan 1 m3 tanah sejauh 30 meter


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 0.3300 106,240.36
Mandor L.04 OH 0.0100 166,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 0.5000 106,240.36
Mandor L.04 OH 0.0500 166,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.10. (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 0.5000 106,240.36
Mandor L.04 OH 0.0500 166,000.00
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Mandor L.04 OH 0.0100 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir urug M3 1.2000 160,690.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.12. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 106,240.36
Mandor L.04 OH 0.0150 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ijuk Kg 6.0000 10,750.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.2.3.1.13. Pengurugan 1 m3 sirtu padat
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 106,240.36
Mandor L.04 OH 0.0250 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Sirtu M3 1.2000 141,290.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.14. Pengurugan 1 m3 Tanah Urug


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Mandor L.04 OH 0.0100 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Taah Urug M3 1.2000 121,670.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)

79,680.27
4,150.00
83,830.27

83,830.27
8,383.03
92,213.30

Jumlah Harga
(Rp)

95,616.32
7,470.00
103,086.32

103,086.32
10,308.63
113,394.96

Jumlah Harga
(Rp)

111,552.38
11,122.00
122,674.38

122,674.38
12,267.44
134,941.82

Jumlah Harga
(Rp)

106,240.36
5,312.00
111,552.36

111,552.36
11,155.24
122,707.60
Jumlah Harga
(Rp)

159,360.54
9,960.00
169,320.54

169,320.54
16,932.05
186,252.59

Jumlah Harga
(Rp)

127,488.43
7,470.00
134,958.43

134,958.43
13,495.84
148,454.28

Jumlah Harga
(Rp)

5,312.02
830.00
6,142.02

6,142.02
614.20
6,756.22

Jumlah Harga
(Rp)

35,059.32
1,660.00
36,719.32

36,719.32
3,671.93
40,391.25
Jumlah Harga
(Rp)

53,120.18
8,300.00
61,420.18

61,420.18
6,142.02
67,562.20

Jumlah Harga
(Rp)

53,120.18
8,300.00
61,420.18

61,420.18
6,142.02
67,562.20

Jumlah Harga
(Rp)

31,872.11
1,660.00
33,532.11

192,828.00
192,828.00

226,360.11
22,636.01
248,996.12

Jumlah Harga
(Rp)

15,936.05
2,490.00
18,426.05

64,500.00
64,500.00

82,926.05
8,292.61
91,218.66
Jumlah Harga
(Rp)

26,560.09
4,150.00
30,710.09

169,548.00
169,548.00

200,258.09
20,025.81
220,283.90

Jumlah Harga
(Rp)

31,872.11
1,660.00
33,532.11

146,004.00
146,004.00

179,536.11
17,953.61
197,489.72
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.5000 106,240.36 159,360.54
Tukang batu L.02 OH 0.7500 119,520.00 89,640.00
Kepala tukang L.03 OH 0.0750 132,800.00 9,960.00
Mandor L.04 OH 0.0750 166,000.00 12,450.00
JUMLAH TENAGA KERJA 271,410.54
B BAHAN
Batu belah M3 1.2000 251,630.00 301,956.00
Semen Portland Kg 202.0000 1,320.00 266,640.00
Pasir pasang M3 0.4850 245,810.00 119,217.85
JUMLAH HARGA BAHAN 687,813.85
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 959,224.39
E Overhead & Profit 10% x D 95,922.44
F Harga Satuan Pekerjaan (D+E) 1,055,146.83

A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.5000 106,240.36 159,360.54
Tukang batu L.02 OH 0.7500 119,520.00 89,640.00
Kepala tukang L.03 OH 0.0750 132,800.00 9,960.00
Mandor L.04 OH 0.0750 166,000.00 12,450.00
JUMLAH TENAGA KERJA 271,410.54
B BAHAN
Batu belah M3 1.2000 251,630.00 301,956.00
Semen Portland Kg 163.0000 1,320.00 215,160.00
Pasir pasang M3 0.5200 245,810.00 127,821.20
JUMLAH HARGA BAHAN 644,937.20
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 916,347.74
E Overhead & Profit 10% x D 91,634.77
F Harga Satuan Pekerjaan (D+E) 1,007,982.51

A.3.2.1.3. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.5000 106,240.36 159,360.54
Tukang batu L.02 OH 0.7500 119,520.00 89,640.00
Kepala tukang L.03 OH 0.0750 132,800.00 9,960.00
Mandor L.04 OH 0.0750 166,000.00 12,450.00
JUMLAH TENAGA KERJA 271,410.54
B BAHAN
Batu belah M3 1.2000 251,630.00 301,956.00
Semen Portland Kg 136.0000 1,320.00 179,520.00
Pasir pasang M3 0.5440 245,810.00 133,720.64
JUMLAH HARGA BAHAN 615,196.64
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 886,607.18
E Overhead & Profit 10% x D 88,660.72
F Harga Satuan Pekerjaan (D+E) 975,267.90
A.3.2.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.5000 106,240.36 159,360.54
Tukang batu L.02 OH 0.7500 119,520.00 89,640.00
Kepala tukang L.03 OH 0.0750 132,800.00 9,960.00
Mandor L.04 OH 0.0750 166,000.00 12,450.00
JUMLAH TENAGA KERJA 271,410.54
B BAHAN
Batu belah M3 1.2000 251,630.00 301,956.00
Semen Portland Kg 117.0000 1,320.00 154,440.00
Pasir pasang M3 0.5610 245,810.00 137,899.41
JUMLAH HARGA BAHAN 594,295.41
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 865,705.95
E Overhead & Profit 10% x D 86,570.60
F Harga Satuan Pekerjaan (D+E) 952,276.55

A.3.2.1.5. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.5000 106,240.36 159,360.54
Tukang batu L.02 OH 0.7500 119,520.00 89,640.00
Kepala tukang L.03 OH 0.0750 132,800.00 9,960.00
Mandor L.04 OH 0.0750 166,000.00 12,450.00
JUMLAH TENAGA KERJA 271,410.54
B BAHAN
Batu belah M3 1.2000 251,630.00 301,956.00
Semen Portland Kg 91.0000 1,320.00 120,120.00
Pasir pasang M3 0.5840 245,810.00 143,553.04
JUMLAH HARGA BAHAN 565,629.04
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 837,039.58


E Overhead & Profit 10% x D 83,703.96
F Harga Satuan Pekerjaan (D+E) 920,743.54

A.3.2.1.6. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.5000 106,240.36 159,360.54
Tukang batu L.02 OH 0.7500 119,520.00 89,640.00
Kepala tukang L.03 OH 0.0750 132,800.00 9,960.00
Mandor L.04 OH 0.0750 166,000.00 12,450.00
JUMLAH TENAGA KERJA 271,410.54
B BAHAN
Batu belah M3 1.2000 251,630.00 301,956.00
Kapur M3 0.1700 -
Semen Portland Kg 0.1700 1,320.00 224.40
Pasir pasang M3 0.3400 245,810.00 83,575.40
JUMLAH HARGA BAHAN 385,755.80
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 657,166.34


E Overhead & Profit 10% x D 65,716.63
F Harga Satuan Pekerjaan (D+E) 722,882.97
A.3.2.1.7. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.5000 106,240.36 159,360.54
Tukang batu L.02 OH 0.7500 119,520.00 89,640.00
Kepala tukang L.03 OH 0.0750 132,800.00 9,960.00
Mandor L.04 OH 0.0750 166,000.00 12,450.00
JUMLAH TENAGA KERJA 271,410.54
B BAHAN
Batu belah M3 1.2000 251,630.00 301,956.00
Semen Portland Kg 61.0000 1,320.00 80,520.00
Kapur M3 0.1470 -
Pasir pasang M3 0.4920 245,810.00 120,938.52
JUMLAH HARGA BAHAN 503,414.52
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 774,825.06


E Overhead & Profit 10% x D 77,482.51
F Harga Satuan Pekerjaan (D+E) 852,307.57

A.3.2.1.8.Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.5000 106,240.36 159,360.54
Tukang batu L.02 OH 0.7500 119,520.00 89,640.00
Kepala tukang L.03 OH 0.0750 132,800.00 9,960.00
Mandor L.04 OH 0.0750 166,000.00 12,450.00
JUMLAH TENAGA KERJA 271,410.54
B BAHAN
Batu belah M3 1.2000 251,630.00 301,956.00
Semen Portland Kg 41.0000 1,320.00 54,120.00
Kapur M3 0.1310 -
Pasir pasang M3 0.5230 245,810.00 128,558.63
JUMLAH HARGA BAHAN 484,634.63
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 756,045.17


E Overhead & Profit 10% x D 75,604.52
F Harga Satuan Pekerjaan (D+E) 831,649.69

A.3.2.1.9. (K3) Pemasangan 1 m3 batu kosong (anstamping)


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.7800 106,240.36 82,867.48
Tukang batu L.02 OH 0.3900 119,520.00 46,612.80
Kepala tukang L.03 OH 0.0390 132,800.00 5,179.20
Mandor L.04 OH 0.0390 166,000.00 6,474.00
JUMLAH TENAGA KERJA 141,133.48
B BAHAN
Batu belah M3 1.2000 251,630.00 301,956.00
Pasir urug M3 0.4320 160,690.00 69,418.08
JUMLAH HARGA BAHAN 371,374.08
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 512,507.56


E Overhead & Profit 10% x D 51,250.76
F Harga Satuan Pekerjaan (D+E) 563,758.32
A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 3.4000 106,240.36 361,217.22
Tukang batu L.02 OH 0.8500 119,520.00 101,592.00
Kepala tukang L.03 OH 0.0850 132,800.00 11,288.00
Mandor L.04 OH 0.1700 166,000.00 28,220.00
JUMLAH TENAGA KERJA 502,317.22
B BAHAN
Batu belah M3 0.4800 251,630.00 120,782.40
Semen Portland Kg 194.0000 1,320.00 256,080.00
Pasir beton M3 0.3120 234,200.00 73,070.40
Kerikil M3 0.4680 259,290.00 121,347.72
Besi beton Kg 126.0000 9,180.00 1,156,680.00
Kawat beton Kg 0.1800 19,740.00 3,553.20
JUMLAH HARGA BAHAN 1,731,513.72
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2,233,830.94


E Overhead & Profit 10% x D 223,383.09
F Harga Satuan Pekerjaan (D+E) 2,457,214.04

A.3.2.1.11. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 2.4000 106,240.36 254,976.86
Tukang batu L.02 OH 0.8000 119,520.00 95,616.00
Kepala tukang L.03 OH 0.0800 132,800.00 10,624.00
Mandor L.04 OH 0.1190 166,000.00 19,754.00
JUMLAH TENAGA KERJA 380,970.86
B BAHAN
Batu belah M3 0.4500 251,630.00 113,233.50
Semen Portland Kg 194.0000 1,320.00 256,080.00
Pasir beton M3 0.3120 234,200.00 73,070.40
Kerikil M3 0.4680 259,290.00 121,347.72
JUMLAH HARGA BAHAN 563,731.62
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 944,702.48


E Overhead & Profit 10% x D 94,470.25
F Harga Satuan Pekerjaan (D+E) 1,039,172.73
A.4.1.1 HARGA SATUAN PEKERJAAN BETON (TANPA ALAT)
A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 MPa
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.6500 106,240.36 175,296.59
Tukang batu L.02 OH 0.2750 119,520.00 32,868.00
Kepala tukang L.03 OH 0.0280 132,800.00 3,718.40
Mandor L.04 OH 0.0830 166,000.00 13,778.00
JUMLAH TENAGA KERJA 225,660.99
B BAHAN
Semen Portland Kg 247.0000 1,320.00 326,040.00
Pasir beton Kg 869.0000 167.29 145,371.29
Kerikil (Maks 30 mm) Kg 999.0000 192.07 191,874.60
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 666,657.09
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 892,318.08
E Overhead & Profit 10% x D 89,231.81
F Harga Satuan Pekerjaan (D+E) 981,549.89

A.4.1.1.2 Membuat 1 m3 beton mutu f’c = 9,8 MPa


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.6500 106,240.36 175,296.59
Tukang batu L.02 OH 0.2750 119,520.00 32,868.00
Kepala tukang L.03 OH 0.0280 132,800.00 3,718.40
Mandor L.04 OH 0.0830 166,000.00 13,778.00
JUMLAH TENAGA KERJA 225,660.99
B BAHAN
Semen Portland Kg 276.0000 1,320.00 364,320.00
Pasir beton Kg 828.0000 167.29 138,512.57
Kerikil (Maks 30 mm) Kg 1,012.0000 192.07 194,371.47
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 700,575.24
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 926,236.23


E Overhead & Profit 10% x D 92,623.62
F Harga Satuan Pekerjaan (D+E) 1,018,859.86

A.4.1.1.3 Membuat 1 m3 beton mutu f’c = 12,2 MPa


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.6500 106,240.36 175,296.59
Tukang batu L.02 OH 0.2750 119,520.00 32,868.00
Kepala tukang L.03 OH 0.0280 132,800.00 3,718.40
Mandor L.04 OH 0.0830 166,000.00 13,778.00
JUMLAH TENAGA KERJA 225,660.99
B BAHAN
Semen Portland Kg 299.0000 1,320.00 394,680.00
Pasir beton Kg 799.0000 167.29 133,661.29
Kerikil (Maks 30 mm) Kg 1,017.0000 192.07 195,331.80
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 727,044.29
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 952,705.28


E Overhead & Profit 10% x D 95,270.53
F Harga Satuan Pekerjaan (D+E) 1,047,975.81
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.2000 106,240.36 127,488.43
Tukang batu L.02 OH 0.2000 119,520.00 23,904.00
Kepala tukang L.03 OH 0.0200 132,800.00 2,656.00
Mandor L.04 OH 0.0600 166,000.00 9,960.00
JUMLAH TENAGA KERJA 164,008.43
B BAHAN
Semen Portland Kg 230.0000 1,320.00 303,600.00
Pasir beton Kg 893.0000 167.29 149,386.14
Kerikil (Maks 30 mm) Kg 1,027.0000 192.07 197,252.47
Air Ltr 200.0000 15.68 3,136.00
JUMLAH HARGA BAHAN 653,374.61
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 817,383.04
E Overhead & Profit 10% x D 81,738.30
F Harga Satuan Pekerjaan (D+E) 899,121.35

A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.6500 106,240.36 175,296.59
Tukang batu L.02 OH 0.2750 119,520.00 32,868.00
Kepala tukang L.03 OH 0.0280 132,800.00 3,718.40
Mandor L.04 OH 0.0830 166,000.00 13,778.00
JUMLAH TENAGA KERJA 225,660.99
B BAHAN
Semen Portland Kg 326.0000 1,320.00 430,320.00
Pasir beton Kg 760.0000 167.29 127,137.14
Kerikil (Maks 30 mm) Kg 1,029.0000 192.07 197,636.60
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 758,464.94
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 984,125.94


E Overhead & Profit 10% x D 98,412.59
F Harga Satuan Pekerjaan (D+E) 1,082,538.53

A.4.1.1.6 Membuat 1 m3 beton mutu f’c = 16,9 Mpa


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.6500 106,240.36 175,296.59
Tukang batu L.02 OH 0.2750 119,520.00 32,868.00
Kepala tukang L.03 OH 0.0280 132,800.00 3,718.40
Mandor L.04 OH 0.0830 166,000.00 13,778.00
JUMLAH TENAGA KERJA 225,660.99
B BAHAN
Semen Portland Kg 352.0000 1,320.00 464,640.00
Pasir beton Kg 731.0000 167.29 122,285.86
Kerikil (Maks 30 mm) Kg 1,031.0000 192.07 198,020.73
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 788,317.79
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,013,978.78


E Overhead & Profit 10% x D 101,397.88
F Harga Satuan Pekerjaan (D+E) 1,115,376.66
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 MPa
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.6500 106,240.36 175,296.59
Tukang batu L.02 OH 0.2750 119,520.00 32,868.00
Kepala tukang L.03 OH 0.0280 132,800.00 3,718.40
Mandor L.04 OH 0.0830 166,000.00 13,778.00
JUMLAH TENAGA KERJA 225,660.99
B BAHAN
Semen Portland Kg 371.0000 1,320.00 489,720.00
Pasir beton Kg 698.0000 167.29 116,765.43
Kerikil (Maks 30 mm) Kg 1,047.0000 192.07 201,093.80
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 810,950.43
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,036,611.42


E Overhead & Profit 10% x D 103,661.14
F Harga Satuan Pekerjaan (D+E) 1,140,272.56

A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 MPa


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.6500 106,240.36 175,296.59
Tukang batu L.02 OH 0.2750 119,520.00 32,868.00
Kepala tukang L.03 OH 0.0280 132,800.00 3,718.40
Mandor L.04 OH 0.0830 166,000.00 13,778.00
JUMLAH TENAGA KERJA 225,660.99
B BAHAN
Semen Portland Kg 384.0000 1,320.00 506,880.00
Pasir beton Kg 692.0000 167.29 115,761.71
Kerikil (Maks 30 mm) Kg 1,039.0000 192.07 199,557.27
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 825,570.18
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,051,231.17


E Overhead & Profit 10% x D 105,123.12
F Harga Satuan Pekerjaan (D+E) 1,156,354.29

A.4.1.1.9. Membuat 1 m3 beton mutu f’c = 24,0 Mpa


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.6500 106,240.36 175,296.59
Tukang batu L.02 OH 0.2750 119,520.00 32,868.00
Kepala tukang L.03 OH 0.0280 132,800.00 3,718.40
Mandor L.04 OH 0.0830 166,000.00 13,778.00
JUMLAH TENAGA KERJA 225,660.99
B BAHAN
Semen Portland Kg 406.0000 1,320.00 535,920.00
Pasir beton Kg 684.0000 167.29 114,423.43
Kerikil (Maks 30 mm) Kg 1,026.0000 192.07 197,060.40
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 850,775.03
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,076,436.02


E Overhead & Profit 10% x D 107,643.60
F Harga Satuan Pekerjaan (D+E) 1,184,079.62
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 MPa
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.6500 106,240.36 175,296.59
Tukang batu L.02 OH 0.2750 119,520.00 32,868.00
Kepala tukang L.03 OH 0.0280 132,800.00 3,718.40
Mandor L.04 OH 0.0830 166,000.00 13,778.00
JUMLAH TENAGA KERJA 225,660.99
B BAHAN
Semen Portland Kg 413.0000 1,320.00 545,160.00
Pasir beton Kg 681.0000 167.29 113,921.57
Kerikil (Maks 30 mm) Kg 1,021.0000 192.07 196,100.07
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 858,552.84
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,084,213.83


E Overhead & Profit 10% x D 108,421.38
F Harga Satuan Pekerjaan (D+E) 1,192,635.22

A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 MPa


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 2.1000 106,240.36 223,104.76
Tukang batu L.02 OH 0.3500 119,520.00 41,832.00
Kepala tukang L.03 OH 0.0350 132,800.00 4,648.00
Mandor L.04 OH 0.1050 166,000.00 17,430.00
JUMLAH TENAGA KERJA 287,014.76
B BAHAN
Semen Portland Kg 439.0000 1,320.00 579,480.00
Pasir beton Kg 670.0000 167.29 112,081.43
Kerikil (Maks 30 mm) Kg 1,006.0000 192.07 193,219.07
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 888,151.70
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,175,166.45


E Overhead & Profit 10% x D 117,516.65
F Harga Satuan Pekerjaan (D+E) 1,292,683.10

A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 2.1000 106,240.36 223,104.76
Tukang batu L.02 OH 0.3500 119,520.00 41,832.00
Kepala tukang L.03 OH 0.0350 132,800.00 4,648.00
Mandor L.04 OH 0.1050 166,000.00 17,430.00
JUMLAH TENAGA KERJA 287,014.76
B BAHAN
Semen Portland Kg 448.0000 1,320.00 591,360.00
Pasir beton Kg 667.0000 167.29 111,579.57
Kerikil (Maks 30 mm) Kg 1,000.0000 192.07 192,066.67
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 898,377.44
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,185,392.19
E Overhead & Profit 10% x D 118,539.22
F Harga Satuan Pekerjaan (D+E) 1,303,931.41
A.4.1.1.13a Pembesian 10 kg dengan besi polos (U-24)
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.0700 106,240.36 7,436.83
Tukang besi L.02 OH 0.0700 119,520.00 8,366.40
Kepala tukang L.03 OH 0.0070 132,800.00 929.60
Mandor L.04 OH 0.0040 166,000.00 664.00
JUMLAH TENAGA KERJA 17,396.83
B BAHAN
Besi beton (polos/U-24) Kg 10.5000 9,180.00 96,390.00
Kawat beton Kg 0.1500 19,740.00 2,961.00
JUMLAH HARGA BAHAN 99,351.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 116,747.83


E Overhead & Profit 10% x D 11,674.78
F Harga Satuan Pekerjaan (D+E) 128,422.61

A.4.1.1.13b Pembesian 10 kg dengan besi besi ulir U-35, (fy=320 kg/mm2)


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.0700 106,240.36 7,436.83
Tukang besi L.02 OH 0.0700 119,520.00 8,366.40
Kepala tukang L.03 OH 0.0070 132,800.00 929.60
Mandor L.04 OH 0.0040 166,000.00 664.00
JUMLAH TENAGA KERJA 17,396.83
B BAHAN
Besi beton Ulir U-35, (fy=320 kg/mm2) Kg 10.5000 9,230.00 96,915.00
Kawat beton Kg 0.1500 19,740.00 2,961.00
JUMLAH HARGA BAHAN 99,876.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 117,272.83


E Overhead & Profit 10% x D 11,727.28
F Harga Satuan Pekerjaan (D+E) 129,000.11

A.4.1.1.13c Pembesian 10 kg dengan besi besi ulir U-40, (fy=400 kg/mm2)


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.0700 106,240.36 7,436.83
Tukang besi L.02 OH 0.0700 119,520.00 8,366.40
Kepala tukang L.03 OH 0.0070 132,800.00 929.60
Mandor L.04 OH 0.0040 166,000.00 664.00
JUMLAH TENAGA KERJA 17,396.83
B BAHAN
Besi beton Ulir U-40, (fy=400 kg/mm2) Kg 10.5000 9,740.00 102,270.00
Kawat beton Kg 0.1500 19,740.00 2,961.00
JUMLAH HARGA BAHAN 105,231.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 122,627.83


E Overhead & Profit 10% x D 12,262.78
F Harga Satuan Pekerjaan (D+E) 134,890.61
A.4.1.1.14 Pemasangan 10 kg kabel prategang (prestressed) polos/strands
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.0500 106,240.36 5,312.02
Tukang besi L.02 OH 0.0500 119,520.00 5,976.00
Kepala tukang L.03 OH 0.0050 132,800.00 664.00
Mandor L.04 OH 0.0030 166,000.00 498.00
JUMLAH TENAGA KERJA 12,450.02
B BAHAN
Besi beton (polos/ulir) Kg 10.5000 9,180.00 96,390.00
Kawat beton Kg 0.1000 19,740.00 1,974.00
JUMLAH HARGA BAHAN 98,364.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 110,814.02


E Overhead & Profit 10% x D 11,081.40
F Harga Satuan Pekerjaan (D+E) 121,895.42

A.4.1.1.15 Pemasangan 10 kg jaring kawat baja (wiremesh m5)


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.0250 106,240.36 2,656.01
Tukang besi L.02 OH 0.0250 119,520.00 2,988.00
Kepala tukang L.03 OH 0.0250 132,800.00 3,320.00
Mandor L.04 OH 0.0010 166,000.00 166.00
JUMLAH TENAGA KERJA 9,130.01
B BAHAN
Jaring kawat baja dilas Kg 10.2000 10,960.00 111,792.00
Kawat beton Kg 0.0500 19,740.00 987.00
JUMLAH HARGA BAHAN 112,779.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 121,909.01


E Overhead & Profit 10% x D 12,190.90
F Harga Satuan Pekerjaan (D+E) 134,099.91
A.4.1.1.B HARGA SATUAN PEKERJAAN BETON DENGAN MOLEN
A.4.1.1.B.1 Membuat 1 m3 beton mutu f’c = 7,4 MPa
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.3230 106,240.36 140,556.00
Tukang batu L.02 OH 0.1890 119,520.00 22,589.28
Kepala tukang L.03 OH 0.0190 132,800.00 2,523.20
Mandor L.04 OH 0.1320 166,000.00 21,912.00
JUMLAH TENAGA KERJA 187,580.48
B BAHAN
Semen Portland Kg 247.0000 1,320.00 326,040.00
Pasir beton Kg 869.0000 167.29 145,371.29
Kerikil (Maks 30 mm) Kg 999.0000 192.07 191,874.60
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 666,657.09
C PERALATAN
Concrete Vibrator jam 0.3010 10,378.53 3,123.94
Molen Kapasitas 0,3 m3 Sewa Hari 0.2500 62,196.76 15,549.19
JUMLAH HARGA ALAT 18,673.13

D Jumlah (A+B+C) 872,910.69


E Overhead & Profit 10% x D 87,291.07
F Harga Satuan Pekerjaan (D+E) 960,201.76

A.4.1.1.B.2 Membuat 1 m3 beton mutu f’c = 9,8 MPa


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.3230 106,240.36 140,556.00
Tukang batu L.02 OH 0.1890 119,520.00 22,589.28
Kepala tukang L.03 OH 0.0190 132,800.00 2,523.20
Mandor L.04 OH 0.1320 166,000.00 21,912.00
JUMLAH TENAGA KERJA 187,580.48
B BAHAN
Semen Portland Kg 276.0000 1,320.00 364,320.00
Pasir beton Kg 828.0000 167.29 138,512.57
Kerikil (Maks 30 mm) Kg 1,012.0000 192.07 194,371.47
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 700,575.24
C PERALATAN
Concrete Vibrator jam 0.3010 10,378.53 3,123.94
Molen Kapasitas 0,3 m3 Sewa Hari 0.2500 62,196.76 15,549.19
JUMLAH HARGA ALAT 18,673.13

D Jumlah (A+B+C) 906,828.84


E Overhead & Profit 10% x D 90,682.88
F Harga Satuan Pekerjaan (D+E) 997,511.73

A.4.1.1.B.3 Membuat 1 m3 beton mutu f’c = 12,2 MPa


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.3230 106,240.36 140,556.00
Tukang batu L.02 OH 0.1890 119,520.00 22,589.28
Kepala tukang L.03 OH 0.0190 132,800.00 2,523.20
Mandor L.04 OH 0.1320 166,000.00 21,912.00
JUMLAH TENAGA KERJA 187,580.48
B BAHAN
Semen Portland Kg 299.0000 1,320.00 394,680.00
Pasir beton Kg 799.0000 167.29 133,661.29
Kerikil (Maks 30 mm) Kg 1,017.0000 192.07 195,331.80
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 727,044.29
C PERALATAN
Concrete Vibrator jam 0.3010 10,378.53 3,123.94
Molen Kapasitas 0,3 m3 Sewa Hari 0.2500 62,196.76 15,549.19
JUMLAH HARGA ALAT 18,673.13

D Jumlah (A+B+C) 933,297.89


E Overhead & Profit 10% x D 93,329.79
F Harga Satuan Pekerjaan (D+E) 1,026,627.68
A.4.1.1.B.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.2000 106,240.36 127,488.43
Tukang batu L.02 OH 0.2000 119,520.00 23,904.00
Kepala tukang L.03 OH 0.0200 132,800.00 2,656.00
Mandor L.04 OH 0.0600 166,000.00 9,960.00
JUMLAH TENAGA KERJA 164,008.43
B BAHAN
Semen Portland Kg 230.0000 1,320.00 303,600.00
Pasir beton Kg 893.0000 167.29 149,386.14
Kerikil (Maks 30 mm) Kg 1,027.0000 192.07 197,252.47
Air Ltr 200.0000 15.68 3,136.00
JUMLAH HARGA BAHAN 653,374.61
C PERALATAN
Concrete Vibrator jam 0.3010 10,378.53 3,123.94
Molen Kapasitas 0,3 m3 Sewa Hari 0.2500 62,196.76 15,549.19
JUMLAH HARGA ALAT 18,673.13

D Jumlah (A+B+C) 836,056.17


E Overhead & Profit 10% x D 83,605.62
F Harga Satuan Pekerjaan (D+E) 919,661.79

A.4.1.1.B.5 Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.3230 106,240.36 140,556.00
Tukang batu L.02 OH 0.1890 119,520.00 22,589.28
Kepala tukang L.03 OH 0.0190 132,800.00 2,523.20
Mandor L.04 OH 0.1320 166,000.00 21,912.00
JUMLAH TENAGA KERJA 187,580.48
B BAHAN
Semen Portland Kg 326.0000 1,320.00 430,320.00
Pasir beton Kg 760.0000 167.29 127,137.14
Kerikil (Maks 30 mm) Kg 1,029.0000 192.07 197,636.60
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 758,464.94
C PERALATAN
Concrete Vibrator jam 0.3010 10,378.53 3,123.94
Molen Kapasitas 0,3 m3 Sewa Hari 0.2500 62,196.76 15,549.19
JUMLAH HARGA ALAT 18,673.13

D Jumlah (A+B+C) 964,718.55


E Overhead & Profit 10% x D 96,471.85
F Harga Satuan Pekerjaan (D+E) 1,061,190.40

A.4.1.1.B.6 Membuat 1 m3 beton mutu f’c = 16,9 Mpa


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.3230 106,240.36 140,556.00
Tukang batu L.02 OH 0.1890 119,520.00 22,589.28
Kepala tukang L.03 OH 0.0190 132,800.00 2,523.20
Mandor L.04 OH 0.1320 166,000.00 21,912.00
JUMLAH TENAGA KERJA 187,580.48
B BAHAN
Semen Portland Kg 352.0000 1,320.00 464,640.00
Pasir beton Kg 731.0000 167.29 122,285.86
Kerikil (Maks 30 mm) Kg 1,031.0000 192.07 198,020.73
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 788,317.79
C PERALATAN
Concrete Vibrator jam 0.3010 10,378.53 3,123.94
Molen Kapasitas 0,3 m3 Sewa Hari 0.2500 62,196.76 15,549.19
JUMLAH HARGA ALAT 18,673.13

D Jumlah (A+B+C) 994,571.40


E Overhead & Profit 10% x D 99,457.14
F Harga Satuan Pekerjaan (D+E) 1,094,028.53
A.4.1.1.B.7 Membuat 1 m3 beton mutu f’c = 19,3 MPa
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.3230 106,240.36 140,556.00
Tukang batu L.02 OH 0.1890 119,520.00 22,589.28
Kepala tukang L.03 OH 0.0190 132,800.00 2,523.20
Mandor L.04 OH 0.1320 166,000.00 21,912.00
JUMLAH TENAGA KERJA 187,580.48
B BAHAN
Semen Portland Kg 371.0000 1,320.00 489,720.00
Pasir beton Kg 698.0000 167.29 116,765.43
Kerikil (Maks 30 mm) Kg 1,047.0000 192.07 201,093.80
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 810,950.43
C PERALATAN
Concrete Vibrator jam 0.3010 10,378.53 3,123.94
Molen Kapasitas 0,3 m3 Sewa Hari 0.2500 62,196.76 15,549.19
JUMLAH HARGA ALAT 18,673.13

D Jumlah (A+B+C) 1,017,204.03


E Overhead & Profit 10% x D 101,720.40
F Harga Satuan Pekerjaan (D+E) 1,118,924.44

A.4.1.1.B.8 Membuat 1 m3 beton mutu f’c = 21,7 MPa


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.3230 106,240.36 140,556.00
Tukang batu L.02 OH 0.1890 119,520.00 22,589.28
Kepala tukang L.03 OH 0.0190 132,800.00 2,523.20
Mandor L.04 OH 0.1320 166,000.00 21,912.00
JUMLAH TENAGA KERJA 187,580.48
B BAHAN
Semen Portland Kg 384.0000 1,320.00 506,880.00
Pasir beton Kg 692.0000 167.29 115,761.71
Kerikil (Maks 30 mm) Kg 1,039.0000 192.07 199,557.27
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 825,570.18
C PERALATAN
Concrete Vibrator jam 0.3010 10,378.53 3,123.94
Molen Kapasitas 0,3 m3 Sewa Hari 0.2500 62,196.76 15,549.19
JUMLAH HARGA ALAT 18,673.13

D Jumlah (A+B+C) 1,031,823.79


E Overhead & Profit 10% x D 103,182.38
F Harga Satuan Pekerjaan (D+E) 1,135,006.16

A.4.1.1.B.9 Membuat 1 m3 beton mutu f’c = 24,0 Mpa


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.3230 106,240.36 140,556.00
Tukang batu L.02 OH 0.1890 119,520.00 22,589.28
Kepala tukang L.03 OH 0.0190 132,800.00 2,523.20
Mandor L.04 OH 0.1320 166,000.00 21,912.00
JUMLAH TENAGA KERJA 187,580.48
B BAHAN
Semen Portland Kg 406.0000 1,320.00 535,920.00
Pasir beton Kg 684.0000 167.29 114,423.43
Kerikil (Maks 30 mm) Kg 1,026.0000 192.07 197,060.40
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 850,775.03
C PERALATAN
Concrete Vibrator jam 0.3010 10,378.53 3,123.94
Molen Kapasitas 0,3 m3 Sewa Hari 0.2500 62,196.76 15,549.19
JUMLAH HARGA ALAT 18,673.13

D Jumlah (A+B+C) 1,057,028.63


E Overhead & Profit 10% x D 105,702.86
F Harga Satuan Pekerjaan (D+E) 1,162,731.50
A.4.1.1.B.10 Membuat 1 m3 beton mutu f’c = 26,4 MPa
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.3230 106,240.36 140,556.00
Tukang batu L.02 OH 0.1890 119,520.00 22,589.28
Kepala tukang L.03 OH 0.0190 132,800.00 2,523.20
Mandor L.04 OH 0.1320 166,000.00 21,912.00
JUMLAH TENAGA KERJA 187,580.48
B BAHAN
Semen Portland Kg 413.0000 1,320.00 545,160.00
Pasir beton Kg 681.0000 167.29 113,921.57
Kerikil (Maks 30 mm) Kg 1,021.0000 192.07 196,100.07
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 858,552.84
C PERALATAN
Concrete Vibrator jam 0.3010 10,378.53 3,123.94
Molen Kapasitas 0,3 m3 Sewa Hari 0.2500 62,196.76 15,549.19
JUMLAH HARGA ALAT 18,673.13

D Jumlah (A+B+C) 1,064,806.44


E Overhead & Profit 10% x D 106,480.64
F Harga Satuan Pekerjaan (D+E) 1,171,287.09

A.4.1.1.B.11 Membuat 1 m3 beton mutu f’c = 28,8 MPa


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.6800 106,240.36 178,483.80
Tukang batu L.02 OH 0.2400 119,520.00 28,684.80
Kepala tukang L.03 OH 0.0240 132,800.00 3,187.20
Mandor L.04 OH 0.1680 166,000.00 27,888.00
JUMLAH TENAGA KERJA 238,243.80
B BAHAN
Semen Portland Kg 439.0000 1,320.00 579,480.00
Pasir beton Kg 670.0000 167.29 112,081.43
Kerikil (Maks 30 mm) Kg 1,006.0000 192.07 193,219.07
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 888,151.70
C PERALATAN
Concrete Vibrator jam 0.3010 10,378.53 3,123.94
Molen Kapasitas 0,3 m3 Sewa Hari 0.2500 62,196.76 15,549.19
JUMLAH HARGA ALAT 18,673.13

D Jumlah (A+B+C) 1,145,068.63


E Overhead & Profit 10% x D 114,506.86
F Harga Satuan Pekerjaan (D+E) 1,259,575.49

A.4.1.1.B.12 Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.6800 106,240.36 178,483.80
Tukang batu L.02 OH 0.2400 119,520.00 28,684.80
Kepala tukang L.03 OH 0.0240 132,800.00 3,187.20
Mandor L.04 OH 0.1680 166,000.00 27,888.00
JUMLAH TENAGA KERJA 238,243.80
B BAHAN
Semen Portland Kg 448.0000 1,320.00 591,360.00
Pasir beton Kg 667.0000 167.29 111,579.57
Kerikil (Maks 30 mm) Kg 1,000.0000 192.07 192,066.67
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 898,377.44
C PERALATAN
Concrete Vibrator jam 0.3010 10,378.53 3,123.94
Molen Kapasitas 0,3 m3 Sewa Hari 0.2500 62,196.76 15,549.19
JUMLAH HARGA ALAT 18,673.13

D Jumlah (A+B+C) 1,155,294.37


E Overhead & Profit 10% x D 115,529.44
F Harga Satuan Pekerjaan (D+E) 1,270,823.81
A.4.1.1.C HARGA SATUAN PEKERJAAN BETON READY MIX
A.4.1.1.C.1 Membuat 1 m3 beton mutu K 100
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.0000 106,240.36 106,240.36
Tukang batu L.02 OH 0.2500 119,520.00 29,880.00
Kepala tukang L.03 OH 0.0250 132,800.00 3,320.00
Mandor L.04 OH 0.1000 166,000.00 16,600.00
JUMLAH TENAGA KERJA 156,040.36
B BAHAN
Beton Ready Mixed K 100 m3 1.0200 705,000.00 719,100.00
JUMLAH HARGA BAHAN 719,100.00
C PERALATAN
Concrete Vibrator jam 0.3010 10,378.53 3,123.94
JUMLAH HARGA ALAT 3,123.94

D Jumlah (A+B+C) 878,264.30


E Overhead & Profit 10% x D 87,826.43
F Harga Satuan Pekerjaan (D+E) 966,090.73

A.4.1.1.C.2 Membuat 1 m3 beton mutu K 125


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.0000 106,240.36 106,240.36
Tukang batu L.02 OH 0.2500 119,520.00 29,880.00
Kepala tukang L.03 OH 0.0250 132,800.00 3,320.00
Mandor L.04 OH 0.1000 166,000.00 16,600.00
JUMLAH TENAGA KERJA 156,040.36
B BAHAN
Beton Ready Mixed K 125 m3 1.0200 728,750.00 743,325.00
JUMLAH HARGA BAHAN 743,325.00
C PERALATAN
Concrete Vibrator jam 0.3010 10,378.53 3,123.94
JUMLAH HARGA ALAT 3,123.94

D Jumlah (A+B+C) 902,489.30


E Overhead & Profit 10% x D 90,248.93
F Harga Satuan Pekerjaan (D+E) 992,738.23

A.4.1.1.C.3 Membuat 1 m3 beton mutu K 175


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.0000 106,240.36 106,240.36
Tukang batu L.02 OH 0.2500 119,520.00 29,880.00
Kepala tukang L.03 OH 0.0250 132,800.00 3,320.00
Mandor L.04 OH 0.1000 166,000.00 16,600.00
JUMLAH TENAGA KERJA 156,040.36
B BAHAN
Beton Ready Mixed K175 m3 1.0200 773,750.00 789,225.00
JUMLAH HARGA BAHAN 789,225.00
C PERALATAN
Concrete Vibrator jam 0.3010 10,378.53 3,123.94
JUMLAH HARGA ALAT 3,123.94

D Jumlah (A+B+C) 948,389.30


E Overhead & Profit 10% x D 94,838.93
F Harga Satuan Pekerjaan (D+E) 1,043,228.23

A.4.1.1.C.4 Membuat 1 m3 beton mutu K 225


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.0000 106,240.36 106,240.36
Tukang batu L.02 OH 0.2500 119,520.00 29,880.00
Kepala tukang L.03 OH 0.0250 132,800.00 3,320.00
Mandor L.04 OH 0.1000 166,000.00 16,600.00
JUMLAH TENAGA KERJA 156,040.36
B BAHAN
Beton Ready Mixed K 225 m3 1.0200 827,500.00 844,050.00
JUMLAH HARGA BAHAN 844,050.00
C PERALATAN
Concrete Vibrator jam 0.3010 10,378.53 3,123.94
JUMLAH HARGA ALAT 3,123.94

D Jumlah (A+B+C) 1,003,214.30


E Overhead & Profit 10% x D 100,321.43
F Harga Satuan Pekerjaan (D+E) 1,103,535.73

A.4.1.1.C.5 Membuat 1 m3 beton mutu K 250


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.0000 106,240.36 106,240.36
Tukang batu L.02 OH 0.2500 119,520.00 29,880.00
Kepala tukang L.03 OH 0.0250 132,800.00 3,320.00
Mandor L.04 OH 0.1000 166,000.00 16,600.00
JUMLAH TENAGA KERJA 156,040.36
B BAHAN
Beton Ready Mixed K 250 m3 1.0200 866,250.00 883,575.00
JUMLAH HARGA BAHAN 883,575.00
C PERALATAN
Concrete Vibrator jam 0.3010 10,378.53 3,123.94
JUMLAH HARGA ALAT 3,123.94

D Jumlah (A+B+C) 1,042,739.30


E Overhead & Profit 10% x D 104,273.93
F Harga Satuan Pekerjaan (D+E) 1,147,013.23

A.4.1.1.C.6 Membuat 1 m3 beton mutu K 300


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.0000 106,240.36 106,240.36
Tukang batu L.02 OH 0.2500 119,520.00 29,880.00
Kepala tukang L.03 OH 0.0250 132,800.00 3,320.00
Mandor L.04 OH 0.1000 166,000.00 16,600.00
JUMLAH TENAGA KERJA 156,040.36
B BAHAN
Beton Ready Mixed K 300 m3 1.0200 915,000.00 933,300.00
JUMLAH HARGA BAHAN 933,300.00
C PERALATAN
Concrete Vibrator jam 0.3010 10,378.53 3,123.94
JUMLAH HARGA ALAT 3,123.94

D Jumlah (A+B+C) 1,092,464.30


E Overhead & Profit 10% x D 109,246.43
F Harga Satuan Pekerjaan (D+E) 1,201,710.73
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.5200 106,240.36 55,244.99
Tukang kayu L.02 OH 0.2600 119,520.00 31,075.20
Kepala tukang L.03 OH 0.0260 132,800.00 3,452.80
Mandor L.04 OH 0.0260 166,000.00 4,316.00
JUMLAH TENAGA KERJA 94,088.99
B BAHAN
Kayu kelas III M3 0.0400 2,827,140.00 113,085.60
Paku 5 – 10 cm Kg 0.3000 18,450.00 5,535.00
Minyak bekisting Ltr 0.1000 15,580.00 1,558.00
JUMLAH HARGA BAHAN 120,178.60
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 214,267.59
E Overhead & Profit 10% x D 21,426.76
F Harga Satuan Pekerjaan (D+E) 235,694.35

A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.5200 106,240.36 55,244.99
Tukang kayu L.02 OH 0.2600 119,520.00 31,075.20
Kepala tukang L.03 OH 0.0260 132,800.00 3,452.80
Mandor L.04 OH 0.0260 166,000.00 4,316.00
JUMLAH 94,088.99
B BAHAN TENAGA
Kayu kelas III M3 KERJA 0.0450 2,827,140.00 127,221.30
Paku 5 cm – 10 cm Kg 0.3000 18,450.00 5,535.00

Minyak bekisting Ltr 0.1000 15,580.00 1,558.00


JUMLAH 134,314.30
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 228,403.29
E Overhead & Profit 10% x D 22,840.33
F Harga Satuan Pekerjaan (D+E) 251,243.62

A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.6600 106,240.36 70,118.64
Tukang kayu L.02 OH 0.3300 119,520.00 39,441.60
Kepala tukang L.03 OH 0.0330 132,800.00 4,382.40
Mandor L.04 OH 0.0330 166,000.00 5,478.00
JUMLAH 119,420.64
B BAHAN TENAGA
Kayu kelas III M3 KERJA 0.0400 2,827,140.00 113,085.60
Paku 5 cm – 12 cm Kg 0.4000 18,450.00 7,380.00
Minyak bekisting Ltr 0.2000 15,580.00 3,116.00
Balok kayu kelas II M3 0.0150 6,443,440.00 96,651.60
Plywood tebal 9 Lbr 0.3500 103,570.00 36,249.50
mm
Bambu  8- 10cm –panj 4 m Batang 2.0000 8,490.00 16,980.00
10cm –panj 4 m JUMLAH 273,462.70
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 392,883.34
E Overhead & Profit 10% x D 39,288.33
F Harga Satuan Pekerjaan (D+E) 432,171.67
A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.6600 106,240.36 70,118.64
Tukang kayu L.02 OH 0.3300 119,520.00 39,441.60
Kepala tukang L.03 OH 0.0330 132,800.00 4,382.40
Mandor L.04 OH 0.0330 166,000.00 5,478.00
JUMLAH 119,420.64
B BAHAN TENAGA
Kayu kelas III M3 KERJA 0.0400 2,827,140.00 113,085.60
Paku 5 cm – 12 cm Kg 0.4000 18,450.00 7,380.00
Minyak bekisting Ltr 0.2000 15,580.00 3,116.00
Balok kayu kelas II M3 0.0180 6,443,440.00 115,981.92
Plywood tebal 9 mm Lbr 0.3500 103,570.00 36,249.50
Bambu  8- 10cm –panj 4 m
Batang 2.0000 8,490.00 16,980.00
10cm –panj 4 m
JUMLAH 292,793.02
C PERALATAN HARGA BAHAN
JUMLAH
D Jumlah (A+B+C) HARGA ALAT 412,213.66
E Overhead & Profit 10% x D 41,221.37
F Harga Satuan Pekerjaan (D+E) 453,435.02

A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.6600 106,240.36 70,118.64
Tukang kayu L.02 OH 0.3300 119,520.00 39,441.60
Kepala tukang L.03 OH 0.0330 132,800.00 4,382.40
Mandor L.04 OH 0.0330 166,000.00 5,478.00
JUMLAH 119,420.64
B BAHAN TENAGA
Kayu kelas III M3 KERJA 0.0400 2,827,140.00 113,085.60
Paku 5 cm – 12 cm Kg 0.4000 18,450.00 7,380.00
Minyak bekisting Ltr 0.2000 15,580.00 3,116.00
Balok kayu kelas II M3 0.0150 6,443,440.00 96,651.60
Plywood tebal 9 mm Lbr 0.3500 103,570.00 36,249.50
Bambu  8- 10cm –panj 4 m
Batang 6.0000 8,490.00 50,940.00
10cm –panj 4 m
JUMLAH 307,422.70
C PERALATAN HARGA BAHAN

JUMLAH
D Jumlah (A+B+C) HARGA ALAT 426,843.34
E Overhead & Profit 10% x D 42,684.33
F Harga Satuan Pekerjaan (D+E) 469,527.67

A.4.1.1.25 (K3) Pemasangan 1 m2 bekisting untuk dinding


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.6600 106,240.36 70,118.64
Tukang kayu L.02 OH 0.3300 119,520.00 39,441.60
Kepala tukang L.03 OH 0.0330 132,800.00 4,382.40
Mandor L.04 OH 0.0330 166,000.00 5,478.00
JUMLAH 119,420.64
B BAHAN TENAGA
Kayu kelas III M3 KERJA 0.0300 2,827,140.00 84,814.20
Paku 5 cm – 12 cm Kg 0.4000 18,450.00 7,380.00
Minyak bekisting Ltr 0.2000 15,580.00 3,116.00
Balok kayu kelas II M3 0.0200 6,443,440.00 128,868.80
Plywood tebal 9 mm Lbr 0.3500 103,570.00 36,249.50
Bambu  8- 10cm –panj 4 m
Batang 3.0000 8,490.00 25,470.00
10cm –panj 4 m
Penjaga jarak Buah 4.0000 -
bekisting/spacer JUMLAH 285,898.50
C PERALATAN HARGA BAHAN
JUMLAH
D Jumlah (A+B+C) HARGA ALAT 405,319.14
E Overhead & Profit 10% x D 40,531.91
F Harga Satuan Pekerjaan (D+E) 445,851.05
A.4.1.1.26 (K3) Pemasangan 1 m2 bekisting untuk tangga
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.6600 106,240.36 70,118.64
Tukang kayu L.02 OH 0.3300 119,520.00 39,441.60
Kepala tukang L.03 OH 0.0330 132,800.00 4,382.40
Mandor L.04 OH 0.0330 166,000.00 5,478.00
JUMLAH 119,420.64
B BAHAN TENAGA
Kayu kelas III M3 KERJA 0.0300 2,827,140.00 84,814.20
Paku 5 cm – 12 cm Kg 0.4000 18,450.00 7,380.00
Minyak bekisting Ltr 0.1500 15,580.00 2,337.00
Balok kayu kelas II M3 0.0150 6,443,440.00 96,651.60
Plywood tebal 9 mm Lbr 0.3500 103,570.00 36,249.50
Bambu  8- 10cm –panj 4 m
Batang 2.0000 8,490.00 16,980.00
10cm –panj 4 m
JUMLAH 244,412.30
C PERALATAN HARGA BAHAN

JUMLAH
D Jumlah (A+B+C) HARGA ALAT 363,832.94
E Overhead & Profit 10% x D 36,383.29
F Harga Satuan Pekerjaan (D+E) 400,216.23

A.4.1.1.27 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.1800 106,240.36 19,123.26
Tukang batu L.02 OH 0.0200 119,520.00 2,390.40
Tukang kayu L.02 OH 0.0200 119,520.00 2,390.40
Tukang besi L.02 OH 0.0200 119,520.00 2,390.40
Kepala tukang L.03 OH 0.0060 132,800.00 796.80
Mandor L.04 OH 0.0090 166,000.00 1,494.00
JUMLAH 28,585.26
B BAHAN TENAGA
Kayu kelas III (papan) M3 KERJA 0.0020 2,827,140.00 5,654.28
Paku 5 cm – 12 cm Kg 0.0100 18,450.00 184.50
Bambu  8- 10cm –panj 4 m Batang - 8,490.00 -
10cm –panj polos
Besi beton 4m Kg 3.0000 9,180.00 27,540.00
Kawat beton Kg 0.4500 19,740.00 8,883.00
Semen Portland Kg 4.0000 1,320.00 5,280.00
Pasir Beton M3 0.0060 234,200.00 1,405.20
Kerikil M3 0.0090 259,290.00 2,333.61
JUMLAH 51,280.59
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 79,865.85
E Overhead & Profit 10% x D 7,986.59
F Harga Satuan Pekerjaan (D+E) 87,852.44
A.4.1.1.28 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.2970 106,240.36 31,553.39
Tukang batu L.02 OH 0.0330 119,520.00 3,944.16
Tukang kayu L.02 OH 0.0330 119,520.00 3,944.16
Tukang besi L.02 OH 0.0330 119,520.00 3,944.16
Kepala tukang L.03 OH 0.0100 132,800.00 1,328.00
Mandor L.04 OH 0.0150 166,000.00 2,490.00
JUMLAH 47,203.87
B BAHAN TENAGA
Kayu kelas III M3 KERJA 0.0030 2,827,140.00 8,481.42
Paku 5 cm – 12 cm Kg 0.0200 18,450.00 369.00
Minyak bekisting Ltr 8,490.00 -
Besi beton polos Kg 3.6000 9,180.00 33,048.00
Kawat beton Kg 0.0500 19,740.00 987.00
Semen Portland Kg 5.5000 1,320.00 7,260.00
Pasir Beton M3 0.0090 234,200.00 2,107.80
Kerikil M3 0.0150 259,290.00 3,889.35
JUMLAH 56,142.57
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 103,346.44
E Overhead & Profit 10% x D 10,334.64
F Harga Satuan Pekerjaan (D+E) 113,681.08

A.4.1.1.29 Pemasangan 10 kg jaring kawat baja (wiremesh m8)


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.0250 106,240.36 2,656.01
Tukang besi L.02 OH 0.0250 119,520.00 2,988.00
Kepala tukang L.03 OH 0.0250 132,800.00 3,320.00
Mandor L.04 OH 0.0010 166,000.00 166.00
JUMLAH TENAGA KERJA 9,130.01
B BAHAN
Jaring kawat baja dilas (wiremesh m8) Kg 10.2000 623,280.00 6,357,456.00
Kawat beton Kg 0.0500 19,740.00 987.00
JUMLAH HARGA BAHAN 6,358,443.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 6,367,573.01


E Overhead & Profit 10% x D 636,757.30
F Harga Satuan Pekerjaan (D+E) 7,004,330.31

A.4.1.1.30 Membuat 1 m3 Beton Pengisi/Pengresek


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.6500 106,240.36 175,296.59
Tukang batu L.02 OH 0.2500 119,520.00 29,880.00
Kepala tukang L.03 OH 0.0250 132,800.00 3,320.00
Mandor L.04 OH 0.0800 166,000.00 13,280.00
JUMLAH TENAGA KERJA 221,776.59
B BAHAN
Semen Portland Kg 109.0000 1,320.00 143,880.00
Pasir beton M3 0.2080 234,200.00 48,713.60
Kerikil (Maks 30 mm) M3 0.3480 259,290.00 90,232.92
Batu Pecah 5-7 cm Ltr 0.6000 251,630.00 150,978.00
JUMLAH HARGA BAHAN 433,804.52
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 655,581.11
E Overhead & Profit 10% x D 65,558.11
F Harga Satuan Pekerjaan (D+E) 721,139.23
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A.4.1.1.B.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi 2X Pakai
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.5200 106,240.36 55,244.99
Tukang kayu L.02 OH 0.2600 119,520.00 31,075.20
Kepala tukang L.03 OH 0.0260 132,800.00 3,452.80
Mandor L.04 OH 0.0260 166,000.00 4,316.00
JUMLAH TENAGA KERJA 94,088.99
B BAHAN
Kayu kelas III M3 0.0200 2,827,140.00 56,542.80
Paku 5 – 10 cm Kg 0.1500 18,450.00 2,767.50
Minyak bekisting Ltr 0.0500 15,580.00 779.00
JUMLAH HARGA BAHAN 60,089.30
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 154,178.29
E Overhead & Profit 10% x D 15,417.83
F Harga Satuan Pekerjaan (D+E) 169,596.12

A.4.1.1.B.21 (K3) Pemasangan 1 m2 bekisting untuk sloof 2X Pakai


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.5200 106,240.36 55,244.99
Tukang kayu L.02 OH 0.2600 119,520.00 31,075.20
Kepala tukang L.03 OH 0.0260 132,800.00 3,452.80
Mandor L.04 OH 0.0260 166,000.00 4,316.00
JUMLAH 94,088.99
B BAHAN TENAGA
Kayu kelas III M3 KERJA 0.0225 2,827,140.00 63,610.65
Paku 5 cm – 10 cm Kg 0.1500 18,450.00 2,767.50

Minyak bekisting Ltr 0.0500 15,580.00 779.00


JUMLAH 67,157.15
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 161,246.14
E Overhead & Profit 10% x D 16,124.61
F Harga Satuan Pekerjaan (D+E) 177,370.75

A.4.1.1.B.22 (K3) Pemasangan 1 m2 bekisting untuk kolom 2X Pakai


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.6600 106,240.36 70,118.64
Tukang kayu L.02 OH 0.3300 119,520.00 39,441.60
Kepala tukang L.03 OH 0.0330 132,800.00 4,382.40
Mandor L.04 OH 0.0330 166,000.00 5,478.00
JUMLAH 119,420.64
B BAHAN TENAGA
Kayu kelas III M3 KERJA 0.0200 2,827,140.00 56,542.80
Paku 5 cm – 12 cm Kg 0.2000 18,450.00 3,690.00
Minyak bekisting Ltr 0.1000 15,580.00 1,558.00
Balok kayu kelas II M3 0.0075 6,443,440.00 48,325.80
Plywood tebal 9 Lbr 0.1750 103,570.00 18,124.75
mm
Bambu  8- 10cm –panj 4 m Batang 1.0000 8,490.00 8,490.00
10cm –panj 4 m JUMLAH 136,731.35
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 256,151.99
E Overhead & Profit 10% x D 25,615.20
F Harga Satuan Pekerjaan (D+E) 281,767.19
A.4.1.1.B.23 (K3) Pemasangan 1 m2 bekisting untuk balok 2X Pakai
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.6600 106,240.36 70,118.64
Tukang kayu L.02 OH 0.3300 119,520.00 39,441.60
Kepala tukang L.03 OH 0.0330 132,800.00 4,382.40
Mandor L.04 OH 0.0330 166,000.00 5,478.00
JUMLAH 119,420.64
B BAHAN TENAGA
Kayu kelas III M3 KERJA 0.0200 2,827,140.00 56,542.80
Paku 5 cm – 12 cm Kg 0.2000 18,450.00 3,690.00
Minyak bekisting Ltr 0.1000 15,580.00 1,558.00
Balok kayu kelas II M3 0.0090 6,443,440.00 57,990.96
Plywood tebal 9 mm Lbr 0.1750 103,570.00 18,124.75
Bambu  8- 10cm –panj 4 m
Batang 1.0000 8,490.00 8,490.00
10cm –panj 4 m
JUMLAH 146,396.51
C PERALATAN HARGA BAHAN
JUMLAH
D Jumlah (A+B+C) HARGA ALAT 265,817.15
E Overhead & Profit 10% x D 26,581.71
F Harga Satuan Pekerjaan (D+E) 292,398.86

A.4.1.1.B.24 (K3) Pemasangan 1 m2 bekisting untuk lantai 2X Pakai


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.6600 106,240.36 70,118.64
Tukang kayu L.02 OH 0.3300 119,520.00 39,441.60
Kepala tukang L.03 OH 0.0330 132,800.00 4,382.40
Mandor L.04 OH 0.0330 166,000.00 5,478.00
JUMLAH 119,420.64
B BAHAN TENAGA
Kayu kelas III M3 KERJA 0.0200 2,827,140.00 56,542.80
Paku 5 cm – 12 cm Kg 0.2000 18,450.00 3,690.00
Minyak bekisting Ltr 0.1000 15,580.00 1,558.00
Balok kayu kelas II M3 0.0075 6,443,440.00 48,325.80
Plywood tebal 9 mm Lbr 0.1750 103,570.00 18,124.75
Bambu  8- 10cm –panj 4 m
Batang 3.0000 8,490.00 25,470.00
10cm –panj 4 m
JUMLAH 153,711.35
C PERALATAN HARGA BAHAN

JUMLAH
D Jumlah (A+B+C) HARGA ALAT 273,131.99
E Overhead & Profit 10% x D 27,313.20
F Harga Satuan Pekerjaan (D+E) 300,445.19

A.4.1.1.B.25 (K3) Pemasangan 1 m2 bekisting untuk dinding 2X Pakai


Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.6600 106,240.36 70,118.64
Tukang kayu L.02 OH 0.3300 119,520.00 39,441.60
Kepala tukang L.03 OH 0.0330 132,800.00 4,382.40
Mandor L.04 OH 0.0330 166,000.00 5,478.00
JUMLAH 119,420.64
B BAHAN TENAGA
Kayu kelas III M3 KERJA 0.0150 2,827,140.00 42,407.10
Paku 5 cm – 12 cm Kg 0.2000 18,450.00 3,690.00
Minyak bekisting Ltr 0.1000 15,580.00 1,558.00
Balok kayu kelas II M3 0.0100 6,443,440.00 64,434.40
Plywood tebal 9 mm Lbr 0.1750 103,570.00 18,124.75
Bambu  8- 10cm –panj 4 m
Batang 1.5000 8,490.00 12,735.00
10cm –panj 4 m
Penjaga jarak Buah 2.0000 -
bekisting/spacer JUMLAH 142,949.25
C PERALATAN HARGA BAHAN
JUMLAH
D Jumlah (A+B+C) HARGA ALAT 262,369.89
E Overhead & Profit 10% x D 26,236.99
F Harga Satuan Pekerjaan (D+E) 288,606.88
A.4.1.1.B.26 (K3) Pemasangan 1 m2 bekisting untuk tangga 2X Pakai
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.6600 106,240.36 70,118.64
Tukang kayu L.02 OH 0.3300 119,520.00 39,441.60
Kepala tukang L.03 OH 0.0330 132,800.00 4,382.40
Mandor L.04 OH 0.0330 166,000.00 5,478.00
JUMLAH 119,420.64
B BAHAN TENAGA
Kayu kelas III M3 KERJA 0.0150 2,827,140.00 42,407.10
Paku 5 cm – 12 cm Kg 0.2000 18,450.00 3,690.00
Minyak bekisting Ltr 0.0750 15,580.00 1,168.50
Balok kayu kelas II M3 0.0075 6,443,440.00 48,325.80
Plywood tebal 9 mm Lbr 0.1750 103,570.00 18,124.75
Bambu  8- 10cm –panj 4 m
Batang 1.0000 8,490.00 8,490.00
10cm –panj 4 m
JUMLAH 122,206.15
C PERALATAN HARGA BAHAN

JUMLAH
D Jumlah (A+B+C) HARGA ALAT 241,626.79
E Overhead & Profit 10% x D 24,162.68
F Harga Satuan Pekerjaan (D+E) 265,789.47
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
A.4.2.1.1. Pemasangan 1 kg rangka kuda-kuda baja IWF
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 0.0600 106,240.36
Tukang las L.03 OH 0.0600 119,520.00
konstruksi
Kepala tukang L.03 OH 0.0060 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi baja IWF Kg 1.1500 13,380.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja CNP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 0.0600 106,240.36
Tukang las L.03 OH 0.0600 119,520.00
konstruksi
Kepala tukang L.03 OH 0.0060 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi baja CNP Kg 1.1500 7,090.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.2. Pemasangan 1 m2 rolling door alluminium


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 1.0000 106,240.36
Tukang khusus L.03 OH 1.0000 119,520.00
alumunium
Kepala tukang L.03 OH 0.1000 132,800.00
Mandor L.04 OH 0.0500 166,000.00
JUMLAH
B BAHAN TENAGA
Rolling door 2 KERJA 1.0000 388,000.00
alluminium m JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.3. Pemasangan 1 m kusen pintu alluminium


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 0.0430 106,240.36
Tukang khusus L.03 OH 0.0430 119,520.00
alumunium
Kepala tukang L.03 OH 0.0043 132,800.00
Mandor L.04 OH 0.0021 166,000.00
JUMLAH
B BAHAN TENAGA
Profil alluminium m KERJA 1.1000 107,000.00
Skrup fixer buah 2.0000 6,430.00
Sealant Tube 0.0600 44,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.4. Pemasangan 1 m2 pintu kaca rangka alluminium
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 0.0850 106,240.36
Tukang L.03 OH 0.0850 119,520.00
allumunium/kaca
Kepala tukang L.03 OH 0.0090 132,800.00
Mandor L.04 OH 0.0050 166,000.00
JUMLAH
B BAHAN TENAGA
Pintu alluminium m KERJA 4.4000 107,000.00
Profil kaca m 4.5000
Sealant Tube 0.2700 44,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.5. Pemasangan 1 m2 kawat nyamuk


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 0.1000 106,240.36
Tukang L.03 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0050 166,000.00
JUMLAH
B BAHAN TENAGA
Kawat nyamuk 2 KERJA 1.1000 20,000.00
Pengelasan m cm 11.1100
Baja strip (0,2 x 2) cm kg 1.7160 9,180.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.6. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 106,240.36
Tukang L.03 OH 0.2000 119,520.00
Kepala tukang L.03 OH 0.0200 132,800.00
Mandor L.04 OH 0.0010 166,000.00
JUMLAH
B BAHAN TENAGA
Seng pelat m KERJA 1.0500 44,500.00
Paku 1 cm - 2,5 cm kg 0.0150 22,000.00
Papan kayu kelas II 3 0.0190 2,827,140.00
atau III m JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.7.Pemasangan 1 m2 rangka besi hollow 1x35.35.0,6mm, modul 60 x 120 cm, untuk partisi
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 106,240.36
Tukang L.03 OH 0.2500 119,520.00
Kepala tukang L.03 OH 0.0250 132,800.00
Mandor L.04 OH 0.0130 166,000.00
JUMLAH
B BAHAN TENAGA
Rangka metal hollow 35.35.0,6 mm KERJA 3.5000 12,000.00
Assesoris (perkuatan, las dll) 100% x rangka 12,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.8. Pemasangan 1 m2 rangka besi hollow 1x35.35.0,6mm, modul 60 x 60 cm, untuk plafon

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 0.3500 106,240.36
Tukang besi L.02 OH 0.3500 119,520.00
Kepala tukang L.03 OH 0.0350 132,800.00
Mandor L.04 OH 0.0180 166,000.00
JUMLAH
B BAHAN TENAGA
Rangka metal hollow 35.35.0,6 mm M1 KERJA 4.0000 12,000.00
Assesoris (perkuatan, las dll) Ls 100% x rangka 12,000.00

JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.9. Pemasangan 1 m2 rangka besi Hollow Galvanis 60/60/1.0 mm, untuk Grill sunscreen

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 0.2300 106,240.36
Tukang besi L.02 OH 0.1460 119,520.00
Kepala tukang L.03 OH 0.1070 132,800.00
Mandor L.04 OH 0.0250 166,000.00
JUMLAH
B BAHAN TENAGA
Rangka Hollow Galvanis 60/60/1.0 mm M1 KERJA 11.0000 37,000.00
Assesoris (perkuatan, las dll) Ls 100% x rangka 37,000.00

JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.10. Pemasangan 1 Bh Angkur Diameter 19

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 0.0100 106,240.36
Tukang besi L.02 OH 0.0080 119,520.00
Kepala tukang L.03 OH 0.0020 132,800.00
Mandor L.04 OH 0.0020 166,000.00
JUMLAH
B BAHAN TENAGA
Angkur D 19 Bh KERJA 1.0000 45,000.00
Alat Dan Material Bantu Ls 1.0000 1,000.00

JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.11. Pemasangan 1 M2 Usuk Baja Ringan UK - 75 Dan Reng baja ringan

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 0.0700 106,240.36
Tukang besi L.02 OH 0.0700 119,520.00
Kepala tukang L.03 OH 0.0070 132,800.00
Mandor L.04 OH 0.0035 166,000.00
JUMLAH
B BAHAN TENAGA
Main Truss UK-75-75 Btg KERJA 0.3500 132,600.00
Reng AA 0,45 Btg 0.7000 37,800.00
Skrup SDS 8 x 16 Bh 8.8000 300.00
Skrup SDS 10 x 16 Bh 2.2000 250.00
Diafrakma (PLD) Bh 2.0000 250.00

JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.11. Pemasangan 1 M Relling Besi Galvanis

No Uraian Kode Satuan Koefisien Harga Satuan (Rp)

A TENAGA
Pekerja L.01 OH 0.2300 106,240.36
Tukang besi L.02 OH 0.1460 119,520.00
Kepala tukang L.03 OH 0.1070 132,800.00
Mandor L.04 OH 0.0250 166,000.00
JUMLAH
B BAHAN TENAGA
Hollow Galvanis 35/35/0.6 mm M KERJA 6.0000 12,000.00
Hollow Galvanis 20/20/0.8 mm M 13.0000 10,000.00
Assesoris (perkuatan, las dll) Ls 100% x rangka 202,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)

6,374.42
7,171.20
796.80
498.00
14,840.42

15,387.00
15,387.00

30,227.42
3,022.74
33,250.16

Jumlah Harga
(Rp)

6,374.42
7,171.20
796.80
498.00
14,840.42

8,153.50
8,153.50

22,993.92
2,299.39
25,293.31

Jumlah Harga
(Rp)

106,240.36
119,520.00
13,280.00
8,300.00
247,340.36

388,000.00
388,000.00

635,340.36
63,534.04
698,874.40

Jumlah Harga
(Rp)
4,568.34
5,139.36
571.04
348.60
10,627.34

117,700.00
12,860.00
2,640.00
133,200.00

143,827.34
143,827.34
14,382.73
158,210.07
Jumlah Harga
(Rp)

9,030.43
10,159.20
1,195.20
830.00
21,214.83

470,800.00
-
11,880.00
482,680.00

503,894.83
50,389.48
554,284.31

Jumlah Harga
(Rp)

10,624.04
11,952.00
1,328.00
830.00
24,734.04

22,000.00
-
15,752.88
37,752.88

62,486.92
6,248.69
68,735.61

Jumlah Harga
(Rp)

21,248.07
23,904.00
2,656.00
166.00
47,974.07

46,725.00
330.00
53,715.66
100,770.66

148,744.73
14,874.47
163,619.21
Jumlah Harga
(Rp)

26,560.09
29,880.00
3,320.00
2,158.00
61,918.09

42,000.00
12,000.00
54,000.00

115,918.09
11,591.81
127,509.90

Jumlah Harga
(Rp)

37,184.13
41,832.00
4,648.00
2,988.00
86,652.13

48,000.00
12,000.00

60,000.00

146,652.13
14,665.21
161,317.34

Jumlah Harga
(Rp)

24,435.28
17,449.92
14,209.60
4,150.00
60,244.80

407,000.00
37,000.00

444,000.00

504,244.80
50,424.48
554,669.28
Jumlah Harga
(Rp)

1,062.40
956.16
265.60
332.00
2,616.16

45,000.00
1,000.00

46,000.00

48,616.16
4,861.62
53,477.78

Jumlah Harga
(Rp)

7,436.83
8,366.40
929.60
581.00
17,313.83

46,410.00
26,460.00
2,640.00
550.00
500.00

76,560.00

93,873.83
9,387.38
103,261.21

Jumlah Harga
(Rp)

24,435.28
17,449.92
14,209.60
4,150.00
60,244.80

72,000.00
130,000.00
202,000.00
404,000.00

464,244.80
46,424.48
510,669.28
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja OH 0.6000 106,240.36
Tukang batu OH 0.2000 119,520.00
Kepala tukang OH 0.0200 132,800.00
Mandor OH 0.0300 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah Buah 140.0000 1,500.00
Semen Portland Kg 43.5000 1,320.00
Pasir pasang M3 0.0800 245,810.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.6000 106,240.36
Tukang batu L.02 OH 0.2000 119,520.00
Kepala tukang L.03 OH 0.0200 132,800.00
Mandor L.04 OH 0.0300 166,000.00
JUMLAH
B BAHAN TENAGA
Bata merah Buah KERJA 140.0000 1,500.00
Semen Portland Kg 32.9500 1,320.00
Pasir pasang M3 0.0910 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.
4.4 Harga Satuan
.1. No Uraian Kode Satuan Koefisien
(Rp)
2.
Pe A TENAGA
ma Pekerja L.01 OH 0.6000 106,240.36
san Tukang batu L.02 OH 0.2000 119,520.00
ga Kepala bukang L.03 OH 0.0200 132,800.00
n
Mandor L.04 OH 0.0300 166,000.00
1m
2 JUMLAH
din B BAHAN TENAGA
din Bata merah Buah KERJA 140.0000 1,500.00
g Semen Kg 26.5500 1,320.00
bat Portland
a Pasir Pasang M3 0.0930 245,810.00
me JUMLAH
rah C PERALATAN HARGA BAHAN
(5x
11 JUMLAH
x2 HARGA ALAT
2)
cm D Jumlah (A+B+C)
teb E Overhead & Profit 10% x D
al
1
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.6000 106,240.36
Tukang batu L.02 OH 0.2000 119,520.00
Kepala tukang L.03 OH 0.0200 132,800.00
Mandor L.04 OH 0.0300 166,000.00
JUMLAH
B BAHAN TENAGA
Bata merah Buah KERJA 140.0000 1,500.00
Semen Portland Kg 22.2000 1,320.00
Pasir pasang M3 0.1020 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.
4.4 Harga Satuan
.1. No Uraian Kode Satuan Koefisien
(Rp)
3
Pe A TENAGA
ma Pekerja L.01 OH 0.6000 106,240.36
san Tukang batu L.02 OH 0.2000 119,520.00
ga Kepala tukang L.03 OH 0.0200 132,800.00
n
Mandor L.04 OH 0.0300 166,000.00
1m
2 JUMLAH
Di B BAHAN TENAGA
ndi Bata merah Buah KERJA 140.0000 1,500.00
ng Semen Portland Kg 18.5000 1,320.00
Ba
ta Pasir pasang M3 0.1220 245,810.00
Me JUMLAH
rah C PERALATAN HARGA BAHAN
(5x
11 JUMLAH
x2 HARGA ALAT
2)
cm D Jumlah (A+B+C)
teb E Overhead & Profit 10% x D
al F Harga Satuan Pekerjaan (D+E)
1
bat
A.
u 4.4.1.4 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
ca Harga Satuan
No Uraian Kode Satuan Koefisien
mp (Rp)
ura A TENAGA
n
1S Pekerja L.01 OH 0.3000 106,240.36
P: Tukang batu L.02 OH 0.1000 119,520.00
6P Kepala tukang L.03 OH 0.0100 132,800.00
P Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Bata merah Buah KERJA 70.0000 1,500.00
Semen Portland Kg 18.9500 1,320.00
Pasir pasang M3 0.0380 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.5 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.02 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Bata merah Buah KERJA 70.0000 1,500.00
Semen Portland Kg 14.3700 1,320.00
Pasir pasang M3 0.0400 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.02 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Bata merah Buah KERJA 70.0000 1,500.00
Semen Portland Kg 11.5000 1,320.00
Pasir pasang M3 0.0430 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :5PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.02 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Bata merah Buah KERJA 70.0000 1,500.00
Semen Portland Kg 9.6800 1,320.00
Pasir pasang M3 0.0450 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 6PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.02 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Bata merah Buah KERJA 70.0000 1,500.00
Semen Portland Kg 8.3200 1,320.00
Pasir pasang M3 0.0490 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.02 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Bata merah Buah KERJA 70.0000 1,500.00
Semen Portland Kg 6.5000 1,320.00
Pasir pasang M3 0.0500 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.10 Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :3PP


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.02 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
HB-10 M3 KERJA 12.5000 2,650.00
Semen Portland Kg 15.1600 1,320.00
Pasir pasang M3 0.3640 245,810.00
Besi angker Kg 0.2800 9,180.00
diameter 8 JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Hb10 : Hollow Block tebal 10 cm
A. 4.4.1.11 Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP : 4PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.02 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
HB-10 M3 KERJA 12.5000 2,650.00
Semen Portland Kg 12.1300 1,320.00
Pasir pasang M3 0.3880 245,810.00
Besi angker Kg 0.2800 9,180.00
diameter 8 JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
HB10 : Hollow Block tebal 10cm

A. 4.4.1.12 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai
B.
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.6700 106,240.36
Tukang batu L.02 OH 1.3000 119,520.00
Kepala tukang L.03 OH 0.1300 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Bata ringan tebal 7,5cm Buah KERJA 8.4000 9,660.00
Mortar siap pakai Kg 0.4730 2,280.75
JUMLAH
C PERALATAN HARGA BAHAN
Peralatan % 10.0000
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.13 Pemasangan 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.6710 106,240.36
Tukang batu L.02 OH 1.3000 119,520.00
Kepala tukang L.03 OH 0.1300 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Bata ringan tebal 10cm Buah KERJA 8.4000 10,800.00
Mortar siap pakai Kg 0.0630 2,280.75
JUMLAH
C PERALATAN HARGA BAHAN
Peralatan % 10.0000
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.14 Pemasangan 1 m2 dinding Batako campuran 1SP : 4PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.02 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Batako M3 KERJA 12.5000 2,650.00
Semen Portland Kg 12.1300 1,320.00
Pasir pasang M3 0.0388 245,810.00
Besi angker Kg 0.2800 9,180.00
diameter 8 JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.15 Pemasangan 1 m2 Batako Rebah campuran 1SP : 4PP


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.4800 106,240.36
Tukang batu L.02 OH 0.1500 119,520.00
Kepala tukang L.03 OH 0.0150 132,800.00
Mandor L.04 OH 0.0225 166,000.00
JUMLAH
B BAHAN TENAGA
Batako M3 KERJA 20.0000 2,650.00
Semen Portland Kg 15.0000 1,320.00
Pasir pasang M3 0.0540 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)

63,744.22
23,904.00
2,656.00
4,980.00
95,284.22

210,000.00
57,420.00
19,664.80
287,084.80

382,369.02
38,236.90
420,605.92

Jumlah Harga
(Rp)

63,744.22
23,904.00
2,656.00
4,980.00
95,284.22

210,000.00
43,494.00
22,368.71
275,862.71

371,146.93
37,114.69
408,261.62

Jumlah Harga
(Rp)

63,744.22
23,904.00
2,656.00
4,980.00
95,284.22

210,000.00
35,046.00
22,860.33
267,906.33

363,190.55
36,319.05
399,509.60
Jumlah Harga
(Rp)

63,744.22
23,904.00
2,656.00
4,980.00
95,284.22

210,000.00
29,304.00
25,072.62
264,376.62

359,660.84
35,966.08
395,626.92

Jumlah Harga
(Rp)

63,744.22
23,904.00
2,656.00
4,980.00
95,284.22

210,000.00
24,420.00
29,988.82
264,408.82

359,693.04
35,969.30
395,662.34

Jumlah Harga
(Rp)

31,872.11
11,952.00
1,328.00
2,490.00
47,642.11

105,000.00
25,014.00
9,340.78
139,354.78

186,996.89
18,699.69
205,696.58
Jumlah Harga
(Rp)

31,872.11
11,952.00
1,328.00
2,490.00
47,642.11

105,000.00
18,968.40
9,832.40
133,800.80

181,442.91
18,144.29
199,587.20

Jumlah Harga
(Rp)

31,872.11
11,952.00
1,328.00
2,490.00
47,642.11

105,000.00
15,180.00
10,569.83
130,749.83

178,391.94
17,839.19
196,231.13

Jumlah Harga
(Rp)

31,872.11
11,952.00
1,328.00
2,490.00
47,642.11

105,000.00
12,777.60
11,061.45
128,839.05

176,481.16
17,648.12
194,129.27
Jumlah Harga
(Rp)

31,872.11
11,952.00
1,328.00
2,490.00
47,642.11

105,000.00
10,982.40
12,044.69
128,027.09

175,669.20
17,566.92
193,236.12

Jumlah Harga
(Rp)

31,872.11
11,952.00
1,328.00
2,490.00
47,642.11

105,000.00
8,580.00
12,290.50
125,870.50

173,512.61
17,351.26
190,863.87

Jumlah Harga
(Rp)

31,872.11
11,952.00
1,328.00
2,490.00
47,642.11

33,125.00
20,011.20
89,474.84
2,570.40
145,181.44

192,823.55
19,282.35
212,105.90
Jumlah Harga
(Rp)

31,872.11
11,952.00
1,328.00
2,490.00
47,642.11

33,125.00
16,011.60
95,374.28
2,570.40
147,081.28

194,723.39
19,472.34
214,195.73

Jumlah Harga
(Rp)

71,181.04
155,376.00
17,264.00
498.00
244,319.04

81,144.00
1,078.79
82,222.79

326,541.84
32,654.18
359,196.02

Jumlah Harga
(Rp)

71,287.28
155,376.00
17,264.00
498.00
244,425.28

90,720.00
143.69
90,863.69

335,288.97
33,528.90
368,817.87
Jumlah Harga
(Rp)

31,872.11
11,952.00
1,328.00
2,490.00
47,642.11

33,125.00
16,011.60
9,537.43
2,570.40
61,244.43

108,886.54
10,888.65
119,775.19

Jumlah Harga
(Rp)

50,995.37
17,928.00
1,992.00
3,735.00
74,650.37

53,000.00
19,800.00
13,273.74
86,073.74

160,724.11
16,072.41
176,796.52
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
A.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja OH 0.3000 106,240.36
Tukang batu OH 0.1500 119,520.00
Kepala tukang OH 0.0150 132,800.00
Mandor OH 0.0150 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 15.5040 1,320.00
Pasir pasang M3 0.0160 245,810.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.03 OH 0.1500 119,520.00
Kepala tukang L.03 OH 0.0150 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Semen Portland Kg KERJA 10.2240 1,320.00
Pasir pasang M3 0.0200 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.03 OH 0.1500 119,520.00
Kepala tukang L.03 OH 0.0150 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Semen Portland Kg KERJA 7.7760 1,320.00
Pasir pasang M3 0.0230 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.03 OH 0.1500 119,520.00
Kepala tukang L.03 OH 0.0150 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Semen Portland Kg KERJA 6.2400 1,320.00
Pasir pasang M3 0.0240 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.03 OH 0.1500 119,520.00
Kepala tukang L.03 OH 0.0150 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Semen Portland Kg KERJA 5.1840 1,320.00
Pasir pasang M3 0.0260 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.03 OH 0.1500 119,520.00
Kepala tukang L.03 OH 0.0150 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Semen Portland Kg KERJA 4.4160 1,320.00
Pasir pasang M3 0.0270 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.03 OH 0.1500 119,520.00
Kepala tukang L.03 OH 0.0150 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Semen Portland Kg KERJA 3.9360 1,320.00
Pasir pasang M3 0.0280 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.03 OH 0.1500 119,520.00
Kepala tukang L.03 OH 0.0150 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Semen Portland Kg KERJA 3.4560 1,320.00
Pasir pasang M3 0.0290 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.4000 106,240.36
Tukang batu L.03 OH 0.2000 119,520.00
Kepala tukang L.03 OH 0.0200 132,800.00
Mandor L.04 OH 0.0220 166,000.00
JUMLAH
B BAHAN TENAGA
Semen Portland Kg KERJA 13.6320 1,320.00
Pasir pasang M3 0.0270 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.2600 106,240.36
Tukang batu L.03 OH 0.2000 119,520.00
Kepala tukang L.03 OH 0.0200 132,800.00
Mandor L.04 OH 0.0130 166,000.00
JUMLAH
B BAHAN TENAGA
Semen Portland Kg KERJA 10.3680 1,320.00
Pasir pasang M3 0.0310 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.2.11. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.4000 106,240.36
Tukang batu L.03 OH 0.2000 119,520.00
Kepala tukang L.03 OH 0.0200 132,800.00
Mandor L.04 OH 0.0220 166,000.00
JUMLAH
B BAHAN TENAGA
Semen Portland Kg KERJA 8.3200 1,320.00
Pasir pasang M3 0.0320 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.12. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.4000 106,240.36
Tukang batu L.03 OH 0.2000 119,520.00
Kepala tukang L.03 OH 0.0200 132,800.00
Mandor L.04 OH 0.0220 166,000.00
JUMLAH
B BAHAN TENAGA
Semen Portland Kg KERJA 6.9120 1,320.00
Pasir pasang M3 0.0350 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.4000 106,240.36
Tukang Batu L.03 OH 0.2000 119,520.00
Kepala Tukang L.03 OH 0.0200 132,800.00
Mandor L.04 OH 0.0220 166,000.00
JUMLAH
B BAHAN TENAGA
Semen Portland Kg KERJA 5.8880 1,320.00
Pasir pasang M3 0.0360 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.14. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm (plesteran kasar)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1500 106,240.36
Tukang batu L.03 OH 0.0750 119,520.00
Kepala tukang L.03 OH 0.0080 132,800.00
Mandor L.04 OH 0.0080 166,000.00
JUMLAH
B BAHAN TENAGA
Semen Portland Kg KERJA 5.1840 1,320.00
Pasir pasang M3 0.0260 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.15. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0800 106,240.36
Tukang batu L.03 OH 0.4000 119,520.00
Kepala tukang L.03 OH 0.0400 132,800.00
Mandor L.04 OH 0.0040 166,000.00
JUMLAH
B BAHAN TENAGA
Semen Portland Kg KERJA 0.5000 1,320.00
Pasir pasang M3 0.0130 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.2.16. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.03 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Semen Portland Kg KERJA 4.3200 1,320.00
Pasir pasang M3 0.0060 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.17 Pemasangan 1 m2 finishing siar pasangan bata merah


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1500 106,240.36
Tukang batu L.03 OH 0.0750 119,520.00
Kepala tukang L.03 OH 0.0080 132,800.00
Mandor L.04 OH 0.0080 166,000.00
JUMLAH
B BAHAN TENAGA
Semen Portland Kg KERJA 3.1080 1,320.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.18. Pemasangan 1 m2 finishing siar pasangan conblock ekspose


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0700 106,240.36
Tukang batu L.03 OH 0.0350 119,520.00
Kepala tukang L.03 OH 0.0040 132,800.00
Mandor L.04 OH 0.0040 166,000.00
JUMLAH
B BAHAN TENAGA
Semen Portland Kg KERJA 1.6000 1,320.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.2.19. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.03 OH 0.1500 119,520.00
Kepala tukang L.03 OH 0.0150 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Semen Portland Kg KERJA 6.3400 1,320.00
Pasir pasang M3 0.0120 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.20. Pemasangan 1 m2 acian


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.2000 106,240.36
Tukang batu L.03 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0100 166,000.00
JUMLAH
B BAHAN TENAGA
Semen Portland Kg KERJA 3.2500 1,320.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.21. Pemasangan 1 m2 plesteran dengan mortar siap pakai (MSP)


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.2000 106,240.36
Tukang batu L.03 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0100 166,000.00
JUMLAH
B BAHAN TENAGA
Mortar siap pakai MU 400 Kg KERJA 3.2500 2,280.75
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)

31,872.11
17,928.00
1,992.00
2,490.00
54,282.11

20,465.28
3,932.96
24,398.24

78,680.35
7,868.03
86,548.38

Jumlah Harga
(Rp)

31,872.11
17,928.00
1,992.00
2,490.00
54,282.11

13,495.68
4,916.20
18,411.88

72,693.99
7,269.40
79,963.39

Jumlah Harga
(Rp)

31,872.11
17,928.00
1,992.00
2,490.00
54,282.11

10,264.32
5,653.63
15,917.95

70,200.06
7,020.01
77,220.06
Jumlah Harga
(Rp)

31,872.11
17,928.00
1,992.00
2,490.00
54,282.11

8,236.80
5,899.44
14,136.24

68,418.35
6,841.83
75,260.18

Jumlah Harga
(Rp)

31,872.11
17,928.00
1,992.00
2,490.00
54,282.11

6,842.88
6,391.06
13,233.94

67,516.05
6,751.60
74,267.65
Jumlah Harga
(Rp)

31,872.11
17,928.00
1,992.00
2,490.00
54,282.11

5,829.12
6,636.87
12,465.99

66,748.10
6,674.81
73,422.91

Jumlah Harga
(Rp)

31,872.11
17,928.00
1,992.00
2,490.00
54,282.11

5,195.52
6,882.68
12,078.20

66,360.31
6,636.03
72,996.34

Jumlah Harga
(Rp)

31,872.11
17,928.00
1,992.00
2,490.00
54,282.11

4,561.92
7,128.49
11,690.41

65,972.52
6,597.25
72,569.77
Jumlah Harga
(Rp)

42,496.14
23,904.00
2,656.00
3,652.00
72,708.14

17,994.24
6,636.87
24,631.11

97,339.25
9,733.93
107,073.18

Jumlah Harga
(Rp)

27,622.49
23,904.00
2,656.00
2,158.00
56,340.49

13,685.76
7,620.11
21,305.87

77,646.36
7,764.64
85,411.00
Jumlah Harga
(Rp)

42,496.14
23,904.00
2,656.00
3,652.00
72,708.14

10,982.40
7,865.92
18,848.32

91,556.46
9,155.65
100,712.11

Jumlah Harga
(Rp)

42,496.14
23,904.00
2,656.00
3,652.00
72,708.14

9,123.84
8,603.35
17,727.19

90,435.33
9,043.53
99,478.87

Jumlah Harga
(Rp)

42,496.14
23,904.00
2,656.00
3,652.00
72,708.14

7,772.16
8,849.16
16,621.32

89,329.46
8,932.95
98,262.41
Jumlah Harga
(Rp)

15,936.05
8,964.00
1,062.40
1,328.00
27,290.45

6,842.88
6,391.06
13,233.94

40,524.39
4,052.44
44,576.83

Jumlah Harga
(Rp)

8,499.23
47,808.00
5,312.00
664.00
62,283.23

660.00
3,195.53
3,855.53

66,138.76
6,613.88
72,752.63
Jumlah Harga
(Rp)

31,872.11
11,952.00
1,328.00
2,490.00
47,642.11

5,702.40
1,474.86
7,177.26

54,819.37
5,481.94
60,301.30

Jumlah Harga
(Rp)

15,936.05
8,964.00
1,062.40
1,328.00
27,290.45

4,102.56
4,102.56

31,393.01
3,139.30
34,532.32

Jumlah Harga
(Rp)

7,436.83
4,183.20
531.20
664.00
12,815.23

2,112.00
2,112.00

14,927.23
1,492.72
16,419.95
Jumlah Harga
(Rp)

31,872.11
17,928.00
1,992.00
2,490.00
54,282.11

8,368.80
2,949.72
11,318.52

65,600.63
6,560.06
72,160.69

Jumlah Harga
(Rp)

21,248.07
11,952.00
1,328.00
1,660.00
36,188.07

4,290.00
4,290.00

40,478.07
4,047.81
44,525.88

Jumlah Harga
(Rp)

21,248.07
11,952.00
1,328.00
1,660.00
36,188.07

7,412.44
7,412.44

43,600.51
4,360.05
47,960.56
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
A.4.4.3.1. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 20 cm x 20 cm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.2700 106,240.36
Tukang batu L.02 OH 0.1350 119,520.00
Kepala tukang L.03 OH 0.0140 132,800.00
Mandor L.04 OH 0.0140 166,000.00
JUMLAH
B BAHAN TENAGA
Ubin abu-abu buah KERJA 26.5000 2,200.00
Semen Portland kg 10.4000 1,320.00
Pasir pasang M3 0.0450 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.2. Pemasangan 1 m2 lantai ubin warna ukuran 20 cm x 20 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.2700 106,240.36
Tukang batu L.02 OH 0.1350 119,520.00
Kepala tukang L.03 OH 0.0140 132,800.00
Mandor L.04 OH 0.0140 166,000.00
JUMLAH
B BAHAN TENAGA
Ubin warna buah KERJA 26.5000 3,200.00
Semen Portland kg 10.4000 1,320.00
Semen warna kg 1.0000 16,000.00
Pasir pasang M3 0.0450 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E) (maksimum)

A.4.4.3.3.a Pemasangan 1m2 lantai keramik ukuran 30 cm x 30 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.7000 106,240.36
Tukang batu L.02 OH 0.3500 119,520.00
Kepala tukang L.03 OH 0.0350 132,800.00
Mandor L.04 OH 0.0350 166,000.00
JUMLAH
B BAHAN TENAGA
Ubin keramik Doos KERJA 1.0500 150,000.00
Semen Portland Kg 10.0000 1,320.00
Pasir pasang M3 0.0450 245,810.00
Semen warna Kg 0.5000 16,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.3.b Pemasangan 1m2 lantai keramik warna ukuran 30 cm x 30 cm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.7000 106,240.36
Tukang batu L.02 OH 0.3500 119,520.00
Kepala tukang L.03 OH 0.0350 132,800.00
Mandor L.04 OH 0.0350 166,000.00
JUMLAH
B BAHAN TENAGA
Ubin keramik Doos KERJA 1.0500 141,830.00
Semen Portland Kg 10.0000 1,320.00
Pasir pasang M3 0.0450 245,810.00
Semen warna Kg 0.5000 16,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.4. Pemasangan 1m2 lantai keramik ukuran 20 cm x 20 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.7000 106,240.36
Tukang batu L.02 OH 0.3500 119,520.00
Kepala tukang L.03 OH 0.0350 132,800.00
Mandor L.04 OH 0.0350 166,000.00
JUMLAH
B BAHAN TENAGA
Ubin keramik Doos KERJA 1.0500 52,000.00
Semen Portland Kg 10.4000 1,320.00
Pasir pasang M3 0.0450 245,810.00
Semen warna Kg 0.5000 16,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.5. Pemasangan 1m2 lantai keramik mozaik ukuran 30 cm x 30 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.7000 106,240.36
Tukang batu L.02 OH 0.3500 119,520.00
Kepala tukang L.03 OH 0.0350 132,800.00
Mandor L.04 OH 0.0350 166,000.00
JUMLAH
B BAHAN TENAGA
Ubin keramik Buah KERJA 11.8700 603,750.00
Semen Portland Kg 14.1500 1,320.00
Pasir pasang M3 0.0390 245,810.00
Semen warna Kg 2.0000 16,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.6.Pemasangan 1 m2 dinding keramik 20 cm x 20 cm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.9000 106,240.36
Tukang batu L.02 OH 0.4500 119,520.00
Kepala tukang L.03 OH 0.0450 132,800.00
Mandor L.04 OH 0.0450 166,000.00
JUMLAH
B BAHAN TENAGA
Keramik artistik Buah KERJA 26.5000 2,080.00
Semen Portland Kg 9.3000 1,320.00
Pasir pasang M3 0.0180 245,810.00
Semen warna Kg 1.9400 16,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.7. Pemasangan 1 m2 dinding batu paras kerobokan


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.7000 106,240.36
Tukang batu L.02 OH 0.3500 119,520.00
Kepala tukang L.03 OH 0.0350 132,800.00
Mandor L.04 OH 0.0350 166,000.00
JUMLAH
B BAHAN TENAGA
Batu paras Buah KERJA 1.1000 59,380.00
Semen Portland kg 11.7500 1,320.00
Pasir pasang M3 0.0350 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.8. Pemasangan 1 m2 dinding batu tempel candi hitam tebal 2cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.7000 106,240.36
Tukang batu L.02 OH 0.3500 119,520.00
Kepala tukang L.03 OH 0.0350 132,800.00
Mandor L.04 OH 0.0350 166,000.00
JUMLAH
B BAHAN TENAGA
Batu tempel hitam Buah KERJA 1.1000 113,950.00
Semen Portland kg 11.7500 1,320.00
Pasir pasang M3 0.0350 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.9. Pemasangan 1 m’ plint kayu kamper tebal 2 cm lebar 10 cm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1200 106,240.36
Tukang batu L.02 OH 0.1200 119,520.00
Kepala tukang L.03 OH 0.0120 132,800.00
Mandor L.04 OH 0.0060 166,000.00
JUMLAH
B BAHAN TENAGA
Papan kayu kelas 1 M3 KERJA 0.0030 8,442,500.00
Paku/skrup 5 cm Kg 0.0500 18,450.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.10. Pemasangan 1 m2 paving block natural tebal 6 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.2500 106,240.36
Tukang batu L.02 OH 0.5000 119,520.00
Kepala tukang L.03 OH 0.0500 132,800.00
Mandor L.04 OH 0.0013 166,000.00
JUMLAH
B BAHAN TENAGA
Paving block 6 cm M2 KERJA 1.0100 1,216,380.00
Pasir beton M3 0.0500 234,200.00
JUMLAH
C PERALATAN HARGA BAHAN
Peralatan % 10.0000
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.11. Pemasangan 1 m2 paving block natural tebal 8 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.5000 106,240.36
Tukang batu L.02 OH 0.5000 119,520.00
Kepala tukang L.03 OH 0.0500 132,800.00
Mandor L.04 OH 0.0013 166,000.00
JUMLAH
B BAHAN TENAGA
Paving block 8 cm M2 KERJA 1.0100 1,527,350.00
natural
Pasir beton M3 0.0500 234,200.00
JUMLAH
C PERALATAN HARGA BAHAN
Peralatan % 10.0000
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.12. Pemasangan 1 m2 paving block berwarna tebal 6 cm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.2500 106,240.36
Tukang batu L.02 OH 0.5000 119,520.00
Kepala tukang L.03 OH 0.0500 132,800.00
Mandor L.04 OH 0.0013 166,000.00
JUMLAH
B BAHAN TENAGA
Paving block 6cm M2 KERJA 1.0100 540,600.00
berwarna
Pasir beton M3 0.0500 234,200.00
JUMLAH
C PERALATAN HARGA BAHAN
Peralatan % 10.0000
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.13. Pemasangan 1 m2 paving block berwarna tebal 8 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.5000 106,240.36
Tukang batu L.02 OH 0.5000 119,520.00
Kepala tukang L.03 OH 0.0500 132,800.00
Mandor L.04 OH 0.0013 166,000.00
JUMLAH
B BAHAN TENAGA
Paving block 8 cm M2 KERJA 1.0100 1,837,510.00
berwarna
Pasir beton M3 0.0500 234,200.00
JUMLAH
C PERALATAN HARGA BAHAN
Peralatan % 10.0000
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.14 Pemasangan 1m2 lantai keramik ukuran 40 cm x 40 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.7000 106,240.36
Tukang batu L.02 OH 0.3500 119,520.00
Kepala tukang L.03 OH 0.0350 132,800.00
Mandor L.04 OH 0.0350 166,000.00
JUMLAH
B BAHAN TENAGA
Ubin keramik Bh KERJA 6.6300 101,830.00
Semen Portland Kg 9.8000 1,320.00
Pasir pasang M3 0.0450 245,810.00
Semen warna Kg 1.3000 16,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.15 Pemasangan 1m Plin keramik warna ukuran 10 cm x 40 cm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0900 106,240.36
Tukang batu L.02 OH 0.0900 119,520.00
Kepala tukang L.03 OH 0.0090 132,800.00
Mandor L.04 OH 0.0050 166,000.00
JUMLAH
B BAHAN TENAGA
Ubin keramik Bh KERJA 0.6625 101,830.00
Semen Portland Kg 1.1400 1,320.00
Pasir pasang M3 0.0030 245,810.00
Semen warna Kg 0.1000 16,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.16 Pemasangan 1m2 lantai keramik ukuran 25 cm x 25 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.7000 106,240.36
Tukang batu L.02 OH 0.3500 119,520.00
Kepala tukang L.03 OH 0.0350 132,800.00
Mandor L.04 OH 0.0350 166,000.00
JUMLAH
B BAHAN TENAGA
keramik textur 25 cm x 25 cm Doos KERJA 1.0500 52,170.00
Semen Portland Kg 10.4000 1,320.00
Pasir pasang M3 0.0450 245,810.00
Semen warna Kg 0.5000 16,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.17 Pemasangan 1m keramik Dinding warna ukuran 25 cm x 40 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.9000 106,240.36
Tukang batu L.02 OH 0.4500 119,520.00
Kepala tukang L.03 OH 0.0450 132,800.00
Mandor L.04 OH 0.0400 166,000.00
JUMLAH
B BAHAN TENAGA
Ubin keramik Doos KERJA 1.0500 275,000.00
Semen Portland Kg 9.3000 1,320.00
Pasir pasang M3 0.0180 245,810.00
Semen warna Kg 1.9400 16,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.18 Pemasangan 1 m2 lantai Homogeneus Tile ukuran 60 cm x 60 cm ex. Granito
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.2400 106,240.36
Tukang batu L.02 OH 0.1200 119,520.00
Kepala tukang L.03 OH 0.0120 132,800.00
Mandor L.04 OH 0.0120 166,000.00
JUMLAH
B BAHAN TENAGA
Homogeneus Tile Ex. Granito Bh KERJA 3.0500 147,000.00
Semen Portland Kg 9.8000 1,320.00
Pasir pasang M3 0.0450 245,810.00
Semen warna Kg 0.1300 16,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.19 Pemasangan 1m Plin Homogeneus Tile ukuran 10 cm x 60 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0900 106,240.36
Tukang batu L.02 OH 0.0900 119,520.00
Kepala tukang L.03 OH 0.0090 132,800.00
Mandor L.04 OH 0.0050 166,000.00
JUMLAH
B BAHAN TENAGA
Homogeneus Tile Ex. Granito Bh KERJA 0.3050 147,000.00
Semen Portland Kg 1.1400 1,320.00
Pasir pasang M3 0.0030 245,810.00
Semen warna Kg 0.1000 16,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.20 Pemasangan 1 m2 Keramik Dinding Homogeneus Tile ukuran 60 cm x 60 cm ex. Granito


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.9000 106,240.36
Tukang batu L.02 OH 0.4500 119,520.00
Kepala tukang L.03 OH 0.0450 132,800.00
Mandor L.04 OH 0.0450 166,000.00
JUMLAH
B BAHAN TENAGA
Homogeneus Tile Ex. Granito Bh KERJA 3.0500 147,000.00
Semen Portland Kg 9.3000 1,320.00
Pasir pasang M3 0.0180 245,810.00
Semen warna Kg 1.9400 16,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.21 Pemasangan 1m2 lantai keramik ukuran 50 cm x 50 cm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.7000 106,240.36
Tukang batu L.02 OH 0.3500 119,520.00
Kepala tukang L.03 OH 0.0350 132,800.00
Mandor L.04 OH 0.0350 166,000.00
JUMLAH
B BAHAN TENAGA
Ubin keramik 50 cm x 50 cm Bh KERJA 4.2000 240,000.00
Semen Portland Kg 9.8000 1,320.00
Pasir pasang M3 0.0450 245,810.00
Semen warna Kg 1.3000 16,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.22 Pemasangan 1m2 lantai keramik ukuran 40 cm x 40 cm Motif Batu Sikat


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.7000 83,200.00
Tukang batu L.02 OH 0.3500 93,600.00
Kepala tukang L.03 OH 0.0350 104,000.00
Mandor L.04 OH 0.0350 130,000.00
JUMLAH
B BAHAN TENAGA
Ubin keramik 40 cm x 40 cm Motif Batu Bh KERJA 6.6300 603,750.00
Sikat
Semen Portland Kg 9.8000 1,310.00
Pasir pasang M3 0.0450 220,450.00
Semen warna Kg 1.3000 13,430.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.23 Pemasangan 1m2 Batu Sikat


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.6250 83,200.00
Tukang batu L.02 OH 0.2500 93,600.00
Kepala tukang L.03 OH 0.0100 104,000.00
Mandor L.04 OH 0.0310 130,000.00
JUMLAH
B BAHAN TENAGA
Koral Sikat Zak KERJA 1.8300 103,330.00
Semen Portland Kg 9.2800 1,310.00
Pasir pasang M3 0.0500 220,450.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)

28,684.90
16,135.20
1,859.20
2,324.00
49,003.30

58,300.00
13,728.00
11,061.45
83,089.45

132,092.75
13,209.27
145,302.02

Jumlah Harga
(Rp)

28,684.90
16,135.20
1,859.20
2,324.00
49,003.30

84,800.00
13,728.00
16,000.00
11,061.45
125,589.45

174,592.75
17,459.27
192,052.02

Jumlah Harga
(Rp)

74,368.25
41,832.00
4,648.00
5,810.00
126,658.25

157,500.00
13,200.00
11,061.45
8,000.00
189,761.45
316,419.70
31,641.97
348,061.67
Jumlah Harga
(Rp)

74,368.25
41,832.00
4,648.00
5,810.00
126,658.25

148,921.50
13,200.00
11,061.45
8,000.00
181,182.95

307,841.20
30,784.12
338,625.32

Jumlah Harga
(Rp)

74,368.25
41,832.00
4,648.00
5,810.00
126,658.25

54,600.00
13,728.00
11,061.45
8,000.00
87,389.45

214,047.70
21,404.77
235,452.47

Jumlah Harga
(Rp)

74,368.25
41,832.00
4,648.00
5,810.00
126,658.25

7,166,512.50
18,678.00
9,586.59
32,000.00
7,226,777.09
7,353,435.34
735,343.53
8,088,778.88
Jumlah Harga
(Rp)

95,616.32
53,784.00
5,976.00
7,470.00
162,846.32

55,120.00
12,276.00
4,424.58
31,040.00
102,860.58

265,706.90
26,570.69
292,277.59

Jumlah Harga
(Rp)

74,368.25
41,832.00
4,648.00
5,810.00
126,658.25

65,318.00
15,510.00
8,603.35
89,431.35

216,089.60
21,608.96
237,698.56

Jumlah Harga
(Rp)

74,368.25
41,832.00
4,648.00
5,810.00
126,658.25

125,345.00
15,510.00
8,603.35
149,458.35

276,116.60
27,611.66
303,728.26
Jumlah Harga
(Rp)

12,748.84
14,342.40
1,593.60
996.00
29,680.84

25,327.50
922.50
26,250.00

55,930.84
5,593.08
61,523.93

Jumlah Harga
(Rp)

26,560.09
59,760.00
6,640.00
215.80
93,175.89

1,228,543.80
11,710.00
1,240,253.80

124,025.38

1,457,455.07
145,745.51
1,603,200.58

Jumlah Harga
(Rp)

53,120.18
59,760.00
6,640.00
215.80
119,735.98

1,542,623.50
11,710.00
1,554,333.50

155,433.35

1,829,502.83
182,950.28
2,012,453.11
Jumlah Harga
(Rp)

26,560.09
59,760.00
6,640.00
215.80
93,175.89

546,006.00
11,710.00
557,716.00

55,771.60

706,663.49
70,666.35
777,329.84

Jumlah Harga
(Rp)

53,120.18
59,760.00
6,640.00
215.80
119,735.98

1,855,885.10
11,710.00
1,867,595.10

186,759.51

2,174,090.59
217,409.06
2,391,499.65

Jumlah Harga
(Rp)

74,368.25
41,832.00
4,648.00
5,810.00
126,658.25

675,132.90
12,936.00
11,061.45
20,800.00
719,930.35

846,588.60
84,658.86
931,247.46
Jumlah Harga
(Rp)

9,561.63
10,756.80
1,195.20
830.00
22,343.63

67,462.38
1,504.80
737.43
1,600.00
71,304.61

93,648.24
9,364.82
103,013.06

Jumlah Harga
(Rp)

74,368.25
41,832.00
4,648.00
5,810.00
126,658.25

54,778.50
13,728.00
11,061.45
8,000.00
87,567.95

214,226.20
21,422.62
235,648.82

Jumlah Harga
(Rp)

95,616.32
53,784.00
5,976.00
6,640.00
162,016.32

288,750.00
12,276.00
4,424.58
31,040.00
336,490.58
498,506.90
49,850.69
548,357.59
Jumlah Harga
(Rp)

25,497.69
14,342.40
1,593.60
1,992.00
43,425.69

448,350.00
12,936.00
11,061.45
2,080.00
474,427.45

517,853.14
51,785.31
569,638.45

Jumlah Harga
(Rp)

9,561.63
10,756.80
1,195.20
830.00
22,343.63

44,835.00
1,504.80
737.43
1,600.00
48,677.23

71,020.86
7,102.09
78,122.95

Jumlah Harga
(Rp)

95,616.32
53,784.00
5,976.00
7,470.00
162,846.32

448,350.00
12,276.00
4,424.58
31,040.00
496,090.58
658,936.90
65,893.69
724,830.59
Jumlah Harga
(Rp)

74,368.25
41,832.00
4,648.00
5,810.00
126,658.25

1,008,000.00
12,936.00
11,061.45
20,800.00
1,052,797.45

1,179,455.70
117,945.57
1,297,401.27

Jumlah Harga
(Rp)

58,240.00
32,760.00
3,640.00
4,550.00
99,190.00

4,002,862.50
12,838.00
9,920.25
17,459.00
4,043,079.75

4,142,269.75
414,226.98
4,556,496.73

Jumlah Harga
(Rp)

52,000.00
23,400.00
1,040.00
4,030.00
80,470.00

189,093.90
12,156.80
11,022.50
212,273.20
292,743.20
29,274.32
322,017.52
A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja OH 0.0300 106,240.36
Tukang kayu OH 0.0700 119,520.00
Kepala tukang OH 0.0070 132,800.00
Mandor OH 0.0040 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes semen M2 1.1000 -
Paku tripleks kg 0.0100 22,000.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A. Harga Satuan
4.5 No Uraian Kode Satuan Koefisien
(Rp)
.1.
2. A TENAGA
Pe Pekerja L.01 OH 0.1000 106,240.36
ma Tukang kayu L.02 OH 0.1000 119,520.00
san Kepala tukang L.03 OH 0.0100 132,800.00
ga
Mandor L.04 OH 0.0050 166,000.00
n1
m2 JUMLAH
lan B BAHAN TENAGA
git Tripleks Lembar KERJA 0.3750 57,130.00
- Paku tripleks kg 0.0300 22,000.00
lan
git JUMLAH
tri C PERALATAN HARGA BAHAN
ple
ks JUMLAH
uk HARGA ALAT
ura
n D Jumlah (A+B+C)
(12 E Overhead & Profit 10% x D
0x F Harga Satuan Pekerjaan (D+E)
24
0)
A.4.5.1.3. Pemasangan 1 m2 langit-langit lambrisering kayu kamper, tebal 9 mm
cm
, Harga Satuan
No Uraian Kode Satuan Koefisien
teb (Rp)
al A TENAGA
3 Pekerja L.01 OH 0.8000 106,240.36
m
m, Tukang kayu L.02 OH 0.8000 119,520.00
4 Kepala tukang L.03 OH 0.0800 132,800.00
m Mandor L.04 OH 0.0400 166,000.00
m JUMLAH
& B BAHAN TENAGA
6 KERJA 0.0150
m Kayu papan 3 8,442,500.00
m Paku tripleks m kg 0.0100 22,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.5.1.4. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1000 106,240.36
Tukang kayu L.02 OH 0.0500 119,520.00
Kepala tukang L.03 OH 0.0050 132,800.00
Mandor L.04 OH 0.0050 166,000.00
JUMLAH
B BAHAN TENAGA
Gypsum board Lembar KERJA 0.3640 61,250.00
Paku skrup kg 0.1100 22,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.5.1.5. Pemasangan 1 m’ list langit-langit kayu profil


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0500 106,240.36
Tukang kayu L.02 OH 0.0500 119,520.00
Kepala tukang L.03 OH 0.0050 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
List kayu profil m KERJA 1.0500 12,500.00
Paku kg 0.0100 22,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.5.1.6. Pemasangan 1 m2 Rangka Plafond hollow 3,5 x 3,5 galvalume


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.2500 106,240.36
Tukang Besi L.02 OH 0.2500 119,520.00
Kepala tukang L.03 OH 0.0250 132,800.00
Mandor L.04 OH 0.0130 166,000.00
JUMLAH
B BAHAN TENAGA
Hollow galvalume 3,5 x 3,5 M' KERJA 3.3611 30,000.00
Wall angle M' 1.2833 6,150.00
paku sekrup hollow bh 2.6889 240.00
paku beton bh 0.8888 178.40
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.5.1.7. Pemasangan 1 m’ list langit-langit Gypsum S7
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0300 106,240.36
Tukang kayu L.02 OH 0.0300 119,520.00
Kepala tukang L.03 OH 0.0030 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
List Gypsum 7/7 m KERJA 1.0500 20,000.00
Coumpond kg 0.0100 40,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.5.1.8. Pemasangan 1 m2 langit - langit Gedeg


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0300 106,240.36
Tukang kayu L.02 OH 0.0700 119,520.00
Kepala tukang L.03 OH 0.0070 132,800.00
Mandor L.04 OH 0.0015 166,000.00
JUMLAH
B BAHAN TENAGA
Gedeg Kulit klas I M2 KERJA 1.1000 35,000.00
Paku Reng Kg 0.0200 18,450.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)

3,187.21
8,366.40
929.60
664.00
13,147.21

-
220.00
220.00

13,367.21
1,336.72
14,703.93

Jumlah Harga
(Rp)

10,624.04
11,952.00
1,328.00
830.00
24,734.04

21,423.75
660.00
22,083.75

46,817.79
4,681.78
51,499.56

Jumlah Harga
(Rp)

84,992.29
95,616.00
10,624.00
6,640.00
197,872.29

126,637.50
220.00
126,857.50

324,729.79
32,472.98
357,202.77
Jumlah Harga
(Rp)

10,624.04
5,976.00
664.00
830.00
18,094.04

22,295.00
2,420.00
24,715.00

42,809.04
4,280.90
47,089.94

Jumlah Harga
(Rp)

5,312.02
5,976.00
664.00
498.00
12,450.02

13,125.00
220.00
13,345.00

25,795.02
2,579.50
28,374.52

Jumlah Harga
(Rp)

26,560.09
29,880.00
3,320.00
2,158.00
61,918.09

100,833.00
7,892.30
645.34
158.56
109,529.19

171,447.28
17,144.73
188,592.01
Jumlah Harga
(Rp)

3,187.21
3,585.60
398.40
498.00
7,669.21

21,000.00
400.00
21,400.00

29,069.21
2,906.92
31,976.13

Jumlah Harga
(Rp)

3,187.21
8,366.40
929.60
249.00
12,732.21

38,500.00
369.00
38,869.00

51,601.21
5,160.12
56,761.33
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1500 106,240.36
Tukang kayu L.03 OH 0.0750 119,520.00
Kepala tukang L.11 OH 0.0075 132,800.00
Mandor L.15 OH 0.0080 166,000.00
JUMLAH
B BAHAN TENAGA
Genteng palentong Buah KERJA 25.0000 1,610.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.2. Pemasangan 1 m2 atap genteng glazuur


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1500 106,240.36
Tukang kayu L.03 OH 0.0750 119,520.00
Kepala tukang L.11 OH 0.0080 132,800.00
Mandor L.15 OH 0.0080 166,000.00
JUMLAH
B BAHAN TENAGA
Genteng glazur Buah KERJA 14.0000 12,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.3. Pemasangan 1 m2 atap genteng Kodok ex Good year


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1500 106,240.36
Tukang kayu L.03 OH 0.0750 119,520.00
Kepala tukang L.11 OH 0.0080 132,800.00
Mandor L.15 OH 0.0080 166,000.00
JUMLAH
B BAHAN TENAGA
Genteng Kodok ex. Good year Buah KERJA 25.0000 6,400.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.3b. Pemasangan 1 m2 atap genteng Kodok ex. Lestari


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1500 106,240.36
Tukang kayu L.03 OH 0.0750 119,520.00
Kepala tukang L.11 OH 0.0080 132,800.00
Mandor L.15 OH 0.0080 166,000.00
JUMLAH
B BAHAN TENAGA
Genteng Kodok ex. Lestari Buah KERJA 25.0000 2,430.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong kecil
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.4000 106,240.36
Tukang kayu L.03 OH 0.2000 119,520.00
Kepala tukang L.11 OH 0.0200 132,800.00
Mandor L.15 OH 0.0020 166,000.00
JUMLAH
B BAHAN TENAGA
Genteng bubungan Pelentong kecil Buah KERJA 5.0000 4,000.00
Semen Portland Kg 8.0000 1,320.00
Pasir pasang M3 0.0320 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.5. Pemasangan 1 m’ bubung genteng glazuur


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.4000 106,240.36
Tukang kayu L.03 OH 0.2000 119,520.00
Kepala tukang L.11 OH 0.0200 132,800.00
Mandor L.15 OH 0.0020 166,000.00
JUMLAH
B BAHAN TENAGA
Genteng bubungan Glazur Buah KERJA 3.0000 30,000.00
Semen Portland Kg 8.0000 1,320.00
Pasir pasang M3 0.0320 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.6. Pemasangan 1 m’ bubung genteng Kodok


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.4000 106,240.36
Tukang kayu L.03 OH 0.2000 119,520.00
Kepala tukang L.11 OH 0.0200 132,800.00
Mandor L.15 OH 0.0020 166,000.00
JUMLAH
B BAHAN TENAGA
Genteng bubung Kodok Buah KERJA 5.0000 18,380.00
Semen Portland Kg 8.0000 1,320.00
Pasir pasang M3 0.0320 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.6b. Pemasangan 1 m’ bubung genteng Kodok


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.4000 106,240.36
Tukang kayu L.03 OH 0.2000 119,520.00
Kepala tukang L.11 OH 0.0200 132,800.00
Mandor L.15 OH 0.0020 166,000.00
JUMLAH
B BAHAN TENAGA
Genteng bubung Kodok Buah KERJA 5.0000 10,250.00
Semen Portland Kg 8.0000 1,320.00
Pasir pasang M3 0.0320 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.5.2.7. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 1,80 m x 5 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1400 106,240.36
Tukang kayu L.03 OH 0.0700 119,520.00
Kepala tukang L.11 OH 0.0070 132,800.00
Mandor L.15 OH 0.0070 166,000.00
JUMLAH
B BAHAN TENAGA
Asbes gel 92 x 250 Lmbr KERJA 0.7500 30,200.00
Paku pancing 6 x 23 Kg 0.1200 38,240.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.8. Pemasangan 1 m2 genteng beton


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.2000 106,240.36
Tukang kayu L.03 OH 0.1000 119,520.00
Kepala tukang L.11 OH 0.0100 132,800.00
Mandor L.15 OH 0.0100 166,000.00
JUMLAH
B BAHAN TENAGA
Genteng beton Buah KERJA 11.0000 8,880.00
Paku biasa 2”-5” Kg 0.0300 18,450.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.9. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.2000 106,240.36
Tukang kayu L.03 OH 0.1000 119,520.00
Kepala tukang L.11 OH 0.0100 132,800.00
Mandor L.15 OH 0.0010 166,000.00
JUMLAH
B BAHAN TENAGA
Genteng metal Buah KERJA 1.3000 36,000.00
Paku biasa ½”-1” Kg 0.2000 22,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.5.2.10. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.2000 106,240.36
Tukang kayu L.03 OH 0.1000 119,520.00
Kepala tukang L.11 OH 0.0100 132,800.00
Mandor L.15 OH 0.0010 166,000.00
JUMLAH
B BAHAN TENAGA
Genteng metal Buah KERJA 2.0000 36,000.00
Paku biasa ½”-1” Kg 0.2000 22,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.11. Pemasangan 1 m’ nok genteng beton


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.4000 106,240.36
Tukang kayu L.03 OH 0.2000 119,520.00
Kepala tukang L.11 OH 0.0200 132,800.00
Mandor L.15 OH 0.0200 166,000.00
JUMLAH
B BAHAN TENAGA
Nok genteng beton Buah KERJA 3.5000 25,000.00
Paku biasa ½”-1” Kg 0.0500 22,000.00
Semen PC Kg 10.8000 1,320.00
Pasir pasang M3 0.0320 245,810.00
Semen warna Kg 1.0000 16,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E) (maksimum)

A.4.5.2.12. Pemasangan 1 m2 atap seng gelombang


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1200 106,240.36
Tukang kayu L.03 OH 0.0600 119,520.00
Kepala tukang L.11 OH 0.0060 132,800.00
Mandor L.15 OH 0.0060 166,000.00
JUMLAH
B BAHAN TENAGA
Seng gel 3”x6” Lmbr KERJA 0.7000 52,500.00
Paku Seng Kg 0.0200 38,240.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.5.2.13. Pemasangan 1 m’nok atap seng
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1500 106,240.36
Tukang kayu L.03 OH 0.0700 119,520.00
Kepala tukang L.11 OH 0.0070 132,800.00
Mandor L.15 OH 0.0060 166,000.00
JUMLAH
B BAHAN TENAGA
Seng pelat 3”x6” bjls Lmbr KERJA 0.3000 44,500.00
28
Paku biasa ½”-1” Kg 0.0400 22,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.14. Pemasangan 1 m2 alumunium foil/sisalation


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1500 106,240.36
Tukang kayu L.03 OH 0.0500 119,520.00
Kepala tukang L.11 OH 0.0050 132,800.00
Mandor L.15 OH 0.0080 166,000.00
JUMLAH
B BAHAN TENAGA
Aluminium foil M2 KERJA 1.0500 3,660.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.15. Pemasangan 1 m2 atap Spandex


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1200 106,240.36
Tukang kayu L.03 OH 0.0600 119,520.00
Kepala tukang L.11 OH 0.0060 132,800.00
Mandor L.15 OH 0.0060 166,000.00
JUMLAH
B BAHAN TENAGA
Atap Spandex M2 KERJA 1.1000 37,000.00
Paku Seng Import Kg 0.0200 38,240.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)

15,936.05
8,964.00
996.00
1,328.00
27,224.05

40,250.00
40,250.00

67,474.05
6,747.41
74,221.46

Jumlah Harga
(Rp)

15,936.05
8,964.00
1,062.40
1,328.00
27,290.45

168,000.00
168,000.00

195,290.45
19,529.05
214,819.50

Jumlah Harga
(Rp)

15,936.05
8,964.00
1,062.40
1,328.00
27,290.45

160,000.00
160,000.00

187,290.45
18,729.05
206,019.50 38,113,607.39

Jumlah Harga
(Rp)
15,936.05
8,964.00
1,062.40
1,328.00
27,290.45

60,750.00
60,750.00

88,040.45
8,804.05
96,844.50
Jumlah Harga
(Rp)

42,496.14
23,904.00
2,656.00
332.00
69,388.14

20,000.00
10,560.00
7,865.92
38,425.92

107,814.06
10,781.41
118,595.47

Jumlah Harga
(Rp)

42,496.14
23,904.00
2,656.00
332.00
69,388.14

90,000.00
10,560.00
7,865.92
108,425.92

177,814.06
17,781.41
195,595.47

Jumlah Harga
(Rp)

42,496.14
23,904.00
2,656.00
332.00
69,388.14

91,900.00
10,560.00
7,865.92
110,325.92

179,714.06
17,971.41
197,685.47

Jumlah Harga
(Rp)

42,496.14
23,904.00
2,656.00
332.00
69,388.14

51,250.00
10,560.00
7,865.92
69,675.92

139,064.06
13,906.41
152,970.47
Jumlah Harga
(Rp)

14,873.65
8,366.40
929.60
1,162.00
25,331.65

22,650.00
4,588.80
27,238.80

52,570.45
5,257.05
57,827.50

Jumlah Harga
(Rp)

21,248.07
11,952.00
1,328.00
1,660.00
36,188.07

97,680.00
553.50
98,233.50

134,421.57
13,442.16
147,863.73

Jumlah Harga
(Rp)

21,248.07
11,952.00
1,328.00
166.00
34,694.07

46,800.00
4,400.00
51,200.00

85,894.07
8,589.41
94,483.48
Jumlah Harga
(Rp)

21,248.07
11,952.00
1,328.00
166.00
34,694.07

72,000.00
4,400.00
76,400.00

111,094.07
11,109.41
122,203.48

Jumlah Harga
(Rp)

42,496.14
23,904.00
2,656.00
3,320.00
72,376.14

87,500.00
1,100.00
14,256.00
7,865.92
16,000.00
126,721.92

199,098.06
19,909.81
219,007.87

Jumlah Harga
(Rp)

12,748.84
7,171.20
796.80
996.00
21,712.84

36,750.00
764.80
37,514.80

59,227.64
5,922.76
65,150.41
Jumlah Harga
(Rp)

15,936.05
8,366.40
929.60
996.00
26,228.05

13,350.00
880.00
14,230.00

40,458.05
4,045.81
44,503.86

Jumlah Harga
(Rp)

15,936.05
5,976.00
664.00
1,328.00
23,904.05

3,843.00
3,843.00

27,747.05
2,774.71
30,521.76

Jumlah Harga
(Rp)

12,748.84
7,171.20
796.80
996.00
21,712.84

40,700.00
764.80
41,464.80

63,177.64
6,317.76
69,495.41
A.4.6.1. HARGA SATUAN PEKERJAAN KAYU
A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I bengkirai
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 7.0000 106,240.36 743,682.52
Tukang kayu L.02 OH 21.0000 119,520.00 2,509,920.00
Kepala tukang L.03 OH 2.1000 132,800.00 278,880.00
Mandor L.04 OH 0.3500 166,000.00 58,100.00
JUMLAH 3,590,582.52
B BAHAN TENAGA
Balok kayu M3 KERJA 1.1000 10,300,000.00 11,330,000.00
Paku 10 cm Kg 1.2500 18,450.00 23,062.50
Lem kayu Kg 1.0000 24,070.00 24,070.00
JUMLAH 11,377,132.50
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 14,967,715.02
E Overhead & Profit 10% x D 1,496,771.50
F Harga Satuan Pekerjaan (D+E) 16,464,486.52

A.4.6.1.2.Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III kamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.0000 106,240.36 637,442.16
Tukang kayu L.02 OH 18.0000 119,520.00 2,151,360.00
Kepala tukang L.03 OH 1.8000 132,800.00 239,040.00
Mandor L.04 OH 0.3000 166,000.00 49,800.00
JUMLAH 3,077,642.16
B BAHAN TENAGA
Balok kayu M3 KERJA 1.2000 7,693,750.00 9,232,500.00
Paku 10 cm Kg 1.2500 18,450.00 23,062.50
Lem kayu Kg 1.0000 24,070.00 24,070.00
JUMLAH 9,279,632.50
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 12,357,274.66
E Overhead & Profit 10% x D 1,235,727.47
F Harga Satuan Pekerjaan (D+E) 13,593,002.13

A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 106,240.36 37,184.13
Tukang kayu L.02 OH 1.0500 119,520.00 125,496.00
Kepala tukang L.03 OH 0.1050 132,800.00 13,944.00
Mandor L.04 OH 0.0180 166,000.00 2,988.00
JUMLAH 179,612.13
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0400 8,442,500.00 337,700.00
Paku 5 – 7 cm Kg 0.0500 18,450.00 922.50
JUMLAH 338,622.50
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 518,234.63
E Overhead & Profit 10% x D 51,823.46
F Harga Satuan Pekerjaan (D+E) 570,058.09
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II kamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 106,240.36 106,240.36
Tukang kayu L.02 OH 3.0000 119,520.00 358,560.00
Kepala tukang L.03 OH 0.3000 132,800.00 39,840.00
Mandor L.04 OH 0.0500 166,000.00 8,300.00
JUMLAH 512,940.36
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0400 8,442,500.00 337,700.00
Lem kayu Kg 0.5000 24,070.00 12,035.00
JUMLAH 349,735.00
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 862,675.36
E Overhead & Profit 10% x D 86,267.54
F Harga Satuan Pekerjaan (D+E) 948,942.90

A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II kamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 106,240.36 84,992.29
Tukang kayu L.02 OH 2.4000 119,520.00 286,848.00
Kepala tukang L.03 OH 0.2400 132,800.00 31,872.00
Mandor L.04 OH 0.0400 166,000.00 6,640.00
JUMLAH 410,352.29
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0240 8,442,500.00 202,620.00
Lem kayu Kg 0.3000 24,070.00 7,221.00
JUMLAH 209,841.00
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 620,193.29
E Overhead & Profit 10% x D 62,019.33
F Harga Satuan Pekerjaan (D+E) 682,212.62

A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi, kayu kelas I atau II kamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. A TENAGA
4.6 Pekerja L.01 OH 1.0000 106,240.36 106,240.36
.1. Tukang kayu L.02 OH 3.0000 119,520.00 358,560.00
7.
Kepala tukang L.03 OH 0.3000 132,800.00 39,840.00
Pe
mb Mandor L.04 OH 0.0500 166,000.00 8,300.00
uat JUMLAH 512,940.36
an B BAHAN TENAGA
da Papan kayu M3 KERJA 0.0640 8,442,500.00 540,320.00
n
pe Lem kayu Kg 0.5000 24,070.00 12,035.00
ma JUMLAH 552,355.00
san C PERALATAN HARGA BAHAN
ga
n JUMLAH
1 HARGA ALAT
m2 D Jumlah (A+B+C) 1,065,295.36
pin E Overhead & Profit 10% x D 106,529.54
tu F Harga Satuan Pekerjaan (D+E) 1,171,824.90
da
n
jen
del
a
jal
usi
ka
yu
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II kruing tertutup (lebar sampai 90 cm)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 106,240.36 74,368.25
Tukang kayu L.02 OH 2.1000 119,520.00 250,992.00
Kepala tukang L.03 OH 0.2100 132,800.00 27,888.00
Mandor L.04 OH 0.0350 166,000.00 5,810.00
JUMLAH 359,058.25
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0250 6,939,110.00 173,477.75
Paku 1 cm – 2,5 cm Kg 0.0300 22,000.00 660.00
Lem kayu Kg 0.5000 24,070.00 12,035.00
Plywood tebal 4 mm Lmbr 1.0000 57,130.00 57,130.00
Ukuran (90 x 220) cm JUMLAH 243,302.75
C PERALATAN HARGA BAHAN

JUMLAH
D Jumlah (A+B+C) HARGA ALAT 602,361.00
E Overhead & Profit 10% x D 60,236.10
F Harga Satuan Pekerjaan (D+E) 662,597.10

A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II kamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 106,240.36 84,992.29
Tukang kayu L.02 OH 2.4000 119,520.00 286,848.00
Kepala tukang L.03 OH 0.2400 132,800.00 31,872.00
Mandor L.04 OH 0.0400 166,000.00 6,640.00
JUMLAH 410,352.29
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0256 8,442,500.00 216,128.00
Paku 1 cm – 2,5 Kg 0.0300 22,000.00 660.00
cm
Lem kayu Kg 0.5000 24,070.00 12,035.00
Plywood 4 mm Lmbr 1.0000 57,130.00 57,130.00
(90 x 220) cm JUMLAH 285,953.00
C PERALATAN HARGA BAHAN

JUMLAH
D Jumlah (A+B+C) HARGA ALAT 696,305.29
E Overhead & Profit 10% x D 69,630.53
F Harga Satuan Pekerjaan (D+E) 765,935.82

A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II kamper


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.6700 106,240.36 71,181.04
Tukang kayu L.02 OH 2.0000 119,520.00 239,040.00
Kepala tukang L.03 OH 0.2000 132,800.00 26,560.00
Mandor L.04 OH 0.3350 166,000.00 55,610.00
JUMLAH 392,391.04
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0600 8,442,500.00 506,550.00
Paku 1 – 2,5 cm Kg 0.1500 22,000.00 3,300.00
JUMLAH 509,850.00
C PERALATAN HARGA BAHAN

JUMLAH
D Jumlah (A+B+C) HARGA ALAT 902,241.04
E Overhead & Profit 10% x D 90,224.10
F Harga Satuan Pekerjaan (D+E) 992,465.15
A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I kamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 106,240.36 84,992.29
Tukang kayu L.02 OH 2.4000 119,520.00 286,848.00
Kepala tukang L.03 OH 0.2400 132,800.00 31,872.00
Mandor L.04 OH 0.0400 166,000.00 6,640.00
JUMLAH 410,352.29
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0250 0 8,442,500.00 211,062.50
Paku 1 – 2,5 cm Kg 0.0300 22,000.00 660.00
Lem kayu Kg 0.3000 24,070.00 7,221.00
Teakwood 4 mm Lmbr 1.0000 108,730.00 108,730.00
90 x 220 cm JUMLAH 327,673.50
C PERALATAN HARGA BAHAN

JUMLAH
D Jumlah (A+B+C) HARGA ALAT 738,025.79
E Overhead & Profit 10% x D 73,802.58
F Harga Satuan Pekerjaan (D+E) 811,828.37

A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.0000 106,240.36 424,961.44
Tukang kayu L.02 OH 12.0000 119,520.00 1,434,240.00
Kepala tukang L.03 OH 1.2000 132,800.00 159,360.00
Mandor L.04 OH 0.2000 166,000.00 33,200.00
JUMLAH 2,051,761.44
B BAHAN TENAGA
Balok kayu M3 KERJA 1.1000 7,693,750.00 8,463,125.00
Besi strip tebal 5 Kg 15.0000 9,180.00 137,700.00
mm
Paku 12 cm Kg 5.6000 18,450.00 103,320.00
JUMLAH 8,704,145.00
C PERALATAN HARGA BAHAN

JUMLAH
D Jumlah (A+B+C) HARGA ALAT 10,755,906.44
E Overhead & Profit 10% x D 1,075,590.64
F Harga Satuan Pekerjaan (D+E) 11,831,497.08

A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I kamper


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.7000 106,240.36 711,810.41
Tukang kayu L.02 OH 20.1000 119,520.00 2,402,352.00
Kepala tukang L.03 OH 2.0100 132,800.00 266,928.00
Mandor L.04 OH 0.3350 166,000.00 55,610.00
JUMLAH 3,436,700.41
B BAHAN TENAGA
Balok kayu M3 KERJA 1.2000 7,693,750.00 9,232,500.00
Besi strip tebal 5 Kg 15.0000 9,180.00 137,700.00
mm
Paku 12 cm Kg 5.6000 18,450.00 103,320.00
JUMLAH 9,473,520.00
C PERALATAN HARGA BAHAN

JUMLAH
D Jumlah (A+B+C) HARGA ALAT 12,910,220.41
E Overhead & Profit 10% x D 1,291,022.04
F Harga Satuan Pekerjaan (D+E) 14,201,242.45
A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II kruing
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.7000 106,240.36 711,810.41
Tukang kayu L.02 OH 20.1000 119,520.00 2,402,352.00
Kepala tukang L.03 OH 2.0100 132,800.00 266,928.00
Mandor L.04 OH 0.3350 166,000.00 55,610.00
JUMLAH 3,436,700.41
B BAHAN TENAGA
Balok kayu M3 KERJA 1.1000 6,443,440.00 7,087,784.00
Besi strip tebal 5 Kg 15.0000 9,180.00 137,700.00
mm
Paku 12 cm Kg 3.0000 18,450.00 55,350.00
JUMLAH 7,280,834.00
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 10,717,534.41
E Overhead & Profit 10% x D 1,071,753.44
F Harga Satuan Pekerjaan (D+E) 11,789,287.85

A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 106,240.36 10,624.04
Tukang kayu L.02 OH 0.1000 119,520.00 11,952.00
Kepala tukang L.03 OH 0.0100 132,800.00 1,328.00
Mandor L.04 OH 0.0050 166,000.00 830.00
JUMLAH 24,734.04
B BAHAN TENAGA
Kaso-kaso 5 x 7cm M3 KERJA 0.0140 8,442,500.00 118,195.00
Reng 2 x 3 cm Kg 0.0360 8,442,500.00 303,930.00
Paku 5 dan 10 cm Kg 0.2500 18,450.00 4,612.50
JUMLAH 426,737.50
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 451,471.54
E Overhead & Profit 10% x D 45,147.15
F Harga Satuan Pekerjaan (D+E) 496,618.69

A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 106,240.36 10,624.04
Tukang kayu L.02 OH 0.1000 119,520.00 11,952.00
Kepala tukang L.03 OH 0.0100 132,800.00 1,328.00
Mandor L.04 OH 0.0050 166,000.00 830.00
JUMLAH 24,734.04
B BAHAN TENAGA
Kaso-kaso 5 x 7cm M3 KERJA 0.0140 8,442,500.00 118,195.00
Reng (3 x 4) cm Kg 0.0570 8,442,500.00 481,222.50
Paku 5 dan 10 cm Kg 0.2500 18,450.00 4,612.50
JUMLAH 604,030.00
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 628,764.04
E Overhead & Profit 10% x D 62,876.40
F Harga Satuan Pekerjaan (D+E) 691,640.44
A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 106,240.36 15,936.05
Tukang kayu L.02 OH 0.3000 119,520.00 35,856.00
Kepala tukang L.03 OH 0.0300 132,800.00 3,984.00
Mandor L.04 OH 0.0750 166,000.00 12,450.00
JUMLAH 68,226.05
B BAHAN TENAGA
Kaso-kaso 5 x 7cm M3 KERJA 0.0154 8,442,500.00 130,014.50
Paku 7 cm – 10 cm Kg 0.2000 18,450.00 3,690.00
JUMLAH 133,704.50
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 201,930.55
E Overhead & Profit 10% x D 20,193.06
F Harga Satuan Pekerjaan (D+E) 222,123.61

A.4.6.1.20.Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III kamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 106,240.36 21,248.07
Tukang kayu L.02 OH 0.3000 119,520.00 35,856.00
Kepala tukang L.03 OH 0.0300 132,800.00 3,984.00
Mandor L.04 OH 0.0100 166,000.00 1,660.00
JUMLAH 62,748.07
B BAHAN TENAGA
Kaso-kaso M3 KERJA 0.0163 8,442,500.00 137,612.75
5 x 7 cm
Paku 7 – 10 cm Kg 0.2500 18,450.00 4,612.50
JUMLAH 142,225.25
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 204,973.32
E Overhead & Profit 10% x D 20,497.33
F Harga Satuan Pekerjaan (D+E) 225,470.65

A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II kamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 106,240.36 10,624.04
Tukang kayu L.02 OH 0.2000 119,520.00 23,904.00
Kepala tukang L.03 OH 0.0200 132,800.00 2,656.00
Mandor L.04 OH 0.0050 166,000.00 830.00
JUMLAH 38,014.04
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0108 8,442,500.00 91,179.00
Paku 5 dan 7 Kg 0.1000 18,450.00 1,845.00
cm JUMLAH 93,024.00
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 131,038.04
E Overhead & Profit 10% x D 13,103.80
F Harga Satuan Pekerjaan (D+E) 144,141.84
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II kruing
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 106,240.36 10,624.04
Tukang kayu L.02 OH 0.2000 119,520.00 23,904.00
Kepala tukang L.03 OH 0.0200 132,800.00 2,656.00
Mandor L.04 OH 0.0050 166,000.00 830.00
JUMLAH 38,014.04
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0110 6,939,110.00 76,330.21
Paku 5 dan 7 cm Kg 0.0500 18,450.00 922.50
JUMLAH 77,252.71
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 115,266.75
E Overhead & Profit 10% x D 11,526.67
F Harga Satuan Pekerjaan (D+E) 126,793.42

A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III Kamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 106,240.36 15,936.05
Tukang kayu L.02 OH 0.4500 119,520.00 53,784.00
Kepala tukang L.03 OH 0.0450 132,800.00 5,976.00
Mandor L.04 OH 0.0080 166,000.00 1,328.00
JUMLAH 77,024.05
B BAHAN TENAGA
Balok kayu M3 KERJA 0.0280 7,693,750.00 215,425.00
Paku 5 dan 7 Kg 0.1500 18,450.00 2,767.50
cm JUMLAH 218,192.50
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 295,216.55
E Overhead & Profit 10% x D 29,521.66
F Harga Satuan Pekerjaan (D+E) 324,738.21

A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II kamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 106,240.36 21,248.07
Tukang kayu L.02 OH 0.6000 119,520.00 71,712.00
Kepala tukang L.03 OH 0.0600 132,800.00 7,968.00
Mandor L.04 OH 0.0100 166,000.00 1,660.00
JUMLAH 102,588.07
B BAHAN TENAGA
Balok kayu, 6 x 12 M3 KERJA 0.0280 7,693,750.00 215,425.00
Paku 5 dan 10 Kg 0.1500 18,450.00 2,767.50
Plywood 4 mm, Lmbr 0.8600 57,130.00 49,131.80
120
Lem xkayu
240 Kg 0.5600 24,070.00 13,479.20
JUMLAH 280,803.50
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 383,391.57
E Overhead & Profit 10% x D 38,339.16
F Harga Satuan Pekerjaan (D+E) 421,730.73
A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I kruing
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 106,240.36 63,744.22
Tukang kayu L.02 OH 1.8000 119,520.00 215,136.00
Kepala tukang L.03 OH 0.1800 132,800.00 23,904.00
Mandor L.04 OH 0.0300 166,000.00 4,980.00
JUMLAH 307,764.22
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0070 6,939,110.00 48,573.77
Paku 5 dan 10 Kg 0.1000 18,450.00 1,845.00
Paku skrup 10 cm Kg 0.1500 18,450.00 2,767.50
JUMLAH 53,186.27
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 360,950.49
E Overhead & Profit 10% x D 36,095.05
F Harga Satuan Pekerjaan (D+E) 397,045.53

A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0250 106,240.36 2,656.01
Tukang kayu L.02 OH 0.0750 119,520.00 8,964.00
Kepala tukang L.03 OH 0.0080 132,800.00 1,062.40
Mandor L.04 OH 0.0010 166,000.00 166.00
JUMLAH 12,848.41
B BAHAN TENAGA
Plywood 4 mm Lmbr KERJA 0.4000 57,130.00 22,852.00
Paku 1 dan 2,5 Kg 0.0500 22,000.00 1,100.00
JUMLAH 23,952.00
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 36,800.41
E Overhead & Profit 10% x D 3,680.04
F Harga Satuan Pekerjaan (D+E) 40,480.45

A.4.6.1.28. Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV albesia
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 106,240.36 10,624.04
Tukang kayu L.02 OH 0.0500 119,520.00 5,976.00
Kepala tukang L.03 OH 0.0050 132,800.00 664.00
Mandor L.04 OH 0.0050 166,000.00 830.00
JUMLAH 18,094.04
B BAHAN TENAGA
Bilik bambu KERJA 1.5000 35,000.00 52,500.00
Kaso-kaso 5 x 7 0.0140 2,827,140.00 39,579.96
Paku 0.0120 18,450.00 221.40
List kayu 2/4 0.0030 6,939,110.00 20,817.33
JUMLAH 113,118.69
C PERALATAN HARGA BAHAN
JUMLAH
D Jumlah (A+B+C) HARGA ALAT 131,212.73
E Overhead & Profit 10% x D 13,121.27
F Harga Satuan Pekerjaan (D+E) 144,334.00
A.4.6.1.29. Pemasangan 1 M2 Pasang Usuk expose diprofil + Reng kayu kamper , atap genteng keramik
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 106,240.36 10,624.04
Tukang kayu L.02 OH 0.1000 119,520.00 11,952.00
Kepala Tukang L.03 OH 0.0100 132,800.00 1,328.00
Mandor L.04 OH 0.0050 166,000.00 830.00
Upah Serut profil Kayu M3 0.0080 - -
JUMLAH 24,734.04
B BAHAN TENAGA
Usuk kamper 5x7 M3 KERJA 0.0140 8,442,500.00 118,195.00
Reng kamper 2x3 M3 0.0036 8,442,500.00 30,393.00
Paku biasa 7-10 cm Kg 0.2500 18,450.00 4,612.50
JUMLAH 153,200.50
C PERALATAN HARGA BAHAN
JUMLAH
D Jumlah (A+B+C) HARGA ALAT 177,934.54
E Overhead & Profit 10% x D 17,793.45
F Harga Satuan Pekerjaan (D+E) 195,727.99

A.4.6.1.30. Pemasangan 1 M2 Pasang Usuk expose diprofil, atap genteng keramik


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 106,240.36 6,374.42
Tukang kayu L.02 OH 0.0600 119,520.00 7,171.20
Kepala Tukang L.03 OH 0.0060 132,800.00 796.80
Mandor L.04 OH 0.0030 166,000.00 498.00
Upah Serut profil Kayu M3 0.0080 - -
JUMLAH 14,840.42
B BAHAN TENAGA
Usuk kruing 5x7 M3 KERJA 0.0140 6,939,110.00 97,147.54
Paku biasa 7-10 cm Kg 0.1250 18,450.00 2,306.25
JUMLAH 99,453.79
C PERALATAN HARGA BAHAN
JUMLAH
D Jumlah (A+B+C) HARGA ALAT 114,294.21
E Overhead & Profit 10% x D 11,429.42
F Harga Satuan Pekerjaan (D+E) 125,723.63

A.4.6.1.31. Pemasangan 1 M2 Pasang Reng kayu kamper , atap genteng keramik


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0400 106,240.36 4,249.61
Tukang kayu L.02 OH 0.0400 119,520.00 4,780.80
Kepala Tukang L.03 OH 0.0040 132,800.00 531.20
Mandor L.04 OH 0.0020 166,000.00 332.00
JUMLAH 9,893.61
B BAHAN TENAGA
Reng kamper 2x3 M3 KERJA 0.0036 8,442,500.00 30,393.00
Paku biasa 7-10 cm Kg 0.1250 18,450.00 2,306.25
JUMLAH 32,699.25
C PERALATAN HARGA BAHAN
JUMLAH
D Jumlah (A+B+C) HARGA ALAT 42,592.86
E Overhead & Profit 10% x D 4,259.29
F Harga Satuan Pekerjaan (D+E) 46,852.15
A.4.6.1.32. Pemasangan 1 m’ lisplank ukuran 3 x 10 cm, kayu kelas I atau kelas II kruing
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 106,240.36 10,624.04
Tukang kayu L.02 OH 0.2000 119,520.00 23,904.00
Kepala tukang L.03 OH 0.0200 132,800.00 2,656.00
Mandor L.04 OH 0.0050 166,000.00 830.00
JUMLAH 38,014.04
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0054 6,939,110.00 37,471.19
Paku 5 dan 7 Kg 0.0500 18,450.00 922.50
cm JUMLAH 38,393.69
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 76,407.73
E Overhead & Profit 10% x D 7,640.77
F Harga Satuan Pekerjaan (D+E) 84,048.50

A.4.6.1.33. Pemasangan 1 m’ lisplank ukuran 3 x 15 cm, kayu kelas I atau kelas II kruing
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 106,240.36 10,624.04
Tukang kayu L.02 OH 0.2000 119,520.00 23,904.00
Kepala tukang L.03 OH 0.0200 132,800.00 2,656.00
Mandor L.04 OH 0.0050 166,000.00 830.00
JUMLAH 38,014.04
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0055 6,939,110.00 38,165.11
Paku 5 dan 7 Kg 0.0500 18,450.00 922.50
cm JUMLAH 39,087.61
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 77,101.64
E Overhead & Profit 10% x D 7,710.16
F Harga Satuan Pekerjaan (D+E) 84,811.81

A.4.6.1.34. Pemasangan 1 m’ lisplank ukuran 2 x (3 x 20) cm, kayu kelas I atau kelas II kruing
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 106,240.36 10,624.04
Tukang kayu L.02 OH 0.2000 119,520.00 23,904.00
Kepala tukang L.03 OH 0.0200 132,800.00 2,656.00
Mandor L.04 OH 0.0050 166,000.00 830.00
JUMLAH 38,014.04
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0216 6,939,110.00 149,884.78
Paku 5 dan 7 Kg 0.2000 18,450.00 3,690.00
cm JUMLAH 153,574.78
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 191,588.81
E Overhead & Profit 10% x D 19,158.88
F Harga Satuan Pekerjaan (D+E) 210,747.69
A.4.6.1.35. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I Merbau
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 7.0000 106,240.36 743,682.52
Tukang kayu L.02 OH 21.0000 119,520.00 2,509,920.00
Kepala tukang L.03 OH 2.1000 132,800.00 278,880.00
Mandor L.04 OH 0.3500 166,000.00 58,100.00
JUMLAH 3,590,582.52
B BAHAN TENAGA
Balok kayu Merbau M3 KERJA 1.1000 20,600,000.00 22,660,000.00
Paku 10 cm Kg 1.2500 18,450.00 23,062.50
Lem kayu Kg 1.0000 24,070.00 24,070.00
JUMLAH 22,707,132.50
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 26,297,715.02
E Overhead & Profit 10% x D 2,629,771.50
F Harga Satuan Pekerjaan (D+E) 28,927,486.52

A.4.6.1.36. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu Merbau


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 106,240.36 106,240.36
Tukang kayu L.02 OH 3.0000 119,520.00 358,560.00
Kepala tukang L.03 OH 0.3000 132,800.00 39,840.00
Mandor L.04 OH 0.0500 166,000.00 8,300.00
JUMLAH 512,940.36
B BAHAN TENAGA
Papan kayu Merbau M3 KERJA 0.0400 22,100,000.00 884,000.00
Lem kayu Kg 0.5000 24,070.00 12,035.00
JUMLAH 896,035.00
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 1,408,975.36
E Overhead & Profit 10% x D 140,897.54
F Harga Satuan Pekerjaan (D+E) 1,549,872.90

A.4.6.1.37. Pemasangan 1 m’ lisplank ukuran 3 x 15 cm, kayu kelas I atau kelas II kamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 106,240.36 10,624.04
Tukang kayu L.02 OH 0.2000 119,520.00 23,904.00
Kepala tukang L.03 OH 0.0200 132,800.00 2,656.00
Mandor L.04 OH 0.0050 166,000.00 830.00
JUMLAH 38,014.04
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0108 6,939,110.000 74,942.39
Paku 5 dan 7 Kg 0.0500 18,450.00 922.50
cm JUMLAH 75,864.89
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 113,878.92
E Overhead & Profit 10% x D 11,387.89
F Harga Satuan Pekerjaan (D+E) 125,266.82
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
A.4.6.2.1. Pemasangan 1 buah kunci tanam biasa
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0100 106,240.36
Tukang kayu L.02 OH 0.5000 119,520.00
Kepala tukang L.03 OH 0.0500 132,800.00
Mandor L.04 OH 0.0050 166,000.00
JUMLAH
B BAHAN TENAGA
Kunci tanam biasa Buah KERJA 1.0000 110,730.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi Har


ga
No Uraian Kode Satuan Koefisien Satu
an
A TENAGA KERJA (Rp)
Pekerja L.01 OH 0.0050 106,240.36
Tukang kayu L.02 OH 0.5000 119,520.00
Kepala tukang L.03 OH 0.0500 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Kunci tanam KM Buah KERJA 1.0000 100,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.2. Pemasangan 1 buah engsel pintu Har


ga
No Uraian Kode Satuan Koefisien Satu
an
A TENAGA (Rp)
Pekerja L.01 OH 0.0150 106,240.36
Tukang kayu L.02 OH 0.1500 119,520.00
Kepala tukang L.03 OH 0.0150 132,800.00
Mandor L.04 OH 0.0008 166,000.00
JUMLAH
B BAHAN TENAGA
Engsel pintu Buah KERJA 1.0000 84,460.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.3. Pemasangan 1 buah engsel jendela kupu-kupu Har
ga
No Uraian Kode Satuan Koefisien Satu
an
A TENAGA (Rp)
Pekerja L.01 OH 0.0100 106,240.36
Tukang kayu L.02 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0005 166,000.00
JUMLAH
B BAHAN TENAGA
Engsel kupu-kupu Buah KERJA 1.0000 49,500.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.4. Pemasangan 1 buah engsel angin


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1000 106,240.36
Tukang kayu L.02 OH 0.2000 119,520.00
Kepala tukang L.03 OH 0.0200 132,800.00
Mandor L.04 OH 0.0005 166,000.00
JUMLAH
B BAHAN TENAGA
Engsel angin Buah KERJA 1.0000 35,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.5. Pemasangan 1 buah spring knip


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0150 106,240.36
Tukang kayu L.02 OH 0.1500 119,520.00
Kepala tukang L.03 OH 0.0150 132,800.00
Mandor L.04 OH 0.0080 166,000.00
JUMLAH
B BAHAN TENAGA
Spring knip Buah KERJA 1.0000 28,850.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.6. Pemasangan 1 buah kait angin
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0150 106,240.36
Tukang kayu L.02 OH 0.1500 119,520.00
Kepala tukang L.03 OH 0.0150 132,800.00
Mandor L.04 OH 0.0080 166,000.00
JUMLAH
B BAHAN TENAGA
Kait angin Buah KERJA 1.0000 35,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.7. Pemasangan 1 buah door closer


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0500 106,240.36
Tukang kayu L.02 OH 0.5000 119,520.00
Kepala tukang L.03 OH 0.0500 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Door closer Set KERJA 1.0000 247,500.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.8. Pemasangan 1 buah kunci slot


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0200 106,240.36
Tukang kayu L.02 OH 0.2000 119,520.00
Kepala tukang L.03 OH 0.0200 132,800.00
Mandor L.04 OH 0.0010 166,000.00
JUMLAH
B BAHAN TENAGA
Kunci slot Buah KERJA 1.0000 100,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.9. Pemasangan 1 buah door holder
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0500 106,240.36
Tukang kayu L.02 OH 0.5000 119,520.00
Kepala tukang L.03 OH 0.0500 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Door holder Buah KERJA 1.0000 40,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.10. Pemasangan 1 buah door stop


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0100 106,240.36
Tukang kayu L.02 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0050 166,000.00
JUMLAH
B BAHAN TENAGA
Door stop Buah KERJA 1.0000 77,670.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.11. Pemasangan 1 m rel pintu sorong


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0600 106,240.36
Tukang kayu L.02 OH 0.6000 119,520.00
Kepala tukang L.03 OH 0.0600 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Rel pintu sorong M KERJA 1.0000 240,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.12. Pemasangan 1 m2 kaca tebal 3 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0150 106,240.36
Tukang kayu L.02 OH 0.1500 119,520.00
Kepala tukang L.03 OH 0.0150 132,800.00
Mandor L.04 OH 0.0008 166,000.00
JUMLAH
B BAHAN TENAGA
Kaca tebal 3 mm M2 KERJA 1.1000 101,830.00
Sealant Kg 0.0500 44,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.13. Pemasangan 1 m2 kaca tebal 5 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0150 106,240.36
Tukang kayu L.02 OH 0.1500 119,520.00
Kepala tukang L.03 OH 0.0150 132,800.00
Mandor L.04 OH 0.0008 166,000.00
JUMLAH
B BAHAN TENAGA
Kaca tebal 5 mm M2 KERJA 1.1000 145,130.00
Sealant Kg 0.0500 44,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.14. Pemasangan 1 m2 kaca tebal 8 mm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0170 106,240.36
Tukang kayu L.02 OH 0.1700 119,520.00
Kepala tukang L.03 OH 0.0170 132,800.00
Mandor L.04 OH 0.0009 166,000.00
JUMLAH
B BAHAN TENAGA
Kaca tebal 8 mm M2 KERJA 1.1000 240,000.00
Sealant Kg 0.0700 44,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.15. Pemasangan 1 m2 kaca cermin tebal 5 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0150 106,240.36
Tukang kayu L.02 OH 0.1500 119,520.00
Kepala tukang L.03 OH 0.0150 132,800.00
Mandor L.04 OH 0.0080 166,000.00
JUMLAH
B BAHAN TENAGA
Kaca cermin 5 mm M2 KERJA 1.1000 275,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.16. Pemasangan 1 Set Gerendel Expagnolet


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0150 106,240.36
Tukang kayu L.02 OH 0.1500 119,520.00
Kepala tukang L.03 OH 0.0150 132,800.00
Mandor L.04 OH 0.0008 166,000.00
JUMLAH
B BAHAN TENAGA
Gerendel Expagnolet Bh KERJA 2.0000 75,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)

1,062.40
59,760.00
6,640.00
830.00
68,292.40

110,730.00
110,730.00

179,022.40
17,902.24
196,924.64

Jumlah Harga
(Rp)

531.20
59,760.00
6,640.00
498.00
67,429.20

100,000.00
100,000.00

167,429.20
16,742.92
184,172.12

Jumlah Harga
(Rp)

1,593.61
17,928.00
1,992.00
132.80
21,646.41

84,460.00
84,460.00

106,106.41
10,610.64
116,717.05
Jumlah Harga
(Rp)

1,062.40
11,952.00
1,328.00
83.00
14,425.40

49,500.00
49,500.00

63,925.40
6,392.54
70,317.94

Jumlah Harga
(Rp)

10,624.04
23,904.00
2,656.00
83.00
37,267.04

35,000.00
35,000.00

72,267.04
7,226.70
79,493.74

Jumlah Harga
(Rp)

1,593.61
17,928.00
1,992.00
1,328.00
22,841.61

28,850.00
28,850.00

51,691.61
5,169.16
56,860.77
Jumlah Harga
(Rp)

1,593.61
17,928.00
1,992.00
1,328.00
22,841.61

35,000.00
35,000.00

57,841.61
5,784.16
63,625.77

Jumlah Harga
(Rp)

5,312.02
59,760.00
6,640.00
498.00
72,210.02

247,500.00
247,500.00

319,710.02
31,971.00
351,681.02

Jumlah Harga
(Rp)

2,124.81
23,904.00
2,656.00
166.00
28,850.81

100,000.00
100,000.00

128,850.81
12,885.08
141,735.89
Jumlah Harga
(Rp)

5,312.02
59,760.00
6,640.00
498.00
72,210.02

40,000.00
40,000.00

112,210.02
11,221.00
123,431.02

Jumlah Harga
(Rp)

1,062.40
11,952.00
1,328.00
830.00
15,172.40

77,670.00
77,670.00

92,842.40
9,284.24
102,126.64

Jumlah Harga
(Rp)

6,374.42
71,712.00
7,968.00
498.00
86,552.42

240,000.00
240,000.00

326,552.42
32,655.24
359,207.66
Jumlah Harga
(Rp)

1,593.61
17,928.00
1,992.00
132.80
21,646.41

112,013.00
2,200.00
114,213.00

135,859.41
13,585.94
149,445.35

Jumlah Harga
(Rp)

1,593.61
17,928.00
1,992.00
132.80
21,646.41

159,643.00
2,200.00
161,843.00

183,489.41
18,348.94
201,838.35

Jumlah Harga
(Rp)

1,806.09
20,318.40
2,257.60
149.40
24,531.49

264,000.00
3,080.00
267,080.00

291,611.49
29,161.15
320,772.63
Jumlah Harga
(Rp)

1,593.61
17,928.00
1,992.00
1,328.00
22,841.61

302,500.00
302,500.00

325,341.61
32,534.16
357,875.77

Jumlah Harga
(Rp)

1,593.61
17,928.00
1,992.00
132.80
21,646.41

150,000.00
150,000.00

171,646.41
17,164.64
188,811.05
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1500 106,240.36
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Soda api Kg KERJA 0.0500 22,300.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1500 106,240.36
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Sabun Kg KERJA 0.0500 -
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.3. 1 m2 Pengerokan karat pada permukaan baja cara manual


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1500 106,240.36
Mandor L.04 OH 0.0080 166,000.00
JUMLAH
B BAHAN TENAGA
Sabun Kg KERJA 0.0500 -
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0700 106,240.36
Tukang cat L.02 OH 0.0090 119,520.00
Kepala tukang L.03 OH 0.0060 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Cat menie Kg KERJA 0.2000 40,700.00
Plamuur Kg 0.1500 23,580.00
Cat dasar Kg 0.1700 30,600.00
Cat penutup Kg 0.2600 65,440.00
Kuas buah 0.0100 19,440.00
Pengencer Kg 0.0300 37,350.00
Ampelas Lbr 0.2000 4,930.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
D Jumlah (A+B+C) HARGA ALAT
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0700 106,240.36
Tukang cat L.02 OH 0.1050 119,520.00
Kepala tukang L.03 OH 0.0040 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Cat menie Kg KERJA 0.2000 40,700.00
Plamuur Kg 0.1500 23,580.00
Cat dasar Kg 0.1700 30,600.00
Cat penutup Kg 0.3500 65,440.00
Kuas buah 0.0100 19,440.00
Pengencer Kg 0.0300 37,350.00
Ampelas Lbr 0.2000 4,930.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
D Jumlah (A+B+C) HARGA ALAT
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0400 106,240.36
Tukang cat L.02 OH 0.0630 119,520.00
Kepala tukang L.03 OH 0.0630 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Teak oil L KERJA 0.3600 52,950.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0400 106,240.36
Tukang cat L.02 OH 0.0600 119,520.00
Kepala tukang L.03 OH 0.0160 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Politur L KERJA 0.1500 77,370.00
Politur jadi L 0.3720 77,370.00
Ampelas Lbr 2.0000 4,930.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan vernis


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1600 106,240.36
Tukang cat L.02 OH 0.1600 119,520.00
Kepala tukang L.03 OH 0.0160 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Vernis L KERJA 0.1500 73,330.00
Dempul Kg 0.0500 47,150.00
Ampelas Lbr 0.1000 4,930.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.9. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0200 106,240.36
Tukang cat L.02 OH 0.0630 119,520.00
Kepala tukang L.03 OH 0.0063 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Plamuur Kg KERJA 0.1000 23,580.00
Cat dasar Kg 0.1000 30,600.00
Cat penutup Kg 0.2600 27,600.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.10. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0280 106,240.36
Tukang cat L.02 OH 0.0420 119,520.00
Kepala tukang L.03 OH 0.0042 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Cat dasar Kg KERJA 0.1200 30,600.00
Cat penutup Kg 0.1800 27,600.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.11. Pengecatan 1 m2 permukaan baja dengan menie besi


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0200 106,240.36
Tukang cat L.02 OH 0.2000 119,520.00
Kepala tukang L.03 OH 0.0200 132,800.00
Mandor L.04 OH 0.0025 166,000.00
JUMLAH
B BAHAN TENAGA
Menie besi Kg KERJA 0.1000 37,840.00
Kwas Buah 0.0100 6,270.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.12. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.2500 106,240.36
Tukang cat L.02 OH 0.2250 119,520.00
Kepala tukang L.03 OH 0.0225 132,800.00
Mandor L.04 OH 0.0075 166,000.00
JUMLAH
B BAHAN TENAGA
Menie besi Kg KERJA 0.1000 37,840.00
Pengencer 0.0100 37,350.00
Kwas 0.0100 6,270.00
Perancah kayu Buah 0.0020 393,064.84
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)

15,936.05
498.00
16,434.05

1,115.00
1,115.00

17,549.05
1,754.91
19,303.96

Jumlah Harga
(Rp)

15,936.05
498.00
16,434.05

-
-

16,434.05
1,643.41
18,077.46

Jumlah Harga
(Rp)

15,936.05
1,328.00
17,264.05

-
-

17,264.05
1,726.41
18,990.46
Jumlah Harga
(Rp)

7,436.83
1,075.68
796.80
498.00
9,807.31

8,140.00
3,537.00
5,202.00
17,014.40
194.40
1,120.50
986.00
36,194.30

46,001.61
4,600.16
50,601.77

Jumlah Harga
(Rp)

7,436.83
12,549.60
531.20
498.00
21,015.63

8,140.00
3,537.00
5,202.00
22,904.00
194.40
1,120.50
986.00
42,083.90

63,099.53
6,309.95
69,409.48

Jumlah Harga
(Rp)

4,249.61
7,529.76
8,366.40
498.00
20,643.77

19,062.00
19,062.00
39,705.77
3,970.58
43,676.35
Jumlah Harga
(Rp)

4,249.61
7,171.20
2,124.80
498.00
14,043.61

11,605.50
28,781.64
9,860.00
50,247.14

64,290.75
6,429.08
70,719.83

Jumlah Harga
(Rp)

16,998.46
19,123.20
2,124.80
498.00
38,744.46

10,999.50
2,357.50
493.00
13,850.00

52,594.46
5,259.45
57,853.90

Jumlah Harga
(Rp)

2,124.81
7,529.76
836.64
498.00
10,989.21

2,358.00
3,060.00
7,176.00
12,594.00

23,583.21
2,358.32
25,941.53
Jumlah Harga
(Rp)

2,974.73
5,019.84
557.76
498.00
9,050.33

3,672.00
4,968.00
8,640.00

17,690.33
1,769.03
19,459.36

Jumlah Harga
(Rp)

2,124.81
23,904.00
2,656.00
415.00
29,099.81

3,784.00
62.70
3,846.70

32,946.51
3,294.65
36,241.16

Jumlah Harga
(Rp)

26,560.09
26,892.00
2,988.00
1,245.00
57,685.09

3,784.00
373.50
62.70
786.13
5,006.33

62,691.42
6,269.14
68,960.56
A.5.3.1 HARGA SATUAN PEKERJAAN STYLE BALI
A.5.3.1 1. Pemasangan 1 M2 Pas. Style Bali Paras Bata
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA KERJA
Upah Pasang M2 1.0000 300,000.00
JUMLAH
B BAHAN TENAGA
Paras Ornamen Bh KERJA 9.0000 106,490.00
Bata Gosok Bh 50.0000 2,500.00
Semen PC Kg 32.0000 1,320.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.5.3.1 2. Pemasangan 1 M2 Pas. Style Bali Batu Candi


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA KERJA
Upah Pasang M2 1.0000 300,000.00
JUMLAH
B BAHAN TENAGA
Batu Candi tebal 5 cm M2 KERJA 1.1000 243,000.00
Semen PC Kg 32.0000 1,320.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.5.3.1 3. Pemasangan 1 M2 Pas. Style Bali Batu Hitam Karangasem


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA KERJA
Upah Pasang M2 1.0000 300,000.00
JUMLAH
B BAHAN TENAGA
Batu Hitam Karangasem M2 KERJA 1.1000 1,225,000.00
Semen PC Kg 32.0000 1,320.00
JUMLAH
C PERALATAN HARGA BAHAN
Alat Bantu Ls 1.0000 50,000.00
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.5.3.1 4. Pemasangan 1 M2 Pas. Style Bali Keramik
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA KERJA
Upah Pasang M2 1.0000 300,000.00
JUMLAH
B BAHAN TENAGA
Ubin keramik Homogeneus Tile 60x60 cm Bh KERJA 3.0500 147,000.00
Semen Portland Kg 9.3000 1,320.00
Pasir pasang M3 0.0180 245,810.00
Semen warna Kg 1.9400 16,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.5.3.1 5. Pemasangan 1 Bh Pasang Saka Jati Ukir


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA KERJA
Upah Pasang Ls 1.0000 150,000.00
JUMLAH
B BAHAN TENAGA
Saka Kayu Jati Ukir Bh KERJA 1.0000 1,650,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.5.3.1 6. Pemasangan 1 Bh Pasang Kencut Saka


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA KERJA
Upah Pasang Ls 1.0000 25,000.00
JUMLAH
B BAHAN TENAGA
Kencut Saka Bh KERJA 1.0000 250,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.5.3.1 7. Pemasangan 1 Pasang Cangah Wang


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA KERJA
Upah Pasang Ls 1.0000 50,000.00
JUMLAH
B BAHAN TENAGA
Cangah Wang Psg KERJA 1.0000 350,000.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.5.3.1 8. Pemasangan 1 M' Pementang kayu jati ukir
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA KERJA
Upah Pasang Ls 1.0000 200,000.00
JUMLAH
B BAHAN TENAGA
Pementang Kayu Jati ukir 10 x 20 cm M KERJA 1.0000 1,950,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.5.3.1 9. Pemasangan 1 M' dedeleg kayu jati ukir


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA KERJA
Upah Pasang Ls 1.0000 100,000.00
JUMLAH
B BAHAN TENAGA
Dedeleg Kayu Jati ukir M KERJA 1.0000 1,275,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.5.3.1 10. Pemasangan 1 M' Ring-ring Ukir


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0500 106,240.36
Tukang kayu L.02 OH 0.0500 119,520.00
Kepala tukang L.03 OH 0.0050 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Ring-ring ukir m KERJA 1.0500 663,330.00
Paku List kg 0.0100 22,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.5.3.1 11. Pemasangan 1 Ps Tapel Ring-ring Ukir
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0500 106,240.36
Tukang kayu L.02 OH 0.0500 119,520.00
Kepala tukang L.03 OH 0.0050 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Tapel Ring-ring ukir Psg KERJA 1.0000 50,000.00
Paku List kg 0.0100 22,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.5.3.1 12. Pemasangan 1 M' Ukiran Penyambung Tapel Lis Plang/Ris


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0500 106,240.36
Tukang kayu L.02 OH 0.0500 119,520.00
Kepala tukang L.03 OH 0.0050 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Ukiran Penyambung Tapel Lis Plang/Ris m KERJA 1.0500 135,500.00
Paku List kg 0.0100 22,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

A.5.3.1 13. Pemasangan 1 Set Tapel Lis Plang/Ris


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Upah Pasang Ls 1.0000 100,000.00
JUMLAH
B BAHAN TENAGA
Tapel Lis Plang/Ris Set KERJA 1.0000 250,000.00
Paku List kg 0.0100 22,000.00
JUMLAH
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

2 1
Pasan
A.
gUPA
Pek. 1 Ls Upah Pasang 25,000,000.0000 ###
Gapur
H
a
B.
BAH 811.48275862069 Bj Paras exs. 40,000.0000 32,459,310.34
AN 30 Zak Bonbiu50
Semen 62,500.0000 1,875,000.00
58x18x5
Kg/sakcn Total : ### 34,334,310.34
Overh
ead &
Harga
Profit
Satua
10
n %
Pekerj
aan
Jumlah Harga
(Rp)

300,000.00
300,000.00

958,410.00
125,000.00
42,240.00
1,125,650.00

1,425,650.00
142,565.00
1,568,215.00

Jumlah Harga
(Rp)

300,000.00
300,000.00

267,300.00
42,240.00
309,540.00

609,540.00
60,954.00
670,494.00

Jumlah Harga
(Rp)

300,000.00
300,000.00

1,347,500.00
42,240.00
1,389,740.00

50,000.00
50,000.00

1,739,740.00
173,974.00
1,913,714.00
Jumlah Harga
(Rp)

300,000.00
300,000.00

448,350.00
12,276.00
4,424.58
31,040.00
496,090.58

796,090.58
79,609.06
875,699.64

Jumlah Harga
(Rp)

150,000.00
150,000.00

1,650,000.00
1,650,000.00

1,800,000.00
180,000.00
1,980,000.00

Jumlah Harga
(Rp)

25,000.00
25,000.00

250,000.00
250,000.00

275,000.00
27,500.00
302,500.00

Jumlah Harga
(Rp)

50,000.00
50,000.00

350,000.00
350,000.00
-

400,000.00
40,000.00
440,000.00
Jumlah Harga
(Rp)

200,000.00
200,000.00

1,950,000.00
1,950,000.00

2,150,000.00
215,000.00
2,365,000.00

Jumlah Harga
(Rp)

100,000.00
100,000.00

1,275,000.00
1,275,000.00

1,375,000.00
137,500.00
1,512,500.00

Jumlah Harga
(Rp)

5,312.02
5,976.00
664.00
498.00
12,450.02

696,496.50
220.00
696,716.50

709,166.52
70,916.65
780,083.17
Jumlah Harga
(Rp)

5,312.02
5,976.00
664.00
498.00
12,450.02

50,000.00
220.00
50,220.00

62,670.02
6,267.00
68,937.02

Jumlah Harga
(Rp)

5,312.02
5,976.00
664.00
498.00
12,450.02

142,275.00
220.00
142,495.00

154,945.02
15,494.50
170,439.52

Jumlah Harga
(Rp)

100,000.00
100,000.00

250,000.00
220.00
250,220.00

350,220.00
35,022.00
385,242.00
59,334,310.34
5,933,431.03
65,267,741.38
### 1 Pasang Pek. Gapura paras tinggi 5.00 m'
A. UPAH
1.0000 Ls Upah Pasang 25,000,000.00 25,000,000.00
B. BAHAN
- Bj Paras exs. Bonbiu 58x18x5 cn - -
30.0000 Zak Semen 50 Kg/sak - -
Total : 25,000,000.00 - 25,000,000.00
Overhead & Profit 10 % 2,500,000.00
Harga Satuan Pekerjaan 27,500,000.00

2 1 Pasang Pek. Gapura paras tinggi 5.00 m'


A. UPAH
1 Ls Upah Pasang 40,000,000 40,000,000
B. BAHAN
1,000 Bj Paras exs. Bonbiu 58x18x5 cn 50,000 50,000,000
40 Zak Semen 50 Kg/sak 62,500 2,500,000
Total : 40,000,000 52,500,000 92,500,000
Overhead & Profit 10 %
Harga Satuan Pekerjaan 92,500,000
ANALISA PENANGKAL PETIR

1 Unit Pemasangan Penangkal Petir


A UPAH
2 Ls Labor cost 75,000 150,000

B BAHAN
2 Bh Stik penerima / blacksem 2m' 65,000
1 Bh Reduser galvanis 3/4" - 1" 9,000
3 M' Pipa Galvanis 1" 56,300
1 Ls Material Bantu 25,000
II. Pek. Instalasi Kabel Penangkar Petir
A UPAH
2 Ls Labor cost 75,000 150,000

B BAHAN
24 Ml Kabel BC 70 mm2 90,000
24 Ml Pipa Conduit high impact 3/4" 9,500
8 Bh Sok/Klem conduit 20 mm 750
1 Ls Material bantu 35,000
II. Pek. Grounding
A UPAH
1 Ls Labor cost 700,000 700,000

B BAHAN
6.6 Ml Kabel BC 70 mm2 90,000
6.6 Ml Pipa Conduit high impact 3/4" 56,300
1 Ls Material bantu 100,000
TOTAL 1,000,000
Over head dan profit 10%
Harga Satua Penangkal petir
130,000
9,000
168,900
25,000

2,160,000
228,000
6,000
35,000

594,000
371,580
100,000
3,827,480 4,827,480
482,748
5,310,228
A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA DI LUAR GEDUNG
A.8.4.1.1 (K3) Pemasangan 1 m pipa PVC 1/2 SNI S-10 SCJ
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 106,240.36 8,605.47
Tukang Pipa L.02 OH 0.0410 119,520.00 4,900.32
Mandor L.04 OH 0.0080 166,000.00 1,328.00
JUMLAH 14,833.79
B BAHAN TENAGA
Pipa PVC 1/2 SNI M' KERJA 1.0000 7,910.00 7,910.00
JUMLAH 7,910.00
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 22,743.79
E Overhead & Profit 10% x D 2,274.38
F Harga Satuan Pekerjaan (D+E) 25,018.17

A.8.4.1.1 (K3) Pemasangan 1 m pipa PVC 3/4 SNI S-10 SCJ


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 106,240.36 8,605.47
Tukang Pipa L.02 OH 0.0410 119,520.00 4,900.32
Mandor L.04 OH 0.0080 166,000.00 1,328.00
JUMLAH 14,833.79
B BAHAN TENAGA
Pipa PVC 3/4 SNI M' KERJA 1.0000 9,950.00 9,950.00
JUMLAH 9,950.00
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 24,783.79
E Overhead & Profit 10% x D 2,478.38
F Harga Satuan Pekerjaan (D+E) 27,262.17

A.8.4.1.1 (K3) Pemasangan 1 m pipa PVC 1 SNI S-10 SCJ


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 106,240.36 8,605.47
Tukang Pipa L.02 OH 0.0410 119,520.00 4,900.32
Mandor L.04 OH 0.0080 166,000.00 1,328.00
JUMLAH 14,833.79
B BAHAN TENAGA
Pipa PVC 1 SNI M' KERJA 1.0000 13,800.00 13,800.00
JUMLAH 13,800.00
C PERALATAN HARGA BAHAN

JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 28,633.79
E Overhead & Profit 10% x D 2,863.38
F Harga Satuan Pekerjaan (D+E) 31,497.17
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE VIBRATOR
2. Tenaga Pw 5.5 HP
3. Kapasitas Cp 25.0 -
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 4 Tahun W 4,000.0 Jam
c. Harga Alat B Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 0 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.31547 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 0.00 Rupiah
W

b. Asuransi, dll = 0.002 x B F 25.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 25.00 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (10%-12%) x Pw x Ms H 8,382.00 Rupiah

2. Pelumas = (0,25%-0,35%) x Pw x Mp I 571.53 Rupiah

Biaya bengkel (2,2% - 2,8%) x B J 275.00 Rupiah


W

3. Perawatan dan (6,4 % - 9 %) x B K 1,125.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 10,353.53 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 10,378.53 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 16,849.21 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,753.97 Rp./Jam
4. Bahan Bakar Bensin Mb 10,300.00 Liter
5. Bahan Bakar Solar Ms 12,700.00 Liter
6. Minyak Pelumas Mp 29,690.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
KONVERSI MUTU BETON
PBI 71 KONVERSI SNI ( fc ) Mpa
K 75 75*0,83/10 6.23 Mpa (75*9,81/100)*0,83 6.1
K 100 100*0,83/10 8.30 Mpa 100*(9,81/100)*0,83 8.1
K 175 175*0,83/10 14.53 Mpa 175*(9,81/100)*0,83 14.2
K 200 200*0,83/10 16.60 Mpa 200*(9,81/100)*0,83 16.3
K 225 225*0,83/10 18.68 Mpa 225*(9,81/100)*0,83 18.3
K 250 250*0,83/10 20.75 Mpa 250*(9,81/100)*0,83 20.4
K 275 275*0,83/10 22.83 Mpa 275*(9,81/100)*0,83 22.4
K 300 300*0,83/10 24.90 Mpa 300*(9,81/100)*0,83 24.4
K 350 350*0,83/10 29.05 Mpa 350*(9,81/100)*0,83 28.5
K 400 400*0,83/10 33.20 Mpa 400*(9,81/100)*0,83 32.6

SNI ( fc ) PBI ( K )
6.1 (6,1/0,83)*(100/9,81) K 75 75
7.4 (7,4/0,83)*(100/9,81) K 91 90
8.1 (8,1/0,83)*(100/9,81) K 99 100
9.8 (9,8/0,83)*(100/9,81) K 120 120
12.2 (12,2/0,83)*(100/9,81) K 150 150
14.5 (14,5/0,83)*(100/9,81) K 178 178
16.9 (16,9/0,83)*(100/9,81) K 208 208
19.3 (19,3/0,83)*(100/9,81) K 237 237
21.7 (21,7/0,83)*(100/9,81) K 267 267
24.43 (24,43/0,83)*(100/9,81) K 300 300
26.4 (26,4/0,83)*(100/9,81) K 324 324
28.8 (28,8/0,83)*(100/9,81) K 354 354
31.2 (31,2/0,83)*(100/9,81) K 383 383
32.6 (32,57/0,83)*(100/9,81) K 400 400