Tenaga Kerja
Pekerja =
Tukang =
Kepala Tukang =
5. PASANGAN BATU KALI 1Pc : 8Ps Analisa A.3.2.1.5 Pas. Batu Belah 1 : 8
Kebutuhan Bahan
Volume 1 Semen =
Lebar1 (d) = 0 m Pasir Pasang =
Lebar 2 (c) = 0 m Batu belah =
Tinggi (a) = 0 m
Panjang = 0 m Tenaga Kerja
Volume 1 = (L1+L2) x 0.5 x T x P Pekerja =
= 0 m3 Tukang =
Kabupaten : Karanganyar Jenis Prasarana :
Kecamatan : Colomadu Take Of Sheet (TOS) Lokasi :
Desa : Volume :
Kepala Tukang =
Volume 2
Lebar (c) = m
Tinggi (b) = m
Panjang = m
Volume 2 = PxLxTx2
= 0.00 m3
7. Membuat Rabat Beton / Lantai Kerja Analisa A.4.1.1.39 Membuat Beton 1Pc : 3Ps : 5Kr
Kebutuhan bahan
Lebar = 1.1 m Semen =
Tinggi = 0.05 m Pasir beton =
Panjang = 1.1 m Kerikil =
Quantity = 11 m
Volume Sal. 2 = LxTxPxQ Tenaga Kerja
= 0.67 m3 Pekerja =
Tukang Batu =
Kepala Tukang =
Begisting Sloof
Lebar = - m Kebutuhan Bahan
Panjang = - m Kayu Klas III =
Paku 2" - 5" =
Luas = Lebar x Panjang Minyak Bekisting =
= - m2 Balok Sengon =
Multiplek t 9mm =
Begisting Kolom
Lebar = - Dolken Kayu Galam d8 - 10 cm / 4 m =
Panjang = -
Tenaga Kerja
Luas = Lebar x Panjang Pekerja =
= - m2 Tukang =
Kepala Tukang =
Begisting ringbalk
Lebar = -
Panjang = -
Begisting dak/lantai
Lebar (A) = 12.00
Lebar (B) = 13.01
Kabupaten : Karanganyar Jenis Prasarana :
Kecamatan : Colomadu Take Of Sheet (TOS) Lokasi :
Desa : Volume :
Panjang (T) = 7.90
Luas = (A+B)/2*T
= 98.79 m2
9. Membuat Beton 1Pc : 2Ps : 3Kr Analisa A.4.1.1.37 Membuat Beton 1Pc : 2Ps : 3Kr
Kebutuhan bahan
Kolom kecil Semen =
Lebar = 0.15 m Pasir beton =
Tinggi = 3.5 m Kerikil =
Panjang = 0.15 m
Quantity = 18.00 bh Tenaga Kerja
Volume 1 = PxLxTxQ Pekerja =
= 1.42 m3 Tukang Batu =
Kepala Tukang =
Kolom besar
Lebar (o) = 0.45 m
Tinggi (n) = 3 m
Panjang = 0.45 m
Quantity = 11 bh
Volume 2 = PxLxTxQ
= 6.68 m3
Ringbalk
Lebar (p) = 0.12 m
Tinggi (m) = 0.15 m
Panjang = 39.15 m
Volume 3 = PxLxT
= 0.70 m3
Balok memanjang
Lebar (p) = 0.20 m
Tinggi (m) = 0.43 m
Panjang = 18.09 m
Volume 3 = PxLxT
= 3.11 m3
Balok memanjang
Lebar (p) = 0.20 m
Tinggi (m) = 0.28 m
Panjang = 50.92 m
Volume 3 = PxLxT
= 5.70 m3
Footplat
Lebar (p) = 1.10 m
Tinggi (m) = 0.20 m
Panjang = 1.10 m
Quantity = 11 bh
Volume 3 = PxLxTxQ
= 2.66 m3
Cor dak/lantai
Lebar (A) = 12.00 m
Lebar (B) = 13.10 m
Tinggi (m) = 0.12 m
Panjang = 7.90 m
Volume 3 = (A+B)/2*T
= 11.90 m3
Tenaga Kerja
Pekerja =
Tukang Batu =
Kepala Tukang =
Tenaga Kerja
Pekerja =
Tukang Batu =
Kepala Tukang =
RING BALK
Panjang = 172.64 m Kebutuhan bahan Pembesian Ø 12
Quantity = - bh Besi Beton Ø 12 =
Total 1 = 172.64 m Kawat Beton =
Konversi Kg Besi Ø 8
= Total x 0.395
Total Besi Ø 8 = 96.13 kg
BALOK 20/55
Panjang = 80.73 m
Quantity = 3.00 bh
Total 1 = 242.19 m
Kabupaten : Karanganyar Jenis Prasarana :
Kecamatan : Colomadu Take Of Sheet (TOS) Lokasi :
Desa : Volume :
BALOK 20/40
Panjang = 88.00 m
Quantity = 5.00 bh
Total 2 = 440.00 m
BALOK 20/40
Panjang = 210.10 m
Quantity = 1.00 bh
Total 3 = 210.10 m
COR PLAT
Lebar bawah = 117.98 m
Lebar atas = 117.98 m
Panjang =
Total = 235.97 m
KOLOM BESAR
Jumlah = 45.60 m
Panjang = 11.00 bh
Total = 501.60 m
Footplat
Lebar bawah melintang = 15.00 m
Lebar bawah memanjang = 15.00 m
Lebar atas melintang = 11.00 m
Lebar atas memanjang = 11.00 m
Quantity = 11.00 bh
Total = 572.00 m
Konversi Kg Besi Ø 6
= Total P. Begel x 0,222
Total Besi Ø 6 = 223.66 kg
Panjang = 2.35
Lebar = 3
Luas = 14.1
Pek. Plesteran
Analisa A,4,4,2.8 Pemasangan Plesteran 1 Pc : 8 Pp Teb
Panjang = 0 Bahan
Lebar = 0 Portland Cement =
Luas = 0 Pasir Pasang =
Panjang = Tenaga
Lebar = 0 Pekerja =
Luas = 0 Tukang Batu =
Kepala Tukang =
Panjang = 0 Mandor =
Lebar = 0
Luas = 0
Panjang = 0
Lebar = 0
Luas = 0
Panjang = 0
Lebar = 0
Luas = 0
Kabupaten : Karanganyar Jenis Prasarana :
Kecamatan : Colomadu Take Of Sheet (TOS) Lokasi :
Desa : Volume :
Panjang = 0
Lebar = 0
Luas = 0
Panjang = 0
Lebar = 0
Luas = 0
Panjang = 0
Lebar = 0
Luas = 0
Panjang = 0
Lebar = 0
Luas = 0
Luas Total = - m2
Tenaga
Pekerja =
Tukang Batu =
Kepala Tukang =
Mandor =
Tenaga
Pekerja =
Tukang Batu =
Kepala Tukang =
Mandor =
Pek. Rangka Atap Analisa pasang Kuda Kuda Baja ringan + Reng Untuk Atap
Bahan
Panjang = 9.47 C75, 0.8
Lebar = 13.00 C75, 0.6
Lebar = 14.01 m2 Baut
Luas = 127.89 m2 Dynabolt
Reng
Talang Jurai
Tenaga
Pekerja =
Tukang Besi =
Kepala Tukang =
Mandor =
Tenaga
Pekerja =
Tukang =
Kep.Tukang =
Tenaga
Kabupaten : Karanganyar Jenis Prasarana :
Kecamatan : Colomadu Take Of Sheet (TOS) Lokasi :
Desa : Volume :
Pekerja =
Tukang =
Kepala Tukang =
Mandor =
Unit = - Bahan
Kloset Jongkok
Portland Semen
Pasir Pasang
Tenaga
Pekerja =
Tukang =
Kepala Tukang =
Mandor =
Tenaga
Pekerja =
Tukang =
Kepala Tukang =
Mandor =
Panjang = - m Bahan
Pipa PVC Ø 3"
Perlengkapan 35% x pipa
Tenaga
Pekerja =
Tukang =
Kepala Tukang =
Mandor =
Unit = - bh Bahan
Floor drain =
Tenaga
Pekerja =
Tukang =
Kepala Tukang =
Mandor =
Tenaga
Kabupaten : Karanganyar Jenis Prasarana :
Kecamatan : Colomadu Take Of Sheet (TOS) Lokasi :
Desa : Volume :
Pekerja =
Tukang =
Kepala Tukang =
Mandor =
Tenaga
Pekerja =
Tukang Cat =
Kepala Tukang =
Mandor =
Tenaga
Pekerja =
Tukang Cat =
Kepala Tukang =
Mandor =
Tenaga
Pekerja =
Mandor =
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
Tenaga
Pekerja =
Tukang Cat =
Kepala Tukang =
Mandor =
Pas. Paving
Bahan
Lebar Paving abu-abu 8 cm
Panjang Pasir urug
Luas -
Kabupaten : Karanganyar Jenis Prasarana :
Kecamatan : Colomadu Take Of Sheet (TOS) Lokasi :
Desa : Volume :
Tenaga
Pekerja
Tukang Batu
luas -
luas Toal -
Bongkar Usuk & Reng Analisa A.2.2.1.18 Menurunkan Usuk dan Reng dari Ka
Lebar = - Tenaga
Panjang = - Pekerja =
Luas = - m2 Tukang Kayu =
Kepala Tukang =
Mandor =
Lebar = - Tenaga
Panjang = - Pekerja =
Luas = - Tukang Kayu =
Kepala Tukang =
Mandor =
Tenaga
Pekerja =
Tukang =
Kepala Tukang =
Mandor =
Tenaga
Pekerja =
Tukang =
Kepala Tukang =
Mandor =
Tenaga
Pekerja =
Tukang =
Kepala Tukang =
Mandor =
Tenaga
Tenaga
Tukang
Tenaga
Pekerja
Tukang Kayu
REKAPITULASI
Bahan
Semen =
@40 Kg/zak =
Pasir pasang =
Batu belah =
Pasir Beton =
Kabupaten : Karanganyar Jenis Prasarana :
Kecamatan : Colomadu Take Of Sheet (TOS) Lokasi :
Desa : Volume :
Kerikil =
Pasir Urug =
Kayu Klas III =
Paku 2" - 5" =
Minyak Bekisting =
Balok Sengon =
Multiplek t 9mm =
Dolken Kayu Galam d8 - 10 cm / 4 m =
Besi 12 Polos =
Besi 8 Polos =
Besi 6 Polos =
Kawat Beton =
Kayu 5/7x 4m =
Paku biasa 1/2"-1" =
Sengon balok =
Bata Merah =
Kapur Padam =
Keramik 20 x 20 =
Keramik 20 x 25 =
Keramik 40 x 40 =
Semen Warna =
C75, 75 =
C75, 0.6 =
Baut =
Dynabolt =
Reng =
Talang Jurai =
Genteng Press Mantili Mojolaban =
Genteng Bubung Mantili Mojolaban =
Galvalum =
Plamir =
Cat Dasar =
Cat Penutup 2 kali =
Gypsum Board =
Paku Sekrup =
Rangka metal hollow 40.40.2 mm =
Lisplank GRC =
Politur =
Politur jadi =
Ampelas =
Kait angin =
Engsel jendela =
Engsel pintu =
Kunci kamar mandi =
Kunci tanam =
Cat Genteng =
Cat Lispalnk =
Kran air =
Kloset jongkok =
Floor drain =
Pipa 3/4 " =
Perlengkapan 35% x pipa =
Pipa 3" =
Perlengkapan 35% x pipa =
Soda api =
Seng plat =
Paku Sekrup =
Kayu meranti =
List kayu profil =
Kabupaten : Karanganyar Jenis Prasarana :
Kecamatan : Colomadu Take Of Sheet (TOS) Lokasi :
Desa : Volume :
GRC board =
Kuas =
Ampelas =
kan Lapangan dan Perataan
&Pemasangan Bouwplank
91.00 x - = - Kg
0.584 x - = - m3
1.20 x - = - m3
1.500 x - = - Hok
0.750 x - = - Hok
0.075 x - = - Hok
at Begisting Lantai
1.650 x - = - Hok
0.250 x - = - Hok
0.025 x - = - Hok
n Plesteran 1 Pc : 8 Pp Tebal 15 mm
26.500 x - = - bh
10.400 x - = - kg
0.045 x - = - m3
1.620 x - = - kg
0.700 x - = - hok
0.350 x - = - hok
0.035 x - = - hok
0.035 x - = - hok
1.060 x - = - m2
9.300 x - = - kg
0.018 x - = - m3
1.940 x - = - kg
0.900 x - = - hok
0.450 x - = - hok
0.045 x - = - hok
0.045 x - = - hok
20.000 x - = - m2
0.150 x - = - Hok
0.075 x - = - Hok
0.0075 x - = - Hok
5.000 x - - m'
8.000 x - - kg
0.032 x - -
0.200 x - = - Hok
0.100 x - = - Hok
0.300 x - = - lbr
0.040 x - = - kg
0.150 x - = - hok
0.070 x - = - hok
0.007 x - = - hok
0.006 x - = - hok
1.000 x - - bh
6.000 x - - kg
0.010 x - - m3
1.000 x - = - hok
1.500 x - = - hok
0.150 x - = - hok
0.160 x - = - hok
1.200 x - - m
0.350 x - - ls
-
0.081 x - = - hok
0.135 x - = - hok
0.135 x - = - hok
0.004 x - = - hok
1.000 x - - bh
0.010 x - = - hok
0.100 x - = - hok
0.010 x - = - hok
0.005 x - = - hok
0.100 x = - kg
0.100 x - = - kg
0.260 x - = - kg
0.020 x - = - hok
0.063 x - = - hok
0.006 x - = - hok
0.003 x - = - hok
0.100 x = - kg
0.100 x 9.19 = 0.92 kg
0.260 x 9.19 = 2.39 kg
0.050 x - = - kg
0.150 x - = - hok
0.003 x - = - hok
1.050 x - = - m'
4.000 x - = - pcs
0.050 x - = - hok
0.100 x - = - hok
0.010 x - = - hok
0.001 x - = - hok
6.000 m
6.000 cm
3.000 cm
1.000 cm
1.600 cm
9.760 kg
1.627 kg - 0.00
0.00 0.00
- btg
- kg
0.010 x - = - hok
0.500 x - = - hok
0.010 x - = - hok
0.005 x - = - hok
0.150 x - = - Ltr
0.372 x - = - Ltr
2.000 x - = - Lbr
0.040 x - = - hok
0.060 x - = - hok
0.016 x - = - hok
0.003 x - = - hok
1.050 x - - m2
0.012 x - - m3
0.240 x - - hok
0.080 x - - hok
0.330 x - = - hok
0.010 x - = - hok
1.000 x - = - hok
0.250 x - = - hok
0.025 x - = - hok
0.050 x = - hok
Per 10 M2
2.000 x - = - hok
0.600 x - = - hok
0.060 x - = - hok
0.100 x = - hok
0.0120 x - = - m3
0.100 x - = - kg
0.150 x - = - hok
0.250 x - = - hok
0.025 x - = - hok
0.075 x - = - hok
1.100 x - = - lbr
0.010 x - = - kg
0.030 x - = -
0.070 x - = -
0.007 x - = -
0.004 x - = -
1.050 x - = - m'
0.010 x - = - kg
0.050 x - = -
0.050 x - = -
0.005 x - = -
0.003 x - = -
4.000 - -
0.350 - -
0.350 - -
0.100 - -
0.050 - -
Pembulatan
15428.7 Kg 15429.00 kg
385.72 Zak = 386.00 zak
41.74 m3 = 42.00 m3
0.00 m3 = 0.00 m3
m3 = 0.00 m3
26.64 m3 = 27.00 m3
0.00 m3 0.00 m3
3.95 m3 = 3.95 m3
39.52 Kg = 40.00 Kg
0.00 Ltr = 0.00 Ltr
1.48 m3 = m3
23.05 Lbr = 24.00 Lbr
197.58 Btg = 198.00 Btg
2053.01 Kg 2054.00 kg
100.93 kg = 101.00 kg
234.84 kg = 235.00 kg
2390.00 kg
34.13 kg = 35.00 kg
0.24 m3
19.18 kg = 20.00 kg
0.14 m3
11788.73 bh 11789.00 bh
0.00 m3 0.00 kg
0.00 bh 0.00 m2
0.00 bh 0.00 m2
111.82 bh 112.00 m2
167.73 kg 168.00 kg
190.30 m' 191.00 m;
285.46 m' 286.00 m'
3580.99 bh 3581.00 bh
204.63 bh 205.00 bh
460.41 m' 461.00 m'
15.86 m' 16.00 m'
0.00 m2 0.00 m2
0.00 m 0.00 m'
140.68 m2 141.00
33.68 kg 34.00 kg
33.68 kg 34.00 kg
87.57 kg 88.00 kg
0.00 lbr 0.00 lbr
0.00 kg 0.00 kg
0.00 m 0.00 m
0.00 m' 0.00 m'
0.00 ltr 0.00 ltr
0.00 ltr 0.00 ltr
0.00 lbr 0.00 lbr
4.00 bh 4.00 bh
4.00 bh 4.00 bh
9.00 bh 9.00 bh
0.00 bh 0.00 bh
3.00 bh 3.00 bh
0.00 kg 0.00 kg
3.31 kg 4.00 kg
1.00 bh 1.00 bh
0.00 bh 0.00 bh
0.00 bh 0.00 bh
24.00 m' 24.00 m'
7.00 ls 7.00 ls
0.00 m' 0.00 m'
0.00 ls 0.00 ls
0.00 kg 0.00 kg
0.00 lbr 0.00 lbr
0.00 pcs 0.00 pcs
0.00 m3
0.00 m' 0.00 m'
0.00 lbr 0.00 lbr
4.00 bh 4.00 bh
7.00 lbr 7.00 lbr
PEMERINTAH KABUPATEN KARANGANYAR
KECAMATAN
DESA TOHUDAN
Alamat :…………………………………………………………………….
A Belanja Jasa
Upah Tenaga Kerja
1 Pekerja 807.00 hok 75,000 60,525,000
2 Tukang 305.00 hok 85,000 25,925,000
3 Kep. Tukang 28.00 hok 95,000 2,660,000
B Belanja Modal
Belanja Material
1 Semen (40 kg) 15429.00 kg 1,200 18,514,800
2 Pasir Pasang 42.00 m3 270,000 11,340,000
3 Kayu 5/7 0.24 m3 2,520,000 601,776
4 Paku Biasa 2" - 5" 40.00 kg 18,900 756,000
5 Paku Biasa 1/2" - 1" 20.00 kg 18,900 378,000
6 Plamir 34.00 kg 22,100 751,400
7 Cat Dasar 34.00 kg 31,500 1,071,000
8 Cat Penutup 2 kali 88.00 kg 1,500 132,000
9 Baut 3581.00 lbr 1,800 6,445,800
10 Baja ringan 477.00 m' 17,100 8,156,700
11 Reng 461.00 m' 17,100 7,883,100
12 Galvalum 141.00 m2 61,600 8,685,600
13 Dynabolt 205.00 bh 10,000 2,050,000
14 Besi 2390.00 kg 10,000 23,900,000
15 Kawat beton 35.00 kg 16,500 577,500
16 Kuas 4.00 bh 17,100 68,400
17 Ampelas 6.00 lbr 6,300 37,800
18 Benang 3.00 rol 3,118 9,353
19 Bata merah 11789.00 bh 650 7,662,850
20 Keramik 40 x 40 112.00 m2 95,000 10,640,000
21 multiplek 24.00 lbr 32,000 768,000
22 Kerikil 27.00 m3 275,000 7,425,000
PEMERINTAH KABUPATEN KARANGANYAR
KECAMATAN
DESA TOHUDAN
Alamat :…………………………………………………………………….