Anda di halaman 1dari 24

tgl -1 hari 0.19 M1 0.09 M2 0.28 0.08 M3 0.37 0.22 M4 0.59 0.32 M5 0.91 BARAK 0.47 M6 M7 1,893.45 0.

0.09 M2 0.28 0.08 M3 0.37 0.22 M4 0.59 0.32 M5 0.91 BARAK 0.47 M6 M7 1,893.45 0.0000 M8 M9 M10 M35 M36 0.19 0.09 0.08 0.22 0.32 0.47 1.38
No. Mata ### 0.19 0.28 0.37 0.59 0.91 1.38
MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 10 MINGGU 36
Pembayaran Uraian Satuan Volume TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL MC MC mc
21/04/2022 22/04/2022 23/04/2022 24/04/2022 25/04/2022 26/04/2022 27/04/2022 28/04/2022 29/04/2022 30/04/2022 01/05/2022 02/05/2022 03/05/2022 04/05/2022 05/05/2022 06/05/2022 07/05/2022 08/05/2022 09/05/2022 10/05/2022 11/05/2022 12/05/2022 13/05/2022 14/05/2022 15/05/2022 16/05/2022 17/05/2022 18/05/2022 19/05/2022 20/05/2022 21/05/2022 22/05/2022 23/05/2022 24/05/2022 25/05/2022 26/05/2022 27/05/2022 28/05/2022 29/05/2022 30/05/2022 31/05/2022 01/06/2022 02/06/2022 03/06/2022 04/06/2022 05/06/2022 06/06/2022 07/06/2022 08/06/2022 09/06/2022 10/06/2022 11/06/2022 12/06/2022 13/06/2022 14/06/2022 15/06/2022 16/06/2022 17/06/2022 18/06/2022 19/06/2022 20/06/2022 21/06/2022 22/06/2022 23/06/2022 24/06/2022 25/06/2022 18/12/2022 19/12/2022 20/12/2022 21/12/2022 22/12/2022 23/12/2022 24/12/2022 bobot 1 2 3 4 5 6 total

I DIVISI 1. UMUM
1.2 1.2 Mobilisasi LS 1 0.12 0.09 0.02 0.02 0.25 - 0.09 - - - 0.09 0.02 - - - - 0.02 - - - - - 0.09 0.01 - - - 0.10 0.015 0.00 - - 0.02 - - - - - - - - - 0.12 - - - 0.12 - - - - - - - - - - - - - - - - - - - - - - - 0.59 0.48 ### ### 727,050,000.00 179,400,000.00 0.12 0.17 0.06 0.02 - 0.07 0.01 0.32
1.8.(1) 1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1 - - 0.03 0.03 - - - - 0.03 - 0.03 - - - - - 0.03 0.03 - - - - - 0.14 0.14 - - - - - 0.03 0.03 - - - - 0.03 0.23 0.26 - - - - - - 0.03 0.03 - 0.03 0.03 - 0.03 - - 0.03 - - - - - 0.03 - 0.03 - - - - - - - - - - - - - - - - - 0.60 0.49 ### ### 443,248,868.55 101,700,452.58 0.11 0.01 0.01 0.01 0.06 0.01 0.10 0.21
1.17.(1a) 1.17.(1a) Pengujian pH Buah 9 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3.00 3.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3.00 - 15,000.00 - - - - - - -
1.17.(1h) 1.17.(1h) Pengujian E Coli Buah 9 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3.00 - 3.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3.00 - 128,000.00 - - - - - - -
1.17.(1j) 1.17.(1j) Pengujian Temperatur (Suhu) Buah 9 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3.00 - 3.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3.00 - 15,000.00 - - - - - - -
1.17.(2a) 1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Buah 9 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3.00 - 3.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3.00 - 75,000.00 - - - - - - -
1.17.(2b) 1.17.(2b) Pengujian Tingkat Getaran Kendaraan Bermotor Buah 9 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3.00 - 3.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3.00 - 250,000.00 - - - - - - -
1.17.(3f) 1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 9 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3.00 - 3.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3.00 - 213,000.00 - - - - - - -
1.19 1.19 Keselamatan dan Kesehatan Kerja LS 1 - - 0.03 0.03 - - - - 0.03 - 0.03 - - - - 0.03 0.03 - - - - 0.03 0.03 0.06 - - - - 0.03 0.03 0.06 - - - - - 0.14 0.14 - - - - - - 0.03 0.03 - 0.14 - - 0.14 - - - - - 0.03 - 0.03 - - - - - - - - - - - - - - - - - 0.54 0.33 ### ### 221,050,000.00 143,902,000.00 0.21 0.01 0.01 0.01 0.02 0.02 0.04 0.10
1.21 1.21 Manajemen Mutu LS 1 - - 0.03 0.03 - - - - 0.03 - 0.03 - - - - - 0.03 0.03 - - - - - 0.03 0.03 - - - - - 0.01 0.01 - - - - - 0.01 0.01 - - - - - - 0.03 0.03 - 0.34 - - 0.34 - - - - - 0.03 - 0.03 - - - - - - - - - - - - - - - - - 0.54 0.13 76,000,000.00 ### 9,500,000.00 31,757,142.86 0.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00
- - - - - - -
- - - - - - -
II DIVISI 2. DRAINASE - - - - - - -
2.1.(1) 2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 1100 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 56.25 56.25 - - - - 112.50 - 225.00 - - 15.60 - - 240.60 - - - - - - - - - 353.10 67,597.37 - - - - - - -
2.2.(1) 2.2.(1) Pasangan Batu dengan Mortar M3 620 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 10.00 - - - - 10.00 - - - - - - - - - 10.00 953,991.14 - - - - - - -
2.3.(28) 2.3.(28) Saluran berbentuk U Tipe DS 4 M1 80 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1,796,483.04 - - - - - - -
2.3.(29) 2.3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) M1 4500 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 21.60 - - - - 21.60 57.20 - - - - 7.20 - 64.40 - - - - - - - - - 86.00 2,761,600.76 - - - - - - -
2.3.(29a) 2.3.(29a) Box Tangkapan Air (Precast) + penutup Bh 2463 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1,195,859.10 - - - - - - -
2.3.(29b) 2.3.(29b) Frame + Cover Manhole Tipe 108.16,5.108 - Bintang B Bh 2463 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 30.00 - - 30.00 - - - - - - - - - 30.00 1,866,124.17 - - - - - - -
- - - - - - -
- - - - - - -
III DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK - - - - - - -
3.1.(1) 3.1.(1) Galian Biasa M3 12728.98 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 90.00 206.00 206.00 - 502.00 - - - - - - - - - 502.00 39,380.20 - - - - - - -
3.1.(7) 3.1.(7) Galian Perkerasan Beraspal dengan Cold Milling Machi M3 1094.56 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 142,426.37 - - - - - - -
- - - - - - -
- - - - - - -
IV DIVISI 4. PEKERJAAN PREVENTIF - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - -
- - - - - - -
V DIVISI 5. PERKERASAN BERBUTIR - - - - - - -
5.1.(1) 5.1.(1) Lapis Pondasi Agregat Kelas A M3 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - -
- - - - - - -
VI DIVISI 6. PERKERASAN ASPAL - - - - - - -
6.1.(2a) 6.1.(2a) Lapis Perekat - Aspal Emulsi Liter 285958.58 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1,418.21 - - 704.30 704.30 - - 2,826.81 - - - - - - - - - - - - - - 819.00 644.70 787.50 939.86 1,939.86 1,939.86 1,939.86 9,010.62 - - - - - - - - - 11,837.43 19,920.00 - - - - - - -
6.3.(5a) 6.3.(5a) Laston Lapis Aus ( AC - WC) Ton 78817.90 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 415.74 - - 219.12 219.12 - - 853.98 - - - - - - - - - - - - - - 260.91 444.85 470.89 582.91 950.00 900.00 900.00 4,509.56 - - - - - - - - - 5,363.54 1,315,000.00 - - - - - - -
6.3.(8) 6.3.(8) Bahan Anti Pengelupasan Kg 1519.40 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 122,864.22 - - - - - - -
- - - - - - -
- - - - - - -
VII DIVISI 7 STRUKTUR - - - - - - -
7.1 (7a) 7.1 (7a) Beton Struktur, fc' 20 Mpa M3 1524 - - - - - - - - - - - - - - - - - - 10.00 10.00 10.00 - - - - 30.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 30.00 1,956,602.35 ### 57,735,422.14 962,648.36 0.49 - - - - 0.03 - 0.03
7.1 (15) 7.1 (15) Beton fc' 15 Mpa M3 4447.56 - - - - - - - - - - - - - - 1.92 1.92 - 3.84 - - - 0.63 1.05 0.34 0.56 2.58 - 2.94 - 2.94 2.57 5.96 2.64 3.44 1.94 1.72 5.13 23.38 1.02 2.42 2.15 - - 3.03 37.98 46.60 15.35 3.21 5.62 5.79 0.42 - - 30.39 31.48 32.29 22.03 21.28 31.35 24.48 24.48 187.39 - - - - - - - - - 297.12 1,949,968.54 ### 17,673,437.15 561,706,626.62 288.06 - - - 0.00 0.00 0.00 0.01
7.3 (1) 7.3 (1) Baja Tulangan Polos BjTP 280 kg 42075.6
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL WILAYAH VIII JAWA TIMUR-BALI
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI BALI
PEJABAT PEMBUAT KOMITMEN 3.2 PROVINSI BALI

PAKET PEKERJAAN
PRESERVASI JALAN DAN JEMBATAN SP. PESANGGARAN-NUSA DUA,
JIMBARAN ULUWATU DAN PENATAAN LANSKAP BUNDARAN, PEDESTRIAN, DAN
MEDIAN RUAS JALAN BANDARA NGURAH RAI-VENUE

LAPORAN MINGGUAN
MINGGU KE : 9

NOMOR KONTRAK : 12/PKS/Bb8.14/3.2/G20/2022


TANGGAL KONTRAK : 22 APRIL 2022
TAHUN ANGGARAN : 2022

KONSULTAN SUPERVISI : PENYEDIA JASA :

PT. VIRAMA KARYA (Persero) PT. WIJAYA KARYA (Persero) Tbk


KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL JAWA TIMUR - BALI
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI BALI

LAPORAN MINGGUAN
SATKER : PJN WILAYAH III PROVINSI BALI
PPK : 3.2 PROVINSI BALI
NAMA PAKET : PRESERVASI JALAN DAN JEMBATAN SP. PESANGGARAN-NUSA DUA, JIMBARAN-ULUWATU DAN PENATAAN LANSKAP BUNDARAN, PEDESTRIAN, DAN MEDIAN RUAS JALAN BANDARA NGURAH RAI - VENUE
KONTRAK NO. : 12/PKS/Bb8.14/3.2/G20/2022

KONTRAKTOR : PT. WIJAYA KARYA (Persero) .Tbk MINGGU KE : 10


KONSULTAN : PT. VIRAMA KARYA (Persero) TANGGAL : 20 June - 26 June 2022

KONTRAK S/D MINGGU LALU MINGGU INI S/D MINGGU INI PROSENTASE TERHADAP
MATA KETERANGAN
URAIAN PEKERJAAN SAT.
PEMBAYARAN BOBOT BOBOT BOBOT BOBOT ITEM PEKERJAAN THD. TOTAL
KUANTITAS HARGA SATUAN JUMLAH HARGA KUANTITAS KUANTITAS KUANTITAS
( Rp.) ( Rp.) (%) (%) (%) (%) (%) (%)
A B C D E F G H I J K L M N = L / D 1* 100 O = N*G / 100 P

DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 1,524,100,000.00 1,524,100,000.00 0.68 0.59 0.40 - 0.00 0.59 0.40 59.47 0.40
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 908,248,868.55 908,248,868.55 0.41 0.60 0.24 - 0.00 0.60 0.24 60.00 0.24
1.17.(1a) Pengujian pH Buah 9.00 15,000.00 135,000.00 0.00 3.00 0.00 - 0.00 3.00 0.00 33.33 0.00
1.17.(1h) Pengujian E Coli Buah 9.00 128,000.00 1,152,000.00 0.00 3.00 0.00 - 0.00 3.00 0.00 33.33 0.00
1.17.(1j) Pengujian Temperatur (Suhu) Buah 9.00 15,000.00 135,000.00 0.00 3.00 0.00 - 0.00 3.00 0.00 33.33 0.00
1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan Buah 9.00 75,000.00 675,000.00 0.00 3.00 0.00 - 0.00 3.00 0.00 33.33 0.00
1.17.(2b) Pengujian Tingkat Getaran Kendaraan Bermotor Buah 9.00 250,000.00 2,250,000.00 0.00 3.00 0.00 - 0.00 3.00 0.00 33.33 0.00
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 9.00 213,000.00 1,917,000.00 0.00 3.00 0.00 - 0.00 3.00 0.00 33.33 0.00
1.2 Keselamatan dan Kesehatan Kerja LS 1.00 672,280,000.00 672,280,000.00 0.30 0.54 0.16 - 0.00 0.54 0.16 54.29 0.16
1.2 Manajemen Mutu LS 1.00 76,000,000.00 76,000,000.00 0.03 0.54 0.02 - 0.00 0.54 0.02 54.29 0.02

Sub Total Pekerjaan DIVISI 1 3,186,892,868.55

DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 1,100.00 67,597.37 74,357,107.00 0.03 112.50 0.00 240.60 0.01 353.10 0.01 32.10 0.01
2.2.(1) Pasangan Batu dengan Mortar M3 620.00 953,991.14 591,474,506.80 0.26 - 0.00 10.00 0.00 10.00 0.00 1.61 0.00
2.3.(28) Saluran berbentuk U Tipe DS 4 M1 80.00 1,796,483.04 143,718,643.11 0.06 - 0.00 - 0.00 - 0.00 - -
2.3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) M1 4,500.00 2,761,600.76 12,427,203,420.00 5.55 21.60 0.03 64.40 0.08 86.00 0.11 1.91 0.11
2.3.(29a) Box Tangkapan Air (Precast) + penutup Bh 2,463.00 1,195,859.10 2,945,400,963.30 1.31 - 0.00 - 0.00 - 0.00 - -
2.3.(29b) Frame + Cover Manhole Tipe 108.16,5.108 - Bintang Besar (precast K.350), T=10 cm Bh 2,463.00 1,866,124.17 4,596,263,830.71 2.05 - 0.00 30.00 0.02 30.00 0.02 1.22 0.02

Sub Total Pekerjaan DIVISI 2 20,778,418,470.92

DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK


3.1.(1) Galian Biasa M3 12,728.98 39,380.20 501,269,778.20 0.22 - 0.00 502.00 0.01 502.00 0.01 3.94 0.01
3.1.(7) Galian Perkerasan Beraspal dengan Cold Milling Machine M3 1,094.56 142,426.37 155,894,207.55 0.07 - 0.00 - 0.00 - 0.00 - -

Sub Total Pekerjaan DIVISI 3 657,163,985.74

DIVISI 6. PERKERASAN ASPAL


6.1.(2a) Lapis Perekat - Aspal Emulsi Liter 285,958.58 19,920.00 5,696,294,913.60 2.54 2,826.81 0.03 9,010.62 0.08 11,837.43 0.11 4.14 0.11
6.3.(5a) Laston Lapis Aus ( AC - WC) Ton 78,817.90 1,315,000.00 103,645,538,500.00 46.27 853.98 0.50 4,509.56 2.65 5,363.54 3.15 6.80 3.15
6.3.(8) Bahan Anti Pengelupasan Kg 1,519.40 122,864.22 186,679,895.87 0.08 - 0.00 - 0.00 - 0.00 - -

Sub Total Pekerjaan DIVISI 6 109,528,513,309.47

DIVISI 7 STRUKTUR
7.1 (7a) Beton Struktur, fc' 20 Mpa M3 1,524.00 1,956,602.35 2,981,861,981.40 1.33 30.00 0.03 - 0.00 30.00 0.03 1.97 0.03
7.1 (15) Beton fc' 15 Mpa M3 4,447.56 1,949,968.54 8,672,602,079.76 3.87 109.73 0.10 187.39 0.16 297.12 0.26 6.68 0.26
7.3 (1) Baja Tulangan Polos BjTP 280 kg 42,075.60 15,336.18 645,278,975.21 0.29 5,850.00 0.04 - 0.00 5,850.00 0.04 13.90 0.04
7.9 (1) Pasangan Batu M3 374.80 867,871.12 325,278,095.78 0.15 - 0.00 1.40 0.00 1.40 0.00 0.37 0.00
7.15. (2) Pembongkaran beton M3 4,506.75 616,383.64 2,777,886,969.57 1.24 33.95 0.01 - 0.00 33.95 0.01 0.75 0.01

Sub Total Pekerjaan DIVISI 7 15,402,908,101.72

DIVISI 8 REHABILITASI JEMBATAN


KONTRAK S/D MINGGU LALU MINGGU INI S/D MINGGU INI PROSENTASE TERHADAP
MATA KETERANGAN
URAIAN PEKERJAAN SAT.
PEMBAYARAN HARGA SATUAN JUMLAH HARGA BOBOT BOBOT BOBOT BOBOT ITEM PEKERJAAN THD. TOTAL
KUANTITAS KUANTITAS KUANTITAS KUANTITAS
( Rp.) ( Rp.) (%) (%) (%) (%) (%) (%)
A B C D E F G H I J K L M N = L / D 1* 100 O = N*G / 100 P
8.1 (1) Cairan Perekat (Epoksi resin) Kg 150.00 336,482.42 50,472,363.00 0.02 - 0.00 - 0.00 - 0.00 - -
8.1 (2) Bahan Penutup (Sealant) Kg 150.00 316,840.89 47,526,133.50 0.02 - 0.00 - 0.00 - 0.00 - -
8.1 (3a) Tabung Penyuntik, penyediaan Buah 300.00 95,672.61 28,701,783.00 0.01 - 0.00 - 0.00 - 0.00 - -
8.1 (3b) Tabung Penyuntik, penggunan Buah 300.00 119,328.80 35,798,640.00 0.02 - 0.00 - 0.00 - 0.00 - -
8.2.(1) Penambahan (Patching) M3 2.18 4,094,726.37 8,926,503.49 0.00 - 0.00 - 0.00 - 0.00 - -
8.3.(2b) Pengecetan dekoratif pada elemen struktur beton, tebal : ….. µm M2 11,880.00 61,931.12 735,741,705.60 0.33 - 0.00 - 0.00 - 0.00 - -
8.7.(1b) Pengecatan struktur baja pada daerah kering tebal 240 mikron M2 70.00 189,229.05 13,246,033.50 0.01 - 0.00 - 0.00 - 0.00 - -
8.11.(1) Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug M1 341.40 2,401,596.23 819,904,952.92 0.37 - 0.00 - 0.00 - 0.00 - -

Sub Total Pekerjaan DIVISI 8 1,740,318,115.01

DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN LAIN


9.1.(1) Mandor Jam 600.00 24,062.50 14,437,500.00 0.01 600.00 0.01 - 0.00 600.00 0.01 100.00 0.01
9.1.(2) Pekerja Biasa Jam 2,400.00 19,957.68 47,898,432.00 0.02 2,400.00 0.02 - 0.00 2,400.00 0.02 100.00 0.02
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 400.00 103,433.33 41,373,332.00 0.02 400.00 0.02 - 0.00 400.00 0.02 100.00 0.02
9.2. (1) Marka jalan termoplastik M2 39,580.77 181,817.34 7,196,470,316.55 3.21 - 0.00 - 0.00 - 0.00 - -
9.2.(7) Rel Pengaman M1 700.00 1,205,231.35 843,661,945.00 0.38 - 0.00 - 0.00 - 0.00 - -
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 46,806.00 168,347.39 7,879,667,936.34 3.52 1,989.80 0.15 1,700.00 0.13 3,689.80 0.28 7.88 0.28
9.2.(10g) Kereb Pracetak Jenis 7 (Kereb pada Pelandaian Trotoar) Buah 11,373.20 125,257.95 1,424,583,716.94 0.64 5,915.00 0.33 3,139.00 0.18 9,054.00 0.51 79.61 0.51
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 56,064.00 281,589.81 15,787,051,107.84 7.05 8,512.66 1.07 1,210.24 0.15 9,722.90 1.22 17.34 1.22
9.2.(12b) Pembongkaran Ubin Eksisting atau Perkerasan Blok Beton Eksisting pada Trotoar atau Median M2 44,720.00 18,071.86 808,173,579.20 0.36 1,607.40 0.01 936.69 0.01 2,544.09 0.02 5.69 0.02
9.2.(15) Unit Lampu penerangan jalan lengan ganda, Tipe LED Buah 24.00 24,554,045.13 589,297,083.12 0.26 - 0.00 - 0.00 - 0.00 - -
Skh.1.9.3 (1a) Perkerasan pada Trotoar dan Median Tipe Kubel stone Ukuran 20x20 cm tebal 3 cm M2 360.00 381,949.12 137,501,683.20 0.06 - 0.00 - 0.00 - 0.00 - -
Skh.1.9.5.(1) Street Furniture ls 1.00 4,497,993,500.00 4,497,993,500.00 2.01 - 0.00 - 0.00 - 0.00 - -
Skh.1.9.6.(1a) Penanganan LANSKAP G20 Segmen 232.60 120,775,914.36 28,092,477,680.14 12.54 12.70 0.68 - 0.00 12.70 0.68 5.46 0.68

Sub Total Pekerjaan DIVISI 9 67,360,587,812.33

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA JALAN


10.1.(9) Perbaikan Campuran Aspal Panas M3 1,000.98 2,825,000.00 2,827,768,500.00 1.26 - 0.00 4.80 0.01 4.80 0.01 0.48 0.01
10.1.(17) Pengecatan Kereb pada Trotoar atau Median M2 43,458.00 56,473.27 2,454,215,367.66 1.10 1,750.00 0.04 1,750.00 0.04 3,500.00 0.09 8.05 0.09
10.2.(1) Pemeliharaan Kinerja Jembatan …… bentang ….. m LS 1.00 55,550,000.00 55,550,000.00 0.02 - 0.00 - 0.00 - 0.00 - -

Sub Total Pekerjaan DIVISI 10 5,337,533,867.66

JUMLAH 223,992,336,531.39 100.00 3.90 3.53 7.43


REALISASI KEMAJUAN PEKERJAAN SD MINGGU INI 7.43 %
RENCANA KEMAJUAN PEKERJAAN SD MINGGU INI 4.60 %
DEVIASI KEMAJUAN PEKERJAAN SD MINGGU INI 2.82 %

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


Pengguna Jasa Konsultan Supervisi Penyedia Jasa
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Satuan Kerja Pelaksanaan Jalan Nasional Wilayah III Provinsi Bali PT. VIRAMA KARYA (Persero) PT. WIJAYA KARYA (Persero) Tbk
Pejabat Pembuat Komitmen 3.2 Provinsi Bali
Koordinator Pengawas Lapangan

Ir. I Ketut Warma Diatmika I Gusti Made Bagiada, ST Yusafat A, ST Muhammad Ato'urrahman
Nip. 19661122 200812 1 001 Inspection Engineer Inspection Engineer Manajer Teknik Jalan
JADWAL PELAKSANAAN PEKERJAAN
Satker : PJN WILAYAH III PROVINSI BALI
PPK : 3.2 PROVINSI BALI
Nama Paket : Preservasi Jalan dan Jembatan Sp. Pesanggaran - Nusa Dua , Jimbaran - Uluwatu dan Penataan Lanskap Bundaran , Pedestrian, dan Median Ruas Jalan Bandara Ngurah Rai - Venue
Kontrak No. : 12/PKS/Bb8.14/3.2/G20/2022
Tanggal : 22 APRIL 2022
Kontraktor : PT. WIJAYA KARYA (Persero), Tbk
Konsultan : PT. VIRAMA KARYA (Persero)

APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER


No. Mata Kuantitas Bobot (%) Skala Keterangan
Uraian Satuan 22/Apr 25/Apr 2/May 9/May 16/May 23/May 30/May 6/Jun 13/Jun 20/Jun 27/Jun 4/Jul 11/Jul 18/Jul 25/Jul 1/Aug 8/Aug 15/Aug 22/Aug 29/Aug 5/Sep 12/Sep 19/Sep 26/Sep 3/Oct 10/Oct 17/Oct 24/Oct 31/Oct 7/Nov 14/Nov 21/Nov 28/Nov 5/Dec 12/Dec 19/Dec
Pembayaran /Volume
22/4-24/4 25/4-1/5 2/5-8/5 9/5-15/5 16/5-22/5 23/5-29/5 30/5-5/6 6/6-12/6 13/6-19/6 20/6-26/6 27/6-3/7 4/7-10/7 11/7-17/7 18/7-24/7 25/7-31/7 1/8-7/8 8/8-14/8 15/8-21/8 22/8-28/8 29/8-4/8 5/9-11/9 12/9-18/9 19/9-25/9 26/9-2/10 3/10-9/10 10/10-16/10 17/10-23/10 24/10-30/10 31/10-6/11 7/11-13/11 14/11-20/11 21/11-27/11 28/11-4/12 5/12-11/12 12/12-18/12 19/12-25/12

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

DIVISI 1. UMUM

1.2 Mobilisasi LS 1.00


0.680 0.001 0.001 0.001 0.001 0.001 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 100
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00
0.405 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.023
1.17.(1a) Pengujian pH Buah 9.00
0.000 0.000 0.000 0.000
1.17.(1h) Pengujian E Coli Buah 9.00
0.001 0.000 0.000 0.000
1.17.(1j) Pengujian Temperatur (Suhu) Buah 9.00
0.000 0.000 0.000 0.000
1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan Buah 9.00
0.000 0.000 0.000 0.000
1.17.(2b) Pengujian Tingkat Getaran Kendaraan Bermotor Buah 9.00
0.001 0.000 0.000 0.000
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 9.00
0.001 0.000 0.000 0.000
1.19 Keselamatan dan Kesehatan Kerja LS 1.00
0.300 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.017
1.21 Manajemen Mutu LS 1.00
0.034 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.002
DIVISI 2. DRAINASE

2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 1,100.00


0.033 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
2.2.(1) Pasangan Batu dengan Mortar M3 620.00
0.264 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026
2.3.(28) Saluran berbentuk U Tipe DS 4 M1 80.00
0.064 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
2.3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) M1 4,500.00
5.548 0.100 0.100 0.100 0.656 0.656 0.656 0.656 0.656 0.656 0.656 0.656
2.3.(29a) Box Tangkapan Air (Precast) + penutup Bh 2,463.00
1.315 0.050 0.050 0.050 0.146 0.146 0.146 0.146 0.146 0.146 0.146 0.146 75
2.3.(29b) Frame + Cover Manhole Tipe 108.16,5.108 - Bintang Besar (precast K.350 Bh 2,463.00
2.052 0.050 0.050 0.130 0.130 0.130 0.130 0.130 0.130 0.130 0.130 0.130 0.130 0.130 0.130 0.130 0.130 0.130
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK

3.1.(1) Galian Biasa M3 12,728.98


0.224 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
3.1.(7) Galian Perkerasan Beraspal dengan Cold Milling Machine M3 1,094.56
0.070 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
DIVISI 4. PEKERJAAN PREVENTIF

DIVISI 5. PERKERASAN BERBUTIR


RENCANA KONTRAK
5.1.(1) Lapis Pondasi Agregat Kelas A M3

DIVISI 6. PERKERASAN ASPAL

6.1.(2a) Lapis Perekat - Aspal Emulsi Liter 285,958.58


2.543 0.141 0.141 0.141 0.141 0.141 0.141 0.141 0.141 0.141 0.141 0.141 0.141 0.141 0.141 0.141 0.141 0.141 0.141
6.3.(5a) Laston Lapis Aus ( AC - WC) Ton 78,817.90
46.272 0.200 0.200 0.200 0.500 1.200 1.200 1.200 3.779 3.779 3.779 3.779 3.779 3.779 3.779 3.779 3.779 3.779 3.779
6.3.(8) Bahan Anti Pengelupasan Kg 1,519.40
0.083 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
DIVISI 7 STRUKTUR

7.1 (7a) Beton Struktur, fc' 20 Mpa M3 1,524.00


1.331 0.010 0.010 0.010 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087
7.1 (15) Beton fc' 15 Mpa M3 4,447.56
3.872 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.050 0.050 0.050 0.050 0.100 0.100 0.100 0.550 0.550 0.550 0.550 0.550 0.550 50
7.3 (1) Baja Tulangan Polos BjTS 280 kg 42,075.60
0.288 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019
7.9 (1) Pasangan Batu M3 374.80
0.145 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015
7.15. (2) Pembongkaran beton M3 4,506.75
1.240 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073
DIVISI 8 REHABILITASI JEMBATAN

8.1 (1) Cairan Perekat (Epoksi resin) Kg 150.00


0.023 0.003 0.003 0.003 0.003 0.003 0.003 0.003
8.1 (2) Bahan Penutup (Sealant) Kg 150.00
0.021 0.003 0.003 0.003 0.003 0.003 0.003 0.003
8.1 (3a) Tabung Penyuntik, penyediaan Buah 300.00
0.013 0.002 0.002 0.002 0.002 0.002 0.002
8.1 (3b) Tabung Penyuntik, penggunan Buah 300.00
0.016 0.002 0.002 0.002 0.002 0.002 0.002 0.002
8.2.(1) Penambahan (Patching) M3 2.18
0.004 0.001 0.001 0.001
8.3.(2b) Pengecetan dekoratif pada elemen struktur beton, tebal : ….. µm M2 11,880.00
0.328 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041
8.7.(1b) Pengecatan struktur baja pada daerah kering tebal 240 mikron M2 70.00
0.006 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
8.11.(1) Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug M1 341.40
0.366 0.092 0.092 0.092 0.092
DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN LAIN

9.1.(1) Mandor Jam 600.00


0.006 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
9.1.(2) Pekerja Biasa Jam 2,400.00
0.021 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 25
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 400.00
0.018 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
9.2. (1) Marka jalan termoplastik M2 39,580.77
3.213 0.050 0.050 0.358 0.358 0.358 0.358 0.358 0.358 0.358 0.358 0.050 0.050 0.050 0.100
9.2.(7) Rel Pengaman M1 700.00
0.377 0.063 0.063 0.063 0.063 0.063 0.063
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 46,806.00
3.518 0.010 0.010 0.010 0.010 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.070 0.070 0.213 0.213 0.213 0.213 0.213 0.213 0.213 0.213 0.213 0.213 0.213 0.213 0.213 0.213
9.2.(10g) Kereb Pracetak Jenis 7 (Kereb pada Pelandaian Trotoar) Buah 11,373.20
0.636 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 56,064.00
7.048 0.010 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.402 0.402 0.402 0.402 0.402 0.402 0.402 0.402 0.402 0.402 0.402 0.402 0.402 0.402 0.402 0.402
9.2.(12b) Pembengkokan Ubin Eksisting atau Perkerasan Blok Beton Eksisting pada M2 44,720.00
0.361 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030
9.2.(15) Unit Lampu penerangan jalan lengan ganda, Tipe LED Buah 24.00
0.263 0.088 0.088 0.088
Skh.1.9.3 (1a) Perkerasan pada Trotoar dan Median Tipe Kubel stone Ukuran 20x20 cm t M2 360.00
0.061 0.020 0.020 0.020
Skh.1.9.5.(1) Street Furniture ls 1.00
2.008 0.287 0.287 0.287 0.287 0.287 0.287 0.287
Skh.1.9.6.(1a) Penanganan LANSKAP G20 Segmen 232.60
12.542 0.010 0.010 0.010 0.010 0.050 0.050 0.050 0.950 0.950 0.950 0.950 0.950 0.950 0.950 0.950 0.950 0.950 0.950 0.950 0.950
DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA JALAN

10.1.(9) Perbaikan Campuran Aspal Panas M3 1,000.98


1.262 0.050 0.050 0.050 0.050 0.005 0.005 0.005 0.005 0.005 0.207 0.207 0.207 0.207 0.207
10.1.(17) Pengecatan Kereb pada Trotoar atau Median M2 43,458.00
1.096 0.091 0.091 0.091 0.091 0.091 0.091 0.091 0.091 0.091 0.091 0.091 0.091
10.2.(1) Pemeliharaan Kinerja Jembatan …… bentang ….. m LS 1.00
0.025 0.004 0.004 0.004 0.004 0.004 0.004

Bobot Rencana Perminggu


100.00 0.02 0.03 0.08 0.12 0.23 0.41 0.47 0.47 1.39 1.37 1.37 1.41 1.43 1.45 2.14 2.67 2.81 3.85 5.09 4.85 4.81 6.64 6.98 6.88 6.37 5.56 5.56 5.65 5.36 5.10 4.60 4.19 0.27 0.21 0.07 0.07
Kumulatif bobot Rencana
0 0.02 0.06 0.14 0.26 0.49 0.90 1.38 1.85 3.23 4.60 5.97 7.38 8.81 10.26 12.40 15.07 17.89 21.74 26.83 31.68 36.50 43.13 50.11 56.99 63.36 68.93 74.49 80.14 85.50 90.60 95.19 99.39 99.66 99.86 99.93 100.00
Bobot Realisasi Perminggu
0.19 0.09 0.08 0.22 0.32 0.47 0.95 0.54 1.03 3.53
Kumulatif bobot Realisasi
0 0.19 0.28 0.37 0.59 0.91 1.38 2.33 2.87 3.90 7.43
Deviasi
0.17 0.23 0.23 0.33 0.42 0.48 0.96 1.02 0.66 2.82

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


Pengguna Jasa Konsultan Supervisi Penyedia Jasa
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Satuan Kerja Pelaksanaan Jalan Nasional Wilayah III Provinsi Bali PT. VIRAMA KARYA (Persero) PT. WIJAYA KARYA (Persero) Tbk
PPK 3.2 Provinsi Bali

Mokhamad Solthon, ST. MT. FX. Edi Sunarno Muhammad Firmansyah


Nip. 197607 152009111001 Supervision Engineer Manajer Proyek
JADWAL PELAKSANAAN PEKERJAAN
Satker : PJN WILAYAH III PROVINSI BALI
PPK : 3.2 PROVINSI BALI
Nama Paket : Preservasi Jalan dan Jembatan Sp. Pesanggaran - Nusa Dua , Jimbaran - Uluwatu dan Penataan Lanskap Bundaran , Pedestrian, dan Median Ruas Jalan Bandara Ngurah Rai - Venue
Kontrak No. : 12/PKS/Bb8.14/3.2/G20/2022
Tanggal : 22 APRIL 2022
Kontraktor : PT. WIJAYA KARYA (Persero), Tbk
Konsultan : PT. VIRAMA KARYA (Persero)

FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKT


No. Mata Kuantitas
Uraian Satuan Bobot (%) 31/Jan 7/Feb 14/Feb 21/Feb 28/Feb 7/Mar 14/Mar 21/Mar 28/Mar 4/Apr 11/Apr 18/Apr 25/Apr 2/May 9/May 16/May 23/May 30/May 6/Jun 13/Jun 20/Jun 27/Jun 4/Jul 11/Jul 18/Jul 25/Jul 1/Aug 8/Aug 15/Aug 22/Aug 29/Aug 5/Sep 12/Sep 19/Sep 26/Sep 3/Oct Skala Keterangan
Pembayaran /Volume
28/1-3/2 04/2-10/2 11/2-17/2 18/2-24/2 25/2-3/3 4/3-10/3 11/3-17/3 18/3-24/3 25/3-31/3 1/4-7/4 8/4-14/4 15/4-21/4 25/4-1/5 2/5-8/5 9/5-15/5 16/5-22/5 23/5-29/5 30/5-6/6 6/6-12/6 13/6-19/6 20/6-26/6 27/6-3/7 11/7-10/7 11/7-17/7 18/7-24/7 25/7-31/7 1/8-7/8 8/8-14/8 15/8-21/8 22/8-28/8 29/8-4/9 5/9-11/9 12/9-18/9 19/9-25/9 26/9-2/10 3/10-9/10

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

DIVISI 1. UMUM

1.2 Mobilisasi LS 1.00


0.680 0.001 0.001 0.001 0.001 0.001 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 100
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00
0.405 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.023
1.17.(1a) Pengujian pH Buah 9.00
0.000 0.000 0.000 0.000
1.17.(1h) Pengujian E Coli Buah 9.00
0.001 0.000 0.000 0.000
1.17.(1j) Pengujian Temperatur (Suhu) Buah 9.00
0.000 0.000 0.000 0.000
1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan Buah 9.00
0.000 0.000 0.000 0.000
1.17.(2b) Pengujian Tingkat Getaran Kendaraan Bermotor Buah 9.00
0.001 0.000 0.000 0.000
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 9.00
0.001 0.000 0.000 0.000
1.19 Keselamatan dan Kesehatan Kerja LS 1.00
0.300 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.017
1.21 Manajemen Mutu LS 1.00
0.034 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.002
DIVISI 2. DRAINASE

2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 1,100.00


0.033 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
2.2.(1) Pasangan Batu dengan Mortar M3 620.00
0.264 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026
2.3.(28) Saluran berbentuk U Tipe DS 4 M1 80.00
0.064 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
2.3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) M1 4,500.00
5.548 0.100 0.100 0.050 0.050 0.050 0.050 0.050 0.050 0.561 0.561 0.561 0.561 0.561 0.561 0.561 0.561 0.561
2.3.(29a) Box Tangkapan Air (Precast) + penutup Bh 2,463.00
1.315 0.050 0.050 0.050 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 0.097 75
2.3.(29b) Frame + Cover Manhole Tipe 108.16,5.108 - Bintang Besar (precast K.350 Bh 2,463.00
2.052 0.187 0.187 0.187 0.187 0.187 0.187 0.187 0.187 0.187 0.187 0.187
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1) Galian Biasa M3 12,728.98
0.224 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
3.1.(7) Galian Perkerasan Beraspal dengan Cold Milling Machine M3 1,094.56
0.070 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
DIVISI 4. PEKERJAAN PREVENTIF

DIVISI 5. PERKERASAN BERBUTIR

5.1.(1) Lapis Pondasi Agregat Kelas A M3

DIVISI 6. PERKERASAN ASPAL

6.1.(2a) Lapis Perekat - Aspal Emulsi Liter 285,958.58


2.543 0.141 0.141 0.050 0.050 0.050 0.050 0.050 0.050 0.178 0.178 0.178 0.178 0.178 0.178 0.178 0.178 0.178 0.178 0.178
6.3.(5a) Laston Lapis Aus ( AC - WC) Ton 78,817.90
46.272 0.200 0.200 0.200 0.100 0.100 0.300 1.250 1.500 2.500 2.500 2.500 2.500 4.632 4.632 4.632 4.632 4.632 4.632 4.632
6.3.(8) Bahan Anti Pengelupasan Kg 1,519.40
0.083 0.005 0.005 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
DIVISI 7 STRUKTUR
7.1 (7a) Beton Struktur, fc' 20 Mpa M3 1,524.00
1.331 0.010 0.010 0.010 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051 0.051
7.1 (15) Beton fc' 15 Mpa M3 4,447.56
3.872 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.050 0.050 0.050 0.050 0.100 0.050 0.050 0.050 0.100 0.300 0.300 0.530 0.530 0.530 0.530 0.530 50
7.3 (1) Baja Tulangan Polos BjTS 280 kg 42,075.60
0.288 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019
7.9 (1) Pasangan Batu M3 374.80
0.145 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015
7.15. (2) Pembongkaran beton M3 4,506.75
1.240 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073
DIVISI 8 REHABILITASI JEMBATAN

8.1 (1) Cairan Perekat (Epoksi resin) Kg 150.00


0.023 0.003 0.003 0.003 0.003 0.003 0.003 0.003
8.1 (2) Bahan Penutup (Sealant) Kg 150.00
0.021 0.003 0.003 0.003 0.003 0.003 0.003 0.003
8.1 (3a) Tabung Penyuntik, penyediaan Buah 300.00
0.013 0.002 0.002 0.002 0.002 0.002 0.002
8.1 (3b) Tabung Penyuntik, penggunan Buah 300.00
0.016 0.002 0.002 0.002 0.002 0.002 0.002 0.002
8.2.(1) Penambahan (Patching) M3 2.18
0.004 0.001 0.001 0.001
8.3.(2b) Pengecetan dekoratif pada elemen struktur beton, tebal : ….. µm M2 11,880.00
0.328 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041
8.7.(1b) Pengecatan struktur baja pada daerah kering tebal 240 mikron M2 70.00
0.006 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
8.11.(1) Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug M1 341.40
0.366 0.046 0.046 0.046 0.046 0.046 0.046 0.046 0.046
DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN LAIN

9.1.(1) Mandor Jam 600.00


0.006 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
9.1.(2) Pekerja Biasa Jam 2,400.00
0.021 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 25
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 400.00
0.018 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
9.2. (1) Marka jalan termoplastik M2 39,580.77
3.213 0.150 0.219 0.219 0.219 0.219 0.219 0.219 0.219 0.219 0.219 0.219 0.219 0.219 0.219 0.219
9.2.(7) Rel Pengaman M1 700.00
0.377 0.063 0.063 0.063 0.063 0.063 0.063
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 46,806.00
3.518 0.010 0.010 0.010 0.010 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.070 0.070 0.213 0.050 0.100 0.100 0.150 0.190 0.190 0.199 0.199 0.199 0.199 0.199 0.199 0.199 0.199 0.199 0.199
9.2.(10g) Kereb Pracetak Jenis 7 (Kereb pada Pelandaian Trotoar) Buah 11,373.20
0.636 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 56,064.00
7.048 0.010 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.402 0.150 0.150 0.150 0.250 0.300 0.350 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360 0.360
9.2.(12b) Pembengkokan Ubin Eksisting atau Perkerasan Blok Beton Eksisting pada M2 44,720.00
0.361 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030
9.2.(15) Unit Lampu penerangan jalan lengan ganda, Tipe LED Buah 24.00
0.263 0.088 0.088 0.088
Skh.1.9.3 (1a) Perkerasan pada Trotoar dan Median Tipe Kubel stone Ukuran 20x20 cm te M2 360.00
0.061 0.020 0.020 0.020
Skh.1.9.5.(1) Street Furniture ls 1.00
2.008 0.201 0.201 0.201 0.201 0.201 0.201 0.201 0.201 0.201 0.201
Skh.1.9.6.(1a) Penanganan LANSKAP G20 Segmen 232.60
12.542 0.010 0.010 0.010 0.010 0.050 0.050 0.050 0.950 0.950 0.950 0.950 0.950 0.950 0.950 0.950 0.050 0.050 0.050 0.200 1.000 1.100 1.150 1.150
DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA JALAN

10.1.(9) Perbaikan Campuran Aspal Panas M3 1,000.98


1.262 0.050 0.050 0.050 0.050 0.005 0.005 0.005 0.005 0.005 0.207 0.207 0.062 0.062 0.062 0.062 0.062 0.062 0.062 0.062 0.062 0.062
10.1.(17) Pengecatan Kereb pada Trotoar atau Median M2 43,458.00
1.096 0.091 0.091 0.091 0.091 0.091 0.091 0.091 0.091 0.091 0.091 0.091 0.091
10.2.(1) Pemeliharaan Kinerja Jembatan …… bentang ….. m LS 1.00
0.025 0.004 0.004 0.004 0.004 0.004 0.004

Bobot Rencana Perminggu


100.00 0.02 0.03 0.08 0.12 0.23 0.41 0.47 0.47 1.39 1.37 1.37 1.41 1.43 1.45 2.14 2.67 0.98 0.98 0.98 1.50 3.54 4.04 6.33 6.51 5.41 5.40 7.47 7.07 7.02 6.92 6.77 6.21 6.01 0.82 0.69 0.29
Kumulatif bobot Rencana
0 0.02 0.06 0.14 0.26 0.49 0.90 1.38 1.85 3.23 4.60 5.97 7.38 8.81 10.26 12.40 15.07 16.06 17.03 18.01 19.51 23.05 27.10 33.42 39.93 45.34 50.74 58.21 65.28 72.31 79.23 85.99 92.20 98.20 99.03 99.71 100.00
Bobot Realisasi Perminggu
0.33 2.39 0.64 3.88 2.80 0.89 0.52 0.86 1.92 0.62 0.42 0.37 0.28 0.08 0.22 0.32 0.47 0.95 0.54 1.03 3.53
Kumulatif bobot Realisasi
0 0.33 2.72 3.36 7.24 10.04 10.92 11.44 12.30 14.22 14.84 15.26 15.63 15.91 16.00 16.22 16.54 17.01 17.96 18.50 19.53 23.06
Deviasi
0.31 2.67 3.22 6.98 9.55 10.02 10.06 10.45 10.99 10.24 9.29 8.25 7.11 5.74 3.81 1.46 0.95 0.93 0.49 0.01 0.00

11.04 27.69 35.25 14.01


KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL JAWA TIMUR - BALI
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI BALI
PEJABAT PEMBUAT KOMITMEN 3.2 PROVINSI BALI

LAPORAN MINGGUAN
NAMA PAKET : PRESERVASI JALAN DAN JEMBATAN SP. PESANGGARAN-NUSA DUA, JIMBARAN ULUWATU DAN PENATAAN LANSKAP BUNDARAN, PEDESTRIAN, DAN MEDIAN RUAS JALAN BANDARA NGURAH RAI -
VENUE TAHUN ANGGARAN : 2022

PENYEDIA JASA : PT. WIJAYA KARYA (Persero) .Tbk MINGGU KE : 10


No. KONTRAK : 12/PKS/Bb8.14/3.2/G20/2022 PERIODE MINGGU : 20 June - 26 June 2022
TANGGAL KONTRAK : 22 APRIL 2022
KONSULTAN : PT. VIRAMA KARYA (Persero)

KONTRAK S/D MINGGU LALU MINGGU INI S/D MINGGU INI PROSENTASE TERHADAP
MATA KETERANGAN
PEMBAYARAN URAIAN PEKERJAAN SAT.
BOBOT BOBOT BOBOT BOBOT ITEM PEKERJAAN THD. TOTAL
KUANTITAS HARGA SATUAN JUMLAH HARGA KUANTITAS KUANTITAS KUANTITAS
( Rp.) ( Rp.) (%) (%) (%) (%) (%) (%)
A B C D E F G H I J K L M N = L / D 1* 100 O = N*G / 100 P

DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 1,524,100,000.00 1,524,100,000.00 0.68 0.59 0.41 (0.59) -0.41 - 0.00 - -
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 908,248,868.55 908,248,868.55 0.41 0.60 0.24 (0.60) -0.24 - 0.00 - -
1.17.(1a) Pengujian pH Buah 9.00 15,000.00 135,000.00 0.00 3.00 0.00 (3.00) 0.00 - 0.00 - -
1.17.(1h) Pengujian E Coli Buah 9.00 128,000.00 1,152,000.00 0.00 3.00 0.00 (3.00) 0.00 - 0.00 - -
1.17.(1j) Pengujian Temperatur (Suhu) Buah 9.00 15,000.00 135,000.00 0.00 3.00 0.00 (3.00) 0.00 - 0.00 - -
1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan Buah 9.00 75,000.00 675,000.00 0.00 3.00 0.00 (3.00) 0.00 - 0.00 - -
1.17.(2b) Pengujian Tingkat Getaran Kendaraan Bermotor Buah 9.00 250,000.00 2,250,000.00 0.00 3.00 0.00 (3.00) 0.00 - 0.00 - -
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 9.00 213,000.00 1,917,000.00 0.00 3.00 0.00 (3.00) 0.00 - 0.00 - -
1.2 Keselamatan dan Kesehatan Kerja LS 1.00 672,280,000.00 672,280,000.00 0.30 0.54 0.16 (0.54) -0.16 - 0.00 - -
1.2 Manajemen Mutu LS 1.00 76,000,000.00 76,000,000.00 0.03 0.54 0.02 (0.54) -0.02 - 0.00 - -

Sub Total Pekerjaan DIVISI 1 3,186,892,868.55

DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 1,100.00 67,597.37 74,357,107.00 0.03 112.50 0.00 128.10 0.00 240.60 0.01 21.87 0.01
2.2.(1) Pasangan Batu dengan Mortar M3 620.00 953,991.14 591,474,506.80 0.27 - 0.00 10.00 0.00 10.00 0.00 1.61 0.00
2.3.(28) Saluran berbentuk U Tipe DS 4 M1 80.00 1,796,483.04 143,718,643.11 0.06 - 0.00 - 0.00 - 0.00 - -
2.3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) M1 4,500.00 2,761,600.76 12,427,203,420.00 5.58 21.60 0.03 42.80 0.05 64.40 0.08 1.43 0.08
2.3.(29a) Box Tangkapan Air (Precast) + penutup Bh 2,463.00 1,195,859.10 2,945,400,963.30 1.32 - 0.00 - 0.00 - 0.00 - -
2.3.(29b) Frame + Cover Manhole Tipe 108.16,5.108 - Bintang Besar (precast K.350), T=10 cm Bh 2,463.00 1,866,124.17 4,596,263,830.71 2.06 - 0.00 30.00 0.03 30.00 0.03 1.22 0.03

Sub Total Pekerjaan DIVISI 2 20,778,418,470.92

DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK


3.1.(1) Galian Biasa M3 12,696.48 39,380.20 499,989,921.70 0.22 - 0.00 502.00 0.01 502.00 0.01 3.95 0.01
3.1.(7) Galian Perkerasan Beraspal dengan Cold Milling Machine M3 1,000.00 142,426.37 142,426,370.00 0.06 - 0.00 - 0.00 - 0.00 - -

Sub Total Pekerjaan DIVISI 3 642,416,291.70

DIVISI 6. PERKERASAN ASPAL


6.1.(2a) Lapis Perekat - Aspal Emulsi Liter 285,296.66 19,920.00 5,683,109,467.20 2.55 7,071.79 0.06 1,938.84 0.02 9,010.62 0.08 3.16 0.08
6.3.(5a) Laston Lapis Aus ( AC - WC) Ton 78,601.36 1,315,000.00 103,360,785,244.00 46.40 2,301.88 1.36 2,207.68 1.30 4,509.56 2.66 5.74 2.66
6.3.(8) Bahan Anti Pengelupasan Kg 1,479.77 122,864.22 181,811,123.58 0.08 - 0.00 - 0.00 - 0.00 - -

Sub Total Pekerjaan DIVISI 6 109,225,705,834.78

DIVISI 7 STRUKTUR
7.1 (7a) Beton Struktur, fc' 20 Mpa M3 1,524.00 1,956,602.35 2,981,861,981.40 1.34 67.00 0.06 (67.00) -0.06 - 0.00 - -
7.1 (15) Beton fc' 15 Mpa M3 4,447.56 1,949,968.54 8,672,602,079.76 3.89 241.53 0.21 (54.13) -0.05 187.39 0.16 4.21 0.16
7.3 (1) Baja Tulangan Polos BjTP 280 kg 42,075.60 15,336.18 645,278,975.21 0.29 5,850.00 0.04 (5,850.00) -0.04 - 0.00 - -
7.9 (1) Pasangan Batu M3 358.00 867,871.12 310,697,860.96 0.14 - 0.00 1.40 0.00 1.40 0.00 0.39 0.00
7.15. (2) Pembongkaran beton M3 4,506.75 616,383.64 2,777,886,969.57 1.25 788.77 0.22 (788.77) -0.22 - 0.00 - -

Sub Total Pekerjaan DIVISI 7 15,388,327,866.90

DIVISI 8 REHABILITASI JEMBATAN


8.1 (1) Cairan Perekat (Epoksi resin) Kg 149.50 336,482.42 50,304,121.79 0.02 - 0.00 - 0.00 - 0.00
8.1 (2) Bahan Penutup (Sealant) Kg 149.50 316,840.89 47,367,713.06 0.02 - 0.00 - 0.00 - 0.00
8.1 (3a) Tabung Penyuntik, penyediaan Buah 298.00 95,672.61 28,510,437.78 0.01 - 0.00 - 0.00 - 0.00
8.1 (3b) Tabung Penyuntik, penggunan Buah 298.00 119,328.80 35,559,982.40 0.02 - 0.00 - 0.00 - 0.00
8.2.(1) Penambahan (Patching) M3 - 4,094,726.37 - 0.00 - 0.00 - 0.00 - 0.00
8.3.(2b) Pengecetan dekoratif pada elemen struktur beton, tebal : ….. µm M2 11,880.00 61,931.12 735,741,705.60 0.33 - 0.00 - 0.00 - 0.00
8.7.(1b) Pengecatan struktur baja pada daerah kering tebal 240 mikron M2 - 189,229.05 - 0.00 - 0.00 - 0.00 - 0.00
8.11.(1) Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug M1 - 2,401,596.23 - 0.00 - 0.00 - 0.00 - 0.00

Sub Total Pekerjaan DIVISI 8 897,483,960.63

DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN LAIN


9.1.(1) Mandor Jam 600.00 24,062.50 14,437,500.00 0.01 600.00 0.01 (600.00) -0.01 - 0.00 - -
9.1.(2) Pekerja Biasa Jam 2,400.00 19,957.68 47,898,432.00 0.02 2,400.00 0.02 (2,400.00) -0.02 - 0.00 - -
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 400.00 103,433.33 41,373,332.00 0.02 400.00 0.02 (400.00) -0.02 - 0.00 - -
9.2. (1) Marka jalan termoplastik M2 39,511.23 181,817.34 7,183,826,193.28 3.23 - 0.00 - 0.00 - 0.00 - -
9.2.(7) Rel Pengaman M1 700.00 1,205,231.35 843,661,945.00 0.38 - 0.00 - 0.00 - 0.00 - -
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 46,806.00 168,347.39 7,879,667,936.34 3.54 18,723.27 1.42 (17,023.27) -1.29 1,700.00 0.13 3.63 0.13
9.2.(10g) Kereb Pracetak Jenis 7 (Kereb pada Pelandaian Trotoar) Buah 11,373.20 125,257.95 1,424,583,716.94 0.64 11,687.00 0.66 (8,548.00) -0.48 3,139.00 0.18 27.60 0.18
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 56,064.00 281,589.81 15,787,051,107.84 7.09 19,413.99 2.45 (18,203.75) -2.30 1,210.24 0.15 2.16 0.15
9.2.(12b) Pembongkaran Ubin Eksisting atau Perkerasan Blok Beton Eksisting pada Trotoar atau Median M2 44,720.00 18,071.86 808,173,579.20 0.36 27,936.60 0.23 (26,999.91) -0.22 936.69 0.01 2.09 0.01
9.2.(15) Unit Lampu penerangan jalan lengan ganda, Tipe LED Buah 24.00 24,554,045.13 589,297,083.12 0.26 - 0.00 - 0.00 - 0.00 - -
Skh.1.9.3 (1a) Perkerasan pada Trotoar dan Median Tipe Kubel stone Ukuran 20x20 cm tebal 3 cm M2 360.00 381,949.12 137,501,683.20 0.06 460.00 0.08 (460.00) -0.08 - 0.00 - -
Skh.1.9.5.(1) Street Furniture ls 1.00 4,497,993,500.00 4,497,993,500.00 2.02 - 0.00 - 0.00 - 0.00 - -
Skh.1.9.6.(1a) Penanganan LANSKAP G20 Segmen 232.60 120,775,914.36 28,092,477,680.14 12.61 219.39 11.90 (219.39) -11.90 - 0.00 - -

Sub Total Pekerjaan DIVISI 9 67,347,943,689.05

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA JALAN


10.1.(9) Perbaikan Campuran Aspal Panas M3 1,000.01 2,825,000.00 2,825,014,125.00 1.27 - 0.00 4.80 0.01 4.80 0.01 0.48 0.01
10.1.(17) Pengecatan Kereb pada Trotoar atau Median M2 43,458.00 56,473.27 2,454,215,367.66 1.10 1,750.00 0.04 - 0.00 1,750.00 0.04 4.03 0.04
10.2.(1) Pemeliharaan Kinerja Jembatan …… bentang ….. m LS - 55,550,000.00 - 0.00 - 0.00 - 0.00 - 0.00

Sub Total Pekerjaan DIVISI 10 5,279,229,492.66

JUMLAH 222,746,418,475.18 100.00 19.63 -16.09 3.55


REALISASI KEMAJUAN PEKERJAAN SD MINGGU INI 3.55 %
RENCANA KEMAJUAN PEKERJAAN SD MINGGU INI 4.62 %
DEVIASI KEMAJUAN PEKERJAAN SD MINGGU INI -1.07 %

Disetujui Oleh : I Gusti Made Bagiada, ST Diperiksa Oleh : Achmad Fitriadi Dibuat Oleh :
Pengguna Jasa Inspector Engineer Konsultan Supervisi Inspector Engineer Penyedia Jasa
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PT. VIRAMA KARYA (PERSERO) PT. WIJAYA KARYA (PERSERO), Tbk
Satuan Kerja Pelaksanaan Jalan Nasional Wilayah III Provinsi Bali
Pejabat Pembuat Komitmen 3.2 Provinsi Bali
Koordinator Pengawas Lapangan

Ir. I Ketut Warma Diatmika Muhammad Ato'urrahman


Nip. 19661122 200812 1 001 Manajer Teknik Proyek
KURVA - S
Satker : PJN WILAYAH III PROVINSI BALI
PPK : 3.2 PROVINSI BALI
Nama Paket : Preservasi Jalan dan Jembatan Sp. Pesanggaran - Nusa Dua , Jimbaran - Uluwatu dan Penataan Lanskap Bundaran , Pedestrian, dan Median Ruas Jalan Bandara Ngurah Rai - Venue
Kontrak No. : 12/PKS/Bb8.14/3.2/G20/2022
Tanggal : 22 APRIL 2022
Kontraktor : PT. WIJAYA KARYA (Persero), Tbk
Konsultan : PT. VIRAMA KARYA (Persero)

Harga Jumlah
Satuan Harga - Harga
( Rupiah) ( Rupiah) APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
No. Mata Kuantitas Bobot (%)
Uraian Satuan 22/Apr 25/Apr 2/May 9/May 16/May 23/May 30/May 6/Jun 13/Jun 20/Jun 27/Jun 4/Jul 11/Jul 18/Jul 25/Jul 1/Aug 8/Aug 15/Aug 22/Aug 29/Aug 5/Sep 12/Sep 19/Sep 26/Sep 3/Oct 10/Oct 17/Oct 24/Oct 31/Oct 7/Nov 14/Nov 21/Nov 28/Nov 5/Dec
Pembayaran /Volume
22/4-24/4 25/4-1/5 2/5-8/5 9/5-15/5 16/5-22/5 23/5-29/5 30/5-5/6 6/6-12/6 13/6-19/6 20/6-26/6 27/6-3/7 4/7-10/7 11/7-17/7 18/7-24/7 25/7-31/7 1/8-7/8 8/8-14/8 15/8-21/8 22/8-28/8 29/8-4/8 5/9-11/9 12/9-18/9 19/9-25/9 26/9-2/10 3/10-9/10 10/10-16/10 17/10-23/10 24/10-30/10 31/10-6/11 7/11-13/11 14/11-20/11 21/11-27/11 28/11-4/12 5/12-11/12

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 1,524,100,000.00 1,524,100,000.00
0.684 0.001 0.001 0.001 0.001 0.001 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 908,248,868.55 908,248,868.55
0.408 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.023
1.17.(1a) Pengujian pH Buah 9.00 15,000.00 135,000.00
0.000 0.000 0.000 0.000
1.17.(1h) Pengujian E Coli Buah 9.00 128,000.00 1,152,000.00
0.001 0.000 0.000 0.000
1.17.(1j) Pengujian Temperatur (Suhu) Buah 9.00 15,000.00 135,000.00
0.000 0.000 0.000 0.000
1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan Buah 9.00 75,000.00 675,000.00
0.000 0.000 0.000 0.000
1.17.(2b) Pengujian Tingkat Getaran Kendaraan Bermotor Buah 9.00 250,000.00 2,250,000.00
0.001 0.000 0.000 0.000
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 9.00 213,000.00 1,917,000.00
0.001 0.000 0.000 0.000
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 672,280,000.00 672,280,000.00
0.302 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.009 0.017
1.21 Manajemen Mutu LS 1.00 76,000,000.00 76,000,000.00
0.034 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.002
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 1,100.00 67,597.37 74,357,107.00
0.033 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003
2.2.(1) Pasangan Batu dengan Mortar M3 620.00 953,991.14 591,474,506.80
0.266 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027
2.3.(28) Saluran berbentuk U Tipe DS 4 M1 80.00 1,796,483.04 143,718,643.11
0.065 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006 0.006
2.3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) M1 4,500.00 2,761,600.76 12,427,203,420.00
5.579 0.100 0.100 0.100 0.660 0.660 0.660 0.660 0.660 0.660 0.660 0.660
2.3.(29a) Box Tangkapan Air (Precast) + penutup Bh 2,463.00 1,195,859.10 2,945,400,963.30
1.322 0.050 0.050 0.050 0.147 0.147 0.147 0.147 0.147 0.147 0.147 0.147
2.3.(29b) Frame + Cover Manhole Tipe 108.16,5.108 - Bintang Besar (precast K.350 Bh 2,463.00 1,866,124.17 4,596,263,830.71
2.063 0.050 0.050 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131 0.131
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1) Galian Biasa M3 12,696.48 39,380.20 499,989,921.70
0.224 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
3.1.(7) Galian Perkerasan Beraspal dengan Cold Milling Machine M3 1,000.00 142,426.37 142,426,370.00
0.064 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
DIVISI 4. PEKERJAAN PREVENTIF

DIVISI 5. PERKERASAN BERBUTIR


RENCANA KONTRAK
5.1.(1) Lapis Pondasi Agregat Kelas A M3 -
DIVISI 6. PERKERASAN ASPAL
6.1.(2a) Lapis Perekat - Aspal Emulsi Liter 285,296.66 19,920.00 5,683,109,467.20
2.551 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142 0.142
6.3.(5a) Laston Lapis Aus ( AC - WC) Ton 78,601.36 1,315,000.00 103,360,785,244.00
46.403 0.200 0.200 0.200 0.500 1.200 1.200 1.200 3.791 3.791 3.791 3.791 3.791 3.791 3.791 3.791 3.791 3.791 3.791
6.3.(8) Bahan Anti Pengelupasan Kg 1,479.77 122,864.22 181,811,123.58
0.082 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
DIVISI 7 STRUKTUR
7.1 (7a) Beton Struktur, fc' 20 Mpa M3 1,524.00 1,956,602.35 2,981,861,981.40
1.339 0.010 0.010 0.010 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087
7.1 (15) Beton fc' 15 Mpa M3 4,447.56 1,949,968.54 8,672,602,079.76
3.893 0.010 0.010 0.010 0.010 0.010 0.010 0.010 0.050 0.050 0.050 0.050 0.100 0.100 0.100 0.554 0.554 0.554 0.554 0.554 0.554
7.3 (1) Baja Tulangan Polos BjTS 280 kg 42,075.60 15,336.18 645,278,975.21
0.290 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019
7.9 (1) Pasangan Batu M3 358.00 867,871.12 310,697,860.96
0.139 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014
7.15. (2) Pembongkaran beton M3 4,506.75 616,383.64 2,777,886,969.57
1.247 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073
DIVISI 8 REHABILITASI JEMBATAN
8.1 (1) Cairan Perekat (Epoksi resin) Kg 149.50 336,482.42 50,304,121.79
0.023 0.003 0.003 0.003 0.003 0.003 0.003 0.003
8.1 (2) Bahan Penutup (Sealant) Kg 149.50 316,840.89 47,367,713.06
0.021 0.003 0.003 0.003 0.003 0.003 0.003 0.003
8.1 (3a) Tabung Penyuntik, penyediaan Buah 298.00 95,672.61 28,510,437.78
0.013 0.002 0.002 0.002 0.002 0.002 0.002
8.1 (3b) Tabung Penyuntik, penggunan Buah 298.00 119,328.80 35,559,982.40
0.016 0.002 0.002 0.002 0.002 0.002 0.002 0.002
8.2.(1) Penambahan (Patching) M3 4,094,726.37 -
- - - -
8.3.(2b) Pengecetan dekoratif pada elemen struktur beton, tebal : ….. µm M2 11,880.00 61,931.12 735,741,705.60
0.330 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041
8.7.(1b) Pengecatan struktur baja pada daerah kering tebal 240 mikron M2 - 189,229.05 -
- - - - - - - - - -
8.11.(1) Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug M1 - 2,401,596.23 -
- - - - -
DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN LAIN
9.1.(1) Mandor Jam 600.00 24,062.50 14,437,500.00
0.006 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
9.1.(2) Pekerja Biasa Jam 2,400.00 19,957.68 47,898,432.00
0.022 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 400.00 103,433.33 41,373,332.00
0.019 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002
9.2. (1) Marka jalan termoplastik M2 39,511.23 181,817.34 7,183,826,193.28
3.225 0.050 0.050 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.359 0.050 0.050 0.050 0.100
9.2.(7) Rel Pengaman M1 700.00 1,205,231.35 843,661,945.00
0.379 0.063 0.063 0.063 0.063 0.063 0.063
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 46,806.00 168,347.39 7,879,667,936.34
3.538 0.010 0.010 0.010 0.010 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.070 0.070 0.215 0.215 0.215 0.215 0.215 0.215 0.215 0.215 0.215 0.215 0.215 0.215 0.215 0.215
9.2.(10g) Kereb Pracetak Jenis 7 (Kereb pada Pelandaian Trotoar) Buah 11,373.20 125,257.95 1,424,583,716.94
0.640 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026 0.026
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 56,064.00 281,589.81 15,787,051,107.84
7.087 0.010 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.050 0.405 0.405 0.405 0.405 0.405 0.405 0.405 0.405 0.405 0.405 0.405 0.405 0.405 0.405 0.405 0.405
9.2.(12b) Pembengkokan Ubin Eksisting atau Perkerasan Blok Beton Eksisting pada M2 44,720.00 18,071.86 808,173,579.20
0.363 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030 0.030
9.2.(15) Unit Lampu penerangan jalan lengan ganda, Tipe LED Buah 24.00 24,554,045.13 589,297,083.12
0.265 0.088 0.088 0.088
Skh.1.9.3 (1a) Perkerasan pada Trotoar dan Median Tipe Kubel stone Ukuran 20x20 cm t M2 360.00 381,949.12 137,501,683.20
0.062 0.021 0.021 0.021
Skh.1.9.5.(1) Street Furniture ls 1.00 4,497,993,500.00 4,497,993,500.00
2.019 0.288 0.288 0.288 0.288 0.288 0.288 0.288
Skh.1.9.6.(1a) Penanganan LANSKAP G20 Segmen 232.60 120,775,914.36 28,092,477,680.14
12.612 0.010 0.010 0.010 0.010 0.050 0.050 0.050 0.956 0.956 0.956 0.956 0.956 0.956 0.956 0.956 0.956 0.956 0.956 0.956 0.956
DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA JALAN
10.1.(9) Perbaikan Campuran Aspal Panas M3 1,000.01 2,825,000.00 2,825,014,125.00
1.268 0.050 0.050 0.050 0.050 0.005 0.005 0.005 0.005 0.005 0.209 0.209 0.209 0.209 0.209
10.1.(17) Pengecatan Kereb pada Trotoar atau Median M2 43,458.00 56,473.27 2,454,215,367.66
1.102 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092 0.092
10.2.(1) Pemeliharaan Kinerja Jembatan …… bentang ….. m LS - 55,550,000.00 -
- - - - - - -

Bobot Rencana Perminggu 222,746,418,475.18


100.00 0.02 0.03 0.08 0.12 0.23 0.41 0.47 0.47 1.39 1.37 1.37 1.41 1.44 1.46 2.15 2.68 2.73 3.78 5.02 4.78 4.83 6.66 7.01 6.90 6.39 5.58 5.58 5.67 5.38 5.12 4.61 4.21 0.27 0.21
Kumulatif bobot Rencana
0 0.02 0.06 0.14 0.26 0.49 0.91 1.38 1.85 3.25 4.62 5.99 7.41 8.84 10.31 12.46 15.14 17.87 21.65 26.67 31.45 36.28 42.94 49.95 56.85 63.24 68.82 74.40 80.07 85.45 90.56 95.18 99.38 99.65 99.86
Bobot Realisasi Perminggu
0.19 0.09 0.09 0.22 0.32 0.47 0.96 0.54 1.03
Kumulatif bobot Realisasi
0 0.19 0.28 0.37 0.59 0.91 1.39 2.35 2.89 3.92
Deviasi
0.17 0.23 0.23 0.33 0.42 0.48 0.97 1.03 0.67

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


Pengguna Jasa Konsultan Supervisi Penyedia Jasa
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Satuan Kerja Pelaksanaan Jalan Nasional Wilayah III Provinsi Bali PT. VIRAMA KARYA (Persero) PT. WIJAYA KARYA (Persero) Tbk
PPK 3.2 Provinsi Bali

Mokhamad Solthon, ST. MT. FX. Edi Sunarno Puthut Jaka Pramana
Nip. 197607 152009111001 Supervision Engineer Manajer Proyek
KURVA - S

DESEMBER
12/Dec 19/Dec Skala Keterangan
12/12-18/12 19/12-25/12

35 36

0.068 0.068 100

75

50

25

0.07 0.07

99.93 100.00
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL JAWA TIMUR - BALI
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH III PROVINSI BALI
PEJABAT PEMBUAT KOMITMEN 3.2 PROVINSI BALI

LAPORAN MINGGUAN
NAMA PAKET : PRESERVASI JALAN DAN JEMBATAN SP. PESANGGARAN-NUSA DUA, JIMBARAN ULUWATU DAN PENATAAN LANSKAP BUNDARAN, PEDESTRIAN, DAN MEDIAN RUAS JALAN BANDARA NGURAH RAI -
VENUE TAHUN ANGGARAN : 2022

PENYEDIA JASA : PT. WIJAYA KARYA (Persero) .Tbk MINGGU KE : 10


No. KONTRAK : 12/PKS/Bb8.14/3.2/G20/2022 PERIODE MINGGU : 20 June - 26 June 2022
TANGGAL KONTRAK : 22 APRIL 2022
KONSULTAN : PT. VIRAMA KARYA (Persero)

PROSENTASE TERHADAP
KONTRAK S/D MINGGU LALU MINGGU INI S/D MINGGU INI
MATA KETERANGAN
PEMBAYARAN URAIAN PEKERJAAN SAT.
BOBOT BOBOT BOBOT BOBOT ITEM PEKERJAAN THD. TOTAL
KUANTITAS HARGA SATUAN JUMLAH HARGA KUANTITAS KUANTITAS KUANTITAS
( Rp.) ( Rp.) (%) (%) (%) (%) (%) (%)
A B C D E F E F G H I J K K = J / D 1* 100 L = K*G / 100

DIVISI 1. UMUM
1.2 Mobilisasi LS 1,524,100,000.00 - 0.00 - 0.00 - 0.00 - 0.00
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 908,248,868.55 - 0.00 - 0.00 - 0.00 - 0.00
1.17.(1a) Pengujian pH Buah 15,000.00 - 0.00 - 0.00 - 0.00 - 0.00
1.17.(1h) Pengujian E Coli Buah 128,000.00 - 0.00 - 0.00 - 0.00 - 0.00
1.17.(1j) Pengujian Temperatur (Suhu) Buah 15,000.00 - 0.00 - 0.00 - 0.00 - 0.00
1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan Buah 75,000.00 - 0.00 - 0.00 - 0.00 - 0.00
1.17.(2b) Pengujian Tingkat Getaran Kendaraan Bermotor Buah 250,000.00 - 0.00 - 0.00 - 0.00 - 0.00
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 213,000.00 - 0.00 - 0.00 - 0.00 - 0.00
1.2 Keselamatan dan Kesehatan Kerja LS 672,280,000.00 - 0.00 - 0.00 - 0.00 - 0.00
1.2 Manajemen Mutu LS 76,000,000.00 - 0.00 - 0.00 - 0.00 - 0.00

Sub Total Pekerjaan DIVISI 1 -

DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 67,597.37 - 0.00 - 0.00 - 0.00 - 0.00
2.2.(1) Pasangan Batu dengan Mortar M3 953,991.14 - 0.00 - 0.00 - 0.00 - 0.00
2.3.(28) Saluran berbentuk U Tipe DS 4 M1 1,796,483.04 - 0.00 - 0.00 - 0.00 - 0.00
2.3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) M1 2,761,600.76 - 0.00 - 0.00 - 0.00 - 0.00
2.3.(29a) Box Tangkapan Air (Precast) + penutup Bh 1,195,859.10 - 0.00 - 0.00 - 0.00 - 0.00
2.3.(29b) Frame + Cover Manhole Tipe 108.16,5.108 - Bintang Besar (precast K.350), T=10 cm Bh 1,866,124.17 - 0.00 - 0.00 - 0.00 - 0.00

Sub Total Pekerjaan DIVISI 2 -

DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK


3.1.(1) Galian Biasa M3 32.50 39,380.20 1,279,856.50 0.10 - 0.00 - 0.00 - 0.00
3.1.(7) Galian Perkerasan Beraspal dengan Cold Milling Machine M3 94.56 142,426.37 13,467,837.55 1.08 - 0.00 - 0.00 - 0.00

Sub Total Pekerjaan DIVISI 3 14,747,694.05

DIVISI 6. PERKERASAN ASPAL


6.1.(2a) Lapis Perekat - Aspal Emulsi Liter 661.92 19,920.00 13,185,446.40 1.06 - 0.00 - 0.00 - 0.00
6.3.(5a) Laston Lapis Aus ( AC - WC) Ton 216.54 1,315,000.00 284,753,256.00 22.85 - 0.00 - 0.00 - 0.00
6.3.(8) Bahan Anti Pengelupasan Kg 39.63 122,864.22 4,868,772.29 0.39 - 0.00 - 0.00 - 0.00

Sub Total Pekerjaan DIVISI 6 302,807,474.69

DIVISI 7 STRUKTUR
7.1 (7a) Beton Struktur, fc' 20 Mpa M3 1,956,602.35 - 0.00 - 0.00 - 0.00 - 0.00
7.1 (15) Beton fc' 15 Mpa M3 1,949,968.54 - 0.00 - 0.00 - 0.00 - 0.00
7.3 (1) Baja Tulangan Polos BjTP 280 kg 15,336.18 - 0.00 - 0.00 - 0.00 - 0.00
7.9 (1) Pasangan Batu M3 16.80 867,871.12 14,580,234.82 1.17 - 0.00 - 0.00 - 0.00
7.15. (2) Pembongkaran beton M3 616,383.64 - 0.00 - 0.00 - 0.00 - 0.00

Sub Total Pekerjaan DIVISI 7 14,580,234.82

DIVISI 8 REHABILITASI JEMBATAN


8.1 (1) Cairan Perekat (Epoksi resin) Kg 0.50 336,482.42 168,241.21 0.01 - 0.00 - 0.00 - 0.00
8.1 (2) Bahan Penutup (Sealant) Kg 0.50 316,840.89 158,420.45 0.01 - 0.00 - 0.00 - 0.00
8.1 (3a) Tabung Penyuntik, penyediaan Buah 2.00 95,672.61 191,345.22 0.02 - 0.00 - 0.00 - 0.00
8.1 (3b) Tabung Penyuntik, penggunan Buah 2.00 119,328.80 238,657.60 0.02 - 0.00 - 0.00 - 0.00
8.2.(1) Penambahan (Patching) M3 2.18 4,094,726.37 8,926,503.49 0.72 - 0.00 - 0.00 - 0.00
8.3.(2b) Pengecetan dekoratif pada elemen struktur beton, tebal : ….. µm M2 61,931.12 - 0.00 - 0.00 - 0.00 - 0.00
8.7.(1b) Pengecatan struktur baja pada daerah kering tebal 240 mikron M2 70.00 189,229.05 13,246,033.50 1.06 - 0.00 - 0.00 - 0.00
8.11.(1) Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug M1 341.40 2,401,596.23 819,904,952.92 65.81 - 0.00 - 0.00 - 0.00

Sub Total Pekerjaan DIVISI 8 842,834,154.38

DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN LAIN


9.1.(1) Mandor Jam 24,062.50 - 0.00 - 0.00 - 0.00 - 0.00
9.1.(2) Pekerja Biasa Jam 19,957.68 - 0.00 - 0.00 - 0.00 - 0.00
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 103,433.33 - 0.00 - 0.00 - 0.00 - 0.00
9.2. (1) Marka jalan termoplastik M2 69.54 181,817.34 12,644,123.28 1.01 - 0.00 - 0.00 - 0.00
9.2.(7) Rel Pengaman M1 1,205,231.35 - 0.00 - 0.00 - 0.00 - 0.00
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 168,347.39 - 0.00 - 0.00 - 0.00 - 0.00
9.2.(10g) Kereb Pracetak Jenis 7 (Kereb pada Pelandaian Trotoar) Buah 125,257.95 - 0.00 - 0.00 - 0.00 - 0.00
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 281,589.81 - 0.00 - 0.00 - 0.00 - 0.00
9.2.(12b) Pembongkaran Ubin Eksisting atau Perkerasan Blok Beton Eksisting pada Trotoar atau Median M2 18,071.86 - 0.00 - 0.00 - 0.00 - 0.00
9.2.(15) Unit Lampu penerangan jalan lengan ganda, Tipe LED Buah 24,554,045.13 - 0.00 - 0.00 - 0.00 - 0.00
Skh.1.9.3 (1a) Perkerasan pada Trotoar dan Median Tipe Kubel stone Ukuran 20x20 cm tebal 3 cm M2 381,949.12 - 0.00 - 0.00 - 0.00 - 0.00
Skh.1.9.5.(1) Street Furniture ls 4,497,993,500.00 - 0.00 - 0.00 - 0.00 - 0.00
Skh.1.9.6.(1a) Penanganan LANSKAP G20 Segmen 120,775,914.36 - 0.00 - 0.00 - 0.00 - 0.00

Sub Total Pekerjaan DIVISI 9 12,644,123.28

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA JALAN


10.1.(9) Perbaikan Campuran Aspal Panas M3 0.98 2,825,000.00 2,754,375.00 0.22 - 0.00 - 0.00 - 0.00
10.1.(17) Pengecatan Kereb pada Trotoar atau Median M2 56,473.27 - 0.00 - 0.00 - 0.00 - 0.00
10.2.(1) Pemeliharaan Kinerja Jembatan …… bentang ….. m LS 1.00 55,550,000.00 55,550,000.00 4.46 - 0.00 - 0.00 - 0.00

Sub Total Pekerjaan DIVISI 10 58,304,375.00

JUMLAH 1,245,918,056.21 100.00 0.00 0.00 0.00


REALISASI KEMAJUAN PEKERJAAN SD MINGGU INI 0.00 %
RENCANA KEMAJUAN PEKERJAAN SD MINGGU INI 0.00 %
DEVIASI KEMAJUAN PEKERJAAN SD MINGGU INI 0.00 %

Disetujui Oleh : I Gusti Made Bagiada, ST Diperiksa Oleh : Achmad Fitriadi Dibuat Oleh :
Pengguna Jasa Inspector Engineer Konsultan Supervisi Inspector Engineer Penyedia Jasa
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PT. VIRAMA KARYA (PERSERO) PT. WIJAYA KARYA (PERSERO), Tbk
Satuan Kerja Pelaksanaan Jalan Nasional Wilayah III Provinsi Bali
Pejabat Pembuat Komitmen 3.2 Provinsi Bali
Koordinator Pengawas Lapangan

Ir. I Ketut Warma Diatmika Muhammad Ato'urrahman


Nip. 19661122 200812 1 001 Manajer Teknik Proyek
JADWAL PELAKSANAAN PEKERJAAN
Satker : PJN WILAYAH III PROVINSI BALI
PPK : 3.2 PROVINSI BALI
Nama Paket : Preservasi Jalan dan Jembatan Sp. Pesanggaran - Nusa Dua , Jimbaran - Uluwatu dan Penataan Lanskap Bundaran , Pedestrian, dan Median Ruas Jalan Bandara Ngurah Rai - Venue
Kontrak No. : 12/PKS/Bb8.14/3.2/G20/2022
Tanggal : 22 APRIL 2022
Kontraktor : PT. WIJAYA KARYA (Persero), Tbk
Konsultan : PT. VIRAMA KARYA (Persero)

APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER


No. Mata Kuantitas Bobot (%) Skala Keterangan
Uraian Satuan 22/Apr 25/Apr 2/May 9/May 16/May 23/May 30/May 6/Jun 13/Jun 20/Jun 27/Jun 4/Jul 11/Jul 18/Jul 25/Jul 1/Aug 8/Aug 15/Aug 22/Aug 29/Aug 5/Sep 12/Sep 19/Sep 26/Sep 3/Oct 10/Oct 17/Oct 24/Oct 31/Oct 7/Nov 14/Nov 21/Nov 28/Nov 5/Dec 12/Dec 19/Dec
Pembayaran /Volume
22/4-24/4 25/4-1/5 2/5-8/5 9/5-15/5 16/5-22/5 23/5-29/5 30/5-5/6 6/6-12/6 13/6-19/6 20/6-26/6 27/6-3/7 4/7-10/7 11/7-17/7 18/7-24/7 25/7-31/7 1/8-7/8 8/8-14/8 15/8-21/8 22/8-28/8 29/8-4/8 5/9-11/9 12/9-18/9 19/9-25/9 26/9-2/10 3/10-9/10 10/10-16/10 17/10-23/10 24/10-30/10 31/10-6/11 7/11-13/11 14/11-20/11 21/11-27/11 28/11-4/12 5/12-11/12 12/12-18/12 19/12-25/12

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

DIVISI 1. UMUM

1.2 Mobilisasi LS
- 100
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS
-
1.17.(1a) Pengujian pH Buah
-
1.17.(1h) Pengujian E Coli Buah
-
1.17.(1j) Pengujian Temperatur (Suhu) Buah
-
1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan Buah
-
1.17.(2b) Pengujian Tingkat Getaran Kendaraan Bermotor Buah
-
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah
-
1.19 Keselamatan dan Kesehatan Kerja LS
-
1.21 Manajemen Mutu LS
-
DIVISI 2. DRAINASE

2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3


-
2.2.(1) Pasangan Batu dengan Mortar M3
-
2.3.(28) Saluran berbentuk U Tipe DS 4 M1
-
2.3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) M1
- RENCANA KONTRAK
2.3.(29a) Box Tangkapan Air (Precast) + penutup Bh
- 75
2.3.(29b) Frame + Cover Manhole Tipe 108.16,5.108 - Bintang Besar (precast K.350 Bh
-
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK

3.1.(1) Galian Biasa M3 32.50


0.103 0.017 0.017 0.017 0.017 0.017 0.017
3.1.(7) Galian Perkerasan Beraspal dengan Cold Milling Machine M3 94.56
1.081 0.180 0.180 0.180 0.180 0.180 0.180
DIVISI 4. PEKERJAAN PREVENTIF

DIVISI 5. PERKERASAN BERBUTIR

5.1.(1) Lapis Pondasi Agregat Kelas A M3

DIVISI 6. PERKERASAN ASPAL

6.1.(2a) Lapis Perekat - Aspal Emulsi Liter 661.92


1.058 0.176 0.176 0.176 0.176 0.176 0.176
6.3.(5a) Laston Lapis Aus ( AC - WC) Ton 216.54
22.855 3.809 3.809 3.809 3.809 3.809 3.809
6.3.(8) Bahan Anti Pengelupasan Kg 39.63
0.391 0.065 0.065 0.065 0.065 0.065 0.065
DIVISI 7 STRUKTUR

7.1 (7a) Beton Struktur, fc' 20 Mpa M3


-
7.1 (15) Beton fc' 15 Mpa M3
- 50
7.3 (1) Baja Tulangan Polos BjTS 280 kg
-
7.9 (1) Pasangan Batu M3 16.80
1.170 0.234 0.234 0.234 0.234 0.234
7.15. (2) Pembongkaran beton M3
-
DIVISI 8 REHABILITASI JEMBATAN

8.1 (1) Cairan Perekat (Epoksi resin) Kg 0.50


0.014 0.002 0.002 0.002 0.002 0.002 0.002 0.002
8.1 (2) Bahan Penutup (Sealant) Kg 0.50
0.013 0.002 0.002 0.002 0.002 0.002 0.002 0.002
8.1 (3a) Tabung Penyuntik, penyediaan Buah 2.00
0.015 0.003 0.003 0.003 0.003 0.003 0.003
8.1 (3b) Tabung Penyuntik, penggunan Buah 2.00
0.019 0.003 0.003 0.003 0.003 0.003 0.003 0.003
8.2.(1) Penambahan (Patching) M3 2.18
0.716 0.239 0.239 0.239
8.3.(2b) Pengecetan dekoratif pada elemen struktur beton, tebal : ….. µm M2
-
8.7.(1b) Pengecatan struktur baja pada daerah kering tebal 240 mikron M2 70.00
1.063 0.118 0.118 0.118 0.118 0.118 0.118 0.118 0.118 0.118
8.11.(1) Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug M1 341.40
65.807 16.452 16.452 16.452 16.452
DIVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN LAIN

9.1.(1) Mandor Jam


-
9.1.(2) Pekerja Biasa Jam
- 25
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam
-
9.2. (1) Marka jalan termoplastik M2 69.54
1.015 1.015
9.2.(7) Rel Pengaman M1
-
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1
-
9.2.(10g) Kereb Pracetak Jenis 7 (Kereb pada Pelandaian Trotoar) Buah
-
9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2
-
9.2.(12b) Pembengkokan Ubin Eksisting atau Perkerasan Blok Beton Eksisting pada M2
-
9.2.(15) Unit Lampu penerangan jalan lengan ganda, Tipe LED Buah
-
Skh.1.9.3 (1a) Perkerasan pada Trotoar dan Median Tipe Kubel stone Ukuran 20x20 cm t M2
-
Skh.1.9.5.(1) Street Furniture ls
-
Skh.1.9.6.(1a) Penanganan LANSKAP G20 Segmen
-
DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA JALAN

10.1.(9) Perbaikan Campuran Aspal Panas M3 0.98


0.221 0.055 0.055 0.055 0.055
10.1.(17) Pengecatan Kereb pada Trotoar atau Median M2
-
10.2.(1) Pemeliharaan Kinerja Jembatan …… bentang ….. m LS 1.00
4.459 1.486 1.486 1.486

Bobot Rencana Perminggu


100.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.20 0.20 0.20 0.20 16.95 16.95 16.87 21.16 4.65 4.41 4.17 4.17 5.66 1.60 1.60 0.00 1.01 0.00
Kumulatif bobot Rencana
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.20 0.40 0.60 0.80 17.75 34.70 51.56 72.72 77.36 81.78 85.95 90.12 95.78 97.38 98.99 98.99 100.00 100.00
Bobot Realisasi Perminggu
0.00 0.00 0.00 0.00 0.00 0.00
Kumulatif bobot Realisasi
0 0.00 0.00 0.00 0.00 0.00 0.00
Deviasi
0.00 0.00 0.00 0.00 0.00 0.00

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


Pengguna Jasa Konsultan Supervisi Penyedia Jasa
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Satuan Kerja Pelaksanaan Jalan Nasional Wilayah III Provinsi Bali PT. VIRAMA KARYA (Persero) PT. WIJAYA KARYA (Persero) Tbk
PPK 3.2 Provinsi Bali

Mokhamad Solthon, ST. MT. FX. Edi Sunarno Puthut Jaka Pramana
Nip. 197607 152009111001 Supervision Engineer Manajer Proyek
REKAP BOBOT RENCANA DAN REALISASI
MINGGUAN RENCANA KONTRAK REALISASI
PERIODE PROGRES TERHADAP KONTRAK TOTAL PROGRES
TAHUN BULAN
TANGGAL
KE BOBOT % KUM BOBOT % KUM DEVIASI BOBOT % KUM DEVIASI
1 0.0221 0.0221 0.19 0.19 0.17
2 0.0331 0.0552 0.09 0.28 0.23
3 0.0822 0.1374 0.08 0.37 0.23
4 0.1222 0.2596 0.22 0.59 0.33
5 0.2306 0.4902 0.32 0.91 0.42
6 0.4129 0.9031 0.47 1.38 0.48
7 0.4721 1.3751 0.95 2.33 0.96
8 0.4721 1.8472 0.54 2.87 1.02
9 1.3861 3.2333
10 1.3675 4.6008
11 1.3675 5.9682
12 1.4075 7.3757
13 1.4301 8.8058
14 1.4543 10.2601
15 2.1439 12.4040
16 2.6705 15.0744
17 2.8120 17.8864
2022

18 3.8549 21.7414
19 5.0869 26.8283
20 4.8543 31.6826
21 4.8128 36.4955
22 6.6367 43.1321
23 6.9788 50.1109
24 6.8791 56.9900
25 6.3728 63.3628
26 5.5623 68.9251
27 5.5623 74.4874
28 5.6494 80.1368
29 5.3625 85.4993
30 5.0967 90.5960
31 4.5964 95.1923
32 4.1940 99.3863
33 0.2688 99.6551
34 0.2098 99.8649
35 0.0675 99.9325
36 0.0675 100.0000
REKAP BOBOT RENCANA DAN REALISASI
MINGGUAN RENCANA KONTRAK REALISASI
PERIODE PROGRES TERHADAP KONTRAK TOTAL PROGRES
TAHUN BULAN
TANGGAL
KE BOBOT % KUM BOBOT % KUM DEVIASI BOBOT % KUM DEVIASI
1 0.0222 0.0222 0.19 0.19 0.17
2 0.0332 0.0554 0.09 0.28 0.23
3 0.0825 0.1379 0.09 0.37 0.23
4 0.1225 0.2604 0.22 0.59 0.33
5 0.2314 0.4918 0.32 0.91 0.42
6 0.4142 0.9060 0.47 1.39 0.48
7 0.4735 1.3795 0.96 2.35 0.97
8 0.4735 1.8529 0.54 2.89 1.03
9 1.3926 3.2455
10 1.3741 4.6196
11 1.3741 5.9938
12 1.4141 7.4079
13 1.4368 8.8448
14 1.4611 10.3058
15 2.1515 12.4574
16 2.6818 15.1392
17 2.7318 17.8710
2022

18 3.7801 21.6511
19 5.0158 26.6669
20 4.7806 31.4475
21 4.8306 36.2781
22 6.6620 42.9402
23 7.0072 49.9474
24 6.9032 56.8506
25 6.3943 63.2449
26 5.5789 68.8238
27 5.5789 74.4027
28 5.6671 80.0699
29 5.3786 85.4485
30 5.1153 90.5638
31 4.6124 95.1761
32 4.2075 99.3837
33 0.2701 99.6537
34 0.2104 99.8642
35 0.0679 99.9321
36 0.0679 100.0000
REKAP BOBOT RENCANA DAN REALISASI
MINGGUAN RENCANA KONTRAK REALISASI
PERIODE PROGRES TERHADAP KONTRAK TOTAL PROGRES
TAHUN BULAN
TANGGAL
KE BOBOT % KUM BOBOT % KUM DEVIASI BOBOT % KUM DEVIASI
1 - - - - -
2 - - - - -
3 - - - - -
4 - - - - -
5 - - - - -
6 - - - - -
7 - - - -
8 - - - -
9 - - - -
10 - - - -
11 - -
12 - -
13 - -
14 - -
15 - -
16 - -
17 - -
2022

18 - -
19 0.1998 0.1998
20 0.1998 0.3997
21 0.1998 0.5995
22 0.2045 0.8040
23 16.9456 17.7497
24 16.9456 34.6953
25 16.8657 51.5611
26 21.1552 72.7163
27 4.6481 77.3644
28 4.4141 81.7785
29 4.1706 85.9491
30 4.1706 90.1197
31 5.6568 95.7765
32 1.6043 97.3808
33 1.6043 98.9852
34 - 98.9852
35 1.0148 100.0000
36 - 100.0000
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI

Lembar 1.2-1
HARGA SATUAN JUMLAH HARGA Bobot Total Bobot Ri
No. URAIAN SATUAN VOL. RA VOL. RI
(Rp.) (Rp.) (%) (%)
A. Sewa Tanah M2 1,200.00 1,200.00 155,000.00 186,000,000.00 0.12 0.12

B. PERALATAN ls 1.00 0.48 56,550,000.00 56,550,000.00 0.04 0.02


Periksa
Periksa lembar
lembar 1.2-2
1.2-2 ( Mobilisasi Peralatan )

C. Kantor Lapangan dan Fasilitas


1 Base Camp m2 - -
2 Kantor 350.00 350.00 1,200,000.00 420,000,000.00 0.28 0.28
3 Barak 300.00 300.00 550,000.00 165,000,000.00 0.11 0.11
4 Bengkel - -
5 Gudang dan lain - lain 100.00 100.00 250,000.00 25,000,000.00 0.02 0.02
6 Kendaraan operasional lapangan > bln -
Th 2015, 2000cc
Laptop Core i7 ram 16 gb vga 1070 bh
8 gb
7 Printer A3 bh -
8 TV LED 65' bh -
9 Drone bh 1.00 1.00 35,000,000.00 35,000,000.00 0.02 0.02
Dokumentasi
CCTV Statis Bh/Bulan - -
CCTV Movable 3 Unit Bh/Bulan 24.00 - 22,000,000.00 528,000,000.00 0.35 -
Kendaraan operasional lapangan >
Th 2015, 2000cc

D. Ls - - -
1 Ruang Laboratorium (sesuai
Gambar)
2 Soil & Aggregate Testing
Compaction Test
CBR Test
Specific Gravity
Atterberg Limits
Grain Size Analysis
Field Density Test by Sand Cone Methode
Moisture Content
Abrasion of Aggregate by Los Angeles Machine

3 Bituminous Testing
Marshall Asphalt Test
Extraction Test, Centrifuge/Refflux
Method
Specific Gravity for Coarse
Aggregate
Specific Gravity for Fine Aggregate

Mix Air Viod Content (Accurate


Method)
Core Drill
Metal Thermometer
Accessories and Tolls
Penetration Test
Softening Point
Refusal Density Compactor

4 Concrete Testing
Slump
Slump Cone
cone
Cylinder/cube mould for
compressive strength
Beam mould for flexural strength
( rigid)
crusing machine

5 Pendukung (Periksa Fasilitas Laboratorium)

6 Operasional (Periksa Fasilitas Laboratorium)


E. MOBILISASI PERSONIL
E.I. Personil Sesuai Struktur Organisasi LS 1.00 1.00 25,000,000.00 25,000,000.00 0.02 0.02
1 GS
2 Tenaga Ahli Jalan
3 Tenaga Ahli Jembatan ....
4 ...................... ....
5 ...................... ....
6 ...................... ....
E.II. Personil lainnya
1 Koordinator manajemen dan
keselamatan lalu lintas
2 Manajer Kendali Mutu
3 Pelaporan dan administrasi kontrak bulan 8.00 2.00 2,000,000.00 16,000,000.00 0.01 0.00
4 Papan nama proyek bh 2.00 1.00 5,500,000.00 11,000,000.00 0.01 0.00
5 Dokumentasi ls - -
6 Ast Build Drawing ls - -

F. Manajemen dan Keselamatan lalu lintas

G. DEMOBILISASI LS 1.00 - 56,550,000.00 56,550,000.00 0.04 -

Total Biaya Mobilisasi 1,524,100,000.00 1.00 0.59 0.59


M-4

ITEM PEMBAYARAN NO. : 1.2


JENIS PEKERJAAN : MOBILISASI
Lembar 1.2-2
HARGA SATUAN JUMLAH HARGA Bobot Total Bobot Ri
No. JENIS ALAT KODE ALAT SATUAN VOL. VOL.
(Rp.) (Rp.) (%) (%)
B. PERALATAN
1 ASPHALT MIXING PLANT Unit - -
2 ASPHALT FINISHER Unit 3.00 1.00 10,000,000.00 30,000,000.00 0.53 0.18
3 POWER BROOM
4 BULDOZER 100-150 HP
5 COMPRESSOR 4000-6500 L\M Unit 3.00 1.00 500,000.00 1,500,000.00 0.03 0.01

6 CONCRETE MIXER 0.3-0.6 M3 Unit 3.00 3.00 500,000.00 1,500,000.00 0.03 0.03

7 CRANE 10-15 TON Unit - -


8 DUMP TRUCK 3 - 4 M3 Unit 45.00 45.00 100,000.00 4,500,000.00 0.08 0.08
9 DUMP TRUCK 6-8 M3 Unit 2.00 2.00 150,000.00 300,000.00 0.01 0.01
D10001 10 EXCAVATOR 80-140 HP Unit 1.00 1.00 1,000,000.00 1,000,000.00 0.02 0.02
11 FLAT BED TRUCK 3-4 TON Unit -
12 GENERATOR SET Unit 3.00 1.00 100,000.00 300,000.00 0.01 0.00
13 MOTOR GRADER >100 HP Unit - -
14 TRACK LOADER 75-100 HP
15 WHEEL LOADER 1.0-1.6 M3 Unit 3.00 1.00 1,000,000.00 3,000,000.00 0.05 0.02
16 THREE WHEEL ROLLER 6-8 T

17 TANDEM ROLLER 6-8 T. Unit 4.00 2.00 1,000,000.00 4,000,000.00 0.07 0.04
18 TIRE ROLLER 8-10 T. Unit 6.00 2.00 1,000,000.00 6,000,000.00 0.11 0.04
19 VIBRATORY ROLLER 5-8 T. Unit -
20 CONCRETE VIBRATOR Unit 2.00 2.00 1,000,000.00 2,000,000.00 0.04 0.04
21 STONE CRUSHER Unit -
22 WATER PUMP 70-100 mm Unit -
23 WATER TANKER 3000-4500 L. Unit 2.00 2.00 150,000.00 300,000.00 0.01 0.01

24 PEDESTRIAN ROLLER
25 TAMPER Unit 1.00 1.00 150,000.00 150,000.00 0.00 0.00
26 JACK HAMMER Unit 2.00 2.00 1,000,000.00 2,000,000.00 0.04 0.04

Total untuk Item B pada Lembar 1 56,550,000.00 1.00 0.48

MOBILISASI FASILITAS LABORATORIUM

SATUAN PENGUKURAN Lump sum


HARGA SATUAN Rp -

Harga satuan Harga satuan


No. Uraian Satuan Volume Total Keterangan

I Laboratory Building
1 Laboratory Building m2 - 100,000.00 -

II Soil & Aggregate Testing


1 Compaction test
2 CBR Test
3 Specific Gravity
4 Atterberg Limits
5 Grain Size Analysis
6 Field Density Test by Sand cone
methode
7 Moisture content
8 Abrasion of aggregate by los
angeles machine

III Bituminous Testing


1 Marshall asphalt test
2 Extraction test, centrifuge/ reflux
method
3 Specific gravity of coarse
aggregate
4 Specific Gravity of Fine Aggregate

5 Mix air viod content ( accurate


method)
6 Core drill
7 Metal Thermometer
8 Accessories and Tolls
9 Penetration test
10 Softening point
11 Refusal density compator

IV Concrete testing
1 Slump cone
2 Cylinder/cube mould for
compressive strength
3 Beam mould for flexural strength

4 Crusing machine

V Peralatan pendukung
1 Mobil Pick up
2 Komputer + printer
3 Furniture

VI Operasional

VII Test Luar


Test luar, sesuai kebutuhan atau
atas perintah pengawas pekerjaan
TOTA - -
L
BIAYA
MOBIL
ISASI
UNTU
K
ITEM
LEMB
AR 1
RINGKASAN KEMAJUAN PROYEK

SATUAN KERJA : PJN WILAYAH III PROVINSI BALI


PPK : 3.2 PROVINSI BALI
NAMA PAKET
: PRESERVASI JALAN DAN JEMBATAN SP. PESANGGARAN-NUSA DUA, JIMBARAN ULUWATU DAN PENATAAN LANSKAP BUNDARAN, PEDESTRIAN, DAN
MEDIAN RUAS JALAN BANDARA NGURAH RAI - VENUE
KONTRAKTOR : PT. WIJAYA KARYA (Persero) .Tbk
KONSULTAN : PT. VIRAMA KARYA (Persero)

PROGRES FISIK PROGRES KEUANGAN


NO MINGGU KE PERIODE SUB PAKET KETERANGAN
RENCANA REALISASI DEVIASI RENCANA REALISASI DEVIASI
Gabungan 0.11 - 0.11
1 1 11 Maret - 17 Maret 2022 Rehabilitasi Mayor Jalan -
Pemeliharaan Berkala Jembatan - - -
Gabungan 0.20 - 0.20
2 2 18 Maret - 24 Maret 2022 Rehabilitasi Mayor Jalan -
Pemeliharaan Berkala Jembatan - - -
Gabungan 0.32 - 0.32
3 3 25 Maret - 31 Maret 2022 Rehabilitasi Mayor Jalan -
Pemeliharaan Berkala Jembatan - - -
2 3 4

MINGGU KE
MINGGU
MINGGU KE (17 January - 23 January 2022) 17/01/2022
28 January - 03 February 2022 28/01/2022
04 February - 10 February 2022 04/02/2022
11 February - 17 February 2022 11/02/2022
18 February - 24 February 2022 18/02/2022
25 February - 03 March 2022 25/02/2022
04 March - 10 March 2022 04/03/2022
11 March - 17 March 2022 11/03/2022
18 March - 24 March 2022 18/03/2022
25 March - 31 March 2022 25/03/2022
01 April - 07 April 2022 01/04/2022
08 April - 14 April 2022 08/04/2022
15 April - 21 April 2022 15/04/2022
1 22 April - 24 April 2022 22/04/2022
2 25 April - 01 May 2022 25/04/2022
3 02 May - 08 May 2022 02/05/2022
4 09 May - 15 May 2022 09/05/2022
5 16 May - 22 May 2022 16/05/2022
6 23 May - 29 May 2022 23/05/2022
7 30 May - 05 June 2022 30/05/2022
8 06 June - 12 June 2022 06/06/2022
9 13 June - 19 June 2022 13/06/2022
10 20 June - 26 June 2022 20/06/2022
11 27 June - 03 July 2022 27/06/2022
12 04 July - 10 July 2022 04/07/2022
13 11 July - 17 July 2022 11/07/2022
14 18 July - 24 July 2022 18/07/2022
15 25 July - 31 July 2022 25/07/2022
16 01 August - 07 August 2022 01/08/2022
17 08 August - 14 August 2022 08/08/2022
18 15 August - 21 August 2022 15/08/2022
19 22 August - 28 August 2022 22/08/2022
20 29 August - 04 September 2022 29/08/2022
21 05 September - 11 September 2022 05/09/2022
22 12 September - 18 September 2022 12/09/2022
23 19 September - 25 September 2022 19/09/2022
24 26 September - 02 October 2022 26/09/2022
25 03 October - 09 October 2022 03/10/2022
26 10 October - 16 October 2022 10/10/2022
27 17 October - 23 October 2022 17/10/2022
28 24 October - 30 October 2022 24/10/2022
29 31 October - 06 November 2022 31/10/2022
30 07 November - 13 November 2022 07/11/2022
31 14 November - 20 November 2022 14/11/2022
32 21 November - 27 November 2022 21/11/2022
33 28 November - 04 December 2022 28/11/2022
34 05 December - 11 December 2022 05/12/2022
35 12 December - 18 December 2022 12/12/2022
36 19 December - 25 December 2022 19/12/2022
37 MINGGU KE 37 : 26 December - 01 January 2022 26/12/2022
38 MINGGU KE 38 : 02 January - 08 January 2022 02/01/2023
39 MINGGU KE 39 : 09 January - 13 January 2022 09/01/2023
40 MINGGU KE 40 : 14 January - 20 January 2022 14/01/2023
41 MINGGU KE 41 : 21 January - 27 January 2022 21/01/2023
42 MINGGU KE 42 : 28 January - 03 February 2022 28/01/2023
43 MINGGU KE 43 : 04 February - 10 February 2022 04/02/2023
44 MINGGU KE 44 : 11 February - 17 February 2022 11/02/2023
45 MINGGU KE 45 : 18 February - 24 February 2022 18/02/2023
46 MINGGU KE 46 : 25 February - 03 March 2022 25/02/2023
47 MINGGU KE 47 : 04 March - 10 March 2022 04/03/2023
48 MINGGU KE 48 : 11 March - 17 March 2022 11/03/2023
49 MINGGU KE 49 : 18 March - 24 March 2022 18/03/2023
50 MINGGU KE 50 : 25 March - 31 March 2022 25/03/2023
51 MINGGU KE 51 : 01 April - 07 April 2022 01/04/2023
52 MINGGU KE 52 : 08 April - 14 April 2022 08/04/2023
53 MINGGU KE 53 : 15 April - 21 April 2022 15/04/2023
54 MINGGU KE 54 : 22 April - 28 April 2022 22/04/2023
55 MINGGU KE 55 : 29 April - 05 May 2022 29/04/2023
56 MINGGU KE 56 : 06 May - 12 May 2022 06/05/2023
57 MINGGU KE 57 : 13 May - 19 May 2022 13/05/2023
58 MINGGU KE 58 : 20 May - 26 May 2022 20/05/2023
59 MINGGU KE 59 : 27 May - 02 June 2022 27/05/2023
60 MINGGU KE 60 : 03 June - 09 June 2022 03/06/2023
61 MINGGU KE 61 : 10 June - 16 June 2022 10/06/2023
62 MINGGU KE 62 : 17 June - 23 June 2022 17/06/2023
63 MINGGU KE 63 : 24 June - 30 June 2022 24/06/2023
64 MINGGU KE 64 : 01 July - 07 July 2022 01/07/2023
65 MINGGU KE 65 : 08 July - 14 July 2022 08/07/2023
66 MINGGU KE 66 : 15 July - 21 July 2022 15/07/2023
67 MINGGU KE 67 : 22 July - 28 July 2022 22/07/2023
68 MINGGU KE 68 : 29 July - 04 August 2022 29/07/2023
69 MINGGU KE 69 : 05 August - 11 August 2022 05/08/2023
70 MINGGU KE 70 : 12 August - 18 August 2022 12/08/2023
71 MINGGU KE 71 : 19 August - 25 August 2022 19/08/2023
72 MINGGU KE 72 : 26 August - 01 September 2022 26/08/2023
73 MINGGU KE 73 : 02 September - 08 September 2022 02/09/2023
74 MINGGU KE 74 : 09 September - 15 September 2022 09/09/2023
75 MINGGU KE 75 : 16 September - 22 September 2022 16/09/2023
76 MINGGU KE 76 : 23 September - 29 September 2022 23/09/2023
77 MINGGU KE 77 : 30 September - 06 October 2022 30/09/2023
78 MINGGU KE 78 : 07 October - 13 October 2022 07/10/2023
5 6 7 8 9 10

17 January 2022 17 January 23/01/2022 23 January 2022 23 January


28 January 2022 28 January 03/02/2022 03 February 2022 03 February
04 February 2022 04 February 10/02/2022 10 February 2022 10 February
11 February 2022 11 February 17/02/2022 17 February 2022 17 February
18 February 2022 18 February 24/02/2022 24 February 2022 24 February
25 February 2022 25 February 03/03/2022 03 March 2022 03 March
04 March 2022 04 March 10/03/2022 10 March 2022 10 March
11 March 2022 11 March 17/03/2022 17 March 2022 17 March
18 March 2022 18 March 24/03/2022 24 March 2022 24 March
25 March 2022 25 March 31/03/2022 31 March 2022 31 March
01 April 2022 01 April 07/04/2022 07 April 2022 07 April
08 April 2022 08 April 14/04/2022 14 April 2022 14 April
15 April 2022 15 April 21/04/2022 21 April 2022 21 April
22 April 2022 22 April 24/04/2022 24 April 2022 24 April
25 April 2022 25 April 01/05/2022 01 May 2022 01 May
02 May 2022 02 May 08/05/2022 08 May 2022 08 May
09 May 2022 09 May 15/05/2022 15 May 2022 15 May
16 May 2022 16 May 22/05/2022 22 May 2022 22 May
23 May 2022 23 May 29/05/2022 29 May 2022 29 May
30 May 2022 30 May 05/06/2022 05 June 2022 05 June
06 June 2022 06 June 12/06/2022 12 June 2022 12 June
13 June 2022 13 June 19/06/2022 19 June 2022 19 June
20 June 2022 20 June 26/06/2022 26 June 2022 26 June
27 June 2022 27 June 03/07/2022 03 July 2022 03 July
04 July 2022 04 July 10/07/2022 10 July 2022 10 July
11 July 2022 11 July 17/07/2022 17 July 2022 17 July
18 July 2022 18 July 24/07/2022 24 July 2022 24 July
25 July 2022 25 July 31/07/2022 31 July 2022 31 July
01 August 2022 01 August 07/08/2022 07 August 2022 07 August
08 August 2022 08 August 14/08/2022 14 August 2022 14 August
15 August 2022 15 August 21/08/2022 21 August 2022 21 August
22 August 2022 22 August 28/08/2022 28 August 2022 28 August
29 August 2022 29 August 04/09/2022 04 September 2022 04 September
05 September 2022 05 September 11/09/2022 11 September 2022 11 September
12 September 2022 12 September 18/09/2022 18 September 2022 18 September
19 September 2022 19 September 25/09/2022 25 September 2022 25 September
26 September 2022 26 September 02/10/2022 02 October 2022 02 October
03 October 2022 03 October 09/10/2022 09 October 2022 09 October
10 October 2022 10 October 16/10/2022 16 October 2022 16 October
17 October 2022 17 October 23/10/2022 23 October 2022 23 October
24 October 2022 24 October 30/10/2022 30 October 2022 30 October
31 October 2022 31 October 06/11/2022 06 November 2022 06 November
07 November 2022 07 November 13/11/2022 13 November 2022 13 November
14 November 2022 14 November 20/11/2022 20 November 2022 20 November
21 November 2022 21 November 27/11/2022 27 November 2022 27 November
28 November 2022 28 November 04/12/2022 04 December 2022 04 December
05 December 2022 05 December 11/12/2022 11 December 2022 11 December
12 December 2022 12 December 18/12/2022 18 December 2022 18 December
19 December 2022 19 December 25/12/2022 25 December 2022 25 December
26 December 2022 26 December 01/01/2023 01 January 2023 01 January
02 January 2023 02 January 08/01/2023 08 January 2023 08 January
09 January 2023 09 January 13/01/2023 13 January 2023 13 January
14 January 2023 14 January 20/01/2023 20 January 2023 20 January
21 January 2023 21 January 27/01/2023 27 January 2023 27 January
28 January 2023 28 January 03/02/2023 03 February 2023 03 February
04 February 2023 04 February 10/02/2023 10 February 2023 10 February
11 February 2023 11 February 17/02/2023 17 February 2023 17 February
18 February 2023 18 February 24/02/2023 24 February 2023 24 February
25 February 2023 25 February 03/03/2023 03 March 2023 03 March
04 March 2023 04 March 10/03/2023 10 March 2023 10 March
11 March 2023 11 March 17/03/2023 17 March 2023 17 March
18 March 2023 18 March 24/03/2023 24 March 2023 24 March
25 March 2023 25 March 31/03/2023 31 March 2023 31 March
01 April 2023 01 April 07/04/2023 07 April 2023 07 April
08 April 2023 08 April 14/04/2023 14 April 2023 14 April
15 April 2023 15 April 21/04/2023 21 April 2023 21 April
22 April 2023 22 April 28/04/2023 28 April 2023 28 April
29 April 2023 29 April 05/05/2023 05 May 2023 05 May
06 May 2023 06 May 12/05/2023 12 May 2023 12 May
13 May 2023 13 May 19/05/2023 19 May 2023 19 May
20 May 2023 20 May 26/05/2023 26 May 2023 26 May
27 May 2023 27 May 02/06/2023 02 June 2023 02 June
03 June 2023 03 June 09/06/2023 09 June 2023 09 June
10 June 2023 10 June 16/06/2023 16 June 2023 16 June
17 June 2023 17 June 23/06/2023 23 June 2023 23 June
24 June 2023 24 June 30/06/2023 30 June 2023 30 June
01 July 2023 01 July 07/07/2023 07 July 2023 07 July
08 July 2023 08 July 14/07/2023 14 July 2023 14 July
15 July 2023 15 July 21/07/2023 21 July 2023 21 July
22 July 2023 22 July 28/07/2023 28 July 2023 28 July
29 July 2023 29 July 04/08/2023 04 August 2023 04 August
05 August 2023 05 August 11/08/2023 11 August 2023 11 August
12 August 2023 12 August 18/08/2023 18 August 2023 18 August
19 August 2023 19 August 25/08/2023 25 August 2023 25 August
26 August 2023 26 August 01/09/2023 01 September 2023 01 September
02 September 2023 02 September 08/09/2023 08 September 2023 08 September
09 September 2023 09 September 15/09/2023 15 September 2023 15 September
16 September 2023 16 September 22/09/2023 22 September 2023 22 September
23 September 2023 23 September 29/09/2023 29 September 2023 29 September
30 September 2023 30 September 06/10/2023 06 October 2023 06 October
07 October 2023 07 October 13/10/2023 13 October 2023 13 October

Anda mungkin juga menyukai