Partikel padat yg terbawa liran akan mengalir di antara plat, lalu menempel plat,
semakin lama yang menempel akan banyak pada plat, lalu jatuh mengendap di
dasar sedimentasi.
Gambarnya
[AUTHOR NAME] 1
Direncanakan :
Tebal plat (
t plat ) = 0,5 cm (0,005 m)
Jarak antara plat settler dengan ruang lumpur adalah 1,2 meter ( l PS−RU )
W
Plate settler C
B
WP D
V
H
VS
A E
Plate Settler
[AUTHOR NAME] 2
Perhitungan,
Maka :
0,2 m 3 /dtk
q bak = =0,1 m 3 /dtk
2
[AUTHOR NAME] 3
v0
=4,8
Q
( )
A
v 0 =4,8 x ( QA )→v = QA
s
Maka,
v 0 =4,8 x v s
v0
v s=
4,8
0 , 002 m/dtk
v s= =0 ,000417 m/dtk
4,8
[AUTHOR NAME] 4
H w
L AB= [ ][ ]+
sin α tan α
86 cm 8 cm
L AB=
[ ][ ] +
sin 600 tan 600
=105 cm
Zona pengendapan
Luas zona pengendapan (A)
Q w
vs=
( )( x
A zp h cosα + w cos2 α )
0,1 m3 /dtk 0 , 08 m
0 , 000417 m/dtk=
( A zp )(x
1,0 mcos60 + 0 , 08 cmcos 2 600
0 )
2
A zp =36 m
Dimensi zona pengendapan
P zp : L zp =5 :1
A zp =Pzp x L zp → A=5 x L
zp 2
Maka ;
0. 5
A
[ ]
Lzp = zp
5
0. 5
36 m2
Lzp = [ ]
5
=2,7 m
Pzp =5 x L zp
[AUTHOR NAME] 5
Pzp =5 x 2,7 m=13 ,5 m
( P zp x sin α )
n plat = [ w ] +1
13 , 5 m x sin 600 )
n plat = [ (
0 , 08 m ]
+1=146 , 13≈146 buah
Pzp=13,5 m +0,84 m
Pzp=14 ,34 m=14 ,5 m
[AUTHOR NAME] 6
Kecepatan aliran dalam plat ( v a )
Panjang plat (
P plat =Lzp ) = 2,7 m
Q plate
v a= → A=P plat x w
A sin α
2
A=2,7 m x 0 ,08 m=0,21 m
0 ,00070 m3 /dtk
v a= =0 ,0038 m/dtk
0 , 21 m2 sin 600
Kontrol aliran
Jari-jari hidrolis (R)
w plat x w
R=
2 x ( w plat +w )
1,0 m x 0 ,08 m
R= =0, 037 m
2 x ( 1,0 m + 0,08 m)
Bilangan Reynold ( N Re )
Viskositas kinematis pada 25 0C (υ) : 0,9055 x 10-6 m2/dtk
Percepatan gravitasi (g) : 9,81 m/dtk2
v a ×R
N Re=
υ
0 , 0038 m/dtk x 0 , 037 m
N Re=
0 , 9055 x 10−6 m2 /dtk
N Re=155 ,540 < 2000 (Memenuhi Syarat)
Bilangan Froude ( N Fr )
v
a2
N Fr =
g×R
( 0 , 0038 m/dtk )2
N Fr =
9 , 81 m/dtk 2 x 0 , 037 m
N Fr =3 , 98 x 10−5 > 10-5 (Memenuhi Syarat)
[AUTHOR NAME] 7
3. Sistem Inlet Bak Sedimentasi
Sistem inlet pada bak sedimentasi terdiri dari saluran inlet dan zona inlet.
Saluran Inlet
Saluran inlet pada sedimentasi juga berfungsi sebagai outlet pada unit
flokulasi, maka saluran ini telah dibahas pada saluran outlet pada perhitungan unit
flokulasi.
Direncanakan,
PZP = (1 2 x h ) + ( h x cos 60 )
ZP ZP
1
PZP =( x 1 , 032 m ) + ( 1 , 032 x cos 60 )=103 m
2
4. Zona outlet
Perhitungan sistem outlet pada bak sedimentasi terdiri dari perhitungan
gutter, pelimpah.
Pelimpah
Direncanakan,
Pelimpah pada gutter merupakan weir bergerigi (V-notch)
Sudut V-notch = 900
Panjang pelimpah = Panjang zona pengendap = 13,3 m
Cd = 0,6
Beban maks pelimpah(hpelimpah) = (3,85-15) m3/m.jam (7 m3/m.jam)
Lebar V-Notch :=10 cm = 0,1 m
[AUTHOR NAME] 8
Gambar 5.13 Sketsa Pelimpah V-Notch
Perhitungan,
Panjang pelimpah (Ppelimpah)
Q
P pe lim pah=
( h pelim pah )
0,1 m3 /dtk
P pe lim pah=
(
7 m3 /m. jam )
x 3600 dtk / jam
P pe lim pah=51 ,4 m
51,4 m
=(
13 ,3 m )
n Pe lim pah
0,1 m3 /dtk
q pelim pah = =0 , 025 m3 /dtk
4
[AUTHOR NAME] 9
Q pelim pah
h pe lim pah=
( P pe lim pah )
0 , 025 m3 /dtk
h pe lim pah= (
13 , 5 m )
x 3600 dtk / jam
3
h pe lim pah=7 m /m. jam (Memenuhi Syarat)
13,5 m
=(
0,1 m )
nV −notch −2
nV −notch=133 buah
0,0002 m3 /dtk 2
hair =
( 8
15
x0,6 x √ 2.9,81x tan
600
2
) 5
[AUTHOR NAME] 10
Tinggi freeboard pada V-notch (hfreeboard)
h freeboard =hair x 20 %
h freeboard =0, 036 m x 20%
h freeboard =0 , 0071 m
Gutter
Direncanakan,
Bentuk gutter = Persegi panjang
Lebar gutter (
Lgutter ) = 0,3 m
Panjang gutter (
Pgutter =Pzp ) = 13,5 m
1 gutter = 2 pelimpah
Perhitungan,
Jumlah gutter (
n gutter )
n pe lim pah 4
n gutter = ( 2 )()
=
2
=2 buah
0,1 m3 /dtk
q gutter = =0 , 052 m3 /dtk
2
[AUTHOR NAME] 11
Ketinggian air pada gutter ( hair )
2/3
q gutter
hair =
(
1 ,38 x Lgutter )
2/3
0 , 052 m3 /dtk
hair = (
1 , 38 x 0,3 m ) =0 , 25 m
Ketinggian freeboard (
h freeboard )
Tinggi gutter (
h gutter )
A gutter=Lgutter x hair
2
A gutter =0,3 m x 0 , 25 m=0 ,075 m
Slope gutter (
S gutter )
2
q gutter x n
S gutter =
( A gutter x ( R gutter )2 /3 )
2
0 , 052 m3 /dtk x 0 , 013
S gutter =
( 2
0 , 075 m x ( 0,1 m ) 2 2/3 ) =0 ,0019 m/m
[AUTHOR NAME] 12
Hl gutter=P gutter x S gutter
Hl gutter =13 , 3 m x 0 ,0019 m/m=0 ,025 m
5. Zona lumpur
Direncankan,
Bentuk limas segitiga terpancung
Perhitungan,
[AUTHOR NAME] 13
V lumpur =qkompartemen x td x S s
86400 dtk
(
V lumpur =0 , 025 m3 / dtk x 1 hr x
1 hr ) x 5000 cm /m
3 3
3
V lumpur =10,8 m
3 V RL
h RL =
P RL x LRL
3 x 10 ,8 m3
h RL = =3,6 m
13 , 3 2 ,67
( ) ( )
2
mx
2
m
7. Sistem Pengurasan
Direncanakan,
Lama pengurasan (
td pengurasan ) = 1 hari
Cd = 0,6
Diameter pipa (
φ pengurasan ) = 250 mm (0,25 m) =10” (inch)
Volume lumpur (
V lumpur ) = 10,8 m3
Jarak antara plat settler dengan ruang lumpur adalah 1 meter ( lPS−RL )
Perhitungan,
[AUTHOR NAME] 14
Debit pengurasan (
Q pengurasan )
1/2
Q pengurasan =Cd x A penguras x ( 2 ghtotal air )
2 2 1/2
Q pengurasan =0,6 x 0 ,049 m x ( 2 x 9 , 81 m/dtk x 5,6 m )
3
Q pengurasan =0 ,311 m /dtk
10 , 8 m3
t= =34 , 76 dtk≈0 , 58 mnt
0 ,311 m3 /dtk
Hasil Rancangan :
Kondisi performa bak (n) = 1/3 (Good Performance)
Plat Settler
Jarak antar plat settler (W) = 8 cm = 0,08 meter
Tebal plat settler (tplat) = 0,5 cm = 0,005 meter
Lebar plat settler (wplat) = 100 cm = 1 meter
Jumlah bak = 2 bak
Kecepatan mengendap (vo) = 0,002 m/dtk
Dimensi bak sedimentasi
Debit pengolahan tiap bak (qbak) = 0,1 m3/dtk
Kecepatan (vs)
Luas permukaan bak sedimentasi (As) = 240 m2
Dimensi zona pengendapan
Tinggi plat settler dalam bak (H) = 86 cm
Tinggi zona pengendapan (hZP) = 1,032 meter
Panjang diagonal antar plat settler (LAB) = 105 cm
Panjang horizontal antar plat settler (wap) = 9,30 cm
Luas zona pengendapan (Azp) = 36 m2
[AUTHOR NAME] 15
Lebar zona pengendapan (Lzp) = 2,7 meter
Panjang zona pengendapan (Pzp) = 13,5 meter
Panjang zona pengendapan sebenarnya (Pzp real) = 14,5 meter
Jumlah plat settler (nplat) = 146 buah
Kontrol aliran
Bilngan Reynold (NRe) = 155,540
Bilangan Froude (NFr) = 3,98 x 10-5
Zona Inlet
Lebar zona inlet (Lzi) = 2,67 meter
Panjang zona inlet (Pzi) = 1,03 meter
Tinggi zona inlet (hzi) = 1,03 meter
Zona outlet (Pelimpah)
Lebar V-Notch (wV-Notch) = 0,1 meter
Panjang pelimpah (Ppelimpah) = 51,4 meter
Jumlah pelimpah (npelimpah) = 4 buah
Jumlah V-Notch tiap saluran (nV-Notch) = 131 buah
Tinggi V-Notch (hV_Notch) = 0,0429 meter
Gutter
Lebar gutter (n) = 2 pelimpah
Panjang gutter (Pgutter) = 13,5 meter
Lebar gutter (Lgutter) = 0,3 meter
Tinggi gutter (hgutter) = 0,3 meter
Luas basah gutter (Agutter) = 0,075 m2
Slope gutter (Sgutter) = 0,0019 m/m
Headloss gutter (hlgutter) = 0,026 meter
Zona Lumpur
Jumlah kompartemen lumpur (n) = 4 bak
Panjang ruang lumpur (Pzp) = 13,5 meter
Lebar ruang lumpur (Lzp) = 2,67 meter
Debit tiap kompartemen (qkompartemen) = 0,025 m3/dtk
Tinggi ruang lumpur tiap kompartemen (hkompartemen) = 3,64 meter
Sistem penguras
Tinggi total air dalam bak (htotal air) = 5,67 meter
Luas penampang pipa penguras (Apenguras)= 0,049 m2
Debit pengurasan (Qpenguras) = 0,311 m3/dtk
Lama bukaan pipa pembuangan tiap pengurasan (t) = 0,58 menit
[AUTHOR NAME] 16
[AUTHOR NAME] 17