Diketahui : A1 = 10.000 Ha
A2 = 12.000 Ha
A3 = 14.000 Ha
A4 = 8.400 Ha
A5 = 10.080 Ha
A6 = 11.760 Ha
NFR = 16.416 L/Hari
e = 0.8
Penyelesaian : Rumus yang digunakan, ialah :
NFR x A
Q =
e x 8.64
Maka :
NFR x A1 NFR x A4
Q1 = Q4 =
e x 8.64 e x 8.64
16.416 x 10.00 16.416 x 8.40
= =
0.8 x 8.64 0.8 x 8.64
164.16 137.89
= =
6.9 6.9
= 23.75 L/dtk = 19.95 L/dtk
NFR x A2 NFR x A5
Q2 = Q5 =
e x 8.64 e x 8.64
16.416 x 12.00 16.416 x 10.1
= =
0.8 x 8.64 0.8 x 8.64
196.99 165.47
= =
= =
6.9 6.9
= 28.50 L/dtk = 24 L/dtk
NFR x A3 NFR x A5
Q3 = Q6 =
e x 8.64 e x 8.64
16.416 x 14.00 16.416 x 11.8
= =
0.8 x 8.64 0.8 x 8.64
229.824 193.05
= =
6.9 6.9
= 33.25 L/dtk = 28 L/dtk
C. CONTOH PERHITUNGAN
I. SALURAN KUARTER (K1)
1. Daerah yang dialiri (Anetto)
Anetto = Abruto x 0.9
= 14.00 x 0.9
= 12.60 Ha
NFR = 16.416
dimana :
Abruto : luasan petak kuarter bruto
c. Panjang Saluran, L
L = 14.0 x 2000 L = 8.1 cm diukur langsung
= 100 dari peta tata letak 1 : 2000
= 280 m
d. Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS)
Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS) ditentukan langsung
dari garis-garis kontur peta berdasarkan elevasi medan. Apabila ujung hilir atau udik
saluran terletak diantara kontur maka penentuan elevasinya diperoleh dengan cara
interpolasi linier.
EHS = 14.43 m
EUS = 14.91 m
g. Kemiringan rencana ( Ir )
Dari gambar 1.2 grafik perencanaan untuk saluran tanpa pasangan dengan k = 30
Q= 29.9 L/dtk dan Im= 0.00171
Karena Hasil plot berada di antara garis putus-putus dan garis v min maka
Ir = 0.00171
d. Menentukan Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS),
berdasarkan peta topografi
EHS = 15.410 m
EUS = 16.340 m
Kemiringan talud, z = 1
Abruto Anetto NFR QR L EHS EUS MAHr MAUm H1 b F h w n A P R Vr MAUr H2 Vmin Vmax
Sal. Im Ir Ket L
Ha Ha mm/hr L/det m m m m m m m m m m m 2
m m m/det m m m/det m/det
T2-K1 10.0 9.00 16.416 21.38 328 14.43 16.37 14.58 16.52 0.0 0.00591 0.00591 0.3 0.28 0.21 0.35 1.43 0.11 0.89 0.12 0.93 16.5 0 0.20 3.00 ###
T2-T1 12.0 10.80 16.416 25.65 404 15.41 16.34 15.56 16.49 0.0 0.00230 0.00230 0.3 0.53 0.22 0.36 1.36 0.11 0.92 0.12 0.60 16 0 0.20 3.00 ###
T1-BT 14.0 12.60 16.416 29.9 386 16.39 16.55 16.54 16.70 0.0 0.00041 0.00041 0.3 1.47 0.22 0.36 1.36 0.11 0.92 0.12 0.25 16.7 0 0.20 3.00
T4-K2 8.4 7.56 16.416 18.0 62 15.26 15.66 15.41 15.81 0.0 0.00645 0.00645 0.3 0.22 0.21 0.35 1.43 0.11 0.89 0.12 0.98 15.8 0 0.20 3.00
T4-T3 10.08 9.07 16.416 21.5 380 15.66 15.86 15.81 16.01 0.0 0.00053 0.00053 0.3 0.94 0.22 0.36 1.36 0.11 0.92 0.12 0.29 16.0 0 0.20 3.00
T3-BT 11.8 10.58 16.416 25.1 322 15.86 16.55 16.01 16.70 0.0 0.00214 0.00214 0.3 0.54 0.22 0.36 1.36 0.11 0.92 0.12 0.58 16.7 0 0.20 3.00
Dimana :
d. Menentukan Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS), berdasarkan peta
topografi
EHS = 54.118 m
EUS = 54.447 m
Indra Purnama Putra " F 111 12 076 " Dimensi Saluran, C/12
Irigasi dan Bangunan Air 1Fakultas Teknik. Universitas Tadulako
g. Kemiringan rencana ( Ir )
Ir = Im = 0.00658
h. Menghitung nilai F
Q
F =
Ir1/2
220.5
=
0.0811
= 2718 m
i
l. Menghitung keliling basah (P)
P = b + 2h 1 + z2
= 0.006 + 0.5559 1 + 1
= 0.006 + 0.7861
= 0.792 m
Indra Purnama Putra " F 111 12 076 " Dimensi Saluran, C/13
Irigasi dan Bangunan Air 1Fakultas Teknik. Universitas Tadulako
= 0.100 m
Indra Purnama Putra " F 111 12 076 " Dimensi Saluran, C/14
Irigasi dan Bangunan Air 1Fakultas Teknik. Universitas Tadulako
2. Saluran Kuarter
a. Daerah yang dialiri (Anetto)
Anetto = Abruto x 0.9
= ### x 0.9
= ### Ha
d. Menentukan Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS), berdasarkan peta
topografi
EHS = 23.759 m
EUS = 26.674 m
Indra Purnama Putra " F 111 12 076 " Dimensi Saluran, C/15
Irigasi dan Bangunan Air 1Fakultas Teknik. Universitas Tadulako
=
350
= 0.008329
g. Kemiringan rencana ( Ir )
Ir = Im = 0.00833
h. Menghitung nilai F
Q
F =
Ir1/2
2E+06
=
0.0913
= 2E+07 m
Indra Purnama Putra " F 111 12 076 " Dimensi Saluran, C/16
Irigasi dan Bangunan Air 1Fakultas Teknik. Universitas Tadulako
R =
P
0.047
=
0.620
= 0.075 m
Indra Purnama Putra " F 111 12 076 " Dimensi Saluran, C/17
A. Menghitung petak - petak irigasi
1. luasan petak tersier 1
a. Luas petak kuarter A1
A1a = 7 x 5000 . 4 x 5000 ƩA1 = A1a + A1b
= 35000 . 20000 = 7 + 3.5
= 700000000 cm2 = 10.5 ha
= 70000 m 2
= 7.000 ha
A1b = 0.5 7 x 5000 . 4 x 5000
= 0.5 35000 . 20000
= 350000000 cm2
= 35000 m2 h. Lebar saluran (b)
= 3.5 ha Dari hasil plot antara nilai Im dan Q digra
b. Luas petak kuarter A2 b = 0.450
A2 = 7 x 5000 . 7 x 5000
= 35000 . 35000
= 1225000000 cm2
= 122500 m2
= 12.250 ha 2. Saluran tersier 2
c. Luas petak kuarter A3 a.
A3a = 8 x 5000 . 7 x 5000 ƩA3 = A3a + A3b
= 40000 . 35000 = 14.000 + 3.000
= 1400000000 cm 2
= 17.00 ha
= 140000 m2
= 14.000 ha b.
A3b = 0.5 8 x 5000 . 3 x 5000
= 0.5 40000 . 15000
= 300000000 cm2
= 30000 m2
= 3.000 ha
d. Luas petak kuarter A4
A4 = 8 x 5000 . 7 x 5000
= 40000 . 35000
= 1400000000 cm2
= 140000 m2 c.
= 14.000 ha
e. luas petak tersier 1
ƩA = A1 + A2 + A3 + A4
= 10.5 + 12.250 + 17.000 + 14.000
= 53.750 ha
d.
= 14.000 ha
c. Luas petak kuarter A3 h.
A3 = 6 x 5000 . 10 x 5000
= 30000 . 50000
= 1500000000 cm2
= 150000 m2
= 15.000 ha
d. Luas petak kuarter A4
A4a = 6 x 5000 . 4.5 x 5000 ƩA4 = A4a + A4b i.
= 30000 . 22500 = 6.750 + 2.625
= 675000000 cm2 = 9.38 ha
= 67500 m 2
j.
= 6.750 ha
A4b = 0.5 6 x 5000 . 3.5 x 5000
= 0.5 30000 . 17500
= 262500000 cm2 k.
= 26250 m2
= 2.625 ha
e. Luas petak kuarter A5
A5a = 0.5 6 x 5000 . 4.0 x 5000 ƩA5 = A5a + A5b + A5c
= 0.5 30000 . 20000 = 3.000 + 9.000 k.
= 300000000 cm 2
= #REF! ha
= 30000 m2
= 3.000 ha
= 6.750 ha
A6b = 0.5 6 x 5000 . 4.0 x 5000 n.
= 0.5 30000 . 20000
= 300000000 cm2
= 30000 m2
= 3.000 ha
g. Luas petak kuarter A7 o.
A7 = 6 x 5000 . 7 x 5000
= 30000 . 35000
= 1050000000 cm2
= 105000 m2
= 10.500 ha o.
h. Luas petak kuarter A8
A8 = 6 x 5000 . 8.5 x 5000
= 30000 . 42500
= 1275000000 cm2
= 127500 m2 p.
= 12.750 ha
i. luas petak tersier 2
ƩA = A1 + A2 + A3 + A4 + A5 + A6 + A7 + A8
= 13.50 + 14 + 15 + 9.375 + #REF! + 9.750 + 10.500 +
= #REF! ha q.
3. Saluran kuarter 1
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
k.
l.
m.
n.
o.
o.
p.
q.
C. Menghitung dimensi
1. Saluran tersier 1
a. Daerah yang di
Anetto
b h F A
m m k=35 k=30 m2 b. Debit rencana (
0.3000 0.2500 1.276 1.094 0.138
Q
0.3000 0.2600 1.387 1.181 0.146
c. Panjang Salura
Saluran tersier 2 L
Daerah yang dialiri (Anetto)
Anetto = Abruto x 0.9
= ### x 0.9
= ### Ha
d. Menentukan El
Debit rencana (Q) topografi
NFR x Abruto Dimana : NFR = 16.8 mm/hari EHS
Q =
e x 8.64 e = 0.8 EUS
16.8 x Err:509
=
0.8 x 8.64 e. Elevasi muka a
### MAHr
=
6.912
= ### L/dtk
= ### L/dtk
f. Kemiringan me
Panjang Saluran, L (BBS - BT1)
Im
L = 34 x 5000
= 100
= 1700 m
Menentukan Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS), berdasarkan peta g. Kemiringan ren
topografi Ir
EHS = 51.712 m
EUS = 54.447 m h. Menghitung nil
F
Elevasi muka air sesuai medan ( MAHr dan MAUm )
MAHr = EHS + 0.1 + 0.05 MAUm = EUS + 0.1 + 0.05
= 51.712 + 0.1 + 0.05 = 54.447 + 0.1 + 0.05
= 51.86 m = 54.60 m
Menghitung nilai F
Q
F =
Ir1/2 k. Menghitung Lu
### A
=
0.0401
= ### m
c. Panjang Salura
L
Saluran kuarter 1, tersier 1
Daerah yang dialiri (Anetto)
Anetto = Abruto x 0.9
= 10.00 x 0.9
= 9.00 Ha d. Menentukan El
topografi
Debit rencana (Q) EHS
NFR x Abruto Dimana : NFR = 16.8 mm/hari EUS
Q =
e x 8.64 e = 0.8
16.8 x 9.00 e. Elevasi muka a
=
0.8 x 8.64 MAHr
151.2
=
6.912
= 21.875 L/dtk
= 0.0219 L/dtk f. Kemiringan me
Im
Panjang Saluran, L (BBS - BT1)
L = 7 x 5000
= 100
= 350 m
g. Kemiringan ren
Menentukan Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS), berdasarkan peta Ir
topografi
EHS = 53.300 m h. Menghitung nil
EUS = 54.118 m
F
b. Debit rencana (
c. Panjang Salura
L
d. Menentukan El
topografi
EHS
EUS
e. Elevasi muka a
MAHr
f. Kemiringan me
Im
g. Kemiringan ren
Ir
h. Menghitung nil
i. Menentukan le
Dari hasil plot a
b=
j. Menentukan in
Dari hasil hasil
h=
k. Menghitung tin
w
k. Menghitung Lu
A
l. Menghitung ke
P
m. Menghitung jar
n. Menghitung ke
Vr
o. Menghitung mu
MAUr
o. Menghitung ke
ΔH2
p. Menghitung ke
Vmaks
q. Menghitung ke
Vmin
Syarat :
Menghitung dimensi saluran tersier
Saluran tersier 1
Daerah yang dialiri (Anetto)
Anetto = Abruto x 0.9
= ### x 0.9
= ### Ha
Menentukan Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS), berdasarkan peta
topografi
EHS = 54.118 m
EUS = 54.447 m
Kemiringan rencana ( Ir )
= Im = 0.00658
Menghitung nilai F
Q
=
Ir1/2
220.5
=
0.0811
= 2718 m
Menentukan Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS), berdasarkan peta
topografi
EHS = 51.712 m
EUS = 54.447 m
Kemiringan rencana ( Ir )
= Im = 0.0016088
Menghitung nilai F
Q
=
Ir1/2
###
=
0.0401
= ### m
Menentukan Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS), berdasarkan peta
topografi
EHS = 53.300 m
EUS = 54.118 m
Elevasi muka air sesuai medan ( MAHr dan MAUm )
MAHr = EHS + 0.1 + 0.05 MAUm = EUS + 0.1 + 0.05
= 53.3 + 0.1 + 0.05 = 54.118 + 0.1 + 0.05
= 53.450 m = 54.268 m
Kemiringan rencana ( Ir )
= Im = 0.0023371
Menghitung nilai F
Q
=
Ir1/2
0.0219
=
0.0483
= 0.4525 m