Tanggal Waktu
Model Material
Sudut Swing Cuaca
No. Unit Lokasi
No.
Swing Swing
No Delay Excavating Dumping Unit Keterangan
(Loaded) (Empty)
HD
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Cycle Time Alat Angkut
Tanggal : Waktu / Cuaca: Backhoe :
Model : Material : Jarak :
No. Unit : Lokasi : Disposal :
Number Delay Queue Loading Hauling Dumping Returning Spotting
No. Keterangan
Loading (menit) (menit) (menit) (menit) (menit) (menit) (menit)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Produktivitas Alat Gali-Muat
Model EX 1900
Satuan
Material Mud OB
Bucket Capacity Heaped (q1) (m3)
Bucket Fill Factor (K)
Cycle Time (sec)
Job Effiency (E) (%)
Bucket Capacity (q) (m3)
Produktivitas (Q) (LCM/jam)
Swell Factor (I)
Produktivitas (Q) (BCM/jam)