Form Monitoring Cycle Excavator
Nama Opt Tanggal Material Load
No Unit Shift Tinggi Jenjang
Lokasi Jam S/d Jumlah Hauler

STD ACT STD ACT STD ACT STD ACT


Code Activity Code Activity Code Activity Code Activity
(s) (s) (s) (s) (s) (s) (s) (s)
Dt Digging 11 Dt Digging 12 Dt Digging 12 Dt Digging 12
Sl Swing load 7 Sl Swing load 7 Sl Swing load 7 Sl Swing load 7
Dm Dumping 3 Dm Dumping 3 Dm Dumping 3 Dm Dumping 3
Se Swing empty 7 Se Swing empty 7 Se Swing empty 7 Se Swing empty 7
Lt Load Time 28 Lt Load Time 29 Lt Load Time 29 Lt Load Time 29

Cyc Time Freq


Unit
Rit Load /Rit Load/Vessel Problem Corrective action
Hauler
(s) (x)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

Saran

Isi kolom Problem Sesuai temuan terkait skill opt pada saat proses
Note Loading berlangsung dan spot time

Isi kolom Corrective Action sesuai feed back,saran dan tindakan perbaikan yang di lakukan
terhadap operator ataupun perubahan metode dan tehnik loading yang terjadi
Dibuat Oleh,
…………………………………..
Form Monitoring Cycle Time Hauler

Nama :
No. Unit :
Lokasi :
Tanggal :
Shift :
Jarak :

No Jam Loader A B C D Total Problem


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Saran
Cycle Time Hauler

Code Arti Min Max Satuan


A Loading Detik
B Haulling muatan Detik
C Dumping Detik
D Haulling Kosongan Detik
Total Total Detik

Corrective action

Dibuat Oleh,

………………………………….
UNIT :
TIPE :
NAMA OPERATOR :
LOKASI :

CYCLE TIME DIGGER

ACTIVITY
LOAD SWING SWING LAOD PROBLEM
DIGGING DUMPING
LOAD EMPTY TIME

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

MENIT
RATA
RATA
RATA
RATA
DETIK
UNIT :
TIPE :
NAMA OPERATOR :
LOKASI :

CYCLE TIME HAULER

ACTIVITY
LOAD EMPTY HAULING PROBLEM
LOADING HAULING DUMPING
HAULING TIME

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

MENIT
RATA
RATA
RATA
RATA
DETIK

Anda mungkin juga menyukai