JAKABARING
No. PENGURANGAN
Item Pekerjaan Spesifikasi Sat. Vol. Harga Total Harga
CWR
RUANG PAKAIAN
A. PEKERJAAN TANAH
1 Galian Pondasi M³ 11.25 118,932 1,337,985.00
2 Urugan tanah pondasi Urug kembali dari sisa galian M³ 9.99 31,717 316,849.50
3 Urugan pasir bawah pondasi tebal = 5 cm M³ 0.22 173,190 38,101.80
4 Lantai kerja bawah pondasi tebal = 5 cm M³ 0.22 1,628,307 358,227.55
5 Timbunan M² 18.00 173,190 3,117,420.00
TOTAL 5,168,583.85
B. PEKERJAAN PONDASI
1 Cerucuk Gelam M² 4.50 89,240 401,580.00
2 Pondasi Tapak Uk.120/120 M³ 1.26 8,271,581 10,422,192.60
3 Balok Sloof Uk.20/40 M³ 0.96 8,737,367 8,387,871.84
4 Pondasi rollag bata M³ 2.88 1,485,516 4,278,287.44
TOTAL 23,489,931.87
D. Pekerjaan Lantai
1 Floor lantai Tebal 5 cm M³ 0.90 1,628,307 1,465,476.32
TOTAL 1,465,476.32
E. Pekerjaan Plafond
1 Plafond Gypsum + Rangka Metal M² 18.00 185,000 3,330,000.00
TOTAL 3,330,000.00
F. Pekerjaan listrik
1 Instalasi titik lampu Kabel Praba Ttk 5.00 239,620 1,198,098.75
2 Instalasi Stop kontak Kabel Praba Ttk 3.00 166,264 498,792.38
3 Instalasi Saklar Bh 2.00 143,031 286,061.93
TOTAL 1,982,953.05
BALKON BELAKANG
B. Pekerjaan Plafond
1 Shunda Plafond + Rangka Metal M² 48.19 348,463 16,792,451.61
TOTAL 16,792,451.61
TAMPAK SAMPING
1 Beton ring balok + Listplank M³ 0.54 9,630,980 5,200,729.07
2 Pek. Bobok M² 14.23 85,000 1,209,550.00
3 Dak beton M³ 0.28 9,630,980 2,677,412.37
TOTAL 9,087,691.44
A. Pekerjaan Lantai
2 Granite Lantai M² 2.32 540,839 1,254,746.43
TOTAL 1,254,746.43
TAMPAK BELAKANG
1 Beton ring balok + Listplank M³ 0.86 9,630,980 8,234,487.69
2 Pek. Dak Pet M³ 0.80 9,630,980 7,704,783.80
3 Dak Lantai beton M³ 0.57 9,630,980 5,489,658.46
TOTAL 21,428,929.94
POS SATPAM
A. PEKERJAAN TANAH
1 Galian Pondasi M³ 9.60 118,932 1,141,747.20
2 Urugan tanah pondasi Urug kembali dari sisa galian M³ 7.92 31,717 251,196.00
1
3 Urugan pasir bawah pondasi tebal = 5 cm M³ 0.26 173,190 44,336.64
4 Lantai Kerja Bawah pondasi tebal = 5 cm M³ 0.26 1,628,307 416,846.60
5 Timbunan M² 11.30 173,190 1,957,047.00
TOTAL 3,811,173.44
B. PEKERJAAN PONDASI
1 Cerucuk Gelam M² 2.88 89,240 257,011.20
2 Pondasi Tapak Uk.60/60 M³ 1.68 8,271,581 13,896,256.79
3 Balok Sloof Uk.20/40 M³ 0.97 8,737,367 8,440,296.04
4 Lantai kerja bawah pondasi T = 5 cm M³ 0.26 1,628,307 416,846.60
5 Pondasi rollag bata M³ 2.57 1,485,516 3,817,777.33
TOTAL 26,828,187.96
E. Pekerjaan Plafond
1 Plafond Gypsum + Rangka Metal Elephant Rangka Metal Furing Aplus M² 11.30 185,000 2,090,500.00
TOTAL 2,090,500.00
F. Pekerjaan Sanitair
1 Bak kontrol Unit 1.00 450,000 450,000.00
2 Septitank Unit 1.00 2,700,000 2,700,000.00
TOTAL 3,150,000.00
B. PEKERJAAN PONDASI
1 Cerucuk Gelam M² 20.48 85,000 1,740,800.00
2 Pondasi Tapak Uk.60/60 M³ 8.06 8,271,581 66,668,946.29
3 Balok Sloof Uk.20/30 M³ 6.25 8,737,367 54,608,540.63
4 Lantai kerja bawah pondasi T = 5 cm M³ 1.02 1,628,307 1,660,873.17
5 Pondasi rollag bata M³ 16.67 1,485,516 24,763,559.57
TOTAL 149,442,719.65
PEK. INSTALASI
A. INSTALASI
1 Instalasi Kabel AC M 250.00 75,000 18,750,000.00
2 Instalasi Kabel cctv M 480.00 22,500 10,800,000.00
3 Tambahan Box Panel Listrik Bh 1.00 4,500,000 4,500,000.00
TOTAL 34,050,000.00
2
1 Pek. Pasang batu Tampak Depan M² 23.21 626,827 14,548,654.94 575,407
TOTAL 14,548,654.94
B. PEKERJAAN TAMBAHAN
1 Pek. Pasang batu Pos Satpam M² 8.00 626,827 5,014,616.09
TOTAL 5,014,616.09
B. PEKERJAAN TAMBAHAN
1 Pek. Pasang Koral Sikat M² 9.30 300,000 2,790,000.00
TOTAL 2,790,000.00
A. PEKERJAAN TAMBAHAN
1 Jalan Cor Samping Kantor M² 8.42 2,390,318 20,126,481.03
TOTAL 20,126,481.03
PEK.TANGGA BESI
A. PEKERJAAN KURANG TAMBAH
1 Pek. Rangka WF 150 & Rangka Hollow M' 8.50 3,013,210 25,612,287.85
TOTAL 25,612,287.85
SUBTOTAL 1,710,372,607.83
Dibulatkan 1,710,300,000.00
923,582,390.77
786,717,609.23