Pekerjaan :
Lokasi :
Th. Anggaran : 2019
Volume
No. Uraian pekerjaan Sat Uraian Perhitungan Keterangan
Terpasang
I PEKERJAAN PERSIAPAN
P x L x T x Banyak
1 #REF! ls = - m3
= - m3
Jumlah = - m3
2 #REF! m'
3 #REF! m2
4 #REF! ls 1.00
P x L x T x Banyak
= - m3
I PEKERJAAN GALIAN DAN URUGAN = - m3
= - m3
1 Galian Pondasi m3 Jumlah = - m3
2 Galian Drainase m3
P x L x T x Banyaknya
x x = - m3
4 Pasang list plafond m' 208.00
= - m3
Jumlah = - m3 1.dalam banguanan
II PEKERJAAN PENGECATAN = - m3
1 Pengecatan tembok (interior) m2 580.00 = - m3
= - m3
Jumlah = - m3
P x L x T x Banyak
= - m3
= - m3
2 Pengecatan plafon Gypsum m2 424.00 = - m3
Jumlah = - m3
P x L x T x Banyak
= - m3
= - m3
3 Pengecatan Plafond Selasar m2 187.15 = - m3
Volume
No. Uraian pekerjaan Sat Uraian Perhitungan Keterangan
Pengecatan Plafond Selasar Terpasang
= - m3
= - m3
= - m3
= - m3
Jumlah = - m3
P x L x T x Banyak
= - m3
= - m3
4 Pengecatan list gypsum m2 20.80 = - m3
= - m3
= - m3
= - m3
= - m3
= - m3
= - m3
Jumlah = - m3
P x L x T x Banyak
P x L x T x Banyak
219.60 x 0.45 x 0.80 x 1.00 = 79.06 m3
III PEKERJAAN PASANGAN
1 Pas. Pondasi Batu Belah 1:5 m3 79.06
Jumlah = 79.06 m3
P x T
48 x 3.60 = 172.80 m2
28 x 3.60 = 100.80 m2
2 Pas Bata Beton Ringan Setara CELCON Blok, uk. 60 x 20 x 10 cm(Standart) m2 484.20 3 x 3.60 = 10.80 m2
3 x 3.60 = 10.80 m2
14 x 3.60 = 50.40 m2
14 x 3.60 = 50.40 m2
3 x 3.60 = 10.80 m2
3 x 3.60 = 10.80 m2
3 x 3.60 = 10.80 m2
3 x 3.60 = 10.80 m2
3 x 3.60 = 10.80 m2
3 x 3.60 = 10.80 m2
3 x 3.60 = 10.80 m2
3.5 x 3.60 = 12.60 m2
Jumlah = 484.20 m2
P x L
2 x 2.00 = 4.00 m2
Jumlah = 4.00 m2
3 Pas. Bata Rolag m2 4.00
P x L
2 x 4.00 = 8.00 m2
V PEKERJAAN PLAFOND Jumlah = 8.00 m2
1 Pek. Drop Ceiling 20 cm GypsumBoard Rangka Hollow galvanis m2 8.00
P x L x T x Banyak
VI. TANGGA : 2.50 x 0.45 x 0.30 x 1.00 = 0.34 m3
KANTOR
1 Pek. Pondasi Sepatu Beton Tangga Ready Mix K 225 Besi 250 kg m3 0.34
Jumlah = 0.34 m3
P x L x T x Banyak
2.10 x 0.30 x 0.17 x 19.00 = 2.03 m3
2.10 x 2.00 x 0.17 x 2.00 = 1.43 m3
Volume
No. Uraian pekerjaan Sat Uraian Perhitungan Keterangan
Terpasang
2 Pek. Beton Tangga Ready Mix K 225 Besi 144 kg m3 3.46
Jumlah = 3.46 m3
P x L x T x Banyak
2.00 x 0.45 x 0.30 x 1.00 = 0.27 m3
AULA
1 Pek. Pondasi Sepatu Beton Tangga Ready Mix K 225 Besi 250 kg m3 0.27
Jumlah = 0.27 m3
P x L x T x Banyak
1.60 x 0.30 x 0.17 x 19.00 = 1.55 m3
1.60 x 2.00 x 0.17 x 2.00 = 1.09 m3
2 Pek. Beton Tangga Ready Mix K 225 Besi 144 kg m3 2.64
Jumlah = 2.64 m3
P x L x T x Banyak
24.00 x 14.00 x 0.10 x 1.00 = 33.60 m3
VII. PEKERJAAN KERAMIK LANTAI DAN DINDING
1 Pek. Lantai Kerja Bawah Lantai B 0 1 pc : 3 ps : 5 krl tebal 10 cm Besi Wiremesh m3 33.60
M6 1 Lapis Jumlah = 33.60 m3
P + P
VIII PEKERJAAN PLUMBING DAN SANITAIR 4.00 + 2.00 = 6.00 m1
A INSTALASI Jumlah = 6.00 m1
1 Pipa PVC 3/4" m' 6.00
P + P
8.00 + 2.00 = 10.00 m1
Jumlah = 10.00 m1
2 Pipa PVC 1" m' 10.00
P + P
28.00 + 1.00 = 29.00 m1
Jumlah = 29.00 m1
3 Pipa PVC 1/2" m' 29.00
P + P
24.00 + 1.00 = 25.00 m1
Jumlah = 25.00 m1
4 Pipa PVC 3" m' 25.00
P + P
24.00 + 1.00 = 25.00 m1
Jumlah = 25.00 m1
5 Pipa PVC 4" m' 25.00
B SANITAIR
1 Pek. Septictank Biofil Kap 4 - 6 orang + instalasi bh 1.00 P x Banyak
2.50 x 50.00 = 125.00 m1
IX PEKERJAAN HALAMAN Jumlah = 125.00 m1
1 Pasang Pagar Beton Precast, t = 2,00 m, 5 Panel, panjang kolom 3m, mutu beton m' 125.00
K-225
L x P x T x Banyak
2 PEKERJAAN LANTAI II 12.00 x 24.00 x 0.12 x 1.00 = 34.56 m3
I PEK. BETON BERTULANG : Jumlah = 34.56 m3
1 Pek. Dak Lantai Beton Ready Mix K 225 Besi 144 kg m3 34.56
L x P x T x Banyak
0.40 x 0.40 x 3.60 x 8.00 = 4.61 m3
Jumlah = 4.61 m3
2 a. Kolom beton K1 40/40 - K.225 m3 4.61
L x P x T x Banyak
0.30 x 0.30 x 3.60 x 3.00 = 0.97 m3
b kolom Beton K 1 30 / 30 m3 0.97 Jumlah = 0.97 m3
Volume
No. Uraian pekerjaan Sat Uraian Perhitungan Keterangan
Terpasang
L x P x T x Banyak
0.35 x 0.35 x 3.60 x 14.00 = 6.17 m3
b. Kolom beton 35/35 - K.225 m3 6.17 Jumlah = 6.17 m3
L x P x T x Banyak
0.20 x 0.50 x 3.60 x 2.00 = 0.72 m3
d. Kolom beton teras 20/50 - K.225 m3 0.72 Jumlah = 0.72 m3
L x T x P x Banyak
Volume
No. Uraian pekerjaan Sat Uraian Perhitungan Keterangan
Terpasang
0.30 x 0.60 x 5.00 x 4.00 = 3.60 m3
3 Balok beton struktur 0.30 0.60 4.00 1.00 0.72 m3
a. Balok beton B1 30/60 - K.225 m3 11.52 0.30 0.60 3.00 2.00 1.08 m3
0.30 0.60 8.00 3.00 4.32 m3
0.30 0.60 2.50 4.00 1.80 m3
Jumlah = 11.52 m3
L x T x P x Banyak
0.25 x 0.50 x 6.00 x 4.00 = 3.00 m3
0.25 x 0.50 x 5.00 x 13.00 = 8.13 m3
b. Balok beton B1 25/50 - K.225 m3 13.08 0.25 x 0.50 x 3.00 x 3.00 = 1.13 m3
1.28 0.25 x 0.50 x 2.60 x 1.00 = 0.33 m3
11.80 0.25 x 0.50 x 1.60 x 1.00 0.20 m3
0.25 x 0.50 x 1.40 x 1.00 0.18 m3
0.25 x 0.50 x 1.00 x 1.00 = 0.13 m3
Jumlah = 13.08 m3
L x T x P x Banyak
0.20 x 0.40 x 5.00 x 6.00 = 2.40 m3
0.20 x 0.40 x 3.50 x 1.00 = 0.28 m3
c. Balok beton BA 20/40 - K.225 m3 4.96 0.20 x 0.40 x 3.00 x 5.00 = 1.20 m3
0.20 0.40 2.50 3.00 0.60 m3
0.20 0.40 2.00 1.00 0.16 m3
0.20 0.40 1.47 2.00 0.24 m3
0.20 0.40 1.00 1.00 0.08 m3
Jumlah = 4.96 m3
L x T x P x Banyak
0.15 x 0.20 x 5.00 x 1.00 0.15 m3
0.15 x 0.20 x 3.00 x 6.00 0.54 m3
d. Balok beton BA 15/20 - K.225 m3 0.99 0.15 x 0.20 x 2.50 x 2.00 0.15 m3
0.15 0.20 2.00 1.00 0.06 m3
0.15 0.20 1.50 2.00 0.09 m3
Jumlah = 0.99 m3
L x T x P x Banyak
0.15 x 0.20 x 5.00 x 1.00 0.15 m3
0.15 x 0.20 x 3.00 x 6.00 0.54 m3
e. m3 0.99 0.15 x 0.20 x 2.50 x 2.00 0.15 m3
Pek. Ring Balok 15/20, Beton Site Mix K-225, Besi = 133 Kg, (RB1)
0.15 0.20 2.00 1.00 0.06 m3
0.15 0.20 1.50 2.00 0.09 m3
Jumlah = 0.99 m3 #REF!
L x T x P x Banyak
0.20 x 0.40 x 6.00 x 7.00 = 3.36 m3
0.20 x 0.40 x 5.00 x 14.00 = 5.60 m3
f. m3 16.44 0.20 x 0.40 x 3.00 x 5.00 = 1.20 m3
Pek. Ring Balok 20/40, Beton Ready Mix K-225, Besi =212 Kg, (RB2) 0.20 x 0.40 x 8.00 x 5.00 = 3.20 m3
0.20 x 0.40 x 6.50 x 3.00 = 1.56 m3
0.20 x 0.40 x 3.50 x 4.00 = 1.12 m3
0.20 x 0.40 x 2.50 x 2.00 = 0.40 m3
Jumlah = 16.44 m3
L x T x P x Banyak
1.50 x 0.10 x 6.00 x 1.00 = 0.90 m3
1.00 x 0.10 x 3.00 x 1.00 = 0.30 m3
g Pek. Dak Atap Beton Beton Ready Mix K 225 Besi 93 kg m3 2.00 1.00 x 0.10 x 5.00 x 1.00 = 0.50 m3
0.50 x 0.10 x 6.00 x 1.00 = 0.30 m3
Jumlah = 2.00 m3
P x T
Volume
No. Uraian pekerjaan Sat Uraian Perhitungan Keterangan
Terpasang
48 x 3.60 = 172.80 m2
Volume
No. Uraian pekerjaan Sat Uraian Perhitungan Keterangan
Terpasang
II. PEKERJAAN PASANGAN : 28 x 3.60 = 100.80 m2
1 Pas Bata Beton Ringan Setara CELCON Blok, uk. 60 x 20 x 10 cm(Standart) m2 484.20 3 x 3.60 = 10.80 m2
3 x 3.60 = 10.80 m2
14 x 3.60 = 50.40 m2
14 x 3.60 = 50.40 m2
3 x 3.60 = 10.80 m2
3 x 3.60 = 10.80 m2
3 x 3.60 = 10.80 m2
3 x 3.60 = 10.80 m2
3 x 3.60 = 10.80 m2
3 x 3.60 = 10.80 m2
3 x 3.60 = 10.80 m2
3.5 x 3.60 = 12.60 m2
Jumlah = 484.20 m2
P x L x T x Banyak
x x x = - m3
III PEKERJAAN ATAP Jumlah = 507.94 m2
1 Pas. Rangka Baja Atap Baja Ringan Berikut Gording, Kaso & Reng + Sertifikat Garansi m2 507.94
dan Perhitungan Software Struktur
P x L x Kemiringan x Banyak
26.00 x 16.00 x 0.819 x 1.00 = 507.94 m2
Jumlah = 507.94 m2
2 Pas. Genteng Model Metal Lapis Butiran Pasir warna Hitam m2 507.94
p x Banyak
47.80 x 1.00 = 47.80 m1
3 Pas. Nok Genteng Model Metal Type butiran m1 47.80 Jumlah = 47.80 m1
P x L x Kemiringan x Banyak
26.00 x 16.00 x 0.819 x 1.00 = 507.94 m2
Jumlah = 507.94 m2
4 Alumunium Foil m2 507.94
I Pek. Persiapan
1 Mobilisasi dan Demobilisasi PERHITUNGAN VOLUME
P B H JML VOL. SAT
Ls
TOTAL - Ls
TOTAL - M'
TOTAL - M2
TOTAL - Unit
II #REF!
1 #REF! PERHITUNGAN VOLUME
(80 x 80 x 75) P B H JML VOL. SAT
M3
TOTAL - M3
TOTAL - M3
TOTAL - M3
III #REF!
1 Pengujian Beton PERHITUNGAN VOLUME
P B H JML VOL. SAT
M3
TOTAL - M3
- Lean Concrete 10 cm
- Penulangan Waremeseh
- Bekisting
TOTAL - M3
2 Pek. Pondasi Setapak PERHITUNGAN VOLUME
P luas trapesium JML VOL. SAT
- Hamparan Pasir 5 cm
- Lean Concrete 10 cm
- Penulangan Besi
- Bekisting
TOTAL M3
- Bekisting
TOTAL - M3
- Bekisting
- Bekisting
M2
- Pengecoran Mutu Beton K-250 M2
M2
TOTAL #REF! M2
Keterangan
BILL OF QUANTITY
( BOQ )
PROGRAM : PEMBANGUNAN LAPANGAN SERBAGUNA
PEKERJAAN : PERENCANAAN PEMBANGUNAN LAPANGAN SERBAGUNA
LOKASI : KAMPUNG AMBORA , DISTRIK DEMTA , KABUPATEN JAYAPURA, PAPUA
T.A : 2021
1 2 4 3 5 6
A PEKERJAAN PERSIAPAN
1 Pembersihan lahan ls 1.00 -
2 Uitzet dan bouwplank M' 38.00 -
3 Pek. Pembuatan Gudang Semen & Peralatan ls 1.00 -
Sub Total A -
B PEKERJAAN STRUKTUR
I PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah sedalam 1 - 2 meter m3 -
2 Pek. Urugan Pasir Bawah Pondasi tinggi 10 cm kg -
3 Pek. Urugan Pasir Bawah Lantai 5 cm kg -
4 Pek. Urugan Sirtu Padat Peninggi Lantai kg -
5 Pek. Urugan Kembali Bekas Galian kg -
Sub Total I -
II PEKERJAAN BETON
1 Pek. Cor Lantai Kerja Bawah Pondasi Telapak t. 5 cm m3 -
2 Pek. Pondasi Telapak 100x100x30 cm K-225 m3 -
3 Pek. Pondasi Telapak 60x100x30 cm K-225 m3 -
4 Pek. Beton Sloof 20x25 cm K-225 m3 -
5 Pek. Sloof Praktis 12x15 cm K-100 m3 -
6 Pek. Balok Beton 20x25 cm K-225 m3 -
7 Pek. Kolom Beton 30x30 cm K-225 m3 -
8 Pek. Kolom Praktis 13x13 cm K-100 m3 -
9 Pek. Ringbalk beton 20x25 cm K-225 m3 -
10 Pek. Plat Beton Lantai tbl. 12 cm K-225 m3 -
11 Pek. Dack Beton tbl. 10 cm K-225 m3 -
12 Pek. Plat Tangga tbl. 15 cm K-225 m3 -
13 Pek. Sirip Beton Fasade tbl. 10 cm K-225 m3 -
Sub Total II -
C PEKERJAAN ARSITEKTUR
I PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Pasangan Pondasi Batu Belah m3 -
2 Pek. Pasangan Dinding Batu Tela Camp. 1:4 m2 -
3 Pek. Pas. Dinding batu Tela camp. 1:4 m2 -
4 Pek. Pas. Plesteran dinding camp. 1:4 m2 -
5 Pek. Pas. Trasram Camp. 1:2 m2 -
6 Pek. Acian dinding dan beton m2 -
7 Pek. Keramik Lantai 60x60 cm m2 -
8 Pek. Keramik Lantai 20x20 cm m2 -
9 Pek. Keramik Dinding 20x40 cm m2 -
10 Pek. Keramik Dinding batu alam m2 -
10 Pek. Plint Keramik 10x60 cm m2 -
Sub Total B -
II PEKERJAAN KUSEN KAYU DAN LANGIT-LANGIT
1 Pek. Kusen Kayu Kls I uk. 5/10 cm m3 -
2 Pek. Daun Pintu Panil Kayu Kls I kg -
3 Pek. Daun Jendela bingkai kaca tbl. 5 mm m1 -
4 Pek. Kaca Mati tbl. 5 mm m1 -
5 Pek. Rangka Langit-Langit Holow 4x4 cm m1 -
6 Pek. Penutup Langit-langit gypsum 9 mm m1 -
Sub Total I -
III PEKERJAAN KUNCI DAN PENGGANTUNG
1 Pas. Kunci Tanam 2x Slaag bh -
2 Pas. Engsel Pintu bh -
3 Pas. Engsel Jendela bh -
4 Pas. Kunci slot / grendel pintu bh -
5 Pas. Kunci slot / grendel jendela bh -
6 Pas. Kait Angin Jendela bh -
Sub Total I -
III PEKERJAAN PENGECATAN
1 Pek. Pengecatan Tembok 1 lapis dasar + 2 Lapis penutup titik
2 Pek. Pengecatan bidang Kayu 1 lapis dasar + 2 Lapis penutup titik
3 Pek. Pengecatan Langit-langit / plafond 2x lapis titik
4 Pek. Waterproofing Dack titik -
Sub Total II -
D PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
I PEKERJAAN ELEKTRIKAL
1 Pek. Lampu Gantung 40 Watt titik
2 Pek. Lampu Downlight 18Watt titik
3 Pek. Saklar Tunggal titik
4 Pek. Saklar Ganda titik -
5 Pek. Stop Kontak titik -
6 Pek. MCB dan Meteran Listrik PLN Ls 1.00 -
Sub Total II -
Sub Total C -
II PEKERJAAN SANITASI DAN PERPIPAAN
1 Pek. Kloset duduk titik
2 Pek. Bath tube titik
3 Pek. Floor drain titik
4 Pek. Kran air titik -
5 Kitchen Sink titik -
6 Pas. Pipa GIP 1/2" Ls 1.00 -
7 Pas. Pipa PVC 4" Closet Ls 1.00 -
8 Pas. Pipa PVC AW 2" Ls 1.00 -
9 Pek. Septic Tank Unit 1.00 -
Sub Total II -
E PEKERJAAN LAIN-LAIN
1 Pemasangan Pintu & Rel Pagar ls 1.00 -
2 Pembersihan Akhir ls 1.00 -
Sub Total D -
JUMLAH HARGA -
DAFTAR HARGA BAHAN BANGUNAN DAN UPAH KERJA DI PROVINSI PAPUA
TAHUN ANGGARAN 2019
URA
IAN
JENI Kegiatan Penyusunan Basic dan Unit Price Bidang Ke-PU-an TA. 2019
S
NO BAH SATUAN
AN
DAN
UPA
1 H 2 3
1 KELOMPOK BAHAN BATU
BAHAN BATU
a. Batu Kali M3
b. Batu Belah M3
c. Batu Tela 10x20x30 Bh
d. Batu Merah Bh
e. Batu Gunung M3
f. Batu pecah pakai mesin :
1-2 M3
2-3 2-5 M3
3-5 M3
5-7 M3
2 BAHAN ASPAL
Aspal Kg
Minyak Aspal Ltr
2 BAHAN KERIKIL
a. Kerikil Kasar M3
b. Kerikil Halus Beton M3
c. Kerikil Galian Gunung M3
3 BAHAN PASIR
a. Pasir Pasang M3
b. Pasir Urug M3
c. Pasir Beton M3
d. Sirtu M3
4 BAHAN TANAH TIMBUNAN
a. Timbunan Biasa M3
b. Timbunan Pilihan M3
5 BAHAN KARANG
a. Karang Kasar.Karang Timbun M3
b. Karang Halus/Cor M3
6 BAHAN SEMEN
a. Semen Tiga Roda 50 Kg Kg
b. Semen Tonasa 50 Kg Kg
c. Semen Putih 1 Kg Kg
d. Semen Warna 1 Kg Kg
8 BAHAN LANTAI
a. Ubin Mozaik DN 30 x 30 M2
b. Ubin Porselin DN 11 x 11 M2
Ubin Porselin DN 10 x 10 M2
Ubin Porselin DN 15 x 15 M2
Ubin Porselin DN 20 x 20 Bh
c. Ubin Wafel DN 15 x 15 M2
Ubin Wafel DN 20 x 20 M2
d. Ubin Keramik Polos
Ubin Keramik DN 10 x 10 Bh
Ubin Keramik DN 10 x 20 Bh
Ubin Keramik DN 20 x 20 Bh
Ubin Keramik DN 30 x 30 Bh
e. Ubin Plin PC DN 10 x 10 M2
Ubin Plin Berwarna 20 x 20 M2
Ubin Plin Berwarna 15 x 20 Bh
Ubin Plin Abu-Abu I 15 x 15 Bh
f. Karpet Wol M'
g. Karpet Plastik M'
Tipe Vinil Polos M2
Tipe Vinil Bergambar M2
h. Granit M2
Granito M2
7 BAHAN KAYU
a. Kayu Besi (sejenis)
Balok Ukuran 10 x 10 x 400 M3
Balok Ukuran 5 x 10 x 400 M3
Balok Ukuran 5 x 5 x 400 M3
b. Kayu Matoa/campuran(sejenis)
Balok Ukuran 10 x 10 x 400 M3
Balok Ukuran 5 x 10 x 400 M3
Balok Ukuran 5 x 5 x 400 M3
c. Kayu Lat
Lat Kayu Besi 1.0/3.0 M3
Lat Kayu Matoa 1.0/3.0 M3
Lis Kayu Profil Btg
d. Triplex 3 mm Lbr
Triplex 4 mm Lbr
Triplex 5 mm Lbr
e. Multiplex 6 mm Lbr
Multiplex 9 mm Lbr
Multiplex 10 mm Lbr
Multiplex 12 mm Lbr
Multiplex 15 mm Lbr
Multiplex 18 mm Lbr
10 BAHAN ATAP
a. Seng Gel BJLS 20 Lbr
Seng Gel BJLS 25 Lbr
Seng Gel BJLS 30 Lbr
c. Seng Galvanis Uk :
Kecil 40 x 60 Lbr
Sedang 60 x 100 Lbr
Besar 100 x 160 Lbr
i lain -lain
Galvanis/Lysplank Lbr
Lem Kayu Kg
11 BAHAN PLAFON
Gypsumboard Lbr
Triplex 4 mm Lbr
Multiplex 6 mm Lbr
12 BAHAN KACA
Ukuran 122 x 182 :
a. Kaca bening Tbl 3 mm Lbr
Kaca bening Tbl 5 mm Lbr
c. Stang Lovers/klip
5 klip Pas
6 klip Pas
7 klip Pas
8 klip Pas
9 klip Pas
10 klip Pas
d. Besi Tralis Nako Bh
e. Kaca Lovers Bening Lbr
f. Kaca Lovers Buram Lbr
g. Kaca Lovers Rayben Lbr
14 BAHAN PENGUNCI/PENGGANTUNG
a. Kunci Tanam
Union 1 Slaag Bh
Union 2 Slaag Bh
Kuda Terbang 1 Slaag Bh
Kuda Terbang 2 Slaag Bh
Yale DN Bh
Yale 2 Slaag Bh
Royal Besar Bh
Royal Kecil Bh
Etema Bh
Kunci-kunci Lokal Bh
b. Engsel
Engsel Lokal Pas
Engsel H Jendela Pas
Engsel H Pintu Pas
Engsel Kupu-Kupu ring nilon pintu Pas
Engsel Kupu-Kupu ring nilon jendela Pas
Engsel Kupu-Kupu ring nilon Pas
Hak angin biasa Pas
Hak angin lipat Pas
Kunci gembok Bh
Kunci royal Bh
Grendel jendela (kilp) Bh
Grendel Lokal Bh
Grendel kecil Bh
Grendel sedang Bh
Grendel besar Bh
15 BAHAN SANITAIR
a. Kloset duduk porselin warna/putih Bh
Kloset duduk keramik/INA Bh
Kloset duduk keramik/KIA Bh
Kloset Monoblok Lokal/KIA Bh
b. Kloset jongkok porselin warna/putih Bh
Kloset jongkok traso Bh
Kloset jongkok keramik Bh
Kloset jongkok KIA Bh
c. Urinoir porselin warna/putih Bh
Urinoir KIA Bh
Urinoir Keramik Bh
d. Wastafel (komplit) Bh
Keramik Bh
Porselin Bh
Keramik KIA Bh
e. Washtafel/Vas+cermin Bh
8 BAHAN PAKU/BAUT
Paku Triplex Kg
Paku Persegi Kg
Paku 1/4 -1/2 Kg
Paku 3/4 - 3.0 Kg
Paku 1/2 - 3.0 Kg
Paku 2 1/2 - 7 Kg
Paku Seng Gelombang Kg
Paku Ardex Kg
Paku Asbes Kg
Paku Seng Kg
Paku Tembok/beton 7 Cm Biji
Paku Tembok/beton 10 Cm Bh
Paku Jembatan Kg
Paku Sumbat Kg
Paku Keling Kg
Paku Sekrup Kg
Paku Sekrup Bh
Paku Reng Kg
Timah Solder Batang Roll
Baut Angker Biji
Baut Baja Galvanisasi Kg
Baut Baja Bh
Baut + Mur 3/8" - 17.5 7" Bh
Baut + Mur 3/8" - 15 6" Bh
Baut + Mur 3/8" - 20 8" Bh
Baut + Mur 3/8" - 35 14" Bh
Baut 1/2 Bh
Baut Mur 1/2 x 10" Bh
Beugel Besi Strap 40.4(sambungan kayu) Bh
Baut Mur diameter 1/2 10 - 30 mm Bh
Diameter 1/2 - 3 Bh
Diameter 3" - 4" Bh
e. Stop kran kopling GIP 1/2 - 1 Bh
f. Pipa PVC 2" M'
g. Talang Plastik PVC Btg
Talang Plastik PVC Btg
h. Pipa Listrik Besi Btg
Pipa Plastik Btg
i. Les aluminium 1/2 Btg
Les aluminium 1/2 Btg
Les aluminium 2 Btg
12 BAHAN CAT
a. Cat Tembok (5 Kg) Klg
Cat Tembok (5 Kg) Klg
Cat Tembok Kg
b. Cat Kayu Kg
Cat Kilat Kayu Kg
Cat Kayu Dasar Kg
c. Cat Aluminium Kg
d. Cat Besi Kg
Cat Besi Crom Kg
Cat Besi Manie Kg
e. Atap HardekCat Kg
f. Lain-lain Kg
Plamur Besi Kg
Plamur Tembok Kg
Plamur Kayu Kg
Dempul Besi Kg
Dempul Kayu Kg
Residu Ltr
Menie Besi Ltr
Menie Kayu Ltr
Politur/teak oil Ltr
Minyak cat Ltr
Amplas Kayu Lbr
Amplas Besi Lbr
Lem Kayu Klg
Lem Aibon Klg
Roster Bh
13 BAHAN BAKAR
Minyak Tanah Ltr
Minyak Solar Ltr
Minyak Pelumas Ltr
Premium Ltr
b. Sekring Khas
Sekring Otomatis Bh
Sekring Box Bh
Kabel NYM Roll
Kabel NYM Roll
Kabel Roll
HARGA SATUAN
Rupiah (Rp)
4
377,500.00
377,500.00
4,000.00
4,000.00
377,500.00
877,500.00
817,500.00
767,500.00
717,500.00
16,800.00
407,500.00
407,500.00
407,500.00
327,500.00
327,500.00
423,000.00
390,500.00
363,500.00
363,500.00
378,500.00
378,500.00
2,848.00
2,848.00
24,747.00
24,747.00
150,000.00
4,125.00
103,125.00
4,125.00
13,636.36
19,200.00
42,240.00
6,800,000.00
6,800,000.00
6,800,000.00
6,800,000.00
6,800,000.00
6,800,000.00
3,772,000.00
3,772,000.00
3,772,000.00
3,772,000.00
3,772,000.00
3,772,000.00
3,400,000.00
1,886,000.00
111,250.00
111,250.00
130,133.00
125,000.00
82,000.00
177,067.00
179,200.00
110,080.00
30,000.00
3,772,000.00
6,800,000.00
6,800,000.00
3,772,000.00
30,000.00
72,529.00
72,529.00
98,279.00
85,947.00
87,000.00
56,250.00
110,080.00
111,250.00
130,133.00
135,000.00
368,750.00
393,750.00
393,750.00
113,920.00
203,520.00
244,480.00
268,160.00
35,000.00
160,000.00
160,000.00
422,400.00
422,400.00
20,000.00
33,690.00
64,375.00
42,917.00
33,690.00
25,833.00
25,833.00
82,829.00
24,533.00
22,187.00
22,187.00
95,147.00
95,147.00
821,875.00
5,000,000.00
5,000,000.00
500,000.00
500,000.00
500,000.00
1,250,000.00
4,000,000.00
1,500,000.00
656,250.00
482,133.00
482,133.00
736,000.00
2,602,667.00
750,000.00
3,000,000.00
55,000.00
36,250.00
43,750.00
43,750.00
43,750.00
43,750.00
43,750.00
58,333.00
58,333.00
43,750.00
43,750.00
11,562.50
1,156.25
21,760.00
7,040.00
13,200.00
35,450.00
37,500.00
5,208.34
46,875.00
50,000.00 600000
53,646.00 50000
53,646.00 600000
39,680.00
20,480.00
20,480.00
20,480.00
20,480.00
20,480.00
20,480.00
20,480.00
20,480.00
20,480.00
20,480.00
20,480.00
32,812.50
10,937.50
24,305.56
24,305.56
65,625.00
965,625.00
2,062,500.00
246,875.00
246,875.00
562,500.00
45,833.00
62,500.00
129,167.00
252,083.00
410,000.00
450,000.00
51,200.00
52,000.00
98,000.00
100,000.00
135,000.00
150,000.00
51,200.00
51,200.00
57,083.00
42,013.83
346,875.00
346,875.00
69,375.00
81,250.00
81,250.00
78,125.00
81,250.00
81,250.00
81,250.00
32,000.00
28,160.00
64,000.00
64,000.00
115,625.00
56,250.00
13,653.40
43,750.00
41,667.00
102,083.00
54,719.00
20,171.00
20,171.00
64,000.00
93,013.00
12,000.00
6,500.00
10,500.00
45,000.00
10,500.00
91,000.00
182,000.00
121,600.00
30,120.00
30,120.00
30,120.00
68,500.00
68,500.00
20,480.00
64,000.00
1,034,650.00
832,000.00
320,000.00
125,000.00
110,000.00
200,000.00
135,000.00
100,000.00
185,000.00
125,000.00
130,000.00
100,000.00
170,000.00
180,000.00
125,000.00
100,000.00
ANALISA SATUAN PEKERJAAN
NO JENIS PEKERJAAN
2 Membuat 1 m³ Beton mutu fc =14,5 MPa (K175), slump (12 ± 2) cm, w/c = 0,66
Bahan :
326.000 Kg Semen ( PC )
750.000 M3 Pasir Cor
1,020.00 M3 Batu Pecah 3/5
215.000 Ltr Air ( biaya air tawar )
Upah :
1.200 Oh Pekerja
0.200 Oh Tukang Batu
0.020 Oh Kepala Tukang Batu
0.006 Oh Mandor
3 Membuat 1 m³ Beton mutu fc =19,3 MPa (K225), slump (12 ± 2) cm, w/c = 0,58
Bahan :
371.000 Kg Semen ( PC )
698.000 Kg Pasir Beton
1,047.00 Kg Batu Pecah 2/3
215.000 Ltr Air ( biaya air tawar )
Upah :
1.650 Oh Pekerja
0.275 Oh Tukang Batu
0.028 Oh Kepala Tukang Batu
0.083 Oh Mandor
4 Membuat 1 m³ Beton mutu fc =21,7 MPa (K250), slump (12 ± 2) cm, w/c = 0,56
Bahan :
384.000 Kg Semen ( PC )
692.000 Kg Pasir Cor
1,039.00 Kg Batu Pecah 2/3
215.000 Ltr Air ( biaya air tawar )
Upah :
1.650 Oh Pekerja
0.275 Oh Tukang Batu
0.028 Oh Kepala Tukang Batu
0.083 Oh Mandor
5 Membuat 1 m³ Beton mutu fc =26,4 MPa (K300), slump (12 ± 2) cm, w/c = 0,52
Bahan :
413.000 Kg Semen ( PC )
681.000 Kg Pasir Cor
1,021.00 Kg Batu Pecah 2/3
215.000 Ltr Air ( biaya air tawar )
Upah :
1.650 Oh Pekerja
0.275 Oh Tukang Batu
0.028 Oh Kepala Tukang Batu
0.083 Oh Mandor
Upah :
0.150 Oh Pekerja
0.050 Oh Tukang Kayu
0.026 Oh Kepala Tukang Kayu
0.026 Oh Mandor
29 Membuat 1 m³ Kolom K4 Ø 50 cm
1.000 M3 Beton Berstruktur K 300 (f'c=26,4 MPa)
33.067 Kg Pembesian polos
96.611 Kg Pembesian ulir
8.000 M2 Pasang Bekisting
6 Memasang 1 m Acian
2
Bahan :
3.250 Kg Semen ( PC )
Upah :
0.150 Oh Pekerja
0.100 Oh Tukang Batu
0.010 Oh Kepala Tukang Batu
0.008 Oh Mandor
4 Membuat dan memasang 1 m² daun pintu double triplek tebal 9 mm lapis HPL slimar kayu besi
Bahan :
0.0250 M3 Papan kayu besi
0.030 Kg Paku
0.500 Kg Lem Kayu
1.000 lbr Triplek tebal 9 mm
1.000 lbr HPL
Upah :
0.800 Oh Pekerja
2.400 Oh Tukang Kayu
0.240 Oh Kepala Tukang Kayu
0.040 Oh Mandor
2 1,00 M2 Pekerjaan Cat Minyak Baru (1 lapis plamir,1 lapis cat dasar,2 lapis cat penutup )
Bahan :
100,000.00 10,000.00
200,000.00 10,000.00
Jumlah 20,000.00
3,772,000.00 45,264.00
3,772,000.00 26,404.00
30,000.00 600.00
100,000.00 10,000.00
170,000.00 17,000.00
180,000.00 1,800.00
200,000.00 1,000.00
Jumlah 102,068.00
100,000.00 75,000.00
200,000.00 5,000.00
10,000.00 4,000.00
Jumlah 84,000.00
100,000.00 26,000.00
200,000.00 5,000.00
Jumlah 31,000.00
Rp 900,000.00 14,940.00
Rp 900,000.00 26,100.00
100,000.00 16,580.00
200,000.00 3,320.00
Jumlah 60,940.00
327,500.00 393,000.00
100,000.00 25,000.00
200,000.00 5,000.00
Jumlah 423,000.00
390,500.00 468,600.00
100,000.00 25,000.00
200,000.00 5,000.00
Jumlah 498,600.00
400,000.00 480,000.00
130,000.00 39,000.00
210,000.00 2,100.00
Jumlah 521,100.00
100,000.00 30,000.00
200,000.00 3,000.00
Jumlah 33,000.00
550,000.00 660,000.00
475,000.00 205,200.00
130,000.00 101,400.00
170,000.00 66,300.00
178,000.00 6,942.00
210,000.00 8,190.00
Jumlah 1,048,032.00
550,000.00 660,000.00
2,300.00 312,800.00
525,000.00 285,600.00
100,000.00 150,000.00
170,000.00 102,000.00
180,000.00 10,800.00
200,000.00 15,000.00
Jumlah 1,536,200.00
2,848.00 655,040.00
302.14 269,813.57
650.00 665,600.00
100.00 20,000.00
100,000.00 120,000.00
170,000.00 34,000.00
180,000.00 3,600.00
200,000.00 1,200.00
Jumlah 1,769,253.57
2,848.00 928,448.00
302.14 226,607.14
568.52 579,888.89
50.00 10,750.00
100,000.00 120,000.00
170,000.00 34,000.00
180,000.00 3,600.00
200,000.00 1,200.00
Jumlah 1,904,494.03
2,300.00 853,300.00
357.14 249,285.71
846.15 885,923.08
500.00 107,500.00
100,000.00 165,000.00
170,000.00 46,750.00
180,000.00 5,040.00
200,000.00 16,600.00
Jumlah 2,329,398.79
2,300.00 883,200.00
357.14 247,142.86
846.15 879,153.85
500.00 107,500.00
100,000.00 165,000.00
170,000.00 46,750.00
180,000.00 5,040.00
200,000.00 16,600.00
Jumlah 2,350,386.70
2,300.00 949,900.00
357.14 243,214.29
846.15 863,923.08
500.00 107,500.00
100,000.00 165,000.00
170,000.00 46,750.00
180,000.00 5,040.00
200,000.00 16,600.00
Jumlah 2,397,927.36
20,480.00 215,040.00
37,500.00 5,625.00
100,000.00 7,000.00
170,000.00 11,900.00
180,000.00 1,260.00
200,000.00 800.00
Jumlah 241,625.00
di, Pembesian 1 Kg dengan besi polos 24,162.50
22,800.00 239,400.00
31,000.00 4,650.00
100,000.00 7,000.00
170,000.00 11,900.00
180,000.00 1,260.00
200,000.00 800.00
Jumlah 265,010.00
adi, Pembesian 1 Kg dengan besi ulir 26,501.00
2,200,000.00 88,000.00
30,000.00 9,000.00
8,200.00 820.00
100,000.00 52,000.00
170,000.00 44,200.00
180,000.00 4,680.00
200,000.00 5,200.00
Jumlah 203,900.00
3,772,000.00 75,440.00
43,750.00 2,187.50
100,000.00 15,000.00
170,000.00 8,500.00
180,000.00 4,680.00
200,000.00 5,200.00
Jumlah 111,007.50
2,200,000.00 88,000.00
30,000.00 12,000.00
8,200.00 1,640.00
3,000,000.00 45,000.00
160,000.00 56,000.00
50,000.00 100,000.00
100,000.00 66,000.00
170,000.00 56,100.00
180,000.00 5,940.00
200,000.00 6,600.00
Jumlah 437,280.00
Pemakaian begesting 2x 218,640.00
2,200,000.00 88,000.00
30,000.00 12,000.00
8,200.00 1,640.00
3,000,000.00 54,000.00
160,000.00 56,000.00
50,000.00 100,000.00
100,000.00 66,000.00
170,000.00 56,100.00
180,000.00 5,940.00
200,000.00 6,600.00
Jumlah 446,280.00
Pemakaian begesting 2x 223,140.00
2,200,000.00 88,000.00
30,000.00 12,000.00
8,200.00 1,640.00
3,000,000.00 45,000.00
160,000.00 56,000.00
50,000.00 300,000.00
100,000.00 66,000.00
170,000.00 56,100.00
180,000.00 5,940.00
200,000.00 6,600.00
Jumlah 637,280.00
2,200,000.00 66,000.00
30,000.00 12,000.00
8,200.00 1,230.00
3,000,000.00 45,000.00
160,000.00 56,000.00
50,000.00 100,000.00
100,000.00 66,000.00
170,000.00 56,100.00
180,000.00 5,940.00
200,000.00 6,600.00
Jumlah 414,870.00
2,397,927.36 2,397,927.36
24,162.50 5,649,917.38
Jumlah 8,047,844.74
2,397,927.36 2,397,927.36
24,162.50 3,253,883.33
203,900.00 736,305.56
Jumlah 6,388,116.25
2,397,927.36 2,397,927.36
24,162.50 2,401,854.79
203,900.00 479,239.42
Jumlah 5,279,021.57
2,397,927.36 2,397,927.36
24,162.50 2,290,967.44
203,900.00 453,065.80
Jumlah 5,141,960.60
2,397,927.36 2,397,927.36
24,162.50 2,204,852.29
203,900.00 388,429.50
Jumlah 4,991,209.15
2,397,927.36 2,397,927.36
24,162.50 983,776.19
203,900.00 372,117.50
Jumlah 3,753,821.05
2,397,927.36 2,397,927.36
24,162.50 4,913,736.54
203,900.00 887,564.71
Jumlah 8,199,228.60
2,397,927.36 2,397,927.36
24,162.50 205,985.31
26,501.00 3,149,833.14
111,007.50 1,110,075.00
Jumlah 6,863,820.82
2,397,927.36 2,397,927.36
24,162.50 205,985.31
26,501.00 2,901,162.11
111,007.50 1,110,075.00
Jumlah 6,615,149.78
2,397,927.36 2,397,927.36
24,162.50 224,711.25
26,501.00 3,909,367.38
111,007.50 1,110,075.00
Jumlah 7,642,080.99
2,350,386.70 2,350,386.70
24,162.50 3,349,916.42
111,007.50 1,480,100.00
Jumlah 7,180,403.12
2,350,386.70 2,350,386.70
24,162.50 4,175,280.00
111,007.50 888,060.00
Jumlah 7,413,726.70
2,397,927.36 2,397,927.36
24,162.50 873,877.08
26,501.00 3,151,852.27
437,280.00 3,206,720.00
Jumlah 9,630,376.71
2,397,927.36 2,397,927.36
24,162.50 936,296.88
26,501.00 3,140,368.50
437,280.00 4,372,800.00
Jumlah 10,847,392.74
2,397,927.36 2,397,927.36
24,162.50 1,220,653.70
26,501.00 2,449,870.22
437,280.00 5,828,942.40
Jumlah 11,897,393.69
2,397,927.36 2,397,927.36
24,162.50 798,973.33
26,501.00 2,560,300.43
437,280.00 3,498,240.00
Jumlah 9,255,441.13
2,350,386.70 2,350,386.70
24,162.50 1,116,844.44
26,501.00 876,299.73
437,280.00 3,498,240.00
Jumlah 7,841,770.88
2,350,386.70 2,350,386.70
24,162.50 4,945,258.33
437,280.00 8,745,600.00
Jumlah 16,041,245.04
2,350,386.70 2,350,386.70
24,162.50 3,371,152.00
218,640.00 3,498,240.00
Jumlah 9,219,778.70
2,397,927.36 2,397,927.36
24,162.50 1,480,450.59
26,501.00 3,490,316.80
446,280.00 3,605,942.40
Jumlah 10,974,637.15
2,397,927.36 2,397,927.36
24,162.50 2,333,843.16
26,501.00 3,383,424.51
446,280.00 3,605,942.40
Jumlah 11,721,137.43
2,397,927.36 2,397,927.36
24,162.50 1,208,125.00
26,501.00 3,307,324.80
446,280.00 4,165,280.00
Jumlah 11,078,657.16
2,350,386.70 2,350,386.70
24,162.50 4,175,280.00
223,140.00 1,785,120.00
Jumlah 8,310,786.70
2,350,386.70 2,350,386.70
24,162.50 1,747,754.17
26,501.00 4,187,158.00
223,140.00 2,789,250.00
Jumlah 11,074,548.87
2,397,927.36 2,397,927.36
24,162.50 1,677,844.00
26,501.00 3,120,757.76
446,280.00 3,748,752.00
Jumlah 10,945,281.12
2,397,927.36 2,397,927.36
24,162.50 2,066,834.01
637,280.00 5,310,666.67
Jumlah 9,775,428.04
2,397,927.36 2,397,927.36
24,162.50 3,048,985.33
24,162.50 3,156,266.83
414,870.00 2,074,350.00
Jumlah 10,677,529.53
2,397,927.36 2,397,927.36
24,162.50 2,512,900.00
24,162.50 1,498,075.00
446,280.00 2,900,820.00
Jumlah 9,309,722.36
2,350,386.70 2,350,386.70
24,162.50 4,722,237.86
437,280.00 2,886,048.00
Jumlah 9,958,672.56
2,397,927.36 2,397,927.36
24,162.50 2,512,900.00
203,900.00 407,800.00
Jumlah 5,318,627.36
1,904,494.03 1,904,494.03
24,162.50 6,982,515.05
111,007.50 1,850,125.00
Jumlah 10,737,134.08
2,397,927.36 2,397,927.36
24,162.50 1,675,266.67
24,162.50 1,449,750.00
111,007.50 1,110,075.00
Jumlah 6,633,019.03
2,397,927.36 2,397,927.36
24,162.50 3,200,188.89
24,162.50 1,367,290.67
437,280.00 2,915,200.00
Jumlah 9,880,606.93
2,397,927.36 2,397,927.36
24,162.50 1,608,256.00
24,162.50 1,438,152.00
437,280.00 6,996,480.00
Jumlah 12,440,815.36
1,904,494.03 1,904,494.03
24,162.50 3,490,138.89
24,162.50 514,571.76
437,280.00 7,288,000.00
Jumlah 13,197,204.68
1,769,253.57 1,769,253.57
637,280.00 4,817,836.80
Jumlah 6,587,090.37
2,329,398.79 2,329,398.79
24,162.50 3,120,989.58
637,280.00 1,274,560.00
Jumlah 6,724,948.37
4,200.00 67,200.00
2,300.00 43,585.00
525,000.00 19,950.00
100,000.00 30,000.00
170,000.00 17,000.00
180,000.00 1,800.00
200,000.00 3,000.00
Jumlah 182,535.00
4,200.00 67,200.00
2,300.00 26,450.00
525,000.00 22,575.00
100,000.00 30,000.00
170,000.00 17,000.00
180,000.00 1,800.00
200,000.00 3,000.00
Jumlah 168,025.00
5,000.00 225,000.00
525,000.00 42,000.00
100,000.00 40,000.00
170,000.00 34,000.00
180,000.00 3,600.00
200,000.00 4,000.00
Jumlah 348,600.00
1,769,253.57 17,692.54
525,000.00 26,250.00
130,000.00 13,000.00
178,000.00 8,900.00
210,000.00 2,100.00
Jumlah 67,942.54
2,848.00 29,117.95
327,500.00 6,550.00
100,000.00 30,000.00
170,000.00 25,500.00
180,000.00 2,700.00
200,000.00 3,000.00
Jumlah 96,867.95
2,848.00 22,146.05
327,500.00 7,532.50
100,000.00 30,000.00
170,000.00 25,500.00
180,000.00 2,700.00
200,000.00 3,000.00
Jumlah 90,878.55
2,848.00 17,771.52
327,500.00 7,860.00
100,000.00 30,000.00
170,000.00 25,500.00
180,000.00 2,700.00
200,000.00 3,000.00
Jumlah 86,831.52
2,300.00 14,582.00
525,000.00 6,300.00
100,000.00 30,000.00
170,000.00 23,800.00
180,000.00 2,520.00
200,000.00 3,000.00
Jumlah 80,202.00
2,300.00 51,037.00
525,000.00 25,200.00
100,000.00 150,000.00
170,000.00 170,000.00
180,000.00 90,000.00
200,000.00 50,000.00
7,500.00 187.50
Jumlah 536,424.50
2,848.00 9,256.00
100,000.00 15,000.00
170,000.00 17,000.00
180,000.00 1,800.00
200,000.00 1,600.00
Jumlah 44,656.00
280,000.00 38,888.89
210,000.00 58,333.33
25,000.00 75,000.00
30,000.00 30,000.00
500.00 3,000.00
38,500.00 2,138.89
100,000.00 15,000.00
170,000.00 25,500.00
180,000.00 5,400.00
200,000.00 2,000.00
Jumlah 255,261.11
120,000.00 43,680.00
100,000.00 10,000.00
170,000.00 8,500.00
180,000.00 900.00
200,000.00 1,000.00
Jumlah 64,080.00
45,000.00 45,000.00
7,500.00 4,875.00
100,000.00 6,000.00
170,000.00 10,200.00
180,000.00 1,080.00
200,000.00 600.00
Jumlah 67,755.00
45,000.00 135,000.00
2,300.00 33,810.00
525,000.00 35,437.50
26,150.00 50,992.50
100,000.00 37,500.00
170,000.00 30,600.00
180,000.00 3,240.00
200,000.00 3,900.00
Jumlah 330,480.00
6,000.00 15,900.00
2,300.00 2,622.00
525,000.00 1,680.00
26,150.00 2,615.00
100,000.00 9,000.00
170,000.00 15,300.00
180,000.00 1,620.00
200,000.00 1,000.00
Jumlah 49,737.00
6.25
16,000.00 100,000.00
2,300.00 22,540.00
525,000.00 23,625.00
26,150.00 33,995.00
100,000.00 25,000.00
170,000.00 20,400.00
180,000.00 2,160.00
200,000.00 2,600.00
Jumlah 230,320.00
14,000.00 155,540.00
2,300.00 23,920.00
525,000.00 23,625.00
26,150.00 42,363.00
100,000.00 62,000.00
170,000.00 59,500.00
180,000.00 6,300.00
200,000.00 6,000.00
Jumlah 379,248.00
13,000.00 130,000.00
2,300.00 23,920.00
525,000.00 23,625.00
26,150.00 42,363.00
100,000.00 60,000.00
170,000.00 59,500.00
180,000.00 6,300.00
200,000.00 6,000.00
Jumlah 351,708.00
5,800,000.00 6,380,000.00
30,000.00 37,500.00
30,000.00 30,000.00
100,000.00 600,000.00
170,000.00 3,400,000.00
180,000.00 360,000.00
200,000.00 60,000.00
Jumlah 10,867,500.00
6,000,000.00 240,000.00
30,000.00 6,000.00
100,000.00 100,000.00
170,000.00 425,000.00
180,000.00 45,000.00
200,000.00 10,000.00
Jumlah 826,000.00
6,000,000.00 144,000.00
30,000.00 9,000.00
167,000.00 167,000.00
100,000.00 80,000.00
170,000.00 340,000.00
180,000.00 36,000.00
200,000.00 8,000.00
Jumlah 784,000.00
5,800,000.00 145,000.00
30,000.00 900.00
30,000.00 15,000.00
160,000.00 160,000.00
200,000.00 200,000.00
100,000.00 80,000.00
170,000.00 408,000.00
180,000.00 43,200.00
200,000.00 8,000.00
Jumlah 1,060,100.00
313,000.00 313,000.00
100,000.00 6,000.00
170,000.00 102,000.00
180,000.00 10,800.00
200,000.00 600.00
Jumlah 432,400.00
26,000.00 26,000.00
100,000.00 1,500.00
170,000.00 25,500.00
180,000.00 2,700.00
200,000.00 200.00
Jumlah 55,900.00
22,500.00 22,500.00
100,000.00 1,000.00
170,000.00 17,000.00
180,000.00 1,800.00
200,000.00 100.00
Jumlah 42,400.00
27,500.00 27,500.00
100,000.00 1,500.00
170,000.00 25,500.00
180,000.00 2,700.00
200,000.00 200.00
Jumlah 57,400.00
26,500.00 26,500.00
100,000.00 1,000.00
170,000.00 17,000.00
180,000.00 1,800.00
200,000.00 100.00
46,400.00
225,000.00 225,000.00
100,000.00 1,000.00
170,000.00 17,000.00
180,000.00 1,800.00
200,000.00 100.00
Jumlah 244,900.00
167,000.00 183,700.00
100,000.00 1,500.00
170,000.00 25,500.00
180,000.00 2,700.00
200,000.00 150.00
Jumlah 213,550.00
720,000.00 720,000.00
2,300.00 13,800.00
525,000.00 5,250.00
100,000.00 100,000.00
170,000.00 255,000.00
180,000.00 270,000.00
200,000.00 32,000.00
Jumlah 1,396,050.00
3,070,000.00 3,070,000.00
614,000.00 614,000.00
100,000.00 100,000.00
170,000.00 255,000.00
180,000.00 270,000.00
200,000.00 32,000.00
Jumlah 4,341,000.00
2,520,000.00 2,520,000.00
2,520,000.00 302,400.00
100,000.00 120,000.00
170,000.00 246,500.00
180,000.00 27,000.00
200,000.00 20,000.00
Jumlah 3,235,900.00
2,100,000.00 2,100,000.00
2,100,000.00 630,000.00
100,000.00 100,000.00
170,000.00 170,000.00
180,000.00 18,000.00
200,000.00 20,000.00
Jumlah 3,038,000.00
475,000.00 475,000.00
5,000.00 500.00
100,000.00 1,000.00
170,000.00 17,000.00
180,000.00 1,800.00
200,000.00 1,000.00
Jumlah 496,300.00
85,000.00 85,000.00
5,000.00 125.00
100,000.00 1,000.00
170,000.00 17,000.00
180,000.00 1,800.00
200,000.00 1,000.00
Jumlah 105,925.00
85,200.00 85,200.00
5,000.00 125.00
100,000.00 1,000.00
170,000.00 17,000.00
180,000.00 1,800.00
200,000.00 1,000.00
Jumlah 106,125.00
65,000.00 65,000.00
100,000.00 1,000.00
170,000.00 17,000.00
180,000.00 1,800.00
200,000.00 1,000.00
Jumlah 85,800.00
20,480.00 8,192.00
10,500.00 3,150.00
5,000.00 200.00
100,000.00 4,000.00
170,000.00 3,400.00
180,000.00 360.00
200,000.00 400.00
30,000.00 5,100.00
Jumlah 24,802.00
per cm' 2,480.20
41,145.83 82,291.67
20,480.00 30,720.00
2,480.20 87,551.06
100,000.00 10,000.00
170,000.00 17,000.00
180,000.00 180.00
200,000.00 200.00
Jumlah 227,942.73
69,375.00 6,937.50
69,375.00 11,100.00
100,000.00 2,000.00
170,000.00 10,710.00
180,000.00 1,134.00
200,000.00 500.00
Jumlah 32,381.50
t penutup )
81,250.00 13,812.50
81,250.00 13,812.50
100,000.00 7,000.00
170,000.00 1,530.00
180,000.00 1,080.00
200,000.00 500.00
Jumlah 37,735.00
99,000.00 69,300.00
8,500.00 170.00
100,000.00 5,000.00
170,000.00 12,750.00
180,000.00 1,350.00
200,000.00 500.00
Jumlah 89,070.00
50,000.00 52,500.00
37,500.00 1,875.00
2,480.20 62,005.00
100,000.00 4,200.00
170,000.00 680.00
180,000.00 360.00
200,000.00 8,400.00
Jumlah 130,020.00
150,000.00 25,000.00
15,000.00 15,000.00
50,000.00 50,000.00
100,000.00 20,000.00
170,000.00 8,500.00
180,000.00 900.00
200,000.00 10,400.00
Jumlah 129,800.00
246,875.00 49,375.00
15,000.00 15,000.00
50,000.00 50,000.00
100,000.00 20,000.00
170,000.00 8,500.00
180,000.00 900.00
200,000.00 10,400.00
Jumlah 154,175.00
BACK UP DATA
PEMBANGUNAN FASILITAS KESEHATAN DAN PERAWATAN LANJUT USIA BERBASIS WISATA EKOLOGI
(Medical Taoturism Senior Living)
PEMASANGAN BOUWPLANK
RINCIAN PERHITUNGAN VOLUME
Panjang Volume Keterangan
NO Jumlah
(m) (m1)
Horizontal Vertikal
a b c=a+b
1 7 12 38
Volume Bouwplank = 38
URURGAN TANAH
RINCIAN PERHITUNGAN VOLUME
NO Pekerjaan JUMLAH Luas Area Tinggi Volume Volume Galian Volume Keterangan
(m2) (m) (m3) (m3) (m3)
a b c=axb d e = d x 1/3
2 Urugan Tanah 1 15 1 15 15
Peninggian Lantai
Elevasi +1.00
GALIAN PASIR
RINCIAN PERHITUNGAN VOLUME
NO Pekerjaan JUMLAH Luas Area Tinggi Volume Panjang Lebar Tinggi Volume Keterangan
(m2) (m) (m3) (m) (m) (m) (m3)
a b c=axb d e f g=dxexf
LANTAI KERJA
RINCIAN PERHITUNGAN VOLUME
NO Pekerjaan JUMLAH Luas Area Tinggi Volume Keterangan
(m2) (m) (m3)
a b c=axb
Dibuat oleh :
BACK UP DATA
PEMBANGUNAN FASILITAS KESEHATAN DAN PERAWATAN LANJUT USIA BERBASIS WISATA EKOLOGI
(Medical Taoturism Senior Living)
Dibuat oleh :
BACK UP DATA
PEMBESIAN SLOOF
RINCIAN PERHITUNGAN VOLUME
Tulangan Berat Jenis Besi Berat Jenis Besi Panjang Jumlah Berat Jenis Ø 12 Berat Jenis Ø 8 Volume Volume per
NO Type Posisi Panjang Volume Besi mm mm
Utama Ø12 mm Ø16 mm Sengkang Sengkang Sengkang Tiang Keterangan
VOL. SATUAN
(m) (pcs) (Kg/m) (Kg/m) (Kg) (m) (pcs) (Kg/m) (Kg/m) (Kg) (Kg)
a b c d=axbxc e f g h=exfxg i=d+h (besi polos)
1 100x100x30 3.00 7.00 0.89 18.63 2.60 20.0 0.89 46.14 83.41
3.00 7.00 0.89 18.63 Besi Ø12 mm 7.8 Batang
Volume Pembesian foot plat 100x100x30 83.41 Besi Ø12 mm 7.8 Batang
Volume Pembesian foot plat 60x100x30 133.46 Besi Ø12 mm 12.5 Batang
Nomor Kontrak :
Nilai Kontrak :
Pelaksana :
1 P1 3 1.00 1 0.3
2 P2 8 1.00 0.6 0.3
Dibuat oleh :
BACK UP DATA
Pemilik :
Item Pekerjaa :
Tangal Pemer:
STING SLOOF
RHITUNGAN VOLUME
Keliling Bekisting Luas Bekisting Keterangan
(m) (m2)
d = 2(a+b) e=dxa
4 3.60
3.2 7.68
11.28
Nomor Kontrak :
Nilai Kontrak :
Pelaksana :
1 P1 3 1.00 0.3 1
2 P2 8 1.00 0.3 0.6
Dibuat oleh :
DATA
WATAN LANJUT USIA BERBASIS WISATA EKOLOGI
m Senior Living)
Pemilik :
Item Pekerjaan :
Tangal Pemeriksaan :
ON K-225 SLOOF
AN VOLUME
Volume Keterangan
(m3)
e=axbxc
0.9
1.44
2.34 m3
PEMBESIAN SLOOF
RINCIAN PERHITUNGAN VOLUME
Tulangan Berat Jenis Besi Berat Jenis Besi Panjang Jumlah Berat Jenis Ø 10 Berat Jenis Ø 8 Volume Volume per
NO Type Posisi Panjang Volume Besi mm mm
Utama Ø12 mm Ø16 mm Sengkang Sengkang Sengkang Tiang Keterangan
VOL. SATUAN
(m) (pcs) (Kg/m) (Kg/m) (Kg) (m) (pcs) (Kg/m) (Kg/m) (Kg) (Kg)
a b c d=axbxc e f g h=exfxg i=d+h (besi polos)
Besi Ø8 mm(beugel) 20.0 Batang
1 SL 20 x 25 Tumpuan 30.03 4.00 1.58 189.46 0.80 300.25 0.39 94.73 390.77 Besi Ø16 mm 10.0 Batang
30.03 4.00 0.89 106.57 Besi Ø12 mm 10.0 Batang
Besi Ø8 mm(beugel) 13.3 Batang
Lapangan 30.03 4.00 1.58 189.46 0.80 200.166666667 0.39 63.15 305.90 Besi Ø16 mm 10.0 Batang
30.03 2.00 0.89 53.29 Besi Ø12 mm 5.0 Batang
Besi Ø8 mm(beugel) 1.1 Batang
2 SL 12 x 15 Tumpuan 2.70 2.00 0.89 4.79 0.47 27 0.39 5.00 14.59 Besi Ø12 mm 0.5 Batang
2.70 2.00 0.89 4.79 Besi Ø12 mm 0.5 Batang
Besi Ø8 mm(beugel) 0.7 Batang
Lapangan 2.70 2.00 0.89 0.00 0.47 18 0.39 3.34 8.13 Besi Ø12 mm 0.0 Batang
2.70 2.00 0.89 4.79 Besi Ø12 mm 0.5 Batang
Nama Pekerjaan
Pemilik :
Nomor Kontrak : Item Pekerjaa:
Nilai Kontrak : Tangal Pemer:
Pelaksana :
PEMBESIAN KOLOM
RINCIAN PERHITUNGAN VOLUME
Tulangan Berat Jenis Besi Berat Jenis Besi Panjang Jumlah Berat Jenis Ø 10 Berat Jenis Ø 8 Volume Volume per Keterangan
NO Type Posisi Panjang Volume Besi mm mm VOL. SATUAN
Utama Ø12 mm Ø16 mm Sengkang Sengkang Sengkang Tiang
(m) (pcs) (Kg/m) (Kg/m) (Kg) (m) (pcs) (Kg/m) (Kg/m) (Kg) (Kg) (besi polos)
a b c d=axbxc e f g h=exfxg i=d+h
1 KL 30x30 Tumpuan 46.75 4 1.58 294.999232 1.1 467.50 0.39 202.81 663.75 Besi Ø8 mm(beugel) 43 Batang
46.75 4 0.89 165.937068 Besi Ø16 mm 16 Batang
Besi Ø12 mm 16 Batang
Lapangan 46.75 4 1.58 294.999232 1.1 311.67 0.39 135.21 596.14 Besi Ø8 mm(beugel) 29 Batang
46.75 4 0.89 165.937068 Besi Ø16 mm 16 Batang
Besi Ø12 mm 16 Batang
2 KL 15x15 lantai 1 31.9 4 0.89 113.2276464 0.55 245.384615385 0.39 53.23 166.45 Besi Ø8 mm(beugel) 35 Batang
3 KL 15x15 lantai 2 43.5 4 0.89 154.401336 0.55 334.615384615 0.39 72.58 226.98 Besi Ø12 mm 31 Batang
4 KL 15x15 lantai atap 17.5 4 0.89 62.11548 0.55 175 0.39 37.96 100.07
1426.35
BACK UP DATA
PEMBANGUNAN FASILITAS KESEHATAN DAN PERAWATAN LANJUT USIA BERBASIS WISATA EKOLOGI
(Medical Taoturism Senior Living)
PEMASANGAN BEKISTINGKOLOM
RINCIAN PERHITUNGAN VOLUME
NO Type Jumlah Panjang Lebar Tinggi Luas Bekisting Total Luas Keterangan
(m) (m) (m) (m2) (m2)
a b c d = (a x 2 )+(b x 2) x c e = d x jumlah
PEMBESIAN BALOK
RINCIAN PERHITUNGAN VOLUME
(m) (pcs) (Kg/m) (Kg/m) (Kg) (m) (pcs) (Kg/m) (Kg/m) (Kg) (Kg)
a b c d=axbxc e f g h=exfxg i=d+h
Volume 2.5934
Nama Pekerjaan :
Nomor Kontrak :
Nilai Kontrak :
Pelaksana :
PEMBESIAN BALOK
RINCIAN PERHITUNGAN VOLUME
Berat Berat
Tulangan Panjang
NO Type Posisi Panjang Jenis Besi Jenis Besi Volume Besi
Utama Sengkang
Ø12 mm Ø16 mm
Dibuat oleh :
BACK UP DATA
PEMBESIAN BALOK
PERHITUNGAN VOLUME
Berat Berat
Jumlah Volume Volume per
Jenis Ø 10 Jenis Ø 8
Sengkang mm mm Sengkang Tiang Keterangan
VOL. SATUAN
(pcs) (Kg/m) (Kg/m) (Kg) (Kg)
f g h=exfxg i=d+h (besi polos)
93.57
BACK UP DATA
PEMBANGUNAN FASILITAS KESEHATAN DAN PERAWATAN LANJUT USIA BERBASIS WISATA EKOLO
(Medical Taoturism Senior Living)
Nomor Kontrak :
Nilai Kontrak :
Pelaksana :
Pemilik :
Item Pekerjaan :
Tangal Pemeriksaan :
Keterangan
Nomor Kontrak :
Nilai Kontrak :
Pelaksana :
Volume 2.5934
Pemilik :
Item Pekerjaan :
Tangal Pemerik:
GBALK
Keterangan
PERHITUNGAN KERAMIK
B KERAMIK DINDING
1 R. Cuci 1 20x40 6.75 6.75
2 fasade teras 1 batu alam 21 21
K1 K2
73 0
2 63
262
2 29
19 9
17 7
138
1 33
13 3
77
K2
K1 5 77
K2
K1
K2
13 2
452
K1
1 86
K2
16 0
89
915
958
Gording Ky. Kls II 5/10
PERHITUNGAN KERAMIK
B KERAMIK DINDING
1 k.m 1 20x40 21 21
2 teras belakang 1 20x25 7 7
3 pas. Batu alam 1 batu alam 12.4 12.4
B Lantai 2
1 PU 1 13.3 0.1 0.05 0.067 0.067
25 25 25 25
30 30
128 128
58 58 58 58
INSTALASI LISTRIK
Dimensi
Volume
NO Uraian Pekerjaan Jumlah Panjang Tinggi Lebar Jumlah Keterangan
(Ttk)
(m) (m) (m) (Ttk)
a b c d
SANITASI
Dimensi
NO Uraian Pekerjaan Jumlah Panjang Tinggi Lebar Jumlah Total (m) Keterangan
(m) (m) (m) (Bh)
a b c d