Lampiran tabel gardu distribusi penyulang Radar

PT.PLN ( PERSERO ) WILAYAH


NTT
CABANG SUMBA

DATA JARINGAN PENYULANG RADAR


No Dari titik Ke titik Jenis Ø Panjang
1 PLTD KM 07 Depan kantor PLW AAAC 150 376.2
2 Depan kantor PLW PD 31 BRIMOP AAAC 70 2589.2
3 PD. 31 BRIMOP PD. 23 AAAC 50 1848.8
4 PD. 23 PD. 16 AAAC 50 2415
5 PD. 16 CO. Radar AAAC 50 98
6 CO. Radar CO. Radar- Telkom AAAC 50 1229
7 CO. Radar- Telkom Hang AAAC 35 392
8 Hang Section Kali AAAC 35 316
9 Section Kali Telkom AAAC 35 732
10 Depan kantor PLW PD 18 AAAC 95 577
11 PD 18 CO Waskita AAAC 95 208
12 CO Waskita Cabang Koramil AAAC 95 1070.8
13 Cabang Waskita PT. Aguamor AAAC 50 1168
14 Cabang Koramil CO. KW. 02 AAAC 95 640.6
15 CO. KW 02 KW. 02 AAAC 70 193.7
16 KW. 02 CO. Depan RSUD AAAC 70 254.2
17 CO. Depan RSUD CO. Patung Sapi AAAC 70 307
18 CO. Patung Sapi CO. Dept. Sosial AAAC 70 241.5
19 CO. Dept. Sosial Recloser AAAC 70 675.8
20 Recloser LBS Jalan Soeharto AAAC 70 144.3
21 LBS Jalan Soeharto KW. 05 AAAC 70 277.5
22 KW. 05 SMP 2 Rada Mata AAAC 70 272.5
23 SMP 2 Rada Mata Hang Rada Mata AAAC 70 200.5
24 Hang Rada Mata CO Sumba Mas AAAC 70 212.5
Total 16,440

78
Universitas kristen petra
Lampiran tabel gardu distribusi penyulang Matawai

PT.PLN ( PERSERO ) WILAYAH


NTT
CABANG SUMBA

DATA JARINGAN PENYULANG MATAWAI


No Dari titik Ke titik Jenis Ø Panjang
1 PLTD Waingapu Depan Amir Hamzah AAAC 70 292.4
2 Depan Amir Hamzah KW. 32 AAAC 70 235.3
3 KW. 32 CO. Inti Karya AAAC 70 312.2
4 CO. AL-taqwa KW. 06 AAAC 70 518
5 KW. 06 CO. El Tari AAAC 70 43
6 CO. El Tari Hang Sumba Mas AAAC 95 101.9
7 Hang Sumba Mas LBS Ole Ate AAAC 95 175.9
8 LBS Ole Ate CO. Samping KW.26 AAAC 95 216.4
9 CO. Toko Megah KW. 07 AAAC 70 180.4
10 KW. 07 KW. 27 AAAC 70 119.5
11 KW. 27 Hang Depan Alfa AAAC 70 33.3
12 CO. Yaponta Hair Studio Salon AAAC 70 271.1
Total 2499.4

79
Universitas kristen petra
Lampiran tabel gardu distribusi penyulang Waingapu

PT.PLN ( PERSERO ) WILAYAH


NTT
CABANG SUMBA

DATA JARINGAN PENYULANG WAINGAPU


No Dari titik Ke titik Jenis Ø Panjang
1 Pangkal PLTD CO.AL - Jihad AAAC 150 327.1
2 CO. AL - Jihad Pertigaan Lataluri AAAC 150 138.6
3 Pertigaan Lataluri KW. 11 AAAC 150 86
4 KW. 11 Jaringan KW. 11 AAAC 150 81.9
5 Pertigaan Lataluri KW. 12 AAAC 70 190.3
6 CO. AL - Jihad KW. 09 AAAC 150 266.6
7 KW. 09 CO. Bpk Dean AAAC 150 82.5
8 CO. Bpk Dean Pertigaan Ole Ate AAAC 150 596.2
10 Pertigaan Ole Ate KW. 26 AAAC 70 90.7
11 KW. 26 CO. Potong Sapi AAAC 70 633.2
12 CO. Potong Sapi KW. 23 AAAC 70 145.6
13 KW.23 CO. Dept.Sosial AAAC 70 803.8
Total 3442.5

80
Universitas kristen petra
Lampiran tabel gardu distribusi penyulang Payeti

PT.PLN ( PERSERO ) WILAYAH


NTT
CABANG SUMBA

DATA JARINGAN PENYULANG PAYETI


No Dari titik Ke titik Jenis Ø Panjang
1 Dari pangkal PLTD Pertigaan Melodi AAAC 150 207.4
2 Pertigaan Melodi CO. Melodi AAAC 150 50.9
3 CO. Melodi KW. 38 AAAC 70 411.5
4 KW. 38 CO. TK Pembina AAAC 70 314.9
5 CO. TK Pembina KW.31 AAAC 70 440
6 KW.31 CO. Wara AAAC 70 468.1
7 CO. Melodi KW. 42 AAAC 150 140.1
8 KW. 42 KW. 08 AAAC 150 205
9 KW. 08 CO. (SS) AAAC 150 74.3
10 CO. (SS) KW. 31,38 AAAC 70 99.5
11 CO. (SS) LBS Pelangi AAAC 150 154.7
12 LBS Pelangi CO. Payeti AAAC 70 745.4
13 Pertigaan RSK. PTS. RS Lindimara AAAC 70 78.1
14 PTS. RS Lindimara KW.13 AAAC 70 425.1
15 KW.13 CO. Samping KW.13 AAAC 70 44.3
16 CO. Samping KW.13 CO. Tatengkeng AAAC 70 225.6
17 CO. Tatengkeng Pertigaan Wangga AAAC 70 182.2
18 Pertigaan Wangga KW.25 AAAC 50 404
19 KW.25 KW.14 AAAC 50 942.1
20 KW.14 CO. Lambanapu AAAC 50 53
21 CO. Lambanapu PD.05 AAAC 50 1,465
22 PD.05 PD.03 AAAC 50 2,585
23 CO. Payeti KW. 15 AAAC 70 41.1

24 KW. 15 CO. Kallu AAAC 70 318.3

25 CO. Kallu KW. 22 AAAC 70 696.9

26 CO. Kallu KW. 17 AAAC 70 1350.1

27 KW. 17 CO. KW.42 AAAC 70 6

28 CO. KW.42 KW. 42 AAAC 70 358.8

29 CO. KW.42 CO. KW. 17 AAAC 70 46.1

81
Universitas kristen petra
Lampiran tabel gardu distribusi penyulang Payeti (sambungan)

No Dari titik Ke titik Jenis Ø Panjang


30 CO. KW. 17 KW. 18 AAAC 150 1059.9

31 KW. 18 CO.Samping KW. 18 AAAC 150 52.5

32 CO.Samping KW. 18 CO. Kelapa Dua AAAC 50 299

33 Pertigaan Padadita KW.16 AAAC 70 285.4

34 KW.16 CO. KW.39 AAAC 70 361.5


35 CO KW 39 KW 39 AAAC 70 254.1
36 CO. Jaringan KW.28 Pertigaan Reclosser ACSR 70 169.9
37 Pertigaan Reclosser KW.19 AAAC 70 565.3
38 PLTD KM 07 Perempatan RSUD AAAC 150 3446.7
39 Perempatan RSUD CO /AVS AAAC 95 120.6
40 CO /AVS Pertigaan Praiwora AAAC 95 632.8
41 Pertigaan Praiwora KW. 34 AAAC 95 554.4
42 KW. 34 Hang Wangga AAAC 95 1016.1
43 Hang Wangga CO. KW. 37 AAAC 70 326.6
44 CO. KW. 37 KW.37 AAAC 70 53
45 CO. KW. 37 Pertigaan Wangga AAAC 70 471.4
46 Pertigaan Wangga CO. Tatengkeng AAAC 70 165.3
47 CO. Tatengkeng LBS Tatengkeng AAAC 95 105.8
48 LBS Tatengkeng CO. Kampung Raja AAAC 95 737.3
49 CO. Kampung Raja Pertigaan Padadita AAAC 70 244.8
50 CO. Kampung Raja KW.21 70 340.2
AAAC
51 KW.21 KW. 28 AAAC 70 934.4

52 KW. 28 CO.Jaringan KW.28 AAAC 70 566.1

53 CO.Jaringan KW.28 CO Reclosser AAAC 70 167.8

54 CO Reclosser Reclosser 70 152.4


AAAC
55 Reclosser CO. KW.36 70 203.4
AAAC
56 CO. Jaringan KW.36 KW.36 70 776.7
AAAC
57 KW.36 Jatingan KW.36 150 1,142.30
AAAC
58 CO. KW.36 Pertigaan Mauhau 70 395.3
AAAC
59 Pertigaan Mauhau CO.Samping KW. 19 70 230.8
AAAC
60 Pertigaan Mauhau PD.01 AAAC 70 770.4

61 PD.01 CO. Jaringan PD.14 AAAC 70 211.5

62 CO. Jaringan PD.14 PD.14 AAAC 70 1,402.90

82
Universitas kristen petra
Lampiran tabel gardu distribusi penyulang Payeti (sambungan)

No Dari titik Ke titik Jenis Ø Panjang


63 CO. KW. 37 Pertigaan Wangga AAAC 70 471.4
64 Pertigaan Wangga CO. Tatengkeng AAAC 70 165.3
65 CO. Tatengkeng LBS Tatengkeng AAAC 95 105.8
66 LBS Tatengkeng CO. Kampung Raja AAAC 95 737.3
67 CO. Kampung Raja Pertigaan Padadita AAAC 70 244.8
68 PD.13 PD.12 AAAC 35 1599.3
69 PD.12 CO.Watutambaka AAAC 35 46.9
70 CO.Watutambaka LBS. Watumbaka AAAC 70 93.7
71 LBS. Watumbaka PD.27 AAAC 70 3716.8
72 PD.27 CO. Laipori AAAC 70 6235.3
73 CO. Laipori PD.26 AAAC 70 4604.7
74 PD.26 PD.25 AAAC 70 3236
75 PD.25 CO. Palakahembi AAAC 70 3473
76 CO. Palakahembi PD.28 AAAC 35 1057.8
77 CO. Palakahembi KWH. EXIM AAAC 70 879
78 KWH. EXIM CO. Kadombul AAAC 70 19.6
79 CO. Kadombul RU.18 AAAC 70 49.4
80 PD.13 PD.12 AAAC 35 1599.3
81 PD.12 CO.Watutambaka AAAC 35 46.9
82 CO.Watutambaka LBS. Watumbaka AAAC 70 93.7
83 LBS. Watumbaka PD.27 AAAC 70 3716.8
84 PD.27 CO. Laipori AAAC 70 6235.3
Total 65911.1

83
Universitas kristen petra
Lampiran tabel data gardu distribusi
PT.PLN ( PERSERO ) WILAYAH NTT
CABANG SUMBA

DATA GARDU DISTRIBUSI


MERK DAYA
NO. ALAMAT PENYULANG GARDU
TRAFO KVA
1 JL.KM. 07 PD.18 Unindo 37,5 50
2 JL.T V R I PD.23 Unindo 37,5 50
3 JL. KM.16 ( Radar) PD.16 Starlite 60 100
4 JL. KM.19 ( Telkom ) RADAR PD.24 Trafindo 37,5 50
5 JL.KM. 07 KW.47 Centrado 37,5 50
6 JL. Adam Malik KW.02 Unindo 37,5 50
7 JL. Soeharto KW.05 Trafindo 65 100
8 JL. Pemuda KW.32 Starlite 96 160
9 JL. Ampera KW.27 Trafindo 100 100
MATAWAI
10 JL. Palapa KW.07 Trafindo 65 100
11 JL. El Tari KW.06 Trafindo 104 160
12 JL. Ahmad Yani KW.43 Sentrado 96 160
13 JL. Ahmad Yani KW.08 Trafindo 65 100
14 JL. Tritura KW.38 Starlite 96 160
15 JL. Sultan Agung KW.31 Starlite 60 100
16 JL. R. Suprapto KW.15 Starlite 60 100
17 JL. S. Parman KW.13 Trafindo 100 100
18 JL. S. Parman KW.25 Trafindo 104 160
19 JL. Kalumbang KW.14 Trafindo 33 50
20 JL. Aibara PD. 05 Trafindo 33 50
PAYETI
21 JL. Lambanapu PD. 03 Trafindo 33 50
22 JL. Hayam Wuruk KW.22 Unindo 65 100
23 JL. Erlangga KW.16 Starlite 60 100
24 JL. Erlangga KW.39 Trafindo 60 100
25 JL. G. Subroto KW.17 Starlite 96 160
26 JL. G. Subroto KW.42 Unindo 120 200
27 JL. R. Suprapto KW.18 Starlite 60 100
28 JL. Nusa Cendana KW.19 Unindo 120 160
29 JL. Kamp. Praiwora KW.34 Unindo 37,5 50

84
Universitas kristen petra
Lampiran tabel data gardu distribusi (sambungan)

MERK DAYA
NO. ALAMAT PENYULANG GARDU
TRAFO KVA
30 JL. Beringin KW.37 Trafindo 65 100
31 JL. Tompelo KW.28 Unindo 37,5 50
32 JL. B. L. K. I KW.21 Rekondisi 60 100
33 JL. Tompelo KW.36 Unindo 37,5 50
34 JL. Mauliru PD.01 37,5 50
35 JL. Karaha PD.14 Unindo 37,5 50
36 JL. Mauliru PD.11 Unindo 37,5 50
37 JL. Kamp. Mara Wahi KW.35 Trafindo 20 50
38 JL. Kambata Tana PD.08 B. Jaya 20 50
39 JL. Kawangu PD.22 Trafindo 20 50
40 JL. Cendana PD.02 Trafindo 20 50
41 JL. Nusa Cendana PD.13 Unindo 20 50
42 JL. Nusa Cendana PD.12 Trafindo 20 50
43 JL. Laipori PD.27 Trafindo 20 50
20
44 JL. Laipori PD.26 Trafindo 50
45 JL. Minggit Timbi PD.25 Trafindo 20 50
46 JL. Palakahembi PD.28 Starlite 20 25
47 Belakang SPK KW.44 Trafindo 20 50
48 JL.Matawai Amh. KW.41 B. Jaya 65 100
49 JL.Matawai Amh. PAYETI KW.33 Unindo 65 100
50 JL.Ikan Hiu KW.03 Starlite 60 100
51 JL.ST. Negeri KW.29 B. Jaya 65 100
52 RSUD KW.01 Unindo 65 100
53 JL.Matawai Amh. KW.04 Tai Ya 60 100
54 JL.Matawai Amh. KW.24 Unindo 37,5 50
55 JL.Desa Temu PD.06 Unindo 37,5 50
56 Jl.Ds.Kanatang PD.07 Unindo 37,5 50
57 Puru cambera PD.30 Morawa 37 50
58 JL.Haharu HH.01 - 37 50
59 JL.Haharu ( D.Mondo ) HH.02 Starlite 37 50

85
Universitas kristen petra
Lampiran tabel data gardu distribusi (sambungan)
MERK DAYA
NO. ALAMAT PENYULANG GARDU
TRAFO KVA
60 JL.Y.Sudarso KW.11 Unindo 130 200
61 JL.Merpati KW.12 Starlite 96 160
62 JL.Diponegoro KW.09 Trafindo 100 100
63 JL.A. Malik KW.26 Unindo 65 100
64 JL.A. Malik KW.23 B. Jaya 65 100
WAINGAPU
65 JL.Ds.Kute PD.09 Unindo 37,5 50
66 JL.Hamba Praing PD.19 B. Jaya 17 25
67 JL.Hamba Praing PD.21 B. Jaya 17 25
68 Dermaga Veri PD. 32 B. Jaya 37,5 50
69 BTN / Possal PD. 29 Starlite 3,5 50

86
Universitas kristen petra
Lampiran daftar circuit breaker / PMT

87
Universitas kristen petra
Lampiran single line jaringan Waingapu berdasarkan ETAP Power Station
4.0.0

88
Universitas kristen petra
Lampiran report short circuit di bus 153 berdasarkan ETAP Power Station
4.0.0

SHORT-CIRCUIT REPORT
Project: ====================
Page: 16
Location: PowerStation 4.0.0C
Date: 01-01-2001
Contract: SN:
KLGCONSULT
Engineer: Study Case: SC File:
kl

==========================================================
==========================================================
===============

Three-phase fault at bus: Bus153 , Nominal kV = 0.380 Prefault


Voltage = 100.00 % of nominal bus kV
Voltage factor (C): 1.05 , Base kV = 0.380 = 100.00
% of base kV

Contribution Voltage (%) & Initial Symmetrical Current (rms)


=========================
===============================================
From Bus To Bus %V kA kA Imag/ kA
ID ID From Bus Real Imaginary Real Magnitude
------------ ------------ -------- -------- --------- ----- ---------
Bus153 Total 0.00 0.118 -0.530 4.5 0.543

Bus151 Bus153 91.92 0.118 -0.530 4.5 0.543

89
Universitas kristen petra
Lampiran report short circuit di bus 153 berdasarkan ETAP Power Station
4.0.0 (sambungan)

SHORT-CIRCUIT REPORT
Project: ====================
Page: 17
Location: PowerStation 4.0.0C
Date: 01-01-2001
Contract: SN:
KLGCONSULT
Engineer: Study Case: SC File:
kl

==========================================================
==========================================================
===============

Three-phase fault at bus: Bus153 , Nominal kV = 0.380 Prefault


Voltage = 100.00 % of nominal bus kV
Voltage factor (C): 1.05 , Base kV = 0.380 = 100.00
% of base kV

Peak Value = 1.170 kA (Method C)


Steady State = 0.543 kA rms (Maximum value)

Breaking and DC Fault Current (kA)

TD(s) Ibsym Ibasym TD(s) Ibsym Ibasym


----- ------- ------- ----- ------- -------
0.01 0.54 0.64 0.08 0.54 0.54
0.02 0.54 0.56 0.09 0.54 0.54
0.03 0.54 0.55 0.10 0.54 0.54
0.04 0.54 0.54 0.15 0.54 0.54
0.05 0.54 0.54 0.20 0.54 0.54
0.06 0.54 0.54 0.25 0.54 0.54
0.07 0.54 0.54 0.30 0.54 0.54

90
Universitas kristen petra
Lampiran report short circuit di bus 153 berdasarkan ETAP Power Station
4.0.0 (sambungan)

S. C. SUMMARY REPORT
Project: ====================
Page: 18
Location: PowerStation 4.0.0C
Date: 01-01-2001
Contract: SN:
KLGCONSULT
Engineer: Study Case: SC File:
kl
--------------------------------------------------------------------------------------------------
---------------------------------

==========================================================
==========================================================
===============

Three-Phase Fault Currents: ( Prefault Voltage = Bus Nominal Voltage )

Bus Information Device Information Device Capacity (kA)


Short Circuit Current (kA)
=================== ========================
===========================
===============================================
ID kV ID Type TD(s) Making Ibasy Ibsymm Idc I"k
ip Ibasy Ibsymm Idc Ik
------------ ------ ------------ ----- ----- ------ ------ ------ ------ ------- ------- ------
- ------- ------- -------
Bus153 0.38 Bus153 Bus 0.00 0.54 1.17
0.54

91
Universitas kristen petra
Lampiran proposal tugas akhir

92
Universitas kristen petra
Lampiran proposal tugas akhir (sambungan)
1. Judul Tugas Akhir
Studi Analisa dan simulasi Koordinasi Proteksi pada Sistem Distribusi 20
kV di Gardu Induk Waingapu pada PT. PLN(Persero) Cabang Sumba menggunakan
Software Power Plot v2.5 dan ETAP 4.00

2. Latar Belakang Masalah


Pembangkit listrik yang dibangun di wilayah Sumba Timur merupakan
pembangkit yang beroperasi pada tegangan menengah 20 kV/6 kV dan tegangan
rendah 220/380 V. Sehingga menggunakan gardu distribusi sebagai gardu induk.
Dalam pengoperasian distribusi listrik, adanya gangguan pasti tidak dapat
dihindari lagi. Dengan adanya sistem proteksi pada jaringan, dapat meminimalkan
terjadinya kerusakan pada peralatan listrik akibat gangguan yang terjadi. Oleh
karena itu, koordinasi peralatan pengaman termasuk koordinasi antar relay di
jaringan menjadi hal yang sangat penting.
Melihat pada hal-hal yang telah dikemukakan di atas, maka penulis
mengangkat topik “Studi Analisa dan simulasi Koordinasi Proteksi pada Sistem
Distribusi 20 kV di Gardu Induk Waingapu pada PT. PLN(Persero) Cabang Sumba
menggunakan Software Power Plot v2.5 dan ETAP 4.00” sebagai topik tugas akhir
ini.

3. Perumusan Masalah
Dalam Tugas Akhir ini akan dilakukan :
1. Menentukan setting relay proteksi yang digunakan pada sistem distribusi
20 kV di Gardu Induk Waingapu PT. PLN. (Persero) Cabang Sumba
berdasarkan data jaringan, trafo dan impedansi yang ada.
2. Pembuatan model simulasi dengan menggunakan software Power Plot
v2.5 dan ETAP 4.00
3. Menganalisa koordinasi proteksi yang digunakan pada sistem distribusi
20 kV Gardu Induk Waingapu PT. PLN. (Persero) Cabang Sumba.
- Apakah setting relay pada jaringan sudah baik ?
- Apakah koordinasi setting relay pada jaringan sudah baik?
93
Universitas kristen petra
Lampiran proposal tugas akhir (sambungan)
4. Ruang Lingkup Tugas Akhir
Dengan rumusan masalah seperti di atas, maka ruang lingkup dari tugas
akhir ini adalah sebagai berikut :
1. Pengamatan koordinasi proteksi yang di sistem distribusi 20 kV Gardu
Induk Waingapu.
2. Analisis koordinasi proteksi dibatasi sesuai dengan relay yang
digunakan yaitu Over Current Relay.

5. Tujuan Tugas Akhir


Mempelajari, memahami dan mengevaluasi sistem proteksi jaringan pada
sistem distribusi 20 kV di Gardu Induk Waingapu.

6. Uraian Singkat Tugas Akhir


6.1. Single line diagram

Gambar 1. Single Line Diagram Subsistem PLTD Waingapu

94
Universitas kristen petra
Lampiran proposal tugas akhir (sambungan)

Gambar 2. Single Line Diagram Subsistem PLTD KM 07

95
Universitas kristen petra
Gambar 3. Single Line Diagram Sistem Distribusi Waingapu
Lampiran proposal tugas akhir (sambungan)
6.2. Over Current Relay
PMT HUBUNG
TRAFO 150/20 KV CT SINGKAT
3 FASA

ON
OFF
NGR OCR OCR OCR

GFR

Gambar 4. Wiring Diagram Over Current Relay

Jika gangguan terjadi pada fasa R,S dan T maka arus gangguan hubung singkat
mengalir di jaringan. Karena arus tersebut lebih besar dari ratio CT pada
sekunder CT mengalir arus yang kemudian masuk ke OCR maka OCR memasok
arus ke PMT mengakibatkan PMT trip.

6.3. Relay Proteksi Sistem Tenaga Listrik


a. Setting Relay
Untuk relay over current digunakan setting arus sebagai berikut :
Relay Definite : 1.2 x I beban
Relay Inverse : 1.05 x I beban

Sedangkan setting waktu


Relay definite : menggunakan tap
td × 0.014
Relay Inverse : tms = 0.02
 If 
  −1
 Iset 

96
Universitas kristen petra
Lampiran proposal tugas akhir (sambungan)
b. Karakteristik relay
- Definite

Gambar 6.Karakteristik Relay Definite


Gambar 7 Karakteristik Relay Definite

- Inverse
T (detik)

Iset I(ampere)

Gambar 7.Karakteristik Relay Inverse

7. Metodologi Penelitian / Perancangan dan Pembuatan


Beberapa metode yang digunakan dalam membuat tugas akhir ini, antara
lain:
• Studi Literatur
Mempelajari konsep-konsep dasar dari berbagai jenis media yang
mendukung pembuatan tugas akhir.

97
Universitas kristen petra
Lampiran proposal tugas akhir (sambungan)
• Studi Sekunder
Mencari dan mengumpulkan data-data yang menunjang pengerjaan tugas
akhir.
• Analisa Data
Melakukan simulasi dan membandingkan hasil simulasi menggunakan
Software Power Plot v2.5 dan ETAP 4.00 dengan kondisi lapangan.
• Penulisan Laporan
Melakukan dokumentasi terhadap hasil karya dalam bentuk teks dan gambar
dengan mengikuti format penulisan yang terstandarisasi sehingga dapat
menjadi salah satu bahan rujukan untuk kedepannya.

8. Relevansi
Tugas akhir ini, nantinya diharapkan dapat meningkatkan keandalan
proteksi jaringan tenaga listrik dan meningkatkan kontinuitas distribusi listrik ke
pelanggan.

9. Jadwal Kegiatan

Bulan ke
Kegiatan
I II III IV
Studi Literatur
Studi Sekunder
Analisa Data
Pembuatan Laporan

98
Universitas kristen petra
Lampiran proposal tugas akhir (sambungan)
10. Daftar Pustaka
Mehta, V. K. Principles of Power System (2nd ed.). New Delhi: S. Chand &
Company Ltd, 2001.
Pabla, A S. Sistem Distribusi Daya Listrik. Jakarta: Penerbit Erlangga, 1994.
Zuhal. Dasar Tenaga Listrik (2nd ed.). Bandung: Institut Teknologi Bandung,
1991.
Kadarisman, Pribadi. Analisa Sistem Tenaga-V1-05, Jakarta: Diklat PLN 2006.
Blackburn, J. Lewis. Protective Relaying. New York and Basel: Marcel Dekker,
1987.

99
Universitas kristen petra
Lampiran proposal tugas akhir (sambungan)

Curriculum Vitae

NRP : 23402121

Nama : Murni Rahmawati Ngara

Alamat rumah : Jl. Jati No. 09 Waingapu Sumba Timur

Alamat kos : Jl. Siwalankerto Tengah Gang Rambutan No. 232C Surabaya

Telepon rumah : 0387 - 62193

Telepon kos : -

Handphone : 0852 312 29897

E-mail : m23402121@john.petra.ac.id, murningara@yahoo.co.id

100
Universitas kristen petra
Lampiran poster tugas akhir

101
Universitas kristen petra

Anda mungkin juga menyukai