WORK DESCRIPTION
Rencana Kegiatan Hari
No. Aktifitas / Item Pekerjaan Satuan Qty Catatan
Berikutnya
MANPOWER EQUIPMENTS
Over Over
No. Description Qty Time Remark No. Item Qty Time Remark
Time Time
1 Project Manager 1 8 1 Truck Crane
2 Deputy Proj. MGR 1 8 2 Jack Hammer 1
3 Site Manager 1 8 3 Gerinda Machine 1
4 Project Control 1 8 4 Bor 1
5 Staff Teknik 2 8 5 Theodolit 1 8
6 Site Coordinator 1 8 6 Autolevel 1 8
7 Engineer / QC MEP 1 8 7 Exca Doosan 500LC-V 1 8
8 Engineer / QC STR 1 8 8 Genset
9 Supervisor 1 8 9 Baby Roller
10 HSE / K3 Konstruksi 1 8 10 Survey Equipment
11 ADM Project 1 8 11 Sand Cone Test
12 Drafter 1 8 12 Hand Stamper
13 Surveyor 1 8 13 Stamper Plate
14 Logistik 1 8 14 Bar Bender
15 Mekanik 1 8 15 Bar Cutter
16 Mandor 16 Compactor
17 Pekerja 2 8 17 Lighting
18 Security 1 12 18 Engine Pump