LAPORAN PELAKSANAAN

KEGIATAN SANITASI PEDESAAN PADAT KARYA

TAHUN ANGGARAN 2019


STATUS PER TANGGAL :
NAMA DESA : WAKUA
NAMA KSM :

MATERIAL (BAHAN) FISIK PROGRES


NO. MATERIAL
SATUAN TOTAL MATERIAL TERPAKAI SISA PEKERJAAN TERBANGUN FISIK % KEUANGAN %

MATERIAL TOKOH PEKERJAAN PEMBANGUNAN WC

1 Semen Galian Tanah


2 Besi 8 Urugan Tanah Bawah Lantai
3 Besi 10 Urugan Pasir
4 Pipa 3" PVC Pasangan Pondasi Batu Kali/ Karang
5 Tripleks 9 mm Lantai Rabat Beton Mutu f'c = 9.8 Mpa
6 Paku Campur Sloof Beton 11/11, f'c = 14.5 Mpa (157 Kg/m³)
7 Hengsel Pintu Kolom Beton 11/11, f'c = 14.5 Mpa (157 Kg/m³)
8 Gagang Pintu Balok Beton 11/11, f'c = 14.5 Mpa (157 Kg/m³)
9 Saringan Lantai Pasangan Dinding ad. 1 : 4
10 Keni 3" PVC Plesteran Dinding ad. 1 : 3
11 Tee 3" PVC Atap Seng Gelombang BJLS 0.25 mm
12 Paku Zink Kuda-kuda Kayu Klas II
13 No Drop 1 KG Gordeng Kayu Klas II
14 Bendrat Listpank Papan uk. 3/20, Kayu Klas. II
15 Grendel Kusen Pintu, Kayu Klas. II
16 Kloset Jongkok Rangka Pintu Klamp Kayu Klas II
17 Skop Daun Pintu Seng Licin BJLS 0.25 mm
18 Pacul Cat Dinding dengan Cat Tembok
19 Paku Wel Cat Listplank dengan Cat Kayu
20 Linggis Engsel Pintu 4"
21 Meter 3 m Kloset Jongkok Keramik/ Porselin
22 Meter 5 m Floor Drain Ø 4"
23 Gerobak
24 Siku Tukang PEKERJAAN BAK KONTROL
25 Waterpas Galian Tanah
26 Tropol Lantai Rabat Beton Mutu f'c = 9.8 Mpa
27 Alkon 2" + Slang (4 m) Pasangan Dinding ad. 1 : 4
Plesteran Dinding ad. 1 : 3
Plat Penutup, f'c = 14.5 Mpa (52 Kg/m³)
Pegangngan Besi Ø 10 mm
MATERIAL LOKAL
1 Pasir TANGKI SEPTIK & RESAPAN
2 Batu
3 Kerikil Galian Tanah
4 Kayu 5/7 Plat Lantai Dasar, f'c = 14.5 Mpa (70 Kg/m³)
5 Kayu 5/10 Dinding Beton, f'c = 14.5 Mpa (62 Kg/m³)
6 Papan Plat Penutup Tangki, f'c = 19.3 Mpa (52 Kg/m³)
7 Batu Bata Penutup Mainhole, f'c = 14.5 Mpa (52 Kg/m³)
Acian Dinding
Media Filter
Pipa Hawa GIP Ø 2"
Pegangngan Besi Ø 10 mm
LAIN-LAIN Lantai Rabat Beton Mutu f'c = 9.8 Mpa
Dudukan Media Filter
Pasangan Batu Kosong
RESAPAN
Galian Tanah
Lapisan Batu Kerikil
Lapisan Ijuk
Pemadatan Tanah Per 20 cm

PEKERJAAN SAMBUNGAN RUMAH (SR)


Galian Tanah
Pasangan Batu Kosong
Urugan Pasir
Pemadatan Tanah Per 20 cm
Kloset - Tangki Septik PVC - D Ø 3"
Bak Kontrol - Resapan PVC-D Ø 3"
Floor Drain -BaK Kontrol PVC - D Ø 3 "
Pipa Penyalur Dalam Tangki Septik PVC-D Ø 3"
Tangki Septik - Resapan PVC - D Ø 3 "
Sambungan Elbow 90º PVC-D Ø 3"
Sambungan Tee 90º PVC-D Ø 3"
Penutup Cap PVC-D Ø 3"
Pemotongan PVC-D Ø 3"
Lem Pipa PVC

TOTAL
NO TANGGAL TERMIN PENARIKAN TRANSFER SUPLIER JUMLAH

PEMAKAIAN / BELANJA
SALDO
SISA UANG DI REKENING
RENCANA ANGGARAN BIAYA
(R.A.B)

Program : SANITASI PERDESAAN PADAT KARYA Tahun Anggaran : 2019


Kegiatan : PEMBANGUNAN TANGKI SEPTIK & SARANA PELENGKAP Kapasitas IPAL : 33.80 M³
Lokasi : Negeri IHA, Kec. Huamual, Kab. Seram Bagian Barat Jumlah SR : 32
Pelaksana : KSM " ULUPALU " Keterangan : Individual

NO. HARGA JUMLAH


NO. URAIAN PEKERJAAN SATUAN KUANTITAS SATUAN HARGA
ANALISA
(Rp) (Rp)

I. PEKERJAAN PEMBANGUNAN WC UNIT 1


1 Galian Tanah m³ 0.50 A.2.3.1.1 52,500.00 26,250.00
2 Urugan Tanah Bawah Lantai m³ 0.08 A.2.3.1.9 70,000.00 5,250.00
3 Urugan Pasir m³ 0.19 A.2.3.1.11 120,000.00 22,440.00
4 Pasangan Pondasi Batu Kali/ Karang m³ 0.55 A.3.2.1.2 732,600.00 404,761.50
5 Lantai Rabat Beton Mutu f'c = 9.8 Mpa m³ 0.09 A.4.1.1.2 776,172.88 67,214.24
6 Sloof Beton 11/11, f'c = 14.5 Mpa (157 Kg/m³) m³ 0.06 An.C390 2,917,279.84 176,495.43
7 Kolom Beton 11/11, f'c = 14.5 Mpa (157 Kg/m³) m³ 0.09 An.C396 3,033,979.84 264,320.32
8 Balok Beton 11/11, f'c = 14.5 Mpa (157 Kg/m³) m³ 0.06 An.C402 3,041,479.84 184,009.53
9 Pasangan Dinding ad. 1 : 4 m² 7.53 A.4.4.1.20 155,348.00 1,169,584.02
10 Plesteran Dinding ad. 1 : 3 m² 18.99 A.4.4.2.2 53,971.60 1,024,931.48
11 Atap Seng Gelombang BJLS 0.25 mm m² 4.00 A.4.5.2.39 55,100.00 220,400.00
12 Kuda-kuda Kayu Klas II m³ 0.06 A.4.6.1.13 4,746,900.00 290,035.59
13 Gordeng Kayu Klas II m³ 0.02 A.4.6.1.15 5,845,500.00 118,663.65
14 Listpank Papan uk. 3/20, Kayu Klas. II m' 8.58 A.4.6.1.21 60,400.00 518,232.00
15 Kusen Pintu, Kayu Klas. II m³ 0.02 A.4.6.1.2 5,639,500.00 124,914.93
16 Rangka Pintu Klamp Kayu Klas II m² 0.70 A.4.6.1.3 251,700.00 176,190.00
17 Daun Pintu Seng Licin BJLS 0.25 mm m² 2.63 H.55 33,000.00 86,625.00
18 Cat Dinding dengan Cat Tembok m² 21.14 A.4.7.1.10 29,960.00 633,360.39
19 Cat Listplank dengan Cat Kayu m² 1.72 A.4.7.1.4 36,605.00 62,814.18
20 Engsel Pintu 4" Buah 2.00 A.4.6.2.5 39,050.00 78,100.00
21 Kloset Jongkok Keramik/ Porselin Buah 1.00 A.5.1.1.2 460,700.00 460,700.00
22 Floor Drain Ø 4" Buah 1.00 A.5.1.1.14 67,700.00 67,700.00
Sub Total - I 6,182,992.27

II. PEKERJAAN BAK KONTROL UNIT 1


1 Galian Tanah m³ 0.10 A.2.3.1.1 52,500.00 5,250.00
2 Lantai Rabat Beton Mutu f'c = 9.8 Mpa m³ 0.01 A.4.1.1.2 776,172.88 6,985.56
3 Pasangan Dinding ad. 1 : 4 m² 0.36 A.4.4.1.20 155,348.00 55,925.28
4 Plesteran Dinding ad. 1 : 3 m² 0.36 A.4.4.2.2 53,971.60 19,429.78
5 Plat Penutup, f'c = 14.5 Mpa (52 Kg/m³) m³ 0.01 An. C420 1,829,704.84 23,420.22
6 Pegangngan Besi Ø 10 mm Kg 0.37 HB.10 9,500.00 3,515.00
Sub Total - II 114,525.83

III. TANGKI SEPTIK & RESAPAN UNIT 1


TANGKI SEPTIK
1 Galian Tanah m³ 2.57 A.2.3.1.2 63,000.00 161,595.00
2 Plat Lantai Dasar, f'c = 14.5 Mpa (70 Kg/m³) m³ 0.19 An. C425 2,041,294.84 387,846.02
3 Dinding Beton, f'c = 14.5 Mpa (62 Kg/m³) m³ 0.67 An. C414 1,942,254.84 1,293,541.72
4 Plat Penutup Tangki, f'c = 19.3 Mpa (52 Kg/m³) m³ 0.16 An. C426 1,898,966.75 307,822.51
5 Penutup Mainhole, f'c = 14.5 Mpa (52 Kg/m³) m³ 0.03 An. C420 1,829,704.84 51,048.77
6 Acian Dinding m² 10.20 A.4.4.2.27 31,200.00 318,240.00
7 Media Filter Ls 1.00 HB.36 300,000.00 300,000.00
8 Pipa Hawa GIP Ø 2" Unit 0.50 HB.50 200,000.00 100,000.00
9 Pegangngan Besi Ø 10 mm Kg 0.37 HB.10 9,500.00 3,515.00
10 Lantai Rabat Beton Mutu f'c = 9.8 Mpa m³ 0.11 A.4.1.1.2 776,172.88 83,050.50
11 Dudukan Media Filter m³ 0.02 A.4.1.1.2 776,172.88 12,418.77
12 Pasangan Batu Kosong m³ 0.19 A.3.2.1.9 356,640.00 67,761.60
RESAPAN
1 Galian Tanah m³ 0.20 A.2.3.1.1 52,500.00 10,500.00
2 Lapisan Batu Kerikil m³ 0.08 HB.7 160,000.00 12,800.00
3 Lapisan Ijuk m² 0.04 A.2.3.1.13 160,500.00 6,420.00
4 Pemadatan Tanah Per 20 cm m² 0.08 A.2.3.1.10 70,000.00 5,600.00
Sub Total - V 3,122,159.88

IV. PEKERJAAN SAMBUNGAN RUMAH (SR) UNIT 1


1 Galian Tanah m³ 1.07 A.2.3.1.1 52,500.00 56,175.00
2 Pasangan Batu Kosong m³ 0.21 A.3.2.1.9 356,640.00 76,320.96
3 Urugan Pasir m³ 0.21 A.2.3.1.11 120,000.00 25,680.00
4 Pemadatan Tanah Per 20 cm m² 0.64 A.2.3.1.10 70,000.00 44,940.00
5 Kloset - Tangki Septik PVC - D Ø 3" m' 1.25 A.5.1.1.31 68,370.00 85,462.50
6 Bak Kontrol - Resapan PVC-D Ø 3" m' 0.50 A.5.1.1.31 68,370.00 34,185.00
7 Floor Drain -BaK Kontrol PVC - D Ø 3 " m' 4.00 A.5.1.1.31 68,370.00 273,480.00
8 Pipa Penyalur Dalam Tangki Septik PVC-D Ø 3" m' 1.00 A.5.1.1.31 68,370.00 68,370.00
9 Tangki Septik - Resapan PVC - D Ø 3 " m' 2.00 A.5.1.1.31 68,370.00 136,740.00
10 Sambungan Elbow 90º PVC-D Ø 3" Buah 2.00 HB.51 20,000.00 40,000.00
11 Sambungan Tee 90º PVC-D Ø 3" Buah 4.00 HB.52 25,000.00 100,000.00
12 Penutup Cap PVC-D Ø 3" Buah 1.00 HB.54 7,500.00 7,500.00
13 Pemotongan PVC-D Ø 3" Buah 4.00 A.8.4.2.1 590.00 2,360.00
14 Lem Pipa PVC Kg 0.50 HB.30 40,000.00 20,000.00
Sub Total - VI 971,213.46
Total 10,390,891.44
LAPORAN PELAKSANAAN

KEGIATAN SANITASI PEDESAAN PADAT KARYA

TAHUN ANGGARAN 2019


STATUS PER TANGGAL :
NAMA DESA : IHA
NAMA KSM :

MATERIAL (BAHAN) KEUANGAN FISIK PROGRES


NO. MATERIAL
TOTAL
MATERIAL TERPAKAI SISA PENARIKAN TERPAKAI SALDO SISA PEKERJAAN TERBANG FISIK % KEUANGAN %
UN

MATERIAL TOKOH PEKERJAAN PEMBANGUNAN WC 70%


1 Semen 100 36.00 64 145,000,000.00 - 100,000,000.00 Galian Tanah 4 0.03
2 Besi 8 40 33.00 7 145,000,000.00 - 100,000,000.00 Urugan Tanah Bawah Lantai 4 0.01
3 Besi 10 20 9.00 11 145,000,000.00 - 100,000,000.00 Urugan Pasir 4 0.03
4 Pipa 3" PVC 20 4.00 16 145,000,000.00 - 100,000,000.00 Pasangan Pondasi Batu Kali/ Karang 4 0.46
5 Tripleks 9 mm 20 8.00 12 145,000,000.00 - 100,000,000.00 Lantai Rabat Beton Mutu f'c = 9.8 Mpa 4 0.08
6 Paku Campur 50 50 145,000,000.00 - 100,000,000.00 Sloof Beton 11/11, f'c = 14.5 Mpa (157 Kg/m³) 4 0.20
7 Hengsel Pintu 20 20 145,000,000.00 - 100,000,000.00 Kolom Beton 11/11, f'c = 14.5 Mpa (157 Kg/m³ 4 0.30
8 Gagang Pintu 20 20 145,000,000.00 - 100,000,000.00 Balok Beton 11/11, f'c = 14.5 Mpa (157 Kg/m³) 4 0.21
9 Saringan Lantai 20 20 145,000,000.00 - 100,000,000.00 Pasangan Dinding ad. 1 : 4 4 1.34
10 Keni 3" PVC 120 120 145,000,000.00 - 100,000,000.00 Plesteran Dinding ad. 1 : 3 4 1.17
11 Tee 3" PVC 20 20 145,000,000.00 - 100,000,000.00 Atap Seng Gelombang BJLS 0.25 mm -
12 Paku Zink 2 2 145,000,000.00 - 100,000,000.00 Kuda-kuda Kayu Klas II -
13 No Drop 1 KG 10 10 145,000,000.00 - 100,000,000.00 Gordeng Kayu Klas II -
14 Bendrat 30 30 145,000,000.00 - 100,000,000.00 Listpank Papan uk. 3/20, Kayu Klas. II -
15 Grendel 20 20 145,000,000.00 - 100,000,000.00 Kusen Pintu, Kayu Klas. II 4 0.14
16 Kloset Jongkok 20 4.00 16 145,000,000.00 - 100,000,000.00 Rangka Pintu Klamp Kayu Klas II -
17 Skop 4 4.00 - 145,000,000.00 - 100,000,000.00 Daun Pintu Seng Licin BJLS 0.25 mm -
18 Pacul 3 3.00 - 145,000,000.00 - 100,000,000.00 Cat Dinding dengan Cat Tembok -
19 Paku Wel 2 2.00 - 145,000,000.00 - 100,000,000.00 Cat Listplank dengan Cat Kayu -
20 Linggis 2 2.00 - 145,000,000.00 - 100,000,000.00 Engsel Pintu 4" -
21 Meter 3 m 2 2.00 - 145,000,000.00 - 100,000,000.00 Kloset Jongkok Keramik/ Porselin 4 0.53
22 Meter 5 m 2 2.00 - 145,000,000.00 - 100,000,000.00 Floor Drain Ø 4" 4 0.08
23 Gerobak 2 2.00 - 145,000,000.00 - 100,000,000.00
24 Siku Tukang 1 1.00 - 145,000,000.00 - 100,000,000.00 PEKERJAAN BAK KONTROL
25 Waterpas 2 2.00 - 145,000,000.00 - 100,000,000.00 Galian Tanah -
26 Tropol 3 3.00 - 145,000,000.00 - 100,000,000.00 Lantai Rabat Beton Mutu f'c = 9.8 Mpa -
27 Alkon 2" + Slang (4 m) 1 1.00 - 145,000,000.00 - 100,000,000.00 Pasangan Dinding ad. 1 : 4 -
145,000,000.00 - 100,000,000.00 Plesteran Dinding ad. 1 : 3 -
MATERIAL LOKAL 145,000,000.00 - 100,000,000.00 Plat Penutup, f'c = 14.5 Mpa (52 Kg/m³) -
1 Pasir 12 2.00 10 145,000,000.00 - 100,000,000.00 Pegangngan Besi Ø 10 mm -
2 Batu 6 6 145,000,000.00 - 100,000,000.00
3 Kerikil 30 2.00 28 145,000,000.00 - 100,000,000.00 TANGKI SEPTIK & RESAPAN
Kayu 5/7 1 1 145,000,000.00 - 100,000,000.00 TANGKI SEPTIK
Kayu 5/10 1 1 145,000,000.00 - 100,000,000.00 41.4
Papan 1.5 2 145,000,000.00 - 100,000,000.00 Galian Tanah 6 0.28
Batu Bata 2000 350.00 1,650 145,000,000.00 - 100,000,000.00 Plat Lantai Dasar, f'c = 14.5 Mpa (70 Kg/m³) 4 0.44
Dinding Beton, f'c = 14.5 Mpa (62 Kg/m³) 4 1.48
Plat Penutup Tangki, f'c = 19.3 Mpa (52 Kg/m³) -
Penutup Mainhole, f'c = 14.5 Mpa (52 Kg/m³) -
Acian Dinding 4 0.36
Media Filter -
Pipa Hawa GIP Ø 2" -
Pegangngan Besi Ø 10 mm -
Lantai Rabat Beton Mutu f'c = 9.8 Mpa 4 0.09
Dudukan Media Filter -
Pasangan Batu Kosong 4 0.08
RESAPAN
Galian Tanah -
Lapisan Batu Kerikil -
Lapisan Ijuk -
Pemadatan Tanah Per 20 cm -

PEKERJAAN SAMBUNGAN RUMAH (SR)


Galian Tanah -
Pasangan Batu Kosong -
Urugan Pasir -
Pemadatan Tanah Per 20 cm -
Kloset - Tangki Septik PVC - D Ø 3" -
Bak Kontrol - Resapan PVC-D Ø 3" -
Floor Drain -BaK Kontrol PVC - D Ø 3 " -
Pipa Penyalur Dalam Tangki Septik PVC-D Ø 3" -
Tangki Septik - Resapan PVC - D Ø 3 " -
Sambungan Elbow 90º PVC-D Ø 3" -
Sambungan Tee 90º PVC-D Ø 3" -
Penutup Cap PVC-D Ø 3" -
Pemotongan PVC-D Ø 3" -
Lem Pipa PVC -
7.30
TOTAL
-
LAPORAN PELAKSANAAN

KEGIATAN SANITASI PEDESAAN PADAT KARYA

TAHUN ANGGARAN 2019

NAMA DESA : Lumalatal


NAMA KSM :

MATERIAL (BAHAN) KEUANGAN FISIK PROGRES


NO. MATERIAL TOT.
TERPAKAI SISA BIAYA YANG DICAIRKAN TAMBAHAN SALDO SISA PEKERJAAN TERBANGUN FISIK KEUANGAN
MATERIAL

MATERIAL TOKOH PEKERJAAN PEMBANGUNAN WC


1 Semen 100 100 Galian Tanah
2 Besi 8 40 40 Urugan Tanah Bawah Lantai
3 Besi 10 20 20 Urugan Pasir
4 Pipa 3" PVC 20 20 Pasangan Pondasi Batu Kali/ Karang
5 Tripleks 9 mm 20 20 Lantai Rabat Beton Mutu f'c = 9.8 Mpa
6 Paku Campur 50 50 Sloof Beton 11/11, f'c = 14.5 Mpa (157 Kg/m³)
7 Hengsel Pintu 20 20 Kolom Beton 11/11, f'c = 14.5 Mpa (157 Kg/m³)
8 Gagang Pintu 20 20 Balok Beton 11/11, f'c = 14.5 Mpa (157 Kg/m³)
9 Saringan Lantai 20 20 Pasangan Dinding ad. 1 : 4
10 Keni 3" PVC 120 120 Plesteran Dinding ad. 1 : 3
11 Tee 3" PVC 20 20 Atap Seng Gelombang BJLS 0.25 mm
12 Paku Zink 2 2 Kuda-kuda Kayu Klas II
13 No Drop 1 KG 10 10 Gordeng Kayu Klas II
14 Bendrat 30 30 Listpank Papan uk. 3/20, Kayu Klas. II
15 Grendel 20 20 Kusen Pintu, Kayu Klas. II
16 Kloset Jongkok 20 20 Rangka Pintu Klamp Kayu Klas II
17 Skop 4 4 Daun Pintu Seng Licin BJLS 0.25 mm
18 Pacul 3 3 Cat Dinding dengan Cat Tembok
19 Paku Wel 2 2 Cat Listplank dengan Cat Kayu
20 Linggis 2 2 Engsel Pintu 4"
21 Meter 3 m 2 2 Kloset Jongkok Keramik/ Porselin
22 Meter 5 m 2 2 Floor Drain Ø 4"
23 Gerobak 2 2
24 Siku Tukang 1 1 PEKERJAAN BAK KONTROL
25 Waterpas 2 2 Galian Tanah
26 Tropol 3 3 Lantai Rabat Beton Mutu f'c = 9.8 Mpa
27 Alkon 2" + Slang (4 m) 1 1 Pasangan Dinding ad. 1 : 4
Plesteran Dinding ad. 1 : 3
MATERIAL LOKAL Plat Penutup, f'c = 14.5 Mpa (52 Kg/m³)
1 Pasir - Pegangngan Besi Ø 10 mm
2 Batu -
3 Kerikil - TANGKI SEPTIK & RESAPAN
Kayu TANGKI SEPTIK
Galian Tanah
Plat Lantai Dasar, f'c = 14.5 Mpa (70 Kg/m³)
Dinding Beton, f'c = 14.5 Mpa (62 Kg/m³)
Plat Penutup Tangki, f'c = 19.3 Mpa (52 Kg/m³)
Penutup Mainhole, f'c = 14.5 Mpa (52 Kg/m³)
Acian Dinding
Media Filter
Pipa Hawa GIP Ø 2"
Pegangngan Besi Ø 10 mm
Lantai Rabat Beton Mutu f'c = 9.8 Mpa
Dudukan Media Filter
RESAPAN
Galian Tanah
Lapisan Batu Kerikil
Lapisan Ijuk
Pemadatan Tanah Per 20 cm

PEKERJAAN SAMBUNGAN RUMAH (SR)


Galian Tanah
Pasangan Batu Kosong
Urugan Pasir
Pemadatan Tanah Per 20 cm
Kloset - Tangki Septik PVC - D Ø 3"
Bak Kontrol - Resapan PVC-D Ø 3"
Floor Drain -BaK Kontrol PVC - D Ø 3 "
Pipa Penyalur Dalam Tangki Septik PVC-D Ø 3"
Tangki Septik - Resapan PVC - D Ø 3 "
Sambungan Elbow 90º PVC-D Ø 3"
Sambungan Tee 90º PVC-D Ø 3"
Penutup Cap PVC-D Ø 3"
Pemotongan PVC-D Ø 3"
Lem Pipa PVC

-
DOKUMENTASI PELAKSANAAN
KEGIATAN SANITASI PEDESAAN PADAT KARYA
TAHUN ANGGARAN 2019

01
KSM WAESALA SEHAT
DESA WAISALA

DOKUMENTASI PELAKSANAAN
KEGIATAN SANITASI PEDESAAN PADAT KARYA
TAHUN ANGGARAN 2019

02
KSM WAESALA SEHAT
DESA WAISALA