Anda di halaman 1dari 46

A.

MENGHITUNG PETAK IRIGASI


LUASAN PETAK KUARTER (Abruto)
a. Luas petak kuarter A1
A1 = 10.0 x 2000 . 25 x 2000
= 20000 . 50000
= 1000000000 cm2
= 100000.000 m2
= 10.00 Ha
b. Luas petak kuarter A2
A2 = 12.0 x 2000 . 25.0 x 2000
= 24000 . 50000
= 1200000000 cm2
= 120000 m2
= 12.00 Ha
c. Luas petak kuarter A3
A3 = 14.0 x 2000 . 25 x 2000
= 28000 . 50000
= 1400000000 cm2
= 140000 m2
= 14.00 Ha
d. Luas petak kuarter A4
A4a = 10.0 x 2000 . 21 x 2000
= 20000 . 42000
= 840000000 cm2
= 84000 m2
= 8.40 Ha
e. Luas petak kuarter A5
A5a = 12.0 x 2000 . 21 x 2000
= 24000 . 42000
= 1008000000 cm2
= 100800 m2
= 10.08 Ha
f. Luas petak kuarter A6
A6 = 14.0 x 2000 . 21 x 2000
= 28000 . 42000
= 1176000000 cm2
= 117600 m2
= 11.76 Ha

e. Luas petak tersier 1


ƩA = A1 + A2 + A3 + A4 + A5 + A6
= 10.0 + 12.00 + 14.0 + 8.400 + 10.08 + 11.76
= 66.24 Ha
B. MENGHITUNG DEBIT RENCANA SALURAN KUARTER

Diketahui : A1 = 10.000 Ha
A2 = 12.000 Ha
A3 = 14.000 Ha
A4 = 8.400 Ha
A5 = 10.080 Ha
A6 = 11.760 Ha
NFR = 16.416 L/Hari
e = 0.8
Penyelesaian : Rumus yang digunakan, ialah :
NFR x A
Q =
e x 8.64
Maka :
NFR x A1 NFR x A4
Q1 = Q4 =
e x 8.64 e x 8.64
16.416 x 10.00 16.416 x 8.40
= =
0.8 x 8.64 0.8 x 8.64
164.16 137.89
= =
6.9 6.9
= 23.75 L/dtk = 19.95 L/dtk

NFR x A2 NFR x A5
Q2 = Q5 =
e x 8.64 e x 8.64
16.416 x 12.00 16.416 x 10.1
= =
0.8 x 8.64 0.8 x 8.64
196.99 165.47
= =
= =
6.9 6.9
= 28.50 L/dtk = 24 L/dtk

NFR x A3 NFR x A5
Q3 = Q6 =
e x 8.64 e x 8.64
16.416 x 14.00 16.416 x 11.8
= =
0.8 x 8.64 0.8 x 8.64
229.824 193.05
= =
6.9 6.9
= 33.25 L/dtk = 28 L/dtk

C. CONTOH PERHITUNGAN
I. SALURAN KUARTER (K1)
1. Daerah yang dialiri (Anetto)
Anetto = Abruto x 0.9
= 14.00 x 0.9
= 12.60 Ha
NFR = 16.416
dimana :
Abruto : luasan petak kuarter bruto

2. Debit rencana (Q)


NFR x Anetto Dimana :
Q =
e x 8.64 NFR= KebutuHan bersih air di sawah (mm/hr)
= 16.416 x 12.60 1
1mm/hari  l/det.ha
0.8 x 8.64 8,64
= 206.8416 e= Untuk saluran tersier
6.9 e = 0,775 – 0,850 ( diambil = 0.8
= 29.9 L/dtk
= 0.029925 m/dtk

c. Panjang Saluran, L
L = 14.0 x 2000 L = 8.1 cm diukur langsung
= 100 dari peta tata letak 1 : 2000
= 280 m
d. Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS)
Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS) ditentukan langsung
dari garis-garis kontur peta berdasarkan elevasi medan. Apabila ujung hilir atau udik
saluran terletak diantara kontur maka penentuan elevasinya diperoleh dengan cara
interpolasi linier.
EHS = 14.43 m
EUS = 14.91 m

e. Elevasi muka air sesuai medan ( MAHr dan MAUm )


MAHr = EHS + 0.1 + 0.05
= 14.43 + 0.1 + 0.05
= 14.58 m
MAUm = EUS + 0.1 + 0.05
= 14.91 + 0.1 + 0.05
= 15.06 m

f. Kemiringan medan yang ada (Im).


Im = MAUm - MAHr - ΔH1 Dimana : ΔH1 = 0
L
= 15.060 - 14.580 - 0
280
= 0.00171

g. Kemiringan rencana ( Ir )
Dari gambar 1.2 grafik perencanaan untuk saluran tanpa pasangan dengan k = 30
Q= 29.9 L/dtk dan Im= 0.00171
Karena Hasil plot berada di antara garis putus-putus dan garis v min maka
Ir = 0.00171

h. Menentukan lebar saluran (b)


Dipilih lebar dasar saluran yang terletak disebelah kanan dari titik plot Q
Sesuai tabel .3 lebar dasar minimum yaitu:
b= 0.3 m
i. Menghitung nilai F
F = Q
Ir1/2
= 0.030
0.041404
= 0.72 m
j. Menentukan Tinggi saluran (h)
Nilai h didapat dengan interpolasi Dari tabel 5 dimensi saluran, maka :
h= 0.210 m
k. Menghitung tinggi jagaan (w)
w = b + 0.25 x h
= 0.30 + 0.25 x 0.210
= 0.35 m
l. Menghitung Luas penampang basah (A)
A = b. h + z.h2 Dimana : z = 1
= 0.063 + 0.044
= 0.11 m2
m. Menghitung keliling basah (P)
P = b + 2h 1 + z2
= 0.3 + 0.42 1 + 1
= 0.3 + 0.59397
= 0.89 m
n. Menghitung jari - jari hidrolis (R)
R = A
P
= 0.107
0.894
= 0.12 m
o. Menghitung kecepatan rencana aliran (Vr)
Vr = k x R2/3 x Ir1/2 Dimana : K = 30
= 30 x 0.243021 x 0.041404
= 0.302 m/dtk
p. Menghitung muka air udik rencana (MAUr)
MAUr = MAHr + Ir . L + ΔH1
= 14.58 + 0.48 + 0
= 15.06 m
q. Menghitung kehilangan tinggi energi dibangunan petak tersier (ΔH2)
ΔH2 = MAUr - MAHr - Ir . L - ΔH1
= 15.06 - 14.58 - 0.48 - 0
= 0.000 m

Syarat : Vmin ≤ Vr ≤ Vmaks


0.200 ≤ 0.302 ≤ 0.578

II. SALURAN TERSIER (T1-T2)

a. Daerah yang dialiri (Anetto)


Anetto = Abruto x 0.9
= 26.0 x 0.9
= 23.40 Ha

b. Debit rencana (Q)


NFR x Anetto Dimana : NFR = 16.416 l/Hari
Q =
e x 8.64 e = 0.8
= 16.416 x 23.40
0.8 x 8.64
= 384.1344
6.9
= 55.6 L/dtk
= 0.055575 m/dtk

c. Panjang Saluran, L (T1-T2)


L = 26 x 2000
= 100
= 520 m

d. Menentukan Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS),
berdasarkan peta topografi
EHS = 15.410 m
EUS = 16.340 m

e. Elevasi muka air sesuai medan ( MAHr dan MAUm )


MAHr = EHS + 0.1 + 0.05
= 15.41 + 0.1 + 0.05
= 15.560 m
MAUm = EUS + 0.1 + 0.05
= 16.340 + 0.1 + 0.05
= 16.490

f. Kemiringan medan yang ada (Im).


Im = MAUm - MAHr - ΔH1 Dimana : ΔH1 = 0
L
= 16.490 - 15.560 - 0.0
520
= 0.0018
g. Kemiringan rencana ( Ir )
Dari gambar 1.2 grafik perencanaan untuk saluran tanpa pasangan dengan k = 50
Q= 55.6 L/dtk dan Im= 0.0018
Karena Hasil plot berada di antara garis putus-putus dan garis vmin maka
Ir = Im = 0.0018
h. Menghitung nilai F
F = Q
Ir1/2
= 0.055575
0.04229
= 1.314 m

i. Menentukan lebar saluran (b)


b = 0.30 m

j. Menentukan inggi saluran (h)


Dari Hasil interpolasi tabel 5 dengan nilai F diperoleh nilai h :
h= 0.22 m

k. Menghitung tinggi jagaan (w)


w = b + 0.25 x h
= 0.3000 + 0.25 x 0.220
= 0.36 m

k. Menghitung Luas penampang basah (A)


A = b. h + z.h2 Dimana : z = 1
= 0.066 + 0.048
= 0.1144 m 2

l. Menghitung keliling basah (P)


P = b + 2h 1 + z2
= 0.300 + 0.44 1 + 1
= 0.300 + 0.622254
= 0.922 m

m. Menghitung jari - jari hidrolis (R)


R = A
P
= 0.11
0.92
= 0.12 m

n. Menghitung kecepatan rencana aliran (Vr)


Vr = K x R2/3 x Ir1/2 Dimana : K = 50
= 50 x 0.248724 x 0.04229
= 0.53 m/dtk

o. Menghitung muka air udik rencana (MAUr)


MAUr = MAHr + Ir . L + ΔH1
= 15.56 + 0.93 + 0
= 16.49 m

p. Menghitung kehilangan tinggi energi dibangunan petak tersier (ΔH2)


ΔH2 = MAUr - MAHr - Ir . L - ΔH1
= 16.49 - 15.56 - 0.93 - 0
= 0.000 m

Syarat : Vmin ≤ Vr ≤ Vmaks


0.200 ≤ 0.53 ≤ 3.00
Tabel Hasil Perhitungan Dimensi Saluran Tersier

Kebutuhan air bersih, NFR = 16.416 mm/hari

Efisiensi dipetak tersier, ept = 0.8

Kemiringan talud, z = 1

Koefisien Stikler, kpas = 50 m1/3/dtk

Abruto Anetto NFR QR L EHS EUS MAHr MAUm H1 b F h w n A P R Vr MAUr H2 Vmin Vmax
Sal. Im Ir Ket L
Ha Ha mm/hr L/det m m m m m m m m m m m 2
m m m/det m m m/det m/det

T2-K1 10.0 9.00 16.416 21.38 328 14.43 16.37 14.58 16.52 0.0 0.00591 0.00591 0.3 0.28 0.21 0.35 1.43 0.11 0.89 0.12 0.93 16.5 0 0.20 3.00 ###

T2-T1 12.0 10.80 16.416 25.65 404 15.41 16.34 15.56 16.49 0.0 0.00230 0.00230 0.3 0.53 0.22 0.36 1.36 0.11 0.92 0.12 0.60 16 0 0.20 3.00 ###

T1-BT 14.0 12.60 16.416 29.9 386 16.39 16.55 16.54 16.70 0.0 0.00041 0.00041 0.3 1.47 0.22 0.36 1.36 0.11 0.92 0.12 0.25 16.7 0 0.20 3.00

T4-K2 8.4 7.56 16.416 18.0 62 15.26 15.66 15.41 15.81 0.0 0.00645 0.00645 0.3 0.22 0.21 0.35 1.43 0.11 0.89 0.12 0.98 15.8 0 0.20 3.00

T4-T3 10.08 9.07 16.416 21.5 380 15.66 15.86 15.81 16.01 0.0 0.00053 0.00053 0.3 0.94 0.22 0.36 1.36 0.11 0.92 0.12 0.29 16.0 0 0.20 3.00

T3-BT 11.8 10.58 16.416 25.1 322 15.86 16.55 16.01 16.70 0.0 0.00214 0.00214 0.3 0.54 0.22 0.36 1.36 0.11 0.92 0.12 0.58 16.7 0 0.20 3.00

Dimana :

𝑄_𝑡=(𝑁𝐹𝑅𝑥𝐴_𝑛𝑒𝑡)/8,64 ℎ ( 𝑑𝑎𝑟𝑖 𝑡𝑎𝑏𝑒𝑙 ) 𝑣=𝑘𝑅^(2/3) 𝐼^(1/2)


〖𝑀𝐴𝐻〗 _𝑟= 𝐸𝐻𝑆+0,1+0,05 𝑤= 0,30+0,25ℎ 𝑀𝐴𝑈𝑟=𝑀𝐴𝐻𝑟+𝐼𝑟.𝐿+Δ𝐻1

〖𝑀𝐴𝑈〗 _𝑚= 𝐸𝑈𝑆+0,1+0,05 𝑛= 𝑏/ℎ ΔH2=𝑀𝐴𝑈𝑟−𝐼𝑟.𝐿− ΔH1−MAHr

𝐼_𝑚= ((MAUm – MAHr – ΔH1))/𝐿 𝐴=𝑏ℎ+𝑚ℎ^2  


Ir dan B dari grafik 𝑃=𝑏+2ℎ√(1+𝑚^2 )

𝐹=𝑄/ 〖𝐼𝑟〗 ^(1/2) 𝑅= 𝐴/𝑃


   
Irigasi dan Bangunan Air 1Fakultas Teknik. Universitas Tadulako

D. Menghitung Volume Galian dan Timbunan


1. Saluran Tersier
a. Daerah yang dialiri (Anetto)
Anetto = Abruto x 0.9
= ### x 0.9
= ### Ha

b. Debit rencana (Q)


NFR x Anetto Dimana : NFR = 16.8 mm/hari
Q =
e x 8.64 e = 0.8
16.8 x ###
=
0.8 x 8.64
2E+06
=
6.912
= 2E+05 L/dtk
= 220.5 m/dtk

c. Panjang Saluran, L (BBS - BT1)


L = 1 x 5000
= 100
= 50 m

d. Menentukan Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS), berdasarkan peta
topografi
EHS = 54.118 m
EUS = 54.447 m

e. Elevasi muka air sesuai medan ( MAHr dan MAUm )


MAHr = EHS + 0.1 + 0.05 MAUm = EUS + 0.1 + 0.05
= 54.118 + 0.1 + 0.05 = 54.447 + 0.1 + 0.05
= 54.268 m = 54.597 m

f. Kemiringan medan yang ada (Im).


MAUm - MAHr - ΔH1 Dimana : ΔH1 = 0
Im =
L
54.597 - 54.268 - 0
=
50
= 0.006580

Indra Purnama Putra " F 111 12 076 " Dimensi Saluran, C/12
Irigasi dan Bangunan Air 1Fakultas Teknik. Universitas Tadulako

g. Kemiringan rencana ( Ir )
Ir = Im = 0.00658

h. Menghitung nilai F
Q
F =
Ir1/2
220.5
=
0.0811
= 2718 m

i. Menentukan lebar saluran (b)


b = 0.006 m

j. Menentukan inggi saluran (h)


Dari hasil hasil perhitungan F dan K, dan hasil interpolasi diperoleh :
h = 0.278 m

k. Menghitung tinggi jagaan (w)


w = b + 0.25 x h
= 0.006 + 0.25 x 0.278
= 0.0754 m

k. Menghitung Luas penampang basah (A)


A = b. h + z.h2 Dimana : z = 1
= 0.002 + 0.077
= 0.079 m 2

i
l. Menghitung keliling basah (P)
P = b + 2h 1 + z2
= 0.006 + 0.5559 1 + 1
= 0.006 + 0.7861
= 0.792 m

m. Menghitung jari - jari hidrolis (R)


A
R =
P
0.079
=
0.792

Indra Purnama Putra " F 111 12 076 " Dimensi Saluran, C/13
Irigasi dan Bangunan Air 1Fakultas Teknik. Universitas Tadulako

= 0.100 m

n. Menghitung kecepatan rencana aliran (Vr)


Vr = K x R2/3 x Ir1/2 Dimana : K = 35
= 35 x 0.2149 x 0.0811
= 0.610 m/dtk

o. Menghitung muka air udik rencana (MAUr)


MAUr = MAHr + Ir . L + ΔH1
= 54.27 + 0.329 + 0
= 54.60 m

o. Menghitung kehilangan tinggi energi dibangunan petak tersier (ΔH 2)


ΔH2 = MAUr - MAHr - Ir . L - ΔH1
= 54.60 - 54.27 - 0.329 - 0
= 0.000 m

Syarat : Vmin ≤ Vr ≤ Vmaks


0.200 ≤ 0.610 ≤ 0.606 OKE…!!

Indra Purnama Putra " F 111 12 076 " Dimensi Saluran, C/14
Irigasi dan Bangunan Air 1Fakultas Teknik. Universitas Tadulako

2. Saluran Kuarter
a. Daerah yang dialiri (Anetto)
Anetto = Abruto x 0.9
= ### x 0.9
= ### Ha

b. Debit rencana (Q)


NFR x Anetto Dimana : NFR = 16.8 mm/hari
Q =
e x 8.64 e = 0.8
16.8 x ###
=
0.8 x 8.64
2E+10
=
6.912
= 2E+09 L/dtk
= 2E+06 m/dtk

c. Panjang Saluran, L (BBS - BT1)


L = 7 x 5000
= 100
= 350 m

d. Menentukan Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS), berdasarkan peta
topografi
EHS = 23.759 m
EUS = 26.674 m

e. Elevasi muka air sesuai medan ( MAHr dan MAUm )


MAHr = EHS + 0.1 + 0.05 MAUm = EUS + 0.1 + 0.05
= 23.759 + 0.1 + 0.05 = 26.674 + 0.1 + 0.05
= 23.909 m = 26.824 m

f. Kemiringan medan yang ada (Im).


MAUm - MAHr - ΔH1 Dimana : ΔH1 = 0
Im =
L
26.824 - 23.909 - 0
=

Indra Purnama Putra " F 111 12 076 " Dimensi Saluran, C/15
Irigasi dan Bangunan Air 1Fakultas Teknik. Universitas Tadulako

=
350
= 0.008329

g. Kemiringan rencana ( Ir )
Ir = Im = 0.00833

h. Menghitung nilai F
Q
F =
Ir1/2
2E+06
=
0.0913
= 2E+07 m

i. Menentukan lebar saluran (b)


b = 0.300 m

j. Menentukan inggi saluran (h)


Dari hasil hasil perhitungan F dan K, dan hasil interpolasi diperoleh :
h = 0.113 m

k. Menghitung tinggi jagaan (w)


w = b + 0.25 x h
= 0.300 + 0.25 x 0.113
= 0.3283 m

k. Menghitung Luas penampang basah (A)


A = b. h + z.h2 Dimana : z = 1
= 0.034 + 0.013
= 0.047 m 2

l. Menghitung keliling basah (P)


P = b + 2h 1 + z2
= 0.300 + 0.226 1 + 1
= 0.300 + 0.3196
= 0.620 m

m. Menghitung jari - jari hidrolis (R)


A
R =

Indra Purnama Putra " F 111 12 076 " Dimensi Saluran, C/16
Irigasi dan Bangunan Air 1Fakultas Teknik. Universitas Tadulako

R =
P
0.047
=
0.620
= 0.075 m

n. Menghitung kecepatan rencana aliran (Vr)


Vr = K x R2/3 x Ir1/2 Dimana : K = 30
= 30 x 0.1783 x 0.0913
= 0.488 m/dtk

o. Menghitung muka air udik rencana (MAUr)


MAUr = MAHr + Ir . L + ΔH1
= 23.91 + 2.915 + 0
= 26.82 m

o. Menghitung kehilangan tinggi energi dibangunan petak tersier (ΔH 2)


ΔH2 = MAUr - MAHr - Ir . L - ΔH1
= 26.82 - 23.91 - 2.915 - 0
= 0.000 m

Syarat : Vmin ≤ Vr ≤ Vmaks


0.200 ≤ 0.488 ≤ 0.521 OKE…!!

Indra Purnama Putra " F 111 12 076 " Dimensi Saluran, C/17
A. Menghitung petak - petak irigasi
1. luasan petak tersier 1
a. Luas petak kuarter A1
A1a = 7 x 5000 . 4 x 5000 ƩA1 = A1a + A1b
= 35000 . 20000 = 7 + 3.5
= 700000000 cm2 = 10.5 ha
= 70000 m 2

= 7.000 ha
A1b = 0.5 7 x 5000 . 4 x 5000
= 0.5 35000 . 20000
= 350000000 cm2
= 35000 m2 h. Lebar saluran (b)
= 3.5 ha Dari hasil plot antara nilai Im dan Q digra
b. Luas petak kuarter A2 b = 0.450
A2 = 7 x 5000 . 7 x 5000
= 35000 . 35000
= 1225000000 cm2
= 122500 m2
= 12.250 ha 2. Saluran tersier 2
c. Luas petak kuarter A3 a.
A3a = 8 x 5000 . 7 x 5000 ƩA3 = A3a + A3b
= 40000 . 35000 = 14.000 + 3.000
= 1400000000 cm 2
= 17.00 ha
= 140000 m2
= 14.000 ha b.
A3b = 0.5 8 x 5000 . 3 x 5000
= 0.5 40000 . 15000
= 300000000 cm2
= 30000 m2
= 3.000 ha
d. Luas petak kuarter A4
A4 = 8 x 5000 . 7 x 5000
= 40000 . 35000
= 1400000000 cm2
= 140000 m2 c.
= 14.000 ha
e. luas petak tersier 1
ƩA = A1 + A2 + A3 + A4
= 10.5 + 12.250 + 17.000 + 14.000
= 53.750 ha
d.

2. luasan petak tersier 2


a. Luas petak kuarter A1
A1a = 6 x 5000 . 8 x 5000 ƩA1 = A1a + A1b
= 30000 . 40000 = 12.000 + 1.500 e.
= 1200000000 cm 2
= 13.50 ha
= 120000 m2
= 12.000 ha
A1b = 0.5 6 x 5000 . 2 x 5000
= 0.5 30000 . 10000 f.
= 150000000 cm2
= 15000 m2
= 1.500 ha
b. Luas petak kuarter A2
A2 = 7 x 5000 . 8 x 5000
= 35000 . 40000
= 1400000000 cm2 g.
= 140000 m 2

= 14.000 ha
c. Luas petak kuarter A3 h.
A3 = 6 x 5000 . 10 x 5000
= 30000 . 50000
= 1500000000 cm2
= 150000 m2
= 15.000 ha
d. Luas petak kuarter A4
A4a = 6 x 5000 . 4.5 x 5000 ƩA4 = A4a + A4b i.
= 30000 . 22500 = 6.750 + 2.625
= 675000000 cm2 = 9.38 ha
= 67500 m 2
j.
= 6.750 ha
A4b = 0.5 6 x 5000 . 3.5 x 5000
= 0.5 30000 . 17500
= 262500000 cm2 k.
= 26250 m2
= 2.625 ha
e. Luas petak kuarter A5
A5a = 0.5 6 x 5000 . 4.0 x 5000 ƩA5 = A5a + A5b + A5c
= 0.5 30000 . 20000 = 3.000 + 9.000 k.
= 300000000 cm 2
= #REF! ha
= 30000 m2
= 3.000 ha

A5b = 6 x 5000 . 6 x 5000 l.


= 30000 . 30000
= 900000000 cm2
= 90000 m2
= 9.000 ha
A5c = 0.5 6 x 5000 . 1 x 5000
= 0.5 30000 . 5000 m.
= 75000000 cm2
= 7500 m2
= 0.750 ha
f. Luas petak kuarter A6
A6a = 6 x 5000 . 4.5 x 5000 ƩA6 = A6a + A6b
= 30000 . 22500 = 6.750 + 3.000
= 675000000 cm2 = 9.75 ha
= 67500 m 2

= 6.750 ha
A6b = 0.5 6 x 5000 . 4.0 x 5000 n.
= 0.5 30000 . 20000
= 300000000 cm2
= 30000 m2
= 3.000 ha
g. Luas petak kuarter A7 o.
A7 = 6 x 5000 . 7 x 5000
= 30000 . 35000
= 1050000000 cm2
= 105000 m2
= 10.500 ha o.
h. Luas petak kuarter A8
A8 = 6 x 5000 . 8.5 x 5000
= 30000 . 42500
= 1275000000 cm2
= 127500 m2 p.
= 12.750 ha
i. luas petak tersier 2
ƩA = A1 + A2 + A3 + A4 + A5 + A6 + A7 + A8
= 13.50 + 14 + 15 + 9.375 + #REF! + 9.750 + 10.500 +
= #REF! ha q.

3. Saluran kuarter 1
a.

b.
c.

d.

e.

f.

g.

h.

i.
j.

k.

k.

l.

m.

n.

o.
o.

p.

q.
C. Menghitung dimensi
1. Saluran tersier 1
a. Daerah yang di
Anetto

b h F A
m m k=35 k=30 m2 b. Debit rencana (
0.3000 0.2500 1.276 1.094 0.138
Q
0.3000 0.2600 1.387 1.181 0.146

ntara nilai Im dan Q digrafik perencanaan saluran petak tersier didapat

q. Menghitung kecepatan kritis aliran (Vmin)


Vmin = 0.550 x h0,64

c. Panjang Salura
Saluran tersier 2 L
Daerah yang dialiri (Anetto)
Anetto = Abruto x 0.9
= ### x 0.9
= ### Ha
d. Menentukan El
Debit rencana (Q) topografi
NFR x Abruto Dimana : NFR = 16.8 mm/hari EHS
Q =
e x 8.64 e = 0.8 EUS
16.8 x Err:509
=
0.8 x 8.64 e. Elevasi muka a
### MAHr
=
6.912
= ### L/dtk
= ### L/dtk
f. Kemiringan me
Panjang Saluran, L (BBS - BT1)
Im
L = 34 x 5000
= 100
= 1700 m
Menentukan Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS), berdasarkan peta g. Kemiringan ren
topografi Ir
EHS = 51.712 m
EUS = 54.447 m h. Menghitung nil

F
Elevasi muka air sesuai medan ( MAHr dan MAUm )
MAHr = EHS + 0.1 + 0.05 MAUm = EUS + 0.1 + 0.05
= 51.712 + 0.1 + 0.05 = 54.447 + 0.1 + 0.05
= 51.86 m = 54.60 m

Kemiringan medan yang ada (Im). i. Menentukan le


MAUm - MAHr - ΔH1 Dimana : ΔH1 = 0 Dari hasil plot a
Im =
L b=
54.60 - 51.86 - 0 j. Menentukan in
=
1700 Dari hasil hasil
= 0.001609 h=

Kemiringan rencana ( Ir ) k. Menghitung tin


Ir = Im = 0.00160882 w

Menghitung nilai F
Q
F =
Ir1/2 k. Menghitung Lu
### A
=
0.0401
= ### m

Menentukan lebar saluran (b) l. Menghitung ke


Dari hasil plot antara nilai Im dan Q digrafik perencanaan saluran petak tersier didapat P
b= 0.200 m
Menentukan inggi saluran (h)
Dari hasil hasil perhitungan F dan K, dan hasil interpolasi diperoleh :
h= 0.126 m
m. Menghitung jar
Menghitung tinggi jagaan (w)
R
w = b + 0.25 x h
= 0.200 + 0.25 x 0.126
= 0.2314 m

Menghitung Luas penampang basah (A)


A = b. h + z.h2 Dimana : z = 1 n. Menghitung ke
= 0.025 + 0.016 Vr
= 0.041 m 2

Menghitung keliling basah (P)


P = b + 2h 1 + z2 o. Menghitung mu
= 0.200 + 0.251 1 + 1 MAUr
= 0.200 + 0.35497
= 0.555 m

Menghitung jari - jari hidrolis (R) o. Menghitung ke


A ΔH2
R =
P
0.041
=
0.555
= 0.074 m p. Menghitung ke
Vmaks

Menghitung kecepatan rencana aliran (Vr) q. Menghitung ke


Vr = K x R2/3 x Ir1/2 Dimana : K = 35 Vmin
= 35 x 0.1756 x 0.0401
= 0.247 m/dtk

Menghitung muka air udik rencana (MAUr) Syarat :


MAUr = MAHr + Ir . L + ΔH1
= 51.86 + 2.735 + 0
= 54.60 m

Menghitung kehilangan tinggi energi dibangunan petak tersier (ΔH 2)


ΔH2 = MAUr - MAHr - Ir . L - ΔH1
= 54.60 - 51.86 - 2.735 - 0
= 0.000 m
Menghitung kecepatan maksimum aliran (Vmaks)
Vmaks = 0.750 x h1/6
= 0.750 x 0.70758
= 0.531 m

Menghitung kecepatan kritis aliran (Vmin) Saluran tersier 2


Vmin = 0.550 x h0,64 a. Daerah yang di
= 0.550 x 0.26493 Anetto
= 0.146 m/dtk

Syarat : Vmin ≤ Vr ≤ Vmaks


0.146 ≤ 0.247 ≤ 0.531 OKE…!! b. Debit rencana (

c. Panjang Salura
L
Saluran kuarter 1, tersier 1
Daerah yang dialiri (Anetto)
Anetto = Abruto x 0.9
= 10.00 x 0.9
= 9.00 Ha d. Menentukan El
topografi
Debit rencana (Q) EHS
NFR x Abruto Dimana : NFR = 16.8 mm/hari EUS
Q =
e x 8.64 e = 0.8
16.8 x 9.00 e. Elevasi muka a
=
0.8 x 8.64 MAHr
151.2
=
6.912
= 21.875 L/dtk
= 0.0219 L/dtk f. Kemiringan me

Im
Panjang Saluran, L (BBS - BT1)
L = 7 x 5000
= 100
= 350 m

g. Kemiringan ren
Menentukan Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS), berdasarkan peta Ir
topografi
EHS = 53.300 m h. Menghitung nil
EUS = 54.118 m
F

Elevasi muka air sesuai medan ( MAHr dan MAUm )


MAHr = EHS + 0.1 + 0.05 MAUm = EUS + 0.1 + 0.05
= 53.3 + 0.1 + 0.05 = 54.118 + 0.1 + 0.05
= 53.450 m = 54.268 m
i. Menentukan le
Kemiringan medan yang ada (Im). Dari hasil plot a
MAUm - MAHr - ΔH1 Dimana : ΔH1 = 0 b=
Im =
L j. Menentukan in
54.268 - 53.450 - 0 Dari hasil hasil
=
350 h=
= 0.002337
k. Menghitung tin
w
Kemiringan rencana ( Ir )
Ir = Im = 0.00233714

Menghitung nilai F k. Menghitung Lu


Q A
F =
Ir1/2
0.0219
=
0.0483
= 0.4525 m l. Menghitung ke
P
Menentukan lebar saluran (b)
Dari hasil plot antara nilai Im dan Q digrafik perencanaan saluran petak tersier didapat
b= 0.200 m
Menentukan inggi saluran (h)
Dari hasil hasil perhitungan F dan K, dan hasil interpolasi diperoleh : m. Menghitung jar
h= 0.126 m
R

Menghitung tinggi jagaan (w)


w = b + 0.25 x h
= 0.200 + 0.25 x 0.126
= 0.2314 m

Menghitung Luas penampang basah (A)


A = b. h + z.h2 Dimana : z = 1
= 0.025 + 0.016 n. Menghitung ke
= 0.041 m2 Vr

Menghitung keliling basah (P)


P = b + 2h 1 + z2
= 0.200 + 0.251 1 + 1 o. Menghitung mu
= 0.200 + 0.35497 MAUr
= 0.555 m

Menghitung jari - jari hidrolis (R)


A o. Menghitung ke
R =
P ΔH2
0.041
=
0.555
= 0.074 m
p. Menghitung ke
Menghitung kecepatan rencana aliran (Vr) Vmaks
Vr = K x R2/3 x Ir1/2 Dimana : K = 35
= 35 x 0.1756 x 0.0483
= 0.297 m/dtk
q. Menghitung ke
Menghitung muka air udik rencana (MAUr) Vmin
MAUr = MAHr + Ir . L + ΔH1
= 53.45 + 0.818 + 0
= 54.27 m
Syarat :
Menghitung kehilangan tinggi energi dibangunan petak tersier (ΔH 2)
ΔH2 = MAUr - MAHr - Ir . L - ΔH1
= 54.27 - 53.45 - 0.818 - 0
= 0.000 m

Menghitung kecepatan maksimum aliran (Vmaks)


Vmaks = 0.750 x h1/6
= 0.750 x 0.70758
= 0.531 m

Menghitung kecepatan kritis aliran (Vmin)


Vmin = 0.550 x h0,64
= 0.550 x 0.26493 Saluran kuarter 1, t
= 0.146 m/dtk a. Daerah yang di
Anetto
Syarat : Vmin ≤ Vr ≤ Vmaks
0.146 ≤ 0.297 ≤ 0.531 OKE…!!

b. Debit rencana (

c. Panjang Salura
L

d. Menentukan El
topografi
EHS
EUS
e. Elevasi muka a
MAHr

f. Kemiringan me

Im

g. Kemiringan ren
Ir

h. Menghitung nil

i. Menentukan le
Dari hasil plot a
b=
j. Menentukan in
Dari hasil hasil
h=

k. Menghitung tin
w

k. Menghitung Lu
A
l. Menghitung ke
P

m. Menghitung jar

n. Menghitung ke
Vr

o. Menghitung mu
MAUr

o. Menghitung ke
ΔH2

p. Menghitung ke
Vmaks

q. Menghitung ke
Vmin
Syarat :
Menghitung dimensi saluran tersier
Saluran tersier 1
Daerah yang dialiri (Anetto)
Anetto = Abruto x 0.9
= ### x 0.9
= ### Ha

Debit rencana (Q)


NFR x Abruto Dimana : NFR = 16.8 mm/hari
=
e x 8.64 e = 0.8
16.8 x ###
=
0.8 x 8.64
2E+06
=
6.912
= 2E+05 L/dtk
= 220.5 L/dtk

Panjang Saluran, L (BBS - BT1)


= 1 x 5000
= 100
= 50 m

Menentukan Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS), berdasarkan peta
topografi
EHS = 54.118 m
EUS = 54.447 m

Elevasi muka air sesuai medan ( MAHr dan MAUm )


MAHr = EHS + 0.1 + 0.05 MAUm = EUS + 0.1 + 0.05
= 54.118 + 0.1 + 0.05 = 54.447 + 0.1 + 0.05
= 54.268 m = 54.597 m

Kemiringan medan yang ada (Im).


MAUm - MAHr - ΔH1 Dimana : ΔH1 = 0
=
L
54.597 - 54.268 - 0
=
50
= 0.006580

Kemiringan rencana ( Ir )
= Im = 0.00658

Menghitung nilai F
Q
=
Ir1/2
220.5
=
0.0811
= 2718 m

Menentukan lebar saluran (b)


Dari hasil plot antara nilai Im dan Q digrafik perencanaan saluran petak tersier didapat
0.200 m
Menentukan inggi saluran (h)
Dari hasil hasil perhitungan F dan K, dan hasil interpolasi diperoleh :
0.126 m

Menghitung tinggi jagaan (w)


= b + 0.25 x h
= 0.200 + 0.25 x 0.126
= 0.2314 m

Menghitung Luas penampang basah (A)


= b. h + z.h2 Dimana : z = 1
= 0.025 + 0.016
= 0.041 m2

Menghitung keliling basah (P)


= b + 2h 1 + z2
= 0.200 + 0.251 1 + 1
= 0.200 + 0.355
= 0.555 m

Menghitung jari - jari hidrolis (R)


A
=
P
0.041
=
0.555
= 0.074 m

Menghitung kecepatan rencana aliran (Vr)


= K x R2/3 x Ir1/2 Dimana : K = 35
= 35 x 0.1756 x 0.0811
= 0.499 m/dtk

Menghitung muka air udik rencana (MAUr)


MAUr = MAHr + Ir . L + ΔH1
= 54.27 + 0.329 + 0
= 54.60 m

Menghitung kehilangan tinggi energi dibangunan petak tersier (ΔH 2)


ΔH2 = MAUr - MAHr - Ir . L - ΔH1
= 54.60 - 54.27 - 0.329 - 0
= 0.000 m

Menghitung kecepatan maksimum aliran (Vmaks)


Vmaks = 0.750 x h1/6
= 0.750 x 0.7076
= 0.531 m

Menghitung kecepatan kritis aliran (Vmin)


Vmin = 0.550 x h0,64
= 0.550 x 0.2649
= 0.146 m/dtk

Syarat : Vmin ≤ Vr ≤ Vmaks


0.146 ≤ 0.499 ≤ 0.531 OKE…!!
Saluran tersier 2
Daerah yang dialiri (Anetto)
Anetto = Abruto x 0.9
= ### x 0.9
= ### Ha

Debit rencana (Q)


NFR x Abruto Dimana : NFR = 16.8 mm/hari
=
e x 8.64 e = 0.8
16.8 x ###
=
0.8 x 8.64
###
=
6.912
= ### L/dtk
= ### L/dtk

Panjang Saluran, L (BBS - BT1)


= 34 x 5000
= 100
= 1700 m

Menentukan Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS), berdasarkan peta
topografi
EHS = 51.712 m
EUS = 54.447 m

Elevasi muka air sesuai medan ( MAHr dan MAUm )


MAHr = EHS + 0.1 + 0.05 MAUm = EUS + 0.1 + 0.05
= 51.712 + 0.1 + 0.05 = 54.447 + 0.1 + 0.05
= 51.86 m = 54.60 m
Kemiringan medan yang ada (Im).
MAUm - MAHr - ΔH1 Dimana : ΔH1 = 0
=
L
54.60 - 51.86 - 0
=
1700
= 0.001609

Kemiringan rencana ( Ir )
= Im = 0.0016088

Menghitung nilai F
Q
=
Ir1/2
###
=
0.0401
= ### m

Menentukan lebar saluran (b)


Dari hasil plot antara nilai Im dan Q digrafik perencanaan saluran petak tersier didapat
0.200 m
Menentukan inggi saluran (h)
Dari hasil hasil perhitungan F dan K, dan hasil interpolasi diperoleh :
0.126 m

Menghitung tinggi jagaan (w)


= b + 0.25 x h
= 0.200 + 0.25 x 0.126
= 0.2314 m

Menghitung Luas penampang basah (A)


= b. h + z.h2 Dimana : z = 1
= 0.025 + 0.016
= 0.041 m 2

Menghitung keliling basah (P)


= b + 2h 1 + z2
= 0.200 + 0.251 1 + 1
= 0.200 + 0.355
= 0.555 m

Menghitung jari - jari hidrolis (R)


A
=
P
0.041
=
0.555
= 0.074 m

Menghitung kecepatan rencana aliran (Vr)


= K x R2/3 x Ir1/2 Dimana : K = 35
= 35 x 0.1756 x 0.0401
= 0.247 m/dtk

Menghitung muka air udik rencana (MAUr)


MAUr = MAHr + Ir . L + ΔH1
= 51.86 + 2.735 + 0
= 54.60 m

Menghitung kehilangan tinggi energi dibangunan petak tersier (ΔH 2)


ΔH2 = MAUr - MAHr - Ir . L - ΔH1
= 54.60 - 51.86 - 2.735 - 0
= 0.000 m

Menghitung kecepatan maksimum aliran (Vmaks)


Vmaks = 0.750 x h1/6
= 0.750 x 0.7076
= 0.531 m

Menghitung kecepatan kritis aliran (Vmin)


Vmin = 0.550 x h0,64
= 0.550 x 0.2649
= 0.146 m/dtk

Syarat : Vmin ≤ Vr ≤ Vmaks


0.146 ≤ 0.247 ≤ 0.531 OKE…!!

Saluran kuarter 1, tersier 1


Daerah yang dialiri (Anetto)
Anetto = Abruto x 0.9
= 10.00 x 0.9
= 9.00 Ha

Debit rencana (Q)


NFR x Abruto Dimana : NFR = 16.8 mm/hari
=
e x 8.64 e = 0.8
16.8 x 9.00
=
0.8 x 8.64
151.2
=
6.912
= 21.875 L/dtk
= 0.0219 L/dtk

Panjang Saluran, L (BBS - BT1)


= 7 x 5000
= 100
= 350 m

Menentukan Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS), berdasarkan peta
topografi
EHS = 53.300 m
EUS = 54.118 m
Elevasi muka air sesuai medan ( MAHr dan MAUm )
MAHr = EHS + 0.1 + 0.05 MAUm = EUS + 0.1 + 0.05
= 53.3 + 0.1 + 0.05 = 54.118 + 0.1 + 0.05
= 53.450 m = 54.268 m

Kemiringan medan yang ada (Im).


MAUm - MAHr - ΔH1 Dimana : ΔH1 = 0
=
L
54.268 - 53.450 - 0
=
350
= 0.002337

Kemiringan rencana ( Ir )
= Im = 0.0023371

Menghitung nilai F
Q
=
Ir1/2
0.0219
=
0.0483
= 0.4525 m

Menentukan lebar saluran (b)


Dari hasil plot antara nilai Im dan Q digrafik perencanaan saluran petak tersier didapat
0.200 m
Menentukan inggi saluran (h)
Dari hasil hasil perhitungan F dan K, dan hasil interpolasi diperoleh :
0.126 m

Menghitung tinggi jagaan (w)


= b + 0.25 x h
= 0.200 + 0.25 x 0.126
= 0.2314 m

Menghitung Luas penampang basah (A)


= b. h + z.h2 Dimana : z = 1
= 0.025 + 0.016
= 0.041 m2

Menghitung keliling basah (P)


= b + 2h 1 + z2
= 0.200 + 0.251 1 + 1
= 0.200 + 0.355
= 0.555 m

Menghitung jari - jari hidrolis (R)


A
=
P
0.041
=
0.555
= 0.074 m

Menghitung kecepatan rencana aliran (Vr)


= K x R2/3 x Ir1/2 Dimana : K = 35
= 35 x 0.1756 x 0.0483
= 0.297 m/dtk

Menghitung muka air udik rencana (MAUr)


MAUr = MAHr + Ir . L + ΔH1
= 53.45 + 0.818 + 0
= 54.27 m

Menghitung kehilangan tinggi energi dibangunan petak tersier (ΔH 2)


ΔH2 = MAUr - MAHr - Ir . L - ΔH1
= 54.27 - 53.45 - 0.818 - 0
= 0.000 m

Menghitung kecepatan maksimum aliran (Vmaks)


Vmaks = 0.750 x h1/6
= 0.750 x 0.7076
= 0.531 m

Menghitung kecepatan kritis aliran (Vmin)


Vmin = 0.550 x h0,64
= 0.550 x 0.2649
= 0.146 m/dtk

Syarat : Vmin ≤ Vr ≤ Vmaks


0.146 ≤ 0.297 ≤ 0.531 OKE…!!
b h F A
2
m m k=35 k=30 m
0.3000 0.2500 1.276 1.094 0.138
0.3000 0.2600 1.387 1.181 0.146
TABEL PERHITUNGAN VOLUME GALIAN DAN TIMBUNAN

LUAS LUAS RATA-RATA VOLUME


PATOK JARAK (m)
GALIAN (m2) TIMBUNAN (m2) GALIAN (m2) TIMBUNAN (m2) GALIAN (m3) TIMBUNAN (m3)

BT1 0.291 1.558


0.230 1.527 50 11.506 76.363
T1 0.169 1.497
0.131 1.850 100 6.538 92.506
P1 0.092 2.204
0.046 3.537 100 2.306 176.844
P2 0.000 4.870
0.000 4.899 100 0.000 244.931
P3 0.000 4.927
0.080 3.214 119 4.000 160.681
T2 0.160 1.500
0.080 2.928 100 4.000 146.419
P4 0.000 4.357
0.025 3.193 100 1.250 159.663
P5 0.050 2.030
0.087 1.746 128 4.363 87.319
T3 0.125 1.463
0.062 3.026 100 3.113 151.313
P6 0.000 4.590
0.000 3.854 100 0.000 192.713
P7 0.000 3.119
0.062 2.291 123.8 3.113 114.550
T4 0.125 1.463
JUMLAH 1120.8 40.188 1603.300