TAHUN 2021
1 2 3 4
1 2 3 4
59 Clear Gloss Kg 71,930.00
60 Closet duduk Toto CW 421J/SW420JP/TC505S set 2,193,300.00
61 Closet Jongkok toto CE 7 set 244,980.00
62 Door stoper solid ok Bh 77,670.00
63 Door closer solid ok Bh 247,500.00
64 Door holder solid ok Bh 40,000.00
65 Engsel Pintu solid ok Bh 84,460.00
66 Engsel jendela solid ok Bh 49,500.00
67 Engsel Nilon solid ok Bh 40,000.00
68 Engsel angin solid ok Bh 35,000.00
69 Expagnolet solid ok Bh 75,000.00
70 Fiber Glass (bak ) ok Bh 230,000.00
71 Floor Drain (Exs : Onda) ok Bh 108,350.00
72 Formite hilang Bh
73 Gedeg Klas I ok M2 35,000.00
74 Genteng pelentong kecil ( Exs : Pejaten) ok Biji 1,610.00
75 Genteng Kaca ok Biji 26,670.00
76 Genteng Plentong besar ok Biji 2,650.00
77 Genteng Beton ok Biji 8,880.00
78 Genteng Kodok(exs good year) ok Biji 5,170.00
78 Genteng Kodok(exs Lestari) ok Biji 2,430.00
79 Genteng glazur(exs : Mclass, KIA) ok Biji 12,000.00
80 Genteng Gemini (exs good year) ok Biji 6,400.00
81 Genteng Metal t = 0.25 mm berpasir ok Lbr 38,000.00
82 Genteng Metal t = 0.3 mm ok Lbr 36,000.00
83 Genteng Bubungan pelentong kecil ok Biji 4,000.00
84 Genteng Bubungan/Nok Beton ok Biji 25,000.00
85 Genteng Bubungan Plentong besar/super ok Biji 7,000.00
86 Genteng Bubungan kodok (exs. Good year) ok Biji 18,380.00
86 Genteng Bubungan kodok (exs. Lestari) ok Biji 10,250.00
87 Genteng Bubungan Glazur (Mclass, KIA) ok Biji 30,000.00
88 Glass Block ok Biji 26,800.00
89 Grendel ok Bh 28,850.00
90 Gypsum Elephant ok Lbr 61,250.00
91 Granit tile 60 x 60 Niro Granite Type White Swan GG 645 Ok Bh 181,970.00
92 Granit Plin 10 x 60 cm Ok Bh
93 Ijuk ok Kg 10,750.00
94 Kaca Bening 3 MM ok M2 101,830.00
95 Kaca Bening 5 MM ok M2 145,130.00
96 Kaca Bening 8 MM ok M2 240,000.00
97 Kaca Buram12 MM ok M2 440,000.00
98 Kaca Cermin 5 MM ok M2 275,000.00
99 Kaca Cermin 8 MM ok M2 335,000.00
100 Kaca Nako ok M2 150,000.00
101 Kaca Ryben 3 MM ok M2 117,500.00
102 Kaca Ryben 5 MM ok M2 141,830.00
103 Kaca Ryben 5 MM ok Ps 141,830.00
104 Karung Plastik ok Bh 3,500.00
105 Kawat Baja Bindrat ok Kg 19,560.00
106 Kawat Beton ok Kg 19,740.00
107 Kawat Berduri ok M1 23,490.00
108 Kawat jaring m2 20,000.00
109 Kayu Bingkirai Balok M3 10,300,000.00
110 Kayu Bingkirai Papan / Usuk / Reng M3 10,942,860.00
111 Kayu Jati Balok M3 11,000,000.00
112 Kayu Jati Papan M3 12,166,670.00
112 Kayu Jati Balok (perhutani) M3 10,000,000.00
112 Kayu Jati Papan (perhutani) M3
112 Kayu Kamper Balok ok M3 7,693,750.00
114 Kayu Kamper Papan/ Usuk / Reng ok M3 8,442,500.00
115 Kayu Kruing Balok ok M3 6,443,440.00
NO NAMA BARANG SATUAN HARGA 2021
1 2 3 4
116 Kayu Kruing Papan / Usuk / Reng ok M3 6,939,110.00
117 Kayu Meranti Balok ok M3 4,083,380.00
118 Kayu Meranti Papan / Usuk / Reng ok M3 4,825,600.00
119 Kayu Dolken (Pekerjaan Sementara) ok Btng 204,440.00
120 Kayu Merbau Balok ok M3 20,600,000.00
121 Kayu Merbau Papan ok M3 22,100,000.00
122 Kayu Terentang/Begesting ok M3 1,925,000.00
123 Kayu Albesia Balok ok M3 2,813,750.00
124 Kayu Albesia Papan / Usuk ok M3 2,827,140.00
125 Kayu Nangka Balok ok M3 5,833,330.00
126 Kayu Cempaka Balok ok M3 5,933,330.00
127 Kayu Profil (List) ok M1 12,500.00
128 Homogenius Tile (Ggranite Tile) 60cmx60cm warna (exs. Granito) Bh 147,000.00
129 Kaca Bening 3 MM ok Tambahkan produk lain dibawah Bh 101,830.00
129 Kaca Bening 8 MM ok Tambahkan produk lain dibawah Bh 240,000.00
130 Kaca Cermin 5 MM ok Tambahkan produk lain dibawah Doos 275,000.00
131 Kaca Nako ok Tambahkan produk lain dibawah Doos 150,000.00
132 Kaca Ryben 5 MM ok Tambahkan produk lain dibawah Doos 141,830.00
133 Kaca Tempered 12 mm ok Tambahkan produk lain dibawah Bh 603,750.00
134 Keramik 33 cm x 33 cm Polos ok Tambahkan produk lain dibawah Doos 102,500.00
135 Keramik 33 cm x 33 cm warna ok Tambahkan produk lain dibawah Doos 102,500.00
136 Keramik dinding 20 cm x 25 cm warna (exs: KIA) ok Tambahkan produk lain dibawah Doos 53,000.00
137 Keramik 20 cm x 20 cm tekstur ok Doos 52,000.00
138 Keramik 25 x 25 tekstur ok Doos 52,170.00
139 Kerawang /roster PC ok Bh 63,330.00
140 Kerikil Beton ok M3 259,290.00
141 Kuas besar ok Set 19,440.00
142 Kunci antik/ handle style Bali ok Bh 90,000.00
143 Kunci tanam ok Set 110,730.00
144 Kunci Slot ok Bh 100,000.00
145 Kuas kecil ok Bh 6,270.00
146 Keran Air Onda ok Bh 37,290.00
147 Lampu TL 20 Watt komplit philips Bh 123,900.00
148 Lampu TL 40 Watt komplit philips Bh 155,000.00
149 Lampu Pijar 40 Watt philips Bh 11,000.00
150 Keran / Ledang (exs : onda) ok Bh 36,240.00
151 Keran Sink (exs : onda) ok Bh 257,360.00
152 Keran wastafel (exs : onda) ok Bh 180,440.00
153 List Gypsum 7/7 ok M1 20,000.00
154 Lem Kayu ok Ltr 24,070.00
155 Lem Pipa ok Kg 87,020.00
156 Hollow Galvanis 40/40/0,4 mm ok m1
157 Minyak Olie Meditran S10W ok Meditran S10W Ltr 15,580.00
158 Minyak Bekisting Meditran S10W ok Meditran S10W Ltr 15,580.00
159 Murda 30 cm (paras cor) ok Bh
160 Murda 25 cm ok Bh 68,330.00
161 Murda 20 cm ok Bh 57,670.00
162 Melamic hilang Kg
163 Mortar siap pakai MU 400 kg 2,280.75
164 Paku List ok kg 22,000.00
165 Parquet kayu Shera ok M2 180,000.00
166 Paku 5 -12 cm ok Kg 18,450.00
167 Paku Seng ok Kg 38,240.00
168 Paku Skrup 1/2 ok bh 28,000.00
169 Paku Skrup 2" ok bh 300.00
170 Paku Skrup 3" ok Bh 900.00
171 Paku Skrup fisher S8 Bh 6,430.00
172 Paku 5 -12 cm ok Kg 18,450.00
173 Paku pancing 60 x 230 pakai di asbes (hilang) Kg 300.00
174 Pasir Beton ok M3 234,200.00
175 Pasir Pasang ok (Tambahkan pasir halus) M3 245,810.00
176 Pasir Urug ok M3 160,690.00
NO NAMA BARANG SATUAN HARGA 2021
1 2 3 4
177 Saluran Beton Pracetak Tipe U60/80X120 (K350) Gadar 10 To ok M2 1,216,380.00
178 Tutup Beton Pracetak Tipe U60X120 (K350) Gadar 10 Ton ok M2 540,600.00
179 Saluran Beton Pracetak Tipe U80/80X120 (K350) Gadar 10 To ok M2 1,527,350.00
180 Saluran Beton Pracetak Tipe U80/100X120 (K350) Gadar 10 T ok M2 1,837,510.00
181 Plamir Tembok Dulux Kg 23,580.00
182 Plywood 3 MM ok Lbr 54,670.00
183 Plywood 4 MM ok Lbr 57,130.00
184 Plywood 6 MM ok Lbr 70,280.00
185 Plywood 9 MM ok Lbr 103,570.00
186 Plywood 12 MM ok Lbr 140,580.00
187 Plywood 18 MM ok Lbr 235,390.00
188 Politure Propan ok Kg 77,370.00
189 Rel Pintu sorong ok M 240,000.00
190 Sanding ok Kg 68,460.00
191 Semen PC Gresik ok Kg 1,320.00
192 Semen warna/semen grouting( MU, Sika) ok Kg 16,000.00
193 Seng Bjls 0,32 ok Lbr 55,000.00
194 Seng plat 3" x 6" BJLS 28 ok Lbr 44,500.00
195 Seng plat (0,30 mm) 180 x 90 cm ok Lbr 49,500.00
196 Seng Gelombang 3" x 6" ok Lbr 52,500.00
197 Seseh Balok Dolken 3 m ok Bt 77,500.00
198 Seal tape ok Bh 5,260.00
199 Sealant Dextone 300ml ok Bh 44,000.00
200 SIrtu ok M3 141,290.00
201 Spandek (0,25x620x67)cm ok lbr 193,330.00
202 Trimdek warna (0,25x620x75)cm ok lbr 213,840.00
203 Trimdek biasa (0,25x620x75)cm ok lbr 208,750.00
204 Soda Api Ltr 22,300.00
205 Spring Knip spring knip/grendel Bh 28,850.00
206 Tali Ijuk kg 12,430.00
207 Tanah Timbun M3 121,670.00
208 Teak Oil Ltr 52,950.00
209 Teak wood 4 mm (120 x 240 cm) Lbr 108,730.00
210 Tegel PC 20 x 20 Cm polos hilang Bh
211 Tegel PC 20/20 Cm warna Bh
212 Thinner Polyurethane Propan Ltr 37,350.00
213 Genteng Bubungan pelentong kecil ok Biji 4,000.00
214 Genteng Metal t = 0.3 mm ok Biji 36,000.00
215 Genteng Metal t = 0.25 mm berpasir ok Biji 38,000.00
216 Urinoir exs. Toto u57 ok Bh 1,500,000.00
217 Vernis (exs : ultran, Imra) ok Kg 73,330.00
218 Wood Filer (exs. mowilek, ultran, impra) ok Kg 47,150.00
219 Washtafel Toto ok Bh 532,900.00
220 Waterdrain ok Bh 168,300.00
221 woodstain cek dengan wood filler Kg 72,500.00
222 Solar Industri ok Ltr 16,500.00
223 Saka Kamper ukir 11/11 cm tambahkan ukiran merbau & Cepaka Bh 950,000.00
224 Saka Bingkirai ukir 11/11 cm tambahkan ukiran merbau & Cepaka Bh 1,300,000.00
225 Saka Jati ukir11/11 cm tambahkan ukiran merbau & Cepaka/Cek har Bh 1,650,000.00
226 Pementang Kamper ukir 10 x 20 cm tambahkan ukiran merbau & Cepaka m1 1,800,000.00
227 Pementang Jati ukir 10 x 20 cm tambahkan ukiran merbau & Cepaka m1 1,950,000.00
228 Dedeleg Jati Ukir tambahkan ukiran merbau & Cepaka m1 1,275,000.00
229 Canggah wang Jati Ukir tambahkan ukiran merbau & Cepaka psg 350,000.00
230 Ring - ring ukir Kamper m1 663,330.00
231 Kencut Saka Bh 250,000.00
232 Ukiran Penyambung Tapel Lis Plang/Ris M1 135,500.00
233 Tapel Lis Plang/Ris Set 250,000.00
234 Tapel Ring - ring Bh 50,000.00
235 Dupak Saka Bh 75,000.00
236 Paras Ornamen (20 x 60 x 5 cm) cek spek baha (klas I&super) paras silakarang BH
237 Paduraksa batu hitam t = 1,5(cek tinggi dg harga) Unit 2,000,000.00
238 Bataran batu hitam cek harga (batu karangasem) m2 1,800,000.00
NO NAMA BARANG SATUAN HARGA 2021
1 2 3 4
239 Candi Bentar batu hitam t = 3,5 m Batu Hitam karangasem Unit 35,000,000.00
240 Candi Bentar paras bata t = 3,7 m Unit 40,000,000.00
241 Candi Bentar paras bata t = 2,5 m Unit 25,000,000.00
242 Paduraksa paras bata (lbr. kepala bag.tengah max 0.4 cm) Unit 2,500,000.00
243 Pipa Galvanis 1/2 " OK M1 23,420.00
244 Pipa Galvanis 3/4 " OK M1 30,530.00
245 Pipa Galvanis 1 " OK M1 43,360.00
246 Pipa Galvanis 1 1/2" OK M1 65,750.00
247 Pipa Galvanis 3" OK M1 148,560.00
248 Pipa Galvanis 4" OK M1 197,560.00
249 Clean Out dia 4" Stainless ok M1 105,000.00
250 Clean Out dia 3" PVC ok M1 12,000.00
251 Clean Out dia 3" Stainless ok M1 97,000.00
252 Stop Valve Besi dia 1/2" Toro ok M1 266,000.00
253 Stop Valve TX 277 SV1 ok M1
254 Gate Valve Besi dia 1" Toro ok M1 384,000.00
255 Gate Valve Besi dia 3/4" Toro ok M1 360,000.00
256 Pipa PVC tipe AW Ø 0,5" P = 4 m Maspion M1 8,600.00
257 Pipa PVC R-R OD dia OD 63 mm, S12,5 pakai langgeng M1 36,830.00
258 Pipa PVC R-R OD dia OD 75 mm, S12,5 pakai langgeng M1 57,600.00
259 Pipa PVC R-R OD dia OD 90 mm, S12,6 pakai langgeng M2 84,070.00
260 Pipa PVC R-R OD dia OD 110 mm, S12,7 pakai langgeng M3 119,510.00
261 Minyak Bekisting Meditran S10W Liter 15,580.00
BATU ALAM
261 Paras Abu-abu M2 106,490.00
262 Paras Kerobokan M2 59,380.00
263 Paras Kelating M2 80,000.00
264 Paras Jogja M2 225,830.00
265 Batu Palimanan M2 114,100.00
266 Batu Jogja M2 158,900.00
267 Batu Candi T = 2 cm M2 113,950.00
268 Batu Candi T = 3 cm M2 162,600.00
269 Batu Candi T = 5 cm M2 243,000.00
269 Batu Hitam Karangasem M2 1,225,000.00
270 Batu Andesite T = 2 cm M2 126,750.00
271 Batu Andesite T = 3 cm M2 253,330.00
272 Bata Press Pejaten T = 5cm Bh 6,300.00
273 Bata Press Pejaten T = 6cm Bh 6,400.00
274 Bata Pasang Bh 1,300.00
275 Batu Bata Gosok sidi 88 Bh 2,500.00
ELEKTRIKAL
NO NAMA BARANG SATUAN HARGA 2021
1 2 3 4
291 Kabel NYM 3 X 2,5 mm (exs. Eterna) ok m' 12,860.00
292 Kabel NYM 3 X 1,5 mm ok m' 10,650.00
293 Kabel NYM 2 X 2,5 mm ok m' 11,490.00
294 Kabel NYM 2 X 1,5 mm ok m' 8,050.00
295 Saklar Tunggal isi merek dan type Bh 16,500.00
296 Saklar Ganda isi merek dan type Bh 26,300.00
297 Stop Kontak isi merek dan type Bh 26,630.00
298 Stop Kontak Outdoor isi merek dan type Bh 42,980.00
299 Saklar Tunggal Outdoor isi merek dan type Bh 64,580.00
300 Saklar Ganda Outdoor isi merek dan type Bh 56,180.00
301 T Dus isi merek dan type (samakan merek diatas) Bh 6,420.00
302 Klem Kabel Cek harga> Bh 2,790.00
303 Pipa Listrik merek pipa m' 11,090.00
304 L Bow isi merek dan type Bh 3,200.00
305 Inbow Dus isi merek dan type Bh 5,440.00
306 Stop Kontak AC isi merek dan type Bh 60,730.00
307 MCB isi merek jika ada Unit 47,110.00
308 Isolasi bh 8,780.00
309 sock bh 1,700.00
310 M dus isi merek bh 3,380.00
311 Downlight 4 " isi merek bh 55,820.00
312 Lampu xl 18 watt isi merek bh 29,970.00
HOLLOW GALVANIS
308 Hollow Galvanis 35/35/0.6 mm ok M' 12,000.00
309 Hollow Galvanis 20/20/0.8 mm ok M' 10,000.00
310 Hollow Galvanis 60/60/1.0 mm ok M' 37,000.00
311 Spandek 0.25 mm silver ok M2 37,000.00
312 Spandek 0.25mm biru ok M2 37,250.00
HOLLOW ALLUMINIUM
313 Hollow Alluminium 40 x 40 mm tambah harga M 6,700.00
314 Hollow Alluminium 20 x 40 mm tambah harga M 5,500.00
PIPA GALVANIS
315 Pipa Galvanis 1/2 " M 23,420.00
316 Pipa Galvanis 3/4 " M 30,530.00
317 Pipa Galvanis 1 " M 43,360.00
318 Pipa Galvanis 1 1/4 " M
319 Pipa Galvanis 1 1/2" M 65,750.00
320 Pipa Galvanis 2" M
321 Pipa Galvanis 2 1/2" M
322 Pipa Galvanis 3" M 148,560.00
323 Pipa Galvanis 3" M 148,560.00
1 2 3 4
305 Downlight 4 " bh 55,820.00
306 Lampu xl 18 watt bh 29,970.00
307 Cat KCA Kg 34,280.00
308 Coumpond Kg 40,000.00
309 Box panel uk. 80x60x25 cm cek merek ok Bh 1,266,670.00
310 box panel 60x40x25 cm cek merek ok Bh 750,000.00
311 MCCB 3 phase 63 ampere ok Bh 522,500.00
312 MCCB 3 phase 40 ampere ok Bh 334,970.00
313 MCB 3 phase 25 ampere ok Bh 206,500.00
314 MCB 3 phase 16 ampere ok Bh 203,070.00
315 MCB 1 phase 6 ampere ok Bh 49,730.00
316 MCB 1 phase 10 ampere ok Bh 52,450.00
317 MCB 1 phase 16 ampere ok Bh 52,850.00
318 lampu pilot ok Bh 36,000.00
319 fuse ok Bh 10,000.00
320 rel MCB ok M1 25,000.00
321 busbar RST ok M1 90,750.00
322 busbar netral dan nol ok Bh 90,750.00
323 Grounding BC 70 mm2 ok M1 99,000.00
324 Splitzen 1' ok Bh 77,000.00
325 kabel NYY 4x16 mm2 ok M1
326 BC 16 mm2 ok M1 122,100.00
327 ITC 2x2x0,6 mm2 ok M1 20,350.00
328 Outlet Telepon ok Bh 38,500.00
329 Pesawat Telepon ok Bh 55,000.00
330 Celing Speaker ok Bh 192,500.00
331 Kabel Data UTP 6 ok M1 220,000.00
332 Outlet Data Bh 80,000.00
333 Kabel NYMHM 2X1,5mm M1 18,000.00
334 Jet Shower Bh
335 Angkur D 19 Bh 45,000.00
336 Baut M16 Bh 11,000.00
Pipa
Harga dari Vendor
1 2 3 4
361 Pipa PVC tipe AW Ø 2" Wavin ok M1 32,330.00
362 Pipa PVC tipe AW Ø 2 1/2" Wavin ok M1 46,670.00
363 Pipa PVC tipe AW Ø 3" Wavin ok M1 66,000.00
364 Pipa PVC tipe AW Ø 4" Wavin ok M1 108,330.00
365 Pipa PVC tipe AW Ø 5" Wavin ok M1 101,470.00
366 Pipa PVC tipe AW Ø 6" Wavin ok M1 155,670.00
367 Pipa PVC tipe AW Ø 12" Wavin ok M1
368 Pipa PVC tipe D Ø 1 1/4" Wavin ok M1 14,000.00
369 Pipa PVC tipe D Ø 1 1/2" Wavin ok M1 16,000.00
370 Pipa PVC tipe D Ø 2" Wavin ok M1 19,480.00
371 Pipa PVC tipe D Ø 2 1/2" Wavin ok M1 26,530.00
372 Pipa PVC tipe D Ø 3" Wavin ok M1 34,400.00
373 Pipa PVC tipe D Ø 4" Wavin ok M1 53,330.00
374 Pipa PVC tipe D Ø 12" Wavin ok M1
375 Lem pipa ok Kg 87,020.00
Vinilon
1 2 3 4
416 saka 11/11/200 kayu jati (kupak) bh 700,000.00
417 Canggah wang kayu jati (kupak) ps
418 Pementang kayu jati (kupak) m1
419 Papan petaka kayu kamper m1 1,275,000.00
420 sendi marmer bh 325,000.00
421 Apit-apit kayu profil m1 47,500.00
422 List kayu 3/5 profil m1 20,000.00
423 sika top seal kg 13,240.00
424 Genteng Karang pilang Bisma bh 4,770.00
HARGA SATUAN BAHAN KRITERIA KHUSUS TAHUN 2021
HARGA SATUAN
NO NAMA BARANG SATUAN
TAHUN 2021
1 2 3 4
CAT 57,540.00
1 Prime Coat AR-300 Propan Kg 475,880.00
2 Prime Coat EPG-4049 Propan Kg 21,490.00
3 Top Coat Decorshield DW-500 Propan Kg 89,200.00
4 Top Coat Decorlotus DLI-480 Propan Kg 68,600.00
5 Cat Exterior Propan Decorsheild litter 94,640.00
6 Politure Propan litter 77,370.00
7 Propan Cat Dasar Alkali Resisting Interior Litter 43,460.00
8 Propan Cat Plafon Interior kg 48,240.00
9 Cat Interior Propan litter 65,600.00
12 Cat Propan Eco Gypsum Primer EPG-4049 L 21,490.00
13 Top Coat Eco EE-4010 Propan Kg 52,890.00
14 Primer Fiberkote FPS-820 Propan Kg 114,550.00
15 Top Coat Fiberkote FBK-889 (color) Kg 156,870.00
16 Coating Batu alam Merk Propan Kg 98,800.00
17 Coating Batu Propan Stone Care SC - 80SB m' 88,560.00
18 Drymix Plester kg 1,680.00
19 Drymix Acian kg 2,530.00
20 Propan Polyfloor PFP-241 m2 95,850.00
21 Propan Polyfloor PFT-253 3K m2 58,500.00
22 Propan Polyfloor PFT-253 2K m2 105,930.00
23 Cat Zincromate kg 57,500.00
PAKU
1 Paku tembak f 20 mm Box 43,520.00
2 Paku tembak f 30 mm Box 52,050.00
3 Skrup kg 51,670.00
5 Baut M16 bh 11,000.00
6 BAUT HTB Dia.16 bh 6,000.00
7 BAUT HTB Dia.12 bh 7,000.00
LEM
1 Lem Putih kg 18,360.00
2 Lem Kuning Fox kg 38,180.00
3 Lem Aica Aibond kg 55,000.00
4 Lem Rajawali kg 42,840.00
BATU ALAM
1 Batu Cobble Andesit Flamed 20 x 20 x 5 cm M2 435,000.00
2 Batu Cobble Andesit Flamed 10 x 10 x 5 cm M2 310,000.00
3 Batu Andesit 30 x 30 x 3 cm (Black Absolute Flamed) m2 330,000.00
4 Batu Palimanan 30 x 30 t 1,5 cm m2 86,890.00
BETON
1 Beton Ready Mix K 100 m3 705,000.00
2 Beton Ready Mix K 125 m3 728,750.00
3 Beton Ready Mix K 175 m3 773,750.00
4 Beton Ready Mix K 225 m3 827,500.00
5 Beton Ready Mix K 250 m3 866,250.00
6 Beton Readymix K 300 m3 915,000.00
7 Tiang Pancang Prestress Mutu Beton K-450 m1
8 Plat Sambung Tbl. 6mm Angker 4D13mm titik
PIPA
3 Pipa PVC AW dia 8" Maspion M1 301,480.00
4 Pipa PPR-PN 10 dia 3/4" Toro m1 71,510.00
5 Pipa PPR-PN 10 dia 1" Toro m1 46,450.00
6 Pipa PPR-PN 10 dia 1-1/2" Toro m1 59,620.00
7 Pipa PPR-PN 10 dia 1-1/4" Toro m1 47,010.00
8 Pipa PPR-PN 10 dia 2" Toro m1 107,010.00
9 Pipa PPR-PN 10 dia 2 1/2" Toro m1 167,740.00
10 Pipa Magnaplast dia 50 mm pj. 3 m ljr
11 Pipa Magnaplast dia 75 mm pj. 3 m ljr
12 Pipa Magnaplast dia 110 mm pj. 3 m ljr
13 Pipa Magnaplast dia 125 mm pj. 3 m ljr
14 Pipa Magnaplast dia 160 mm pj. 3 m ljr
15 Roof Drain dia.150 mm Bh
16 Clean Out dia 4" PVC Bh 28,500.00
17 Clean Out dia 4" Stainless Bh 105,000.00
18 Clean Out dia 3" PVC Bh 12,000.00
19 Clean Out dia 3" Stainless Bh 97,000.00
20 Stop Valve Besi dia 1/2" Toro Bh 266,000.00
22 Gate Valve Besi dia 1" Toro Bh 384,000.00
23 Gate Valve Besi dia 3/4" Toro Bh 360,000.00
24 Body LW 103 JT1 W/F White Bh
25 Lavatory Faucet T 205 QN (Cold only) Bh
26 P-Trap TX 709 AV4N Bh
27 Stop Valve TX 277 S Bh
28 Body LW 647 CJ W/F White Bh
29 Lavatory Faucet TX 115 LRS Bh
30 P-Trap THX 1A-5N Bh
31 Stop Valve TX 277 SV1 Bh
SANITAIR
1 Closet Duduk Toto Type CW 896 JP White Comp Unit 5,391,500.00
2 Closet CW 425JW : Children Toilet Unit 8,090,000.00
3 Urinal Partition A 100 white Bh 1,112,800.00
6 Floor Drain TX 1 BN Bh 287,950.00
8 Mixing Shower TX 443 SRS Bh 1,010,000.00
9 Head Shower TX 465 SEN Bh 1,170,000.00
10 Kran air 1/2" atau 3/4" merk Onda Bh 35,510.00
11 Kran Dapur/Angsa merk Toto type TX609K Bh 72,300.00
15 Urinoir Toto Type U57/T60P Unit 2,144,950.00
19 Closet duduk Toto CW 421J/SW420JP/TC505S Unit 2,193,300.00
Closet duduk Toto Type SUPERIOR C436N/TX436C1-2WS 5,330,000.00
20 Unit
21 Closet Duduk Toto Type C51 T150NL Unit 2,873,000.00
26 One Piece Toilet Bh 3,060,600.00
31 Jet Washer (White) Bh 194,950.00
32 TP 1006 Angle Valve Bh 54,000.00
33 Lineare Two-hole basin mixer M-Size Bh
34 Single-lever mixer 1/2", universal concealed body Bh
35 AMSTAD Bh
36 Waste fitting Bh
37 Trap Bh
38 Euphoria System 260 Shower system with thermostat for wall mounting Bh
39 Allure Three-hole basin mixer 1/2" M-Size Bh
40 Two-handle basin mixer concealed body,1/2" Bh
41 Eurostyle Vessel basin 50 Bh
42 Grohtherm SmartControl Perfect shower set with Rainshower 310 SmartActive Bh
43 Zenistone Floor Standing Tub Round Bh
44 Allure Single-lever bath mixer 1/2", floor mounted Bh
45 Rough-in set ½" Bh
46 Winston Deck Mount Kitchen Bh
47 IN 305 Flexible Hose 50cm Bh
48 Stop Valve A4400 Bh 46,400.00
51 Plat Baja 0,3 mm M2 275,000.00
55 Sekrup Pas. Baja Ringan pcs 180.00
59 Floor Drain Type TX1BN Unit 287,950.00
60 Paper Holder Type TX720ACR Unit 266,600.00
61 Grab Bar Toto Type TX3A2 Unit 553,150.00
63 Shower Toto Type TX420SPN Unit 468,650.00
64 Shower Toto TX492SRS Unit 4,128,970.00
66 Tempat Sabun Toto Type TS125R Unit 57,900.00
68 Jet Washer Toto Type THX20MCRB Unit 205,870.00
MEP
27 Kabel BC 25 mm M1 36,020.00
28 Kabel BC 6 mm M1 12,900.00
29 Kabel NYYHY 2 x 1,5 mm2 M1 11,120.00
30 Kabel NYYHY 2 x 2,5 mm2 M1 9,440.00
31 Kabel NYYHY 2 x 4 Sqmm + HIC 20mm M1 23,000.00
32 Kabel NYMHY 3 x 2,5 mm2 M1 16,200.00
33 Kabel NYYHY 2 x 4 mm2 M1 26,370.00
34 Kabel NYY 4 x 4 mm2 M1 33,600.00
35 Kabel NYY 4x50 mm2 +1E M1 286,000.00
36 Kabel NYY 4x35 mm2 +1E M1 215,200.00
37 Kabel NYY 4x25 mm2 +1E M1 141,500.00
38 Kabel NYFGbY 4x240 mm2 M1 1,453,600.00
39 Kabel NYFGbY 4x35 mm M1 231,200.00
40 Kabel NYFGbY 4x16 mm M1 115,600.00
41 Kabel NYFGbY 4x6 mm M1 68,960.00
42 Kabel NYFGbY 3x6 mm M1 56,320.00
43 Kabel NYFGbY 3x4 mm M1 42,560.00
44 Kabel NYFGbY 3x2.5 mm M1 31,040.00
45 Kabel Data Cat 6 M1 8,000.00
46 Pipa Clipsal 20 mm warna hitam m1 9,420.00
47 Tee Clipsal 20 mm warna hitam Bh 3,900.00
48 Klem Clipsal 20 mm warna hitam Bj 1,400.00
49 Sock Clipsal 20 warna hitam Bh 800.00
50 Fisher Bh 330.00
51 PVC Conduit 20 mm m 6,220.00
52 Saklar Tukar Bh 275,000.00
53 Exhaust Fan Axial Inline type Kap.100 CPM Panasonic Bh 355,200.00
unit
Lampu Down Light Saka 501 2 Kaki Adjustable 5" White
240,000.00
Komponen Philips (LED Bulb 10-85 W E27 6500 K/3000K
54
unit
Lampu Down Light Saka 501 2 Kaki Adjustable 3" White
190,000.00
Komponen Philips (LED Bulb 10-85 W E27 6500 K/3000K
55
Lampu Eseential LED Tube 600 mm 8 W/865 T8 AP I G, unit
Philips (RMI Platinium setara SAKA Powder Coating 2 x 18 W 840,000.00
56 Fitting BJB)
57 Lampu LED 12 volt 36 w ( RGB light ) unit 44,000.00
58 Lampu Lantai Water Proof LED 10 Watt/220 Volt unit 56,000.00
unit
Lampu Tangga Tanam ukuran 24 x 10 x 8,3 Cm LED 5 Watt 160,000.00
60
unit
Lampu Tangga Tanam ukuran 24 x 10 x 8,3 Cm LED 5 Watt 160,000.00
61
Lampu Spot kotak LED 50 watt/220 volt IP 66 Water Proof unit
214,950.00
63 warm white
Lampu Spot kotak LED 100 watt/220 volt IP 66 Water Proof unit
307,450.00
64 warm white
67 Lampu Kolam Underwater 10 W ( Kolam Depan ) unit 175,000.00
70 Lampu Spot Tancap Taman 6 Watt LED unit 77,500.00
131 Ground Tank Kapasitas 30 m3 Produksi Sam Tung unit 109,300,000.00
132 Ground Tank Kapasitas 12 m3 Produksi Sam Tung unit 60,175,000.00
133 Ground Tank Kapasitas 2 m3 Produksi Sam Tung unit 10,925,000.00
134 STP Tank System Kapasitas 5 m3 Produksi Sam Tung unit 42,600,000.00
135 STP Type: BCR-140 Unit 82,800,000.00
136 Bioseptic Tank, Kap 0,8 m3/hari Unit 5,850,000.00
137 AC New Smile Inverter STKC50TV 2 PK Daikin Unit 10,950,000.00
138 AC New Smile Inverter STKC35TV 1,5 PK Daikin Unit 7,200,000.00
139 AC New Smile Inverter STKC20TV 3/4 PK Daikin Unit 5,380,000.00
140 AC New Smile Inverter STKC15TV 1/2 PK Daikin Unit 5,150,000.00
LANGIT-LANGIT / PLAFOND
142 Gypsum Jayaboard Sheetrock 9mm Lbr 60,000.00
144 Kalsiboard 4,5 mm Lbr 70,000.00
145 List Gypsum 7/7 M1 20,000.00
150 Smart Drain - Square Drain Bh 302,450.00
152 Shower-TX488SM; Toto Bh 135,000.00
153 Keran Shower Bh 129,580.00
Tutup Beton Pracetak Tipe U60X120 (K350) Gadar 10 Ton pcs 540,600.00
7
8 Frame Manhole 800x800 (K350) pcs 756,370.00
9 Buis Beton 25 x 75 Cm pcs 69,500.00
10 Bak Tangkapan Air (BTA) 42 x 37 x 40 tebal 8,5 cm pcs 473,220.00
Griil Besi Tangkapan Air (BTA) 63 x 51 cm (Gandar 20 T) pcs 1,873,080.00
11
12 SECURITY BOLT SC-5072 pcs 290,000.00
Spider Fitting SUS 316, SP-2001 Kaki 1 (Konektor Kaca) pcs
13
14 Daun Pintu Duma Door WPC BB Khusus pcs
DINDING
3 Jendela Nako Kaca Bening + Tralis set 350,000.00
4 Jendela naco set 300,000.00
LAIN-LAIN
1 Ijuk m3 10,750.00
4 Pagar BRC T.120 diameter 6mm m' 402,500.00
13 Koral Pipih Zak 216,670.00
18 Engsel set 41,630.00
19 Kunci Slot pcs 100,000.00
34 Roll Bh 31,640.00
35 Kapi Bh 6,040.00
40 Glass Block bh 26,800.00
42 Kaca Akrilik marga cipta inklud pasang t 2mm putih susu m2 505,000.00
43 Akrilik 2mm putih m2 209,500.00
44 Akrilik 5mm bening m2 480,000.00
DAFTAR HARGA SATUAN UPAH TAHUN 2021
1,94 - 2,02
2,50 - 2,65
1,65 - 1,93
ENGINEERING ESTIMATE (EE)
KEGIATAN : PERENCANAAN TEKNIS III PEMBANGUNAN FASILITAS UMUM / FASILITAS IBADAH KECAMATAN SUKAWATI
PEKERJAAN : PEMBANGUNAN BALAI SERBA GUNA BANJAR ADAT KALAH DESA PAKRAMAN DELOD TUKAD, BANJAR KALAH DESA
BATUBULAN KECAMATAN SUKAWATI
LOKASI : DESA BATUBULAN KECAMATAN SUKAWATI GIANYAR
TAHUN ANGGARAN : 2020
TINGGI
PANJANG LEBAR
NO. URAIAN PEKERJAAN Hasil JUMLAH
Valume Sat. (m) (m)
(m)
1 2 3=4x5x6x7 4 5 6.00 7
I PEKERJAAN PERSIAPAN
1 Pek. Pembongkaran 1.00 ls
2 Pek. Pengukuran dan pas. bowplank 52.00 m1 52.00 52.00
(Jarak bowplank diambil 1 m dari as bangunan)
3 Pek. Pas. Papan nama proyek 1.00 bh
A PEKERJAAN LANTAI 1
2 Pek. Pasangan batu kali 1pc : 6ps 2.00 Panjang L. Rata2 Tinggi
IV PEKERJAAN BETON
1 Pek. Beton Poer (P1) 8.06 m3 8.06 1.20 X 1.20 X 0.35 X 16.00
Pek. Begesting batako pile cap P1 ( pas.batako) 41.60 m2 Panjang Lebar Tinggi Jmlh
41.60 5.20 X 0.50 X 16.00
2 Pek. Beton rabat bawah sloof cm (t = 5 cm) K 125 m3 Panjang Lebar Tinggi Jmlh
3 Pek. Beton rabat bawah pondasi pilecap (t = 5 cm) fc 7,4 Mpa 1.15 m3
bawah pond. Poer (P1) 1.15 1.20 X 1.20 X 0.05 X 16.00
4 Pek. Beton rabat lantai fc 9,8 Mpa 0.00 m3 0.00 8.60 X 7.50 X 0.06 X 0.00
0.00 8.60 X 6.00 X 0.06 X 0.00
Total 0.00 m3
Panjang
Berat Besi Jmlh Jmlh
Pek. Pembesian sloof 25/35 cm besi ulir Ts 40 322.09 kg Hasil Besi +
kg/m Batang Bentang
Overlap
TULANGAN POKOK 6d 13 322.09 kg
Grid A, B, C, D, E, dan F 140.72 7.50 X 1.042 X 6.00 X 3.00
Grid 1, 2, 3, 4 181.37 14.50 X 1.042 X 6.00 X 2.00
6 Pek. Beton kolom pedestal 25/25 cm fc 21,7 Mpa 1.65 m3 1.65 0.25 X 0.25 X 1.65 X 16.00
7 Pek. Beton kolom 25/25 cm fc 21,7 Mpa 4.45 m3 0.25 X 0.25 X 4.45 X 16.00
4.45
742.17 kg
222.04
Pek. Begesting kolom 25/25 cm K1 (2 x pakai) 34.08 m2 Panjang Lebar Tinggi Jmlh
68.16 1.20 X 3.55 X 16.00
68.16
Panjang
Berat Besi Jmlh Jmlh
Pek. Pembesian balok 10/25 cm BS besi ulir Ts 40 248.08 kg Hasil Besi +
kg/m Batang Bentang
Overlap
Pek. Begesting balok 15/25 cm (BS) dua kali pakai 15.33 m2 Panjang Lebar Tinggi Jmlh
Grid A, grid F Sisi Kanan Kiri 7.20 7.20 X 0.25 X 4.00
Sisi Bawah 2.88 7.20 X 0.20 X 2.00
Panjang
Berat Besi Jmlh Jmlh
Pek. Pembesian balok 20/30 cm B1 besi ulir Ts 40 506.22 kg Hasil Besi +
kg/m Batang Bentang
Overlap
Sengkang Tumpuan
Grid A, grid G 35.53
∅10 - 10
kg 0.90 X 0.617 X 32.00 X 2.00
Sengkang Lapangan
24.42
∅10 - 15
kg 0.90 0.617 X 22.00 X 2.00
Sengkang Tumpuan
Grid 1, grid 4 77.72
∅10 - 10
kg 0.90 X 0.617 X 70.00 X 2.00
Sengkang Lapangan
77.72
∅10 - 15
kg 0.90 0.617 X 70.00 X 2.00
Pek. Begesting balok 20/30 cm (B1) 36.00 m2 Panjang Lebar Tinggi Jmlh
Grid A, grid G Sisi Kanan Kiri 7.50 6.25 X 0.60 X 2.00
Sisi Bawah 3.75 6.25 X 0.30 X 2.00
Panjang
Berat Besi Jmlh Jmlh
Pek. Pembesian balok 20/30 cm B2 besi ulir Ts 40 200.80 kg Hasil Besi +
kg/m Batang Bentang
Overlap
Panjang
Berat Besi Jmlh Jmlh
Pek. Pembesian balok B3 besi ulir Ts 40 143.85 kg Hasil Besi +
kg/m Batang Bentang
Overlap
Panjang
Berat Besi Jmlh Jmlh
Pek. Pembesian balok BN 15/25 cm B8 besi ulir Ts 40 0.00 kg Hasil Besi +
kg/m Batang Bentang
Overlap
Pek. Begesting balok 15/25 cm (BN) 0.00 m2 Panjang Lebar Tinggi Jmlh
Sisi Kanan Kiri 0.00 7.10 X 0.50 X 0.00
Sisi Bawah 0.00 7.10 X 0.25 X 0.00
0.00
13 Pek. Beton kolom 20/30 cm (k2) fc 21,7 Mpa 0.84 m3 0.20 X 0.30 X 1.75 X 8.00
36.95
Pek. Begesting kolom 20/30cm K2 (2 x pakai) 7.44 m2 Panjang Lebar Tinggi Jmlh
14.88 1.20 X 1.55 X 8.00
14 Pek. Beton balok BKB 20/30 cm (rata-rata) fc 21,7 Mpa 2.38 m3
Grid B, C, D, E 1.58 3.30 X 0.20 X 0.30 X 8.00
Grid 2, grid 3 0.79 3.30 X 0.20 X 0.30 X 4.00
Beton Jurai bawah 1.20 5.00 X 0.20 X 0.30 X 4.00
3.58
Panjang
Berat Besi Jmlh Jmlh
Pek. Pembesian balok 20/30 cm BKB besi ulir Ts 40 469.90 kg Hasil Besi +
kg/m Batang Bentang
Overlap
Pek. Begesting balok 20/30 cm (BKB) 113.24 m2 Panjang Lebar Tinggi Jmlh
Grid B, C, D, E Sisi Kanan Kiri 15.84 3.30 X 0.60 X 8.00
Sisi Bawah 9.24 3.30 X 0.35 X 8.00
Beton Jurai bawah Sisi Kanan Kiri 12.00 5.00 X 0.60 X 4.00
Sisi Bawah 7.00 5.00 X 0.35 X 4.00
56.62
113.24
Panjang
Berat Besi Jmlh Jmlh
Pek. Pembesian balok 20/30 cm BKA besi ulir Ts 40 0.00 kg Hasil Besi +
kg/m Batang Bentang
Overlap
Beton Jurai atas Sisi Kanan Kiri 0.00 4.50 X 0.50 X 0.00
Sisi Bawah 0.00 4.50 X 0.25 X 0.00
0.00
0.00
VI PEKERJAAN KAYU
A Atap bagian bawah
Pekerjaan gording expose kayu kruing Atap Bawah 1.34 m3
1 0.26 11.80 0.08 0.15 2.00
2 0.08 3.80 0.08 0.15 2.00
3 0.31 14.10 0.08 0.15 2.00
4 0.13 6.10 0.08 0.15 2.00
0.37 16.80 0.08 0.15 2.00
0.19 8.80 0.08 0.15 2.00
Pek pas lambersiring di atas usuk 181.46 m2 54.18 6.30 4.30 2.00
127.28 14.80 4.30 2.00
Pemasangan 1 m’ lisplank ukuran 2 x (3 x 20) cm, kayu kelas I atau kelas II kruin 59.20 m
Tumpang bawah 37.60 18.80 2.00
21.60 10.80 2.00
Pemasangan 1 m’ lisplank ukuran 3 x 15 cm, kayu kelas I atau kelas II kruing 53.80 m
Tumpang bawah 34.80 17.40 2.00
19.00 9.50 2.00
Pek ring ring ukuran 3/10 kayu kruing 59.20 m 37.60 18.80 2.00
21.60 10.80 2.00
Pek tatab ukuran 3/10 kayu kruing 59.20 m 37.60 18.80 2.00
21.60 10.80 2.00
Pemasangan 1 m’ lisplank ukuran 2 x (3 x 20) cm, kayu kelas I atau kelas II kruing
Tumpang atas 40.40 m 28.20 14.1 2.00
12.20 6.10 2.00
Pemasangan 1 m’ lisplank ukuran 3 x 15 cm, kayu kelas I atau kelas II kruing 37.20 m
Tumpang atas 26.60 13.30 2.00
10.60 5.30 2.00
Pek ring ring ukuran 3/10 kayu kruing 40.40 m 28.20 14.1 2.00
12.20 6.10 2.00
Pek tatab ukuran 3/10 kayu kruing 40.40 m 28.20 14.10 2.00
12.20 6.10 2.00
JUMLAH
HARGA BAHAN
C PERALATAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng expose , kayu kelas II kruing
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 6.7000
Tukang kayu L.02 OH 20.1000
Kepala tukang L.03 OH 2.0100
Mandor L.04 OH 0.3350
Upah Serut profil Kayu M3 1.0000
JUMLAH
TENAGA
KERJA
B BAHAN
Balok kayu M3 1.2000
Besi strip tebal 5 Kg 15.0000
mm
Paku 12 cm Kg 3.0000
JUMLAH
HARGA BAHAN
C PERALATAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.15. Pemasangan 1 m3 bale bale (pelangkan)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 6.7000
Tukang kayu L.02 OH 20.1000
Kepala tukang L.03 OH 2.0100
Mandor L.04 OH 0.3350
Upah Serut profil Kayu M3 1.0000
JUMLAH
TENAGA
KERJA
B BAHAN
Kayu kamper (sunduk,waton,galar ,dll) M3 1.2000
Paku 12 cm Kg 3.0000
JUMLAH
HARGA BAHAN
C PERALATAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
C PERALATAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
TENAGA
KERJA
B BAHAN
Ijuk kg 245.0000
JUMLAH
HARGA BAHAN
C PERALATAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
C PERALATAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan Jumlah Harga
(Rp) (Rp)
106,240.36 50,145.45
119,520.00 169,479.36
132,800.00 18,724.80
166,000.00 3,818.00
242,167.61
2,216,670.00 2,216,670.00
2,216,670.00
2,458,837.61
245,883.76
2,704,721.37
106,240.36 711,810.41
119,520.00 2,402,352.00
132,800.00 266,928.00
166,000.00 55,610.00
2,166,300.00 2,166,300.00
5,603,000.41
6,443,440.00 7,732,128.00
9,180.00 137,700.00
18,450.00 55,350.00
7,925,178.00
13,528,178.41
1,352,817.84
14,880,996.25
6,443,440.00 7,732,128.00
18,450.00 55,350.00
7,787,478.00
13,390,478.41
1,339,047.84
14,729,526.25
87,600.00 41,347.20
98,550.00 139,743.90
109,500.00 15,439.50
136,875.00 3,148.13
199,678.73
5,800,000.00 5,800,000.00
5,800,000.00
5,999,678.73
599,967.87
6,599,646.60
87,600.00 52,560.00
98,550.00 39,420.00
109,500.00 4,380.00
136,875.00 1,095.00
97,455.00
8,000.00 1,960,000.00
1,960,000.00
2,057,455.00
205,745.50
2,263,200.50
106,240.36 5,312.02
119,520.00 5,976.00
132,800.00 664.00
166,000.00 498.00
12,450.02
47,500.00 49,875.00
22,000.00 220.00
50,095.00
62,545.02
6,254.50
68,799.52
REKAPITULASI HARGA SATUAN K3
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN GIANYAR 2020
SEWA ALAT
A TENAGA
Pekerja L.01 OH 0.4000 106,240.36
Tukang kayu L.02 OH 0.2000 119,520.00
Kepala tukang L.03 OH 0.0200 132,800.00
Mandor L.04 OH 0.0200 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu d 8-10/400 cm Batang 1.2500 8,490.00
Semen portland Kg 5.0000 1,320.00
Pasir beton M3 0.0050 234,200.00
Koral beton M3 0.0090 259,290.00
Kayu 5/7 M3 0.0720 2,827,140.00
Paku biasa 2” – 5” Kg 0.0600 18,450.00
Residu Liter 0.4000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 106,240.36
Tukang kayu L.02 OH 0.4000 119,520.00
Kepala tukang L.03 OH 0.0200 132,800.00
Mandor L.04 OH 0.0200 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu d 8-10/400 cm Batang 1.2500 8,490.00
Semen portland Kg 2.5000 1,320.00
Seng gelombang Lbr 1.2000 52,500.00
Pasir beton M3 0.0050 234,200.00
Koral beton M3 0.0090 259,290.00
Kayu 5/7 M3 0.0720 6,270.00
Paku biasa 2” – 5” Kg 0.0600 18,450.00
Meni besi Liter 0.4500 37,840.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 2.2.1.3. (K3) Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 106,240.36
Tukang kayu L.02 OH 0.3000 119,520.00
Kepala tukang L.03 OH 0.0200 132,800.00
Mandor L.04 OH 0.0200 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu Batang 1.0000 8,490.00
8-10/400 cm
Semen portland Kg 2.0000 1,320.00
Kawat duri Lbr 25.0000 23,490.00
Pasir beton M3 0.0050 234,200.00
Koral beton M3 0.0090 259,290.00
Paku biasa 2” – 5” Kg 0.0600 18,450.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.1000 106,240.36
Tukang kayu L.02 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0050 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu balok 5/7 M3 0.0120 2,813,750.00
Paku 2”-3” Kg 0.0200 18,450.00
Kayu papan 3/20 M3 0.0070 2,827,140.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 2.2.1.6. (K3) Pembuatan 1 m2 rumah jaga (konstruksi kayu )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 106,240.36
Tukang kayu L.02 OH 1.5000 119,520.00
Kepala tukang L.03 OH 0.1500 132,800.00
Mandor L.04 OH 0.0500 166,000.00
JUMLAH
B BAHAN TENAGA
Dolken kayu Batang KERJA 3.0000 8,490.00
8-10/400 cm
Kayu M3 0.2760 2,813,750.00
Paku biasa Kg 0.7000 18,450.00
Seng gelombang Lbr 1.5000 52,500.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
D Jumlah (A+B+C) HARGA ALAT
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 2.2.1.8. (K3) Pembuatan 1 m2 bedeng pekerja
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 106,240.36
Tukang kayu L.02 OH 2.0000 119,520.00
Kepala tukang L.03 OH 0.2000 132,800.00
Mandor L.04 OH 0.0500 166,000.00
JUMLAH
B BAHAN TENAGA
Dolken kayu diameter 8-10/400 Batang KERJA 1.2500 8,490.00
cm
Kayu M3 0.1860 2,813,750.00
Paku biasa Kg 0.3000 18,450.00
Semen Portland Kg 18.0000 1,320.00
Pasir beton Kg 0.0300 234,200.00
Koral beton M3 0.0500 259,290.00
Seng gelombang Lbr 1.5000 52,500.00
Plywood 4mm Lbr 1.3500 57,130.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
D Jumlah (A+B+C) HARGA ALAT
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.0000 106,240.36
Tukang kayu L.02 OH 2.0000 119,520.00
Kepala tukang L.03 OH 0.2000 132,800.00
Mandor L.04 OH 0.0500 166,000.00
JUMLAH
B BAHAN TENAGA
Bambu diameter 6-8/600 cm Batang KERJA 1.2500 8,490.00
Tali ijuk Kg 0.1860 12,430.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Tukang kayu L.02 OH 0.3000 119,520.00
Kepala tukang L.03 OH 0.0300 132,800.00
JUMLAH
B BAHAN TENAGA
Kayu papan kelas III M3 KERJA 0.0360 2,827,140.00
Kayu balok 5/7 kelas III M3 0.0140 2,813,750.00
Paku biasa Kg 0.0800 18,450.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 13.3340 83,200.00
Mandor L.04 OH 0.6660 130,000.00
JUMLAH
B BAHAN TENAGA
KERJA
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 2.2.1.14. Pembongkaran 1 m3 dinding tembok bata
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 6.6670 83,200.00
Mandor L.04 OH 0.3330 130,000.00
JUMLAH
B BAHAN TENAGA
KERJA
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)
42,496.14
23,904.00
2,656.00
3,320.00
72,376.14
10,612.50
6,600.00
1,171.00
2,333.61
203,554.08
1,107.00
-
225,378.19
297,754.33
29,775.43
327,529.77
Jumlah Harga
(Rp)
21,248.07
47,808.00
2,656.00
3,320.00
75,032.07
10,612.50
3,300.00
63,000.00
1,171.00
2,333.61
451.44
1,107.00
17,028.00
99,003.55
174,035.62
17,403.56
191,439.18
Jumlah Harga
(Rp)
21,248.07
35,856.00
2,656.00
3,320.00
63,080.07
8,490.00
2,640.00
587,250.00
1,171.00
2,333.61
1,107.00
602,991.61
666,071.68
66,607.17
732,678.85
Jumlah Harga
(Rp)
10,624.04
11,952.00
1,328.00
830.00
24,734.04
33,765.00
369.00
19,789.98
53,923.98
78,658.02
7,865.80
86,523.82
Jumlah Harga
(Rp)
212,480.72
239,040.00
119,520.00
39,840.00
8,300.00
619,180.72
10,612.50
506,475.00
1,476.00
-
46,200.00
36,871.50
23,420.00
38,893.50
45,000.00
11,125.00
-
8,146.40
16,609.50
3,427.80
748,257.20
1,367,437.92
136,743.79
1,504,181.71
Jumlah Harga
(Rp)
106,240.36
179,280.00
19,920.00
8,300.00
313,740.36
25,470.00
776,595.00
12,915.00
78,750.00
893,730.00
1,207,470.36
120,747.04
1,328,217.40
Jumlah Harga
(Rp)
106,240.36
239,040.00
26,560.00
8,300.00
380,140.36
14,433.00
590,887.50
5,535.00
13,860.00
7,026.00
12,964.50
78,750.00
11,125.00
734,581.00
1,114,721.36
111,472.14
1,226,193.50
Jumlah Harga
(Rp)
106,240.36
239,040.00
26,560.00
8,300.00
380,140.36
10,612.50
523,357.50
5,535.00
23,760.00
7,026.00
12,964.50
78,750.00
77,125.50
739,131.00
1,119,271.36
111,927.14
1,231,198.50
Jumlah Harga
(Rp)
8,320.00
6,500.00
14,820.00
14,820.00
1,482.00
16,302.00
Jumlah Harga
(Rp)
106,240.36
239,040.00
26,560.00
8,300.00
380,140.36
10,612.50
2,311.98
12,924.48
393,064.84
39,306.48
432,371.32
Jumlah Harga
(Rp)
35,856.00
3,984.00
39,840.00
101,777.04
39,392.50
1,476.00
142,645.54
182,485.54
18,248.55
200,734.09
Jumlah Harga
(Rp)
83,200.00
650.00
83,850.00
37,744.50
22,646.70
2,458.10
62,849.30
146,699.30
14,669.93
161,369.23
Jumlah Harga
(Rp)
1,109,388.80
86,580.00
1,195,968.80
1,195,968.80
119,596.88
1,315,565.68
Jumlah Harga
(Rp)
554,694.40
43,290.00
597,984.40
597,984.40
59,798.44
657,782.84
Jumlah Harga
(Rp)
4,462.10
478.08
265.60
6,972.00
12,177.78
2,868.00
2,868.00
15,045.78
1,504.58
16,550.35
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 0.7500 106,240.36
Mandor L.04 OH 0.0250 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
A TENAGA
Pekerja L.01 OH 0.9000 106,240.36
Mandor L.04 OH 0.0450 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
A TENAGA
Pekerja L.01 OH 1.0500 106,240.36
Mandor L.04 OH 0.0670 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
A TENAGA
Pekerja L.01 OH 1.0000 106,240.36
Mandor L.04 OH 0.0320 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
A TENAGA
Pekerja L.01 OH 1.5000 106,240.36
Mandor L.04 OH 0.0600 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
A TENAGA
Pekerja L.01 OH 1.2000 106,240.36
Mandor L.04 OH 0.0450 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
A TENAGA
Pekerja L.01 OH 0.0500 106,240.36
Mandor L.04 OH 0.0050 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
A TENAGA
Pekerja L.01 OH 0.3300 106,240.36
Mandor L.04 OH 0.0100 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
A TENAGA
Pekerja L.01 OH 0.5000 106,240.36
Mandor L.04 OH 0.0500 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
A TENAGA
Pekerja L.01 OH 0.5000 106,240.36
Mandor L.04 OH 0.0500 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Mandor L.04 OH 0.0100 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir urug M3 1.2000 160,690.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)
79,680.27
4,150.00
83,830.27
83,830.27
8,383.03
92,213.30
Jumlah Harga
(Rp)
95,616.32
7,470.00
103,086.32
103,086.32
10,308.63
113,394.96
Jumlah Harga
(Rp)
111,552.38
11,122.00
122,674.38
122,674.38
12,267.44
134,941.82
Jumlah Harga
(Rp)
106,240.36
5,312.00
111,552.36
111,552.36
11,155.24
122,707.60
Jumlah Harga
(Rp)
159,360.54
9,960.00
169,320.54
169,320.54
16,932.05
186,252.59
Jumlah Harga
(Rp)
127,488.43
7,470.00
134,958.43
134,958.43
13,495.84
148,454.28
Jumlah Harga
(Rp)
5,312.02
830.00
6,142.02
6,142.02
614.20
6,756.22
Jumlah Harga
(Rp)
35,059.32
1,660.00
36,719.32
36,719.32
3,671.93
40,391.25
Jumlah Harga
(Rp)
53,120.18
8,300.00
61,420.18
61,420.18
6,142.02
67,562.20
Jumlah Harga
(Rp)
53,120.18
8,300.00
61,420.18
61,420.18
6,142.02
67,562.20
Jumlah Harga
(Rp)
31,872.11
1,660.00
33,532.11
192,828.00
192,828.00
226,360.11
22,636.01
248,996.12
Jumlah Harga
(Rp)
15,936.05
2,490.00
18,426.05
64,500.00
64,500.00
82,926.05
8,292.61
91,218.66
Jumlah Harga
(Rp)
26,560.09
4,150.00
30,710.09
169,548.00
169,548.00
200,258.09
20,025.81
220,283.90
Jumlah Harga
(Rp)
31,872.11
1,660.00
33,532.11
146,004.00
146,004.00
179,536.11
17,953.61
197,489.72
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.5000 106,240.36 159,360.54
Tukang batu L.02 OH 0.7500 119,520.00 89,640.00
Kepala tukang L.03 OH 0.0750 132,800.00 9,960.00
Mandor L.04 OH 0.0750 166,000.00 12,450.00
JUMLAH TENAGA KERJA 271,410.54
B BAHAN
Batu belah M3 1.2000 251,630.00 301,956.00
Semen Portland Kg 202.0000 1,320.00 266,640.00
Pasir pasang M3 0.4850 245,810.00 119,217.85
JUMLAH HARGA BAHAN 687,813.85
C PERALATAN
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.6500 106,240.36 175,296.59
Tukang batu L.02 OH 0.2750 119,520.00 32,868.00
Kepala tukang L.03 OH 0.0280 132,800.00 3,718.40
Mandor L.04 OH 0.0830 166,000.00 13,778.00
JUMLAH TENAGA KERJA 225,660.99
B BAHAN
Semen Portland Kg 326.0000 1,320.00 430,320.00
Pasir beton Kg 760.0000 167.29 127,137.14
Kerikil (Maks 30 mm) Kg 1,029.0000 192.07 197,636.60
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 758,464.94
C PERALATAN
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 2.1000 106,240.36 223,104.76
Tukang batu L.02 OH 0.3500 119,520.00 41,832.00
Kepala tukang L.03 OH 0.0350 132,800.00 4,648.00
Mandor L.04 OH 0.1050 166,000.00 17,430.00
JUMLAH TENAGA KERJA 287,014.76
B BAHAN
Semen Portland Kg 448.0000 1,320.00 591,360.00
Pasir beton Kg 667.0000 167.29 111,579.57
Kerikil (Maks 30 mm) Kg 1,000.0000 192.07 192,066.67
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 898,377.44
C PERALATAN
A.4.1.1.B.5 Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.3230 106,240.36 140,556.00
Tukang batu L.02 OH 0.1890 119,520.00 22,589.28
Kepala tukang L.03 OH 0.0190 132,800.00 2,523.20
Mandor L.04 OH 0.1320 166,000.00 21,912.00
JUMLAH TENAGA KERJA 187,580.48
B BAHAN
Semen Portland Kg 326.0000 1,320.00 430,320.00
Pasir beton Kg 760.0000 167.29 127,137.14
Kerikil (Maks 30 mm) Kg 1,029.0000 192.07 197,636.60
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 758,464.94
C PERALATAN
Concrete Vibrator jam 0.3010 10,378.53 3,123.94
Molen Kapasitas 0,3 m3 Sewa Hari 0.2500 62,196.76 15,549.19
JUMLAH HARGA ALAT 18,673.13
A.4.1.1.B.12 Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.6800 106,240.36 178,483.80
Tukang batu L.02 OH 0.2400 119,520.00 28,684.80
Kepala tukang L.03 OH 0.0240 132,800.00 3,187.20
Mandor L.04 OH 0.1680 166,000.00 27,888.00
JUMLAH TENAGA KERJA 238,243.80
B BAHAN
Semen Portland Kg 448.0000 1,320.00 591,360.00
Pasir beton Kg 667.0000 167.29 111,579.57
Kerikil (Maks 30 mm) Kg 1,000.0000 192.07 192,066.67
Air Ltr 215.0000 15.68 3,371.20
JUMLAH HARGA BAHAN 898,377.44
C PERALATAN
Concrete Vibrator jam 0.3010 10,378.53 3,123.94
Molen Kapasitas 0,3 m3 Sewa Hari 0.2500 62,196.76 15,549.19
JUMLAH HARGA ALAT 18,673.13
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 228,403.29
E Overhead & Profit 10% x D 22,840.33
F Harga Satuan Pekerjaan (D+E) 251,243.62
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 392,883.34
E Overhead & Profit 10% x D 39,288.33
F Harga Satuan Pekerjaan (D+E) 432,171.67
A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.6600 106,240.36 70,118.64
Tukang kayu L.02 OH 0.3300 119,520.00 39,441.60
Kepala tukang L.03 OH 0.0330 132,800.00 4,382.40
Mandor L.04 OH 0.0330 166,000.00 5,478.00
JUMLAH 119,420.64
B BAHAN TENAGA
Kayu kelas III M3 KERJA 0.0400 2,827,140.00 113,085.60
Paku 5 cm – 12 cm Kg 0.4000 18,450.00 7,380.00
Minyak bekisting Ltr 0.2000 15,580.00 3,116.00
Balok kayu kelas II M3 0.0180 6,443,440.00 115,981.92
Plywood tebal 9 mm Lbr 0.3500 103,570.00 36,249.50
Bambu 8- 10cm –panj 4 m
Batang 2.0000 8,490.00 16,980.00
10cm –panj 4 m
JUMLAH 292,793.02
C PERALATAN HARGA BAHAN
JUMLAH
D Jumlah (A+B+C) HARGA ALAT 412,213.66
E Overhead & Profit 10% x D 41,221.37
F Harga Satuan Pekerjaan (D+E) 453,435.02
JUMLAH
D Jumlah (A+B+C) HARGA ALAT 426,843.34
E Overhead & Profit 10% x D 42,684.33
F Harga Satuan Pekerjaan (D+E) 469,527.67
JUMLAH
D Jumlah (A+B+C) HARGA ALAT 363,832.94
E Overhead & Profit 10% x D 36,383.29
F Harga Satuan Pekerjaan (D+E) 400,216.23
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 79,865.85
E Overhead & Profit 10% x D 7,986.59
F Harga Satuan Pekerjaan (D+E) 87,852.44
A.4.1.1.28 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.2970 106,240.36 31,553.39
Tukang batu L.02 OH 0.0330 119,520.00 3,944.16
Tukang kayu L.02 OH 0.0330 119,520.00 3,944.16
Tukang besi L.02 OH 0.0330 119,520.00 3,944.16
Kepala tukang L.03 OH 0.0100 132,800.00 1,328.00
Mandor L.04 OH 0.0150 166,000.00 2,490.00
JUMLAH 47,203.87
B BAHAN TENAGA
Kayu kelas III M3 KERJA 0.0030 2,827,140.00 8,481.42
Paku 5 cm – 12 cm Kg 0.0200 18,450.00 369.00
Minyak bekisting Ltr 8,490.00 -
Besi beton polos Kg 3.6000 9,180.00 33,048.00
Kawat beton Kg 0.0500 19,740.00 987.00
Semen Portland Kg 5.5000 1,320.00 7,260.00
Pasir Beton M3 0.0090 234,200.00 2,107.80
Kerikil M3 0.0150 259,290.00 3,889.35
JUMLAH 56,142.57
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 103,346.44
E Overhead & Profit 10% x D 10,334.64
F Harga Satuan Pekerjaan (D+E) 113,681.08
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 161,246.14
E Overhead & Profit 10% x D 16,124.61
F Harga Satuan Pekerjaan (D+E) 177,370.75
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 256,151.99
E Overhead & Profit 10% x D 25,615.20
F Harga Satuan Pekerjaan (D+E) 281,767.19
A.4.1.1.B.23 (K3) Pemasangan 1 m2 bekisting untuk balok 2X Pakai
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.6600 106,240.36 70,118.64
Tukang kayu L.02 OH 0.3300 119,520.00 39,441.60
Kepala tukang L.03 OH 0.0330 132,800.00 4,382.40
Mandor L.04 OH 0.0330 166,000.00 5,478.00
JUMLAH 119,420.64
B BAHAN TENAGA
Kayu kelas III M3 KERJA 0.0200 2,827,140.00 56,542.80
Paku 5 cm – 12 cm Kg 0.2000 18,450.00 3,690.00
Minyak bekisting Ltr 0.1000 15,580.00 1,558.00
Balok kayu kelas II M3 0.0090 6,443,440.00 57,990.96
Plywood tebal 9 mm Lbr 0.1750 103,570.00 18,124.75
Bambu 8- 10cm –panj 4 m
Batang 1.0000 8,490.00 8,490.00
10cm –panj 4 m
JUMLAH 146,396.51
C PERALATAN HARGA BAHAN
JUMLAH
D Jumlah (A+B+C) HARGA ALAT 265,817.15
E Overhead & Profit 10% x D 26,581.71
F Harga Satuan Pekerjaan (D+E) 292,398.86
JUMLAH
D Jumlah (A+B+C) HARGA ALAT 273,131.99
E Overhead & Profit 10% x D 27,313.20
F Harga Satuan Pekerjaan (D+E) 300,445.19
JUMLAH
D Jumlah (A+B+C) HARGA ALAT 241,626.79
E Overhead & Profit 10% x D 24,162.68
F Harga Satuan Pekerjaan (D+E) 265,789.47
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
A.4.2.1.1. Pemasangan 1 kg rangka kuda-kuda baja IWF
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 106,240.36
Tukang las L.03 OH 0.0600 119,520.00
konstruksi
Kepala tukang L.03 OH 0.0060 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi baja IWF Kg 1.1500 13,380.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.0600 106,240.36
Tukang las L.03 OH 0.0600 119,520.00
konstruksi
Kepala tukang L.03 OH 0.0060 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi baja CNP Kg 1.1500 7,090.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.0000 106,240.36
Tukang khusus L.03 OH 1.0000 119,520.00
alumunium
Kepala tukang L.03 OH 0.1000 132,800.00
Mandor L.04 OH 0.0500 166,000.00
JUMLAH
B BAHAN TENAGA
Rolling door 2 KERJA 1.0000 388,000.00
alluminium m JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.4. Pemasangan 1 m2 pintu kaca rangka alluminium
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 0.0850 106,240.36
Tukang L.03 OH 0.0850 119,520.00
allumunium/kaca
Kepala tukang L.03 OH 0.0090 132,800.00
Mandor L.04 OH 0.0050 166,000.00
JUMLAH
B BAHAN TENAGA
Pintu alluminium m KERJA 4.4000 107,000.00
Profil kaca m 4.5000
Sealant Tube 0.2700 44,000.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.1000 106,240.36
Tukang L.03 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0050 166,000.00
JUMLAH
B BAHAN TENAGA
Kawat nyamuk 2 KERJA 1.1000 20,000.00
Pengelasan m cm 11.1100
Baja strip (0,2 x 2) cm kg 1.7160 9,180.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.7.Pemasangan 1 m2 rangka besi hollow 1x35.35.0,6mm, modul 60 x 120 cm, untuk partisi
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 106,240.36
Tukang L.03 OH 0.2500 119,520.00
Kepala tukang L.03 OH 0.0250 132,800.00
Mandor L.04 OH 0.0130 166,000.00
JUMLAH
B BAHAN TENAGA
Rangka metal hollow 35.35.0,6 mm KERJA 3.5000 12,000.00
Assesoris (perkuatan, las dll) 100% x rangka 12,000.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.8. Pemasangan 1 m2 rangka besi hollow 1x35.35.0,6mm, modul 60 x 60 cm, untuk plafon
A TENAGA
Pekerja L.01 OH 0.3500 106,240.36
Tukang besi L.02 OH 0.3500 119,520.00
Kepala tukang L.03 OH 0.0350 132,800.00
Mandor L.04 OH 0.0180 166,000.00
JUMLAH
B BAHAN TENAGA
Rangka metal hollow 35.35.0,6 mm M1 KERJA 4.0000 12,000.00
Assesoris (perkuatan, las dll) Ls 100% x rangka 12,000.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.9. Pemasangan 1 m2 rangka besi Hollow Galvanis 60/60/1.0 mm, untuk Grill sunscreen
A TENAGA
Pekerja L.01 OH 0.2300 106,240.36
Tukang besi L.02 OH 0.1460 119,520.00
Kepala tukang L.03 OH 0.1070 132,800.00
Mandor L.04 OH 0.0250 166,000.00
JUMLAH
B BAHAN TENAGA
Rangka Hollow Galvanis 60/60/1.0 mm M1 KERJA 11.0000 37,000.00
Assesoris (perkuatan, las dll) Ls 100% x rangka 37,000.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.10. Pemasangan 1 Bh Angkur Diameter 19
A TENAGA
Pekerja L.01 OH 0.0100 106,240.36
Tukang besi L.02 OH 0.0080 119,520.00
Kepala tukang L.03 OH 0.0020 132,800.00
Mandor L.04 OH 0.0020 166,000.00
JUMLAH
B BAHAN TENAGA
Angkur D 19 Bh KERJA 1.0000 45,000.00
Alat Dan Material Bantu Ls 1.0000 1,000.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.0700 106,240.36
Tukang besi L.02 OH 0.0700 119,520.00
Kepala tukang L.03 OH 0.0070 132,800.00
Mandor L.04 OH 0.0035 166,000.00
JUMLAH
B BAHAN TENAGA
Main Truss UK-75-75 Btg KERJA 0.3500 132,600.00
Reng AA 0,45 Btg 0.7000 37,800.00
Skrup SDS 8 x 16 Bh 8.8000 300.00
Skrup SDS 10 x 16 Bh 2.2000 250.00
Diafrakma (PLD) Bh 2.0000 250.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.2300 106,240.36
Tukang besi L.02 OH 0.1460 119,520.00
Kepala tukang L.03 OH 0.1070 132,800.00
Mandor L.04 OH 0.0250 166,000.00
JUMLAH
B BAHAN TENAGA
Hollow Galvanis 35/35/0.6 mm M KERJA 6.0000 12,000.00
Hollow Galvanis 20/20/0.8 mm M 13.0000 10,000.00
Assesoris (perkuatan, las dll) Ls 100% x rangka 202,000.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)
6,374.42
7,171.20
796.80
498.00
14,840.42
15,387.00
15,387.00
30,227.42
3,022.74
33,250.16
Jumlah Harga
(Rp)
6,374.42
7,171.20
796.80
498.00
14,840.42
8,153.50
8,153.50
22,993.92
2,299.39
25,293.31
Jumlah Harga
(Rp)
106,240.36
119,520.00
13,280.00
8,300.00
247,340.36
388,000.00
388,000.00
635,340.36
63,534.04
698,874.40
Jumlah Harga
(Rp)
4,568.34
5,139.36
571.04
348.60
10,627.34
117,700.00
12,860.00
2,640.00
133,200.00
143,827.34
143,827.34
14,382.73
158,210.07
Jumlah Harga
(Rp)
9,030.43
10,159.20
1,195.20
830.00
21,214.83
470,800.00
-
11,880.00
482,680.00
503,894.83
50,389.48
554,284.31
Jumlah Harga
(Rp)
10,624.04
11,952.00
1,328.00
830.00
24,734.04
22,000.00
-
15,752.88
37,752.88
62,486.92
6,248.69
68,735.61
Jumlah Harga
(Rp)
21,248.07
23,904.00
2,656.00
166.00
47,974.07
46,725.00
330.00
53,715.66
100,770.66
148,744.73
14,874.47
163,619.21
Jumlah Harga
(Rp)
26,560.09
29,880.00
3,320.00
2,158.00
61,918.09
42,000.00
12,000.00
54,000.00
115,918.09
11,591.81
127,509.90
Jumlah Harga
(Rp)
37,184.13
41,832.00
4,648.00
2,988.00
86,652.13
48,000.00
12,000.00
60,000.00
146,652.13
14,665.21
161,317.34
Jumlah Harga
(Rp)
24,435.28
17,449.92
14,209.60
4,150.00
60,244.80
407,000.00
37,000.00
444,000.00
504,244.80
50,424.48
554,669.28
Jumlah Harga
(Rp)
1,062.40
956.16
265.60
332.00
2,616.16
45,000.00
1,000.00
46,000.00
48,616.16
4,861.62
53,477.78
Jumlah Harga
(Rp)
7,436.83
8,366.40
929.60
581.00
17,313.83
46,410.00
26,460.00
2,640.00
550.00
500.00
76,560.00
93,873.83
9,387.38
103,261.21
Jumlah Harga
(Rp)
24,435.28
17,449.92
14,209.60
4,150.00
60,244.80
72,000.00
130,000.00
202,000.00
404,000.00
464,244.80
46,424.48
510,669.28
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja OH 0.6000 106,240.36
Tukang batu OH 0.2000 119,520.00
Kepala tukang OH 0.0200 132,800.00
Mandor OH 0.0300 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah Buah 140.0000 1,500.00
Semen Portland Kg 43.5000 1,320.00
Pasir pasang M3 0.0800 245,810.00
JUMLAH HARGA BAHAN
C PERALATAN
A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.6000 106,240.36
Tukang batu L.02 OH 0.2000 119,520.00
Kepala tukang L.03 OH 0.0200 132,800.00
Mandor L.04 OH 0.0300 166,000.00
JUMLAH
B BAHAN TENAGA
Bata merah Buah KERJA 140.0000 1,500.00
Semen Portland Kg 32.9500 1,320.00
Pasir pasang M3 0.0910 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.
4.4 Harga Satuan
.1. No Uraian Kode Satuan Koefisien
(Rp)
2.
Pe A TENAGA
ma Pekerja L.01 OH 0.6000 106,240.36
san Tukang batu L.02 OH 0.2000 119,520.00
ga Kepala bukang L.03 OH 0.0200 132,800.00
n
Mandor L.04 OH 0.0300 166,000.00
1m
2 JUMLAH
din B BAHAN TENAGA
din Bata merah Buah KERJA 140.0000 1,500.00
g Semen Kg 26.5500 1,320.00
bat Portland
a Pasir Pasang M3 0.0930 245,810.00
me JUMLAH
rah C PERALATAN HARGA BAHAN
(5x
11 JUMLAH
x2 HARGA ALAT
2)
cm D Jumlah (A+B+C)
teb E Overhead & Profit 10% x D
al
1
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.6000 106,240.36
Tukang batu L.02 OH 0.2000 119,520.00
Kepala tukang L.03 OH 0.0200 132,800.00
Mandor L.04 OH 0.0300 166,000.00
JUMLAH
B BAHAN TENAGA
Bata merah Buah KERJA 140.0000 1,500.00
Semen Portland Kg 22.2000 1,320.00
Pasir pasang M3 0.1020 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.
4.4 Harga Satuan
.1. No Uraian Kode Satuan Koefisien
(Rp)
3
Pe A TENAGA
ma Pekerja L.01 OH 0.6000 106,240.36
san Tukang batu L.02 OH 0.2000 119,520.00
ga Kepala tukang L.03 OH 0.0200 132,800.00
n
Mandor L.04 OH 0.0300 166,000.00
1m
2 JUMLAH
Di B BAHAN TENAGA
ndi Bata merah Buah KERJA 140.0000 1,500.00
ng Semen Portland Kg 18.5000 1,320.00
Ba
ta Pasir pasang M3 0.1220 245,810.00
Me JUMLAH
rah C PERALATAN HARGA BAHAN
(5x
11 JUMLAH
x2 HARGA ALAT
2)
cm D Jumlah (A+B+C)
teb E Overhead & Profit 10% x D
al F Harga Satuan Pekerjaan (D+E)
1
bat
A.
u 4.4.1.4 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
ca Harga Satuan
No Uraian Kode Satuan Koefisien
mp (Rp)
ura A TENAGA
n
1S Pekerja L.01 OH 0.3000 106,240.36
P: Tukang batu L.02 OH 0.1000 119,520.00
6P Kepala tukang L.03 OH 0.0100 132,800.00
P Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Bata merah Buah KERJA 70.0000 1,500.00
Semen Portland Kg 18.9500 1,320.00
Pasir pasang M3 0.0380 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.5 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.02 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Bata merah Buah KERJA 70.0000 1,500.00
Semen Portland Kg 14.3700 1,320.00
Pasir pasang M3 0.0400 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.02 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Bata merah Buah KERJA 70.0000 1,500.00
Semen Portland Kg 11.5000 1,320.00
Pasir pasang M3 0.0430 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :5PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.02 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Bata merah Buah KERJA 70.0000 1,500.00
Semen Portland Kg 9.6800 1,320.00
Pasir pasang M3 0.0450 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 6PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.02 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Bata merah Buah KERJA 70.0000 1,500.00
Semen Portland Kg 8.3200 1,320.00
Pasir pasang M3 0.0490 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.02 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Bata merah Buah KERJA 70.0000 1,500.00
Semen Portland Kg 6.5000 1,320.00
Pasir pasang M3 0.0500 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Hb10 : Hollow Block tebal 10 cm
A. 4.4.1.11 Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP : 4PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.02 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
HB-10 M3 KERJA 12.5000 2,650.00
Semen Portland Kg 12.1300 1,320.00
Pasir pasang M3 0.3880 245,810.00
Besi angker Kg 0.2800 9,180.00
diameter 8 JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
HB10 : Hollow Block tebal 10cm
A. 4.4.1.12 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai
B.
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.6700 106,240.36
Tukang batu L.02 OH 1.3000 119,520.00
Kepala tukang L.03 OH 0.1300 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Bata ringan tebal 7,5cm Buah KERJA 8.4000 9,660.00
Mortar siap pakai Kg 0.4730 2,280.75
JUMLAH
C PERALATAN HARGA BAHAN
Peralatan % 10.0000
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.13 Pemasangan 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.6710 106,240.36
Tukang batu L.02 OH 1.3000 119,520.00
Kepala tukang L.03 OH 0.1300 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Bata ringan tebal 10cm Buah KERJA 8.4000 10,800.00
Mortar siap pakai Kg 0.0630 2,280.75
JUMLAH
C PERALATAN HARGA BAHAN
Peralatan % 10.0000
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.14 Pemasangan 1 m2 dinding Batako campuran 1SP : 4PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.02 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Batako M3 KERJA 12.5000 2,650.00
Semen Portland Kg 12.1300 1,320.00
Pasir pasang M3 0.0388 245,810.00
Besi angker Kg 0.2800 9,180.00
diameter 8 JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)
63,744.22
23,904.00
2,656.00
4,980.00
95,284.22
210,000.00
57,420.00
19,664.80
287,084.80
382,369.02
38,236.90
420,605.92
Jumlah Harga
(Rp)
63,744.22
23,904.00
2,656.00
4,980.00
95,284.22
210,000.00
43,494.00
22,368.71
275,862.71
371,146.93
37,114.69
408,261.62
Jumlah Harga
(Rp)
63,744.22
23,904.00
2,656.00
4,980.00
95,284.22
210,000.00
35,046.00
22,860.33
267,906.33
363,190.55
36,319.05
399,509.60
Jumlah Harga
(Rp)
63,744.22
23,904.00
2,656.00
4,980.00
95,284.22
210,000.00
29,304.00
25,072.62
264,376.62
359,660.84
35,966.08
395,626.92
Jumlah Harga
(Rp)
63,744.22
23,904.00
2,656.00
4,980.00
95,284.22
210,000.00
24,420.00
29,988.82
264,408.82
359,693.04
35,969.30
395,662.34
Jumlah Harga
(Rp)
31,872.11
11,952.00
1,328.00
2,490.00
47,642.11
105,000.00
25,014.00
9,340.78
139,354.78
186,996.89
18,699.69
205,696.58
Jumlah Harga
(Rp)
31,872.11
11,952.00
1,328.00
2,490.00
47,642.11
105,000.00
18,968.40
9,832.40
133,800.80
181,442.91
18,144.29
199,587.20
Jumlah Harga
(Rp)
31,872.11
11,952.00
1,328.00
2,490.00
47,642.11
105,000.00
15,180.00
10,569.83
130,749.83
178,391.94
17,839.19
196,231.13
Jumlah Harga
(Rp)
31,872.11
11,952.00
1,328.00
2,490.00
47,642.11
105,000.00
12,777.60
11,061.45
128,839.05
176,481.16
17,648.12
194,129.27
Jumlah Harga
(Rp)
31,872.11
11,952.00
1,328.00
2,490.00
47,642.11
105,000.00
10,982.40
12,044.69
128,027.09
175,669.20
17,566.92
193,236.12
Jumlah Harga
(Rp)
31,872.11
11,952.00
1,328.00
2,490.00
47,642.11
105,000.00
8,580.00
12,290.50
125,870.50
173,512.61
17,351.26
190,863.87
Jumlah Harga
(Rp)
31,872.11
11,952.00
1,328.00
2,490.00
47,642.11
33,125.00
20,011.20
89,474.84
2,570.40
145,181.44
192,823.55
19,282.35
212,105.90
Jumlah Harga
(Rp)
31,872.11
11,952.00
1,328.00
2,490.00
47,642.11
33,125.00
16,011.60
95,374.28
2,570.40
147,081.28
194,723.39
19,472.34
214,195.73
Jumlah Harga
(Rp)
71,181.04
155,376.00
17,264.00
498.00
244,319.04
81,144.00
1,078.79
82,222.79
326,541.84
32,654.18
359,196.02
Jumlah Harga
(Rp)
71,287.28
155,376.00
17,264.00
498.00
244,425.28
90,720.00
143.69
90,863.69
335,288.97
33,528.90
368,817.87
Jumlah Harga
(Rp)
31,872.11
11,952.00
1,328.00
2,490.00
47,642.11
33,125.00
16,011.60
9,537.43
2,570.40
61,244.43
108,886.54
10,888.65
119,775.19
Jumlah Harga
(Rp)
50,995.37
17,928.00
1,992.00
3,735.00
74,650.37
53,000.00
19,800.00
13,273.74
86,073.74
160,724.11
16,072.41
176,796.52
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
A.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja OH 0.3000 106,240.36
Tukang batu OH 0.1500 119,520.00
Kepala tukang OH 0.0150 132,800.00
Mandor OH 0.0150 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 15.5040 1,320.00
Pasir pasang M3 0.0160 245,810.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.03 OH 0.1500 119,520.00
Kepala tukang L.03 OH 0.0150 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Semen Portland Kg KERJA 4.4160 1,320.00
Pasir pasang M3 0.0270 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.2.11. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.4000 106,240.36
Tukang batu L.03 OH 0.2000 119,520.00
Kepala tukang L.03 OH 0.0200 132,800.00
Mandor L.04 OH 0.0220 166,000.00
JUMLAH
B BAHAN TENAGA
Semen Portland Kg KERJA 8.3200 1,320.00
Pasir pasang M3 0.0320 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.2.16. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.03 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Semen Portland Kg KERJA 4.3200 1,320.00
Pasir pasang M3 0.0060 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.2.19. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 106,240.36
Tukang batu L.03 OH 0.1500 119,520.00
Kepala tukang L.03 OH 0.0150 132,800.00
Mandor L.04 OH 0.0150 166,000.00
JUMLAH
B BAHAN TENAGA
Semen Portland Kg KERJA 6.3400 1,320.00
Pasir pasang M3 0.0120 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)
31,872.11
17,928.00
1,992.00
2,490.00
54,282.11
20,465.28
3,932.96
24,398.24
78,680.35
7,868.03
86,548.38
Jumlah Harga
(Rp)
31,872.11
17,928.00
1,992.00
2,490.00
54,282.11
13,495.68
4,916.20
18,411.88
72,693.99
7,269.40
79,963.39
Jumlah Harga
(Rp)
31,872.11
17,928.00
1,992.00
2,490.00
54,282.11
10,264.32
5,653.63
15,917.95
70,200.06
7,020.01
77,220.06
Jumlah Harga
(Rp)
31,872.11
17,928.00
1,992.00
2,490.00
54,282.11
8,236.80
5,899.44
14,136.24
68,418.35
6,841.83
75,260.18
Jumlah Harga
(Rp)
31,872.11
17,928.00
1,992.00
2,490.00
54,282.11
6,842.88
6,391.06
13,233.94
67,516.05
6,751.60
74,267.65
Jumlah Harga
(Rp)
31,872.11
17,928.00
1,992.00
2,490.00
54,282.11
5,829.12
6,636.87
12,465.99
66,748.10
6,674.81
73,422.91
Jumlah Harga
(Rp)
31,872.11
17,928.00
1,992.00
2,490.00
54,282.11
5,195.52
6,882.68
12,078.20
66,360.31
6,636.03
72,996.34
Jumlah Harga
(Rp)
31,872.11
17,928.00
1,992.00
2,490.00
54,282.11
4,561.92
7,128.49
11,690.41
65,972.52
6,597.25
72,569.77
Jumlah Harga
(Rp)
42,496.14
23,904.00
2,656.00
3,652.00
72,708.14
17,994.24
6,636.87
24,631.11
97,339.25
9,733.93
107,073.18
Jumlah Harga
(Rp)
27,622.49
23,904.00
2,656.00
2,158.00
56,340.49
13,685.76
7,620.11
21,305.87
77,646.36
7,764.64
85,411.00
Jumlah Harga
(Rp)
42,496.14
23,904.00
2,656.00
3,652.00
72,708.14
10,982.40
7,865.92
18,848.32
91,556.46
9,155.65
100,712.11
Jumlah Harga
(Rp)
42,496.14
23,904.00
2,656.00
3,652.00
72,708.14
9,123.84
8,603.35
17,727.19
90,435.33
9,043.53
99,478.87
Jumlah Harga
(Rp)
42,496.14
23,904.00
2,656.00
3,652.00
72,708.14
7,772.16
8,849.16
16,621.32
89,329.46
8,932.95
98,262.41
Jumlah Harga
(Rp)
15,936.05
8,964.00
1,062.40
1,328.00
27,290.45
6,842.88
6,391.06
13,233.94
40,524.39
4,052.44
44,576.83
Jumlah Harga
(Rp)
8,499.23
47,808.00
5,312.00
664.00
62,283.23
660.00
3,195.53
3,855.53
66,138.76
6,613.88
72,752.63
Jumlah Harga
(Rp)
31,872.11
11,952.00
1,328.00
2,490.00
47,642.11
5,702.40
1,474.86
7,177.26
54,819.37
5,481.94
60,301.30
Jumlah Harga
(Rp)
15,936.05
8,964.00
1,062.40
1,328.00
27,290.45
4,102.56
4,102.56
31,393.01
3,139.30
34,532.32
Jumlah Harga
(Rp)
7,436.83
4,183.20
531.20
664.00
12,815.23
2,112.00
2,112.00
14,927.23
1,492.72
16,419.95
Jumlah Harga
(Rp)
31,872.11
17,928.00
1,992.00
2,490.00
54,282.11
8,368.80
2,949.72
11,318.52
65,600.63
6,560.06
72,160.69
Jumlah Harga
(Rp)
21,248.07
11,952.00
1,328.00
1,660.00
36,188.07
4,290.00
4,290.00
40,478.07
4,047.81
44,525.88
Jumlah Harga
(Rp)
21,248.07
11,952.00
1,328.00
1,660.00
36,188.07
7,412.44
7,412.44
43,600.51
4,360.05
47,960.56
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
A.4.4.3.1. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 20 cm x 20 cm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.2700 106,240.36
Tukang batu L.02 OH 0.1350 119,520.00
Kepala tukang L.03 OH 0.0140 132,800.00
Mandor L.04 OH 0.0140 166,000.00
JUMLAH
B BAHAN TENAGA
Ubin abu-abu buah KERJA 26.5000 2,200.00
Semen Portland kg 10.4000 1,320.00
Pasir pasang M3 0.0450 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E) (maksimum)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.3.b Pemasangan 1m2 lantai keramik warna ukuran 30 cm x 30 cm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.7000 106,240.36
Tukang batu L.02 OH 0.3500 119,520.00
Kepala tukang L.03 OH 0.0350 132,800.00
Mandor L.04 OH 0.0350 166,000.00
JUMLAH
B BAHAN TENAGA
Ubin keramik Doos KERJA 1.0500 141,830.00
Semen Portland Kg 10.0000 1,320.00
Pasir pasang M3 0.0450 245,810.00
Semen warna Kg 0.5000 16,000.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.6.Pemasangan 1 m2 dinding keramik 20 cm x 20 cm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.9000 106,240.36
Tukang batu L.02 OH 0.4500 119,520.00
Kepala tukang L.03 OH 0.0450 132,800.00
Mandor L.04 OH 0.0450 166,000.00
JUMLAH
B BAHAN TENAGA
Keramik artistik Buah KERJA 26.5000 2,080.00
Semen Portland Kg 9.3000 1,320.00
Pasir pasang M3 0.0180 245,810.00
Semen warna Kg 1.9400 16,000.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.9. Pemasangan 1 m’ plint kayu kamper tebal 2 cm lebar 10 cm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1200 106,240.36
Tukang batu L.02 OH 0.1200 119,520.00
Kepala tukang L.03 OH 0.0120 132,800.00
Mandor L.04 OH 0.0060 166,000.00
JUMLAH
B BAHAN TENAGA
Papan kayu kelas 1 M3 KERJA 0.0030 8,442,500.00
Paku/skrup 5 cm Kg 0.0500 18,450.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.15 Pemasangan 1m Plin keramik warna ukuran 10 cm x 40 cm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0900 106,240.36
Tukang batu L.02 OH 0.0900 119,520.00
Kepala tukang L.03 OH 0.0090 132,800.00
Mandor L.04 OH 0.0050 166,000.00
JUMLAH
B BAHAN TENAGA
Ubin keramik Bh KERJA 0.6625 101,830.00
Semen Portland Kg 1.1400 1,320.00
Pasir pasang M3 0.0030 245,810.00
Semen warna Kg 0.1000 16,000.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.18 Pemasangan 1 m2 lantai Homogeneus Tile ukuran 60 cm x 60 cm ex. Granito
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.2400 106,240.36
Tukang batu L.02 OH 0.1200 119,520.00
Kepala tukang L.03 OH 0.0120 132,800.00
Mandor L.04 OH 0.0120 166,000.00
JUMLAH
B BAHAN TENAGA
Homogeneus Tile Ex. Granito Bh KERJA 3.0500 147,000.00
Semen Portland Kg 9.8000 1,320.00
Pasir pasang M3 0.0450 245,810.00
Semen warna Kg 0.1300 16,000.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.21 Pemasangan 1m2 lantai keramik ukuran 50 cm x 50 cm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.7000 106,240.36
Tukang batu L.02 OH 0.3500 119,520.00
Kepala tukang L.03 OH 0.0350 132,800.00
Mandor L.04 OH 0.0350 166,000.00
JUMLAH
B BAHAN TENAGA
Ubin keramik 50 cm x 50 cm Bh KERJA 4.2000 240,000.00
Semen Portland Kg 9.8000 1,320.00
Pasir pasang M3 0.0450 245,810.00
Semen warna Kg 1.3000 16,000.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)
28,684.90
16,135.20
1,859.20
2,324.00
49,003.30
58,300.00
13,728.00
11,061.45
83,089.45
132,092.75
13,209.27
145,302.02
Jumlah Harga
(Rp)
28,684.90
16,135.20
1,859.20
2,324.00
49,003.30
84,800.00
13,728.00
16,000.00
11,061.45
125,589.45
174,592.75
17,459.27
192,052.02
Jumlah Harga
(Rp)
74,368.25
41,832.00
4,648.00
5,810.00
126,658.25
157,500.00
13,200.00
11,061.45
8,000.00
189,761.45
316,419.70
31,641.97
348,061.67
Jumlah Harga
(Rp)
74,368.25
41,832.00
4,648.00
5,810.00
126,658.25
148,921.50
13,200.00
11,061.45
8,000.00
181,182.95
307,841.20
30,784.12
338,625.32
Jumlah Harga
(Rp)
74,368.25
41,832.00
4,648.00
5,810.00
126,658.25
54,600.00
13,728.00
11,061.45
8,000.00
87,389.45
214,047.70
21,404.77
235,452.47
Jumlah Harga
(Rp)
74,368.25
41,832.00
4,648.00
5,810.00
126,658.25
7,166,512.50
18,678.00
9,586.59
32,000.00
7,226,777.09
7,353,435.34
735,343.53
8,088,778.88
Jumlah Harga
(Rp)
95,616.32
53,784.00
5,976.00
7,470.00
162,846.32
55,120.00
12,276.00
4,424.58
31,040.00
102,860.58
265,706.90
26,570.69
292,277.59
Jumlah Harga
(Rp)
74,368.25
41,832.00
4,648.00
5,810.00
126,658.25
65,318.00
15,510.00
8,603.35
89,431.35
216,089.60
21,608.96
237,698.56
Jumlah Harga
(Rp)
74,368.25
41,832.00
4,648.00
5,810.00
126,658.25
125,345.00
15,510.00
8,603.35
149,458.35
276,116.60
27,611.66
303,728.26
Jumlah Harga
(Rp)
12,748.84
14,342.40
1,593.60
996.00
29,680.84
25,327.50
922.50
26,250.00
55,930.84
5,593.08
61,523.93
Jumlah Harga
(Rp)
26,560.09
59,760.00
6,640.00
215.80
93,175.89
1,228,543.80
11,710.00
1,240,253.80
124,025.38
1,457,455.07
145,745.51
1,603,200.58
Jumlah Harga
(Rp)
53,120.18
59,760.00
6,640.00
215.80
119,735.98
1,542,623.50
11,710.00
1,554,333.50
155,433.35
1,829,502.83
182,950.28
2,012,453.11
Jumlah Harga
(Rp)
26,560.09
59,760.00
6,640.00
215.80
93,175.89
546,006.00
11,710.00
557,716.00
55,771.60
706,663.49
70,666.35
777,329.84
Jumlah Harga
(Rp)
53,120.18
59,760.00
6,640.00
215.80
119,735.98
1,855,885.10
11,710.00
1,867,595.10
186,759.51
2,174,090.59
217,409.06
2,391,499.65
Jumlah Harga
(Rp)
74,368.25
41,832.00
4,648.00
5,810.00
126,658.25
675,132.90
12,936.00
11,061.45
20,800.00
719,930.35
846,588.60
84,658.86
931,247.46
Jumlah Harga
(Rp)
9,561.63
10,756.80
1,195.20
830.00
22,343.63
67,462.38
1,504.80
737.43
1,600.00
71,304.61
93,648.24
9,364.82
103,013.06
Jumlah Harga
(Rp)
74,368.25
41,832.00
4,648.00
5,810.00
126,658.25
54,778.50
13,728.00
11,061.45
8,000.00
87,567.95
214,226.20
21,422.62
235,648.82
Jumlah Harga
(Rp)
95,616.32
53,784.00
5,976.00
6,640.00
162,016.32
288,750.00
12,276.00
4,424.58
31,040.00
336,490.58
498,506.90
49,850.69
548,357.59
Jumlah Harga
(Rp)
25,497.69
14,342.40
1,593.60
1,992.00
43,425.69
448,350.00
12,936.00
11,061.45
2,080.00
474,427.45
517,853.14
51,785.31
569,638.45
Jumlah Harga
(Rp)
9,561.63
10,756.80
1,195.20
830.00
22,343.63
44,835.00
1,504.80
737.43
1,600.00
48,677.23
71,020.86
7,102.09
78,122.95
Jumlah Harga
(Rp)
95,616.32
53,784.00
5,976.00
7,470.00
162,846.32
448,350.00
12,276.00
4,424.58
31,040.00
496,090.58
658,936.90
65,893.69
724,830.59
Jumlah Harga
(Rp)
74,368.25
41,832.00
4,648.00
5,810.00
126,658.25
1,008,000.00
12,936.00
11,061.45
20,800.00
1,052,797.45
1,179,455.70
117,945.57
1,297,401.27
Jumlah Harga
(Rp)
58,240.00
32,760.00
3,640.00
4,550.00
99,190.00
4,002,862.50
12,838.00
9,920.25
17,459.00
4,043,079.75
4,142,269.75
414,226.98
4,556,496.73
Jumlah Harga
(Rp)
52,000.00
23,400.00
1,040.00
4,030.00
80,470.00
189,093.90
12,156.80
11,022.50
212,273.20
292,743.20
29,274.32
322,017.52
A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja OH 0.0300 106,240.36
Tukang kayu OH 0.0700 119,520.00
Kepala tukang OH 0.0070 132,800.00
Mandor OH 0.0040 166,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes semen M2 1.1000 -
Paku tripleks kg 0.0100 22,000.00
JUMLAH HARGA BAHAN
C PERALATAN
A. Harga Satuan
4.5 No Uraian Kode Satuan Koefisien
(Rp)
.1.
2. A TENAGA
Pe Pekerja L.01 OH 0.1000 106,240.36
ma Tukang kayu L.02 OH 0.1000 119,520.00
san Kepala tukang L.03 OH 0.0100 132,800.00
ga
Mandor L.04 OH 0.0050 166,000.00
n1
m2 JUMLAH
lan B BAHAN TENAGA
git Tripleks Lembar KERJA 0.3750 57,130.00
- Paku tripleks kg 0.0300 22,000.00
lan
git JUMLAH
tri C PERALATAN HARGA BAHAN
ple
ks JUMLAH
uk HARGA ALAT
ura
n D Jumlah (A+B+C)
(12 E Overhead & Profit 10% x D
0x F Harga Satuan Pekerjaan (D+E)
24
0)
A.4.5.1.3. Pemasangan 1 m2 langit-langit lambrisering kayu kamper, tebal 9 mm
cm
, Harga Satuan
No Uraian Kode Satuan Koefisien
teb (Rp)
al A TENAGA
3 Pekerja L.01 OH 0.8000 106,240.36
m
m, Tukang kayu L.02 OH 0.8000 119,520.00
4 Kepala tukang L.03 OH 0.0800 132,800.00
m Mandor L.04 OH 0.0400 166,000.00
m JUMLAH
& B BAHAN TENAGA
6 KERJA 0.0150
m Kayu papan 3 8,442,500.00
m Paku tripleks m kg 0.0100 22,000.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.5.1.4. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1000 106,240.36
Tukang kayu L.02 OH 0.0500 119,520.00
Kepala tukang L.03 OH 0.0050 132,800.00
Mandor L.04 OH 0.0050 166,000.00
JUMLAH
B BAHAN TENAGA
Gypsum board Lembar KERJA 0.3640 61,250.00
Paku skrup kg 0.1100 22,000.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.5.1.7. Pemasangan 1 m’ list langit-langit Gypsum S7
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0300 106,240.36
Tukang kayu L.02 OH 0.0300 119,520.00
Kepala tukang L.03 OH 0.0030 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
List Gypsum 7/7 m KERJA 1.0500 20,000.00
Coumpond kg 0.0100 40,000.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)
3,187.21
8,366.40
929.60
664.00
13,147.21
-
220.00
220.00
13,367.21
1,336.72
14,703.93
Jumlah Harga
(Rp)
10,624.04
11,952.00
1,328.00
830.00
24,734.04
21,423.75
660.00
22,083.75
46,817.79
4,681.78
51,499.56
Jumlah Harga
(Rp)
84,992.29
95,616.00
10,624.00
6,640.00
197,872.29
126,637.50
220.00
126,857.50
324,729.79
32,472.98
357,202.77
Jumlah Harga
(Rp)
10,624.04
5,976.00
664.00
830.00
18,094.04
22,295.00
2,420.00
24,715.00
42,809.04
4,280.90
47,089.94
Jumlah Harga
(Rp)
5,312.02
5,976.00
664.00
498.00
12,450.02
13,125.00
220.00
13,345.00
25,795.02
2,579.50
28,374.52
Jumlah Harga
(Rp)
26,560.09
29,880.00
3,320.00
2,158.00
61,918.09
100,833.00
7,892.30
645.34
158.56
109,529.19
171,447.28
17,144.73
188,592.01
Jumlah Harga
(Rp)
3,187.21
3,585.60
398.40
498.00
7,669.21
21,000.00
400.00
21,400.00
29,069.21
2,906.92
31,976.13
Jumlah Harga
(Rp)
3,187.21
8,366.40
929.60
249.00
12,732.21
38,500.00
369.00
38,869.00
51,601.21
5,160.12
56,761.33
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1500 106,240.36
Tukang kayu L.03 OH 0.0750 119,520.00
Kepala tukang L.11 OH 0.0075 132,800.00
Mandor L.15 OH 0.0080 166,000.00
JUMLAH
B BAHAN TENAGA
Genteng palentong Buah KERJA 25.0000 1,610.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong kecil
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.4000 106,240.36
Tukang kayu L.03 OH 0.2000 119,520.00
Kepala tukang L.11 OH 0.0200 132,800.00
Mandor L.15 OH 0.0020 166,000.00
JUMLAH
B BAHAN TENAGA
Genteng bubungan Pelentong kecil Buah KERJA 5.0000 4,000.00
Semen Portland Kg 8.0000 1,320.00
Pasir pasang M3 0.0320 245,810.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.5.2.7. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 1,80 m x 5 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1400 106,240.36
Tukang kayu L.03 OH 0.0700 119,520.00
Kepala tukang L.11 OH 0.0070 132,800.00
Mandor L.15 OH 0.0070 166,000.00
JUMLAH
B BAHAN TENAGA
Asbes gel 92 x 250 Lmbr KERJA 0.7500 30,200.00
Paku pancing 6 x 23 Kg 0.1200 38,240.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.5.2.10. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.2000 106,240.36
Tukang kayu L.03 OH 0.1000 119,520.00
Kepala tukang L.11 OH 0.0100 132,800.00
Mandor L.15 OH 0.0010 166,000.00
JUMLAH
B BAHAN TENAGA
Genteng metal Buah KERJA 2.0000 36,000.00
Paku biasa ½”-1” Kg 0.2000 22,000.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E) (maksimum)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.5.2.13. Pemasangan 1 m’nok atap seng
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1500 106,240.36
Tukang kayu L.03 OH 0.0700 119,520.00
Kepala tukang L.11 OH 0.0070 132,800.00
Mandor L.15 OH 0.0060 166,000.00
JUMLAH
B BAHAN TENAGA
Seng pelat 3”x6” bjls Lmbr KERJA 0.3000 44,500.00
28
Paku biasa ½”-1” Kg 0.0400 22,000.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)
15,936.05
8,964.00
996.00
1,328.00
27,224.05
40,250.00
40,250.00
67,474.05
6,747.41
74,221.46
Jumlah Harga
(Rp)
15,936.05
8,964.00
1,062.40
1,328.00
27,290.45
168,000.00
168,000.00
195,290.45
19,529.05
214,819.50
Jumlah Harga
(Rp)
15,936.05
8,964.00
1,062.40
1,328.00
27,290.45
160,000.00
160,000.00
187,290.45
18,729.05
206,019.50 38,113,607.39
Jumlah Harga
(Rp)
15,936.05
8,964.00
1,062.40
1,328.00
27,290.45
60,750.00
60,750.00
88,040.45
8,804.05
96,844.50
Jumlah Harga
(Rp)
42,496.14
23,904.00
2,656.00
332.00
69,388.14
20,000.00
10,560.00
7,865.92
38,425.92
107,814.06
10,781.41
118,595.47
Jumlah Harga
(Rp)
42,496.14
23,904.00
2,656.00
332.00
69,388.14
90,000.00
10,560.00
7,865.92
108,425.92
177,814.06
17,781.41
195,595.47
Jumlah Harga
(Rp)
42,496.14
23,904.00
2,656.00
332.00
69,388.14
91,900.00
10,560.00
7,865.92
110,325.92
179,714.06
17,971.41
197,685.47
Jumlah Harga
(Rp)
42,496.14
23,904.00
2,656.00
332.00
69,388.14
51,250.00
10,560.00
7,865.92
69,675.92
139,064.06
13,906.41
152,970.47
Jumlah Harga
(Rp)
14,873.65
8,366.40
929.60
1,162.00
25,331.65
22,650.00
4,588.80
27,238.80
52,570.45
5,257.05
57,827.50
Jumlah Harga
(Rp)
21,248.07
11,952.00
1,328.00
1,660.00
36,188.07
97,680.00
553.50
98,233.50
134,421.57
13,442.16
147,863.73
Jumlah Harga
(Rp)
21,248.07
11,952.00
1,328.00
166.00
34,694.07
46,800.00
4,400.00
51,200.00
85,894.07
8,589.41
94,483.48
Jumlah Harga
(Rp)
21,248.07
11,952.00
1,328.00
166.00
34,694.07
72,000.00
4,400.00
76,400.00
111,094.07
11,109.41
122,203.48
Jumlah Harga
(Rp)
42,496.14
23,904.00
2,656.00
3,320.00
72,376.14
87,500.00
1,100.00
14,256.00
7,865.92
16,000.00
126,721.92
199,098.06
19,909.81
219,007.87
Jumlah Harga
(Rp)
12,748.84
7,171.20
796.80
996.00
21,712.84
36,750.00
764.80
37,514.80
59,227.64
5,922.76
65,150.41
Jumlah Harga
(Rp)
15,936.05
8,366.40
929.60
996.00
26,228.05
13,350.00
880.00
14,230.00
40,458.05
4,045.81
44,503.86
Jumlah Harga
(Rp)
15,936.05
5,976.00
664.00
1,328.00
23,904.05
3,843.00
3,843.00
27,747.05
2,774.71
30,521.76
Jumlah Harga
(Rp)
12,748.84
7,171.20
796.80
996.00
21,712.84
40,700.00
764.80
41,464.80
63,177.64
6,317.76
69,495.41
A.4.6.1. HARGA SATUAN PEKERJAAN KAYU
A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I bengkirai
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 7.0000 106,240.36 743,682.52
Tukang kayu L.02 OH 21.0000 119,520.00 2,509,920.00
Kepala tukang L.03 OH 2.1000 132,800.00 278,880.00
Mandor L.04 OH 0.3500 166,000.00 58,100.00
JUMLAH 3,590,582.52
B BAHAN TENAGA
Balok kayu M3 KERJA 1.1000 10,300,000.00 11,330,000.00
Paku 10 cm Kg 1.2500 18,450.00 23,062.50
Lem kayu Kg 1.0000 24,070.00 24,070.00
JUMLAH 11,377,132.50
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 14,967,715.02
E Overhead & Profit 10% x D 1,496,771.50
F Harga Satuan Pekerjaan (D+E) 16,464,486.52
A.4.6.1.2.Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III kamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.0000 106,240.36 637,442.16
Tukang kayu L.02 OH 18.0000 119,520.00 2,151,360.00
Kepala tukang L.03 OH 1.8000 132,800.00 239,040.00
Mandor L.04 OH 0.3000 166,000.00 49,800.00
JUMLAH 3,077,642.16
B BAHAN TENAGA
Balok kayu M3 KERJA 1.2000 7,693,750.00 9,232,500.00
Paku 10 cm Kg 1.2500 18,450.00 23,062.50
Lem kayu Kg 1.0000 24,070.00 24,070.00
JUMLAH 9,279,632.50
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 12,357,274.66
E Overhead & Profit 10% x D 1,235,727.47
F Harga Satuan Pekerjaan (D+E) 13,593,002.13
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 518,234.63
E Overhead & Profit 10% x D 51,823.46
F Harga Satuan Pekerjaan (D+E) 570,058.09
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II kamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 106,240.36 106,240.36
Tukang kayu L.02 OH 3.0000 119,520.00 358,560.00
Kepala tukang L.03 OH 0.3000 132,800.00 39,840.00
Mandor L.04 OH 0.0500 166,000.00 8,300.00
JUMLAH 512,940.36
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0400 8,442,500.00 337,700.00
Lem kayu Kg 0.5000 24,070.00 12,035.00
JUMLAH 349,735.00
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 862,675.36
E Overhead & Profit 10% x D 86,267.54
F Harga Satuan Pekerjaan (D+E) 948,942.90
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II kamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 106,240.36 84,992.29
Tukang kayu L.02 OH 2.4000 119,520.00 286,848.00
Kepala tukang L.03 OH 0.2400 132,800.00 31,872.00
Mandor L.04 OH 0.0400 166,000.00 6,640.00
JUMLAH 410,352.29
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0240 8,442,500.00 202,620.00
Lem kayu Kg 0.3000 24,070.00 7,221.00
JUMLAH 209,841.00
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 620,193.29
E Overhead & Profit 10% x D 62,019.33
F Harga Satuan Pekerjaan (D+E) 682,212.62
A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi, kayu kelas I atau II kamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. A TENAGA
4.6 Pekerja L.01 OH 1.0000 106,240.36 106,240.36
.1. Tukang kayu L.02 OH 3.0000 119,520.00 358,560.00
7.
Kepala tukang L.03 OH 0.3000 132,800.00 39,840.00
Pe
mb Mandor L.04 OH 0.0500 166,000.00 8,300.00
uat JUMLAH 512,940.36
an B BAHAN TENAGA
da Papan kayu M3 KERJA 0.0640 8,442,500.00 540,320.00
n
pe Lem kayu Kg 0.5000 24,070.00 12,035.00
ma JUMLAH 552,355.00
san C PERALATAN HARGA BAHAN
ga
n JUMLAH
1 HARGA ALAT
m2 D Jumlah (A+B+C) 1,065,295.36
pin E Overhead & Profit 10% x D 106,529.54
tu F Harga Satuan Pekerjaan (D+E) 1,171,824.90
da
n
jen
del
a
jal
usi
ka
yu
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II kruing tertutup (lebar sampai 90 cm)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 106,240.36 74,368.25
Tukang kayu L.02 OH 2.1000 119,520.00 250,992.00
Kepala tukang L.03 OH 0.2100 132,800.00 27,888.00
Mandor L.04 OH 0.0350 166,000.00 5,810.00
JUMLAH 359,058.25
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0250 6,939,110.00 173,477.75
Paku 1 cm – 2,5 cm Kg 0.0300 22,000.00 660.00
Lem kayu Kg 0.5000 24,070.00 12,035.00
Plywood tebal 4 mm Lmbr 1.0000 57,130.00 57,130.00
Ukuran (90 x 220) cm JUMLAH 243,302.75
C PERALATAN HARGA BAHAN
JUMLAH
D Jumlah (A+B+C) HARGA ALAT 602,361.00
E Overhead & Profit 10% x D 60,236.10
F Harga Satuan Pekerjaan (D+E) 662,597.10
A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II kamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 106,240.36 84,992.29
Tukang kayu L.02 OH 2.4000 119,520.00 286,848.00
Kepala tukang L.03 OH 0.2400 132,800.00 31,872.00
Mandor L.04 OH 0.0400 166,000.00 6,640.00
JUMLAH 410,352.29
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0256 8,442,500.00 216,128.00
Paku 1 cm – 2,5 Kg 0.0300 22,000.00 660.00
cm
Lem kayu Kg 0.5000 24,070.00 12,035.00
Plywood 4 mm Lmbr 1.0000 57,130.00 57,130.00
(90 x 220) cm JUMLAH 285,953.00
C PERALATAN HARGA BAHAN
JUMLAH
D Jumlah (A+B+C) HARGA ALAT 696,305.29
E Overhead & Profit 10% x D 69,630.53
F Harga Satuan Pekerjaan (D+E) 765,935.82
JUMLAH
D Jumlah (A+B+C) HARGA ALAT 902,241.04
E Overhead & Profit 10% x D 90,224.10
F Harga Satuan Pekerjaan (D+E) 992,465.15
A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I kamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 106,240.36 84,992.29
Tukang kayu L.02 OH 2.4000 119,520.00 286,848.00
Kepala tukang L.03 OH 0.2400 132,800.00 31,872.00
Mandor L.04 OH 0.0400 166,000.00 6,640.00
JUMLAH 410,352.29
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0250 0 8,442,500.00 211,062.50
Paku 1 – 2,5 cm Kg 0.0300 22,000.00 660.00
Lem kayu Kg 0.3000 24,070.00 7,221.00
Teakwood 4 mm Lmbr 1.0000 108,730.00 108,730.00
90 x 220 cm JUMLAH 327,673.50
C PERALATAN HARGA BAHAN
JUMLAH
D Jumlah (A+B+C) HARGA ALAT 738,025.79
E Overhead & Profit 10% x D 73,802.58
F Harga Satuan Pekerjaan (D+E) 811,828.37
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.0000 106,240.36 424,961.44
Tukang kayu L.02 OH 12.0000 119,520.00 1,434,240.00
Kepala tukang L.03 OH 1.2000 132,800.00 159,360.00
Mandor L.04 OH 0.2000 166,000.00 33,200.00
JUMLAH 2,051,761.44
B BAHAN TENAGA
Balok kayu M3 KERJA 1.1000 7,693,750.00 8,463,125.00
Besi strip tebal 5 Kg 15.0000 9,180.00 137,700.00
mm
Paku 12 cm Kg 5.6000 18,450.00 103,320.00
JUMLAH 8,704,145.00
C PERALATAN HARGA BAHAN
JUMLAH
D Jumlah (A+B+C) HARGA ALAT 10,755,906.44
E Overhead & Profit 10% x D 1,075,590.64
F Harga Satuan Pekerjaan (D+E) 11,831,497.08
JUMLAH
D Jumlah (A+B+C) HARGA ALAT 12,910,220.41
E Overhead & Profit 10% x D 1,291,022.04
F Harga Satuan Pekerjaan (D+E) 14,201,242.45
A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II kruing
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.7000 106,240.36 711,810.41
Tukang kayu L.02 OH 20.1000 119,520.00 2,402,352.00
Kepala tukang L.03 OH 2.0100 132,800.00 266,928.00
Mandor L.04 OH 0.3350 166,000.00 55,610.00
JUMLAH 3,436,700.41
B BAHAN TENAGA
Balok kayu M3 KERJA 1.1000 6,443,440.00 7,087,784.00
Besi strip tebal 5 Kg 15.0000 9,180.00 137,700.00
mm
Paku 12 cm Kg 3.0000 18,450.00 55,350.00
JUMLAH 7,280,834.00
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 10,717,534.41
E Overhead & Profit 10% x D 1,071,753.44
F Harga Satuan Pekerjaan (D+E) 11,789,287.85
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 451,471.54
E Overhead & Profit 10% x D 45,147.15
F Harga Satuan Pekerjaan (D+E) 496,618.69
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 628,764.04
E Overhead & Profit 10% x D 62,876.40
F Harga Satuan Pekerjaan (D+E) 691,640.44
A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 106,240.36 15,936.05
Tukang kayu L.02 OH 0.3000 119,520.00 35,856.00
Kepala tukang L.03 OH 0.0300 132,800.00 3,984.00
Mandor L.04 OH 0.0750 166,000.00 12,450.00
JUMLAH 68,226.05
B BAHAN TENAGA
Kaso-kaso 5 x 7cm M3 KERJA 0.0154 8,442,500.00 130,014.50
Paku 7 cm – 10 cm Kg 0.2000 18,450.00 3,690.00
JUMLAH 133,704.50
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 201,930.55
E Overhead & Profit 10% x D 20,193.06
F Harga Satuan Pekerjaan (D+E) 222,123.61
A.4.6.1.20.Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III kamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 106,240.36 21,248.07
Tukang kayu L.02 OH 0.3000 119,520.00 35,856.00
Kepala tukang L.03 OH 0.0300 132,800.00 3,984.00
Mandor L.04 OH 0.0100 166,000.00 1,660.00
JUMLAH 62,748.07
B BAHAN TENAGA
Kaso-kaso M3 KERJA 0.0163 8,442,500.00 137,612.75
5 x 7 cm
Paku 7 – 10 cm Kg 0.2500 18,450.00 4,612.50
JUMLAH 142,225.25
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 204,973.32
E Overhead & Profit 10% x D 20,497.33
F Harga Satuan Pekerjaan (D+E) 225,470.65
A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II kamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 106,240.36 10,624.04
Tukang kayu L.02 OH 0.2000 119,520.00 23,904.00
Kepala tukang L.03 OH 0.0200 132,800.00 2,656.00
Mandor L.04 OH 0.0050 166,000.00 830.00
JUMLAH 38,014.04
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0108 8,442,500.00 91,179.00
Paku 5 dan 7 Kg 0.1000 18,450.00 1,845.00
cm JUMLAH 93,024.00
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 131,038.04
E Overhead & Profit 10% x D 13,103.80
F Harga Satuan Pekerjaan (D+E) 144,141.84
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II kruing
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 106,240.36 10,624.04
Tukang kayu L.02 OH 0.2000 119,520.00 23,904.00
Kepala tukang L.03 OH 0.0200 132,800.00 2,656.00
Mandor L.04 OH 0.0050 166,000.00 830.00
JUMLAH 38,014.04
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0110 6,939,110.00 76,330.21
Paku 5 dan 7 cm Kg 0.0500 18,450.00 922.50
JUMLAH 77,252.71
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 115,266.75
E Overhead & Profit 10% x D 11,526.67
F Harga Satuan Pekerjaan (D+E) 126,793.42
A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III Kamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 106,240.36 15,936.05
Tukang kayu L.02 OH 0.4500 119,520.00 53,784.00
Kepala tukang L.03 OH 0.0450 132,800.00 5,976.00
Mandor L.04 OH 0.0080 166,000.00 1,328.00
JUMLAH 77,024.05
B BAHAN TENAGA
Balok kayu M3 KERJA 0.0280 7,693,750.00 215,425.00
Paku 5 dan 7 Kg 0.1500 18,450.00 2,767.50
cm JUMLAH 218,192.50
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 295,216.55
E Overhead & Profit 10% x D 29,521.66
F Harga Satuan Pekerjaan (D+E) 324,738.21
A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II kamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 106,240.36 21,248.07
Tukang kayu L.02 OH 0.6000 119,520.00 71,712.00
Kepala tukang L.03 OH 0.0600 132,800.00 7,968.00
Mandor L.04 OH 0.0100 166,000.00 1,660.00
JUMLAH 102,588.07
B BAHAN TENAGA
Balok kayu, 6 x 12 M3 KERJA 0.0280 7,693,750.00 215,425.00
Paku 5 dan 10 Kg 0.1500 18,450.00 2,767.50
Plywood 4 mm, Lmbr 0.8600 57,130.00 49,131.80
120
Lem xkayu
240 Kg 0.5600 24,070.00 13,479.20
JUMLAH 280,803.50
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 383,391.57
E Overhead & Profit 10% x D 38,339.16
F Harga Satuan Pekerjaan (D+E) 421,730.73
A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I kruing
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 106,240.36 63,744.22
Tukang kayu L.02 OH 1.8000 119,520.00 215,136.00
Kepala tukang L.03 OH 0.1800 132,800.00 23,904.00
Mandor L.04 OH 0.0300 166,000.00 4,980.00
JUMLAH 307,764.22
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0070 6,939,110.00 48,573.77
Paku 5 dan 10 Kg 0.1000 18,450.00 1,845.00
Paku skrup 10 cm Kg 0.1500 18,450.00 2,767.50
JUMLAH 53,186.27
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 360,950.49
E Overhead & Profit 10% x D 36,095.05
F Harga Satuan Pekerjaan (D+E) 397,045.53
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 36,800.41
E Overhead & Profit 10% x D 3,680.04
F Harga Satuan Pekerjaan (D+E) 40,480.45
A.4.6.1.28. Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV albesia
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 106,240.36 10,624.04
Tukang kayu L.02 OH 0.0500 119,520.00 5,976.00
Kepala tukang L.03 OH 0.0050 132,800.00 664.00
Mandor L.04 OH 0.0050 166,000.00 830.00
JUMLAH 18,094.04
B BAHAN TENAGA
Bilik bambu KERJA 1.5000 35,000.00 52,500.00
Kaso-kaso 5 x 7 0.0140 2,827,140.00 39,579.96
Paku 0.0120 18,450.00 221.40
List kayu 2/4 0.0030 6,939,110.00 20,817.33
JUMLAH 113,118.69
C PERALATAN HARGA BAHAN
JUMLAH
D Jumlah (A+B+C) HARGA ALAT 131,212.73
E Overhead & Profit 10% x D 13,121.27
F Harga Satuan Pekerjaan (D+E) 144,334.00
A.4.6.1.29. Pemasangan 1 M2 Pasang Usuk expose diprofil + Reng kayu kamper , atap genteng keramik
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 106,240.36 10,624.04
Tukang kayu L.02 OH 0.1000 119,520.00 11,952.00
Kepala Tukang L.03 OH 0.0100 132,800.00 1,328.00
Mandor L.04 OH 0.0050 166,000.00 830.00
Upah Serut profil Kayu M3 0.0080 - -
JUMLAH 24,734.04
B BAHAN TENAGA
Usuk kamper 5x7 M3 KERJA 0.0140 8,442,500.00 118,195.00
Reng kamper 2x3 M3 0.0036 8,442,500.00 30,393.00
Paku biasa 7-10 cm Kg 0.2500 18,450.00 4,612.50
JUMLAH 153,200.50
C PERALATAN HARGA BAHAN
JUMLAH
D Jumlah (A+B+C) HARGA ALAT 177,934.54
E Overhead & Profit 10% x D 17,793.45
F Harga Satuan Pekerjaan (D+E) 195,727.99
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 76,407.73
E Overhead & Profit 10% x D 7,640.77
F Harga Satuan Pekerjaan (D+E) 84,048.50
A.4.6.1.33. Pemasangan 1 m’ lisplank ukuran 3 x 15 cm, kayu kelas I atau kelas II kruing
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 106,240.36 10,624.04
Tukang kayu L.02 OH 0.2000 119,520.00 23,904.00
Kepala tukang L.03 OH 0.0200 132,800.00 2,656.00
Mandor L.04 OH 0.0050 166,000.00 830.00
JUMLAH 38,014.04
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0055 6,939,110.00 38,165.11
Paku 5 dan 7 Kg 0.0500 18,450.00 922.50
cm JUMLAH 39,087.61
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 77,101.64
E Overhead & Profit 10% x D 7,710.16
F Harga Satuan Pekerjaan (D+E) 84,811.81
A.4.6.1.34. Pemasangan 1 m’ lisplank ukuran 2 x (3 x 20) cm, kayu kelas I atau kelas II kruing
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 106,240.36 10,624.04
Tukang kayu L.02 OH 0.2000 119,520.00 23,904.00
Kepala tukang L.03 OH 0.0200 132,800.00 2,656.00
Mandor L.04 OH 0.0050 166,000.00 830.00
JUMLAH 38,014.04
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0216 6,939,110.00 149,884.78
Paku 5 dan 7 Kg 0.2000 18,450.00 3,690.00
cm JUMLAH 153,574.78
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 191,588.81
E Overhead & Profit 10% x D 19,158.88
F Harga Satuan Pekerjaan (D+E) 210,747.69
A.4.6.1.35. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I Merbau
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 7.0000 106,240.36 743,682.52
Tukang kayu L.02 OH 21.0000 119,520.00 2,509,920.00
Kepala tukang L.03 OH 2.1000 132,800.00 278,880.00
Mandor L.04 OH 0.3500 166,000.00 58,100.00
JUMLAH 3,590,582.52
B BAHAN TENAGA
Balok kayu Merbau M3 KERJA 1.1000 20,600,000.00 22,660,000.00
Paku 10 cm Kg 1.2500 18,450.00 23,062.50
Lem kayu Kg 1.0000 24,070.00 24,070.00
JUMLAH 22,707,132.50
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 26,297,715.02
E Overhead & Profit 10% x D 2,629,771.50
F Harga Satuan Pekerjaan (D+E) 28,927,486.52
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 1,408,975.36
E Overhead & Profit 10% x D 140,897.54
F Harga Satuan Pekerjaan (D+E) 1,549,872.90
A.4.6.1.37. Pemasangan 1 m’ lisplank ukuran 3 x 15 cm, kayu kelas I atau kelas II kamper
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 106,240.36 10,624.04
Tukang kayu L.02 OH 0.2000 119,520.00 23,904.00
Kepala tukang L.03 OH 0.0200 132,800.00 2,656.00
Mandor L.04 OH 0.0050 166,000.00 830.00
JUMLAH 38,014.04
B BAHAN TENAGA
Papan kayu M3 KERJA 0.0108 6,939,110.000 74,942.39
Paku 5 dan 7 Kg 0.0500 18,450.00 922.50
cm JUMLAH 75,864.89
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 113,878.92
E Overhead & Profit 10% x D 11,387.89
F Harga Satuan Pekerjaan (D+E) 125,266.82
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
A.4.6.2.1. Pemasangan 1 buah kunci tanam biasa
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0100 106,240.36
Tukang kayu L.02 OH 0.5000 119,520.00
Kepala tukang L.03 OH 0.0500 132,800.00
Mandor L.04 OH 0.0050 166,000.00
JUMLAH
B BAHAN TENAGA
Kunci tanam biasa Buah KERJA 1.0000 110,730.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.3. Pemasangan 1 buah engsel jendela kupu-kupu Har
ga
No Uraian Kode Satuan Koefisien Satu
an
A TENAGA (Rp)
Pekerja L.01 OH 0.0100 106,240.36
Tukang kayu L.02 OH 0.1000 119,520.00
Kepala tukang L.03 OH 0.0100 132,800.00
Mandor L.04 OH 0.0005 166,000.00
JUMLAH
B BAHAN TENAGA
Engsel kupu-kupu Buah KERJA 1.0000 49,500.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.6. Pemasangan 1 buah kait angin
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0150 106,240.36
Tukang kayu L.02 OH 0.1500 119,520.00
Kepala tukang L.03 OH 0.0150 132,800.00
Mandor L.04 OH 0.0080 166,000.00
JUMLAH
B BAHAN TENAGA
Kait angin Buah KERJA 1.0000 35,000.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.9. Pemasangan 1 buah door holder
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0500 106,240.36
Tukang kayu L.02 OH 0.5000 119,520.00
Kepala tukang L.03 OH 0.0500 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Door holder Buah KERJA 1.0000 40,000.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.12. Pemasangan 1 m2 kaca tebal 3 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0150 106,240.36
Tukang kayu L.02 OH 0.1500 119,520.00
Kepala tukang L.03 OH 0.0150 132,800.00
Mandor L.04 OH 0.0008 166,000.00
JUMLAH
B BAHAN TENAGA
Kaca tebal 3 mm M2 KERJA 1.1000 101,830.00
Sealant Kg 0.0500 44,000.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.15. Pemasangan 1 m2 kaca cermin tebal 5 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0150 106,240.36
Tukang kayu L.02 OH 0.1500 119,520.00
Kepala tukang L.03 OH 0.0150 132,800.00
Mandor L.04 OH 0.0080 166,000.00
JUMLAH
B BAHAN TENAGA
Kaca cermin 5 mm M2 KERJA 1.1000 275,000.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)
1,062.40
59,760.00
6,640.00
830.00
68,292.40
110,730.00
110,730.00
179,022.40
17,902.24
196,924.64
Jumlah Harga
(Rp)
531.20
59,760.00
6,640.00
498.00
67,429.20
100,000.00
100,000.00
167,429.20
16,742.92
184,172.12
Jumlah Harga
(Rp)
1,593.61
17,928.00
1,992.00
132.80
21,646.41
84,460.00
84,460.00
106,106.41
10,610.64
116,717.05
Jumlah Harga
(Rp)
1,062.40
11,952.00
1,328.00
83.00
14,425.40
49,500.00
49,500.00
63,925.40
6,392.54
70,317.94
Jumlah Harga
(Rp)
10,624.04
23,904.00
2,656.00
83.00
37,267.04
35,000.00
35,000.00
72,267.04
7,226.70
79,493.74
Jumlah Harga
(Rp)
1,593.61
17,928.00
1,992.00
1,328.00
22,841.61
28,850.00
28,850.00
51,691.61
5,169.16
56,860.77
Jumlah Harga
(Rp)
1,593.61
17,928.00
1,992.00
1,328.00
22,841.61
35,000.00
35,000.00
57,841.61
5,784.16
63,625.77
Jumlah Harga
(Rp)
5,312.02
59,760.00
6,640.00
498.00
72,210.02
247,500.00
247,500.00
319,710.02
31,971.00
351,681.02
Jumlah Harga
(Rp)
2,124.81
23,904.00
2,656.00
166.00
28,850.81
100,000.00
100,000.00
128,850.81
12,885.08
141,735.89
Jumlah Harga
(Rp)
5,312.02
59,760.00
6,640.00
498.00
72,210.02
40,000.00
40,000.00
112,210.02
11,221.00
123,431.02
Jumlah Harga
(Rp)
1,062.40
11,952.00
1,328.00
830.00
15,172.40
77,670.00
77,670.00
92,842.40
9,284.24
102,126.64
Jumlah Harga
(Rp)
6,374.42
71,712.00
7,968.00
498.00
86,552.42
240,000.00
240,000.00
326,552.42
32,655.24
359,207.66
Jumlah Harga
(Rp)
1,593.61
17,928.00
1,992.00
132.80
21,646.41
112,013.00
2,200.00
114,213.00
135,859.41
13,585.94
149,445.35
Jumlah Harga
(Rp)
1,593.61
17,928.00
1,992.00
132.80
21,646.41
159,643.00
2,200.00
161,843.00
183,489.41
18,348.94
201,838.35
Jumlah Harga
(Rp)
1,806.09
20,318.40
2,257.60
149.40
24,531.49
264,000.00
3,080.00
267,080.00
291,611.49
29,161.15
320,772.63
Jumlah Harga
(Rp)
1,593.61
17,928.00
1,992.00
1,328.00
22,841.61
302,500.00
302,500.00
325,341.61
32,534.16
357,875.77
Jumlah Harga
(Rp)
1,593.61
17,928.00
1,992.00
132.80
21,646.41
150,000.00
150,000.00
171,646.41
17,164.64
188,811.05
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.1500 106,240.36
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Soda api Kg KERJA 0.0500 22,300.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0700 106,240.36
Tukang cat L.02 OH 0.0090 119,520.00
Kepala tukang L.03 OH 0.0060 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Cat menie Kg KERJA 0.2000 40,700.00
Plamuur Kg 0.1500 23,580.00
Cat dasar Kg 0.1700 30,600.00
Cat penutup Kg 0.2600 65,440.00
Kuas buah 0.0100 19,440.00
Pengencer Kg 0.0300 37,350.00
Ampelas Lbr 0.2000 4,930.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
D Jumlah (A+B+C) HARGA ALAT
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0700 106,240.36
Tukang cat L.02 OH 0.1050 119,520.00
Kepala tukang L.03 OH 0.0040 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Cat menie Kg KERJA 0.2000 40,700.00
Plamuur Kg 0.1500 23,580.00
Cat dasar Kg 0.1700 30,600.00
Cat penutup Kg 0.3500 65,440.00
Kuas buah 0.0100 19,440.00
Pengencer Kg 0.0300 37,350.00
Ampelas Lbr 0.2000 4,930.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
D Jumlah (A+B+C) HARGA ALAT
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.9. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0200 106,240.36
Tukang cat L.02 OH 0.0630 119,520.00
Kepala tukang L.03 OH 0.0063 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Plamuur Kg KERJA 0.1000 23,580.00
Cat dasar Kg 0.1000 30,600.00
Cat penutup Kg 0.2600 27,600.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.10. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0280 106,240.36
Tukang cat L.02 OH 0.0420 119,520.00
Kepala tukang L.03 OH 0.0042 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Cat dasar Kg KERJA 0.1200 30,600.00
Cat penutup Kg 0.1800 27,600.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)
15,936.05
498.00
16,434.05
1,115.00
1,115.00
17,549.05
1,754.91
19,303.96
Jumlah Harga
(Rp)
15,936.05
498.00
16,434.05
-
-
16,434.05
1,643.41
18,077.46
Jumlah Harga
(Rp)
15,936.05
1,328.00
17,264.05
-
-
17,264.05
1,726.41
18,990.46
Jumlah Harga
(Rp)
7,436.83
1,075.68
796.80
498.00
9,807.31
8,140.00
3,537.00
5,202.00
17,014.40
194.40
1,120.50
986.00
36,194.30
46,001.61
4,600.16
50,601.77
Jumlah Harga
(Rp)
7,436.83
12,549.60
531.20
498.00
21,015.63
8,140.00
3,537.00
5,202.00
22,904.00
194.40
1,120.50
986.00
42,083.90
63,099.53
6,309.95
69,409.48
Jumlah Harga
(Rp)
4,249.61
7,529.76
8,366.40
498.00
20,643.77
19,062.00
19,062.00
39,705.77
3,970.58
43,676.35
Jumlah Harga
(Rp)
4,249.61
7,171.20
2,124.80
498.00
14,043.61
11,605.50
28,781.64
9,860.00
50,247.14
64,290.75
6,429.08
70,719.83
Jumlah Harga
(Rp)
16,998.46
19,123.20
2,124.80
498.00
38,744.46
10,999.50
2,357.50
493.00
13,850.00
52,594.46
5,259.45
57,853.90
Jumlah Harga
(Rp)
2,124.81
7,529.76
836.64
498.00
10,989.21
2,358.00
3,060.00
7,176.00
12,594.00
23,583.21
2,358.32
25,941.53
Jumlah Harga
(Rp)
2,974.73
5,019.84
557.76
498.00
9,050.33
3,672.00
4,968.00
8,640.00
17,690.33
1,769.03
19,459.36
Jumlah Harga
(Rp)
2,124.81
23,904.00
2,656.00
415.00
29,099.81
3,784.00
62.70
3,846.70
32,946.51
3,294.65
36,241.16
Jumlah Harga
(Rp)
26,560.09
26,892.00
2,988.00
1,245.00
57,685.09
3,784.00
373.50
62.70
786.13
5,006.33
62,691.42
6,269.14
68,960.56
A.5.3.1 HARGA SATUAN PEKERJAAN STYLE BALI
A.5.3.1 1. Pemasangan 1 M2 Pas. Style Bali Paras Bata
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA KERJA
Upah Pasang M2 1.0000 300,000.00
JUMLAH
B BAHAN TENAGA
Paras Ornamen Bh KERJA 9.0000 106,490.00
Bata Gosok Bh 50.0000 2,500.00
Semen PC Kg 32.0000 1,320.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
A.5.3.1 11. Pemasangan 1 Ps Tapel Ring-ring Ukir
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0500 106,240.36
Tukang kayu L.02 OH 0.0500 119,520.00
Kepala tukang L.03 OH 0.0050 132,800.00
Mandor L.04 OH 0.0030 166,000.00
JUMLAH
B BAHAN TENAGA
Tapel Ring-ring ukir Psg KERJA 1.0000 50,000.00
Paku List kg 0.0100 22,000.00
JUMLAH
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
2 1
Pasan
A.
gUPA
Pek. 1 Ls Upah Pasang 25,000,000.0000 ###
Gapur
H
a
B.
BAH 811.48275862069 Bj Paras exs. 40,000.0000 32,459,310.34
AN 30 Zak Bonbiu50
Semen 62,500.0000 1,875,000.00
58x18x5
Kg/sakcn Total : ### 34,334,310.34
Overh
ead &
Harga
Profit
Satua
10
n %
Pekerj
aan
Jumlah Harga
(Rp)
300,000.00
300,000.00
958,410.00
125,000.00
42,240.00
1,125,650.00
1,425,650.00
142,565.00
1,568,215.00
Jumlah Harga
(Rp)
300,000.00
300,000.00
267,300.00
42,240.00
309,540.00
609,540.00
60,954.00
670,494.00
Jumlah Harga
(Rp)
300,000.00
300,000.00
1,347,500.00
42,240.00
1,389,740.00
50,000.00
50,000.00
1,739,740.00
173,974.00
1,913,714.00
Jumlah Harga
(Rp)
300,000.00
300,000.00
448,350.00
12,276.00
4,424.58
31,040.00
496,090.58
796,090.58
79,609.06
875,699.64
Jumlah Harga
(Rp)
150,000.00
150,000.00
1,650,000.00
1,650,000.00
1,800,000.00
180,000.00
1,980,000.00
Jumlah Harga
(Rp)
25,000.00
25,000.00
250,000.00
250,000.00
275,000.00
27,500.00
302,500.00
Jumlah Harga
(Rp)
50,000.00
50,000.00
350,000.00
350,000.00
-
400,000.00
40,000.00
440,000.00
Jumlah Harga
(Rp)
200,000.00
200,000.00
1,950,000.00
1,950,000.00
2,150,000.00
215,000.00
2,365,000.00
Jumlah Harga
(Rp)
100,000.00
100,000.00
1,275,000.00
1,275,000.00
1,375,000.00
137,500.00
1,512,500.00
Jumlah Harga
(Rp)
5,312.02
5,976.00
664.00
498.00
12,450.02
696,496.50
220.00
696,716.50
709,166.52
70,916.65
780,083.17
Jumlah Harga
(Rp)
5,312.02
5,976.00
664.00
498.00
12,450.02
50,000.00
220.00
50,220.00
62,670.02
6,267.00
68,937.02
Jumlah Harga
(Rp)
5,312.02
5,976.00
664.00
498.00
12,450.02
142,275.00
220.00
142,495.00
154,945.02
15,494.50
170,439.52
Jumlah Harga
(Rp)
100,000.00
100,000.00
250,000.00
220.00
250,220.00
350,220.00
35,022.00
385,242.00
59,334,310.34
5,933,431.03
65,267,741.38
### 1 Pasang Pek. Gapura paras tinggi 5.00 m'
A. UPAH
1.0000 Ls Upah Pasang 25,000,000.00 25,000,000.00
B. BAHAN
- Bj Paras exs. Bonbiu 58x18x5 cn - -
30.0000 Zak Semen 50 Kg/sak - -
Total : 25,000,000.00 - 25,000,000.00
Overhead & Profit 10 % 2,500,000.00
Harga Satuan Pekerjaan 27,500,000.00
B BAHAN
2 Bh Stik penerima / blacksem 2m' 65,000
1 Bh Reduser galvanis 3/4" - 1" 9,000
3 M' Pipa Galvanis 1" 56,300
1 Ls Material Bantu 25,000
II. Pek. Instalasi Kabel Penangkar Petir
A UPAH
2 Ls Labor cost 75,000 150,000
B BAHAN
24 Ml Kabel BC 70 mm2 90,000
24 Ml Pipa Conduit high impact 3/4" 9,500
8 Bh Sok/Klem conduit 20 mm 750
1 Ls Material bantu 35,000
II. Pek. Grounding
A UPAH
1 Ls Labor cost 700,000 700,000
B BAHAN
6.6 Ml Kabel BC 70 mm2 90,000
6.6 Ml Pipa Conduit high impact 3/4" 56,300
1 Ls Material bantu 100,000
TOTAL 1,000,000
Over head dan profit 10%
Harga Satua Penangkal petir
130,000
9,000
168,900
25,000
2,160,000
228,000
6,000
35,000
594,000
371,580
100,000
3,827,480 4,827,480
482,748
5,310,228
A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA DI LUAR GEDUNG
A.8.4.1.1 (K3) Pemasangan 1 m pipa PVC 1/2 SNI S-10 SCJ
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 106,240.36 8,605.47
Tukang Pipa L.02 OH 0.0410 119,520.00 4,900.32
Mandor L.04 OH 0.0080 166,000.00 1,328.00
JUMLAH 14,833.79
B BAHAN TENAGA
Pipa PVC 1/2 SNI M' KERJA 1.0000 7,910.00 7,910.00
JUMLAH 7,910.00
C PERALATAN HARGA BAHAN
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 22,743.79
E Overhead & Profit 10% x D 2,274.38
F Harga Satuan Pekerjaan (D+E) 25,018.17
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 24,783.79
E Overhead & Profit 10% x D 2,478.38
F Harga Satuan Pekerjaan (D+E) 27,262.17
JUMLAH
HARGA ALAT
D Jumlah (A+B+C) 28,633.79
E Overhead & Profit 10% x D 2,863.38
F Harga Satuan Pekerjaan (D+E) 31,497.17
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE VIBRATOR
2. Tenaga Pw 5.5 HP
3. Kapasitas Cp 25.0 -
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 4 Tahun W 4,000.0 Jam
c. Harga Alat B Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 16,849.21 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 13,753.97 Rp./Jam
4. Bahan Bakar Bensin Mb 10,300.00 Liter
5. Bahan Bakar Solar Ms 12,700.00 Liter
6. Minyak Pelumas Mp 29,690.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
KONVERSI MUTU BETON
PBI 71 KONVERSI SNI ( fc ) Mpa
K 75 75*0,83/10 6.23 Mpa (75*9,81/100)*0,83 6.1
K 100 100*0,83/10 8.30 Mpa 100*(9,81/100)*0,83 8.1
K 175 175*0,83/10 14.53 Mpa 175*(9,81/100)*0,83 14.2
K 200 200*0,83/10 16.60 Mpa 200*(9,81/100)*0,83 16.3
K 225 225*0,83/10 18.68 Mpa 225*(9,81/100)*0,83 18.3
K 250 250*0,83/10 20.75 Mpa 250*(9,81/100)*0,83 20.4
K 275 275*0,83/10 22.83 Mpa 275*(9,81/100)*0,83 22.4
K 300 300*0,83/10 24.90 Mpa 300*(9,81/100)*0,83 24.4
K 350 350*0,83/10 29.05 Mpa 350*(9,81/100)*0,83 28.5
K 400 400*0,83/10 33.20 Mpa 400*(9,81/100)*0,83 32.6
SNI ( fc ) PBI ( K )
6.1 (6,1/0,83)*(100/9,81) K 75 75
7.4 (7,4/0,83)*(100/9,81) K 91 90
8.1 (8,1/0,83)*(100/9,81) K 99 100
9.8 (9,8/0,83)*(100/9,81) K 120 120
12.2 (12,2/0,83)*(100/9,81) K 150 150
14.5 (14,5/0,83)*(100/9,81) K 178 178
16.9 (16,9/0,83)*(100/9,81) K 208 208
19.3 (19,3/0,83)*(100/9,81) K 237 237
21.7 (21,7/0,83)*(100/9,81) K 267 267
24.43 (24,43/0,83)*(100/9,81) K 300 300
26.4 (26,4/0,83)*(100/9,81) K 324 324
28.8 (28,8/0,83)*(100/9,81) K 354 354
31.2 (31,2/0,83)*(100/9,81) K 383 383
32.6 (32,57/0,83)*(100/9,81) K 400 400