Lampiran-1

SURAT PERINTAH KERJA


: PEKERJAAN PENGADAAN DAN PEMASANGAN JARINGAN FIBER OPTIK FIBERISASI ISAT MOCN-P1
NAMA PROJECT
& MOCN-P2 PT. IFORTE SOLUSI INFOTEK
KONTRAK : TEC.034/TKM.00/I/2022 Tanggal 4 Januari 2022
SPK : TEC.034.120/TKM-03/VI/2022 Tanggal 14 Juni 2022
LOKASI : IF-TBT-MOCNPhase1-DF002
MITRA : MESRI EDIONO

IF-TBT-MOCNPhase1-DF002

23537
Harga 05TBT001 20654 21203 21081
No Item Unit Satuan TEBING_TINGGI_ THAMRIN_TBT_PL PADANG_HULU_ KUTA_BARU_TEBI JUMLAH TOTAL KET
TBT_PL to 20654 SYIHAB_BADAK_PL to 21081 TBT_GT to 23537 NG_PL to
(Rp) to 21203
SYIHAB_BADAK_P THAMRIN_TBT_PL 05SDB014
PADANG_HULU_TB KUTA_BARU_TEBI TEBING_TINGGI_
L T_GT NG_PL GAPURA_TB

Penarikan Kabel termasuk pemasangan Accessories 2,200 1,311 785 537 2,633
1 meter
Tiang (New Cable)

Penarikan Kabel termasuk pemasangan Accessories 2,200 652 500 547 1,699
2 meter
Tiang (Collo Tiang)

Tiang besi 7 meter Include accessories tiang dan 120,000 22 13 9 - - 44


7 Batang
Pelabelan Tiang

Tiang besi 9 meter Include accessories tiang dan 125,000 4 2 2 - - 8


8 Batang
Pelabelan Tiang

9 Slack Hanger Per 400 meter pcs 20,000 4 3 2 - - 9

10 Label Tiang pcs 5,000 26 15 11 - - 52

11 Riser Pipe Kabel (Galvanis 1,5 Inc) pcs 45,000 2 1 1 1 1 6

12 Conduit Hitam (Outdoor) pcs 1,000 20 10 10 10 10 60

13 HDPE pcs 1,000 20 10 10 10 10 60

Jumlah 16,640,400

Tebing Tinggi, 14 Juni 2022


Pelaksana Mengetahui Menyetujui

Mesri Ediono Wardani Setiawan Yaya Sunarya Almaida Ida Isnaeni


Mandor Quality Control Project Officer Finance Manager Direktur
Lampiran-1
SURAT PERINTAH KERJA
: PEKERJAAN PENGADAAN DAN PEMASANGAN JARINGAN FIBER OPTIK FIBERISASI
NAMA PROJECT
ISAT MOCN-P1 & MOCN-P2 PT. IFORTE SOLUSI INFOTEK
KONTRAK : TEC.034/TKM.00/I/2022 Tanggal 4 Januari 2022
SPK : TEC.034.120/TKM-03/VI/2022 Tanggal 14 Juni 2022
LOKASI : IF-TBT-MOCNPhase1-DF002
MITRA : MESRI EDIONO

IF-TBT-MOCNPhase1-DF002

Harga 05SDB013 05SDB035 23029 05TBT009 23430 05TBT008 23488 05TBT015 23270 22574 23410
No Item Unit Satuan DOLOKMASIHUL PADANG_HULU_TB DOLOKMASIHULTE 23408 BROHOL_EB BAJENIS_PL to PELITA_BAJENIS_T PINANG_MANCU TELUK_KARANG_ BULIAN_MDN_TB JLKARYA_TEBING SATRIA_TEBING_ BADAK_BEJUANG JUMLAH TOTAL KET
to 05SDB035 to 23029 BINGTINGGI_PL to to 05TBT009 23430 B to 05TBT008 NG_MT to 23488 ST to 05TBT015 to 23270 _MT to 22574 TB to 23410 _EB to 05TBT001
(Rp) PADANG_HULU_ DOLOKMASIHULTE 23408 BROHOL_EB BAJENIS_PL PELITA_BAJENIS_T PINANG_MANCUN TELUK_KARANG_ BULIAN_MDN_TB JLKARYA_TEBING SATRIA_TEBING_ BADAK_BEJUANG TEBING_TINGGI_
TB BINGTINGGI_PL B G_MT ST _MT TB _EB TBT_PL

Penarikan Kabel termasuk pemasangan 2,200 589 1,418 1,698 1,419 956 1,064 1,719 1,435 597 1,902 12,797
1 meter
Accessories Tiang (New Cable)

Penarikan Kabel termasuk pemasangan 2,200 1,297 500 1,115 2,912


2 meter
Accessories Tiang (Collo Tiang)

Tiang besi 7 meter Include accessories 120,000 10 - - 24 29 24 16 18 29 24 10 32 216


7 Batang
tiang dan Pelabelan Tiang

Tiang besi 9 meter Include accessories 125,000 2 - - 4 5 4 3 3 5 4 2 6 38


8 Batang
tiang dan Pelabelan Tiang

9 Slack Hanger Per 400 meter pcs 20,000 2 - - 5 6 5 3 4 6 5 2 6 44

10 Label Tiang pcs 5,000 12 - - 28 34 28 19 21 34 28 12 38 254

11 Riser Pipe Kabel (Galvanis 1,5 Inc) pcs 45,000 2 1 1 1 1 1 1 1 1 1 1 1 13

12 Conduit Hitam (Outdoor) pcs 1,000 20 10 10 10 10 10 10 10 10 10 10 10 130

13 HDPE pcs 1,000 20 10 10 10 10 10 10 10 10 10 10 10 130

Jumlah 68,224,800

Tebing Tinggi, 14 Juni 2022


Pelaksana Mengetahui Menyetujui

Mesri Ediono Wardani Setiawan Yaya Sunarya Almaida Ida Isnaeni


Mandor Quality Control Project Officer Finance Manager Direktur
Lampiran-1
SURAT PERINTAH KERJA
: PEKERJAAN PENGADAAN DAN PEMASANGAN JARINGAN FIBER OPTIK FIBERISASI
NAMA PROJECT
ISAT MOCN-P1 & MOCN-P2 PT. IFORTE SOLUSI INFOTEK
KONTRAK : TEC.034/TKM.00/I/2022 Tanggal 4 Januari 2022
SPK : TEC.034.120/TKM-03/VI/2022 Tanggal 14 Juni 2022
LOKASI : IF-KIS-MOCNPhase1-DF004
MITRA : MESRI EDIONO

IF-KIS-MOCNPhase1-DF004

Harga 23216
05KIS016 23215 BOGAK_CM PANGKALAN_INDR 23656 05KIS071 23201 23263 05KIS009 23217
No Item Unit Satuan SEI_BEJANGKAR_ to 23216 LUBUK_CUIK1_CM LUBUK_CUIK_PL to LUBUK_CUIK2_MT INDRAPURA_PL INDRA_PURA_MT SIPAREPARE_CM JUMLAH TOTAL KET
TB to 23215 PANGKALAN_INDR AYAMAN_CM to to 05KIS071 23201 to 23263 to 05KIS009 to 23217 to 05KIS002
(Rp) 23656
BOGAK_CM AYAMAN_CM LUBUK_CUIK1_CM LUBUK_CUIK_PL LUBUK_CUIK2_MT INDRAPURA_PL INDRA_PURA_MT SIPAREPARE_CM INALUM_EP

Penarikan Kabel termasuk pemasangan 2,200 764 4,340 1,570 747 15,434 564 23,419
1 meter
Accessories Tiang (New Cable)

Penarikan Kabel termasuk pemasangan 2,200 650 764 1,318 2,732


2 meter
Accessories Tiang (Collo Tiang)

Tiang besi 7 meter Include accessories 120,000 - 13 - 74 27 13 262 - 10 399


7 Batang
tiang dan Pelabelan Tiang

Tiang besi 9 meter Include accessories 125,000 - 2 - 13 5 2 46 - 2 70


8 Batang
tiang dan Pelabelan Tiang

9 Slack Hanger Per 400 meter pcs 20,000 - 3 - 14 5 2 51 - 2 77

10 Label Tiang pcs 5,000 - 15 - 87 32 15 308 - 12 469

11 Riser Pipe Kabel (Galvanis 1,5 Inc) pcs 45,000 2 1 1 1 1 1 1 1 1 10

12 Conduit Hitam (Outdoor) pcs 1,000 20 10 10 10 10 10 10 10 10 100


13 HDPE pcs 1,000 20 10 10 10 10 10 10 10 10 100

Jumlah 118,697,200

Tebing Tinggi, 14 Juni 2022


Pelaksana Mengetahui Menyetujui

Mesri Ediono Wardani Setiawan Yaya Sunarya Almaida Ida Isnaeni


Mandor Quality Control Project Officer Finance Manager Direktur
Lampiran-1
SURAT PERINTAH KERJA
: PEKERJAAN PENGADAAN DAN PEMASANGAN JARINGAN FIBER OPTIK FIBERISASI
NAMA PROJECT
ISAT MOCN-P1 & MOCN-P2 PT. IFORTE SOLUSI INFOTEK
KONTRAK : TEC.034/TKM.00/I/2022 Tanggal 4 Januari 2022
SPK : TEC.034.120/TKM-03/VI/2022 Tanggal 14 Juni 2022
LOKASI : IF-TBT-MOCNPhase1-DF002 & IF-TBT-MOCNPhase2-DF001
MITRA : MESRI EDIONO

VOLUME SESUAI SPK VOLUME SESUAI PELAKSANAAN

Harga Satuan IF-TBT- IF-TBT- IF-TBT- IF-TBT- IF-KIS-


No Item Unit IF-KIS-MOCNPhase1- JUMLAH JUMLAH KET
(Rp) MOCNPhase1- MOCNPhase2- MOCNPhase1- MOCNPhase2- MOCNPhase1-
DF002 DF001 DF004 TOTAL DF002 DF001 DF004 TOTAL

Penarikan Kabel termasuk pemasangan 2,200 2,633 12,797 23,419 38,849 3,062 14,967 36,112 54,141
1 meter
Accessories Tiang (New Cable)
Penarikan Kabel termasuk pemasangan
2
Accessories Tiang (Collo Tiang)
meter 2,200 1,699 2,912 2,732 7,343 702 2,213 2,915

Tiang besi 7 meter Include accessories tiang 120,000 44 216 399 659 9 185 355 549
7 Batang
dan Pelabelan Tiang
Tiang besi 9 meter Include accessories tiang 125,000 8 38 70 116 2 1 10 13
8 Batang
dan Pelabelan Tiang
9 Slack Hanger Per 400 meter pcs 20,000 9 44 77 130 9 68 99 176
10 Label Tiang pcs 5,000 52 254 469 775 -
11 Riser Pipe Kabel (Galvanis 1,5 Inc) pcs 45,000 6 13 10 29 2 6 4 12
12 Conduit Hitam (Outdoor) pcs 1,000 60 130 100 290 110 120 75 305
13 HDPE pcs 1,000 60 130 100 290 110 120 230

Jumlah 203,562,400 10,100,800 61,991,000 125,531,400 197,623,200

Tebing Tinggi, 2 Agustus 2022


Pelaksana Mengetahui Menyetujui

Mesri Ediono Ketut Sukrisno Wardani Setiawan Yaya Sunarya Almaida Ida Isnaeni
Mandor Site Manager Quality Control Project Officer Finance Manager Direktur