ACTUAL PROGRESS
S/D MINGGU LALU MINGGU INI S/D MINGGU INI
NO URAIAN PEKERJAAN BOBOT %
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
% % %
ACTUAL PROGRESS
S/D MINGGU LALU MINGGU INI S/D MINGGU INI
NO URAIAN PEKERJAAN BOBOT %
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
% % %
ACTUAL PROGRESS
S/D MINGGU LALU MINGGU INI S/D MINGGU INI
NO URAIAN PEKERJAAN BOBOT %
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
% % %
ACTUAL PROGRESS
S/D MINGGU LALU MINGGU INI S/D MINGGU INI
NO URAIAN PEKERJAAN BOBOT %
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
% % %
ACTUAL PROGRESS
S/D MINGGU LALU MINGGU INI S/D MINGGU INI
NO URAIAN PEKERJAAN BOBOT %
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
% % %
ACTUAL PROGRESS
S/D MINGGU LALU MINGGU INI S/D MINGGU INI
NO URAIAN PEKERJAAN BOBOT %
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
% % %
ACTUAL PROGRESS
S/D MINGGU LALU MINGGU INI S/D MINGGU INI
NO URAIAN PEKERJAAN BOBOT %
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
% % %
ACTUAL PROGRESS
S/D MINGGU LALU MINGGU INI S/D MINGGU INI
NO URAIAN PEKERJAAN BOBOT %
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
% % %
ACTUAL PROGRESS
S/D MINGGU LALU MINGGU INI S/D MINGGU INI
NO URAIAN PEKERJAAN BOBOT %
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
% % %
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5
I PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek 1.00 bh 403,275.59 403,275.59
2 Pengadaan Direksi Keet 6.00 m2 1,621,120.41 9,726,722.43
3 Pengadaan / pembuatan Gudang bahan dan alat 9.00 m2 938,687.37 8,448,186.32
4 Penyediaan Air dan Listrik Kerja 1.00 ls 2,398,750.00 2,398,750.00
5 Pekerjaan bongkaran & Pembuangan limbah/puing-puing 3,726.00 ls 4,000.00 14,904,000.00
6 Biaya Administrasi, pelaporan dan dokumendasi 1.00 ls 15,000,000.00 15,000,000.00
Jumlah 50,880,934.34
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5
V PEKERJAAN SANITASI
1 Pasang Kloset jongkok warna 8.00 bh 550,268.41 4,402,147.31
2 Pasang Orinoir 9.00 bh 2,815,339.77 25,338,057.94
3 Pasang Kran air 11.00 bh 26,107.73 287,185.03
4 Pasang Floor drain (stainless) 11.00 bh 54,525.90 599,784.90
5 Pasang Bak mandi feberglas 8.00 bh 634,131.10 5,073,048.82
6 Pasang saluran air dari pasangan bata 228.00 m' 97,727.52 22,281,874.96
Jumlah 57,982,098.95
REKAPITULASI
RONI FATONI
Direktur
METODE PELAKSANAAN
KEGIATAN : Rehabilitasi Puskesmas Jawilan
Alamat : Kp. Rokoy Rt 001 Rw 007 Kecamatan Kaduhejo Kababupaten Pandeglang – Banten
Email : Restu_bumiraya001@yahoo.co.id (087772486515-087773924015)
KONTRAK AWAL
NO URAIAN PEKERJAAN VOLUME SAT.
1 2 3 4
I PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek 1.00 bh
2 Pengadaan Direksi Keet 6.00 m2
3 Pengadaan / pembuatan Gudang bahan dan alat 9.00 m2
4 Penyediaan Air dan Listrik Kerja 1.00 ls
5 Pekerjaan bongkaran & Pembuangan limbah/puing-puing 3,726.00 ls
6 Biaya Administrasi, pelaporan dan dokumendasi 1.00 ls
V PEKERJAAN SANITASI
1 Pasang Kloset jongkok warna 8.00 bh
2 Pasang Orinoir 9.00 bh
3 Pasang Kran air 11.00 bh
4 Pasang Floor drain (stainless) 11.00 bh
5 Pasang Bak mandi feberglas 8.00 bh
6 Pasang saluran air dari pasangan bata 228.00 m'
7 Pasang Kusen + Pintu GRC unit
KONTRAK AWAL
NO URAIAN PEKERJAAN VOLUME SAT.
1 2 3 4
REKAPITULASI
Kegiatan : Program Peningkatan Sarana dan Prasarana Olahraga
Pekerjaan : Rehabilitasi Gedung Gelanggang Remaja ( GGR ) TAHAP 1
Lokasi : Kota Serang
Sumber Dana : APBD Perubahan Kota Serang
Tahun Anggaran : 2014
NO URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN
#REF! #REF!
#REF! #REF!
II PEKERJAAN KUSEN DAN PINTU
III PEKERJAAN KUNCI DAN ALAT PENGGANTUNG
IV PEKERJAAN INSTALASI LISTRIK
V PEKERJAAN SANITASI
VI PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND
VII PEKERJAAN PENGECATAN
VIII PEKERJAAN LAIN-LAIN
Jumlah
PPN 10%
Jumlah
Dibulatkan
TERBILANG : SATU MILYAR DELAPAN RATUS SEMBILAN PULUH JUTA TIGA RATUS EMPAT PULUH RIBU RUPIAH
Pandeglang, 07 Agustus 2
CV. RESTU BUMI RA
RONI FATONI
Direktur
CV. RESTU BUMI RAYA
METODE PELAKSANAAN
KEGIATAN : Rehabilitasi Puskesmas Jawilan
Rp 50,880,934.34
Rp #REF!
Rp #REF!
Rp 15,536,220.88
Rp 5,583,476.09
Rp 97,065,887.50
Rp 57,982,098.95
Rp 1,168,156,749.17
Rp 318,291,319.81
Rp 5,000,000.00
Rp #REF!
Rp #REF!
Rp #REF!
Rp #REF!
S EMPAT PULUH RIBU RUPIAH
RONI FATONI
Direktur
MI RAYA
AAN
ang
Kaduhejo Kababupaten Pandeglang – Banten
72486515-087773924015)
TAMBAH KURANG
VOLUME JUMLAH HARGA VOLUME JUMLAH HARGA KETERANGAN
(Rp.) (Rp.)
11 12 13 14 15
- - - - Tetap
- - - - Tetap
- - 5.00 4,693,436.85 Kurang
- - - - Tetap
- - - - Tetap
- - - - Tetap
- 4,693,436.85
- - - - Tetap
- - - - Tetap
12.59 893,702.56 - - Tambah
56.08 2,976,199.82 - - Tambah
- - - - Tetap
- - 12.62 670,292.37 Kurang
226.80 6,282,430.35 - - Tambah
12.20 2,454,436.01 - - Tambah
- - 313.73 16,947,153.98 Kurang
22.65 1,015,021.68 - - Tambah
- - - - Tetap
- - - - Tetap
- - 52.77 1,704,033.25 Kurang
- - 222.80 11,405,983.99 Kurang
13,621,790.42 30,727,463.58
- - - - Tetap
22.64 1,116,774.64 - - Tambah
- - 2,582.43 24,992,135.31 Kurang
- - - - Tetap
1.58 61,141.65 - - Tambah
356.52 8,896,917.53 - - Tambah
680.82 52,576,523.22 - - Tambah
62,651,357.04 24,992,135.31
- - - - Tetap
95.64 15,460,256.35 - - Tambah
83.84 6,186,607.26 - - Tambah
21,646,863.61 -
127,841,170.03 127,841,174.68
4.65
1,718,496,688.10 0.023
1,718,496,688.10 0.566
1,718,496,688.10 0.218
1,718,496,688.10 0.140
1,718,496,688.10 0.867
1,718,496,688.10 0.873
1,718,496,688.10 0.751
1,718,496,688.10 0.992
1,718,496,688.10 0.368
1,718,496,688.10 0.089
1,718,496,688.10 0.028
1,718,496,688.10 0.098
1,718,496,688.10 1.257
1,718,496,688.10 0.044
1,718,496,688.10 0.014
1,718,496,688.10 0.040
1,718,496,688.10 0.578
1,718,496,688.10 0.044
1,718,496,688.10 0.088
1,718,496,688.10 0.150
1,718,496,688.10 0.378
1,718,496,688.10 0.128
1,718,496,688.10 1.474
1,718,496,688.10 0.017
1,718,496,688.10 0.035
1,718,496,688.10 0.148
1,718,496,688.10 0.938
1,718,496,688.10 0.411
1,718,496,688.10 13.059
1,718,496,688.10 9.147
1,718,496,688.10 0.500
1,718,496,688.10 9.549
1,718,496,688.10 18.897
1,718,496,688.10 0.182
1,718,496,688.10 5.259
1,718,496,688.10 0.705
1,718,496,688.10 2.343
1,718,496,688.10 2.822
1,718,496,688.10 0.977
1,718,496,688.10 0.751
1,718,496,688.10 2.135
1,718,496,688.10 0.653
1,718,496,688.10 1.375
1,718,496,688.10 3.998
1,718,496,688.10 1.437
1,718,496,688.10 7.456
1,718,496,688.10 2.870
1,718,496,688.10 0.518
1,718,496,688.10 3.059
1,718,496,688.10 0.291
1,718,496,688.10 0.900
1,718,496,688.10 0.360
100.00
REKAPITULASI ANALISA HARGA SATUAN
No. Standar Satuan Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5) (6) (7)
PEKERJAAN PERSIAPAN
1 1.0000 m2 Pembuatan stager dari bambu 18,249.79 10,285.00 28,534.79
2 1.0000 m2 Pembuatan Gudang bahan dan alat 239,078.40 699,608.97 938,687.37
3 1.0000 bh Membuat Papan Nama Proyek 82,500.00 320,775.59 403,275.59
4 SNI 2835-2002 1.0000 m2 Pembuatan kantor sementara, dengan lantai plesteran 377,995.20 1,243,125.21 1,621,120.41
PEKERJAAN TANAH
1 SNI 2835-2008 1.0000 m3 Urug pasir 19,546.56 168,516.22 188,062.78
PEKERJAAN DINDING
1 SNI 6897-2008 1.0000 m2 Pasangan bata merah tebal 1/2 bata, 1 PC : 4 PP 27,767.52 69,960.00 97,727.52
PEKERJAAN PELESTERAN
1 SNI 2837-2008 1.0000 m2 Plesteran beton 1 Pc : 4 PP, tebal 15 mm 31,624.56 13,005.99 44,630.55
PEKERJAAN PLAFOND
1 SNI 2839-2008 1.0000 m2 Langit-langit gypsum board ukuran (1200 x 2400 x 9 )mm 10,990.32 33,828.94 44,819.26
2 1.0000 m2 Langit-langit GRC ukuran (1200 x 2400 x 9 )mm 10,990.32 30,533.56 41,523.88
3 SNI 2839-2008 1.0000 m1 Pasang list plafond gypsum profil 10,990.32 21,301.38 32,291.70
PEKERJAAN LISPLANG
1 1.0000 m1 Pasang lisplank GRC 23,907.84 27,285.98 51,193.82
PEKERJAAN ATAP
1 SNI 1.0000 m2 Pasang atap genteng metal zinc alume type prima roof 21,068.26 88,132.04 109,200.30
2 Pasang Nok genteng metal zinc alume type prima roof 29,971.92 41,013.19 70,985.11
3 SNI 1.0000 m2 Pasang alumunium foil / sisalation 14,383.25 38,686.73 53,069.97
PEKERJAAN PENGECATAN
1 SNI 1.0000 m2 Mengikis / mengerok permukaan cat tembok lama 9,519.84 157.91 9,677.75
2 SNI 1.0000 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup 12,159.31 30,753.58 42,912.89
3 SNI 1.0000 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 5,223.08 19,731.81 24,954.89
4 SNI 1.0000 m2 Pengecatan bidang besi ( 3 x ) 12,159.31 26,537.94 38,697.25
1.0000 m2 Pengecatan Plapond dengan cat tembok Vinilex (3 x) 35,951.52 13,370.91 49,322.43
PEKERJAAN SANITASI
1 SNI 1.0000 bh Memasang kloset jongkok porselen 301,340.16 248,928.25 550,268.41
2 SNI 1.0000 bh Memasang urinoir 149,054.40 2,666,285.37 2,815,339.77
3 SNI 1.0000 bh Memasang bak mandi fiberglass volume 0,30 m3 352,154.88 281,976.22 634,131.10
4 SNI 1.0000 bh Memasang kran diameter 3/4" atau 1/2" 8,838.72 17,269.01 26,107.73
5 SNI 1.0000 bh Memasang floor drain 8,838.72 45,687.18 54,525.90
PEKERJAAN PERSIAPAN
PEKERJAAN TANAH
SNI 1.0000 m3 Urug pasir
6.11 1.2000 m3 Pasir urug @ Rp. 127,663.80 153,196.56
2835:2008 0.3000 org Pekerja @ Rp. 56,160.00 16,848.00
0.0100 org Mandor @ Rp. 92,160.00 921.60
JUMLAH ( BELUM PPN ) 17,769.60 153,196.56 170,966.16
JASA 10 % 1,776.96 15,319.66 17,096.62
JUMLAH 19,546.56 168,516.22 188,062.78
PEKERJAAN DINDING
PEKERJAAN PELESTERAN
SNI 1.0000 m² Membantu dan Memasang Daun Pintu Panel, Kayu Kelas I dan II
6.5 0.0400 m3 Papan Kayu @ Rp. 3,905,229.90 156,209.20
03-3434-2008 0.5000 Kg Lem Kayu @ Rp. 8,708.70 4,354.35
3.0000 org Tukang kayu @ Rp. 71,040.00 213,120.00
0.3000 org Kepala tukang kayu @ Rp. 72,480.00 21,744.00
1.0000 org Pekerja @ Rp. 56,160.00 56,160.00
0.0500 org Mandor @ Rp. 92,160.00 4,608.00
JUMLAH ( BELUM PPN ) 295,632.00 160,563.55 456,195.55
JASA 10 % 29,563.20 16,056.35 45,619.55
JUMLAH 325,195.20 176,619.90 501,815.10
PEKERJAAN PLAFOND
SNI 1.0000 m2 Langit-langit gypsum board ukuran (1200 x 2400 x 9 )mm
6.7 0.3640 lbr Gypsum board @ Rp. 80,005.20 29,121.89
2839-2008 0.1100 kg Paku skrup @ Rp. 14,833.50 1,631.69
0.1000 org Pekerja @ Rp. 56,160.00 5,616.00
0.0500 org Tukang kayu @ Rp. 71,040.00 3,552.00
0.0050 org Kepala tukang kayu @ Rp. 72,480.00 362.40
0.0050 org Mandor @ Rp. 92,160.00 460.80
JUMLAH ( BELUM PPN ) 9,991.20 30,753.58 40,744.78
JASA 10 % 999.12 3,075.36 4,074.48
JUMLAH 10,990.32 33,828.94 44,819.26
PEKERJAAN LISPLANK
PEKERJAAN ATAP
SNI 1.0000 m2 Pasang atap genteng metal zinc alume type prima roof
03-3436-2002 1.0200 m2 Genteng metal @ Rp. 71,775.00 73,210.50
6.32 0.2000 kg Paku anti karat @ Rp. 34,547.70 6,909.54
0.1000 org Tukang kayu @ Rp. 71,040.00 7,104.00
0.0100 org Kepala tukang kayu @ Rp. 72,480.00 724.80
0.2000 org Pekerja @ Rp. 56,160.00 11,232.00
0.0010 org Mandor @ Rp. 92,160.00 92.16
JUMLAH ( BELUM PPN ) 19,152.96 80,120.04 99,273.00
JASA 10 % 1,915.30 8,012.00 9,927.30
JUMLAH 21,068.26 88,132.04 109,200.30
1.0000 m2 Pasang Nok genteng metal zinc alume type prima roof
1.0100 m2 Genteng metal @ Rp. 33,495.00 33,829.95
0.1000 kg Paku anti karat @ Rp. 34,547.70 3,454.77
0.1400 org Tukang kayu @ Rp. 71,040.00 9,945.60
0.0750 org Kepala tukang kayu @ Rp. 72,480.00 5,436.00
0.0800 org Pekerja @ Rp. 56,160.00 4,492.80
0.0800 org Mandor @ Rp. 92,160.00 7,372.80
JUMLAH ( BELUM PPN ) 27,247.20 37,284.72 64,531.92
JASA 10 % 2,724.72 3,728.47 6,453.19
JUMLAH 29,971.92 41,013.19 70,985.11
PEKERJAAN PENGECATAN
SNI 1.0000 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup
6.9 0.2000 kg Cat meni @ Rp. 17,417.40 3,483.48
0.1500 kg Plamir @ Rp. 28,135.80 4,220.37
0.1700 kg Cat dasar @ Rp. 38,949.90 6,621.48
0.3500 kg Cat penutup @ Rp. 38,949.90 13,632.47
0.1050 org Tukang cat @ Rp. 62,880.00 6,602.40
0.0040 org Kepala tukang cat @ Rp. 72,480.00 289.92
0.0700 org Pekerja @ Rp. 56,160.00 3,931.20
0.0025 org Mandor @ Rp. 92,160.00 230.40
JUMLAH ( BELUM PPN ) 11,053.92 27,957.80 39,011.72
JASA 10 % 1,105.39 2,795.78 3,901.17
JUMLAH 12,159.31 30,753.58 42,912.89
SNI 1.0000 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
6.15 0.1200 kg Cat dasar @ Rp. 41,533.80 4,984.06
0.1800 kg Cat penutup 2 x @ Rp. 71,966.40 12,953.95
0.0420 org Tukang cat @ Rp. 62,880.00 2,640.96
0.0042 org Kepala tukang cat @ Rp. 72,480.00 304.42
0.0280 org Pekerja @ Rp. 56,160.00 1,572.48
0.0025 org Mandor @ Rp. 92,160.00 230.40
JUMLAH ( BELUM PPN ) 4,748.26 17,938.01 22,686.26
JASA 10 % 474.83 1,793.80 2,268.63
JUMLAH 5,223.08 19,731.81 24,954.89
PEKERJAAN SANITASI
HARGA
NO JENIS BAHAN SAT BAHAN
Rp.
1 2 3 4
BAHAN AGREGAT KASAR, BAHAN PEREKAT DAN
BAHAN JADI
1 Batu Koral Beton kali M3 164,700
2 Batu Koral Pecah Mesin 1/2 M3 130,343
3 Kerikil M3 149,292
4 Pasir Beton M3 150,345
5 Pasir Pasang Kali M3 154,651
6 Pasir Urug M3 127,664
7 Semen PC Tiga Roda ( 50kg/Zak ) ZAK 65,000
8 Semen Warna KG 7,943
9 Bata Merah Bakar Kelas 1 BUAH 600
BAHAN SANITAIR
1 Closet Jongkok Std. TOTO ( setara ) BUAH 216,952
2 Urinoir TOTO ( setara ) BUAH 1,857,346
3 Floor Drain Stainless Steel BUAH 41,534
4 Kran Stainless Steel BUAH 15,599
5 Bak Mandi Fiber 60 x 60 UNIT 217,239
TENAGA
1 Tukang kayu hari 71,040.00
2 Kepala tukang kayu hari 72,480.00
3 Tukang batu hari 62,880.00
4 Kepala tukang batu hari 72,480.00
5 Tukang besi hari 71,040.00
6 Kepala tukang besi hari 72,480.00
7 Tukang las hari 71,040.00
8 Kepala tukang las hari 72,480.00
9 Tukang cat hari 62,880.00
10 Kepala tukang cat hari 72,480.00
11 Tukang plitur hari 62,880.00
12 Kepala tukang plitur hari 72,480.00
13 Pekerja hari 56,160.00
14 Mandor hari 92,160.00
KPUT 100.0000 m2 Perkerasan lapis pondasi bawah (sub base) tebal 20 cm padat
10.8 5.0000 m3 Pasair pasang @ Rp. 76,000.00 380,000.00
23.0000 m3 Batu belah 15/20 @ Rp. 80,000.00 1,840,000.00
3.0000 m3 Batu pecah 5/7 cm @ Rp. 132,000.00 396,000.00
6.5000 m3 Pasir urug @ Rp. 55,000.00 357,500.00
26.0000 m Isi batu berkerasan
3
@ Rp. 90,967.00 2,365,142.00
6.5000 Tng Menyawur pasir @ Rp. 56,160.00 365,040.00
JUMLAH ( BELUM TERMASUK PPN ) 2,730,182.00 2,973,500.00 5,703,682.00
DIBULATKAN 5,703,682.00
Tiap m2
1/100 x 2,730,182.00 + 2,973,500.00 27,301.82 29,735.00
Biaya menggilas
1/200 x 56,160.00 + 120,550.00 280.80 602.75
Sewa motor walls
1/200 x #REF! #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF! 30,337.75 #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!
Tiap m2
1/100 x 2,145,623.50 + 2,412,000.00 21,456.24 24,120.00
Biaya menggilas
1/200 x 56,160.00 + 120,550.00 280.80 602.75
Sewa motor walls
1/200 x #REF! #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF! 24,722.75 #REF!
JASA 10 % #REF!
Analisa KPUT - 48
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
JUMLAH #REF!
DIBULATKAN #REF!
Analisa KPUT - 49
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Tiap m2
1/100 x 1,365,091.00 + 1,896,750.00 13,650.91 18,967.50
Biaya menggilas
1/150 x 56,160.00 + 120,550.00 374.40 803.67
Sewa motor walls
1/150 x #REF! #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF! 19,771.17 #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!
Analisa KPUT - 50
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Tiap m2
1/100 x 878,400.00 + #REF! 8,784.00 #REF!
Biaya menggilas
4/12,5/200 x 56,160.00 + 120,550.00 89.86 192.88
Sewa motor walls
1/200 x #REF! #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF! #REF! #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!
Tiap m2
Aspal sand sheet 2 cm jereng (1 cm padat)
2/100 x 491,760.00 + 1,488,250.00 9,835.20 29,765.00
Biaya menggilas
1/500 x 56,160.00 + 120,550.00 112.32 241.10
Sewa motor walls
1/500 x #REF! #REF!
Aspal untuk lem 0,5 kg
0.5000 x 10,650.00 5,325.00
JUMLAH ( BELUM TERMASUK PPN ) #REF! 35,331.10 #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!
Tiap m2
Aspal sand sheet 3 cm jereng (2 cm padat)
3/100 x 491,760.00 + 1,488,250.00 14,752.80 44,647.50
Biaya menggilas
1/500 x 56,160.00 + 120,550.00 112.32 241.10
Sewa motor walls
1/500 x #REF! #REF!
Aspal untuk lem 0,5 kg
0.5000 x 10,650.00 5,325.00
JUMLAH ( BELUM TERMASUK PPN ) #REF! 50,213.60 #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!
KPUT 100.0000 m2 Pengaspalan sand sheet (latasir) tanpa aspal, tebal 1 cm jereng
M.8 - kg Aspal 10,650.00 -
1.0000 m Pasair pasang
3
@ Rp. 76,000.00 76,000.00
0.9000 m3 Kayu bakar @ Rp. 90,000.00 81,000.00
0.2500 org Juru godog aspal @ Rp. - -
8.1000 org Pekerja @ Rp. 56,160.00 454,896.00
0.4000 org Mandor @ Rp. 92,160.00 36,864.00
JUMLAH ( BELUM TERMASUK PPN ) 491,760.00 157,000.00 648,760.00
DIBULATKAN 648,760.00
Analisa KPUT - 51
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Tiap m2
Aspal sand sheet 2 cm jereng (1 cm padat) tanpa aspal
2/100 x 491,760.00 + 157,000.00 9,835.20 3,140.00
Biaya menggilas
1/500 x 56,160.00 + 120,550.00 112.32 241.10
Sewa motor walls
1/500 x #REF! #REF!
Aspal untuk lem 0,5 kg
- x 10,650.00 -
JUMLAH ( BELUM TERMASUK PPN ) #REF! 3,381.10 #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!
Tiap m2
Aspal sand sheet 3 cm jereng (2 cm padat) tanpa aspal
3/100 x 491,760.00 + 157,000.00 14,752.80 4,710.00
Biaya menggilas
1/500 x 56,160.00 + 120,550.00 112.32 241.10
Sewa motor walls
1/500 x #REF! #REF!
Aspal untuk lem 0,5 kg
- x 10,650.00 -
JUMLAH ( BELUM TERMASUK PPN ) #REF! 4,951.10 #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!
Analisa KPUT - 52
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Analisa KPUT - 53
ANJALISA PEKERJAAN LISTRIK
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Analisa Gedung - 54
(1) (2) (3) (4) (5)
Analisa Gedung - 55
(1) (2) (3) (4) (5)
Analisa Gedung - 56
(1) (2) (3) (4) (5)
Analisa Gedung - 57
(1) (2) (3) (4) (5)
25. 1.0000 set Pasang Stang Ornamen 2,2 meter + Lampu SRP 822/250 Watt Son + pengetesan dan penyalaan
0.5000 org Pekerja @ Rp. 56,160.00 28,080.00
0.5000 org Tukang Listrik @ Rp. 0.04 0.02
1.2500 org Pengawas @ Rp. - -
0.5000 org Mandor @ Rp. 92,160.00 46,080.00
JUMLAH (A) 74,160.02 - 74,160.02
27. 1.0000 set Pasang Stang Ornamen 6 meter + Lampu SRP 822/250 Watt Son
0.8750 org Pekerja @ Rp. 56,160.00 49,140.00
0.8750 org Tukang Listrik @ Rp. 0.04 0.03
1.8033 org Pengawas @ Rp. - -
0.7413 org Mandor @ Rp. 92,160.00 68,320.97
JUMLAH (C) 117,461.01 - 117,461.01
28. 1.0000 set Pasang Stang Ornamen 2,2 meter + Lampu SRP 822/250 Watt Son
0.5000 org Pekerja @ Rp. 56,160.00 28,080.00
0.5000 org Tukang Listrik @ Rp. 0.04 0.02
1.2500 org Pengawas @ Rp. - -
0.5000 org Mandor @ Rp. 92,160.00 46,080.00
JUMLAH (D) 74,160.02 - 74,160.02
29. 1.0000 set Pasang Tiang Octogonal Cabang 1, h= 7 meter+ lampu SRP 822/250 Watt Son
0.4200 m3 Pondasi Tiang Beton bertulang 1:2:3 @ Rp. #REF! #REF!
2.8500 org Pekerja @ Rp. 56,160.00 160,056.00
2.8500 org Tukang Listrik @ Rp. 0.04 0.11
2.0075 org Pengawas @ Rp. - -
1.0000 org Mandor @ Rp. 92,160.00 92,160.00
JUMLAH (E) 252,216.11 #REF! #REF!
30. 1.0000 set Pasang Tiang Octogonal Cabang 1, h= 9 meter + lampu SRP 822/250 Watt Son
0.4200 m 3
Pondasi Tiang Beton bertulang 1:2:3 @ Rp. #REF! #REF!
3.1000 org Pekerja @ Rp. 56,160.00 174,096.00
3.1000 org Tukang Listrik @ Rp. 0.04 0.12
2.5000 org Pengawas @ Rp. - -
1.2100 org Mandor @ Rp. 92,160.00 111,513.60
JUMLAH (F) 285,609.72 #REF! #REF!
Analisa Gedung - 58
(1) (2) (3) (4) (5)
31. 1.0000 set Pasang Tiang Octogonal Cabang 2, h= 9 meter+ lampu SRP 822/250 Watt Son
0.4200 m3 Pondasi Tiang Beton bertulang 1:2:3 @ Rp. #REF! #REF!
3.3000 org Pekerja @ Rp. 56,160.00 185,328.00
3.3000 org Tukang Listrik @ Rp. 0.04 0.13
2.5782 org Pengawas @ Rp. - -
1.2433 org Mandor @ Rp. 92,160.00 114,582.53
JUMLAH (G) 299,910.65 #REF! #REF!
32. 1.0000 set Pasang Tiang Octogonal Cabang 3, h= 9 m+ lampu SRP 822/250 Watt Son
0.4200 m 3
Pondasi Tiang Beton bertulang 1:2:3 @ Rp. #REF! #REF!
3.8100 org Pekerja @ Rp. 56,160.00 213,969.60
3.8100 org Tukang Listrik @ Rp. 0.04 0.15
2.6626 org Pengawas @ Rp. - -
1.2650 org Mandor @ Rp. 92,160.00 116,582.40
JUMLAH (H) 330,552.15 #REF! #REF!
33. 1.0000 set Pasang Tiang Octogonal Cabang 3, h= 11 m+ lampu SRP 822/250 Watt Son
0.4200 m3 Pondasi Tiang Beton bertulang 1:2:3 @ Rp. #REF! #REF!
4.2500 org Pekerja @ Rp. 56,160.00 238,680.00
4.2500 org Tukang Listrik @ Rp. 0.04 0.16
2.9287 org Pengawas @ Rp. - -
1.2939 org Mandor @ Rp. 92,160.00 119,245.82
JUMLAH (I) 357,925.99 #REF! #REF!
34. 1.0000 set Bongkar armatur pada stang ornamen existing + pasang lampu SRP 822/150 Watt Son + return
0.9000 org Pekerja @ Rp. 56,160.00 50,544.00
0.9000 org Tukang Listrik @ Rp. 0.04 0.03
2.1044 org Pengawas @ Rp. - -
0.8418 org Mandor @ Rp. 92,160.00 77,580.29
0.0500 unit Retur material existing @ Rp. 100,000.00 5,000.00
JUMLAH (J) 133,124.32 - 133,124.32
35. 1.0000 set Bongkar armatur pada stang ornamen existing + pasang Lampu SRP 822/250 Watt Son + retur
0.8750 org Pekerja @ Rp. 56,160.00 49,140.00
0.8750 org Tukang Listrik @ Rp. 0.04 0.03
1.6995 org Pengawas @ Rp. - -
0.6798 org Mandor @ Rp. 92,160.00 62,650.37
0.0500 unit Retur material existing @ Rp. 100,000.00 5,000.00
JUMLAH (K) 116,790.40 - 116,790.40
Analisa Gedung - 59
(1) (2) (3) (4) (5)
36. 1.0000 set Bongkar armatur pada tang existing + pasang Lampu SRP 822/250 Watt Son + retur
0.9000 org Pekerja @ Rp. 56,160.00 50,544.00
0.9000 org Tukang Listrik @ Rp. 0.04 0.03
2.1044 org Pengawas @ Rp. - -
0.8418 org Mandor @ Rp. 92,160.00 77,580.29
0.0500 unit Retur material existing @ Rp. 100,000.00 5,000.00
JUMLAH (L) 133,124.32 - 133,124.32
37. 1.0000 set Bongkar komponen lama existing + pasang komponen Lampu SRP 822/250 Watt Son + retur
0.8500 org Pekerja @ Rp. 56,160.00 47,736.00
0.8500 org Tukang Listrik @ Rp. 0.04 0.03
1.9554 org Pengawas @ Rp. - -
0.7822 org Mandor @ Rp. 92,160.00 72,087.55
0.0500 unit Retur material existing @ Rp. 100,000.00 5,000.00
JUMLAH (M) 124,823.58 - 124,823.58
Analisa Gedung - 60
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan ASPHALT MIXING PLANT E01
2 Tenaga Pw 150.00 HP
3 Kapasitas Cp 50.00 Ton/jam
4 Alat Baru : a. Umur Ekonomis A 10.00 Tahun
b. Jam Kerja dalam 1 Tahun W 1,500.00 Jam
c. Harga Alat B 7,500,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 10.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 1,500.00 Jam Alat Baru
c. Harga Alat B' 7,500,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 61
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan ASPHALT FINISHER E02
2 Tenaga Pw 47.00 HP
3 Kapasitas Cp 6.00 Ton
4 Alat Baru : a. Umur Ekonomis A 6.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 715,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 6.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 715,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 62
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan ASPHALT SPRAYER E03
2 Tenaga Pw 15.00 HP
3 Kapasitas Cp 800.00 Liter
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 145,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 145,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 63
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan BULLDOZER 100 -150 HP E04
2 Tenaga Pw 140.00 HP
3 Kapasitas Cp Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 700,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 700,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 64
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan COMPRESSOR 4000 - 6500 L/M E05
2 Tenaga Pw 80.00 HP
3 Kapasitas Cp Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 175,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 175,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 65
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan WHEEL LOADER 1,0 - 1,6 M3 E15
2 Tenaga Pw 105.00 HP
3 Kapasitas Cp 1.50 Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 840,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 840,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 66
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan TANDEM ROLLER 6 - 8 T E17
2 Tenaga Pw 50.00 HP
3 Kapasitas Cp 8.00 Ton
4 Alat Baru a Umur Ekonomis A 5.00 Tahun
b Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c Harga Alat B 460,000,000.00 Rupiah
5 Alat yang dipakai a Umur Ekonomis A' 5.00 Tahun Alat Baru
b Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c Harga Alat B' 460,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 67
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan PNEUMATIC TYRE ROLLER 8 - 10 T E18
2 Tenaga Pw 60.00 HP
3 Kapasitas Cp 10.00 Ton
4 Alat Baru a Umur Ekonomis A 5.00 Tahun
b Jam Kerja dalam 1 Tahun W 1,800.00 Jam
c Harga Alat B 510,000,000.00 Rupiah
5 Alat yang dipakai a Umur Ekonomis A' 5.00 Tahun Alat Baru
b Jam Kerja dalam 1 Tahun W' 1,800.00 Jam Alat Baru
c Harga Alat B' 510,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 68
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan DUMP TRUCK E09
2 Tenaga Pw 125.00 HP
3 Kapasitas Cp 8.00 Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 145,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 145,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 69
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan GENERATOR SET E12
2 Tenaga Pw 175.00 HP
3 Kapasitas Cp 125.00 KVA
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 440,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 440,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 70
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan MOTOR GRADER > 100 HP E12
2 Tenaga Pw 125.00 HP
3 Kapasitas Cp - -
4 Alat Baru a Umur Ekonomis A 5.00 Tahun
b Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c Harga Alat B 880,000,000.00 Rupiah
5 Alat yang dipakai a Umur Ekonomis A' 5.00 Tahun Alat Baru
b Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c Harga Alat B' 880,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 71
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan VIBRATORY ROLLER 5 - 8 T E19
2 Tenaga Pw 75.00 HP
3 Kapasitas Cp 7.00 Ton
4 Alat Baru Umur Ekonomis A 4.00 Tahun
Jam Kerja dalam 1 Tahun W 2,000.00 Jam
Harga Alat B 500,000,000.00 Rupiah
5 Alat yang dipakai a Umur Ekonomis A' 4.00 Tahun Alat Baru
b Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c Harga Alat B' 500,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 72
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan WATER TANK TRUCK 3000 - 4000 L E23
2 Tenaga Pw 100.00 HP
3 Kapasitas Cp 4,000.00 Liter
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 50,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 50,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 73
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan JACK HAMMER E26
2 Tenaga Pw 3.00 HP
3 Kapasitas Cp - Liter
4 Alat Baru : a. Umur Ekonomis A 4.00 Tahun
b. Jam Kerja dalam 1 Tahun W 1,000.00 Jam
c. Harga Alat B 3,500,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 4.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 1,000.00 Jam Alat Baru
c. Harga Alat B' 3,500,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 74
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan TAMPER E25
2 Tenaga Pw 5.00 HP
3 Kapasitas Cp 0.170 Ton
4 Alat Baru : a. Umur Ekonomis A 4.00 Tahun
b. Jam Kerja dalam 1 Tahun W 1,000.00 Jam
c. Harga Alat B 3,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 4.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 1,000.00 Jam Alat Baru
c. Harga Alat B' 3,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 75
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan STONE CRUSHER E21
2 Tenaga Pw 220.00 HP
3 Kapasitas Cp 50.00 Ton/Jam
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 491,500,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 491,500,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 76
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan THREE WHEEL ROLLER 6 - 8 T E16
2 Tenaga Pw 55.00 HP
3 Kapasitas Cp 8.00 Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 125,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 125,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 77
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan CONCRETE VIBRATOR E20
2 Tenaga Pw 10.00 HP
3 Kapasitas Cp - -
4 Alat Baru : a. Umur Ekonomis A 4.00 Tahun
b. Jam Kerja dalam 1 Tahun W 1,000.00 Jam
c. Harga Alat B 12,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 4.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 1,000.00 Jam Alat Baru
c. Harga Alat B' 12,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 78
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan CONCRETE MIXER 0.3 - 0.6 M3 E06
2 Tenaga Pw 15.00 HP
3 Kapasitas Cp 500.00 Liter
4 Alat Baru : a. Umur Ekonomis A 4.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 45,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 4.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 45,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 79
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan CRANE 10 - 15 TON E07
2 Tenaga Pw 150.00 HP
3 Kapasitas Cp 15.00 Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 300,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 300,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 80
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan DUMP TRUCK 3 - 4 M3 E08
2 Tenaga Pw 100.00 HP
3 Kapasitas Cp 6.00 Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 100,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 100,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 81
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan EXCAVATOR 80 - 140 HP E10
2 Tenaga Pw 80.00 HP
3 Kapasitas Cp 0.50 M3
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 250,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 250,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 82
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan FLAT BED TRUCK 3 - 4 M3 E11
2 Tenaga Pw 100.00 HP
3 Kapasitas Cp 4.00 M3
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 250,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 250,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 83
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan WATER PUMP 70 - 100 mm E22
2 Tenaga Pw 6.00 HP
3 Kapasitas Cp - -
4 Alat Baru : a. Umur Ekonomis A 2.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 5,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 2.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 5,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 84
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan FULVI MIXER E27
2 Tenaga Pw 75.00 HP
3 Kapasitas Cp - -
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 100,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 100,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 85
URAIAN ANALISA ALAT
I URAIAN PERALATAN
1 Jenis Peralatan TRACK LOADER 75 - 100 HP E14
2 Tenaga Pw 90.00 HP
3 Kapasitas Cp 1.60 M3
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 300,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 300,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 - Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 - Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
Analisa Alat - 86
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0113 7,020.00 79.57
2 Mandor ( L 03 ) Jam 0.0016 11,520.00 18.65
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.0121 126,500.00 1,532.51
2 Agregat Halus ( M 04 ) M3 0.0232 79,750.00 1,850.41
3 Filler ( M 05 ) Kg 4.8004 750.00 3,600.33
4 Aspal ( M 10 ) Kg 5.2962 10,650.00 56,404.89
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0011 #REF! #REF!
2 AMP ( E 01 ) Jam 0.0016 #REF! #REF!
3 Genset ( E 12 ) Jam 0.0016 #REF! #REF!
4 Dump Truck ( E 09 ) Jam 0.0143 #REF! #REF!
5 Aspal Finisher ( E 02 ) Jam 0.0020 #REF! #REF!
6 Tandem Roller ( E 17 ) Jam 0.0017 #REF! #REF!
7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0013 #REF! #REF!
8 Alat Bantu Ls 1.0000 500.00 500.00
JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 87
URAIAN ANALISA HARGA SATUAN LATASTON ( HRS )
SATUAN : M2 Analisa EI - 633
I ASUMSI
1 Menggunakan alat berat ( cara mekanik )
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km
5 Tebal lapisan padat t 0.03 m
6 Jam kerja efektif 1 hari Tk 7.00 Jam
7 Faktor kehilangan material
- Agregat Fh 1 1.10 -
- Aspal Fh 2 1.05 -
II METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat
langsung ke dalam Dump Truck dan diangkut ke lokasi pekerjaan.
3 Campuran panas HRS dihampar dengan Finisher dan dipadatakan dengan
Tandem dan Peneumatic Tire Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50 m3
Faktor bucket Fb 0.90 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus Ts 1
- Muat T1 1.50 menit
- Lain lain T2 0.50 menit
Ts 1 2.00 menit
Analisa - E 88
No URAIAN KODE KOEF. SATUAN KET.
d Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 8.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata rata bermuatan v1 40.00 km / jam
Kecepatan rata rata kosong v2 50.00 km / jam
Kapasitas AMP batch Q2 b 0.50 ton
Waktu menyiapkan 1 batch HRS Tb 1.00 menit
Waktu Siklus Ts2
- Mengisi bak = ( V : Q2b ) x Tb T1 16.00 menit
- Angkut = ( L : v1 ) x 60 menit T2 30.00 menit
- Tunggu + Dumping + Putar T3 15.00 menit
- Kembali = ( L : v2 ) x 60 menit T4 24.00 menit
Ts2 85.00 menit
e Finisher ( E 02 )
Kapasitas produksi V 40.00 km / jam
Faktor efisiensi alat Fa 0.83 -
f Tandem Roller ( E 17 )
Kecepatan rata rata alat v 3.50 km/jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 6.00 lintasan
Faktor efisiensi alat Fa 0.83 -
Analisa - E 89
No URAIAN KODE KOEF. SATUAN KET.
h Alat Bantu
Diperlukan :
- Kereta dorong = 2 bh Lump sum
- Skop = 3 bh
- Garpu = 2 bh
- Tongkat kontrol ketebalan hamparan
3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 617.56 m2 / jam
Produksi HRS / hari = Tk x Q2 Qt 4,322.92 m2
Kebutuhan tenaga
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Rp #REF! / M2
Analisa - E 90
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0217 7,020.00 152.24
2 Mandor ( L 03 ) Jam 0.0022 11,520.00 24.98
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.0336 126,500.00 4,254.51
2 Agregat Halus ( M 04 ) M3 0.0149 79,750.00 1,184.29
3 Filler ( M 05 ) Kg 4.8015 750.00 3,601.13
4 Aspal ( M 10 ) Kg 6.6150 10,650.00 70,449.75
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0015 #REF! #REF!
2 AMP ( E 01 ) Jam 0.0022 #REF! #REF!
3 Genset ( E 12 ) Jam 0.0022 #REF! #REF!
4 Dump Truck ( E 09 ) Jam 0.0348 #REF! #REF!
5 Aspal Finisher ( E 02 ) Jam 0.0027 #REF! #REF!
6 Tandem Roller ( E 17 ) Jam 0.0016 #REF! #REF!
7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0023 #REF! #REF!
8 Alat Bantu Ls 1.0000 500.00 500.00
JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 91
URAIAN ANALISA HARGA SATUAN LASTON ( AC )
SATUAN : M2 Analisa EI - 634
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km
5 Tebal lapisan ( AC ) padat t 0.04 m
6 Jam kerja efektif 1 hari Tk 7.00 Jam
7 Faktor kehilangan material
- Agregat Fh 1 1.10 -
- Aspal Fh 2 1.05 -
II METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat
langsung ke dalam Dump Truck dan diangkut ke lapangan
3 Campuran panas AC dihampar dengan Finisher dan dipadatakan dengan
Tandem dan Tire Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50 m3
Faktor bucket Fb 0.90 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus Ts 1
- Muat T1 1.50 menit
- Lain lain T2 0.50 menit
Ts 1 2.00 menit
Analisa - E 92
No URAIAN KODE KOEF. SATUAN KET.
d Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 4.00 m3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata rata bermuatan v1 40.00 km / jam
Kecepatan rata rata kosong v2 50.00 km / jam
Kapasitas AMP batch Q2 b 0.50 ton
Waktu menyiapkan 1 batch AC Tb 1.00 menit
Waktu Siklus Ts2
- Mengisi bak = ( V : Q2b ) x Tb T1 8.00 menit
- Angkut = ( L : v1 ) x 60 menit T2 29.99 menit
- Tunggu + Dumping + Putar T3 15.00 menit
- Kembali = ( L : v2 ) x 60 menit T4 23.99 menit
Ts2 76.98 menit
e Finisher ( E 02 )
Kapasitas produksi V 40.00 ton / jam
Faktor efisiensi alat Fa 0.83 -
f Tandem Roller ( E 17 )
Kecepatan rata rata alat v 2.50 km / jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 4.00 lintasan
Faktor efisiensi alat Fa 0.83 -
Analisa - E 93
No URAIAN KODE KOEF. SATUAN KET.
h Alat Bantu
Diperlukan :
- Rambu = 2 bh
- Kereta dorong = 2 bh Lump sum
- Skop = 3 bh
- Garpu = 2 bh
- Tongkat kontrol ketebalan hamparan
3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 461.11 m2 / jam
Produksi AC / hari = Tk x Q2 Qt 3,227.78 m2
Kebutuhan tenaga
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
Rp #REF! / M2
Analisa - E 94
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.3880 7,020.00 2,723.42
2 Mandor ( L 03 ) Jam 0.0554 11,520.00 638.46
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.7028 126,500.00 88,901.39
2 Agregat Halus ( M 04 ) M3 0.5341 79,750.00 42,595.36
3 Filler ( M 05 ) Kg 139.2 750.00 104,399.98
4 Aspal ( M 10 ) Kg 157.0 10,650.00 1,672,049.95
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0380 #REF! #REF!
2 AMP ( E 01 ) Jam 0.0554 #REF! #REF!
3 Genset ( E 12 ) Jam 0.0554 #REF! #REF!
4 Dump Truck ( E 09 ) Jam 0.4906 #REF! #REF!
5 Aspal Finisher ( E 02 ) Jam 0.0767 #REF! #REF!
6 Tandem Roller ( E 17 ) Jam 0.0430 #REF! #REF!
7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0321 #REF! #REF!
8 Alat Bantu Ls 1.0000 500.00 500.00
JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 95
URAIAN ANALISA HARGA SATUAN ASPHALT TREATED BASE ( ATB )
I ASUMSI
1 Menggunakan alat berat ( Cara mekanik )
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km
5 Tebal lapisan ( ATB ) padat t 0.04 m
6 Jam kerja efektif 1 hari Tk 7.00 Jam
7 Faktor kehilangan material
- Agregat Fh 1 1.10 -
- Aspal Fh 2 1.05 -
II METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat
langsung ke dalam Dump truck dan diangkut ke lokasi pekerjaan
3 Campuran panas ATB dihampar dengan Finisher dan dipadatakan dengan
Tandem dan Pneumatic Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50 m3
Faktor bucket Fb 0.90 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus Ts 1
- Muat T1 1.50 menit
- Lain lain T2 0.50 menit
Ts 1 2.00 menit
Analisa - E 96
No URAIAN KODE KOEF. SATUAN KET.
d Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 8.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata rata bermuatan v1 40.00 km / jam
Kecepatan rata rata kosong v2 50.00 km / jam
Kapasitas AMP batch Q2 b 0.50 ton
Waktu menyiapkan 1 batch ATB Tb 1.00 menit
Waktu Siklus Ts2
- Mengisi bak = ( V : Q2b ) x Tb T1 16.00 menit
- Angkut = ( L : v1 ) x 60 menit T2 29.99 menit
- Tunggu + Dumping + Putar T3 15.00 menit
- Kembali = ( L : v2 ) x 60 menit T4 23.99 menit
Ts2 84.99 menit
e Finisher
Kapasitas produksi V 40.00 ton/jam
Faktor efisiensi alat Fa 0.75 -
f Tandem Roller ( E 17 )
Kecepatan rata rata alat v 3.50 km / jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 6.00 lintasan
Faktor efisiensi alat Fa 0.83 -
Analisa - E 97
No URAIAN KODE KOEF. SATUAN KET.
h Alat Bantu
Diperlukan :
- Kereta dorong = 2 bh Lump sum
- Skop = 3 bh
- Garpu = 2 bh
- Tongkat kontrol ketebalan hamparan
3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 18.04 m3 / jam
Produksi ATB / hari = Tk x Q2 Qt 126.30 m3
Kebutuhan tenaga
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Rp #REF! / M3
Analisa - E 98
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0301 7,020.00 211.45
2 Mandor ( L 03 ) Jam 0.0060 11,520.00 69.40
B BAHAN
1 Aspal ( M 10 ) ( M 10 ) Kg 0.6417 10,650.00 6,834.30
2 Karosene ( M 11 ) ( M 11 ) Liter 0.4889 1,000.00 488.90
C PERALATAN
1 Asphalt Sprayer ( E 03 ) Jam 0.0030 #REF! #REF!
2 Compresor ( E 05 ) Jam 0.0031 #REF! #REF!
3 Dump Truck ( E 08 ) Jam 0.0030 #REF! #REF!
JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 99
URAIAN ANALISA HARGA SATUAN LAPIS RESAP PENGIKAT
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.00 Km
4 Jam kerja efektif 1 hari Tk 7.00 Jam
5 Faktor kehilangan material Fh 1.10 -
6 Komposisi campuran AC ( Spesifikasi )
- Aspal AC - 10 atau AC - 20 AS 56 % 100 Bagian
- Minyak Flux / pencair K 44 % 80 Bagian
8 Bahan dasar ( aspal dan minyak pencair ) semuanya diterima di Lokasi Pekerjaan
II METODA KERJA
1 Aspal dan minyak Flux dicampur dan dipanaskan sehingga menjadi campuran aspal cair
2 Permukaan yang akan dilapis dibersihkan dari debu dan kotoran dg air kompresor
3 Campuran aspal cair disemprotkan dg aspahalt sprayer ke atas permukaan yg akan dilapis
4 Angkutan aspal dan minyak Flux menggunakan Dump truck
2 ALAT
a Asphalt Sprayer ( E 03 )
Kapasitas alat V 800.00 liter
Faktor efisiensi alat Fa 0.83 -
Waktu siklus ( termasuk proses pemanasan ) Ts 2.00 jam
b Air Compresor ( E 05 )
Kapasitas alat -----------> Diambil V 400.00 m2 / jam
Aplikasi Lapis Resap Pengikat Rata rata ( Spesifikasi ) Ap 0.80 liter / m2
Analisa - E 100
No URAIAN KODE KOEF. SATUAN KET.
c Dump Truk ( DT ) ( E 08 )
Sebagai alat pengangkut bahan di lokasi pekerjaan Dump Truck melayani alat
Asphalt Sprayer
3 TENAGA
Produksi menentukan : ASPALT FINISHER Q4 332.00 Liter
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt 2,324.00 Liter
Kebutuhan tenaga
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
Rp #REF! / LITER
Analisa - E 101
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.4373 7,020.00 3,069.88
2 Mandor ( L 03 ) Jam 0.0625 11,520.00 719.68
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.7680 126,500.00 97,152.00
2 Agregat Halus ( M 04 ) M3 0.4320 79,750.00 34,452.00
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0625 #REF! #REF!
2 Dump Truck ( E 09 ) Jam 0.1994 #REF! #REF!
3 Motor Grader ( E 13 ) Jam 0.0117 #REF! #REF!
4 Vibratory Roller ( E 19 ) Jam 0.0178 #REF! #REF!
5 Pneumatic Tyre Roller ( E 18 ) Jam 0.0043 #REF! #REF!
6 Water Tank Truck ( E 23 ) Jam 0.0211 #REF! #REF!
7 Alat Bantu Ls 1.0000 500.00 500.00
JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 102
URAIAN ANALISA HARGA SATUAN LAPIS PONDASI AGREGAT KLAS A
I ASUMSI
1 Menggunakan alat berat Cara mekanik
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km
5 Tebal Agregat padat t 0.15 m
6 Faktor kembang material ( padat - lepas ) Fk 1.20
7 Jam kerja efektif per hari Tk 7.00 Jam
8 Proporsi campuran
- Agregat Kasar Ak 64.00 % Tabel; 5.1.2 (a)
- Agregat halus Ah 36.00 %
II METODA KERJA
1 WHEEL LOADER mencampur dan memuat agregat ke dalam Dump Truck di
Base camp
2 Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dg motor
Grader
3 Hamparan Agregat di basahi dengan Water Tank Truck sebelum dipadatkan
dengan Tandem Roller & PTR
4 Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan level
permukaan dengan menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50 m3
Faktor bucket Fb 0.90 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus Ts 1
- Mencampur T1 2.50 menit
- Memuat dan Lain lain T2 1.00 menit
Ts 1 3.50 menit
b Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 6.00 m3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata rata bermuatan v1 45.00 km / jam
Kecepatan rata rata kosong v2 60.00 km / jam
Waktu Siklus Ts2
- Waktu tempuh isi = ( L : v1 ) x 60 menit T1 26.65 menit
- Waktu tempuh kosong = ( L : v2 ) x 60 menit T2 19.99 menit
- lain lain termasuk menurunkan Agregat T3 3.00 menit
Analisa - E 103
No URAIAN KODE KOEF. SATUAN KET.
c Motor Grader ( E 13 )
Panjang hamparan Lh 50.00 m
Lebar efektif kerja blade b 2.40 m
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata rata alat v 4.00 km / jam
Jumlah lintasan n 6.00 Lintas 3 x pp
Waktu siklus Ts 3
- Perataan 1 Lintasan = Lh : ( v x 1000 x 60 menit ) T1 0.75 menit
- Lain lain T2 1.00 menit
Ts 3 1.75 menit
d Vibratory Roller ( E 19 )
Kecepatan rata rata alat v 3.00 km / jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 8.00 lintasan
Faktor efisiensi alat Fa 0.83 -
Analisa - E 104
No URAIAN KODE KOEF. SATUAN KET.
g Alat Bantu
Diperlukan :
3 TENAGA
Produksi menentukan : WHEEL LOADER Q1 16.01 m3 / jam
Produksi Agregat / hari = Tk x Q1 Qt 112.05 m3
Kebutuhan tenaga
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Rp #REF! / M2
Analisa - E 105
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.4373 7,020.00 3,069.88
2 Mandor ( L 03 ) Jam 0.0625 11,520.00 719.68
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.7080 126,500.00 89,562.00
2 Agregat Halus ( M 04 ) M3 0.4920 79,750.00 39,237.00
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0625 #REF! #REF!
2 Dump Truck ( E 09 ) Jam 0.1994 #REF! #REF!
3 Motor Grader ( E 13 ) Jam 0.0117 #REF! #REF!
4 Vibratory Roller ( E 19 ) Jam 0.0178 #REF! #REF!
5 Pneumatic Tyre Roller ( E 18 ) Jam 0.0043 #REF! #REF!
6 Water Tank Truck ( E 23 ) Jam 0.0211 #REF! #REF!
7 Alat Bantu Ls 1.0000 500.00 500.00
JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 106
URAIAN ANALISA HARGA SATUAN LAPIS PONDASI AGREGAT KLAS B
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km
5 Tebal Agregat padat t 0.15 m
6 Faktor kembang material ( padat - lepas ) Fk 1.20
7 Jam kerja efektif per hari Tk 7.00 Jam
8 Proporsi campuran
- Agregat Kasar Ak 59.00 % Tabel; 5.1.2 (a)
- Agregat halus Ah 41.00 %
II METODA KERJA
1 WHEEL LOADER mencampur dan memuat agregat ke dalam Dump Truck di
Base camp
2 Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dengan
motor Grader
3 Hamparan Agregat di basahi dengan Water Tank Truck sebelum dipadatkan
dengan Tandem Roller & PTR
4 Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan level
permukaan dengan menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50 m3
Faktor bucket Fb 0.90 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus Ts 1
- Mencampur T1 2.50 menit
- Memuat dan Lain lain T2 1.00 menit
Ts 1 3.50 menit
b Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 6.00 m3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata rata bermuatan v1 45.00 km / jam
Kecepatan rata rata kosong v2 60.00 km / jam
Waktu Siklus Ts2
- Waktu tempuh isi = ( L : v1 ) x 60 menit T1 26.65 menit
- Waktu tempuh kosong = ( L : v2 ) x 60 menit T2 19.99 menit
- lain lain termasuk menurunkan Agregat T3 3.00 menit
Analisa - E 107
No URAIAN KODE KOEF. SATUAN KET.
c Motor Grader ( E 13 )
Panjang hamparan Lh 50.00 m
Lebar efektif kerja blade b 2.40 m
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata rata alat v 4.00 km / jam
Jumlah lintasan n 6.00 Lintas 3 x pp
Waktu siklus Ts 3
- Perataan 1 Lintasan = ( Lh x 60 ) : ( v x 1000 ) T1 0.75 menit
- Lain lain T2 1.00 menit
Ts 3 1.75 menit
d Vibratory Roller ( E 17 )
Kecepatan rata rata alat v 3.00 km / jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 8.00 lintasan
Faktor efisiensi alat Fa 0.83 -
Analisa - E 108
No URAIAN KODE KOEF. SATUAN KET.
g Alat Bantu
Diperlukan :
3 TENAGA
Produksi menentukan : WHEEL LOADER Q1 16.01 m3 / jam
Produksi Agregat / hari = Tk x Q1 Qt 112.05 m3 / jam
Kebutuhan tenaga
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Rp #REF! / M2
Analisa - E 109
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0301 7,020.00 211.45
2 Mandor ( L 03 ) Jam 0.0060 11,520.00 69.40
B BAHAN
1 Aspal ( M 10 ) Kg 0.8880 10,650.00 9,456.82
2 Kerosene ( M 11 ) Liter 0.2530 1,000.00 253.00
C PERALATAN
1 Asphalt Sprayer ( E 03 ) Jam 0.0030 #REF! #REF!
2 Compresor ( E 05 ) Jam 0.0063 #REF! #REF!
3 Dump Truck ( E 08 ) Jam 0.0030 #REF! #REF!
JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 110
URAIAN ANALISA HARGA SATUAN LAPIS PEREKAT
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.00 Km
4 Jam kerja efektif 1 hari Tk 7.00 Jam
5 Faktor kehilangan material Fh 1.10 -
6 Komposisi campuran ( Spesifikasi )
- Aspal AC - 10 atau AC - 20 AS 77 % 100 Bagian
- Minyak Flux / pencair K 23 % 30 Bagian
II METODA KERJA
1 Aspal dan minyak Flux dicampur dan dipanaskan sehingga menjadi campuran
aspal cair
2 Permukaan yang akan dilapis dibersihkan dari debu dan kotoran dg air
kompresor
3 Campuran aspal cair disemprotkan dg aspahalt sprayer ke atas permukaan yg
akan dilapis
4 Angkutan aspal dan minyak Flux menggunakan Dump truck
2 ALAT
a Asphalt Sprayer ( E 03 )
Kapasitas alat V 800.00 Liter
Faktor efisiensi alat Fa 0.83 -
Waktu siklus ( termasuk proses pemanasan ) Ts 2.00 Jam
b Air Compresor ( E 05 )
Kapasitas alat . . . . . Diambil V 400.00 m2 / jam
Aplikasi Lapis Resap Pengikat Rata rata ( Spesifikasi ) Ap 0.40 Liter / m2
Analisa - E 111
No URAIAN KODE KOEF. SATUAN KET.
c Dump Truk ( DT ) ( E 08 )
Sebagai alat pengangkut bahan di lokasi pekerjaan Dump Truck melayani alat
Asphalt Sprayer
3 TENAGA
Produksi menentukan : ASPALT FINISHER Q4 332.00 Liter
Produksi Lapis Perekat / hari = Tk x Q4 Qt 2,324.00 Liter
Kebutuhan tenaga
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
Rp #REF! / Liter
Analisa - E 112
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0161 7,020.00 112.77
2 Mandor ( L 02 ) Jam 0.0040 11,520.00 46.27
B BAHAN
C PERALATAN
1 Motor Grader ( E 13 ) Jam 0.0025 #REF! #REF!
2 Vibratory Roller ( E 19 ) Jam 0.0040 #REF! #REF!
3 Water Tank Truck ( E 23 ) Jam 0.0105 #REF! #REF!
4 Alat Bantu Ls 1.0000 500.00 500.00
JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 113
URAIAN ANALISA HARGA SATUAN PENYIAPAN BADAN JALAN
( PEMADATAN DAN PERATAAN )
SATUAN : M2 Analisa EI - 33
I ASUMSI
1 Pekerjaan dilakukan pada hanya pada tanah galian
2 Pekerjaan dilakukan secara mekanis
3 Lokasi pekerjaan : sepanjang jalan
4 Kondisi jalan : jelek / belum padat
5 Jam kerja efektif per hari Tk 7.00 Jam
II URUTAN KERJA
1 Motor Grader meratakan permukaan hasil galian
2 Vibro Roller memadatkan permukaan jalan yang telah diratakan oleh Motor grader
3 Sekelompok pekerja akan membanru meratakan badan jalan dengan alat bantu
permukaan dengan menggunakan alat bantu
2 ALAT
a Motor Grader ( E 13 )
Panjang hamparan Lh 50.00 m
Lebar efektif kerja blade b 2.40 m
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata rata alat v 2.00 km / jam
Jumlah lintasan n 6.00 Lintas 3 x pp
Waktu siklus Ts 1
- Perataan 1 Lintasan = Lh : ( v x 1000 x 60 menit ) T1 1.50 menit
- Lain lain T2 1.00 menit
Ts 1 2.50 menit
b Vibratory Roller ( E 19 )
Kecepatan rata rata alat v 2.00 km / jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 8.00 lintasan
Faktor efisiensi alat Fa 0.83 -
Analisa - E 114
No URAIAN KODE KOEF. SATUAN KET.
g Alat Bantu
Diperlukan :
3 TENAGA
Produksi menentukan : VIBRATORY ROLLER Q2 249.00 m3 / jam
Produksi Pekerjaan / hari = Tk x Q2 Qt 1,743.00 m3
Kebutuhan tenaga
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Rp #REF! / M2
Analisa - E 115
PEMERINTAH KOTA SERANG
DINAS PEMUDA OLAH RAGA DAN PARIWISATA
ACTUAL PROGRESS
S/D MINGGU LALU MINGGU INI S/D MINGGU INI
NO URAIAN PEKERJAAN VOL BOBOT %
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT PRESTASI
% % % %
I PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek 1.00 bh 0.0235 - - 1.00 0.023 1.00 0.023 100.00
2 Pengadaan Direksi Keet 6.00 m2 0.5660 - - 6.00 0.566 6.00 0.566 100.00
3 Pengadaan / pembuatan Gudang bahan dan alat 9.00 m2 0.4916 - - 9.00 0.492 9.00 0.492 100.00
4 Penyediaan Air dan Listrik Kerja 1.00 ls 0.1396 - - - - - - -
5 Pekerjaan bongkaran & Pembuangan limbah/puing-puing 3,726.00 ls 0.8673 - - 186.30 0.043 186.30 0.043 5.00
6 Biaya Administrasi, pelaporan dan dokumendasi 1.00 ls 0.8729 - - - - - - -
2.9608 - 1.124 1.124
II PEKERJAAN KUSEN DAN PINTU
1 Pekerjaan Kusen pintu/jendela & bouwvenligh kayu klas II 1.23 m3 0.4611 - - - - - - -
2 Pasang daun pintu panel kayu klas II 15.17 m2 0.4430 - - - - - - -
0.9041 - - -
III PEKERJAAN KUNCI DAN ALAT PENGGANTUNG
1 Pasang kunci pintu double slaag standard 11.00 bh 0.1445 - - - - - - -
2 Pasang engsel pintu standard 33.00 bh 0.0702 - - - - - - -
3 Pasang angkur kusen 64.00 bh 0.0123 - - - - - - -
4 Pasang kaca polos 5 mm 10.32 m2 0.0979 - - - - - - -
0.3249 - - -
IV PEKERJAAN INSTALASI LISTRIK
1 Pasang instalasi titik cahaya 272.00 ttk 1.4245 - - - - - - -
2 pasang stop kontak 30.00 bh 0.0238 - - - - - - -
3 Pasang saklar tunggal 51.00 bh 0.0386 - - - - - - -
4 Pasang saklar ganda 1.00 bh 0.0010 - - - - - - -
5 Pasang lampu SL 20 watt Philips 113.00 bh 0.4912 - - - - - - -
6 Pasang lampu Mercury 250 watt Philips (lengkap) 35.00 bh 0.5153 - - - - - - -
7 Pasang lampu TL 36 watt Philips (lengkap) 98.00 bh 0.2444 - - - - - - -
8 Pasang Exaust fan 30 x 30 cm 40.00 bh 0.5819 - - - - - - -
9 Pasang Turbin Ventilator Stainlees Steel 24" + Upah pasang 20.00 bh 2.3276 - - - - - - -
5.6483 - - -
V PEKERJAAN SANITASI
1 Pasang Kloset jongkok warna 8.00 bh 0.2562 - - - - - - -
2 Pasang Orinoir 9.00 bh 1.4744 - - - - - - -
3 Pasang Kran air 11.00 bh 0.0167 - - - - - - -
4 Pasang Floor drain (stainless) 11.00 bh 0.0349 - - - - - - -
5 Pasang Bak mandi feberglas 8.00 bh 0.2952 - - - - - - -
6 Pasang saluran air dari pasangan bata 228.00 m' 1.2966 - - - - - - -
3.3740 - - -
VI PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND
1 Pasang kuda + rangka atap Zingalum/baja ringan 1,419.80 m2 13.0590 - - - - - - -
2 Pasang penutup atap genteng metal roof rainbow (pasir) 1,439.50 m2 9.1472 - - - - - - -
3 Pekerjaan bubungan genteng metal roof rainbow (pasir) 108.50 m' 0.4482 - - - - - - -
4 Pasang Alumunium Foile + Glass wool + Alumunium foil 3,036.00 m2 9.3757 - - - - - - -
5 Pasang penutup Atap Spandek warna 3,262.80 m2 18.8967 - - - - - - -
6 Pasang bubungan Atap Spandek warna 71.60 m' 0.2213 - - - - - - -
7 Pasang kawat loket / kawat ayam 3,036.00 m2 4.8937 - - - - - - -
8 Pasang talang miring ( jurai ) 48.00 m' 0.5619 - - - - - - -
9 Pekerjaan Rangka Plafond Gypsum (bagian dalam) besi hollow 1,059.25 m2 3.3295 - - - - - - -
10 Pekerjaan Plafond Gypsum (bagian dalam) 1,059.25 m2 2.7626 - - - - - - -
11 Pekerjaan Rangka Plafond GRC (bagian luar) besi hollow 310.96 m2 0.9774 - - - - - - -
12 Pekerjaan Plafond GRC (bagian luar) 310.96 m2 0.7514 - - - - - - -
13 Pasang List Gypsum 1,189.00 m' 2.2342 - - - - - - -
14 Pasang listplank GRC lebar 30 cm (motif kayu) 442.00 m' 1.3167 - - - - - - -
67.9755 - - -
VII PEKERJAAN PENGECATAN
1 Pengecatan kayu dengan cat kayu setara glotek (3 x) 550.80 m2 1.3754 - - - - - - -
2 Pengecatan plafond dgn cat tembok setara vinilex (3 x) 1,370.21 m2 3.9326 - - - - - - -
3 Pekerjaan mengerok Permukaan cat tembok lama 5,134.21 m2 2.8913 - - - - - - -
4 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 5,134.21 m2 7.4556 - - - - - - -
5 Pengecatan Besi atap lama & water turn dng cat besi (3x) 1,273.00 m2 2.8666 - - - - - - -
18.5215 - - -
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan dan penyempurnaan pekerjaan 1.00 ls 0.2910 - - - - - - -
0.2910 - - -
JUMLAH 100.00 - 1.1244 1.1244
PEMERINTAH KOTA SERANG
DINAS PEMUDA OLAH RAGA DAN PARIWISATA
ACTUAL PROGRESS
S/D MINGGU LALU MINGGU INI S/D MINGGU INI
NO URAIAN PEKERJAAN VOL BOBOT %
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT PRESTASI
% % % %
I PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek 1.00 bh 0.0235 1.00 0.02 - - 1.00 0.023 100.00
2 Pengadaan Direksi Keet 6.00 m2 0.5660 6.00 0.57 - - 6.00 0.566 100.00
3 Pengadaan / pembuatan Gudang bahan dan alat 9.00 m2 0.4916 9.00 0.49 - - 9.00 0.492 100.00
4 Penyediaan Air dan Listrik Kerja 1.00 ls 0.1396 - - 0.40 0.056 0.40 0.056 40.00
5 Pekerjaan bongkaran & Pembuangan limbah/puing-puing 3,726.00 ls 0.8673 186.30 0.04 1,117.80 0.260 1,304.10 0.304 35.00
6 Biaya Administrasi, pelaporan dan dokumendasi 1.00 ls 0.8729 - - - - - - -
2.9608 1.1244 0.316 1.440
II PEKERJAAN KUSEN DAN PINTU
1 Pekerjaan Kusen pintu/jendela & bouwvenligh kayu klas II 1.23 m3 0.4611 - - - - - - -
2 Pasang daun pintu panel kayu klas II 15.17 m2 0.4430 - - - - - - -
0.9041 - - -
III PEKERJAAN KUNCI DAN ALAT PENGGANTUNG
1 Pasang kunci pintu double slaag standard 11.00 bh 0.1445 - - - - - - -
2 Pasang engsel pintu standard 33.00 bh 0.0702 - - - - -
3 Pasang angkur kusen 64.00 bh 0.0123 - - - - - - -
4 Pasang kaca polos 5 mm 10.32 m2 0.0979 - - - - - - -
0.3249 - - -
IV PEKERJAAN INSTALASI LISTRIK
1 Pasang instalasi titik cahaya 272.00 ttk 1.4245 - - - - - - -
2 pasang stop kontak 30.00 bh 0.0238 - - - - - - -
3 Pasang saklar tunggal 51.00 bh 0.0386 - - - - - - -
4 Pasang saklar ganda 1.00 bh 0.0010 - - - - - - -
5 Pasang lampu SL 20 watt Philips 113.00 bh 0.4912 - - - - - - -
6 Pasang lampu Mercury 250 watt Philips (lengkap) 35.00 bh 0.5153 - - - - - - -
7 Pasang lampu TL 36 watt Philips (lengkap) 98.00 bh 0.2444 - - - - - - -
8 Pasang Exaust fan 30 x 30 cm 40.00 bh 0.5819 - - - - - - -
9 Pasang Turbin Ventilator Stainlees Steel 24" + Upah pasang 20.00 bh 2.3276 - - - - - - -
5.6483 - - -
V PEKERJAAN SANITASI
1 Pasang Kloset jongkok warna 8.00 bh 0.2562 - - - - - - -
2 Pasang Orinoir 9.00 bh 1.4744 - - - - - - -
3 Pasang Kran air 11.00 bh 0.0167 - - - - - - -
4 Pasang Floor drain (stainless) 11.00 bh 0.0349 - - - - - - -
5 Pasang Bak mandi feberglas 8.00 bh 0.2952 - - - - - - -
6 Pasang saluran air dari pasangan bata 228.00 m' 1.2966 - - - - - - -
3.3740 - - -
VI PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND
1 Pasang kuda + rangka atap Zingalum/baja ringan 1,419.80 m2 13.0590 - - 141.98 1.306 141.98 1.306 10.00
2 Pasang penutup atap genteng metal roof rainbow (pasir) 1,439.50 m2 9.1472 - - - - - - -
3 Pekerjaan bubungan genteng metal roof rainbow (pasir) 108.50 m' 0.4482 - - - - - - -
4 Pasang Alumunium Foile + Glass wool + Alumunium foil 3,036.00 m2 9.3757 - - - - - - -
5 Pasang penutup Atap Spandek warna 3,262.80 m2 18.8967 - - - - - - -
6 Pasang bubungan Atap Spandek warna 71.60 m' 0.2213 - - - - - - -
7 Pasang kawat loket / kawat ayam 3,036.00 m2 4.8937 - - - - - - -
8 Pasang talang miring ( jurai ) 48.00 m' 0.5619 - - - - - - -
9 Pekerjaan Rangka Plafond Gypsum (bagian dalam) besi hollow 1,059.25 m2 3.3295 - - - - - - -
10 Pekerjaan Plafond Gypsum (bagian dalam) 1,059.25 m2 2.7626 - - - - - - -
11 Pekerjaan Rangka Plafond GRC (bagian luar) besi hollow 310.96 m2 0.9774 - - - - - - -
12 Pekerjaan Plafond GRC (bagian luar) 310.96 m2 0.7514 - - - - - - -
13 Pasang List Gypsum 1,189.00 m' 2.2342 - - - - - - -
14 Pasang listplank GRC lebar 30 cm (motif kayu) 442.00 m' 1.3167 - - - - - - -
67.9755 - 1.3059 1.3059
VII PEKERJAAN PENGECATAN
1 Pengecatan kayu dengan cat kayu setara glotek (3 x) 550.80 m2 1.3754 - - - - - - -
2 Pengecatan plafond dgn cat tembok setara vinilex (3 x) 1,370.21 m2 3.9326 - - - - - - -
3 Pekerjaan mengerok Permukaan cat tembok lama 5,134.21 m2 2.8913 - - 770.13 0.434 770.13 0.434 15.00
4 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 5,134.21 m2 7.4556 - - 513.42 0.746 513.42 0.746 10.00
5 Pengecatan Besi atap lama & water turn dng cat besi (3x) 1,273.00 m2 2.8666 - - 190.95 0.430 190.95 0.430 15.00
18.5215 - 1.6092 1.6092
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan dan penyempurnaan pekerjaan 1.00 ls 0.2910 - - - - - - -
0.2910 - - -
JUMLAH 100.00 1.12 3.231 4.356
PEMERINTAH KOTA SERANG
DINAS PEMUDA OLAH RAGA DAN PARIWISATA
ACTUAL PROGRESS
S/D MINGGU LALU MINGGU INI S/D MINGGU INI
NO URAIAN PEKERJAAN VOL BOBOT %
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT PRESTASI
% % % %
I PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek 1.00 bh 0.0235 1.00 0.02 - - 1.00 0.023 100.00
2 Pengadaan Direksi Keet 6.00 m2 0.5660 6.00 0.57 - - 6.00 0.566 100.00
3 Pengadaan / pembuatan Gudang bahan dan alat 9.00 m2 0.4916 9.00 0.49 - - 9.00 0.492 100.00
4 Penyediaan Air dan Listrik Kerja 1.00 ls 0.1396 0.40 0.06 0.05 0.007 0.45 0.063 45.00
5 Pekerjaan bongkaran & Pembuangan limbah/puing-puing 3,726.00 ls 0.8673 1,304.10 0.30 - - 1,304.10 0.304 35.00
6 Biaya Administrasi, pelaporan dan dokumendasi 1.00 ls 0.8729 - - - - - - -
2.961 1.440 0.007 1.447
II PEKERJAAN KUSEN DAN PINTU
1 Pekerjaan Kusen pintu/jendela & bouwvenligh kayu klas II 1.23 m3 0.4611 - - - - - - -
2 Pasang daun pintu panel kayu klas II 15.17 m2 0.4430 - - - - - - -
0.904 - - -
III PEKERJAAN KUNCI DAN ALAT PENGGANTUNG
1 Pasang kunci pintu double slaag standard 11.00 bh 0.1445 - - - - - - -
2 Pasang engsel pintu standard 33.00 bh 0.0702 - - - - - - -
3 Pasang angkur kusen 64.00 bh 0.0123 - - - - - - -
4 Pasang kaca polos 5 mm 10.32 m2 0.0979 - - - - - - -
0.325 - - -
IV PEKERJAAN INSTALASI LISTRIK
1 Pasang instalasi titik cahaya 272.00 ttk 1.4245 - - - - - - -
2 pasang stop kontak 30.00 bh 0.0238 - - - - - - -
3 Pasang saklar tunggal 51.00 bh 0.0386 - - - - - - -
4 Pasang saklar ganda 1.00 bh 0.0010 - - - - - - -
5 Pasang lampu SL 20 watt Philips 113.00 bh 0.4912 - - - - - - -
6 Pasang lampu Mercury 250 watt Philips (lengkap) 35.00 bh 0.5153 - - - - - - -
7 Pasang lampu TL 36 watt Philips (lengkap) 98.00 bh 0.2444 - - - - - - -
8 Pasang Exaust fan 30 x 30 cm 40.00 bh 0.5819 - - - - - - -
9 Pasang Turbin Ventilator Stainlees Steel 24" + Upah pasang 20.00 bh 2.3276 - - - - - - -
5.648 - - -
V PEKERJAAN SANITASI
1 Pasang Kloset jongkok warna 8.00 bh 0.2562 - - - - - - -
2 Pasang Orinoir 9.00 bh 1.4744 - - - - - - -
3 Pasang Kran air 11.00 bh 0.0167 - - - - - - -
4 Pasang Floor drain (stainless) 11.00 bh 0.0349 - - - - - - -
5 Pasang Bak mandi feberglas 8.00 bh 0.2952 - - - - - - -
6 Pasang saluran air dari pasangan bata 228.00 m' 1.2966 - - 91.20 0.519 91.20 0.519 40.00
3.374 - 0.519 0.519
VI PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND
1 Pasang kuda + rangka atap Zingalum/baja ringan 1,419.80 m2 13.0590 141.98 1.31 496.93 4.571 638.91 5.877 45.00
2 Pasang penutup atap genteng metal roof rainbow (pasir) 1,439.50 m2 9.1472 - - - - - - -
3 Pekerjaan bubungan genteng metal roof rainbow (pasir) 108.50 m' 0.4482 - - - - - - -
4 Pasang Alumunium Foile + Glass wool + Alumunium foil 3,036.00 m2 9.3757 - - - - - - -
5 Pasang penutup Atap Spandek warna 3,262.80 m2 18.8967 - - - - - - -
6 Pasang bubungan Atap Spandek warna 71.60 m' 0.2213 - - - - - - -
7 Pasang kawat loket / kawat ayam 3,036.00 m2 4.8937 - - - - - - -
8 Pasang talang miring ( jurai ) 48.00 m' 0.5619 - - - - - - -
9 Pekerjaan Rangka Plafond Gypsum (bagian dalam) besi hollow 1,059.25 m2 3.3295 - - - - - - -
10 Pekerjaan Plafond Gypsum (bagian dalam) 1,059.25 m2 2.7626 - - - - - - -
11 Pekerjaan Rangka Plafond GRC (bagian luar) besi hollow 310.96 m2 0.9774 - - - - - - -
12 Pekerjaan Plafond GRC (bagian luar) 310.96 m2 0.7514 - - - - - - -
13 Pasang List Gypsum 1,189.00 m' 2.2342 - - - - - - -
14 Pasang listplank GRC lebar 30 cm (motif kayu) 442.00 m' 1.3167 - - - - - - -
67.976 1.306 4.571 5.877
VII PEKERJAAN PENGECATAN
1 Pengecatan kayu dengan cat kayu setara glotek (3 x) 550.80 m2 1.3754 - - - - - - -
2 Pengecatan plafond dgn cat tembok setara vinilex (3 x) 1,370.21 m2 3.9326 - - - - - - -
3 Pekerjaan mengerok Permukaan cat tembok lama 5,134.21 m2 2.8913 770.13 0.43 513.42 0.289 1,283.55 0.723 25.00
4 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 5,134.21 m2 7.4556 513.42 0.75 513.42 0.746 1,026.84 1.491 20.00
5 Pengecatan Besi atap lama & water turn dng cat besi (3x) 1,273.00 m2 2.8666 190.95 0.43 63.65 0.143 254.60 0.573 20.00
18.521 1.609 1.178 2.787
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan dan penyempurnaan pekerjaan 1.00 ls 0.2910 - - - - - - -
0.2910 - - -
JUMLAH 100.00 4.356 6.274 10.630
PEMERINTAH KOTA SERANG
DINAS PEMUDA OLAH RAGA DAN PARIWISATA
ACTUAL PROGRESS
S/D MINGGU LALU MINGGU INI S/D MINGGU INI
NO URAIAN PEKERJAAN VOL BOBOT %
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT PRESTASI
% % % %
I PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek 1.00 bh 0.0235 1.00 0.02 - - 1.00 0.023 100.00
2 Pengadaan Direksi Keet 6.00 m2 0.5660 6.00 0.57 6.00 0.566 12.00 1.132 200.00
3 Pengadaan / pembuatan Gudang bahan dan alat 9.00 m2 0.2185 9.00 0.49 9.00 0.218 18.00 0.710 325.00
4 Penyediaan Air dan Listrik Kerja 1.00 ls 0.1396 0.45 0.06 0.55 0.077 1.00 0.140 100.00
5 Pekerjaan bongkaran & Pembuangan limbah/puing-puing 3,726.00 ls 0.8673 1,304.10 0.30 447.12 0.104 1,751.22 0.408 47.00
6 Biaya Administrasi, pelaporan dan dokumendasi 1.00 ls 0.8729 - - - - - - -
2.688 1.447 0.965 2.413
II PEKERJAAN KUSEN DAN PINTU
1 Pekerjaan Kusen pintu/jendela & bouwvenligh kayu klas II 2.00 m3 0.7507 - - - - - - -
2 Pasang daun pintu panel kayu klas II 33.98 m2 0.9922 - - - - - - -
1.743 - - -
III PEKERJAAN KUNCI DAN ALAT PENGGANTUNG
1 Pasang kunci pintu double slaag standard 28.00 bh 0.3678 - - - - - - -
2 Pasang engsel pintu standard 42.00 bh 0.0893 - - - - - - -
3 Pasang angkur kusen 144.00 bh 0.0277 - - - - - - -
4 Pasang kaca polos 5 mm 10.32 m2 0.0979 - - - - - - -
0.583 - - -
IV PEKERJAAN INSTALASI LISTRIK
1 Pasang instalasi titik cahaya 240.00 ttk 1.2569 - - - - - - -
2 pasang stop kontak 56.00 bh 0.0445 - - - - - - -
3 Pasang saklar tunggal 18.00 bh 0.0136 - - - - - - -
4 Pasang saklar ganda 39.00 bh 0.0398 - - - - - - -
5 Pasang lampu SL 20 watt Philips 133.00 bh 0.5781 - - - - - - -
6 Pasang lampu Mercury 250 watt Philips (lengkap) 3.00 bh 0.0442 - - - - - - -
7 Pasang lampu Mercury 250 watt Philips + Upah pasang 11.00 bh 0.0875 - - - - - - -
8 Pasang lampu TL 36 watt Philips (lengkap) 60.00 bh 0.1496 - - - - - - -
9 Pasang Exaust fan 30 x 30 cm 26.00 bh 0.3782 - - - - - - -
2.592 - - -
V PEKERJAAN SANITASI
1 Pasang Kloset jongkok warna 4.00 bh 0.1281 - - - - - - -
2 Pasang Orinoir 9.00 bh 1.4744 - - - - - - -
3 Pasang Kran air 11.00 bh 0.0167 - - - - - - -
4 Pasang Floor drain (stainless) 11.00 bh 0.0349 - - - - - - -
5 Pasang Bak mandi feberglas 4.00 bh 0.1476 - - - - - - -
6 Pasang saluran air dari pasangan bata 165.00 m' 0.9383 91.20 0.52 57.75 0.328 148.95 0.847 90.27
7 Pekerjaan Rangka Plafond GRC (bagian luar) besi hollow 13.00 bh 0.4105 - - - - - - -
3.151 0.519 0.328 0.847
VI PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND
1 Pasang kuda + rangka atap Zingalum/baja ringan 1,419.80 m2 13.0590 638.91 5.88 496.93 4.571 1,135.84 10.447 80.00
2 Pasang penutup atap genteng metal roof rainbow (pasir) 1,439.50 m2 9.1472 - - 115.16 0.732 115.16 0.732 8.00
3 Pekerjaan bubungan genteng metal roof rainbow (pasir) 121.09 m' 0.5002 - - - - - - -
4 Pasang Alumunium Foile + Glass wool + Alumunium foil 3,092.08 m2 9.5488 - - - - - - -
5 Pasang penutup Atap Spandek warna 3,262.80 m2 18.8967 - - - - - - -
6 Pasang bubungan Atap Spandek warna 58.98 m' 0.1823 - - - - - - -
7 Pasang kawat loket / kawat ayam 3,262.80 m2 5.2593 - - - - - - -
8 Pasang talang miring ( jurai ) 60.20 m' 0.7048 - - - - - - -
9 Pekerjaan Rangka Plafond Gypsum (bagian dalam) besi hollow 745.52 m2 2.3434 - - 74.55 0.234 74.55 0.234 10.00
10 Pekerjaan Plafond Gypsum (bagian dalam) 1,081.90 m2 2.8216 - - - - - - -
11 Pekerjaan Rangka Plafond GRC (bagian luar) besi hollow 310.96 m2 0.9774 - - - - - - -
12 Pekerjaan Plafond GRC (bagian luar) 310.96 m2 0.7514 - - - - - - -
13 Pasang List Gypsum 1,136.23 m' 2.1351 - - - - - - -
14 Pasang listplank GRC lebar 30 cm (motif kayu) 219.20 m' 0.6530 - - - - - - -
66.980 5.877 5.537 11.413
VII PEKERJAAN PENGECATAN
1 Pengecatan kayu dengan cat kayu setara glotek (3 x) 550.80 m2 1.3754 - - - - - - -
2 Pengecatan plafond dgn cat tembok setara vinilex (3 x) 1,392.85 m2 3.9976 - - - - - - -
3 Pekerjaan mengerok Permukaan cat tembok lama 2,551.78 m2 1.4370 1,283.55 0.72 255.18 0.144 1,538.73 0.867 60.30
4 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 5,134.21 m2 7.4556 1,026.84 1.49 1,642.95 2.386 2,669.79 3.877 52.00
5 Pengecatan Besi atap lama & water turn dng cat besi (3x) 1,274.58 m2 2.8701 254.60 0.57 764.75 1.722 1,019.35 2.295 79.98
6 Pengecatan Lantai Lapangan 356.52 m2 0.5177 - - - - - - -
7 Politur Lantai Lapangan 680.82 m2 3.0594 - - - - - - -
20.713 2.787 4.252 7.039
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan dan penyempurnaan pekerjaan 1.00 ls 0.2910 - - - - - - -
2 Perbaikan Lantai Keramik 30 x 30 95.64 m2 0.8996 - - - - - - -
3 Perbaikan Lantai Kayu Lapangan 83.84 m2 0.3600 - - - - - - -
1.5506 - - -
JUMLAH 100.00 10.630 11.082 21.712
PEMERINTAH KOTA SERANG
DINAS PEMUDA OLAH RAGA DAN PARIWISATA
ACTUAL PROGRESS
S/D MINGGU LALU MINGGU INI S/D MINGGU INI
NO URAIAN PEKERJAAN VOL BOBOT %
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT PRESTASI
% % % %
I PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek 1.00 bh 0.0235 1.00 0.02 - - 1.00 0.023 100.00
2 Pengadaan Direksi Keet 6.00 m2 0.5660 6.00 0.57 - - 6.00 0.566 100.00
3 Pengadaan / pembuatan Gudang bahan dan alat 9.00 m2 0.2185 9.00 0.22 - - 9.00 0.218 100.00
4 Penyediaan Air dan Listrik Kerja 1.00 ls 0.1396 1.00 0.14 - - 1.00 0.140 100.00
5 Pekerjaan bongkaran & Pembuangan limbah/puing-puing 3,726.00 ls 0.8673 1,751.22 0.41 745.20 0.173 2,496.42 0.581 67.00
6 Biaya Administrasi, pelaporan dan dokumendasi 1.00 ls 0.8729 - - - - - - -
2.688 1.355 0.173 1.529
II PEKERJAAN KUSEN DAN PINTU
1 Pekerjaan Kusen pintu/jendela & bouwvenligh kayu klas II 2.00 m3 0.7507 - - 0.80 0.300 0.80 0.300 40.00
2 Pasang daun pintu panel kayu klas II 33.98 m2 0.9922 - - 3.40 0.099 3.40 0.099 10.00
1.743 - 0.400 0.400
III PEKERJAAN KUNCI DAN ALAT PENGGANTUNG
1 Pasang kunci pintu double slaag standard 28.00 bh 0.3678 - - - - - - -
2 Pasang engsel pintu standard 42.00 bh 0.0893 - - - - - - -
3 Pasang angkur kusen 144.00 bh 0.0277 - - 28.80 0.006 28.80 0.006 20.00
4 Pasang kaca polos 5 mm 10.32 m2 0.0979 - - - - - - -
0.583 - 0.006 0.006
IV PEKERJAAN INSTALASI LISTRIK
1 Pasang instalasi titik cahaya 240.00 ttk 1.2569 - - 72.00 0.377 72.00 0.377 30.00
2 pasang stop kontak 56.00 bh 0.0445 - - 16.80 0.013 16.80 0.013 30.00
3 Pasang saklar tunggal 18.00 bh 0.0136 - - 3.60 0.003 3.60 0.003 20.00
4 Pasang saklar ganda 39.00 bh 0.0398 - - 11.70 0.012 11.70 0.012 30.00
5 Pasang lampu SL 20 watt Philips 133.00 bh 0.5781 - - - - - - -
6 Pasang lampu Mercury 250 watt Philips (lengkap) 3.00 bh 0.0442 - - - - - - -
7 Pasang lampu Mercury 250 watt Philips + Upah pasang 11.00 bh 0.0875 - - - - - - -
8 Pasang lampu TL 36 watt Philips (lengkap) 60.00 bh 0.1496 - - - - - - -
9 Pasang Exaust fan 30 x 30 cm 26.00 bh 0.3782 - - - - - - -
2.592 - 0.405 0.405
V PEKERJAAN SANITASI
1 Pasang Kloset jongkok warna 4.00 bh 0.1281 - - 0.60 0.019 0.60 0.019 15.00
2 Pasang Orinoir 9.00 bh 1.4744 - - - - - - -
3 Pasang Kran air 11.00 bh 0.0167 - - - - - - -
4 Pasang Floor drain (stainless) 11.00 bh 0.0349 - - - - - - -
5 Pasang Bak mandi feberglas 4.00 bh 0.1476 - - - - - - -
6 Pasang saluran air dari pasangan bata 228.00 m' 0.9383 148.95 0.85 22.18 0.091 171.13 0.938 100.00
7 Pekerjaan Rangka Plafond GRC (bagian luar) besi hollow 13.00 bh 0.4105 - - - - - - -
3.151 0.847 0.111 0.958
VI PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND
1 Pasang kuda + rangka atap Zingalum/baja ringan 1,419.80 m2 13.0590 1,135.84 10.45 283.96 2.612 1,419.80 13.059 100.00
2 Pasang penutup atap genteng metal roof rainbow (pasir) 1,439.50 m2 9.1472 115.16 0.73 287.90 1.829 403.06 2.561 28.00
3 Pekerjaan bubungan genteng metal roof rainbow (pasir) 121.09 m' 0.5002 - - 6.05 0.025 6.05 0.025 5.00
4 Pasang Alumunium Foile + Glass wool + Alumunium foil 3,092.08 m2 9.5488 - - - - - - -
5 Pasang penutup Atap Spandek warna 3,262.80 m2 18.8967 - - - - - - -
6 Pasang bubungan Atap Spandek warna 58.98 m' 0.1823 - - - - - - -
7 Pasang kawat loket / kawat ayam 3,262.80 m2 5.2593 - - 326.28 0.526 326.28 0.526 10.00
8 Pasang talang miring ( jurai ) 60.20 m' 0.7048 - - - - - - -
9 Pekerjaan Rangka Plafond Gypsum (bagian dalam) besi hollow 745.52 m2 2.3434 74.55 0.23 447.31 1.406 521.86 1.640 70.00
10 Pekerjaan Plafond Gypsum (bagian dalam) 1,081.90 m2 2.8216 - - 216.38 0.564 216.38 0.564 20.00
11 Pekerjaan Rangka Plafond GRC (bagian luar) besi hollow 310.96 m2 0.9774 - - 124.38 0.391 124.38 0.391 40.00
12 Pekerjaan Plafond GRC (bagian luar) 310.96 m2 0.7514 - - - - - - -
13 Pasang List Gypsum 1,136.23 m' 2.1351 - - - - - - -
14 Pasang listplank GRC lebar 30 cm (motif kayu) 219.20 m' 0.6530 - - - - - - -
66.980 11.413 7.353 18.767
VII PEKERJAAN PENGECATAN
1 Pengecatan kayu dengan cat kayu setara glotek (3 x) 550.80 m2 1.3754 - - 275.40 0.688 275.40 0.688 50.00
2 Pengecatan plafond dgn cat tembok setara vinilex (3 x) 1,392.85 m2 3.9976 - - - - - - -
3 Pekerjaan mengerok Permukaan cat tembok lama 2,551.78 m2 1.4370 1,538.73 0.867 - - 1,538.73 0.867 60.30
4 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 5,134.21 m2 7.4556 2,669.79 3.88 513.42 0.746 3,183.21 4.622 62.00
5 Pengecatan Besi atap lama & water turn dng cat besi (3x) 1,274.58 m2 2.8701 1,019.35 2.30 63.73 0.144 1,083.08 2.439 84.98
6 Pengecatan Lantai Lapangan 356.52 m2 0.5177 - - - - - - -
7 Politur Lantai Lapangan 680.82 m2 3.0594 - - - - - - -
20.713 7.039 1.577 8.616
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan dan penyempurnaan pekerjaan 1.00 ls 0.2910 - - 0.10 0.029 0.10 0.029 10.00
2 Perbaikan Lantai Keramik 30 x 30 95.64 m2 0.8996 - - - - - - -
3 Perbaikan Lantai Kayu Lapangan 83.84 m2 0.3600 - - - - - - -
1.5506 - 0.0291 0.0291
JUMLAH 100.00 20.654 10.053 30.708
PEMERINTAH KOTA SERANG
DINAS PEMUDA OLAH RAGA DAN PARIWISATA
ACTUAL PROGRESS
S/D MINGGU LALU MINGGU INI S/D MINGGU INI
NO URAIAN PEKERJAAN VOL BOBOT %
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT PRESTASI
% % % %
I PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek 1.00 bh 0.0235 1.00 0.02 - - 1.00 0.023 100.00
2 Pengadaan Direksi Keet 6.00 m2 0.5660 6.00 0.57 - - 6.00 0.566 100.00
3 Pengadaan / pembuatan Gudang bahan dan alat 9.00 m2 0.2185 9.00 0.22 - - 9.00 0.218 100.00
4 Penyediaan Air dan Listrik Kerja 1.00 ls 0.1396 1.00 0.14 - - 1.00 0.140 100.00
5 Pekerjaan bongkaran & Pembuangan limbah/puing-puing 3,726.00 ls 0.8673 2,496.42 0.58 745.20 0.173 3,241.62 0.755 87.00
6 Biaya Administrasi, pelaporan dan dokumendasi 1.00 ls 0.8729 - - 1.00 0.873 1.00 0.873 100.00
2.688 1.529 1.046 2.575
II PEKERJAAN KUSEN DAN PINTU
1 Pekerjaan Kusen pintu/jendela & bouwvenligh kayu klas II 2.00 m3 0.7507 0.80 0.30 1.20 0.450 2.00 0.751 100.00
2 Pasang daun pintu panel kayu klas II 33.98 m2 0.9922 3.40 0.10 16.99 0.496 20.39 0.595 60.00
1.743 0.400 0.947 1.346
III PEKERJAAN KUNCI DAN ALAT PENGGANTUNG
1 Pasang kunci pintu double slaag standard 28.00 bh 0.3678 - - - - - - -
2 Pasang engsel pintu standard 42.00 bh 0.0893 - - - - - - -
3 Pasang angkur kusen 144.00 bh 0.0277 28.80 0.01 115.20 0.022 144.00 0.028 100.00
4 Pasang kaca polos 5 mm 10.32 m2 0.0979 - - - - - - -
0.583 0.006 0.022 0.028
IV PEKERJAAN INSTALASI LISTRIK
1 Pasang instalasi titik cahaya 240.00 ttk 1.2569 72.00 0.38 120.00 0.628 192.00 1.006 80.00
2 pasang stop kontak 56.00 bh 0.0445 16.80 0.01 22.40 0.018 39.20 0.031 70.00
3 Pasang saklar tunggal 18.00 bh 0.0136 3.60 0.00 7.20 0.005 10.80 0.008 60.00
4 Pasang saklar ganda 39.00 bh 0.0398 11.70 0.01 15.60 0.016 27.30 0.028 70.00
5 Pasang lampu SL 20 watt Philips 133.00 bh 0.5781 - - - - - - -
6 Pasang lampu Mercury 250 watt Philips (lengkap) 3.00 bh 0.0442 - - - - - - -
7 Pasang lampu Mercury 250 watt Philips + Upah pasang 11.00 bh 0.0875 - - - - - - -
8 Pasang lampu TL 36 watt Philips (lengkap) 60.00 bh 0.1496 - - - - - - -
9 Pasang Exaust fan 30 x 30 cm 26.00 bh 0.3782 - - - - - - -
2.592 0.405 0.668 1.073
V PEKERJAAN SANITASI
1 Pasang Kloset jongkok warna 4.00 bh 0.1281 0.60 0.02 3.40 0.109 4.00 0.128 100.00
2 Pasang Orinoir 9.00 bh 1.4744 - - - - - - -
3 Pasang Kran air 11.00 bh 0.0167 - - - - - - -
4 Pasang Floor drain (stainless) 11.00 bh 0.0349 - - 11.00 0.035 11.00 0.035 100.00
5 Pasang Bak mandi feberglas 4.00 bh 0.1476 - - 2.00 0.074 2.00 0.074 50.00
6 Pasang saluran air dari pasangan bata 228.00 m' 0.9383 171.13 0.94 - - 171.13 0.938 100.00
7 Pekerjaan Rangka Plafond GRC (bagian luar) besi hollow 13.00 bh 0.4105 - - 13.00 0.411 13.00 0.411 100.00
3.151 0.958 0.628 1.586
VI PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND
1 Pasang kuda + rangka atap Zingalum/baja ringan 1,419.80 m2 13.0590 1,419.80 13.06 - - 1,419.80 13.059 100.00
2 Pasang penutup atap genteng metal roof rainbow (pasir) 1,439.50 m2 9.1472 403.06 2.56 892.49 5.671 1,295.55 8.232 90.00
3 Pekerjaan bubungan genteng metal roof rainbow (pasir) 121.09 m' 0.5002 6.05 0.03 84.76 0.350 90.82 0.375 75.00
4 Pasang Alumunium Foile + Glass wool + Alumunium foil 3,092.08 m2 9.5488 - - 1,546.04 4.774 1,546.04 4.774 50.00
5 Pasang penutup Atap Spandek warna 3,262.80 m2 18.8967 - - 1,631.40 9.448 1,631.40 9.448 50.00
6 Pasang bubungan Atap Spandek warna 58.98 m' 0.1823 - - - - - - -
7 Pasang kawat loket / kawat ayam 3,262.80 m2 5.2593 326.28 0.53 1,631.40 2.630 1,957.68 3.156 60.00
8 Pasang talang miring ( jurai ) 60.20 m' 0.7048 - - 30.10 0.352 30.10 0.352 50.00
9 Pekerjaan Rangka Plafond Gypsum (bagian dalam) besi hollow 745.52 m2 2.3434 521.86 1.64 192.27 0.604 714.13 2.245 95.79
10 Pekerjaan Plafond Gypsum (bagian dalam) 1,081.90 m2 2.8216 216.38 0.56 649.14 1.693 865.52 2.257 80.00
11 Pekerjaan Rangka Plafond GRC (bagian luar) besi hollow 310.96 m2 0.9774 124.38 0.39 93.29 0.293 217.67 0.684 70.00
12 Pekerjaan Plafond GRC (bagian luar) 310.96 m2 0.7514 - - - - - - -
13 Pasang List Gypsum 1,136.23 m' 2.1351 - - - - - - -
14 Pasang listplank GRC lebar 30 cm (motif kayu) 219.20 m' 0.6530 - - 109.60 0.326 109.60 0.326 50.00
66.980 18.767 26.143 44.910
VII PEKERJAAN PENGECATAN
1 Pengecatan kayu dengan cat kayu setara glotek (3 x) 550.80 m2 1.3754 275.40 0.69 - - 275.40 0.688 50.00
2 Pengecatan plafond dgn cat tembok setara vinilex (3 x) 1,392.85 m2 3.9976 - - - - - - -
3 Pekerjaan mengerok Permukaan cat tembok lama 2,551.78 m2 1.4370 1,538.73 0.87 1,013.06 0.571 2,551.79 1.437 100.00
4 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 5,134.21 m2 7.4556 3,183.21 4.62 924.16 1.342 4,107.37 5.964 80.00
5 Pengecatan Besi atap lama & water turn dng cat besi (3x) 1,274.58 m2 2.8701 1,083.08 2.44 191.50 0.431 1,274.58 2.870 100.00
6 Pengecatan Lantai Lapangan 356.52 m2 0.5177 - - - - - - -
7 Politur Lantai Lapangan 680.82 m2 3.0594 - - - - - - -
20.713 8.616 2.344 10.959
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan dan penyempurnaan pekerjaan 1.00 ls 0.2910 0.10 0.03 0.25 0.073 0.35 0.102 35.00
2 Perbaikan Lantai Keramik 30 x 30 95.64 m2 0.8996 - - - - - - -
3 Perbaikan Lantai Kayu Lapangan 83.84 m2 0.3600 - - - - - - -
1.5506 0.0291 0.0727 0.1018
JUMLAH 100.00 30.708 31.870 62.578
PEMERINTAH KOTA SERANG
DINAS PEMUDA OLAH RAGA DAN PARIWISATA
ACTUAL PROGRESS
S/D MINGGU LALU MINGGU INI S/D MINGGU INI
NO URAIAN PEKERJAAN VOL BOBOT %
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT PRESTASI
% % % %
I PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek 1.00 bh 0.0235 1.00 0.02 - - 1.00 0.023 100.00
2 Pengadaan Direksi Keet 6.00 m2 0.5660 6.00 0.57 - - 6.00 0.566 100.00
3 Pengadaan / pembuatan Gudang bahan dan alat 9.00 m2 0.2185 9.00 0.22 - - 9.00 0.218 100.00
4 Penyediaan Air dan Listrik Kerja 1.00 ls 0.1396 1.00 0.14 - - 1.00 0.140 100.00
5 Pekerjaan bongkaran & Pembuangan limbah/puing-puing 3,726.00 ls 0.8673 3,241.62 0.75 - - 3,241.62 0.755 87.00
6 Biaya Administrasi, pelaporan dan dokumendasi 1.00 ls 0.8729 1.00 0.87 - - 1.00 0.873 100.00
2.688 2.575 - 2.575
II PEKERJAAN KUSEN DAN PINTU
1 Pekerjaan Kusen pintu/jendela & bouwvenligh kayu klas II 2.00 m3 0.7507 2.00 0.75 - - 2.00 0.751 100.00
2 Pasang daun pintu panel kayu klas II 33.98 m2 0.9922 20.39 0.60 13.59 0.397 33.98 0.992 100.00
1.743 1.346 0.397 1.743
III PEKERJAAN KUNCI DAN ALAT PENGGANTUNG
1 Pasang kunci pintu double slaag standard 28.00 bh 0.3678 - - 22.40 0.294 22.40 0.294 80.00
2 Pasang engsel pintu standard 42.00 bh 0.0893 - - 33.60 0.071 33.60 0.071 80.00
3 Pasang angkur kusen 144.00 bh 0.0277 144.00 0.03 - - 144.00 0.028 100.00
4 Pasang kaca polos 5 mm 10.32 m2 0.0979 - - - - - - -
0.583 0.028 0.366 0.393
IV PEKERJAAN INSTALASI LISTRIK
1 Pasang instalasi titik cahaya 240.00 ttk 1.2569 192.00 1.01 - - 192.00 1.006 80.00
2 pasang stop kontak 56.00 bh 0.0445 39.20 0.03 - - 39.20 0.031 70.00
3 Pasang saklar tunggal 18.00 bh 0.0136 10.80 0.01 - - 10.80 0.008 60.00
4 Pasang saklar ganda 39.00 bh 0.0398 27.30 0.03 - - 27.30 0.028 70.00
5 Pasang lampu SL 20 watt Philips 133.00 bh 0.5781 - - 133.00 0.578 133.00 0.578 100.00
6 Pasang lampu Mercury 250 watt Philips (lengkap) 3.00 bh 0.0442 - - - - - - -
7 Pasang lampu Mercury 250 watt Philips + Upah pasang 11.00 bh 0.0875 - - - - - - -
8 Pasang lampu TL 36 watt Philips (lengkap) 60.00 bh 0.1496 - - - - - - -
9 Pasang Exaust fan 30 x 30 cm 26.00 bh 0.3782 - - - - - - -
2.592 1.073 0.578 1.651
V PEKERJAAN SANITASI
1 Pasang Kloset jongkok warna 4.00 bh 0.1281 4.00 0.13 - - 4.00 0.128 100.00
2 Pasang Orinoir 9.00 bh 1.4744 - - - - - - -
3 Pasang Kran air 11.00 bh 0.0167 - - - - - - -
4 Pasang Floor drain (stainless) 11.00 bh 0.0349 11.00 0.03 - - 11.00 0.035 100.00
5 Pasang Bak mandi feberglas 4.00 bh 0.1476 2.00 0.07 2.00 0.074 4.00 0.148 100.00
6 Pasang saluran air dari pasangan bata 228.00 m' 0.9383 171.13 0.94 - - 171.13 0.938 100.00
7 Pekerjaan Rangka Plafond GRC (bagian luar) besi hollow 13.00 bh 0.4105 13.00 0.41 - - 13.00 0.411 100.00
3.151 1.586 0.074 1.659
VI PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND
1 Pasang kuda + rangka atap Zingalum/baja ringan 1,419.80 m2 13.0590 1,419.80 13.06 - - 1,419.80 13.059 100.00
2 Pasang penutup atap genteng metal roof rainbow (pasir) 1,439.50 m2 9.1472 1,295.55 8.23 143.95 0.915 1,439.50 9.147 100.00
3 Pekerjaan bubungan genteng metal roof rainbow (pasir) 121.09 m' 0.5002 90.82 0.38 30.27 0.125 121.09 0.500 100.00
4 Pasang Alumunium Foile + Glass wool + Alumunium foil 3,092.08 m2 9.5488 1,546.04 4.77 1,546.04 4.774 3,092.08 9.549 100.00
5 Pasang penutup Atap Spandek warna 3,262.80 m2 18.8967 1,631.40 9.45 1,631.40 9.448 3,262.80 18.897 100.00
6 Pasang bubungan Atap Spandek warna 58.98 m' 0.1823 - - 23.59 0.073 23.59 0.073 40.00
7 Pasang kawat loket / kawat ayam 3,262.80 m2 5.2593 1,957.68 3.16 1,305.12 2.104 3,262.80 5.259 100.00
8 Pasang talang miring ( jurai ) 60.20 m' 0.7048 30.10 0.35 30.10 0.352 60.20 0.705 100.00
9 Pekerjaan Rangka Plafond Gypsum (bagian dalam) besi hollow 745.52 m2 2.3434 714.13 2.24 - - 714.13 2.245 95.79
10 Pekerjaan Plafond Gypsum (bagian dalam) 1,081.90 m2 2.8216 865.52 2.26 216.38 0.564 1,081.90 2.822 100.00
11 Pekerjaan Rangka Plafond GRC (bagian luar) besi hollow 310.96 m2 0.9774 217.67 0.68 93.29 0.293 310.96 0.977 100.00
12 Pekerjaan Plafond GRC (bagian luar) 310.96 m2 0.7514 - - 62.19 0.150 62.19 0.150 20.00
13 Pasang List Gypsum 1,136.23 m' 2.1351 - - 340.87 0.641 340.87 0.641 30.00
14 Pasang listplank GRC lebar 30 cm (motif kayu) 219.20 m' 0.6530 109.60 0.33 109.60 0.326 219.20 0.653 100.00
66.980 44.910 19.766 64.676
VII PEKERJAAN PENGECATAN
1 Pengecatan kayu dengan cat kayu setara glotek (3 x) 550.80 m2 1.3754 275.40 0.69 220.32 0.550 495.72 1.238 90.00
2 Pengecatan plafond dgn cat tembok setara vinilex (3 x) 1,392.85 m2 3.9976 - - 557.14 1.599 557.14 1.599 40.00
3 Pekerjaan mengerok Permukaan cat tembok lama 2,551.78 m2 1.4370 2,551.79 1.44 - - 2,551.79 1.437 100.00
4 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 5,134.21 m2 7.4556 4,107.37 5.96 513.42 0.746 4,620.79 6.710 90.00
5 Pengecatan Besi atap lama & water turn dng cat besi (3x) 1,274.58 m2 2.8701 1,274.58 2.87 - - 1,274.58 2.870 100.00
6 Pengecatan Lantai Lapangan 356.52 m2 0.5177 - - - - - - -
7 Politur Lantai Lapangan 680.82 m2 3.0594 - - - - - - -
20.713 10.959 2.895 13.854
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan dan penyempurnaan pekerjaan 1.00 ls 0.2910 0.35 0.10 0.15 0.044 0.50 0.145 50.00
2 Perbaikan Lantai Keramik 30 x 30 95.64 m2 0.8996 - - - - - - -
3 Perbaikan Lantai Kayu Lapangan 83.84 m2 0.3600 - - - - - - -
1.5506 0.1018 0.0436 0.1455
JUMLAH 100.00 62.578 24.119 86.698
PEMERINTAH KOTA SERANG
DINAS PEMUDA OLAH RAGA DAN PARIWISATA
ACTUAL PROGRESS
S/D MINGGU LALU MINGGU INI S/D MINGGU INI
NO URAIAN PEKERJAAN VOL BOBOT %
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT PRESTASI
% % % %
I PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek 1.00 bh 0.0235 1.00 0.02 - - 1.00 0.023 100.00
2 Pengadaan Direksi Keet 6.00 m2 0.5660 6.00 0.57 - - 6.00 0.566 100.00
3 Pengadaan / pembuatan Gudang bahan dan alat 9.00 m2 0.2185 9.00 0.22 - - 9.00 0.218 100.00
4 Penyediaan Air dan Listrik Kerja 1.00 ls 0.1396 1.00 0.14 - - 1.00 0.140 100.00
5 Pekerjaan bongkaran & Pembuangan limbah/puing-puing 3,726.00 ls 0.8673 3,241.62 0.75 111.78 0.026 3,353.40 0.781 90.00
6 Biaya Administrasi, pelaporan dan dokumendasi 1.00 ls 0.8729 1.00 0.87 - - 1.00 0.873 100.00
2.688 2.575 0.026 2.601
II PEKERJAAN KUSEN DAN PINTU
1 Pekerjaan Kusen pintu/jendela & bouwvenligh kayu klas II 2.00 m3 0.7507 2.00 0.75 - - 2.00 0.751 100.00
2 Pasang daun pintu panel kayu klas II 33.98 m2 0.9922 33.98 0.99 - - 33.98 0.992 100.00
1.743 1.743 - 1.743
III PEKERJAAN KUNCI DAN ALAT PENGGANTUNG
1 Pasang kunci pintu double slaag standard 28.00 bh 0.3678 22.40 0.29 5.60 0.074 28.00 0.368 100.00
2 Pasang engsel pintu standard 42.00 bh 0.0893 33.60 0.07 8.40 0.018 42.00 0.089 100.00
3 Pasang angkur kusen 144.00 bh 0.0277 144.00 0.03 - - 144.00 0.028 100.00
4 Pasang kaca polos 5 mm 10.32 m2 0.0979 - - - - - - -
0.583 0.393 0.091 0.485
IV PEKERJAAN INSTALASI LISTRIK
1 Pasang instalasi titik cahaya 240.00 ttk 1.2569 192.00 1.01 36.00 0.189 228.00 1.194 95.00
2 pasang stop kontak 56.00 bh 0.0445 39.20 0.03 16.80 0.013 56.00 0.044 100.00
3 Pasang saklar tunggal 18.00 bh 0.0136 10.80 0.01 7.20 0.005 18.00 0.014 100.00
4 Pasang saklar ganda 39.00 bh 0.0398 27.30 0.03 11.70 0.012 39.00 0.040 100.00
5 Pasang lampu SL 20 watt Philips 133.00 bh 0.5781 133.00 0.58 - - 133.00 0.578 100.00
6 Pasang lampu Mercury 250 watt Philips (lengkap) 3.00 bh 0.0442 - - - - - - -
7 Pasang lampu Mercury 250 watt Philips + Upah pasang 11.00 bh 0.0875 - - - - - - -
8 Pasang lampu TL 36 watt Philips (lengkap) 60.00 bh 0.1496 - - 60.00 0.150 60.00 0.150 100.00
9 Pasang Exaust fan 30 x 30 cm 26.00 bh 0.3782 - - 1.30 0.019 1.30 0.019 5.00
2.592 1.651 0.388 2.039
V PEKERJAAN SANITASI
1 Pasang Kloset jongkok warna 4.00 bh 0.1281 4.00 0.13 - - 4.00 0.128 100.00
2 Pasang Orinoir 9.00 bh 1.4744 - - - - - - -
3 Pasang Kran air 11.00 bh 0.0167 - - - - - - -
4 Pasang Floor drain (stainless) 11.00 bh 0.0349 11.00 0.03 - - 11.00 0.035 100.00
5 Pasang Bak mandi feberglas 4.00 bh 0.1476 4.00 0.15 - - 4.00 0.148 100.00
6 Pasang saluran air dari pasangan bata 228.00 m' 0.9383 171.13 0.94 - - 171.13 0.938 100.00
Pekerjaan Rangka Plafond GRC (bagian luar) besi hollow 13.00 bh 0.4105 13.00 0.41 - - 13.00 0.411 100.00
3.151 1.659 - 1.659
VI PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND
1 Pasang kuda + rangka atap Zingalum/baja ringan 1,419.80 m2 13.0590 1,419.80 13.06 - - 1,419.80 13.059 100.00
2 Pasang penutup atap genteng metal roof rainbow (pasir) 1,439.50 m2 9.1472 1,439.50 9.15 - - 1,439.50 9.147 100.00
3 Pekerjaan bubungan genteng metal roof rainbow (pasir) 121.09 m' 0.5002 121.09 0.50 - - 121.09 0.500 100.00
4 Pasang Alumunium Foile + Glass wool + Alumunium foil 3,092.08 m2 9.5488 3,092.08 9.55 - - 3,092.08 9.549 100.00
5 Pasang penutup Atap Spandek warna 3,262.80 m2 18.8967 3,262.80 18.90 - - 3,262.80 18.897 100.00
6 Pasang bubungan Atap Spandek warna 58.98 m' 0.1823 23.59 0.07 35.39 0.109 58.98 0.182 100.00
7 Pasang kawat loket / kawat ayam 3,262.80 m2 5.2593 3,262.80 5.26 - - 3,262.80 5.259 100.00
8 Pasang talang miring ( jurai ) 60.20 m' 0.7048 60.20 0.70 - - 60.20 0.705 100.00
9 Pekerjaan Rangka Plafond Gypsum (bagian dalam) besi hollow 745.52 m2 2.3434 714.13 2.24 - - 714.13 2.245 95.79
10 Pekerjaan Plafond Gypsum (bagian dalam) 1,081.90 m2 2.8216 1,081.90 2.82 - - 1,081.90 2.822 100.00
11 Pekerjaan Rangka Plafond GRC (bagian luar) besi hollow 310.96 m2 0.9774 310.96 0.98 - - 310.96 0.977 100.00
12 Pekerjaan Plafond GRC (bagian luar) 310.96 m2 0.7514 62.19 0.15 233.22 0.564 295.41 0.714 95.00
13 Pasang List Gypsum 1,136.23 m' 2.1351 340.87 0.64 568.12 1.068 908.98 1.708 80.00
14 Pasang listplank GRC lebar 30 cm (motif kayu) 219.20 m' 0.6530 219.20 0.65 - - 219.20 0.653 100.00
66.980 64.676 1.740 66.417
VII PEKERJAAN PENGECATAN
1 Pengecatan kayu dengan cat kayu setara glotek (3 x) 550.80 m2 1.3754 495.72 1.24 55.08 0.138 550.80 1.375 100.00
2 Pengecatan plafond dgn cat tembok setara vinilex (3 x) 1,392.85 m2 3.9976 557.14 1.60 626.78 1.799 1,183.92 3.398 85.00
3 Pekerjaan mengerok Permukaan cat tembok lama 2,551.78 m2 1.4370 2,551.79 1.44 - - 2,551.79 1.437 100.00
4 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 5,134.21 m2 7.4556 4,620.79 6.71 - - 4,620.79 6.710 90.00
5 Pengecatan Besi atap lama & water turn dng cat besi (3x) 1,274.58 m2 2.8701 1,274.58 2.87 - - 1,274.58 2.870 100.00
6 Pengecatan Lantai Lapangan 356.52 m2 0.5177 - - 356.52 0.518 356.52 0.518 100.00
7 Politur Lantai Lapangan 680.82 m2 3.0594 - - 612.74 2.754 612.74 2.754 90.00
20.713 13.854 5.208 19.062
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan dan penyempurnaan pekerjaan 1.00 ls 0.2910 0.50 0.15 0.25 0.073 0.75 0.218 75.00
2 Perbaikan Lantai Keramik 30 x 30 95.64 m2 0.8996 - - 86.08 0.810 86.08 0.810 90.00
3 Perbaikan Lantai Kayu Lapangan 83.84 m2 0.3600 - - 75.46 0.324 75.46 0.324 90.00
1.5506 0.1455 1.2064 1.3519
JUMLAH 100.00 86.698 8.660 95.357
PEMERINTAH KOTA SERANG
DINAS PEMUDA OLAH RAGA DAN PARIWISATA
ACTUAL PROGRESS
S/D MINGGU LALU MINGGU INI S/D MINGGU INI
NO URAIAN PEKERJAAN VOL BOBOT %
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT PRESTASI
% % % %
I PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek 1.00 bh 0.0235 1.00 0.02 - - 1.00 0.023 100.00
2 Pengadaan Direksi Keet 6.00 m2 0.5660 6.00 0.57 - - 6.00 0.566 100.00
3 Pengadaan / pembuatan Gudang bahan dan alat 9.00 m2 0.2185 9.00 0.22 - - 9.00 0.218 100.00
4 Penyediaan Air dan Listrik Kerja 1.00 ls 0.1396 1.00 0.14 - - 1.00 0.140 100.00
5 Pekerjaan bongkaran & Pembuangan limbah/puing-puing 3,726.00 ls 0.8673 3,353.40 0.78 372.60 0.087 3,726.00 0.867 100.00
6 Biaya Administrasi, pelaporan dan dokumendasi 1.00 ls 0.8729 1.00 0.87 - - 1.00 0.873 100.00
2.688 2.601 0.087 2.688
II PEKERJAAN KUSEN DAN PINTU
1 Pekerjaan Kusen pintu/jendela & bouwvenligh kayu klas II 2.00 m3 0.7507 2.00 0.75 - - 2.00 0.751 100.00
2 Pasang daun pintu panel kayu klas II 33.98 m2 0.9922 33.98 0.99 - - 33.98 0.992 100.00
1.743 1.743 - 1.743
III PEKERJAAN KUNCI DAN ALAT PENGGANTUNG
1 Pasang kunci pintu double slaag standard 28.00 bh 0.3678 28.00 0.37 - - 28.00 0.368 100.00
2 Pasang engsel pintu standard 42.00 bh 0.0893 42.00 0.09 - - 42.00 0.089 100.00
3 Pasang angkur kusen 144.00 bh 0.0277 144.00 0.03 - - 144.00 0.028 100.00
4 Pasang kaca polos 5 mm 10.32 m2 0.0979 - - 10.32 0.098 10.32 0.098 100.00
0.583 0.485 0.098 0.583
IV PEKERJAAN INSTALASI LISTRIK
1 Pasang instalasi titik cahaya 240.00 ttk 1.2569 228.00 1.19 12.00 0.063 240.00 1.257 100.00
2 pasang stop kontak 56.00 bh 0.0445 56.00 0.04 - - 56.00 0.044 100.00
3 Pasang saklar tunggal 18.00 bh 0.0136 18.00 0.01 - - 18.00 0.014 100.00
4 Pasang saklar ganda 39.00 bh 0.0398 39.00 0.04 - - 39.00 0.040 100.00
5 Pasang lampu SL 20 watt Philips 133.00 bh 0.5781 133.00 0.58 - - 133.00 0.578 100.00
6 Pasang lampu Mercury 250 watt Philips (lengkap) 3.00 bh 0.0442 - - 3.00 0.044 3.00 0.044 100.00
7 Pasang lampu Mercury 250 watt Philips + Upah pasang 11.00 bh 0.0875 - - 11.00 0.088 11.00 0.088 100.00
8 Pasang lampu TL 36 watt Philips (lengkap) 60.00 bh 0.1496 60.00 0.15 - - 60.00 0.150 100.00
9 Pasang Exaust fan 30 x 30 cm 26.00 bh 0.3782 1.30 0.02 24.70 0.359 26.00 0.378 100.00
2.592 2.039 0.554 2.592
V PEKERJAAN SANITASI
1 Pasang Kloset jongkok warna 4.00 bh 0.1281 4.00 0.13 - - 4.00 0.128 100.00
2 Pasang Orinoir 9.00 bh 1.4744 - - 9.00 1.474 9.00 1.474 100.00
3 Pasang Kran air 11.00 bh 0.0167 - - 11.00 0.017 11.00 0.017 100.00
4 Pasang Floor drain (stainless) 11.00 bh 0.0349 11.00 0.03 - - 11.00 0.035 100.00
5 Pasang Bak mandi feberglas 4.00 bh 0.1476 4.00 0.15 - - 4.00 0.148 100.00
6 Pasang saluran air dari pasangan bata 228.00 m' 0.9383 171.13 0.94 - - 171.13 0.938 100.00
Pekerjaan Rangka Plafond GRC (bagian luar) besi hollow 13.00 bh 0.4105 13.00 0.41 - - 13.00 0.411 100.00
3.151 1.659 1.491 3.151
VI PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND
1 Pasang kuda + rangka atap Zingalum/baja ringan 1,419.80 m2 13.0590 1,419.80 13.06 - - 1,419.80 13.059 100.00
2 Pasang penutup atap genteng metal roof rainbow (pasir) 1,439.50 m2 9.1472 1,439.50 9.15 - - 1,439.50 9.147 100.00
3 Pekerjaan bubungan genteng metal roof rainbow (pasir) 121.09 m' 0.5002 121.09 0.50 - - 121.09 0.500 100.00
4 Pasang Alumunium Foile + Glass wool + Alumunium foil 3,092.08 m2 9.5488 3,092.08 9.55 - - 3,092.08 9.549 100.00
5 Pasang penutup Atap Spandek warna 3,262.80 m2 18.8967 3,262.80 18.90 - - 3,262.80 18.897 100.00
6 Pasang bubungan Atap Spandek warna 58.98 m' 0.1823 58.98 0.18 - - 58.98 0.182 100.00
7 Pasang kawat loket / kawat ayam 3,262.80 m2 5.2593 3,262.80 5.26 - - 3,262.80 5.259 100.00
8 Pasang talang miring ( jurai ) 60.20 m' 0.7048 60.20 0.70 - - 60.20 0.705 100.00
9 Pekerjaan Rangka Plafond Gypsum (bagian dalam) besi hollow 745.52 m2 2.3434 714.13 2.24 31.39 0.099 745.52 2.343 100.00
10 Pekerjaan Plafond Gypsum (bagian dalam) 1,081.90 m2 2.8216 1,081.90 2.82 - - 1,081.90 2.822 100.00
11 Pekerjaan Rangka Plafond GRC (bagian luar) besi hollow 310.96 m2 0.9774 310.96 0.98 - - 310.96 0.977 100.00
12 Pekerjaan Plafond GRC (bagian luar) 310.96 m2 0.7514 295.41 0.71 15.55 0.038 310.96 0.751 100.00
13 Pasang List Gypsum 1,136.23 m' 2.1351 908.98 1.71 227.25 0.427 1,136.23 2.135 100.00
14 Pasang listplank GRC lebar 30 cm (motif kayu) 219.20 m' 0.6530 219.20 0.65 - - 219.20 0.653 100.00
66.980 66.417 0.563 66.980
VII PEKERJAAN PENGECATAN
1 Pengecatan kayu dengan cat kayu setara glotek (3 x) 550.80 m2 1.3754 550.80 1.38 - - 550.80 1.375 100.00
2 Pengecatan plafond dgn cat tembok setara vinilex (3 x) 1,392.85 m2 3.9976 1,183.92 3.40 208.93 0.600 1,392.85 3.998 100.00
3 Pekerjaan mengerok Permukaan cat tembok lama 2,551.78 m2 1.4370 2,551.79 1.44 - - 2,551.79 1.437 100.00
4 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 5,134.21 m2 7.4556 4,620.79 6.71 513.42 0.746 5,134.21 7.456 100.00
5 Pengecatan Besi atap lama & water turn dng cat besi (3x) 1,274.58 m2 2.8701 1,274.58 2.87 - - 1,274.58 2.870 100.00
6 Pengecatan Lantai Lapangan 356.52 m2 0.5177 356.52 0.52 - - 356.52 0.518 100.00
7 Politur Lantai Lapangan 680.82 m2 3.0594 612.74 2.75 68.08 0.306 680.82 3.059 100.00
20.713 19.062 1.651 20.713
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan dan penyempurnaan pekerjaan 1.00 ls 0.2910 0.75 0.22 0.25 0.073 1.00 0.291 100.00
2 Perbaikan Lantai Keramik 30 x 30 95.64 m2 0.8996 86.08 0.81 9.56 0.090 95.64 0.900 100.00
3 Perbaikan Lantai Kayu Lapangan 83.84 m2 0.3600 75.46 0.32 8.38 0.036 83.84 0.360 100.00
1.5506 1.3519 0.1987 1.5506
JUMLAH 100.00 95.36 4.643 100.000
PAKET PEKERJAAN
REHABILITASI GEDUNG GELANGGANG REMAJA
MAULANA YUSUF
KOTA SERANG - BANTEN
LAPORAN PROGRES
Kegiatan : PROGRAM PENINGKATAN SARANA & PRASARANA OLAHRAGA
MC - 100 PROGRES
PRESTASI
NO URAIAN PEKERJAAN VOLUME BOBOT
VOLUME BOBOT %
% %
I PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek 1.00 bh 0.0235 1.00 0.02 100.00
2 Pengadaan Direksi Keet 6.00 m2 0.5660 6.00 0.57 100.00
3 Pengadaan / pembuatan Gudang bahan dan alat 9.00 m2 0.2185 9.00 0.22 100.00
4 Penyediaan Air dan Listrik Kerja 1.00 ls 0.1396 1.00 0.14 100.00
5 Pekerjaan bongkaran & Pembuangan limbah/puing-puing 3,726.00 ls 0.8673 3,726.00 0.87 100.00
6 Biaya Administrasi, pelaporan dan dokumendasi 1.00 ls 0.8729 1.00 0.87 100.00
2.688 2.688
II PEKERJAAN KUSEN DAN PINTU
1 Pekerjaan Kusen pintu/jendela & bouwvenligh kayu klas II 2.00 m3 0.7507 2.00 0.75 100.00
2 Pasang daun pintu panel kayu klas II 33.98 m2 0.9922 33.98 0.99 100.00
1.743 1.743
III PEKERJAAN KUNCI DAN ALAT PENGGANTUNG
1 Pasang kunci pintu double slaag standard 28.00 bh 0.3678 28.00 0.37 100.00
2 Pasang engsel pintu standard 42.00 bh 0.0893 42.00 0.09 100.00
3 Pasang angkur kusen 144.00 bh 0.0277 144.00 0.03 100.00
4 Pasang kaca polos 5 mm 10.32 m2 0.0979 10.32 0.10 100.00
0.583 0.583
IV PEKERJAAN INSTALASI LISTRIK
1 Pasang instalasi titik cahaya 240.00 ttk 1.2569 240.00 1.26 100.00
2 pasang stop kontak 56.00 bh 0.0445 56.00 0.04 100.00
3 Pasang saklar tunggal 18.00 bh 0.0136 18.00 0.01 100.00
4 Pasang saklar ganda 39.00 bh 0.0398 39.00 0.04 100.00
5 Pasang lampu SL 20 watt Philips 133.00 bh 0.5781 133.00 0.58 100.00
6 Pasang lampu Mercury 250 watt Philips (lengkap) 3.00 bh 0.0442 3.00 0.04 100.00
7 Pasang lampu Mercury 250 watt Philips + Upah pasang 11.00 bh 0.0875 11.00 0.09 100.00
8 Pasang lampu TL 36 watt Philips (lengkap) 60.00 bh 0.1496 60.00 0.15 100.00
9 Pasang Exaust fan 30 x 30 cm 26.00 bh 0.3782 26.00 0.38 100.00
2.592 2.592
V PEKERJAAN SANITASI
1 Pasang Kloset jongkok warna 4.00 bh 0.1281 4.00 0.13 100.00
2 Pasang Orinoir 9.00 bh 1.4744 9.00 1.47 100.00
3 Pasang Kran air 11.00 bh 0.0167 11.00 0.02 100.00
4 Pasang Floor drain (stainless) 11.00 bh 0.0349 11.00 0.03 100.00
5 Pasang Bak mandi feberglas 4.00 bh 0.1476 4.00 0.15 100.00
6 Pasang saluran air dari pasangan bata 228.00 m' 0.9383 171.13 0.94 100.00
Pekerjaan Rangka Plafond GRC (bagian luar) besi hollow 13.00 bh 0.4105 13.00 0.41 100.00
3.151 3.151
VI PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND
1 Pasang kuda + rangka atap Zingalum/baja ringan 1,419.80 m2 13.0590 1,419.80 13.06 100.00
2 Pasang penutup atap genteng metal roof rainbow (pasir) 1,439.50 m2 9.1472 1,439.50 9.15 100.00
3 Pekerjaan bubungan genteng metal roof rainbow (pasir) 121.09 m' 0.5002 121.09 0.50 100.00
4 Pasang Alumunium Foile + Glass wool + Alumunium foil 3,092.08 m2 9.5488 3,092.08 9.55 100.00
5 Pasang penutup Atap Spandek warna 3,262.80 m2 18.8967 3,262.80 18.90 100.00
6 Pasang bubungan Atap Spandek warna 58.98 m' 0.1823 58.98 0.18 100.00
7 Pasang kawat loket / kawat ayam 3,262.80 m2 5.2593 3,262.80 5.26 100.00
8 Pasang talang miring ( jurai ) 60.20 m' 0.7048 60.20 0.70 100.00
9 Pekerjaan Rangka Plafond Gypsum (bagian dalam) besi hollow 745.52 m2 2.3434 745.52 2.34 100.00
10 Pekerjaan Plafond Gypsum (bagian dalam) 1,081.90 m2 2.8216 1,081.90 2.82 100.00
11 Pekerjaan Rangka Plafond GRC (bagian luar) besi hollow 310.96 m2 0.9774 310.96 0.98 100.00
12 Pekerjaan Plafond GRC (bagian luar) 310.96 m2 0.7514 310.96 0.75 100.00
13 Pasang List Gypsum 1,136.23 m' 2.1351 1,136.23 2.14 100.00
14 Pasang listplank GRC lebar 30 cm (motif kayu) 219.20 m' 0.6530 219.20 0.65 100.00
66.980 66.980
VII PEKERJAAN PENGECATAN
1 Pengecatan kayu dengan cat kayu setara glotek (3 x) 550.80 m2 1.3754 550.80 1.38 100.00
2 Pengecatan plafond dgn cat tembok setara vinilex (3 x) 1,392.85 m2 3.9976 1,392.85 4.00 100.00
3 Pekerjaan mengerok Permukaan cat tembok lama 2,551.78 m2 1.4370 2,551.79 1.44 100.00
4 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 5,134.21 m2 7.4556 5,134.21 7.46 100.00
5 Pengecatan Besi atap lama & water turn dng cat besi (3x) 1,274.58 m2 2.8701 1,274.58 2.87 100.00
6 Pengecatan Lantai Lapangan 356.52 m2 0.5177 356.52 0.52 100.00
7 Politur Lantai Lapangan 680.82 m2 3.0594 680.82 3.06 100.00
20.713 20.713
MC - 100 PROGRES
PRESTASI
NO URAIAN PEKERJAAN VOLUME BOBOT
VOLUME BOBOT %
% %
VIII PEKERJAAN LAIN-LAIN
1 Pembersihan dan penyempurnaan pekerjaan 1.00 ls 0.2910 1.00 0.29 100.00
2 Perbaikan Lantai Keramik 30 x 30 95.64 m2 0.8996 95.64 0.90 100.00
3 Perbaikan Lantai Kayu Lapangan 83.84 m2 0.3600 83.84 0.36 100.00
1.5506 1.5506
JUMLAH 100.00 100.00
1.
CATUR HINDRATNO
Team Leader
Kontraktor Pelaksana
CV. RESTU BUMI RAYA 2.
IMAL RAHMAN 3.
Project Manager
M. SUMARDI, SE
NIP. 46512051986021006
Kegiatan : PROGRAM PENINGKATAN SARANA & PRASARANA OLAHRAGA
Pekerjaan : REHABILITASI GEDUNG GELANGGANG REMAJA (GGR)
Lokasi : KOTA SERANG
Sumber Dana : 2014
RENCANA PEKERJAAN
BOBOT SEPTEMBER OKTOBER NOVEMBER
NO URAIAN PEKERJAAN VOL
% MINGGU
MINGGU
1 MINGGU
2 MINGGU
3 MINGGU
4 MINGGU
5 MINGGU
6 MINGGU
7 MINGGU
8 9
18 25 2 9 16 23 30 6 10
I PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek 1.00 bh 0.02
2 Pengadaan Direksi Keet 6.00 m2 0.57 0.11
3 Pengadaan / pembuatan Gudang bahan dan alat 9.00 m2 0.49 0.10
4 Penyediaan Air dan Listrik Kerja 1.00 ls 0.14
5 Pekerjaan bongkaran & Pembuangan limbah/puing-puing 3,726.00 ls 0.87
6 Biaya Administrasi, pelaporan dan dokumendasi 1.00 ls 0.87 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
V PEKERJAAN SANITASI
1 Pasang Kloset jongkok warna 8.00 bh 0.26 0.03
2 Pasang Orinoir 9.00 bh 1.47 0.16
3 Pasang Kran air 11.00 bh 0.02 0.00
4 Pasang Floor drain (stainless) 11.00 bh 0.03 0.01
5 Pasang Bak mandi feberglas 8.00 bh 0.30 0.03
6 Pasang saluran air dari pasangan bata 228.00 m' 1.30 0.06 0.06 0.06
Bobot Rencana Mingguan 0.25 0.06 1.59 3.69 3.69 3.23 0.85 1.01 0.56
Komulatif Rencana Mingguan 0.68 2.48 13.43 38.78 52.56 75.12 90.85 97.66 100
TIME SCHEDULE
BOBOT SEPTEMBER OKTOBER NOVEMBER
NO URAIAN PEKERJAAN
%
1 2 3 4 5 6 7 8 9
I PEKERJAAN PERSIAPAN 2.96 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37
II PEKERJAAN KUSEN DAN PINTU 0.90 0.18 0.18 0.18 0.18 0.18
VI PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND 67.98 13.60 13.60 13.60 13.60 13.60
VII PEKERJAAN PENGECATAN 18.52 2.65 2.65 2.65 2.65 2.65 2.65 2.65
Bobot Rencana Mingguan 0.37 0.55 16.79 17.47 18.60 18.76 18.58 4.97 3.92
Komulatif Rencana Mingguan 0.37 0.92 17.71 35.18 53.78 72.53 91.11 96.08 100.00
Realisasi Bobot Mingguan 1.12 3.23 6.27
Komulatif Realisasi Mingguan 1.12 4.36 10.63
Deviasi 0.75 3.43 (7.08)
TIME SCHEDULE
BOBOT SEPTEMBER OKTOBER NOVEMBER
NO URAIAN PEKERJAAN
%
1 2 3 4 5 6 7 8 9
I PEKERJAAN PERSIAPAN 2.96 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37
II PEKERJAAN KUSEN DAN PINTU 0.90 0.18 0.18 0.18 0.18 0.18
VI PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND 67.98 13.60 13.60 13.60 13.60 13.60
VII PEKERJAAN PENGECATAN 18.52 2.65 2.65 2.65 2.65 2.65 2.65 2.65
Bobot Rencana Mingguan 0.37 0.55 16.79 17.47 18.60 18.76 18.58 4.97 3.92
Komulatif Rencana Mingguan 0.37 0.92 17.71 35.18 53.78 72.53 91.11 96.08 100.00
Realisasi Bobot Mingguan 1.12 3.23 6.27
Komulatif Realisasi Mingguan 1.12 4.36 10.63
Deviasi 0.75 3.43 (7.08)
TIME SCHEDULE
BOBOT SEPTEMBER OKTOBER NOVEMBER
NO URAIAN PEKERJAAN
%
1 2 3 4 5 6 7 8 9
I PEKERJAAN PERSIAPAN 2.96 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37
II PEKERJAAN KUSEN DAN PINTU 0.90 0.18 0.18 0.18 0.18 0.18
VI PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND 67.98 13.60 13.60 13.60 13.60 13.60
VII PEKERJAAN PENGECATAN 18.52 2.65 2.65 2.65 2.65 2.65 2.65 2.65
Bobot Rencana Mingguan 0.37 0.55 16.79 17.47 18.60 18.76 18.58 4.97 3.92
Komulatif Rencana Mingguan 0.37 0.92 17.71 35.18 53.78 72.53 91.11 96.08 100.00
Realisasi Bobot Mingguan 1.12 3.23 6.27
Komulatif Realisasi Mingguan 1.12 4.36 10.63
Deviasi 0.75 3.43 (7.08)
TIME SCHEDULE
BOBOT SEPTEMBER OKTOBER NOVEMBER
NO URAIAN PEKERJAAN
%
1 2 3 4 5 6 7 8 9
I PEKERJAAN PERSIAPAN 2.69 0.37 0.37 0.37 0.40 0.40 0.40 0.40 0.40
II PEKERJAAN KUSEN DAN PINTU 1.74 0.18 0.18 0.26 0.26 0.26 0.26 0.26
III PEKERJAAN KUNCI DAN ALAT PENGGANTUNG 0.58 0.19 0.19 0.19
VI PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND 66.98 13.60 13.35 13.35 13.35 13.35
VII PEKERJAAN PENGECATAN 20.71 2.65 3.01 3.01 3.01 3.01 3.01 3.01
Bobot Rencana Mingguan 0.37 0.55 16.79 17.65 18.17 18.36 18.36 5.02 0.56
Komulatif Rencana Mingguan 0.37 0.92 17.71 35.36 53.53 71.90 90.26 95.28 100.00
Realisasi Bobot Mingguan 0.07 3.23 6.27 11.08
Komulatif Realisasi Mingguan 0.07 3.30 9.57 20.65
Deviasi (0.30) 2.38 (8.14) (14.7)
TIME SCHEDULE
BOBOT SEPTEMBER OKTOBER NOVEMBER
NO URAIAN PEKERJAAN
%
1 2 3 4 5 6 7 8 9
I PEKERJAAN PERSIAPAN 2.69 0.37 0.37 0.37 0.40 0.40 0.40 0.40 0.40
II PEKERJAAN KUSEN DAN PINTU 1.74 0.18 0.18 0.26 0.26 0.26 0.26 0.26
III PEKERJAAN KUNCI DAN ALAT PENGGANTUNG 0.58 0.19 0.19 0.19
VI PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND 66.98 13.60 13.35 13.35 13.35 13.35
VII PEKERJAAN PENGECATAN 20.71 2.65 3.01 3.01 3.01 3.01 3.01 3.01
Bobot Rencana Mingguan 0.37 0.55 16.79 17.65 18.17 18.36 18.36 5.02 0.56
Komulatif Rencana Mingguan 0.37 0.92 17.71 35.36 53.53 71.90 90.26 95.28 100.00
Realisasi Bobot Mingguan 0.07 3.23 6.27 11.08 10.05
Komulatif Realisasi Mingguan 0.07 3.30 9.57 20.65 30.71
Deviasi (0.30) 2.38 (8.14) (14.7) (22.8)
TIME SCHEDULE
BOBOT SEPTEMBER OKTOBER NOVEMBER
NO URAIAN PEKERJAAN
%
1 2 3 4 5 6 7 8 9
I PEKERJAAN PERSIAPAN 2.69 0.37 0.37 0.37 0.40 0.40 0.40 0.40 0.40
II PEKERJAAN KUSEN DAN PINTU 1.74 0.18 0.18 0.26 0.26 0.26 0.26 0.26
III PEKERJAAN KUNCI DAN ALAT PENGGANTUNG 0.58 0.19 0.19 0.19
VI PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND 66.98 13.60 13.35 13.35 13.35 13.35
VII PEKERJAAN PENGECATAN 20.71 2.65 3.01 3.01 3.01 3.01 3.01 3.01
Bobot Rencana Mingguan 0.37 0.55 16.79 17.65 18.17 18.36 18.36 5.02 0.56
Komulatif Rencana Mingguan 0.37 0.92 17.71 35.36 53.53 71.90 90.26 95.28 100.00
Realisasi Bobot Mingguan 0.07 3.23 6.27 11.08 10.05 31.87
Komulatif Realisasi Mingguan 0.07 3.30 9.57 20.65 30.71 62.58
Deviasi (0.30) 2.38 (8.14) (14.7) (22.8) (9.3)
TIME SCHEDULE
BOBOT SEPTEMBER OKTOBER NOVEMBER
NO URAIAN PEKERJAAN
%
1 2 3 4 5 6 7 8 9
I PEKERJAAN PERSIAPAN 2.69 0.37 0.37 0.37 0.40 0.40 0.40 0.40 0.40
II PEKERJAAN KUSEN DAN PINTU 1.74 0.18 0.18 0.26 0.26 0.26 0.26 0.26
III PEKERJAAN KUNCI DAN ALAT PENGGANTUNG 0.58 0.19 0.19 0.19
VI PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND 66.98 13.60 13.35 13.35 13.35 13.35
VII PEKERJAAN PENGECATAN 20.71 2.65 3.01 3.01 3.01 3.01 3.01 3.01
Bobot Rencana Mingguan 0.37 0.55 16.79 17.65 18.17 18.36 18.36 5.02 0.56
Komulatif Rencana Mingguan 0.37 0.92 17.71 35.36 53.53 71.90 90.26 95.28 100.00
Realisasi Bobot Mingguan 0.07 3.23 6.27 11.08 10.05 31.87 24.12
Komulatif Realisasi Mingguan 0.07 3.30 9.57 20.65 30.71 62.58 86.70
Deviasi (0.30) 2.38 (8.14) (14.7) (22.8) (9.3) (3.6)
TIME SCHEDULE
BOBOT SEPTEMBER OKTOBER NOVEMBER
NO URAIAN PEKERJAAN
%
1 2 3 4 5 6 7 8 9
I PEKERJAAN PERSIAPAN 2.69 0.37 0.37 0.37 0.40 0.40 0.40 0.40 0.40
II PEKERJAAN KUSEN DAN PINTU 1.74 0.18 0.18 0.26 0.26 0.26 0.26 0.26
III PEKERJAAN KUNCI DAN ALAT PENGGANTUNG 0.58 0.19 0.19 0.19
VI PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND 66.98 13.60 13.35 13.35 13.35 13.35
VII PEKERJAAN PENGECATAN 20.71 2.65 3.01 3.01 3.01 3.01 3.01 3.01
Bobot Rencana Mingguan 0.37 0.55 16.79 17.65 18.17 18.36 18.36 5.02 0.56
Komulatif Rencana Mingguan 0.37 0.92 17.71 35.36 53.53 71.90 90.26 95.28 100.00
Realisasi Bobot Mingguan 0.07 3.23 6.27 11.08 10.05 31.87 24.12 8.66
Komulatif Realisasi Mingguan 0.07 3.30 9.57 20.65 30.71 62.58 86.70 95.36
Deviasi (0.30) 2.38 (8.14) (14.7) (22.8) (9.3) (3.6) 0.1
TIME SCHEDULE
BOBOT SEPTEMBER OKTOBER NOVEMBER
NO URAIAN PEKERJAAN
%
1 2 3 4 5 6 7 8 9
I PEKERJAAN PERSIAPAN 2.69 0.37 0.37 0.37 0.40 0.40 0.40 0.40 0.40
II PEKERJAAN KUSEN DAN PINTU 1.74 0.18 0.18 0.26 0.26 0.26 0.26 0.26
III PEKERJAAN KUNCI DAN ALAT PENGGANTUNG 0.58 0.19 0.19 0.19
VI PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND 66.98 13.60 13.35 13.35 13.35 13.35
VII PEKERJAAN PENGECATAN 20.71 2.65 3.01 3.01 3.01 3.01 3.01 3.01
Bobot Rencana Mingguan 0.37 0.55 16.79 17.65 18.17 18.36 18.36 5.02 0.56
Komulatif Rencana Mingguan 0.37 0.92 17.71 35.36 53.53 71.90 90.26 95.28 100.00
Realisasi Bobot Mingguan 0.07 3.23 6.27 11.08 10.05 31.87 24.12 8.66 4.64
Komulatif Realisasi Mingguan 0.07 3.30 9.57 20.65 30.71 62.58 86.70 95.36 100.00
Deviasi (0.30) 2.38 (8.14) (14.7) (22.8) (9.3) (3.6) 0.1 0.0
LAPORAN KONTRAKTOR
MINGGU 1
PERIODE , 12 SEPTEMBER - 18 SEPTEMBER 2014
PROGRAM
PENINGKATAN SARANA DAN PRASARANA OLAH RAGA
PEKERJAAN
REHABILITASI GEDUNG GELANGGANG REMAJA (GGR)
MAULANA YUSUF
TAHUN ANGGARAN
2014
KONTRAKTOR PELAKSANA
PEMERINTAHAN KOTA SERANG
DINAS PEMUDA OLAH RAGA DAN PARIWISATA
LAPORAN KONSULTAN
DOKUMENTASI
PERIODE , 10 OKTOBER - 10 NOVEMBER 2014
PROGRAM
PENINGKATAN SARANA DAN PRASARANA OLAH RAGA
PEKERJAAN
REHABILITASI GEDUNG GELANGGANG REMAJA (GGR)
MAULANA YUSUF
TAHUN ANGGARAN
2014
KONSULTAN PENGAWAS
PEMERINTAHAN KOTA SERANG
DINAS PEMUDA OLAH RAGA DAN PARIWISATA
LAPORAN KONSULTAN
BULAN 1
PERIODE , 12 SEPTEMBER - 09 OKTOBER 2014
PROGRAM
PENINGKATAN SARANA DAN PRASARANA OLAH RAGA
PEKERJAAN
REHABILITASI GEDUNG GELANGGANG REMAJA (GGR)
MAULANA YUSUF
TAHUN ANGGARAN
2014
KONSULTAN PENGAWAS
Nomor : 01/PWS-REHAB GGR MY/SK/XI/2014
Lampiram : 1 (satu) berkas
Kepada Yth,
Pejabat Pembuat Komitmen
Rehabilitasi Gedung Gelanggang Remaja Maulana Yusuf
Tahun Anggaran 2014
Di –
KOTA SERANG
Dengan hormat,
Bersama ini kami sampaikan Laporan Bulanan Nomor 01 untuk Pekerjaan Pengawasan Teknis Rehabilitasi
Gedung Gelanggang Remaja Maulana Yusuf, Tahun Anggaran 2014 periode 12 September sampai dengan
09 Oktober 2014.
Demikian Laporan Bulanan ini kami sampaikan, Semoga Bermanfaat. atas perhatian dan kerjasama yang
baik kami ucapkan terima kasih.
CATUR HINDRATNO
Team Leader
Kepada Yth,
Pejabat Pembuat Komitmen
Rehabilitasi Gedung Gelanggang Remaja Maulana Yusuf
Tahun Anggaran 2014
Di –
KOTA SERANG
Dengan hormat,
Bersama ini kami sampaikan Laporan Bulanan Nomor 01 untuk Pekerjaan Pengawasan Teknis Rehabilitasi
Gedung Gelanggang Remaja Maulana Yusuf, Tahun Anggaran 2014 periode 10 Oktober sampai dengan 10
November 2014.
Demikian Laporan Bulanan ini kami sampaikan, Semoga Bermanfaat. atas perhatian dan kerjasama yang
baik kami ucapkan terima kasih.
CATUR HINDRATNO
Team Leader
Bulan Ke : 1 (Satu)
Paket Pekerjaan : REHABILITASI GEDUNG GELANGGANG REMAJA (GGR)
Kegiatan : Peningkatan Pembangunan Sarana Dan Prasarana Olah Raga
Lokasi : Kota Serang
Rencana Proges
No Progres Minggu Deviasi
Mingguan Mingguan
(%) (%) (%)
1 Minggu 1 0.37 1.12 0.75
Mengetahui :
Pejabat Pelaksana Teknis Kegiatan
Program Peningkatan Sarana dan Prasarana Olah Raga
DISPORAPAR KOTA SERANG
M. SUMARDI, SE
NIP. 46512051986021006
LAPORAN BULANAN
KEMAJUAN PEKERJAAN
Bulan Ke : 2 (DUA)
Paket Pekerjaan : REHABILITASI GEDUNG GELANGGANG REMAJA (GGR)
Kegiatan : Peningkatan Pembangunan Sarana Dan Prasarana Olah Raga
Lokasi : Kota Serang
Rencana Proges
No Progres Minggu Deviasi
Mingguan Mingguan
(%) (%) (%)
1 Minggu 5 53.53 30.71 (22.83)
Mengetahui :
Pejabat Pelaksana Teknis Kegiatan
Program Peningkatan Sarana dan Prasarana Olah Raga
DISPORAPAR KOTA SERANG
M. SUMARDI, SE
NIP. 46512051986021006
BAB I
PENDAHULUAN
1. UMUM
DATA ADMINISTRASI :
Minggu 1
Tahun 2014
Pekerjaan :
Pembuatan Papan
Nama Proyek
Minggu 1
Tahun 2014
Pekerjaan :
Bongkaran &
Pembuangan
Limbah
Minggu 2
Tahun 2014
Pekerjaan :
Pasang Kuda +
Rangka Atap Baja
Ringan
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 2
Tahun 2014
Pekerjaan :
Mengerok Cat
Tembok Lama
Minggu 2
Tahun 2014
Pekerjaan :
Pengecatan
Tembok Lama
Minggu 2
Tahun 2014
Pekerjaan :
Pengecatan Besi
Atap Lama
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 3
Tahun 2014
Pekerjaan :
Pasang Saluran Air
Dari Pasangan
Bata
Minggu 4
Tahun 2014
Pekerjaan :
Pembuatan
Gudang & Direksi
Keet
Minggu 4
Tahun 2014
Pekerjaan :
Pemasangan
Penutup Genting
Metal roof
Rainbow
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 4
Tahun 2014
Pekerjaan :
Rangka Plafon
Gypsum
Minggu 4
Tahun 2014
Pekerjaan :
Rangka Plafon
Gypsum
Minggu 4
Tahun 2014
Pekerjaan :
Pasang Kuda +
Rangka Atap Baja
Ringan
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 2
Tahun 2014
Pekerjaan :
Lantai Kerja
Pondasi & Sloof
Minggu 2
Tahun 2014
Pekerjaan :
Pabrikasi Baja WF
BLK
Minggu 2
Tahun 2014
Pekerjaan :
Pembesian Sloof
BLK
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 2
Tahun 2014
Pekerjaan :
Pembesian Plat
BLK
Minggu 2
Tahun 2014
Pekerjaan :
Galian Pondasi
Masjid
Minggu 2
Tahun 2014
Pekerjaan :
Pas. Pondasi
Batu Kali
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Tahun 2014
Pekerjaan :
Tahun 2014
Pekerjaan :
Tahun 2014
Pekerjaan :
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 3
Tahun 2014
Pekerjaan :
Galian Tanah
BLK
Minggu 3
Tahun 2014
Pekerjaan :
Lantai Kerja
BLK
Minggu 3
Tahun 2014
Pekerjaan :
Pondasi Foot Plat
BLK
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 3
Tahun 2014
Pekerjaan :
Begesting Sloof
BLK
Minggu 3
Tahun 2014
Pekerjaan :
Cor Sloof
BLK
Minggu 3
Tahun 2014
Pekerjaan :
Cor Kolom
BLK
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 3
Tahun 2013
Pekerjaan :
Pabrikasi Kolom
BLK
Minggu 3
Tahun 2013
Pekerjaan :
Pabrikasi Baja
BLK
Minggu 3
Tahun 2013
Pekerjaan :
Pabrikasi Baja
BLK
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 3
Tahun 2013
Pekerjaan :
Galian Tanah
Masjid
Minggu 3
Tahun 2013
Pekerjaan :
Pasangan Batu
Masjid
Minggu 3
Tahun 2013
Pekerjaan :
Pasangan Batu
Masjid
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 4
Tahun 2014
Pekerjaan :
Pemasangan Kolom
BLK
Minggu 4
Tahun 2014
Pekerjaan :
Pemasangan Kolom
BLK
Minggu 4
Tahun 2014
Pekerjaan :
Kuda 2 WF 200
BLK
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 4
Tahun 2014
Pekerjaan :
Kolom 25 x 25
BLK
Minggu 4
Tahun 2014
Pekerjaan :
Pasangan Batu Kali
Masjid
Minggu 4
Tahun 2014
Pekerjaan :
Plat Pondasi
Masjid
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 4
Tahun 2014
Pekerjaan :
Sloof
Masjid
Minggu 4
Tahun 2014
Pekerjaan :
Sloof
BLK
Minggu 4
Tahun 2014
Pekerjaan :
Urugan Kembali
BLK
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 4
Tahun 2014
Pekerjaan :
Stek besi beton BLK
Minggu 4
Tahun 2014
Pekerjaan :
Pembesian Sloof
Masjid
Minggu 4
Tahun 2014
Pekerjaan :
Cor Sloof Masjid
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 5
Tahun 2014
Pekerjaan :
Pasang Gordeng
Minggu 5
Tahun 2014
Pekerjaan :
Balok Rafter
Minggu 5
Tahun 2014
Pekerjaan :
Pasang Cross
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 5
Tahun 2014
Pekerjaan :
Pasangan Dinding
Bata BLK
Minggu 5
Tahun 2014
Pekerjaan :
Pasang Loster
BLK
Minggu 5
Tahun 2014
Pekerjaan :
Pasang Jendela
BLK
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 5
Tahun 2014
Pekerjaan :
Urugan Tanah
Masjid
Minggu 5
Tahun 2014
Pekerjaan :
Cor Sloof Masjid
Minggu 5
Tahun 2014
Pekerjaan :
Pembesian Kolom
Masjid
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 5
Tahun 2014
Pekerjaan :
Begesting Kolom
Masjid
Minggu 5
Tahun 2014
Pekerjaan :
Pasangan Bata
Masjid
Minggu 5
Tahun 2014
Pekerjaan :
Cor Kolom Masjid
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 6
Tahun 2014
Pekerjaan :
Minggu 6
Tahun 2014
Pekerjaan :
Minggu 6
Tahun 2014
Pekerjaan :
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 6
Tahun 2014
Pekerjaan :
Minggu 6
Tahun 2014
Pekerjaan :
Minggu 6
Tahun 2014
Pekerjaan :
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Tahun 2014
Pekerjaan :
Cor talang
belakang
Tahun 2014
Pekerjaan :
Plester Aci
Tahun 2014
Pekerjaan :
AtapBaja Ringan
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 10
Tahun 2013
Pekerjaan :
Suport Begesting
Balok
Minggu 10
Tahun 2013
Pekerjaan :
Begesting Balok
& Suport
Begesting Plat
Minggu 10
Tahun 2013
Pekerjaan :
Begesting Balok
& Suport
Begesting Plat
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 11
Tahun 2013
Pekerjaan :
Pas. Bata
Minggu 11
Tahun 2013
Pekerjaan :
Plestera Aci
Dinding
Minggu 11
Tahun 2013
Pekerjaan :
Plestera Aci
Kolom Beton
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 11
Tahun 2013
Pekerjaan :
Rangka Atap
Baja Ringan
Minggu 11
Tahun 2013
Pekerjaan :
Atap Metal Roof
Minggu 11
Tahun 2013
Pekerjaan :
Dinding Keramik
Kamar Mandi
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 12
Tahun 2013
Pekerjaan :
Atap Metal Roof
Minggu 12
Tahun 2013
Pekerjaan :
Plafon
Minggu 12
Tahun 2013
Pekerjaan :
Instalasi listrik
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 19
Tahun 2013
Pekerjaan :
Kusen Jendela
Alumunium
Minggu 19
Tahun 2013
Pekerjaan :
Kusen Pintu
Alumunium
Minggu 19
Tahun 2013
Pekerjaan :
Alumunium
Composit
(ACP)
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 19
Tahun 2013
Pekerjaan :
Cat Batu Alam
Minggu 19
Tahun 2013
Pekerjaan :
Pintu Kaca
Tempered
Minggu 19
Tahun 2013
Pekerjaan :
Instalasi listrik
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 12
Tahun 2013
Pekerjaan :
Cor dak beton
Minggu 12
Tahun 2013
Pekerjaan :
Pas.Bata
Atas depan
Minggu 12
Tahun 2013
Pekerjaan :
Keramik dinding
K.Mandi
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 13
Tahun 2013
Pekerjaan :
Urugan tanah
untuk leveling
Minggu 13
Tahun 2013
Pekerjaan :
Meja beton
Minggu 13
Tahun 2013
Pekerjaan :
Plafon Gypsum
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 13
Tahun 2013
Pekerjaan :
Pas.Genteng
Minggu 13
Tahun 2013
Pekerjaan :
Sanitasi
pipa
Minggu 13
Tahun 2013
Pekerjaan :
Plester aci
dinding
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 14
Tahun 2013
Pekerjaan :
Lantai Keramik
Minggu 14
Tahun 2013
Pekerjaan :
Dinding Keramik
Minggu 14
Tahun 2013
Pekerjaan :
Plafon Gypsum
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 14
Tahun 2013
Pekerjaan :
Pas.Instalasi
Lampu
Minggu 14
Tahun 2013
Pekerjaan :
Kloset Jongkok
Minggu 14
Tahun 2013
Pekerjaan :
Leveling Lantai
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 20
Tahun 2013
Pekerjaan :
Alumunium
Composit
(ACP)
Minggu 20
Tahun 2013
Pekerjaan :
Tiang Kayu
Finish Plitur
Minggu 20
Tahun 2013
Pekerjaan :
Pengecatan
Luar
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 20
Tahun 2013
Pekerjaan :
Papan nama
dan Logo
Minggu 20
Tahun 2013
Pekerjaan :
Batu Kerikil Putih
Minggu 20
Tahun 2013
Pekerjaan :
Lampu Sorot
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 15
Tahun 2013
Pekerjaan :
Pas. Keramik
Lantai
Minggu 15
Tahun 2013
Pekerjaan :
Pas. Keramik
Lantai & dinding
Kamar Mandi
Minggu 15
Tahun 2013
Pekerjaan :
Plafon
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 15
Tahun 2013
Pekerjaan :
Cat Plafon
Minggu 15
Tahun 2013
Pekerjaan :
Profil Minimalis
Minggu 15
Tahun 2013
Pekerjaan :
Profil GRC
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 15
Tahun 2012
Pekerjaan :
Pas.Bata Untuk
Rabat Beton
Minggu 15
Tahun 2012
Pekerjaan :
Pas.Instalasi
Listrik & Lampu
Minggu 15
Tahun 2012
Pekerjaan :
Rumah Pompa
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 18
Tahun 2012
Pekerjaan :
Pas.Dinding Bata
Minggu 18
Tahun 2012
Pekerjaan :
Plester Aci Dinding
Minggu 18
Tahun 2012
Pekerjaan :
Plester Aci Beton
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 18
Tahun 2012
Pekerjaan :
Keramik Lantai
Minggu 18
Tahun 2012
Pekerjaan :
Cat Dinding
Minggu 18
Tahun 2012
Pekerjaan :
Cat Plafon
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 18
Tahun 2012
Pekerjaan :
Keramik Lantai
Minggu 18
Tahun 2012
Pekerjaan :
Cat Dinding
Minggu 18
Tahun 2012
Pekerjaan :
Cat Plafon
DOKUMENTASI
REHABILITASI GEDUNG GELANGGANG REMAJA MAULANA YUSUF
Minggu 18
Tahun 2012
Pekerjaan :
Keramik Lantai
Minggu 18
Tahun 2012
Pekerjaan :
Cat Dinding
Minggu 18
Tahun 2012
Pekerjaan :
Cat Plafon