Anda di halaman 1dari 4

FAKTUR (INVOICE)

PT UNITED TRACTORS Tbk


Jalan Raya Bekasi Km. 22, Jakarta 13910 - Indonesia
NPWP : 01.308.524.6-091.000
Kepada (Sold To) :
PT TUNAS MUDA PERTIWI
JL.SAM RATULANGI NO.507
KAROMBASAN UTARA WANEA
KOTA MANADO SULAWESI UTARA
NPWP : 84.902.796.6-821.000

Nomor Pelanggan (Account No) : 38670 Nomor Faktur (Invoice Number) : 914241850-MO
Nomor Pesanan (Order Reff) : PO.T02-023/MR-OB/2022 Tanggal Faktur (Invoice Date) : 28 Maret 2022
Tanggal Pesanan (Order Date) : 26 Maret 2022 Tanggal Jatuh Tempo (Payment Due Date) : 12 Mei 2022
Mata Uang (Currency) : IDR Nomor Faktur Pajak (VAT No.) : 010.001-22.67002128
Sales Order (Sales Order No.) : 0231132305

NAMA BARANG KENA PAJAK / JASA KENA PAJAK HARGA JUAL / PENGGANTIAN
PENJELASAN TOTAL ITEM (AMOUNT)
(DESCRIPTION) (ITEM) Valas Rp.

Penjualan suku cadang sesuai detail terlampir 33.622.750


(details attached)

Ketentuan pembayaran :
- Jumlah total harga jual termasuk PPN yang tercantum dalam faktur (invoice) adalah TOTAL HARGA JUAL / ---------------------
PENGGANTIAN 33.622.750
berdasarkan pesanan atau purchase order POTONGAN HARGA
- Pembayaran dengan menggunakan cek/giro/letter of credit/bank garansi atau
alat pembayaran lain harus mencantumkan nama PT United Tractors Tbk dan kata- UANG MUKA (UM) YANG TELAH DITERIMA
kata "Pembawa" dalam cek/giro agar dicoret. Pembayaran dianggap dilakukan setelah HARGA SETELAH POTONGAN DAN UM /
dana efektif diterima di rekening PT United Tractors Tbk.
- Pembayaran dengan menggunakan transfer harus mencantumkan nomor dan nama DASAR PENGENAAN PAJAK (DPP) 33.622.750
pelanggan
- Rincian nomor invoice yang dibayar harus dicantumkan PPN (VAT) = 10 % x DPP 3.362.275
- Pembayaran harga jual/penggantian dan PPN dilakukan dengan menggunakan mata GRAND TOTAL 36.985.025
uang Rupiah (atau original currency apabila diperbolehkan menurut peraturan
perundang-undangan yang berlaku)
- Pembayaran dilakukan dengan transfer ke rekening yang ditunjuk oleh
PT United Tractors Tbk : Jakarta, 28 Maret 2022
IDR ke PT. BANK MANDIRI Cabang : Manado Account : 1500074000157
USD ke Bank Citibank Account : 0-100624-516
- Bagi pelanggan yang mengikuti fasilitas pembiayaan dari perusahaan pembiayaan
atau bank, ketentuan pembayaran mengikuti ketentuan pembayaran dalam
perjanjian pembiayaan antara pembeli dengan perusahaan pembiayaan atau bank
- Invoice ini bukan merupakan bukti kepemilikan.

Ruther Gadhu Pongallo


Parts Department Head

Invoice ini sah, diterbitkan secara elektronik melalui sistem elektronik PT United Tractors Tbk sehingga tidak memerlukan cap dan tanda tangan basah.
Validasi terhadap data dalam dokumen ini dapat dilakukan melalui url pada QR Code yang tercetak
LAMPIRAN FAKTUR (INVOICE DETAILS)
PT UNITED TRACTORS Tbk
Jalan Raya Bekasi Km. 22, Jakarta 13910 - Indonesia
NPWP : 01.308.524.6-091.000

Kepada (Sold To) :


PT TUNAS MUDA PERTIWI
JL.SAM RATULANGI NO.507
KAROMBASAN UTARA WANEA
KOTA MANADO SULAWESI UTARA
NPWP : 84.902.796.6-821.000

Nomor Pelanggan (Account No) : 38670 Nomor Faktur (Invoice Number) : 914241850-MO
Nomor Pesanan (Order Reff) : PO.T02-023/MR-OB/2022 Tanggal Faktur (Invoice Date) : 28 Maret 2022
Tanggal Pesanan (Order Date) : 26 Maret 2022 Tanggal Jatuh Tempo (Payment Due Date) : 12 Mei 2022
Mata Uang (Currency) : IDR Nomor Faktur Pajak (VAT No.) : 010.001-22.67002128

NAMA BARANG KENA PAJAK / JASA KENA PAJAK HARGA JUAL / PENGGANTIAN
No NOMOR MATERIAL PENJELASAN JUMLAH HARGA (AMOUNT)
(MATERIAL NUMBER) (DESCRIPTION) (QUANTITY) (UNIT PRICE) Valas Rp.
1 207-60-71182 Element Hydraulic 1 PC 1.003.380 1.003.380
( 207-60-71183 ELEMENT FILTER (C) 1 PC )
2 07000-15195 Oring 1 PC 140.980 140.980
3 07002-10823 Oring 12 PC 15.120 181.440
4 07000-13024 Oring 11 PC 28.770 316.470
5 07430-71380 Oring 29 PC 29.820 864.780
6 07000-11010 Oring 8 PC 13.510 108.080
7 07000-12012 Oring 4 PC 13.510 54.040
8 723-11-19130 Oring 6 PC 32.340 194.040
9 723-46-17520 Ring Back Up 6 PC 17.640 105.840
10 07000-12021 Oring 7 PC 13.510 94.570
11 07000-13032 Oring 11 PC 38.080 418.880
12 723-46-17530 Oring 13 PC 15.330 199.290
13 723-11-18150 Oring 4 PC 113.330 453.320
14 07000-12012 Oring 12 PC 13.510 162.120
15 07000-13036 Oring 1 PC 38.080 38.080
16 702-16-53920 Oring 13 PC 44.940 584.220
17 723-46-41950 Ring Back Up 33 PC 60.900 2.009.700
18 07002-13634 Oring 9 PC 38.080 342.720
19 700-93-11320 Oring 9 PC 38.990 350.910
20 07002-11823 Oring 6 PC 14.910 89.460
21 07002-11423 Oring 37 PC 14.910 551.670
22 07000-11007 Oring 2 PC 13.510 27.020
23 07001-01007 Ring Back Up 1 PC 47.250 47.250
24 723-40-82220 Filter 4 PC 172.760 691.040
25 07002-11023 Oring 6 PC 14.910 89.460
26 07000-12014 Oring 1 PC 13.510 13.510
27 723-40-56350 Ring Back Up 1 PC 14.560 14.560
28 07000-12016 Oring 2 PC 13.510 27.020
29 723-60-22230 Ring Back Up 2 PC 17.780 35.560
30 07002-12434 Oring 2 PC 29.120 58.240
31 700-22-11410 Oring 3 PC 36.820 110.460
32 700-80-64220 Ring Back Up 2 PC 59.500 119.000
33 07000-12020 Oring 3 PC 13.510 40.530
34 709-25-11390 Oring 5 PC 28.770 143.850
( 07000-13024 O-RING ** -p 5 PC )
35 702-16-55610 Oring 2 PC 14.420 28.840
36 723-11-19960 Oring 2 PC 45.850 91.700

.
Page 1 from 2
LAMPIRAN FAKTUR (INVOICE DETAILS)
PT UNITED TRACTORS Tbk
Jalan Raya Bekasi Km. 22, Jakarta 13910 - Indonesia
NPWP : 01.308.524.6-091.000 Nomor Pesanan (Order Reff) : PO.T02-023/MR-OB/2022
Nomor Faktur (Invoice Number) : 914241850-MO

NAMA BARANG KENA PAJAK / JASA KENA PAJAK HARGA JUAL / PENGGANTIAN
No NOMOR MATERIAL PENJELASAN JUMLAH HARGA (AMOUNT)
(MATERIAL NUMBER) (DESCRIPTION) (QUANTITY) (UNIT PRICE) Valas Rp.
37 700-80-61260 Oring 2 PC 13.510 27.020
38 02896-11008 Oring 31 PC 13.510 418.810
39 723-46-18720 Oring 2 PC 27.720 55.440
40 07002-11623 Oring 3 PC 15.120 45.360
41 07000-11009 Oring 3 PC 13.510 40.530
42 702-21-62300 Valve, Pilot 2 PC 4.901.540 9.803.080
43 702-21-55420 Oring 1 PC 25.900 25.900
44 702-21-55520 Oring 1 PC 15.330 15.330
45 702-21-55440 Filter 1 PC 17.290 17.290
46 07000-12011 Oring 7 PC 13.510 94.570
47 07000-11010 Oring 8 PC 13.510 108.080
48 07000-12035 Oring 1 PC 38.080 38.080
49 723-40-87170 Oring 2 PC 54.810 109.620
50 07000-13035 Oring 3 PC 38.080 114.240
51 07000-11008 Oring 2 PC 13.510 27.020
52 702-21-54910 Oring 2 PC 38.990 77.980
53 07002-13334 Oring 2 PC 38.080 76.160
54 07001-02011 Ring Back Up 2 PC 62.860 125.720
55 07001-01010 Ring Back Up 2 PC 57.680 115.360
56 07000-13038 Oring 1 PC 38.080 38.080
57 07002-10823 Oring 2 PC 15.120 30.240
58 723-46-17510 Oring 2 PC 21.560 43.120
59 02896-11009 Oring 3 PC 13.510 40.530
60 07002-11223 Oring 5 PC 14.910 74.550
61 7861-93-1812 Sensor Pressure 2 PC 2.673.720 5.347.440
62 07002-61823 Oring 1 PC 37.380 37.380
63 07000-13025 Oring 16 PC 38.080 609.280
64 07000-13048 Oring 4 PC 41.860 167.440
65 07000-15160 Oring 2 PC 125.720 251.440
66 07000-15195 Oring 2 PC 140.980 281.960
67 21T-09-11460 Oring 20 PC 41.510 830.200
68 702-21-53120 Filter 1 PC 807.310 807.310
69 07000-13028 Oring 1 PC 38.080 38.080
70 723-46-41930 Seal 7 PC 153.230 1.072.610
71 723-46-42930 Seal 4 PC 146.580 586.320
72 723-46-43910 Seal 1 PC 146.580 146.580
73 07000-12018 Oring 2 PC 13.650 27.300
74 702-16-71150 Seal 4 PC 92.680 370.720
75 702-16-71160 Seat 4 PC 193.270 773.080
76 07000-12015 Oring 4 PC 13.510 54.040
77 07000-12018 Oring 2 PC 13.650 27.300
78 6754-21-6250 Oring 1 PC 60.130 60.130
79 6754-21-6240 Oring 2 PC 385.000 770.000
TOTAL HARGA JUAL / PENGGANTIAN
-------------------- 33.622.750
POTONGAN HARGA
UANG MUKA (UM) YANG TELAH DITERIMA
HARGA SETELAH POTONGAN DAN UM /
DASAR PENGENAAN PAJAK (DPP) 33.622.750
PPN (VAT) = 10 % x DPP 3.362.275
GRAND TOTAL 36.985.025

.
Page 2 from 2
LAMPIRAN FAKTUR (INVOICE DETAILS)
PT UNITED TRACTORS Tbk
Jalan Raya Bekasi Km. 22, Jakarta 13910 - Indonesia
NPWP : 01.308.524.6-091.000 Nomor Pesanan (Order Reff) : PO.T02-023/MR-OB/2022
Nomor Faktur (Invoice Number) : 914241850-MO

Jakarta, 28 Maret 2022

Ruther Gadhu Pongallo


Parts Department Head

Page 3 from 2

Anda mungkin juga menyukai