Progress Report

Alila Hotel - SCBD


Grup Busri
Tanggal : 01/03/2017
Harga satuan Jumlah
No Deskripsi Qty Unit

1 Coloum Cladding 404.46 m2 Rp 542,000.0 Rp 219,217,320


2 Wall Cladding 50.62 m2 Rp 647,000.0 Rp 32,751,140
3 Beam Cladding 25.04 m2 Rp 672,000.0 Rp 16,826,880
4 Skriting 20cm 17.45 m2 Rp 90,000.0 Rp 1,570,500
5 Floor 533.00 m2 Rp 360,000.0 Rp 191,880,000
6 Ledge 9.41 m2 Rp 647,000.0 Rp 6,088,270

Subtotal Rp 468,334,110

Diajukan Oleh
Apliktor

BUSRI
Periode Lalu Periode ini s.d Saat ini
Jumlah
Bobot Progres Bobot Progres Bobot
Progres
46.81% 20% 80.89 9.36% 65% 262.90 30.43% 85% 343.79
6.99% 25% 12.66 1.75% 45% 22.78 3.15% 70% 35.43
3.59% 30% 7.51 1.08% 30% 7.51 1.08% 60% 15.02
0.34% 40% 6.98 0.13% 30% 5.24 0.10% 70% 12.22
40.97% 30% 159.90 12.29% 30% 159.90 12.29% 60% 319.80
1.30% 20% 1.88 0.26% 40% 3.76 0.52% 60% 5.65

100.00% 24.87% 47.56%

Diperiksa Diperiksa
Project Manager QS

EBEN DODIK
s.d Saat ini
Jumlah
Bobot
39.79%
4.90%
2.16%
0.23%
24.58%
0.78%

72.43%