RAB TAMBAHAN PEKERJAAN RUMAH BAPAK ARDI

JAKABARING

No. PENGURANGAN
Item Pekerjaan Spesifikasi Sat. Vol. Harga Total Harga
CWR

RUANG PAKAIAN
A. PEKERJAAN TANAH
1 Galian Pondasi M³ 11.25 118,932 1,337,985.00
2 Urugan tanah pondasi Urug kembali dari sisa galian M³ 9.99 31,717 316,849.50
3 Urugan pasir bawah pondasi tebal = 5 cm M³ 0.22 173,190 38,101.80
4 Lantai kerja bawah pondasi tebal = 5 cm M³ 0.22 1,628,307 358,227.55
5 Timbunan M² 18.00 173,190 3,117,420.00
TOTAL 5,168,583.85

B. PEKERJAAN PONDASI
1 Cerucuk Gelam M² 4.50 89,240 401,580.00
2 Pondasi Tapak Uk.120/120 M³ 1.26 8,271,581 10,422,192.60
3 Balok Sloof Uk.20/40 M³ 0.96 8,737,367 8,387,871.84
4 Pondasi rollag bata M³ 2.88 1,485,516 4,278,287.44
TOTAL 23,489,931.87

C. Pekerjaan Dinding dan Beton


1 Pasangan bata 1:5 Bata Palembang M² 42.00 171,261 7,192,969.92
2 Plester Konvensional M² 84.00 94,853 7,967,688.75
3 Acian M² 84.00 70,409 5,914,335.00
4 Beton kolom praktis Uk 12/12 cm M³ 0.05 8,569,569 428,478.43
5 Beton kolom Uk. 12/40 M³ 0.51 9,446,882 4,817,909.57
6 Beton ring balok Uk 20/40 cm M³ 0.96 9,630,980 9,245,740.56
7 Dak beton T = 12 cm M³ 2.16 9,630,980 20,802,916.26
TOTAL 56,370,038.48

D. Pekerjaan Lantai
1 Floor lantai Tebal 5 cm M³ 0.90 1,628,307 1,465,476.32
TOTAL 1,465,476.32

E. Pekerjaan Plafond
1 Plafond Gypsum + Rangka Metal M² 18.00 185,000 3,330,000.00
TOTAL 3,330,000.00

F. Pekerjaan listrik
1 Instalasi titik lampu Kabel Praba Ttk 5.00 239,620 1,198,098.75
2 Instalasi Stop kontak Kabel Praba Ttk 3.00 166,264 498,792.38
3 Instalasi Saklar Bh 2.00 143,031 286,061.93
TOTAL 1,982,953.05

BALKON BELAKANG

A. Pekerjaan Dinding dan Beton


1 Beton kolom Uk. 12/40 M³ 0.77 9,446,882 7,255,204.99
2 Beton ring balok Uk 20/30 cm M³ 1.50 9,630,980 14,446,469.63
3 Beton ring balok Uk 20/40 cm M³ 3.38 9,630,980 32,552,711.56
4 Balok Listplank Skylight M³ 1.41 9,630,980 13,579,681.45
5 Dak beton M³ 5.78 9,630,980 55,667,062.96
TOTAL 123,501,130.57

B. Pekerjaan Plafond
1 Shunda Plafond + Rangka Metal M² 48.19 348,463 16,792,451.61
TOTAL 16,792,451.61

SKYLIGHT RUANG TENGAH


1 Beton ring balok Uk 20/30 cm M³ 0.63 9,630,980 6,067,517.24
2 Listplank M³ 1.67 9,630,980 16,083,736.18
TOTAL 22,151,253.43

TAMPAK SAMPING
1 Beton ring balok + Listplank M³ 0.54 9,630,980 5,200,729.07
2 Pek. Bobok M² 14.23 85,000 1,209,550.00
3 Dak beton M³ 0.28 9,630,980 2,677,412.37
TOTAL 9,087,691.44

A. Pekerjaan Lantai
2 Granite Lantai M² 2.32 540,839 1,254,746.43
TOTAL 1,254,746.43

TAMPAK BELAKANG
1 Beton ring balok + Listplank M³ 0.86 9,630,980 8,234,487.69
2 Pek. Dak Pet M³ 0.80 9,630,980 7,704,783.80
3 Dak Lantai beton M³ 0.57 9,630,980 5,489,658.46
TOTAL 21,428,929.94

TAMBAHAN TIANG VARIASI KANTOR


1 Beton Tiang kolom M³ 0.88 9,630,980 8,475,262.18
2 Acian M² 13.20 70,409 929,395.50
TOTAL 9,404,657.68

FLOOR LANTAI KAMAR UTK PARKIT


1 Floor lantai M³ 12.11 1,628,307 19,718,798.07
2 Acian M² 121.15 70,409 8,530,020.06
TOTAL 28,248,818.14

POS SATPAM
A. PEKERJAAN TANAH
1 Galian Pondasi M³ 9.60 118,932 1,141,747.20
2 Urugan tanah pondasi Urug kembali dari sisa galian M³ 7.92 31,717 251,196.00

1
3 Urugan pasir bawah pondasi tebal = 5 cm M³ 0.26 173,190 44,336.64
4 Lantai Kerja Bawah pondasi tebal = 5 cm M³ 0.26 1,628,307 416,846.60
5 Timbunan M² 11.30 173,190 1,957,047.00
TOTAL 3,811,173.44

B. PEKERJAAN PONDASI
1 Cerucuk Gelam M² 2.88 89,240 257,011.20
2 Pondasi Tapak Uk.60/60 M³ 1.68 8,271,581 13,896,256.79
3 Balok Sloof Uk.20/40 M³ 0.97 8,737,367 8,440,296.04
4 Lantai kerja bawah pondasi T = 5 cm M³ 0.26 1,628,307 416,846.60
5 Pondasi rollag bata M³ 2.57 1,485,516 3,817,777.33
TOTAL 26,828,187.96

C. Pekerjaan Dinding dan Beton


1 Pasangan bata 1:5 Bata Palembang M² 55.13 171,261 9,440,773.02
2 Plester Konvensional M² 110.25 94,853 10,457,591.48
3 Acian M² 110.25 70,409 7,762,564.69
4 Beton kolom praktis Uk 12/12 cm M³ 0.43 8,569,569 3,650,636.21
5 Beton kolom variasi Uk. 15/30 M³ 0.11 9,446,882 1,058,050.73
6 Beton ring balok Uk 20/40 cm M³ 1.29 9,630,980 12,404,701.92
7 Dak beton T = 12 cm M³ 1.36 9,630,980 13,059,608.54
TOTAL 57,833,926.59

D. Pekerjaan Lantai Kerja


1 Lantai kerja cor beton M³ 1.13 1,628,307 1,839,986.94
TOTAL 1,839,986.94

E. Pekerjaan Plafond
1 Plafond Gypsum + Rangka Metal Elephant Rangka Metal Furing Aplus M² 11.30 185,000 2,090,500.00
TOTAL 2,090,500.00

F. Pekerjaan Sanitair
1 Bak kontrol Unit 1.00 450,000 450,000.00
2 Septitank Unit 1.00 2,700,000 2,700,000.00
TOTAL 3,150,000.00

PEK. PAGAR DAN TIMBUNAN


A. PEKERJAAN TANAH
1 Galian Pondasi M³ 40.96 118,932 4,871,454.72
2 Urugan tanah pondasi Urug kembali dari sisa galian M³ 32.89 31,717 1,043,161.17
4 Timbunan Tambahan Kavling M² 667.20 173,190 115,552,368.00
5 Timbunan Tambahan Ketinggian Lantai M³ 228.84 173,190 39,632,799.60
6 Pek. Cor Wiremesh Bangunan M³ 38.14 1,628,307 62,103,629.93
TOTAL 223,203,413.42

B. PEKERJAAN PONDASI
1 Cerucuk Gelam M² 20.48 85,000 1,740,800.00
2 Pondasi Tapak Uk.60/60 M³ 8.06 8,271,581 66,668,946.29
3 Balok Sloof Uk.20/30 M³ 6.25 8,737,367 54,608,540.63
4 Lantai kerja bawah pondasi T = 5 cm M³ 1.02 1,628,307 1,660,873.17
5 Pondasi rollag bata M³ 16.67 1,485,516 24,763,559.57
TOTAL 149,442,719.65

C. Pekerjaan Dinding dan Beton


1 Pasangan bata 1:5 Bata Palembang M² 265.00 171,261 45,384,214.97
2 Plester Konvensional M² 434.75 94,853 41,237,531.95
3 Beton kolom praktis Uk 12/12 cm M³ 1.15 8,569,569 9,855,003.85
4 Beton ring balok Uk 12/20 cm M³ 2.50 9,630,980 24,077,449.38
TOTAL 120,554,200.14

PEK. INSTALASI
A. INSTALASI
1 Instalasi Kabel AC M 250.00 75,000 18,750,000.00
2 Instalasi Kabel cctv M 480.00 22,500 10,800,000.00
3 Tambahan Box Panel Listrik Bh 1.00 4,500,000 4,500,000.00
TOTAL 34,050,000.00

PEK. KOLAM RENANG


B. Pekerjaan Tambahan
1 Pek kolam renang Uk. 2 x 5 m M² 15.40 3,500,000 53,900,000.00
TOTAL 53,900,000.00

PEK. GRANIT MOTIF HITAM DINDING


A. PEKERJAAN TAMBAHAN
1 Dinding Belakang + Balkon Belakang Granit 120 x 120 M² 70.01 1,313,136 91,932,619.86
2 Kantor ( bag. Samping) + samping Kolam Renang Granit 120 x 120 M² 55.68 1,313,136 73,115,387.42
TOTAL 165,048,007.28
1,313,135.55
B. PEKERJAAN KURANG TAMBAH DIKURANG
1 Dinding Balkon Depan Samping Granit 120 x 120 M² 31.77 737,729 23,437,636.03 575,407
2 Kantor Bagian Depan Granit 120 x 120 M² 30.82 737,729 22,736,793.91 737,728.55
TOTAL 46,174,429.94

PEK. GRANIT RUANG TAMU & SELASAR ATAS


A. PEKERJAAN KURANG TAMBAH
1 Pek Ruang tamu dan Selasar atas Granit 80 x 80 M² 100.21 -34,568 -3,464,061.24 540,838.98
TOTAL -3,464,061.24 DIKURANG
575,407
PEK. BATU ALAM ANDESIT HITAM -34,568.02
A. PEKERJAAN KURANG TAMBAH
1 Pek. Pasang batu andesit M² 107.40 -51,420 -5,522,509.26
TOTAL -5,522,509.26 523,986.99
DIKURANG
A. PEKERJAAN TAMBAHAN 575,407
1 Pek. Pasang batu andesit Balkon Bawah M² 62.70 523,987 32,853,984.17 -51,420.01
2 Pek. Pasang batu andesit Dinding R. Jemur M² 38.43 523,987 20,136,819.96
3 Pek. Pasang batu andesit Dinding T. Wudhu M² 8.69 523,987 4,553,446.93
TOTAL 57,544,251.05

PEK. BATU PARAS PUTIH


A. PEKERJAAN KURANG TAMBAH

2
1 Pek. Pasang batu Tampak Depan M² 23.21 626,827 14,548,654.94 575,407
TOTAL 14,548,654.94

B. PEKERJAAN TAMBAHAN
1 Pek. Pasang batu Pos Satpam M² 8.00 626,827 5,014,616.09
TOTAL 5,014,616.09

PEK. TALI AIR


A. PEKERJAAN TAMBAHAN
1 Pek. Tali Air Plafond dan Dinding M' 630.94 65,000 41,011,100.00
2 Profil tali air dinding luar M' 20.40 45,000 918,000.00
3 Penebalan dinding (profil) M' 10.90 45,000 490,500.00
4 Siku Tiang Fiber M' 399.70 65,000 25,980,500.00
TOTAL 68,400,100.00

PEKERJAAN PLAFOND (SHUNDA PLAFOND)


A. PEKERJAAN KURANG TAMBAH
1 Dak atas M² 44.83 161,463 7,238,386.29 348,463
2 Plafond Atas Kolam Renang Granit 120 x 120 M² 6.30 161,463 1,017,216.90 dikurangi 185,000
TOTAL 8,255,603.19

PEK. KANOPI DAN JENDELA BESI


A. PEKERJAAN TAMBAHAN
1 Kanopi Belakang Atas (Balkon) M² 17.07 2,142,297 36,569,016.49
2 Dinding R. Kaca Samping M² 21.81 1,448,366 31,588,852.54
TOTAL 68,157,869.03

B. PEKERJAAN KURANG TAMBAH


1 Kanopi Kolam Renang M² 25.27 2,164,935 54,707,904.08 DIKURANGI KACA
2 Jendela Kantor M² 20.94 951,745 19,929,539.15 DIKURANGI KUSEN KAYU
3 Skylight M² 19.82 2,442,703 48,414,381.09 DIKURANGI DAK
TOTAL 123,051,824.32

PEK. BATU BELAH DAN KORAL SIKAT


A. PEKERJAAN TAMBAHAN
1 Pek. Pasang Batu Belah M² 27.24 303,942 8,279,376.14
TOTAL 8,279,376.14

B. PEKERJAAN TAMBAHAN
1 Pek. Pasang Koral Sikat M² 9.30 300,000 2,790,000.00
TOTAL 2,790,000.00

PEK. KUSEN KAYU


A. PEKERJAAN TAMBAHAN
1 Samping Musholla & R. Fitness M² 2.11 350,000 738,500.00
2 Kamar Mandi Utama & R.anak M² 4.14 550,000 2,277,000.00
3 R. Pakaian M² 1.30 550,000 715,000.00
TOTAL 3,730,500.00

A. PEKERJAAN TAMBAHAN
1 Jalan Cor Samping Kantor M² 8.42 2,390,318 20,126,481.03
TOTAL 20,126,481.03

PEK. Dinding Atap Alkan Belakang


A. PEKERJAAN TAMBAHAN
1 Pek. Dinding Bata M² 39.91 171,261 6,835,034.04
2 Pek. Plesteran M² 79.82 94,853 7,571,201.38
3 Pas. Batu Andesit Motif M² 39.91 523,987 20,912,320.70
4 Pek. Atap Alkan M² 13.00 271,928 3,535,066.54
TOTAL 38,853,622.65

PEK. PAGAR DEPAN


A. PEKERJAAN KURANG TAMBAH
1 Pek Beton M² 2.97 9,446,882 28,057,238.06
2 Pas Batu Bata M² 32.07 171,261 5,492,346.32
3 Pek Plesteran M² 64.14 94,853 6,083,899.48
4 Acian M² 30.00 70,409 2,112,262.50
5 Pek Pagar Besi M² 30.00 1,100,000 33,000,000.00
TOTAL 41,745,746.35

GRANIT R. TENGAH & CONTOH


A. PEKERJAAN TAMBAHAN
1 Granit R. Tengah dus 3.00 1,944,000 5,832,000.00
2 Granit Contoh dus 1.00 1,800,000 1,800,000.00
TOTAL 7,632,000.00

PEK.TANGGA BESI
A. PEKERJAAN KURANG TAMBAH
1 Pek. Rangka WF 150 & Rangka Hollow M' 8.50 3,013,210 25,612,287.85
TOTAL 25,612,287.85

PEK.INSTALASI AIR PANAS


A. PEKERJAAN TAMBAH
1 Pek. Instalasi pipa Galvanis M' 150.00 93,420 14,013,037.50
TOTAL 14,013,037.50

SUBTOTAL 1,710,372,607.83
Dibulatkan 1,710,300,000.00

923,582,390.77

786,717,609.23