Anda di halaman 1dari 41

ANALISA HARGA SATUAN PEKERJAAN

Kode / Harga Satuan Pekerjaan


No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
A. PEKERJAAN PERSIAPAN
1 A.1 A.2.2.1.4 1m Pengukuran dan pemasangan Bouwplank 202,652.66
0.1000 L.01 OH Pekerja 88,000.00 8,800.00
0.1000 L.02 OH Tukang Kayu 93,500.00 9,350.00
0.0100 L.03 OH Kepala Tukang 125,000.00 1,250.00
0.0050 L.04 OH Mandor 100,000.00 500.00
0.0120 m3 Balok kayu 5/7 8,428,200.00 101,138.40
0.0200 kg Paku kayu 27,700.00 554.00
0.0070 m3 Balok kayu kelas II 7,803,900.00 54,627.30
Jumlah Harga Upah dan Bahan = 19,900.00 156,319.70 176,219.70
Overhead dan Profit (15%) = 2,985.00 23,447.96 26,432.96
Harga Satuan Pekerjaan = 22,885.00 179,767.66 202,652.66
2 A.1 A.2.2.1.13 1 m3 Pembongkaran beton bertulang 1,425,990.80
13.3340 L.01 OH Pekerja 88,000.00 1,173,392.00
0.6660 L.04 OH Mandor 100,000.00 66,600.00
Jumlah Harga Upah dan Bahan = 1,239,992.00 1,239,992.00
Overhead dan Profit (15%) = 185,998.80 185,998.80
Harga Satuan Pekerjaan = 1,425,990.80 1,425,990.80
3 A.2 A.2.2.1.14 1 m3 Pembongkaran dinding tembok bata 712,995.40
6.6670 L.01 OH Pekerja 88,000.00 586,696.00
0.3330 L.04 OH Mandor 100,000.00 33,300.00
Jumlah Harga Upah dan Bahan = 619,996.00 619,996.00
Overhead dan Profit (15%) = 92,999.40 92,999.40
Harga Satuan Pekerjaan = 712,995.40 712,995.40
4 A.3 A.2.2.1.14 1 m2 Pembongkaran dinding kayu 13,814.38
0.1000 L.01 OH Pekerja 88,000.00 8,800.00
0.0050 L.04 OH Mandor 100,000.00 500.00
0.0250 L.02 OH Tukang kayu 93,500.00 2,337.50
0.0030 L.03 OH Kepala Tukang 125,000.00 375.00
Jumlah Harga Upah dan Bahan = 12,012.50 12,012.50
Overhead dan Profit (15%) = 1,801.88 1,801.88
Harga Satuan Pekerjaan = 13,814.38 13,814.38
5 A.4 A.2.2.1.14 1 m2 Pembongkaran Atap dan Plafon 4,144.31
0.0300 L.01 OH Pekerja 88,000.00 2,640.00
0.0015 L.04 OH Mandor 100,000.00 150.00
0.0075 L.02 OH Tukang kayu 93,500.00 701.25
0.0009 L.03 OH Kepala Tukang 125,000.00 112.50
Jumlah Harga Upah dan Bahan = 3,603.75 3,603.75
Overhead dan Profit (15%) = 540.56 540.56
Harga Satuan Pekerjaan = 4,144.31 4,144.31
B PEKERJAAN TANAH
6 B.1 A.2.3.1.1 1 m3 Penggalian tanah biasa sedalam 1 m 59,160.60
0.5630 L.01 OH Pekerja 88,000.00 49,544.00
0.0190 L.04 OH Mandor 100,000.00 1,900.00
Jumlah Harga Upah dan Bahan = 51,444.00 51,444.00
Overhead dan Profit (15%) = 7,716.60 7,716.60
Harga Satuan Pekerjaan = 59,160.60 59,160.60
7 B.2 A.2.3.1.4 1 m3 Penggalian tanah keras sedalam 1 m 104,880.00
1.0000 L.01 OH Pekerja 88,000.00 88,000.00
0.0320 L.04 OH Mandor 100,000.00 3,200.00
Jumlah Harga Upah dan Bahan = 91,200.00 91,200.00
Overhead dan Profit (15%) = 13,680.00 13,680.00
Harga Satuan Pekerjaan = 104,880.00 104,880.00
8 B.3 A.2.3.1.6 1 m3 Penggalian tanah lumpur sedalam 1 m 126,615.00
1.2000 L.01 OH Pekerja 88,000.00 105,600.00
0.0450 L.04 OH Mandor 100,000.00 4,500.00
Jumlah Harga Upah dan Bahan = 110,100.00 110,100.00
Overhead dan Profit (15%) = 16,515.00 16,515.00
Harga Satuan Pekerjaan = 126,615.00 126,615.00
9 B.4 A.2.3.1.9 1 m3 Pengurugan kembali galian tanah 26,220.00
0.2500 L.01 OH Pekerja 88,000.00 22,000.00
0.0080 L.04 OH Mandor 100,000.00 800.00
Jumlah Harga Upah dan Bahan = 22,800.00 22,800.00
Overhead dan Profit (15%) = 3,420.00 3,420.00
Harga Satuan Pekerjaan = 26,220.00 26,220.00
Kode / Harga Satuan Pekerjaan
No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
10 B.5 A.2.3.1.11 1 m3 Pengurugan dengan pasir urug 219,190.00
0.3000 L.01 OH Pekerja 88,000.00 26,400.00
0.0100 L.04 OH Mandor 100,000.00 1,000.00
1.2000 m3 Pasir urug 136,000.00 163,200.00
Jumlah Harga Upah dan Bahan = 27,400.00 163,200.00 190,600.00
Overhead dan Profit (15%) = 4,110.00 24,480.00 28,590.00
Harga Satuan Pekerjaan = 31,510.00 187,680.00 219,190.00
11 B.6 A.2.3.1.14 1 m2 Pengurugan situ padat 490,199.00
0.2500 L.01 OH Pekerja 88,000.00 22,000.00
0.0250 L.04 OH Mandor 100,000.00 2,500.00
1.2000 m3 Sirtu 334,800.00 401,760.00
Jumlah Harga Upah dan Bahan = 24,500.00 401,760.00 426,260.00
Overhead dan Profit (15%) = 3,675.00 60,264.00 63,939.00
Harga Satuan Pekerjaan = 28,175.00 462,024.00 490,199.00
12 B.7 -- 1 m3 Pengurugan dengan tanah merah 254,293.75
0.2500 L.01 OH Pekerja 88,000.00 22,000.00
0.0250 L.04 OH Mandor 100,000.00 2,500.00
1.2500 m3 Tanah merah 157,300.00 196,625.00
Jumlah Harga Upah dan Bahan = 24,500.00 196,625.00 221,125.00
Overhead dan Profit (15%) = 3,675.00 29,493.75 33,168.75
Harga Satuan Pekerjaan = 28,175.00 226,118.75 254,293.75
13 B.8 -- 1 m3 Pengurugan dengan tanah urug 247,003.24
0.1331 L.01 OH Pekerja 88,000.00 11,712.80
0.0266 L.04 OH Mandor 100,000.00 2,660.00
1.2000 m3 Tanah urug 60,000.00 72,000.00
0.1863 jam Dump truk 7,5 ton 322,111.00 60,009.28
1.3494 jam Vibrator plate tamper 48,839.00 65,903.35
0.0500 set Alat bantu 50,000.00 2,500.00
Jumlah Harga Upah dan Bahan = 14,372.80 200,412.63 214,785.43
Overhead dan Profit (15%) = 2,155.92 30,061.89 32,217.81
Harga Satuan Pekerjaan = 16,528.72 230,474.52 247,003.24
C PEKERJAAN PONDASI
A.3.2.1.1 1 m3 Pemasangan pondasi batu belah campuran 1 SP : 3 PP 898,926.25
1.5000 L.01 OH Pekerja 88,000.00 132,000.00
0.7500 L.02 OH Tukang Batu 93,500.00 70,125.00
0.0750 L.03 OH Kepala Tukang 130,000.00 9,750.00
0.0750 L.04 OH Mandor 100,000.00 7,500.00
1.2000 m3 Batu belah 210,000.00 252,000.00
202.0000 kg Semen Portland 1,200.00 242,400.00
0.4850 m3 Pasir pasang 140,000.00 67,900.00
Jumlah Harga Upah dan Bahan = 219,375.00 562,300.00 781,675.00
Overhead dan Profit (10%) = 32,906.25 84,345.00 117,251.25
Harga Satuan Pekerjaan = 252,281.25 646,645.00 898,926.25
14 C.1 A.3.2.1.2 1 m3 Pemasangan pondasi batu belah campuran 1 SP : 4 PP 850,310.00
1.5000 L.01 OH Pekerja 88,000.00 132,000.00
0.7500 L.02 OH Tukang Batu 93,500.00 70,125.00
0.0750 L.03 OH Kepala Tukang 125,000.00 9,375.00
0.0750 L.04 OH Mandor 100,000.00 7,500.00
1.2000 m3 Batu belah 210,000.00 252,000.00
163.0000 kg Semen Portland 1,200.00 195,600.00
0.5200 m3 Pasir pasang 140,000.00 72,800.00
Jumlah Harga Upah dan Bahan = 219,000.00 520,400.00 739,400.00
Overhead dan Profit (15%) = 32,850.00 78,060.00 110,910.00
Harga Satuan Pekerjaan = 251,850.00 598,460.00 850,310.00
A.3.2.1.3 1 m3 Pemasangan pondasi batu belah campuran 1 SP : 5 PP 817,345.25
1.5000 L.01 OH Pekerja 88,000.00 132,000.00
0.7500 L.02 OH Tukang Batu 93,500.00 70,125.00
0.0750 L.03 OH Kepala Tukang 130,000.00 9,750.00
0.0750 L.04 OH Mandor 100,000.00 7,500.00
1.2000 m3 Batu belah 210,000.00 252,000.00
136.0000 kg Semen Portland 1,200.00 163,200.00
0.5440 m3 Pasir pasang 140,000.00 76,160.00
Jumlah Harga Upah dan Bahan = 219,375.00 491,360.00 710,735.00
Overhead dan Profit (10%) = 32,906.25 73,704.00 106,610.25
Harga Satuan Pekerjaan = 252,281.25 565,064.00 817,345.25
A.3.2.1.4 1 m3 Pemasangan pondasi batu belah campuran 1 SP : 6 PP 793,862.25
1.5000 L.01 OH Pekerja 88,000.00 132,000.00
0.7500 L.02 OH Tukang Batu 93,500.00 70,125.00
0.0750 L.03 OH Kepala Tukang 130,000.00 9,750.00
0.0750 L.04 OH Mandor 100,000.00 7,500.00
1.2000 m3 Batu belah 210,000.00 252,000.00
117.0000 kg Semen Portland 1,200.00 140,400.00
0.5610 m3 Pasir pasang 140,000.00 78,540.00
Jumlah Harga Upah dan Bahan = 219,375.00 470,940.00 690,315.00
Overhead dan Profit (10%) = 32,906.25 70,641.00 103,547.25
Harga Satuan Pekerjaan = 252,281.25 541,581.00 793,862.25
Kode / Harga Satuan Pekerjaan
No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
A.3.2.1.5 1 m3 Pemasangan pondasi batu belah campuran 1 SP : 8 PP 761,685.25
1.5000 L.01 OH Pekerja 88,000.00 132,000.00
0.7500 L.02 OH Tukang Batu 93,500.00 70,125.00
0.0750 L.03 OH Kepala Tukang 130,000.00 9,750.00
0.0750 L.04 OH Mandor 100,000.00 7,500.00
1.2000 m3 Batu belah 210,000.00 252,000.00
91.0000 kg Semen Portland 1,200.00 109,200.00
0.5840 m3 Pasir pasang 140,000.00 81,760.00
Jumlah Harga Upah dan Bahan = 219,375.00 442,960.00 662,335.00
Overhead dan Profit (10%) = 32,906.25 66,444.00 99,350.25
Harga Satuan Pekerjaan = 252,281.25 509,404.00 761,685.25
A.3.2.1.6 1 m3 Pemasangan pondasi batu belah campuran 1 SP : 1 KP : 2 PP -
1.5000 L.01 OH Pekerja -
0.7500 L.02 OH Tukang Batu -
0.0750 L.03 OH Kepala Tukang -
0.0750 L.04 OH Mandor -
1.2000 m3 Batu belah -
0.1700 m3 Kapur -
0.1700 kg Semen Portland -
0.3400 m3 Pasir pasang -
Jumlah Harga Upah dan Bahan = - - -
Overhead dan Profit (10%) = - - -
Harga Satuan Pekerjaan = - - -
A.3.2.1.7 1 m3 Pemasangan pondasi batu belah campuran 1 SP : 3 KP : 10 PP -
1.5000 L.01 OH Pekerja -
0.7500 L.02 OH Tukang Batu -
0.0750 L.03 OH Kepala Tukang -
0.0750 L.04 OH Mandor -
1.2000 m3 Batu belah -
61.0000 kg Semen Portland -
0.1470 m3 Kapur -
0.4920 m3 Pasir pasang -
Jumlah Harga Upah dan Bahan = - - -
Overhead dan Profit (10%) = - - -
Harga Satuan Pekerjaan = - - -
A.3.2.1.8 1 m3 Pemasangan pondasi batu belah campuran ½ SP : 1 KP : 4 PP -
1.5000 L.01 OH Pekerja -
0.7500 L.02 OH Tukang Batu -
0.0750 L.03 OH Kepala Tukang -
0.0750 L.04 OH Mandor -
1.2000 m3 Batu belah -
41.0000 kg Semen Portland -
0.1310 m3 Kapur -
0.5230 m3 Pasir pasang -
Jumlah Harga Upah dan Bahan = - - -
Overhead dan Profit (10%) = - - -
Harga Satuan Pekerjaan = - - -
15 C.2 A.3.2.1.9 (K3) 1 m3 Pemasangan batu kosong (anstamping) 488,326.80
0.7800 L.01 OH Pekerja 88,000.00 68,640.00
0.3900 L.02 OH Tukang Batu 93,500.00 36,465.00
0.0390 L.03 OH Kepala Tukang 125,000.00 4,875.00
0.0390 L.04 OH Mandor 100,000.00 3,900.00
1.2000 m3 Batu belah 210,000.00 252,000.00
0.4320 m3 Pasir urug 136,000.00 58,752.00
Jumlah Harga Upah dan Bahan = 113,880.00 310,752.00 424,632.00
Overhead dan Profit (15%) = 17,082.00 46,612.80 63,694.80
Harga Satuan Pekerjaan = 130,962.00 357,364.80 488,326.80
16 C.3 -- 1m Pancangan kayu galam Ø8-10 22,630.56
0.0400 L.01 OJ Pekerja 88,000.00 3,520.00
0.0200 L.02 OJ Tukang Kayu 93,500.00 1,870.00
0.0020 L.04 OJ Mandor 100,000.00 200.00
0.0250 OJ Kepala Tukang 125,000.00 3,125.00
1.0000 m Kayu dolken Ø 8-10 cm, p = 4 m 17,500.00 17,500.00
Jumlah Harga Upah dan Bahan = 2,178.75 17,500.00 19,678.75
Overhead dan Profit (15%) = 326.81 2,625.00 2,951.81
Harga Satuan Pekerjaan = 2,505.56 20,125.00 22,630.56
Kode / Harga Satuan Pekerjaan
No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
D PEKERJAAN BETON
A.4.1.1.1 1 m3 Membuat beton mutu f'c = 7,4 MPa (K-100), slump (12±2) cm, w/c = 0,87 982,686.75
1.6500 L.01 OH Pekerja 88,000.00 145,200.00
0.2750 L.02 OH Tukang Batu 93,500.00 25,712.50
0.0280 L.03 OH Kepala Tukang 125,000.00 3,500.00
0.0830 L.04 OH Mandor 100,000.00 8,300.00
247.0000 kg Semen Portland 1,200.00 296,400.00
0.6207 m3 Pasir beton 162,000.00 100,555.71
0.7400 m3 Batu kerikil 313,300.00 231,842.00
215.0000 ltr Air 200.00 43,000.00
Jumlah Harga Upah dan Bahan = 182,712.50 671,797.71 854,510.21
Overhead dan Profit (10%) = 27,406.88 100,769.66 128,176.53
Harga Satuan Pekerjaan = 210,119.38 772,567.37 982,686.75
A.4.1.1.2 1 m3 Membuat beton mutu f'c = 9,8 MPa (K-125), slump (12±2) cm, w/c = 0,78 1,020,720.33
1.6500 L.01 OH Pekerja 88,000.00 145,200.00
0.2750 L.02 OH Tukang Batu 93,500.00 25,712.50
0.0280 L.03 OH Kepala Tukang 125,000.00 3,500.00
0.0830 L.04 OH Mandor 100,000.00 8,300.00
276.0000 kg Semen Portland 1,200.00 331,200.00
0.5914 m3 Pasir beton 162,000.00 95,811.43
0.7496 m3 Batu kerikil 313,300.00 234,858.96
215.0000 ltr Air 200.00 43,000.00
Jumlah Harga Upah dan Bahan = 182,712.50 704,870.39 887,582.89
Overhead dan Profit (10%) = 27,406.88 105,730.56 133,137.43
Harga Satuan Pekerjaan = 210,119.38 810,600.95 1,020,720.33
A.4.1.1.3 1 m3 Membuat beton mutu f'c = 12,2 MPa (K-150), slump (12±2) cm, w/c = 0,72 1,049,935.68
1.6500 L.01 OH Pekerja 88,000.00 145,200.00
0.2750 L.02 OH Tukang Batu 93,500.00 25,712.50
0.0280 L.03 OH Kepala Tukang 125,000.00 3,500.00
0.0830 L.04 OH Mandor 100,000.00 8,300.00
299.0000 kg Semen Portland 1,200.00 358,800.00
0.5707 m3 Pasir beton 162,000.00 92,455.71
0.7533 m3 Batu kerikil 313,300.00 236,019.33
215.0000 ltr Air 200.00 43,000.00
Jumlah Harga Upah dan Bahan = 182,712.50 730,275.05 912,987.55
Overhead dan Profit (10%) = 27,406.88 109,541.26 136,948.13
Harga Satuan Pekerjaan = 210,119.38 839,816.30 1,049,935.68
17 D.1 A.4.1.1.4 1 m3 Membuat lantai kerja beton mutu f'c = 7,4 MPa (K-100), slump (3-6) cm, w/c = 0,87 909,043.87
1.2000 L.01 OH Pekerja 88,000.00 105,600.00
0.2000 L.02 OH Tukang Batu 93,500.00 18,700.00
0.0200 L.03 OH Kepala Tukang 125,000.00 2,500.00
0.0600 L.04 OH Mandor 100,000.00 6,000.00
230.0000 kg Semen Portland 1,200.00 276,000.00
0.6379 m3 Pasir beton 162,000.00 103,332.86
0.7607 m3 Batu kerikil 313,300.00 238,340.07
200.0000 ltr Air 200.00 40,000.00
Jumlah Harga Upah dan Bahan = 132,800.00 657,672.93 790,472.93
Overhead dan Profit (15%) = 19,920.00 98,650.94 118,570.94
Harga Satuan Pekerjaan = 152,720.00 756,323.87 909,043.87
A.4.1.1.5 1 m3 Membuat beton mutu f'c = 14,5 MPa (K-175), slump (12±2) cm, w/c = 0,66 1,085,208.52
1.6500 L.01 OH Pekerja 88,000.00 145,200.00
0.2750 L.02 OH Tukang Batu 93,500.00 25,712.50
0.0280 L.03 OH Kepala Tukang 125,000.00 3,500.00
0.0830 L.04 OH Mandor 100,000.00 8,300.00
326.0000 kg Semen Portland 1,200.00 391,200.00
0.5429 m3 Pasir beton 162,000.00 87,942.86
0.7622 m3 Batu kerikil 313,300.00 238,804.22
215.0000 ltr Air 200.00 43,000.00
Jumlah Harga Upah dan Bahan = 182,712.50 760,947.08 943,659.58
Overhead dan Profit (10%) = 27,406.88 114,142.06 141,548.94
Harga Satuan Pekerjaan = 210,119.38 875,089.14 1,085,208.52
A.4.1.1.6 1 m3 Membuat beton mutu f'c = 16,9 MPa, slump (12±2) cm, w/c = 0,61 1,104,553.00
1.6500 L.01 OH Pekerja 88,000.00 145,200.00
0.2750 L.02 OH Tukang Batu 93,500.00 25,712.50
0.0280 L.03 OH Kepala Tukang 125,000.00 3,500.00
0.0830 L.04 OH Mandor 100,000.00 8,300.00
352.0000 kg Semen Portland 1,200.00 422,400.00
0.5221 m3 Pasir beton 140,000.00 73,100.00
0.7637 m3 Batu kerikil 313,300.00 239,268.37
215.0000 ltr Air 200.00 43,000.00
Jumlah Harga Upah dan Bahan = 182,712.50 777,768.37 960,480.87
Overhead dan Profit (10%) = 27,406.88 116,665.26 144,072.13
Harga Satuan Pekerjaan = 210,119.38 894,433.63 1,104,553.00
18 D.2 A.4.1.1.7 1 m3 Membuat beton mutu f'c = 19,3 MPa (K-225), slump (12±2) cm, w/c = 0,58 1,143,862.02
1.6500 L.01 OH Pekerja 88,000.00 145,200.00
Kode / Harga Satuan Pekerjaan
No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
0.2750 L.02 OH Tukang Batu 93,500.00 25,712.50
0.0280 L.03 OH Kepala Tukang 125,000.00 3,500.00
0.0830 L.04 OH Mandor 100,000.00 8,300.00
371.0000 kg Semen Portland 1,200.00 445,200.00
0.4986 m3 Pasir beton 162,000.00 80,768.57
0.7756 m3 Batu kerikil 313,300.00 242,981.56
215.0000 ltr Air 200.00 43,000.00
Jumlah Harga Upah dan Bahan = 182,712.50 811,950.13 994,662.63
Overhead dan Profit (15%) = 27,406.88 121,792.52 149,199.39
Harga Satuan Pekerjaan = 210,119.38 933,742.65 1,143,862.02
A.4.1.1.8 1 m3 Membuat beton mutu f'c = 21,7 MPa (K-250), slump (12±2) cm, w/c = 0,56 1,158,868.51
1.6500 L.01 OH Pekerja 88,000.00 145,200.00
0.2750 L.02 OH Tukang Batu 93,500.00 25,712.50
0.0280 L.03 OH Kepala Tukang 125,000.00 3,500.00
0.0830 L.04 OH Mandor 100,000.00 8,300.00
384.0000 kg Semen Portland 1,200.00 460,800.00
0.4943 m3 Pasir beton 162,000.00 80,074.29
0.7696 m3 Batu kerikil 313,300.00 241,124.96
215.0000 ltr Air 200.00 43,000.00
Jumlah Harga Upah dan Bahan = 182,712.50 824,999.25 1,007,711.75
Overhead dan Profit (10%) = 27,406.88 123,749.89 151,156.76
Harga Satuan Pekerjaan = 210,119.38 948,749.14 1,158,868.51
19 D.3 A.4.1.1.17 1 kg Pembesian dengan besi polos 16,528.95
0.0070 L.01 OH Pekerja 88,000.00 616.00
0.0070 L.02 OH Tukang Besi 93,500.00 654.50
0.0007 L.03 OH Kepala Tukang 125,000.00 87.50
0.0004 L.04 OH Mandor 100,000.00 40.00
1.0500 kg Besi beton polos 12,000.00 12,600.00
0.0150 kg Kawat besi beton 25,000.00 375.00
Jumlah Harga Upah dan Bahan = 1,398.00 12,975.00 14,373.00
Overhead dan Profit (15%) = 209.70 1,946.25 2,155.95
Harga Satuan Pekerjaan = 1,607.70 14,921.25 16,528.95
20 D.4 A.4.1.1.20 (K3)1 m2 Pemasangan bekisting untuk pondasi 404,326.20
0.5200 L.01 OH Pekerja 88,000.00 45,760.00
0.2600 L.02 OH Tukang Kayu 93,500.00 24,310.00
0.0260 L.03 OH Kepala Tukang 125,000.00 3,250.00
0.0260 L.04 OH Mandor 100,000.00 2,600.00
0.0400 m3 Kayu Kelas III 6,670,200.00 266,808.00
0.3000 kg Paku kayu 27,700.00 8,310.00
0.1000 ltr Minyak bekisting 5,500.00 550.00
Jumlah Harga Upah dan Bahan = 75,920.00 275,668.00 351,588.00
Overhead dan Profit (15%) = 11,388.00 41,350.20 52,738.20
Harga Satuan Pekerjaan = 87,308.00 317,018.20 404,326.20
21 D.5 A.4.1.1.21 (K3)1 m2 Pemasangan bekisting untuk sloof 355,371.85 442,679.85
0.5200 L.01 OH Pekerja 88,000.00 45,760.00
0.2600 L.02 OH Tukang Kayu 93,500.00 24,310.00
0.0260 L.03 OH Kepala Tukang 125,000.00 3,250.00
0.0260 L.04 OH Mandor 100,000.00 2,600.00
0.0450 m3 Kayu Kelas III 6,670,200.00 300,159.00
0.3000 kg Paku kayu 27,700.00 8,310.00
0.1000 ltr Minyak bekisting 5,500.00 550.00
Jumlah Harga Upah dan Bahan = 75,920.00 309,019.00 384,939.00
Overhead dan Profit (15%) = 11,388.00 46,352.85 57,740.85
Harga Satuan Pekerjaan = 87,308.00 355,371.85 442,679.85
Kode / Harga Satuan Pekerjaan
No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
22 D.6 A.4.1.1.22 (K3)1 m2 Pemasangan bekisting untuk kolom 248,587.80 359,401.80
0.6600 L.01 OH Pekerja 88,000.00 58,080.00
0.3300 L.02 OH Tukang Kayu 93,500.00 30,855.00
0.0330 L.03 OH Kepala Tukang 125,000.00 4,125.00
0.0330 L.04 OH Mandor 100,000.00 3,300.00
0.0400 m3 Kayu Kelas III 6,670,200.00
0.4000 kg Paku kayu 27,700.00 11,080.00
0.2000 ltr Minyak bekisting 5,500.00 1,100.00
0.0150 m3 Balok kayu kelas II 7,803,900.00 117,058.50
0.0160 lbr Papan bekisting 4,682,800.00 74,924.80
2.0000 btg Galam Ø 5-7 cm panjang 4 m (dolken) 6,000.00 12,000.00
Jumlah Harga Upah dan Bahan = 96,360.00 216,163.30 312,523.30
Overhead dan Profit (15%) = 14,454.00 32,424.50 46,878.50
Harga Satuan Pekerjaan = 110,814.00 248,587.80 359,401.80
23 D.7 A.4.1.1.23 (K3)1 m2 Pemasangan bekisting untuk balok 275,511.25 386,325.25
0.6600 L.01 OH Pekerja 88,000.00 58,080.00
0.3300 L.02 OH Tukang Kayu 93,500.00 30,855.00
0.0330 L.03 OH Kepala Tukang 125,000.00 4,125.00
0.0330 L.04 OH Mandor 100,000.00 3,300.00
0.0400 m3 Kayu Kelas III 6,670,200.00
0.4000 kg Paku kayu 27,700.00 11,080.00
0.2000 ltr Minyak bekisting 5,500.00 1,100.00
0.0180 m3 Balok kayu kelas II 7,803,900.00 140,470.20
0.0160 lbr Papan bekisting 4,682,800.00 74,924.80
2.0000 btg Galam Ø 5-7 cm panjang 4 m (dolken) 6,000.00 12,000.00
Jumlah Harga Upah dan Bahan = 96,360.00 239,575.00 335,935.00
Overhead dan Profit (15%) = 14,454.00 35,936.25 50,390.25
Harga Satuan Pekerjaan = 110,814.00 275,511.25 386,325.25
24 D.8 A.4.1.1.24 (K3)1 m2 Pemasangan bekisting untuk lantai 178,594.14
0.6600 L.01 OH Pekerja 88,000.00 58,080.00
0.3300 L.02 OH Tukang Kayu 93,500.00 30,855.00
0.0330 L.03 OH Kepala Tukang 125,000.00 4,125.00
0.0330 L.04 OH Mandor 100,000.00 3,300.00
0.0400 m3 Kayu Kelas III 6,670,200.00
0.4000 kg Paku kayu 27,700.00 11,080.00
0.2000 ltr Minyak bekisting 5,500.00 1,100.00
0.0150 m3 Balok kayu kelas II 7,803,900.00 117,058.50
0.3500 lbr Plywood 240 cm × 120 cm × 9 mm 140,000.00 49,000.00
6.0000 btg Galam Ø 5-7 cm panjang 4 m (dolken) 6,000.00 36,000.00
Jumlah Harga Upah dan Bahan = 96,360.00 214,238.50 310,598.50
Overhead dan Profit (15%) = 14,454.00 32,135.78 46,589.78
Harga Satuan Pekerjaan = 110,814.00 246,374.28 357,188.28
25 D.9 A.4.1.1.25 (K3)1 m2 Pemasangan bekisting untuk dinding 411,260.70
0.6600 L.01 OH Pekerja 88,000.00 58,080.00
0.3300 L.02 OH Tukang Kayu 93,500.00 30,855.00
0.0330 L.03 OH Kepala Tukang 125,000.00 4,125.00
0.0330 L.04 OH Mandor 100,000.00 3,300.00
0.0300 m3 Kayu Kelas III 6,670,200.00
0.4000 kg Paku kayu 27,700.00 11,080.00
0.2000 ltr Minyak bekisting 5,500.00 1,100.00
0.0200 m3 Balok kayu kelas II 7,803,900.00 156,078.00
0.3500 lbr Plywood 240 cm × 120 cm × 9 mm 140,000.00 49,000.00
3.0000 btg Galam Ø 5-7 cm panjang 4 m (dolken) 6,000.00 18,000.00
4.0000 bh Penjaga jarak bekisting/spacer 6,500.00 26,000.00
Jumlah Harga Upah dan Bahan = 96,360.00 261,258.00 357,618.00
Overhead dan Profit (15%) = 14,454.00 39,188.70 53,642.70
Harga Satuan Pekerjaan = 110,814.00 300,446.70 411,260.70
Kode / Harga Satuan Pekerjaan
No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
26 D.10 A.4.1.1.26 (K3)1 m2 Pemasangan bekisting untuk tangga 329,272.03
0.6600 L.01 OH Pekerja 88,000.00 58,080.00
0.3300 L.02 OH Tukang Kayu 93,500.00 30,855.00
0.0330 L.03 OH Kepala Tukang 125,000.00 4,125.00
0.0330 L.04 OH Mandor 100,000.00 3,300.00
0.0300 m3 Kayu Kelas III 6,670,200.00
0.4000 kg Paku kayu 27,700.00 11,080.00
0.1500 ltr Minyak bekisting 5,500.00 825.00
0.0150 m3 Balok kayu kelas II 7,803,900.00 117,058.50
0.3500 lbr Plywood 240 cm × 120 cm × 9 mm 140,000.00 49,000.00
2.0000 btg Galam Ø 5-7 cm panjang 4 m (dolken) 6,000.00 12,000.00
Jumlah Harga Upah dan Bahan = 96,360.00 189,963.50 286,323.50
Overhead dan Profit (15%) = 14,454.00 28,494.53 42,948.53
Harga Satuan Pekerjaan = 110,814.00 218,458.03 329,272.03
27 D.11 A.4.1.1.35 1 m Membuat kolom praktis beton bertulang (11 × 11) cm 107,556.17
0.1800 L.01 OH Pekerja 88,000.00 15,840.00
0.0200 L.02 OH Tukang Batu 93,500.00 1,870.00
0.0200 L.02 OH Tukang Kayu 93,500.00 1,870.00
0.0200 L.02 OH Tukang Besi 93,500.00 1,870.00
0.0060 L.03 OH Kepala Tukang 125,000.00 750.00
0.0090 L.04 OH Mandor 100,000.00 900.00
0.0020 m3 kayu kelas III 6,670,200.00 13,340.40
0.0100 kg Paku kayu 27,700.00 277.00
0.2000 ltr Minyak bekisting 5,500.00 1,100.00
3.0000 kg Besi beton polos 12,000.00 36,000.00
0.4500 kg Kawat besi beton 25,000.00 11,250.00
4.0000 kg Semen Portland 1,200.00 4,800.00
0.0060 m3 Pasir beton 140,000.00 840.00
0.0090 m3 Batu kerikil 313,300.00 2,819.70
Jumlah Harga Upah dan Bahan = 23,100.00 70,427.10 93,527.10
Overhead dan Profit (15%) = 3,465.00 10,564.07 14,029.07
Harga Satuan Pekerjaan = 26,565.00 80,991.17 107,556.17
28 D.12 A.4.1.1.36 1 m Membuat ring balok beton bertulang (10 × 15) cm 134,339.09
0.2970 L.01 OH Pekerja 88,000.00 26,136.00
0.0330 L.02 OH Tukang Batu 93,500.00 3,085.50
0.0330 L.02 OH Tukang Kayu 93,500.00 3,085.50
0.0330 L.02 OH Tukang Besi 93,500.00 3,085.50
0.0100 L.03 OH Kepala Tukang 125,000.00 1,250.00
0.0150 L.04 OH Mandor 100,000.00 1,500.00
0.0030 m3 kayu kelas III 6,670,200.00 20,010.60
0.0200 kg Paku kayu 27,700.00 554.00
0.2000 ltr Minyak bekisting 5,500.00 1,100.00
3.6000 kg Besi beton polos 12,000.00 43,200.00
0.0500 kg Kawat besi beton 25,000.00 1,250.00
5.5000 kg Semen Portland 1,200.00 6,600.00
0.0090 m3 Pasir beton 140,000.00 1,260.00
0.0150 m3 Batu kerikil 313,300.00 4,699.50
Jumlah Harga Upah dan Bahan = 38,142.50 78,674.10 116,816.60
Overhead dan Profit (15%) = 5,721.38 11,801.12 17,522.49
Harga Satuan Pekerjaan = 43,863.88 90,475.22 134,339.09
-- 1 m3 Membuat beton tumbuk adukan 1:3:5 957,931.03
1.6500 L.01 OH Pekerja 88,000.00 145,200.00
0.2750 L.02 OH Tukang Batu 93,500.00 25,712.50
0.0280 L.03 OH Kepala Tukang 125,000.00 3,500.00
0.0830 L.04 OH Mandor 100,000.00 8,300.00
218.0000 kg Semen Portland 1,200.00 261,600.00
0.5221 m3 Pasir beton 140,000.00 73,100.00
0.8700 m3 Batu kerikil 313,300.00 272,571.00
215.0000 ltr Air 200.00 43,000.00
Jumlah Harga Upah dan Bahan = 182,712.50 650,271.00 832,983.50
Overhead dan Profit (10%) = 27,406.88 97,540.65 124,947.53
Harga Satuan Pekerjaan = 210,119.38 747,811.65 957,931.03
-- 1 m3 Membuat 1 m3 beton Ready Mix mutu f'c = 21,7 Mpa (K-250), slump (12±2) cm, w/c=0,52 2,215,526.75
1.6000 L.01 OH Pekerja 88,000.00 140,800.00
0.2700 L.02 OH Tukang Batu 93,500.00 25,245.00
0.0200 L.03 OH Kepala Tukang 125,000.00 2,500.00
0.0800 L.04 OH Mandor 100,000.00 8,000.00
1.0000 m3 Beton Ready Mix fc' = 21,7 Mpa 1,700,000.00 1,700,000.00
1.0000 Ls Alat bantu 50,000.00 50,000.00
Jumlah Harga Upah dan Bahan = 176,545.00 1,750,000.00 1,926,545.00
Overhead dan Profit (10%) = 26,481.75 262,500.00 288,981.75
Harga Satuan Pekerjaan = 203,026.75 2,012,500.00 2,215,526.75
E PEKERJAAN BESI DAN ALUMINIUM
A.4.2.1.1 1 kg Pemasangan besi profil 126,143.50
0.0600 L.01 OH Pekerja 88,000.00 5,280.00
0.0600 L.03 OH Tukang Las Konstruksi 93,500.00 5,610.00
Kode / Harga Satuan Pekerjaan
No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
0.0060 L.03 OH Kepala Tukang 125,000.00 750.00
0.0030 L.04 OH Mandor 100,000.00 300.00
1.1500 kg Besi profil 85,000.00 97,750.00
Jumlah Harga Upah dan Bahan = 11,940.00 97,750.00 109,690.00
Overhead dan Profit (10%) = 1,791.00 14,662.50 16,453.50
Harga Satuan Pekerjaan = 13,731.00 112,412.50 126,143.50
A.4.2.1.2 1 kg Pemasangan baja WF 13,731.00
0.0600 L.01 OH Pekerja 88,000.00 5,280.00
0.0600 L.03 OH Tukang Las Konstruksi 93,500.00 5,610.00
0.0060 L.03 OH Kepala Tukang 125,000.00 750.00
0.0030 L.04 OH Mandor 100,000.00 300.00
1.1500 kg Baja WF - -
Jumlah Harga Upah dan Bahan = 11,940.00 - 11,940.00
Overhead dan Profit (10%) = 1,791.00 - 1,791.00
Harga Satuan Pekerjaan = 13,731.00 - 13,731.00
A.4.2.1.1 1 kg Pemasangan baja kanal C 13,731.00
0.0600 L.01 OH Pekerja 88,000.00 5,280.00
0.0600 L.03 OH Tukang Las Konstruksi 93,500.00 5,610.00
0.0060 L.03 OH Kepala Tukang 125,000.00 750.00
0.0030 L.04 OH Mandor 100,000.00 300.00
1.1500 kg Baja C - -
Jumlah Harga Upah dan Bahan = 11,940.00 - 11,940.00
Overhead dan Profit (10%) = 1,791.00 - 1,791.00
Harga Satuan Pekerjaan = 13,731.00 - 13,731.00
A.4.2.1.4 1 m2 Pembuatan pintu besi pelat baja tebal 2 mm rangkap, rangka baja siku 1,213,261.50
1.0500 L.01 OH Pekerja 88,000.00 92,400.00
1.0500 L.03 OH Tukang Las Konstruksi 93,500.00 98,175.00
0.1050 L.03 OH Kepala Tukang 125,000.00 13,125.00
0.0520 L.04 OH Mandor 100,000.00 5,200.00
15.0000 kg Besi siku L 30.30.3 mm 13,200.00 198,000.00
32.8000 kg Besi pelat baja 19,700.00 646,160.00
0.0500 kg Kawat las 39,000.00 1,950.00
Jumlah Harga Upah dan Bahan = 208,900.00 846,110.00 1,055,010.00
Overhead dan Profit (10%) = 31,335.00 126,916.50 158,251.50
Harga Satuan Pekerjaan = 240,235.00 973,026.50 1,213,261.50
A.4.2.1.7 1 m2 Pemasangan pintu rolling door 304,980.00
1.2000 L.01 OH Pekerja 88,000.00 105,600.00
1.2000 L.03 OH Tukang Las Konstruksi 120,000.00 144,000.00
0.1200 L.03 OH Kepala Tukang 125,000.00 15,000.00
0.0060 L.04 OH Mandor 100,000.00 600.00
1.0000 m2 Pintu gulung besi -
Jumlah Harga Upah dan Bahan = 265,200.00 - 265,200.00
Overhead dan Profit (10%) = 39,780.00 - 39,780.00
Harga Satuan Pekerjaan = 304,980.00 - 304,980.00
29 E.1 A.4.2.1.11 1 m Pemasangan kusen pintu aluminium 137,772.30
0.0430 L.01 OH Pekerja 88,000.00 3,784.00
0.0430 L.03 OH Tukang Las Konstruksi 93,500.00 4,020.50
0.0043 L.03 OH Kepala Tukang 125,000.00 537.50
0.0021 L.04 OH Mandor 100,000.00 210.00
1.1000 m Kusen pintu/jendela aluminium uk. 3" 100,000.00 110,000.00
2.0000 bh Sekrup fixer 100.00 200.00
0.0600 tube Sealant 17,500.00 1,050.00
Jumlah Harga Upah dan Bahan = 8,552.00 111,250.00 119,802.00
Overhead dan Profit (15%) = 1,282.80 16,687.50 17,970.30
Harga Satuan Pekerjaan = 9,834.80 127,937.50 137,772.30
30 E.2 A.4.2.1.19 1 m Pemasangan talang 1/2 lingkaran dia. 15 cm, seng plat BJLS 30 lebar 45 cm 115,956.80
0.1500 L.01 OH Pekerja 88,000.00 13,200.00
0.3000 L.02 OH Tukang Kayu 93,500.00 28,050.00
0.0300 L.03 OH Kepala Tukang 125,000.00 3,750.00
0.0080 L.04 OH Mandor 100,000.00 800.00
1.0500 m Seng plat 46,600.00 48,930.00
0.0100 kg Paku kayu 27,700.00 277.00
0.5000 kg Besi strip 11,650.00 5,825.00
Jumlah Harga Upah dan Bahan = 45,800.00 55,032.00 100,832.00
Overhead dan Profit (15%) = 6,870.00 8,254.80 15,124.80
Harga Satuan Pekerjaan = 52,670.00 63,286.80 115,956.80
Kode / Harga Satuan Pekerjaan
No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
A.4.2.1.20 1 m2 Pemasangan rangka besi hollow 1 × 40.40.2 mm, modul 60 × 120 cm, untuk partisi 88,320.00
0.2500 L.01 OH Pekerja 88,000.00 22,000.00
0.2500 L.02 OH Tukang Besi 93,500.00 23,375.00
0.0250 L.03 OH Kepala Tukang 125,000.00 3,125.00
0.0130 L.04 OH Mandor 100,000.00 1,300.00
3.5000 m Besi hollow 40.40.2 mm 6,000.00 21,000.00
100% Ls Aksesoris (perkuatan, las, dll) 6,000.00 6,000.00
Jumlah Harga Upah dan Bahan = 49,800.00 27,000.00 76,800.00
Overhead dan Profit (10%) = 7,470.00 4,050.00 11,520.00
Harga Satuan Pekerjaan = 57,270.00 31,050.00 88,320.00
31 E.3 A.4.2.1.21 1 m2 Pemasangan rangka besi hollow 1 × 40.40.2 mm, modul 60 × 60 cm, untuk plafon 114,655.00
0.3500 L.01 OH Pekerja 88,000.00 30,800.00
0.3500 L.02 OH Tukang Besi 93,500.00 32,725.00
0.0350 L.03 OH Kepala Tukang 125,000.00 4,375.00
0.0180 L.04 OH Mandor 100,000.00 1,800.00
4.0000 m Besi hollow 40.40.2 mm 6,000.00 24,000.00
100% Ls Aksesoris (perkuatan, las, dll) 6,000.00 6,000.00
Jumlah Harga Upah dan Bahan = 69,700.00 30,000.00 99,700.00
Overhead dan Profit (15%) = 10,455.00 4,500.00 14,955.00
Harga Satuan Pekerjaan = 80,155.00 34,500.00 114,655.00
F PEKERJAAN PASANGAN DINDING
F.0 A.4.4.1.1 1 m2 Pemasangan dinding bata merah (5 × 11 × 22) cm tebal 1 batu campuran 1 SP : 2 PP 265,190.00
0.6000 L.01 OH Pekerja 88,000.00 52,800.00
0.2000 L.02 OH Tukang Batu 120,000.00 24,000.00
0.0200 L.03 OH Kepala Tukang 125,000.00 2,500.00
0.0300 L.04 OH Mandor 130,000.00 3,900.00
140.0000 bh Batu bata 600.00 84,000.00
43.5000 kg Semen Portland 1,200.00 52,200.00
0.0800 m3 Pasir pasang 140,000.00 11,200.00
Jumlah Harga Upah dan Bahan = 83,200.00 147,400.00 230,600.00
Overhead dan Profit (10%) = 12,480.00 22,110.00 34,590.00
Harga Satuan Pekerjaan = 95,680.00 169,510.00 265,190.00
32 F.1 A.4.4.1.2 1 m2 Pemasangan dinding bata ringan tebal 1/4 batu campuran 1 SP : 4 PP 387,299.30
0.6710 L.01 OH Pekerja 88,000.00 59,048.00
1.3000 L.02 OH Tukang Batu 93,500.00 121,550.00
0.1300 L.03 OH Kepala Tukang 125,000.00 16,250.00
0.0030 L.04 OH Mandor 100,000.00 300.00
8.4000 bh Batu bata 12,000.00 100,800.000
30.3200 kg Semen Portland 1,200.00 36,384.00
0.0175 m3 Pasir pasang 140,000.00 2,450.00
Jumlah Harga Upah dan Bahan = 197,148.00 139,634.00 336,782.00
Overhead dan Profit (15%) = 29,572.20 20,945.10 50,517.30
Harga Satuan Pekerjaan = 226,720.20 160,579.10 387,299.30
33 F.2 A.4.4.1.9 1 m2 Pemasangan dinding bata merah 5×11×22 cm tebal ½ batu campuran 1 SP : 4 PP 122,268.00
0.3000 L.01 OH Pekerja 88,000.00 26,400.00
0.1000 L.02 OH Tukang Batu 93,500.00 9,350.00
0.0100 L.03 OH Kepala Tukang 125,000.00 1,250.00
0.0150 L.04 OH Mandor 100,000.00 1,500.00
80.0000 bh Batu bata 600.00 48,000.00
11.5000 kg Semen Portland 1,200.00 13,800.00
0.0430 m3 Pasir pasang 140,000.00 6,020.00
Jumlah Harga Upah dan Bahan = 38,500.00 67,820.00 106,320.00
Overhead dan Profit (15%) = 5,775.00 10,173.00 15,948.00
Harga Satuan Pekerjaan = 44,275.00 77,993.00 122,268.00
G PEKERJAAN PLESTERAN
A.4.4.2.1 1 m2 Pemasangan plesteran 1 SP : 1 PP tebal 15 mm 74,859.02
0.3000 L.01 OH Pekerja 88,000.00 26,400.00
0.1500 L.02 OH Tukang Batu 93,500.00 14,025.00
0.0150 L.03 OH Kepala Tukang 125,000.00 1,875.00
0.0150 L.04 OH Mandor 130,000.00 1,950.00
15.5040 kg Semen Portland 1,200.00 18,604.80
0.0160 m3 Pasir pasang 140,000.00 2,240.00
Jumlah Harga Upah dan Bahan = 44,250.00 20,844.80 65,094.80
Overhead dan Profit (10%) = 6,637.50 3,126.72 9,764.22
Harga Satuan Pekerjaan = 50,887.50 23,971.52 74,859.02
A.4.4.2.2 1 m2 Pemasangan plesteran 1 SP : 2 PP tebal 15 mm 68,216.62
0.3000 L.01 OH Pekerja 88,000.00 26,400.00
0.1500 L.02 OH Tukang Batu 93,500.00 14,025.00
0.0150 L.03 OH Kepala Tukang 125,000.00 1,875.00
0.0150 L.04 OH Mandor 130,000.00 1,950.00
10.2240 kg Semen Portland 1,200.00 12,268.80
0.0200 m3 Pasir pasang 140,000.00 2,800.00
Jumlah Harga Upah dan Bahan = 44,250.00 15,068.80 59,318.80
Overhead dan Profit (10%) = 6,637.50 2,260.32 8,897.82
Harga Satuan Pekerjaan = 50,887.50 17,329.12 68,216.62
Kode / Harga Satuan Pekerjaan
No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
34 G.1 A.4.4.2.3 1 m2 Pemasangan plesteran 1 SP : 3 PP tebal 15 mm 64,803.88
0.3000 L.01 OH Pekerja 88,000.00 26,400.00
0.1500 L.02 OH Tukang Batu 93,500.00 14,025.00
0.0150 L.03 OH Kepala Tukang 125,000.00 1,875.00
0.0150 L.04 OH Mandor 100,000.00 1,500.00
7.7760 kg Semen Portland 1,200.00 9,331.20
0.0230 m3 Pasir pasang 140,000.00 3,220.00
Jumlah Harga Upah dan Bahan = 43,800.00 12,551.20 56,351.20
Overhead dan Profit (15%) = 6,570.00 1,882.68 8,452.68
Harga Satuan Pekerjaan = 50,370.00 14,433.88 64,803.88
35 G.2 A.4.4.2.4 1 m2 Pemasangan plesteran 1 SP : 4 PP tebal 15 mm 62,845.20
0.3000 L.01 OH Pekerja 88,000.00 26,400.00
0.1500 L.02 OH Tukang Batu 93,500.00 14,025.00
0.0150 L.03 OH Kepala Tukang 125,000.00 1,875.00
0.0150 L.04 OH Mandor 100,000.00 1,500.00
6.2400 kg Semen Portland 1,200.00 7,488.00
0.0240 m3 Pasir pasang 140,000.00 3,360.00
Jumlah Harga Upah dan Bahan = 43,800.00 10,848.00 54,648.00
Overhead dan Profit (15%) = 6,570.00 1,627.20 8,197.20
Harga Satuan Pekerjaan = 50,370.00 12,475.20 62,845.20
Kode / Harga Satuan Pekerjaan
No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
A.4.4.2.13 1 m2 Pemasangan plesteran 1 SP : 1 PP tebal 20 mm 91,308.16
0.4000 L.01 OH Pekerja 88,000.00 35,200.00
0.2000 L.02 OH Tukang Batu 93,500.00 18,700.00
0.0200 L.03 OH Kepala Tukang 125,000.00 2,500.00
0.0220 L.04 OH Mandor 130,000.00 2,860.00
13.6320 kg Semen Portland 1,200.00 16,358.40
0.0270 m3 Pasir pasang 140,000.00 3,780.00
Jumlah Harga Upah dan Bahan = 59,260.00 20,138.40 79,398.40
Overhead dan Profit (10%) = 8,889.00 3,020.76 11,909.76
Harga Satuan Pekerjaan = 68,149.00 23,159.16 91,308.16
A.4.4.2.14 1 m2 Pemasangan plesteran 1 SP : 3 PP tebal 20 mm 71,934.34
0.2600 L.01 OH Pekerja 88,000.00 22,880.00
0.2000 L.02 OH Tukang Batu 93,500.00 18,700.00
0.0200 L.03 OH Kepala Tukang 125,000.00 2,500.00
0.0130 L.04 OH Mandor 130,000.00 1,690.00
10.3680 kg Semen Portland 1,200.00 12,441.60
0.0310 m3 Pasir pasang 140,000.00 4,340.00
Jumlah Harga Upah dan Bahan = 45,770.00 16,781.60 62,551.60
Overhead dan Profit (10%) = 6,865.50 2,517.24 9,382.74
Harga Satuan Pekerjaan = 52,635.50 19,298.84 71,934.34
A.4.4.2.15 1 m2 Pemasangan plesteran 1 SP : 4 PP tebal 20 mm 84,782.60
0.4000 L.01 OH Pekerja 88,000.00 35,200.00
0.2000 L.02 OH Tukang Batu 93,500.00 18,700.00
0.0200 L.03 OH Kepala Tukang 125,000.00 2,500.00
0.0220 L.04 OH Mandor 130,000.00 2,860.00
8.3200 kg Semen Portland 1,200.00 9,984.00
0.0320 m3 Pasir pasang 140,000.00 4,480.00
Jumlah Harga Upah dan Bahan = 59,260.00 14,464.00 73,724.00
Overhead dan Profit (10%) = 8,889.00 2,169.60 11,058.60
Harga Satuan Pekerjaan = 68,149.00 16,633.60 84,782.60
36 G.3 A.4.4.2.27 1 m2 Pemasangan acian 38,065.00
0.2000 L.01 OH Pekerja 88,000.00 17,600.00
0.1000 L.02 OH Tukang Batu 93,500.00 9,350.00
0.0100 L.03 OH Kepala Tukang 125,000.00 1,250.00
0.0100 L.04 OH Mandor 100,000.00 1,000.00
3.2500 kg Semen Portland 1,200.00 3,900.00
Jumlah Harga Upah dan Bahan = 29,200.00 3,900.00 33,100.00
Overhead dan Profit (15%) = 4,380.00 585.00 4,965.00
Harga Satuan Pekerjaan = 33,580.00 4,485.00 38,065.00
H PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
37 H.1 A.4.4.3.4 1 m2 Pemasangan lantai ubin warna ukuran 40 cm×40 cm 142,739.73
0.2500 L.01 OH Pekerja 95,000.00 23,750.00
0.1250 L.02 OH Tukang Batu 93,500.00 11,687.50
0.0130 L.03 OH Kepala Tukang 125,000.00 1,625.00
0.0130 L.04 OH Mandor 125,000.00 1,625.00
6.6300 bh Ubin keramik 40 cm × 40 cm warna 9,800.00 64,974.00
9.8000 kg Semen Portland 1,200.00 11,760.00
0.6000 kg Semen warna 4,000.00 2,400.00
0.0450 m3 Pasir pasang 140,000.00 6,300.00
Jumlah Harga Upah dan Bahan = 38,687.50 85,434.00 124,121.50
Overhead dan Profit (15%) = 5,803.13 12,815.10 18,618.23
Harga Satuan Pekerjaan = 44,490.63 98,249.10 142,739.73
38 H.2 A.4.4.3.5 1 m2 Pemasangan lantai ubin warna ukuran 30 cm × 30 cm 103,755.88
0.2500 L.01 OH Pekerja 88,000.00 22,000.00
0.1250 L.02 OH Tukang Batu 93,500.00 11,687.50
0.0130 L.03 OH Kepala Tukang 125,000.00 1,625.00
0.0130 L.04 OH Mandor 100,000.000 1,300.00
6.6300 bh Ubin keramik 30 cm × 30 cm warna 5,000.00 33,150.00
9.8000 kg Semen Portland 1,200.00 11,760.00
0.6000 kg Semen warna 4,000.00 2,400.00
0.0450 m3 Pasir pasang 140,000.00 6,300.00
Jumlah Harga Upah dan Bahan = 36,612.50 53,610.00 90,222.50
Overhead dan Profit (15%) = 5,491.88 8,041.50 13,533.38
Harga Satuan Pekerjaan = 42,104.38 61,651.50 103,755.88
39 H.3 A.4.4.3.6 1 m2 Pemasangan lantai ubin warna ukuran 20 cm × 20 cm 70,842.88
0.2700 L.01 OH Pekerja 95,000.00 25,650.00
0.1350 L.02 OH Tukang Batu 93,500.00 12,622.50
0.0140 L.03 OH Kepala Tukang 125,000.00 1,750.00
0.0140 L.04 OH Mandor 100,000.00 1,400.00
26.5000 bh Ubin keramik 20 cm × 20 cm anti slip - -
10.4000 kg Semen Portland 1,200.00 12,480.00
1.0000 kg Semen warna 1,400.00 1,400.00
0.0450 m3 Pasir pasang 140,000.00 6,300.00
Jumlah Harga Upah dan Bahan = 41,422.50 20,180.00 61,602.50
Overhead dan Profit (15%) = 6,213.38 3,027.00 9,240.38
Kode / Harga Satuan Pekerjaan
No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
Harga Satuan Pekerjaan = 47,635.88 23,207.00 70,842.88
A.4.4.3.9 1 m2 Pemasangan lantai ubin granit ukuran 40 cm × 40 cm 211,356.78
0.2500 L.01 OH Pekerja 88,000.00 22,000.00
0.1250 L.02 OH Tukang Batu 93,500.00 11,687.50
0.0130 L.03 OH Kepala Tukang 125,000.00 1,625.00
0.0130 L.04 OH Mandor 100,000.00 1,300.00
6.6300 bh Ubin granit 40 cm × 40 cm 19,200.00 127,296.00
9.8000 kg Semen Portland 1,200.00 11,760.00
1.3000 kg Semen warna 1,400.00 1,820.00
0.0450 m3 Pasir pasang 140,000.00 6,300.00
Jumlah Harga Upah dan Bahan = 36,612.50 147,176.00 183,788.50
Overhead dan Profit (10%) = 5,491.88 22,076.40 27,568.28
Harga Satuan Pekerjaan = 42,104.38 169,252.40 211,356.78
A.4.4.3.10 1 m2 Pemasangan lantai ubin granit ukuran 30 cm × 30 cm 67,114.00
0.2600 L.01 OH Pekerja 88,000.00 22,880.00
0.1300 L.02 OH Tukang Batu 93,500.00 12,155.00
0.0130 L.03 OH Kepala Tukang 125,000.00 1,625.00
0.0130 L.04 OH Mandor 100,000.00 1,300.00
11.8700 bh Ubin granit 30 cm × 30 cm - -
10.0000 kg Semen Portland 1,200.00 12,000.00
1.5000 kg Semen warna 1,400.00 2,100.00
0.0450 m3 Pasir pasang 140,000.00 6,300.00
Jumlah Harga Upah dan Bahan = 37,960.00 20,400.00 58,360.00
Overhead dan Profit (10%) = 5,694.00 3,060.00 8,754.00
Harga Satuan Pekerjaan = 43,654.00 23,460.00 67,114.00
H.5 A.4.4.3.13 1 m2 Pemasangan lantai ubin teralux marmer ukuran 60 cm × 60 cm 340,653.00
0.2400 L.01 OH Pekerja 95,000.00 22,800.00
0.1200 L.02 OH Tukang Batu 120,000.00 14,400.00
0.0120 L.03 OH Kepala Tukang 125,000.00 1,500.00
0.0120 L.04 OH Mandor 100,000.00 1,200.00
3.1000 bh Granit keramik 60 cm × 60 cm tekstur 75,000.00 232,500.00
9.6000 kg Semen Portland 1,200.00 11,520.00
1.5000 kg Semen warna 4,000.00 6,000.00
0.0450 m3 Pasir pasang 140,000.00 6,300.00
Jumlah Harga Upah dan Bahan = 39,900.00 256,320.00 296,220.00
Overhead dan Profit (10%) = 5,985.00 38,448.00 44,433.00
Harga Satuan Pekerjaan = 45,885.00 294,768.00 340,653.00
40 H.4 A.4.4.3.21 1 m Pemasangan plint ubin warna ukuran 10 cm × 40 cm 40,998.08
0.0900 L.01 OH Pekerja 88,000.00 7,920.00
0.0900 L.02 OH Tukang Batu 93,500.00 8,415.00
0.0090 L.03 OH Kepala Tukang 125,000.00 1,125.00
0.0050 L.04 OH Mandor 100,000.00 500.00
2.6500 bh Plint ubin 10 cm × 40 cm 5,850.00 15,502.50
1.1400 kg Semen Portland 1,200.00 1,368.00
0.1000 kg Semen warna 4,000.00 400.00
0.0030 m3 Pasir pasang 140,000.00 420.00
Jumlah Harga Upah dan Bahan = 17,960.00 17,690.50 35,650.50
Overhead dan Profit (15%) = 2,694.00 2,653.58 5,347.58
Harga Satuan Pekerjaan = 20,654.00 20,344.08 40,998.08
Kode / Harga Satuan Pekerjaan
No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
I PEKERJAAN LANGIT-LANGIT (PLAFON)
41 I.1 -- 1 m2 Pemasangan langit-langit gypsum board ukuran (120×240×) mm, tebal 3 mm 65,283.78
0.1000 L.01 OH Pekerja 88,000.00 8,800.00
0.1000 L.02 OH Tukang Kayu 93,500.00 9,350.00
0.0100 L.03 OH Kepala Tukang 125,000.00 1,250.00
0.0050 L.04 OH Mandor 100,000.00 500.00
0.3750 bh Calcium silicate 3 mm 96,100.00 36,037.50
0.0300 kg Paku kayu plafond 27,700.00 831.00
Jumlah Harga Upah dan Bahan = 19,900.00 36,868.50 56,768.50
Overhead dan Profit (15%) = 2,985.00 5,530.28 8,515.28
Harga Satuan Pekerjaan = 22,885.00 42,398.78 65,283.78
42 I.2 -- 1m Pemasangan list langit-langit gypsum profil 42,031.35
0.0600 L.01 OH Pekerja 88,000.00 5,280.00
0.0600 L.02 OH Tukang Kayu 93,500.00 5,610.00
0.0060 L.03 OH Kepala Tukang 125,000.00 750.00
0.0030 L.04 OH Mandor 100,000.00 300.00
1.0500 m List gypsum profil minimalis tebal 10 cm 22,100.00 23,205.00
0.1500 kg Tepung gypsum 9,360.00 1,404.00
Jumlah Harga Upah dan Bahan = 11,940.00 24,609.00 36,549.00
Overhead dan Profit (15%) = 1,791.00 3,691.35 5,482.35
Harga Satuan Pekerjaan = 13,731.00 28,300.35 42,031.35
43 I.3 -- 1m Pemasangan 1 m’ list langit-langit kayu profil 17,856.05
0.0500 L.01 OH Pekerja 88,000.00 4,400.00
0.0500 L.02 OH Tukang Kayu 93,500.00 4,675.00
0.0050 L.03 OH Kepala Tukang 125,000.00 625.00
0.0030 L.04 OH Mandor 100,000.00 300.00
1.0500 m2 List kayu profil 5,000.00 5,250.00
0.0100 kg Paku kayu 5 dan 10 27,700.00 277.00
Jumlah Harga Upah dan Bahan = 10,000.00 5,527.00 15,527.00
Overhead dan Profit (15%) = 1,500.00 829.05 2,329.05
Harga Satuan Pekerjaan = 11,500.00 6,356.05 17,856.05
J PEKERJAAN PENUTUP ATAP
44 J.1 A.4.5.2.32 1 m2 Pemasangan genteng metal ukuran 80 × 100 atap pelana 167,497.50
0.2000 L.01 OH Pekerja 88,000.00 17,600.00
0.1000 L.02 OH Tukang Kayu 93,500.00 9,350.00
0.0100 L.03 OH Kepala Tukang 125,000.00 1,250.00
0.0010 L.04 OH Mandor 130,000.00 130.00
1.6200 bh Genteng metal 69,000.00 111,780.00
0.2000 kg Paku kayu 27,700.00 5,540.00
Jumlah Harga Upah dan Bahan = 28,330.00 117,320.00 145,650.00
Overhead dan Profit (15%) = 4,249.50 17,598.00 21,847.50
Harga Satuan Pekerjaan = 32,579.50 134,918.00 167,497.50
45 J.2 A.4.5.2.33 1 m2 Pemasangan genteng metal ukuran 80 × 100 atap jurai 197,616.00
0.2000 L.01 OH Pekerja 88,000.00 17,600.00
0.1000 L.02 OH Tukang Kayu 93,500.00 9,350.00
0.0100 L.03 OH Kepala Tukang 125,000.00 1,250.00
0.0010 L.04 OH Mandor 100,000.00 100.00
2.0000 bh Genteng metal 69,000.00 138,000.00
0.2000 kg Paku kayu 27,700.00 5,540.00
Jumlah Harga Upah dan Bahan = 28,300.00 143,540.00 171,840.00
Overhead dan Profit (15%) = 4,245.00 21,531.00 25,776.00
Harga Satuan Pekerjaan = 32,545.00 165,071.00 197,616.00
46 J.3 A.4.5.2.37 1 m Pemasangan nok genteng metal 78,297.75
0.2500 L.01 OH Pekerja 88,000.00 22,000.00
0.1500 L.02 OH Tukang Kayu 93,500.00 14,025.00
0.0150 L.03 OH Kepala Tukang 125,000.00 1,875.00
0.0130 L.04 OH Mandor 100,000.00 1,300.00
1.1000 bh Nok genteng metal 25,000.00 27,500.00
0.0500 kg Paku kayu 27,700.00 1,385.00
Jumlah Harga Upah dan Bahan = 39,200.00 28,885.00 68,085.00
Overhead dan Profit (15%) = 5,880.00 4,332.75 10,212.75
Harga Satuan Pekerjaan = 45,080.00 33,217.75 78,297.75
47 J.4 -- 1m Pemasangan listplank ukuran (3 × 30) cm 103,597.75
0.2500 L.01 OH Pekerja 88,000.00 22,000.00
0.1500 L.02 OH Tukang Kayu 93,500.00 14,025.00
0.0150 L.03 OH Kepala Tukang 125,000.00 1,875.00
0.0130 L.04 OH Mandor 100,000.00 1,300.00
1.1000 bh Listplank ex Kalsiplank 240 × 30 × 8 mm 45,000.00 49,500.00
0.0500 kg Paku kayu 27,700.00 1,385.00
Jumlah Harga Upah dan Bahan = 39,200.00 50,885.00 90,085.00
Overhead dan Profit (15%) = 5,880.00 7,632.75 13,512.75
Harga Satuan Pekerjaan = 45,080.00 58,517.75 103,597.75
Kode / Harga Satuan Pekerjaan
No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
K PEKERJAAN KAYU
48 K.1 A.4.6.1.1 1 m3 Pembuatan dan pemasangan kusen pintu , kayu kelas I 14,041,666.75
7.0000 L.01 OH Pekerja 88,000.00 616,000.00
21.0000 L.02 OH Tukang Kayu 93,500.00 1,963,500.00
2.1000 L.03 OH Kepala Tukang 125,000.00 262,500.00
0.3500 L.04 OH Mandor 100,000.00 35,000.00
1.1000 m3 Balok kayu ulin 8,428,200.00 9,271,020.00
1.2500 kg Paku kayu 27,700.00 34,625.00
1.0000 kg Lem kayu 27,500.00 27,500.00
Jumlah Harga Upah dan Bahan = 2,877,000.00 9,333,145.00 12,210,145.00
Overhead dan Profit (15%) = 431,550.00 1,399,971.75 1,831,521.75
Harga Satuan Pekerjaan = 3,308,550.00 10,733,116.75 14,041,666.75
49 K.2 A.4.6.1.2 1 m3 Pekerjaan Rangka Bawah Ulin Pjg 4 meter 13,024,923.00
5.0000 L.01 OH Pekerja 88,000.00 440,000.00
15.0000 L.02 OH Tukang Kayu 93,500.00 1,402,500.00
1.5000 L.03 OH Kepala Tukang 125,000.00 187,500.00
0.2500 L.04 OH Mandor 100,000.00 25,000.00
1.1000 m3 Balok kayu ulin pjg 4m 8,428,200.00 9,271,020.00
Jumlah Harga Upah dan Bahan = 2,055,000.00 9,271,020.00 11,326,020.00
Overhead dan Profit (15%) = 308,250.00 1,390,653.00 1,698,903.00
Harga Satuan Pekerjaan = 2,363,250.00 10,661,673.00 13,024,923.00
50 K.3 A.4.6.1.3 1 m3 Pekerjaan Rangka Bawah Ulin Pjg 2 meter 12,235,183.50
5.0000 L.01 OH Pekerja 88,000.00 440,000.00
15.0000 L.02 OH Tukang Kayu 93,500.00 1,402,500.00
1.5000 L.03 OH Kepala Tukang 125,000.00 187,500.00
0.2500 L.04 OH Mandor 100,000.00 25,000.00
1.1000 m3 Balok kayu ulin pjg 2m 7,803,900.00 8,584,290.00
Jumlah Harga Upah dan Bahan = 2,055,000.00 8,584,290.00 10,639,290.00
Overhead dan Profit (15%) = 308,250.00 1,287,643.50 1,595,893.50
Harga Satuan Pekerjaan = 2,363,250.00 9,871,933.50 12,235,183.50
51 K.4 A.4.6.1.4 1 m3 Pekerjaan Rangka Badan Ulin 13,153,263.00
5.0000 L.01 OH Pekerja 88,000.00 440,000.00
15.0000 L.02 OH Tukang Kayu 93,500.00 1,402,500.00
1.5000 L.03 OH Kepala Tukang 125,000.00 187,500.00
0.2500 L.04 OH Mandor 100,000.00 25,000.00
1.1000 m3 Balok kayu ulin pjg 4m 8,428,200.00 9,271,020.00
3.0000 kg Paku Ulin 37,200.00 111,600.00
Jumlah Harga Upah dan Bahan = 2,055,000.00 9,382,620.00 11,437,620.00
Overhead dan Profit (15%) = 308,250.00 1,407,393.00 1,715,643.00
Harga Satuan Pekerjaan = 2,363,250.00 10,790,013.00 13,153,263.00
52 K.5 A.4.6.1.5 1 m3 Pekerjaan Rangka Badan Ulin Kayu Kelas II dan III 12,363,523.50
5.0000 L.01 OH Pekerja 88,000.00 440,000.00
15.0000 L.02 OH Tukang Kayu 93,500.00 1,402,500.00
1.5000 L.03 OH Kepala Tukang 125,000.00 187,500.00
0.2500 L.04 OH Mandor 100,000.00 25,000.00
1.1000 m3 Balok kayu meranti 7,803,900.00 8,584,290.00
3.0000 kg Paku Ulin 37,200.00 111,600.00
Jumlah Harga Upah dan Bahan = 2,055,000.00 8,695,890.00 10,750,890.00
Overhead dan Profit (15%) = 308,250.00 1,304,383.50 1,612,633.50
Harga Satuan Pekerjaan = 2,363,250.00 10,000,273.50 12,363,523.50
53 K.6 A.4.6.1.6 1 m3 Pemasangan 1 m2 dinding pemisah plywood rangkap. rangka kayu kelas II 305,342.25
0.2000 L.01 OH Pekerja 88,000.00 17,600.00
0.6000 L.02 OH Tukang Kayu 93,500.00 56,100.00
0.0600 L.03 OH Kepala Tukang 125,000.00 7,500.00
0.0100 L.04 OH Mandor 100,000.00 1,000.00
0.0280 m3 Balok kayu kelas II 4,025,000.00 112,700.00
0.1500 kg Paku kayu 5 dan 10 27,700.00 4,155.00
0.8600 lembar Plywood 240 cm × 120 cm × 4 mm 75,000.00 64,500.00
0.5600 kg Lem kayu kg 3,500.00 1,960.00
Jumlah Harga Upah dan Bahan = 82,200.00 183,315.00 265,515.00
Overhead dan Profit (15%) = 12,330.00 27,497.25 39,827.25
Harga Satuan Pekerjaan = 94,530.00 210,812.25 305,342.25
54 K.7 A.4.6.1.7 1 m3 Pekerjaan Lantai Papan ulin pjg 4 m kelas 1 187,390.20
0.1000 L.01 OH Pekerja 88,000.00 8,800.00
0.2000 L.02 OH Tukang Kayu 93,500.00 18,700.00
0.0300 L.03 OH Kepala Tukang 125,000.00 3,750.00
0.0100 L.04 OH Mandor 100,000.00 1,000.00
0.0120 m3 Kayu papan ulin pjg 4 m 10,581,500.00 126,978.00
0.1000 kg Paku Ulin 37,200.00 3,720.00
Jumlah Harga Upah dan Bahan = 32,250.00 130,698.00 162,948.00
Overhead dan Profit (15%) = 4,837.50 19,604.70 24,442.20
Harga Satuan Pekerjaan = 37,087.50 150,302.70 187,390.20
Kode / Harga Satuan Pekerjaan
No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
55 K.8 A.4.6.1.8 1 btg Pasangan tongkat ulin 10/10 cm tinggi 3,8 m 524,091.34
0.8750 L.01 OH Pekerja 88,000.00 77,000.00
0.5100 L.02 OH Tukang Kayu 93,500.00 47,685.00
0.0510 L.03 OH Kepala Tukang 125,000.00 6,375.00
0.0440 L.04 OH Mandor 100,000.00 4,400.00
0.0380 m3 Balok kayu ulin pjg 4m 8,428,200.00 320,271.60
Jumlah Harga Upah dan Bahan = 135,460.00 320,271.60 455,731.60
Overhead dan Profit (15%) = 20,319.00 48,040.74 68,359.74
Harga Satuan Pekerjaan = 155,779.00 368,312.34 524,091.34
56 K.9 A.4.6.1.9 1 m3 Pasangan suai 5/7 13,669,716.50
0.8750 L.01 OH Pekerja 88,000.00 77,000.00
0.5100 L.02 OH Tukang Kayu 93,500.00 47,685.00
0.0510 L.03 OH Kepala Tukang 125,000.00 6,375.00
0.0440 L.04 OH Mandor 100,000.00 4,400.00
1.1000 m3 Kayu papan ulin pjg 4 m 10,581,500.00 11,639,650.00
3.0000 kg Paku ulin 37,200.00 111,600.00
Jumlah Harga Upah dan Bahan = 135,460.00 11,751,250.00 11,886,710.00
Overhead dan Profit (15%) = 20,319.00 1,762,687.50 1,783,006.50
Harga Satuan Pekerjaan = 155,779.00 13,513,937.50 13,669,716.50
57 K.10 A.4.6.1.10 1 m3 Pasangan sloof dan gelagar 13,343,473.00
5.0000 L.01 OH Pekerja 88,000.00 440,000.00
15.0000 L.02 OH Tukang Kayu 93,500.00 1,402,500.00
1.5000 L.03 OH Kepala Tukang 125,000.00 187,500.00
0.2500 L.04 OH Mandor 100,000.00 25,000.00
1.1000 m3 Balok kayu ulin 8,428,200.00 9,271,020.00
10.0000 kg Paku kayu 27,700.00 277,000.00
Jumlah Harga Upah dan Bahan = 2,055,000.00 9,548,020.00 11,603,020.00
Overhead dan Profit (15%) = 308,250.00 1,432,203.00 1,740,453.00
Harga Satuan Pekerjaan = 2,363,250.00 10,980,223.00 13,343,473.00
58 K.11 A.4.6.1.10 1 m2 Pemasangan 1m2 Dinding papan kayu kelas II dan III 239,957.16
0.2800 L.01 OH Pekerja 88,000.00 24,640.00
0.8000 L.02 OH Tukang Kayu 93,500.00 74,800.00
0.0800 L.03 OH Kepala Tukang 125,000.00 10,000.00
0.0100 L.04 OH Mandor 100,000.00 1,000.00
0.0160 m3 Kayu Papan kelas II 5,792,400.00 92,678.40
0.2000 kg Paku kayu 27,700.00 5,540.00
Jumlah Harga Upah dan Bahan = 110,440.00 98,218.40 208,658.40
Overhead dan Profit (15%) = 16,566.00 14,732.76 31,298.76
Harga Satuan Pekerjaan = 127,006.00 112,951.16 239,957.16
L PEKERJAAN KUNCI DAN KACA
59 L.1 A.4.6.2.2 1 bh Pemasangan kunci tanam biasa 170,752.00
0.0100 L.01 OH Pekerja 88,000.00 880.00
0.5000 L.02 OH Tukang Kayu 93,500.00 46,750.00
0.0500 L.03 OH Kepala Tukang 125,000.00 6,250.00
0.0050 L.04 OH Mandor 100,000.00 500.00
1.0000 bh Kunci tanam 94,100.00 94,100.00
Jumlah Harga Upah dan Bahan = 54,380.00 94,100.00 148,480.00
Overhead dan Profit (15%) = 8,157.00 14,115.00 22,272.00
Harga Satuan Pekerjaan = 62,537.00 108,215.00 170,752.00
60 L.2 A.4.6.2.3 1 bh Pemasangan kunci kamar mandi 176,801.00
0.0050 L.01 OH Pekerja 88,000.00 440.00
0.5000 L.02 OH Tukang Kayu 93,500.00 46,750.00
0.0500 L.03 OH Kepala Tukang 125,000.00 6,250.00
0.0030 L.04 OH Mandor 100,000.00 300.00
1.0000 bh Kunci tanam KM 100,000.00 100,000.00
Jumlah Harga Upah dan Bahan = 53,740.00 100,000.00 153,740.00
Overhead dan Profit (15%) = 8,061.00 15,000.00 23,061.00
Harga Satuan Pekerjaan = 61,801.00 115,000.00 176,801.00
61 L.3 A.4.6.2.5 1 bh Pemasangan engsel pintu 42,895.00
0.0150 L.01 OH Pekerja 88,000.00 1,320.00
0.1500 L.02 OH Tukang Kayu 93,500.00 14,025.00
0.0150 L.03 OH Kepala Tukang 125,000.00 1,875.00
0.0008 L.04 OH Mandor 100,000.00 80.00
1.0000 bh Engsel pintu 20,000.00 20,000.00
Jumlah Harga Upah dan Bahan = 17,300.00 20,000.00 37,300.00
Overhead dan Profit (15%) = 2,595.00 3,000.00 5,595.00
Harga Satuan Pekerjaan = 19,895.00 23,000.00 42,895.00
Kode / Harga Satuan Pekerjaan
No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
62 L.4 A.4.6.2.6 1 bh Pemasangan engsel jendela kupu-kupu 33,384.50
0.0100 L.01 OH Pekerja 88,000.00 880.00
0.1000 L.02 OH Tukang Kayu 93,500.00 9,350.00
0.0100 L.03 OH Kepala Tukang 125,000.00 1,250.00
0.0005 L.04 OH Mandor 100,000.00 50.00
1.0000 bh Engsel kupu-kupu 17,500.00 17,500.00
Jumlah Harga Upah dan Bahan = 11,530.00 17,500.00 29,030.00
Overhead dan Profit (15%) = 1,729.50 2,625.00 4,354.50
Harga Satuan Pekerjaan = 13,259.50 20,125.00 33,384.50
63 L.5 A.4.6.2.7 1 bh Pemasangan engsel angin 97,462.50
0.1000 L.01 OH Pekerja 95,000.00 9,500.00
0.2000 L.02 OH Tukang Kayu 93,500.00 18,700.00
0.0200 L.03 OH Kepala Tukang 125,000.00 2,500.00
0.0005 L.04 OH Mandor 100,000.00 50.00
1.0000 bh Engsel angin 54,000.00 54,000.00
Jumlah Harga Upah dan Bahan = 30,750.00 54,000.00 84,750.00
Overhead dan Profit (15%) = 4,612.50 8,100.00 12,712.50
Harga Satuan Pekerjaan = 35,362.50 62,100.00 97,462.50
64 L.6 A.4.6.2.9 1 bh Pemasangan kait angin 36,794.25
0.0150 L.01 OH Pekerja 88,000.00 1,320.00
0.1500 L.02 OH Tukang Kayu 120,000.00 18,000.00
0.0150 L.03 OH Kepala Tukang 125,000.00 1,875.00
0.0080 L.04 OH Mandor 100,000.00 800.00
1.0000 bh Kait angin kuningan 10,000.00 10,000.00
Jumlah Harga Upah dan Bahan = 21,995.00 10,000.00 31,995.00
Overhead dan Profit (15%) = 3,299.25 1,500.00 4,799.25
Harga Satuan Pekerjaan = 25,294.25 11,500.00 36,794.25
65 L.7 A.4.6.2.10 1 bh Pemasangan door closer 123,855.00
0.0500 L.01 OH Pekerja 88,000.00 4,400.00
0.5000 L.02 OH Tukang Kayu 93,500.00 46,750.00
0.0500 L.03 OH Kepala Tukang 125,000.00 6,250.00
0.0030 L.04 OH Mandor 100,000.00 300.00
1.0000 set Door closer 50,000.00 50,000.00
Jumlah Harga Upah dan Bahan = 57,700.00 50,000.00 107,700.00
Overhead dan Profit (1%) = 8,655.00 7,500.00 16,155.00
Harga Satuan Pekerjaan = 66,355.00 57,500.00 123,855.00
66 L.8 A.4.6.2.17 1 m2 Pemasangan kaca polos tebal 5 mm 184,851.00
0.0150 L.01 OH Pekerja 88,000.00 1,320.00
0.1500 L.02 OH Tukang Kayu 93,500.00 14,025.00
0.0150 L.03 OH Kepala Tukang 125,000.00 1,875.00
0.0008 L.04 OH Mandor 100,000.00 80.00
1.1000 m2 Kaca polos tebal 5 mm 130,400.00 143,440.00
0.0500 kg Sealant 17,500.00
Jumlah Harga Upah dan Bahan = 17,300.00 143,440.00 160,740.00
Overhead dan Profit (15%) = 2,595.00 21,516.00 24,111.00
Harga Satuan Pekerjaan = 19,895.00 164,956.00 184,851.00
M PEKERJAAN PENGECATAN
67 M.1 A.4.7.1.4 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 51,847.91
0.0700 L.01 OH Pekerja 88,000.00 6,160.00
0.1050 L.02 OH Tukang Cat 93,500.00 9,817.50
0.0040 L.03 OH Kepala Tukang 125,000.00 500.00
0.0030 L.04 OH Mandor 100,000.00 300.00
0.2000 kg Cat menie 31,700.00 6,340.00
0.1500 kg Plamir 25,000.00 3,750.00
0.1700 kg Cat dasar 32,492.00 5,523.64
0.2600 kg Cat kayu 39,400.00 10,244.00
0.0100 bh Kuas 15,000.00 150.00
0.0300 kg Pengencer 30,000.00 900.00
0.2000 lbr Ampelas 7,000.00 1,400.00
Jumlah Harga Upah dan Bahan = 16,777.50 28,307.64 45,085.14
Overhead dan Profit (15%) = 2,516.63 4,246.15 6,762.77
Harga Satuan Pekerjaan = 19,294.13 32,553.79 51,847.91
Kode / Harga Satuan Pekerjaan
No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
68 M.2 A.4.7.1.10 1 m2 Pengecatan tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) interior 27,451.79
0.0200 L.01 OH Pekerja 88,000.00 1,760.00
0.0630 L.02 OH Tukang Cat 93,500.00 5,890.50
0.0063 L.03 OH Kepala Tukang 125,000.00 787.50
0.0030 L.04 OH Mandor 100,000.00 300.00
0.1000 kg Plamir 25,000.00 2,500.00
0.1000 kg Cat dasar 32,492.00 3,249.20
0.2600 kg Cat tembok interior 36,092.00 9,383.92
Jumlah Harga Upah dan Bahan = 8,738.00 15,133.12 23,871.12
Overhead dan Profit (15%) = 1,310.70 2,269.97 3,580.67
Harga Satuan Pekerjaan = 10,048.70 17,403.09 27,451.79
69 M.3 A.4.7.1.10 1 m2 Pengecatan tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) eksterior 46,560.28
0.0200 L.01 OH Pekerja 88,000.00 1,760.00
0.0630 L.02 OH Tukang Cat 93,500.00 5,890.50
0.0063 L.03 OH Kepala Tukang 125,000.00 787.50
0.0030 L.04 OH Mandor 100,000.00 300.00
0.1000 kg Plamir 25,000.00 2,500.00
0.1000 kg Cat dasar 32,492.00 3,249.20
0.2600 kg Cat tembok eksterior 100,000.00 26,000.00
Jumlah Harga Upah dan Bahan = 8,738.00 31,749.20 40,487.20
Overhead dan Profit (15%) = 1,310.70 4,762.38 6,073.08
Harga Satuan Pekerjaan = 10,048.70 36,511.58 46,560.28
A.4.7.1.11 1 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) -
0.0280 L.01 OH Pekerja -
0.0420 L.02 OH Tukang Cat -
0.0042 L.03 OH Kepala Tukang -
0.0030 L.04 OH Mandor -
0.1200 kg Cat dasar -
0.1800 kg Cat penutup -
Jumlah Harga Upah dan Bahan = - - -
Overhead dan Profit (10%) = - - -
Harga Satuan Pekerjaan = - - -
A.4.7.1.12 1 m2 Pelaburan tembok dengan kalkarium -
0.0280 L.01 OH Pekerja -
0.0420 L.02 OH Tukang Cat -
0.0042 L.03 OH Kepala Tukang -
0.0030 L.04 OH Mandor -
0.1000 kg Kalkarium -
Jumlah Harga Upah dan Bahan = - - -
Overhead dan Profit (10%) = - - -
Harga Satuan Pekerjaan = - - -
A.4.7.1.13 1 m2 Pelaburan tembok dengan kapur sirih -
0.1500 L.01 OH Pekerja -
0.0010 L.02 OH Tukang Cat -
0.0001 L.03 OH Kepala Tukang -
0.0025 L.04 OH Mandor -
0.1500 kg Kapur sirih -
0.1000 lbr Ampelas -
0.2500 ikat Alang-alang -
Jumlah Harga Upah dan Bahan = - - -
Overhead dan Profit (10%) = - - -
Harga Satuan Pekerjaan = - - -
A.4.7.1.14 1 m2 Pelaburan tembok lama dengan kapur sirih -
0.0400 L.01 OH Pekerja -
0.0050 L.02 OH Tukang Cat -
0.0005 L.03 OH Kepala Tukang -
0.0025 L.04 OH Mandor -
0.3000 kg Kapur sirih -
0.2000 lbr Ampelas -
0.2500 ikat Alang-alang -
Jumlah Harga Upah dan Bahan = - - -
Overhead dan Profit (10%) = - - -
Harga Satuan Pekerjaan = - - -
A.4.7.1.15 1 m2 Pemasangan wallpaper -
0.0200 L.01 OH Pekerja -
0.2000 L.02 OH Tukang Cat -
0.0200 L.03 OH Kepala Tukang -
0.0025 L.04 OH Mandor -
1.2000 m2 Wall paper -
0.2000 kg Lem -
Jumlah Harga Upah dan Bahan = - - -
Overhead dan Profit (10%) = - - -
Harga Satuan Pekerjaan = - - -
A.4.7.1.16 1 m2 Pengecatan permukaan baja dengan menie besi -
0.0200 L.01 OH Pekerja -
0.2000 L.02 OH Tukang Cat -
Kode / Harga Satuan Pekerjaan
No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
0.0200 L.03 OH Kepala Tukang -
0.0025 L.04 OH Mandor -
0.1000 kg Meni besi -
0.0100 bh Kuas -
Jumlah Harga Upah dan Bahan = - - -
Overhead dan Profit (10%) = - - -
Harga Satuan Pekerjaan = - - -
A.4.7.1.17 1 m2 Pengecatan permukaan baja dengan menie besi dengan perancah -
0.2500 L.01 OH Pekerja -
0.2250 L.02 OH Tukang Cat -
0.0225 L.03 OH Kepala Tukang -
0.0075 L.04 OH Mandor -
0.1000 kg Meni besi -
0.0100 ltr Pengencer -
0.0100 bh Kuas -
0.0020 m3 Perancah kayu -
Jumlah Harga Upah dan Bahan = - - -
Overhead dan Profit (10%) = - - -
Harga Satuan Pekerjaan = - - -
A.4.7.1.18 1 m2 Pengecatan permukaan baja galvanis secara manual 4 lapis -
0.2500 L.01 OH Pekerja -
0.2500 L.02 OH Tukang Cat -
0.0250 L.03 OH Kepala Tukang -
0.0013 L.04 OH Mandor -
0.1000 kg Meni A -
0.1000 kg Meni B -
0.0800 kg Cat -
0.0100 bh Kuas -
0.0100 ltr Pengencer -
Jumlah Harga Upah dan Bahan = - - -
Overhead dan Profit (10%) = - - -
Harga Satuan Pekerjaan = - - -
A.4.7.1.19 1 m2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir -
0.0600 L.01 OH Pekerja -
0.0600 L.02 OH Tukang Cat -
0.0120 L.03 OH Kepala Tukang -
0.0030 L.04 OH Mandor -
0.3000 kg Cat -
0.0100 bh Kuas -
0.0100 ltr Pengencer -
Jumlah Harga Upah dan Bahan = - - -
Overhead dan Profit (10%) = - - -
Harga Satuan Pekerjaan = - - -
A.4.7.1.20 1 m2 Pengecatan permukaan baja galvanis secara manual sistem 3 lapis 154,331.86
0.4000 L.01 OH Pekerja 88,000.00 35,200.00
0.8000 L.02 OH Tukang Cat 93,500.00 74,800.00
0.0800 L.03 OH Kepala Tukang 125,000.00 10,000.00
0.0200 L.04 OH Mandor 100,000.00 2,000.00
0.1100 kg Cat dasar 32,492.00 3,574.12
0.1700 kg Cat antara 12,450.00 2,116.50
0.0800 kg Cat besi 77,800.00 6,224.00
0.0100 bh Kuas 15,000.00 150.00
0.0100 ltr Tiner 13,700.00 137.00
Jumlah Harga Upah dan Bahan = 122,000.00 12,201.62 134,201.62
Overhead dan Profit (10%) = 18,300.00 1,830.24 20,130.24
Harga Satuan Pekerjaan = 140,300.00 14,031.86 154,331.86
A.4.7.1.21 1 m2 Pengecatan permukaan baja secara semprot sistem 3 lapis cat mutakhir -
0.4000 L.01 OH Pekerja -
0.7000 L.02 OH Tukang Cat -
0.0700 L.03 OH Kepala Tukang -
0.0200 L.04 OH Mandor -
0.3000 kg Cat dasar -
0.0100 ltr Pengencer -
Jumlah Harga Upah dan Bahan = - - -
Overhead dan Profit (10%) = - - -
Harga Satuan Pekerjaan = - - -
A.4.7.1.22 1 m2 Plituran dengan plitur melamik 246,940.08
0.2000 L.01 OH Pekerja 88,000.00 17,600.00
1.2000 L.02 OH Tukang Cat 93,500.00 112,200.00
0.1200 L.03 OH Kepala Tukang 125,000.00 15,000.00
0.0100 L.04 OH Mandor 100,000.00 1,000.00
0.1500 kg Wood filler 38,870.00 5,830.50
0.1500 kg Woodstain 169,000.00 25,350.00
0.1500 kg Sanding 80,600.00 12,090.00
0.2400 kg Melamic 78,000.00 18,720.00
Kode / Harga Satuan Pekerjaan
No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
0.2000 ltr Tiner 13,700.00 2,740.00
0.6000 lbr Ampelas 7,000.00 4,200.00
Jumlah Harga Upah dan Bahan = 145,800.00 68,930.50 214,730.50
Overhead dan Profit (10%) = 21,870.00 10,339.58 32,209.58
Harga Satuan Pekerjaan = 167,670.00 79,270.08 246,940.08
N PEKERJAAN SANITASI DALAM GEDUNG
A.5.1.1.1 (K3)1 bh Pemasangan kloset duduk/monoblok 2,698,944.20
3.3000 L.01 OH Pekerja 88,000.00 290,400.00
1.1000 L.02 OH Tukang Batu 93,500.00 102,850.00
0.0100 L.03 OH Kepala Tukang 125,000.00 1,250.00
0.1600 L.04 OH Mandor 100,000.00 16,000.00
1.0000 unit Kloset duduk porselen 1,826,800.00 1,826,800.00
6% Ls Perlengkapan 1,826,800.00 109,608.00
Jumlah Harga Upah dan Bahan = 410,500.00 1,936,408.00 2,346,908.00
Overhead dan Profit (10%) = 61,575.00 290,461.20 352,036.20
Harga Satuan Pekerjaan = 472,075.00 2,226,869.20 2,698,944.20
A.5.1.1.2 1 bh Pemasangan kloset jongkok porselen 870,090.00
1.0000 L.01 OH Pekerja 88,000.00 88,000.00
1.5000 L.02 OH Tukang Batu 93,500.00 140,250.00
0.1500 L.03 OH Kepala Tukang 125,000.00 18,750.00
0.1600 L.04 OH Mandor 100,000.00 16,000.00
1.0000 unit Kloset jongkok porselen 485,000.00 485,000.00
6.0000 kg Semen Portland 1,200.00 7,200.00
0.0100 m3 Pasir pasang 140,000.00 1,400.00
Jumlah Harga Upah dan Bahan = 263,000.00 493,600.00 756,600.00
Overhead dan Profit (10%) = 39,450.00 74,040.00 113,490.00
Harga Satuan Pekerjaan = 302,450.00 567,640.00 870,090.00
A.5.1.1.3 1 bh Pemasangan kloset jongkok teraso -
1.0000 L.01 OH Pekerja -
1.5000 L.02 OH Tukang Batu -
0.1500 L.03 OH Kepala Tukang -
0.0500 L.04 OH Mandor -
1.0000 unit Kloset jongkok -
6.0000 kg Semen Portland -
0.0100 m3 Pasir pasang -
7.0000 bh Bata merah -
Jumlah Harga Upah dan Bahan = - - -
Overhead dan Profit (10%) = - - -
Harga Satuan Pekerjaan = - - -
A.5.1.1.4 (K3)1 bh Pemasangan urinoir 953,649.00
1.0000 L.01 OH Pekerja 88,000.00 88,000.00
1.0000 L.02 OH Tukang Batu 93,500.00 93,500.00
0.1000 L.03 OH Kepala Tukang 125,000.00 12,500.00
0.0500 L.04 OH Mandor 100,000.00 5,000.00
1.0000 unit Urinoir 478,200.00 478,200.00
6.0000 kg Semen Portland 1,200.00 7,200.00
0.0100 m3 Pasir pasang 140,000.00 1,400.00
30% Ls Perlengkapan 478,200.00 143,460.00
Jumlah Harga Upah dan Bahan = 199,000.00 630,260.00 829,260.00
Overhead dan Profit (10%) = 29,850.00 94,539.00 124,389.00
Harga Satuan Pekerjaan = 228,850.00 724,799.00 953,649.00
A.5.1.1.5 (K3)1 bh Pemasangan wastafel 1,622,191.15
1.2000 L.01 OH Pekerja 88,000.00 105,600.00
1.4500 L.02 OH Tukang Batu 93,500.00 135,575.00
0.1500 L.03 OH Kepala Tukang 125,000.00 18,750.00
0.0600 L.04 OH Mandor 100,000.00 6,000.00
1.2000 unit Wastafel 859,300.00 1,031,160.00
6.0000 kg Semen Portland 1,500.00 9,000.00
0.0100 m3 Pasir pasang 140,000.00 1,400.00
12% Ls Perlengkapan 859,300.00 103,116.00
Jumlah Harga Upah dan Bahan = 265,925.00 1,144,676.00 1,410,601.00
Overhead dan Profit (10%) = 39,888.75 171,701.40 211,590.15
Harga Satuan Pekerjaan = 305,813.75 1,316,377.40 1,622,191.15
A.5.1.1.6 (K3)1 bh Pemasangan bathcuip porselen 4,929,360.00
0.0750 L.01 OH Pekerja 88,000.00 6,600.00
0.7500 L.02 OH Tukang Batu 93,500.00 70,125.00
0.0750 L.03 OH Kepala Tukang 125,000.00 9,375.00
0.0030 L.04 OH Mandor 100,000.00 300.00
1.0000 unit Bathcuip 3,500,000.00 3,500,000.00
20% Ls Perlengkapan 3,500,000.00 700,000.00
Jumlah Harga Upah dan Bahan = 86,400.00 4,200,000.00 4,286,400.00
Overhead dan Profit (10%) = 12,960.00 630,000.00 642,960.00
Harga Satuan Pekerjaan = 99,360.00 4,830,000.00 4,929,360.00
A.5.1.1.7 (K3)1 bh Pemasangan bak fiberglass volume 1 m3 2,726,650.00
3.0000 L.01 OH Pekerja 88,000.00 264,000.00
4.5000 L.02 OH Tukang Batu 93,500.00 420,750.00
Kode / Harga Satuan Pekerjaan
No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
0.0500 L.03 OH Kepala Tukang 125,000.00 6,250.00
0.9000 L.04 OH Mandor 100,000.00 90,000.00
1.0000 unit Bak fiberglass 750,000.00 750000 750,000.00
12% Ls Perlengkapan 750,000.00 90,000.00
Jumlah Harga Upah dan Bahan = 1,531,000.00 840,000.00 2,371,000.00
Overhead dan Profit (10%) = 229,650.00 126,000.00 355,650.00
Harga Satuan Pekerjaan = 1,760,650.00 966,000.00 2,726,650.00
A.5.1.1.8 (K3)1 bh Pemasangan bak mandi batu bata volume 0,30 m3 2,229,045.00
6.0000 L.01 OH Pekerja 88,000.00 528,000.00
3.0000 L.02 OH Tukang Batu 93,500.00 280,500.00
0.3000 L.03 OH Kepala Tukang 125,000.00 37,500.00
0.0030 L.04 OH Mandor 100,000.00 300.00
150.0000 m3 Bata merah 600.00 90,000.00
120.0000 kg Semen Portland 1,200.00 144,000.00
0.3000 m3 Pasir pasang 140,000.00 42,000.00
360.0000 bh Porselen 11×11 2,200.00 792,000.00
6.0000 kg Semen warna 4,000.00 24,000.00
Jumlah Harga Upah dan Bahan = 846,300.00 1,092,000.00 1,938,300.00
Overhead dan Profit (10%) = 126,945.00 163,800.00 290,745.00
Harga Satuan Pekerjaan = 973,245.00 1,255,800.00 2,229,045.00
A.5.1.1.9 1 bh Pemasangan bak mandi teraso volume 0,30 m3 1,542,150.00
3.0000 L.01 OH Pekerja 88,000.00 264,000.00
4.5000 L.02 OH Tukang Batu 93,500.00 420,750.00
0.0500 L.03 OH Kepala Tukang 125,000.00 6,250.00
0.9000 L.04 OH Mandor 100,000.00 90,000.00
1.0000 unit Bak fiberglass 500,000.00 500,000.00
12% Ls Perlengkapan 500,000.00 60,000.00
Jumlah Harga Upah dan Bahan = 781,000.00 560,000.00 1,341,000.00
Overhead dan Profit (10%) = 117,150.00 84,000.00 201,150.00
Harga Satuan Pekerjaan = 898,150.00 644,000.00 1,542,150.00
A.5.1.1.10 1 bh Pemasangan bak air fiberglass volume 1 m3 1,305,940.00
0.3000 L.01 OH Pekerja 88,000.00 26,400.00
0.4500 L.02 OH Tukang Batu 93,500.00 42,075.00
0.0450 L.03 OH Kepala Tukang 125,000.00 5,625.00
0.0150 L.04 OH Mandor 100,000.00 1,500.00
1.0000 unit Bak air fiberglass 500,000.00 500000 500,000.00
12% Ls Perlengkapan 500,000.00 60,000.00
Jumlah Harga Upah dan Bahan = 575,600.00 560,000.00 1,135,600.00
Overhead dan Profit (10%) = 86,340.00 84,000.00 170,340.00
Harga Satuan Pekerjaan = 661,940.00 644,000.00 1,305,940.00
A.5.1.1.11 (K3)1 bh Pemasangan bak beton volume 1 m3 11,069,462.89
3.5000 L.01 OH Pekerja 88,000.00 308,000.00
4.5000 L.02 OH Tukang Batu 93,500.00 420,750.00
0.0500 L.03 OH Kepala Tukang 125,000.00 6,250.00
0.0180 L.04 OH Mandor 100,000.00 1,800.00
0.9000 m3 Beton 1:2:3 1,049,935.68 944942.111785714 944,942.11
180.0000 kg Baja tulangan 16,528.95 2975211 2,975,211.00
8.0000 m2 Kayu bekisting 102,815.18 822,521.40
500.0000 bh Ubin porselen 200.00 100,000.00
12% Ls Perlengkapan 1,049,935.68 125,992.28
Jumlah Harga Upah dan Bahan = 4,656,953.11 4,968,666.79 9,625,619.91
Overhead dan Profit (10%) = 698,542.97 745,300.02 1,443,842.99
Harga Satuan Pekerjaan = 5,355,496.08 5,713,966.81 11,069,462.89
A.5.1.1.12 1 bh Pemasangan bak cuci piring stainless steel 944,081.00
0.0300 L.01 OH Pekerja 88,000.00 2,640.00
0.3000 L.02 OH Tukang Batu 93,500.00 28,050.00
0.0300 L.03 OH Kepala Tukang 125,000.00 3,750.00
0.0150 L.04 OH Mandor 100,000.00 1,500.00
1.0000 unit Bak cuci piring 750,000.00 750,000.00
1.0000 bh Water drain 35,000.00 35,000.00
Jumlah Harga Upah dan Bahan = 35,940.00 785,000.00 820,940.00
Overhead dan Profit (10%) = 5,391.00 117,750.00 123,141.00
Harga Satuan Pekerjaan = 41,331.00 902,750.00 944,081.00
A.5.1.1.13 1 bh Pemasangan bak cuci piring teraso 1,007,285.00
0.0500 L.01 OH Pekerja 88,000.00 4,400.00
0.5000 L.02 OH Tukang Batu 93,500.00 46,750.00
0.0500 L.03 OH Kepala Tukang 125,000.00 6,250.00
0.0250 L.04 OH Mandor 100,000.00 2,500.00
1.0000 unit Bak cuci piring 750,000.00 750,000.00
1.0000 bh Water drain 35,000.00 35,000.00
20.0000 kg Semen Portland 1,200.00 24,000.00
0.0500 m3 Pasir pasang 140,000.00 7,000.00
Jumlah Harga Upah dan Bahan = 59,900.00 816,000.00 875,900.00
Overhead dan Profit (10%) = 8,985.00 122,400.00 131,385.00
Harga Satuan Pekerjaan = 68,885.00 938,400.00 1,007,285.00
Kode / Harga Satuan Pekerjaan
No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
A.5.1.1.14 1 bh Pemasangan floor drain 64,147.00
0.0100 L.01 OH Pekerja 88,000.00 880.00
0.1000 L.02 OH Tukang Batu 93,500.00 9,350.00
0.0100 L.03 OH Kepala Tukang 125,000.00 1,250.00
0.0050 L.04 OH Mandor 100,000.00 500.00
1.0000 unit Floor drain 43,800.00 43,800.00
Jumlah Harga Upah dan Bahan = 11,980.00 43,800.00 55,780.00
Overhead dan Profit (10%) = 1,797.00 6,570.00 8,367.00
Harga Satuan Pekerjaan = 13,777.00 50,370.00 64,147.00
A.5.1.1 19. 1 bh Pemasangan Kran Air 113,740.75
0.0100 L.01 OH Pekerja 88,000.00 880.00
0.4000 L.02 OH Tukang Batu 93,500.00 37,400.00
0.0400 L.03 OH Kepala Tukang 125,000.00 5,000.00
0.0050 L.04 OH Mandor 100,000.00 500.00
1.0000 unit Kran Air 55,000.00 55,000.00
0.0250 Sealtape 5,000.00 125.00
Jumlah Harga Upah dan Bahan = 43,780.00 55,125.00 98,905.00
Overhead dan Profit (10%) = 6,567.00 8,268.75 14,835.75
Harga Satuan Pekerjaan = 50,347.00 63,393.75 113,740.75
A.5.1.1.15 1 bh Pemasangan bak kontrol pasangan bata 30×30 tinggi 35 cm 560,828.92
2.1600 L.01 OH Pekerja 88,000.00 190,080.00
0.7200 L.02 OH Tukang Batu 93,500.00 67,320.00
0.0720 L.03 OH Kepala Tukang 125,000.00 9,000.00
0.0110 L.04 OH Mandor 100,000.00 1,100.00
40.0000 bh Bata merah 600.00 24000 24,000.00
44.0000 kg Semen Portland 1,200.00 52800 52,800.00
0.0700 m3 Pasir pasang 140,000.00 9,800.00
0.0600 m3 Pasir beton 140,000.00 8,400.00
0.0700 m3 Kerikil 313,300.00 21,931.00
1.6000 kg Baja tulangan 16,528.95 26,446.32
Jumlah Harga Upah dan Bahan = 344,300.00 143,377.32 487,677.32
Overhead dan Profit (10%) = 51,645.00 21,506.60 73,151.60
Harga Satuan Pekerjaan = 395,945.00 164,883.92 560,828.92
A.5.1.1.16 1 bh Pemasangan bak kontrol pasangan bata 45×45 tinggi 50 cm 944,129.92
3.2000 L.01 OH Pekerja 88,000.00 281,600.00
1.1500 L.02 OH Tukang Batu 93,500.00 107,525.00
0.0110 L.03 OH Kepala Tukang 125,000.00 1,375.00
0.0160 L.04 OH Mandor 100,000.00 1,600.00
70.0000 bh Bata merah 600.00 42000 42,000.00
77.0000 kg Semen Portland 1,200.00 92400 92,400.00
0.1300 m3 Pasir pasang 140,000.00 18200 18,200.00
0.0900 m3 Pasir beton 140,000.00 12600 12,600.00
0.0200 m3 Kerikil 313,300.00 6266 6,266.00
2.6000 kg Baja tulangan 16,528.95 42975.27 42,975.27
Jumlah Harga Upah dan Bahan = 606,541.27 214,441.27 820,982.54
Overhead dan Profit (10%) = 90,981.19 32,166.19 123,147.38
Harga Satuan Pekerjaan = 697,522.46 246,607.46 944,129.92
A.5.1.1.17 1 bh Pemasangan bak kontrol pasangan bata 60×60 tinggi 65 cm 846,128.95
3.2000 L.01 OH Pekerja 88,000.00 281,600.00
1.1500 L.02 OH Tukang Batu 93,500.00 107,525.00
0.0110 L.03 OH Kepala Tukang 125,000.00 1,375.00
0.0160 L.04 OH Mandor 100,000.00 1,600.00
123.0000 bh Bata merah 600.00 73,800.00
114.0000 kg Semen Portland 1,200.00 136,800.00
0.1840 m3 Pasir pasang 140,000.00 25,760.00
0.1200 m3 Pasir beton 140,000.00 16,800.00
0.0330 m3 Kerikil 313,300.00 10,338.90
4.8500 kg Baja tulangan 16,528.95 80,165.41
Jumlah Harga Upah dan Bahan = 392,100.00 343,664.31 735,764.31
Overhead dan Profit (10%) = 58,815.00 51,549.65 110,364.65
Harga Satuan Pekerjaan = 450,915.00 395,213.95 846,128.95
A.5.1.1.18 1 m Pemasangan pipa galvanis diameter ½" -
0.0540 L.01 OH Pekerja -
0.0900 L.02 OH Tukang Batu -
0.0090 L.03 OH Kepala Tukang -
0.0270 L.04 OH Mandor -
1.2000 m Pipa galvanis ½" -
35% Ls Perlengkapan - -
Jumlah Harga Upah dan Bahan = - - -
Overhead dan Profit (10%) = - - -
Harga Satuan Pekerjaan = - - -
A.5.1.1.19 1 bh Pemasangan kran diameter ½" atau ¾" 100,429.50
0.0100 L.01 OH Pekerja 88,000.00 880.00
0.4000 L.02 OH Tukang Batu 93,500.00 37,400.00
0.0400 L.03 OH Kepala Tukang 125,000.00 5,000.00
0.0050 L.04 OH Mandor 100,000.00 500.00
Kode / Harga Satuan Pekerjaan
No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
1.0000 bh Keran air 43,400.00 43,400.00
0.0250 bh Seal tape 6,000.00 150.00
Jumlah Harga Upah dan Bahan = 43,780.00 43,550.00 87,330.00
Overhead dan Profit (10%) = 6,567.00 6,532.50 13,099.50
Harga Satuan Pekerjaan = 50,347.00 50,082.50 100,429.50
A.5.1.1.20 1 m Pemasangan pipa galvanis diameter ¾" 103,318.30
0.0540 L.01 OH Pekerja 88,000.00 4,752.00
0.0900 L.02 OH Tukang Batu 93,500.00 8,415.00
0.0090 L.03 OH Kepala Tukang 125,000.00 1,125.00
0.0270 L.04 OH Mandor 100,000.00 2,700.00
1.2000 m Pipa galvanis ½" 47,000.00 56,400.00
35% Ls Perlengkapan 47,000.00 16,450.00
Jumlah Harga Upah dan Bahan = 16,992.00 72,850.00 89,842.00
Overhead dan Profit (10%) = 2,548.80 10,927.50 13,476.30
Harga Satuan Pekerjaan = 19,540.80 83,777.50 103,318.30
A.5.1.1.21 1 m Pemasangan pipa galvanis diameter 1" 110,151.22
0.0540 L.01 OH Pekerja 88,000.00 4,752.00
0.0900 L.02 OH Tukang Batu 93,500.00 8,415.00
0.0090 L.03 OH Kepala Tukang 125,000.00 1,125.00
0.0270 L.04 OH Mandor 100,000.00 2,700.00
1.2000 m Pipa GIP 1" 50,833.33 61,000.00
35% Ls Perlengkapan 50,833.33 17,791.67
Jumlah Harga Upah dan Bahan = 16,992.00 78,791.67 95,783.67
Overhead dan Profit (10%) = 2,548.80 11,818.75 14,367.55
Harga Satuan Pekerjaan = 19,540.80 90,610.42 110,151.22
A.5.1.1.22 1 m Pemasangan pipa galvanis diameter 1 1/2" 213,479.10
0.1080 L.01 OH Pekerja 88,000.00 9,504.00
0.1800 L.02 OH Tukang Batu 93,500.00 16,830.00
0.0180 L.03 OH Kepala Tukang 125,000.00 2,250.00
0.0050 L.04 OH Mandor 100,000.00 500.00
1.2000 m Pipa galvanis 1 1/2" 101,000.00 121,200.00
35% Ls Perlengkapan 101,000.00 35,350.00
Jumlah Harga Upah dan Bahan = 29,084.00 156,550.00 185,634.00
Overhead dan Profit (10%) = 4,362.60 23,482.50 27,845.10
Harga Satuan Pekerjaan = 33,446.60 180,032.50 213,479.10
A.5.1.1.23 1 m Pemasangan pipa galvanis diameter 3" 264,778.88
0.1350 L.01 OH Pekerja 88,000.00 11,880.00
0.2250 L.02 OH Tukang Batu 93,500.00 21,037.50
0.0230 L.03 OH Kepala Tukang 125,000.00 2,875.00
0.0070 L.04 OH Mandor 100,000.00 700.00
1.2000 m Pipa galvanis 3" 125,000.00 150,000.00
35% Ls Perlengkapan 125,000.00 43,750.00
Jumlah Harga Upah dan Bahan = 36,492.50 193,750.00 230,242.50
Overhead dan Profit (10%) = 5,473.88 29,062.50 34,536.38
Harga Satuan Pekerjaan = 41,966.38 222,812.50 264,778.88
A.5.1.1.24 1 m Pemasangan pipa galvanis diameter 4" 309,341.38
0.1350 L.01 OH Pekerja 88,000.00 11,880.00
0.2250 L.02 OH Tukang Batu 93,500.00 21,037.50
0.0230 L.03 OH Kepala Tukang 125,000.00 2,875.00
0.0070 L.04 OH Mandor 100,000.00 700.00
1.2000 m Pipa galvanis 4" 150,000.00 180,000.00
35% Ls Perlengkapan 150,000.00 52,500.00
Jumlah Harga Upah dan Bahan = 36,492.50 232,500.00 268,992.50
Overhead dan Profit (10%) = 5,473.88 34,875.00 40,348.88
Harga Satuan Pekerjaan = 41,966.38 267,375.00 309,341.38
A.5.1.1.25 1 m Pemasangan pipa PVC tipe AW diameter ½" 64,662.20
0.0360 L.01 OH Pekerja 88,000.00 3,168.00
0.0600 L.02 OH Tukang Batu 93,500.00 5,610.00
0.0060 L.03 OH Kepala Tukang 125,000.00 750.00
0.0020 L.04 OH Mandor 100,000.00 200.00
1.2000 m Pipa PVC ½" 30,000.00 36,000.00
35% Ls Perlengkapan 30,000.00 10,500.00
Jumlah Harga Upah dan Bahan = 9,728.00 46,500.00 56,228.00
Overhead dan Profit (10%) = 1,459.20 6,975.00 8,434.20
Harga Satuan Pekerjaan = 11,187.20 53,475.00 64,662.20
A.5.1.1.26 1 m Pemasangan pipa PVC tipe AW diameter ¾" 78,213.80
0.0360 L.01 OH Pekerja 95,000.00 3,420.00
0.0600 L.02 OH Tukang Batu 93,500.00 5,610.00
0.0060 L.03 OH Kepala Tukang 125,000.00 750.00
0.0020 L.04 OH Mandor 100,000.00 200.00
1.2000 m Pipa PVC ¾" 37,440.00 44,928.00
35% Ls Perlengkapan 37,440.00 13,104.00
Jumlah Harga Upah dan Bahan = 9,980.00 58,032.00 68,012.00
Overhead dan Profit (10%) = 1,497.00 8,704.80 10,201.80
Harga Satuan Pekerjaan = 11,477.00 66,736.80 78,213.80
A.5.1.1.27 1 m Pemasangan pipa PVC tipe AW diameter 1" 100,346.70
0.0360 L.01 OH Pekerja 88,000.00 3,168.00
0.0600 L.02 OH Tukang Batu 93,500.00 5,610.00
0.0060 L.03 OH Kepala Tukang 130,000.00 780.00
Kode / Harga Satuan Pekerjaan
No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
0.0020 L.04 OH Mandor 100,000.00 200.00
1.2000 m Pipa PVC 1" 50,000.00 60,000.00
35% Ls Perlengkapan 50,000.00 17,500.00
Jumlah Harga Upah dan Bahan = 9,758.00 77,500.00 87,258.00
Overhead dan Profit (10%) = 1,463.70 11,625.00 13,088.70
Harga Satuan Pekerjaan = 11,221.70 89,125.00 100,346.70
A.5.1.1.28 1 m Pemasangan pipa PVC tipe AW diameter 1 ½" -
0.0540 L.01 OH Pekerja -
0.0900 L.02 OH Tukang Batu -
0.0090 L.03 OH Kepala Tukang -
0.0030 L.04 OH Mandor -
1.2000 m Pipa PVC 1 1/2" -
35% Ls Perlengkapan - -
Jumlah Harga Upah dan Bahan = - - -
Overhead dan Profit (10%) = - - -
Harga Satuan Pekerjaan = - - -
A.5.1.1.29 1 m Pemasangan pipa PVC tipe AW diameter 2" 117,670.30
0.0540 L.01 OH Pekerja 88,000.00 4,752.00
0.0900 L.02 OH Tukang Batu 93,500.00 8,415.00
0.0090 L.03 OH Kepala Tukang 125,000.00 1,125.00
0.0030 L.04 OH Mandor 100,000.00 300.00
1.2000 m Pipa PVC 2" 56,600.00 67,920.00
35% Ls Perlengkapan 56,600.00 19,810.00
Jumlah Harga Upah dan Bahan = 14,592.00 87,730.00 102,322.00
Overhead dan Profit (10%) = 2,188.80 13,159.50 15,348.30
Harga Satuan Pekerjaan = 16,780.80 100,889.50 117,670.30
A.5.1.1.30 1 m Pemasangan pipa PVC tipe AW diameter 2 ½" -
0.0540 L.01 OH Pekerja -
0.0900 L.02 OH Tukang Batu -
0.0090 L.03 OH Kepala Tukang -
0.0030 L.04 OH Mandor -
1.2000 m Pipa PVC 2½" -
35% Ls Perlengkapan - -
Jumlah Harga Upah dan Bahan = - - -
Overhead dan Profit (10%) = - - -
Harga Satuan Pekerjaan = - - -
A.5.1.1.31 1 m Pemasangan pipa PVC tipe AW diameter 3" 298,085.75
0.0810 L.01 OH Pekerja 88,000.00 7,128.00
0.1350 L.02 OH Tukang Batu 93,500.00 12,622.50
0.0135 L.03 OH Kepala Tukang 125,000.00 1,687.50
0.0040 L.04 OH Mandor 100,000.00 400.00
1.2000 m Pipa PVC 3" 153,140.00 183,768.00
35% Ls Perlengkapan 153,140.00 53,599.00
Jumlah Harga Upah dan Bahan = 21,838.00 237,367.00 259,205.00
Overhead dan Profit (10%) = 3,275.70 35,605.05 38,880.75
Harga Satuan Pekerjaan = 25,113.70 272,972.05 298,085.75
A.5.1.1.32 1 m Pemasangan pipa PVC tipe AW diameter 4" 707,775.55
0.0810 L.01 OH Pekerja 88,000.00 7,128.00
0.1350 L.02 OH Tukang Batu 93,500.00 12,622.50
0.0135 L.03 OH Kepala Tukang 125,000.00 1,687.50
0.0040 L.04 OH Mandor 100,000.00 400.00
1.2000 m Pipa PVC 4" 382,980.00 459,576.00
35% Ls Perlengkapan 382,980.00 134,043.00
Jumlah Harga Upah dan Bahan = 21,838.00 593,619.00 615,457.00
Overhead dan Profit (10%) = 3,275.70 89,042.85 92,318.55
Harga Satuan Pekerjaan = 25,113.70 682,661.85 707,775.55
Kode / Harga Satuan Pekerjaan
No. No. AHSP 2018 Uraian Tenaga dan Bahan Harga Satuan (Rp) Upah (Rp) Bahan (Rp)
Koefisien (Rp)
(1) (2) (3) (4) (5) (6) (7)
1 A.7.1.1.1. -- 1 bh Pemasangan 1 unit septicktank 7,429,000.00
5.6000 OH Pekerja 88,000.00 492,800.00
3.2000 OH Tukang 93,500.00 299,200.00
2.5500 Galian Tanah 104,880.00 267,444.00
0.6400 Urugan sirtu 490,199.00 313,727.36
0.8100 urugan pasir 219,190.00 177,543.90
1.0000 Batu Kosong 488,326.80 488,326.80
25.2000 Pas. Bata 1:5 122,268.00 3,081,153.60
17.1600 Plesteran 1:2 68,216.62 1,170,597.20
0.4500 Pek. Beton 1:2:3 982,686.75 442,209.04
30.0000 Ijuk 20,000.00 600,000.00
1.0000 Pipa Cerobong 50,000.00 50,000.00
1.0000 Pipa PVC AW 4" 45,000.00 45,000.00
Jumlah Harga Upah dan Bahan = 792,000.00 6,636,001.90 7,428,001.90
Dibulatkan = 792,000.00 6,637,000.00 7,429,000.00
Dibulatkan = 792,000.00 6,637,000.00 7,429,000.00
1 A.7.1.1.2. -- m Pemasangan 1 m' saluran keliling bangunan 145,000.00
0.2700 Galian tanah biasa 104,880.00 28,317.60
0.1400 Urugan tanah kembali 26,220.00 3,670.80
0.0700 Urugan pasir 219,190.00 15,343.30
0.2200 Pas. Bata 1:5 122,268.00 26,898.96
1.4500 Pelesteran 1:5 +acian 68,216.62 98,914.10

Jumlah Harga Upah dan Bahan = - 144,827.16 144,827.16


Dibulatkan = - 145,000.00 145,000.00
Dibulatkan = - 145,000.00 145,000.00
HARGA SATUAN UPAH DAN BAHAN

No. Uraian Harga Satuan


(1) (2) (3) (4)

A UPAH
1 Pekerja 88,000.00 OH
2 Tukang Batu 93,500.00 OH
3 Tukang Kayu 93,500.00 OH
4 Tukang Besi 93,500.00 OH
5 Tukang Cat 93,500.00 OH
6 Tukang Las Konstruksi 93,500.00 OH
7 Kepala Tukang 125,000.00 OH
8 Mandor 100,000.00 OH

B BAHAN
B.1 Tanah/Timbunan
1 Pasir urug 136,000.00 m3
2 Pasir pasang 140,000.00 m3
3 Pasir beton 140,000.00 m3
4 Tanah urug 60,000.00 m3
6 Tanah merah 157,300.00 m3

B.2 Bahan Perekat


1 Semen Portland 1,200.00 kg
2 Semen warna 4,000.00 kg
3 Air 200.00 liter
4 Mortar siap pakai 2,250.00 kg

B.3 Batu/Batu Cetakan


1 Batu belah 210,000.00 m3
2 Batu kerikil 313,300.00 m3
3 Koral betonX 265,000.00 m3
4 Batu bata 600.00 buah
5 Bata ringan 12,000.00 buah
6 Batu pecahX 450,300.00 buah
7 Koral sikat 195,000.00 m2
8 Sirtu 334,800.00
No. Uraian Harga Satuan
(1) (2) (3) (4)
B.4 Kayu
1 Kayu sembarang/bekisting 1,700,000.00 m3
2 Kayu papan kelas I 10,581,500.00 m3
3 Kayu papan kelas II 5,792,400.00 m3
3 kayu Papan Ulin pjg 4 m 10,581,500.00 m3
4 Balok kayu ulin 8,428,200.00 m3
7 Balok kayu kelas II 7,803,900.00 m3
9 Kayu kelas III 6,670,200.00 m3
10 Balok kayu 5/7 8,428,200.00 m3
11 Kayu dolken Ø 10-12 cm, p = 7 mx 40,200.00 batang
12 Kayu dolken Ø 8-10 cm, p = 4 m 17,500.00 batang
13 Galam Ø 5-7 cm panjang 4 m (dolken) 6,000.00 batang
14 Penjaga jarak bekisting/spacer 6,500.00 batang
15 Plywood 240 cm × 120 cm × 4 mm 75,000.00 lembar
16 Plywood 240 cm × 120 cm × 9 mm 140,000.00 lembar
17 Papan Bekisting 4,682,800.00 m3
18 List Kayu Profil 5,000.00 m

B.5 Besi dan Aluminium


1 Besi beton polos 12,000.00 kg
2 Kawat besi beton 25,000.0 kg
3 Kusen pintu/jendela aluminium uk. 3" 100,000.00 m
4 List aluminium U 65,000.00 m
5 Paku kayu 27,700.00 kg
7 paku plywood 35,400.00 kg
7 Paku Ulin 37,200.00 kg
8 Paku beton 79,200.00 kg
9 Paku sekrup 35,300.00 kg
10 Paku seng 27,400.00 kg
12 Sekrup fixer 100.00 buah
13 Sealant 17,500.00 kg
14 Besi hollow 40.40.2 mm 6,000.00 m
16 Besi strip 11,650.00 kg
17 Seng plat 46,600.00 m
18 Aluminium komposit panel 200,000.00 m2
20 Besi siku L 30.30.3 mm 13,200.00 kg
21 Besi pelat baja 19,700.00 kg
22 Kawat las 39,000.00 kg
23 Kasau C 75 mm 19,250.00 kg
24 Reng 40 mm 12,750.00 kg
No. Uraian Harga Satuan
(1) (2) (3) (4)
B.6 Langit-Langit
1 GRC board 172,900.00 lembar
2 Calcium silicate 3 mm 96,100.00 lembar
3 Plafon PVC tebal 8 mm 113,750.00 m2
4 Plafon aluminium sprandel tebal 12 cm (termasuk instalasi+rangka) 455,000.00 m2
5 List gypsum profil minimalis tebal 10 cm 22,100.00 m
6 List PVC 23,237.50 m
7 Tepung gypsum 9,360.00 kg

B.7 Penutup Lantai dan Dinding


1 Ubin keramik 40 cm × 40 cm warna 9,800.00 buah
2 Ubin keramik 40 cm × 40 cm tekstur kasar 12,000.00 buah
3 Ubin granit 40 cm × 40 cm 19,200.00 buah
4 Granit keramik 60 cm × 60 cm tekstur 75,000.00 buah
5 Plint ubin 10 cm × 40 cm 5,850.00 buah

B.8 Penutup Atap


1 Rangka atap baja ringan 160,000.00 m2
2 Genteng metal 69,000.00 buah
3 Nok genteng metal 25,000.00 buah
4 Listplank ex Kalsiplank 240 × 30 × 8 mm 45,000.00 buah

B.9 Cat/Minyak/Lem
1 Cat dasar 32,492.00 kg
2 Cat antara 12,450.00 kg
3 Cat tembok interior 36,092.00 kg
4 Cat tembok eksterior 100,000.00 kg
5 Cat besi 77,800.00 kg
6 Cat kayu 39,400.00 kg
7 Plamir 25,000.00 kg
8 Minyak bekisting 5,500.00 liter
10 Cat menie 31,700.00 kg
11 Lem kayu 27,500.00 liter
12 Lem Kayu kg 3,500.00 kg
13 Kuas 15,000.00 buah
14 Pengencer 30,000.00 kg
15 Wood filler 38,870.00 kg
16 Woodstain 169,000.00 kg
17 Sanding 80,600.00 kg
No. Uraian Harga Satuan
(1) (2) (3) (4)
18 Melamic 78,000.00 kg
19 Tiner 13,700.00 liter
20 Ampelas 7,000.00 lembar

B.12 Elektrikal
1 Instalasi pemasangan titik lampu 200,000.00 titik
2 MCB 3 phase 50 ampere 356,821.05 buah
3 Meteran listrik metbelosa 104,000.00 buah
4 Sakelar tunggal 10,100.00 buah
5 Sakelar ganda 13,000.00 buah
6 Stop kontak 11,300.00 buah
7 Kabel NYM Inti 4 Uk 1,5 mm2 12,000.00 m
8 Lighting panel (LP) 2,300,000.00 buah
9 Sub distribution panel (SDP) 9,000,000.00 buah
10 Lampu TKO 2×40 watt 212,000.00 buah
11 Lampu down light 212,300.00 buah
12 Lampu SL 1×18 watt 111,000.00 buah
13 Panel box listrik 600,000.00 buah

B.13 Kusen/Pintu/Jendela/Kaca/Aksesoris
1 Kaca polos tebal 5 mm 130,400.00 m2
2 Kunci tanam 94,100.00 buah
3 Kunci tanam KM 100,000.00 buah
4 Engsel pintu 20,000.00 buah
5 Engsel kupu-kupu 17,500.00 buah
6 Engsel angin 54,000.00 buah
7 Spring knip 37,000.00 buah
8 Kait angin Kuningan 10,000.00 buah
9 Door closer 50,000.00 buah
10 Floor hinge 1,560,000.00 buah
11 Over panel 361,400.00 buah
12 Top patch fitting 165,100.00 buah
13 Bottom patch fitting 176,800.00 buah
14 Bottom patch lock + silinder 1,250,000.00 buah
15 Pull handle 2,250,000.00 buah
16 Pintu Panel Ulin 80x210 775,000.00 buah
17 Daun angin-angin 450,000.00 buah
18 Daun pintu kaca 9 mm rangka aluminium standar 2,472,500.00 buah
19 Daun pintu kaca 9 mm rangka aluminium besar 3,450,000.00 buah
20 Daun jendela kaca 5 mm rangka aluminium standar 546,250.00 buah
21 Kusen dan pintu PVC toilet 500,000.00 buah
22 Rel sliding track PG aluminium 240 cm 455,000.00 m
23 Gerendel jendela kuningan 20,000.00 bh
24 Gerendel Pintu panjang 40,000.00 bh
25 Tarikan jendela 17,500.00 bh
26 Pintu panil kayu meranti uk. 80 x 190 cm 770,000.00 bh
REKAPITULASI ANALISA PEKERJAAN
No. Kode Uraian Pekerjaan Harga Satuan (Rp) Satuan
(1) (2) (3) (4) (5)
A PEKERJAAN PERSIAPAN
1 A.1 Pengukuran dan pemasangan Bouwplank 202,652.66 1m
2 A.1 Pengukuran dan pemasangan Bouwplank 202,652.66 1m
3 A.2 Pembongkaran dinding tembok bata 712,995.40 1 m3
4 A.3 Pembongkaran dinding kayu 13,814.38 1 m2
5 A.4 Pembongkaran Atap dan Plafon 4,144.31 1 m2
B PEKERJAAN TANAH
6 B.1 Penggalian tanah biasa sedalam 1 m 59,160.60 1 m3
7 B.2 Penggalian tanah keras sedalam 1 m 104,880.00 1 m3
8 B.3 Penggalian tanah lumpur sedalam 1 m 126,615.00 1 m3
9 B.4 Pengurugan kembali galian tanah 26,220.00 1 m3
10 B.5 Pengurugan dengan pasir urug 219,190.00 1 m3
11 B.6 Pengurugan situ padat 490,199.00 1 m2
12 B.7 Pengurugan dengan tanah merah 254,293.75 1 m3
13 B.8 Pengurugan dengan tanah urug 247,003.24 1 m3
C PEKERJAAN PONDASI
14 C.1 Pemasangan pondasi batu belah campuran 1 SP : 4 PP 850,310.00 1 m3
15 C.2 Pemasangan batu kosong (anstamping) 488,326.80 1 m3
16 C.3 Pancangan kayu galam Ø8-10 22,630.56 1m
D PEKERJAAN BETON
17 D.1 Membuat lantai kerja beton mutu f'c = 7,4 MPa (K-100), slump (3-6) cm, w/c = 0,87 909,043.87 1 m3
18 D.2 Membuat beton mutu f'c = 19,3 MPa (K-225), slump (12±2) cm, w/c = 0,58 1,143,862.02 1 m3
19 D.3 Pembesian dengan besi polos 16,528.95 1 kg
20 D.4 Pemasangan bekisting untuk pondasi 404,326.20 1 m2
21 D.5 Pemasangan bekisting untuk sloof 442,679.85 1 m2
22 D.6 Pemasangan bekisting untuk kolom 359,401.80 1 m2
23 D.7 Pemasangan bekisting untuk balok 386,325.25 1 m2
24 D.8 Pemasangan bekisting untuk lantai 357,188.28 1 m2
25 D.9 Pemasangan bekisting untuk dinding 411,260.70 1 m2
26 D.10 Pemasangan bekisting untuk tangga 329,272.03 1 m2
27 D.11 Membuat kolom praktis beton bertulang (11 × 11) cm 107,556.17 1m
28 D.12 Membuat ring balok beton bertulang (10 × 15) cm 134,339.09 1m
E PEKERJAAN BESI DAN ALUMINIUM
29 E.1 Pemasangan kusen pintu aluminium 137,772.30 1m
30 E.2 Pemasangan talang 1/2 lingkaran dia. 15 cm, seng plat BJLS 30 lebar 45 cm 115,956.80 1m
31 E.3 Pemasangan rangka besi hollow 1 × 40.40.2 mm, modul 60 × 60 cm, untuk plafon 114,655.00 1 m2
F PEKERJAAN PASANGAN DINDING
32 F.1 Pemasangan dinding bata ringan tebal 7,5 cm campuran 1 SP : 3PP 387,299.30 1 m2
33 F.2 Pemasangan dinding bata merah 5×11×22 cm tebal ½ batu campuran 1 SP : 4 PP 122,268.00 1 m2
34 F.0 Pemasangan dinding bata merah (5 × 11 × 22) cm tebal 1 batu campuran 1 SP : 2 PP 265,190.00 1 m2
G PEKERJAAN PLESTERAN
35 G.2 Pemasangan plesteran 1 SP : 4 PP tebal 15 mm 64,803.88 1 m2
36 G.3 Pemasangan acian 62,845.20 1 m2
37 H.1 Pemasangan lantai ubin warna ukuran 40 cm×40 cm 38,065.00 1 m2
H PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
38 H.2 Pemasangan lantai ubin warna ukuran 30 cm × 30 cm 103,755.88 1 m2
39 H.3 Pemasangan lantai ubin warna ukuran 20 cm × 20 cm 103,755.88 1 m2
40 H.4 Pemasangan plint ubin warna ukuran 10 cm × 40 cm 40,998.08 1m
41 H.5 Pemasangan lantai ubin teralux marmer ukuran 60 cm × 60 cm 340,653.00
I PEKERJAAN LANGIT-LANGIT (PLAFON)
42 I.1 Pemasangan langit-langit gypsum board ukuran (120×240×) mm, tebal 3 mm 65,283.78 m2
43 I.3 Pemasangan 1 m’ list langit-langit kayu profil 42,031.35 1m
44 J.1 Pemasangan genteng metal ukuran 80 × 100 atap pelana 167,497.50 1 m2
45 J.2 Pemasangan genteng metal ukuran 80 × 100 atap jurai 197,616.00 1 m2
J PEKERJAAN PENUTUP ATAP
46 J.3 Pemasangan nok genteng metal 78,297.75 1m
47 J.4 Pemasangan listplank ukuran (3 × 30) cm 103,597.75 1m
48 K.1 Pembuatan dan pemasangan kusen pintu , kayu kelas I 14,041,666.75 1 m3
49 K.2 Pekerjaan Rangka Bawah Ulin Pjg 4 meter 13,024,923.00 1 m3
K PEKERJAAN KAYU
50 K.3 Pekerjaan Rangka Bawah Ulin Pjg 2 meter 12,235,183.50 1 m3
51 K.4 Pekerjaan Rangka Badan Ulin 13,153,263.00 1 m3
52 K.5 Pekerjaan Rangka Badan Ulin Kayu Kelas II dan III 12,363,523.50 1 m3
53 K.6 Pemasangan 1 m2 dinding pemisah plywood rangkap. rangka kayu kelas II 305,342.25 1 m3
54 K.7 Pekerjaan Lantai Papan ulin pjg 4 m kelas 1 187,390.20 1 m3
55 K.8 Pasangan tongkat ulin 10/10 cm tinggi 3,8 m 524,091.34 1 btg
56 K.9 Pasangan suai 5/7 13,669,716.50 1 m3
57 K.10 Pasangan sloof dan gelagar 13,343,473.00 1 m3
58 K.11 Pemasangan 1m2 Dinding papan kayu kelas II dan III 239,957.16 1 m2
59 L.1 Pemasangan kunci tanam biasa 170,752.00 1 bh
60 L.2 Pemasangan kunci kamar mandi 176,801.00 1 bh
No. Kode Uraian Pekerjaan Harga Satuan (Rp) Satuan
(1) (2) (3) (4) (5)
M PEKERJAAN PENGECATAN
50 M.1 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 51,847.91 1 m2
51 M.2 Pengecatan tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) interior 27,451.79 1 m2
52 M.3 Pengecatan tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) eksterior 46,560.28 1 m2

K PEKERJAAN KAYU
53 K.6 Pemasangan 1 m2 dinding pemisah plywood rangkap. rangka kayu kelas II 170,752.00 1 m3
54 K.7 Pekerjaan Lantai Papan ulin pjg 4 m kelas 1 176,801.00 1 m3
55 K.8 Pasangan tongkat ulin 10/10 cm tinggi 3,8 m 42,895.00 1 btg
56 K.9 Pasangan suai 5/7 33,384.50 1 m3
57 K.10 Pasangan sloof dan gelagar 97,462.50 1 m3
58 K.11 Pemasangan 1m2 Dinding papan kayu kelas II dan III 36,794.25 1 m2
59 L.1 Pemasangan kunci tanam biasa 123,855.00 1 bh
60 L.2 Pemasangan kunci kamar mandi 184,851.00 1 bh
L PEKERJAAN KUNCI DAN KACA
61 L.3 Pemasangan engsel pintu 51,847.91 1 bh
62 L.4 Pemasangan engsel jendela kupu-kupu 27,451.79 1 bh
63 L.5 Pemasangan engsel angin 46,560.28 1 bh
N LAIN - LAIN
64 N.1 Pemasangan kusen kayu daun Pintu kayu meranti P1 4,307,000.00 1 bh
65 N.2 Pemasangan kusen daun kayu J1 3,842,000.00 1 bh
66 N.3 Pemasangan kusen daun kayu J2 5,833,000.00 1 bh
67 N.4 Pemasangan kusen kayu daun Pintu kayu meranti P2 6,818,000.00 1 bh
68 N.5 Ventelasi & Jendela Alimunium 1,867,000.00 1 bh
M SANITASI
69 K.3 Pemasangan bak mandi batu bata volume 0,30 m3 2,229,045.00 1 bh
70 K.4 Pemasangan kloset jongkok porselen 870,090.00 1 bh
71 K.5 Pemasangan urinoir 953,649.00 1 bh
72 K.6 Pemasangan wastafel 1,622,191.15 1 bh
73 K.8 Pemasangan floor drain 64,147.00 1 bh
74 K.9 Pemasangan pipa PVC tipe AW diameter ½" 64,662.20 1 bh
75 K.10 Pemasangan pipa PVC tipe AW diameter 2" 117,670.30 1 bh
76 K.11 Pemasangan pipa PVC tipe AW diameter 4" 707,775.55 1 bh
77 Paving Blok 264,989.90 m2
78 Pemasangan Kran Air 113,740.75 1 bh
79 Pemasangan 1 unit septicktank 7,429,000.00
80 Pemasangan 1 m' saluran keliling bangunan 145,000.00
REKAPITULASI
Pekerjaan : Sarana Toilet Umum RTH Tapin
Lokasi : Kab. Tapin
Tahun Anggaran : 2018

No. Uraian Pekerjaan Harga (Rp) Keterangan


(1) (2) (3) (4)

A PEKERJAAN PERSIAPAN 2,084,000.00


B PEKERJAAN STRUKTURAL 86,922,320.70
C PEKERJAAN ATAP 13,874,042.00
D PEKERJAAN DINDING DAN PEREKAT 18,798,748.00
E PEKERJAAN LANGIT-LANGIT 6,193,129.00
F PEKERJAAN PENUTUP LANTAI DAN DINDING 31,899,634.01
G PEKERJAAN KUSEN PINTU, JENDELA DAN KELENGKAPANN 33,702,000.00
H PEKERJAAN SANITASI & UTILITAS 48,509,809.80
I PEKERJAAN FINISHING 16,630,331.00
J PEKERJAAN ELEKTRIKAL 4,418,421.00
PEKERJAAN HALAMAN 33,334,254.20
JUMLAH = 296,366,689.72
PPn 10% 326,003,358.69
Banjarmasin, 2018
Konsultan Perencana
RENCANA ANGGARAN BIAYA (RAB)
Pekerjaan : Sarana Toilet Umum RTH Tapin
Lokasi : Kab. Tapin
Tahun Anggaran : 2018

No. Uraian Pekerjaan Kode Analisa Volume Harga Satuan (Rp) Jumlah Harga (Rp)

(1) (2) (3) (4) (5) (6)

A PEKERJAAN PERSIAPAN
1 Uitzen, pembersihan dan pengukuran lapangan -- 1.00 Ls 750,000.00 750,000.00
2 Papan nama proyek -- 1.00 Ls 334,000.00 334,000.00
3 Pemasangan bouwplank -- 1.00 Ls 1,000,000.00 1,000,000.00
Jumlah 2,084,000.00
B PEKERJAAN STRUKTURAL
Sub Struktur
Pekerjaan Pondasi
1 Galian Tanah pondasi B.2 21.93 m3 104,880.00 2,300,018.00
2 Tanah Urug B.8 30.60 m3 247,003.24 7,558,299.00
3 Pasir Urug bawah pondasi B.5 5.81 m3 219,190.00 1,272,398.00
4 Pondasi batu kali C.1 18.92 m3 850,310.00 16,087,865.00
5 Pasangan Batu Kosong (Anstamping) C.2 5.81 m3 488,326.80 2,834,737.00
6 Pondasi Poer (P1) 80 x 80
Beton D.2 0.77 m3 1,143,862.02 878,486.00
Besi D.3 7.20 kg 16,528.95 119,079.00
Bekisting D.4 9.60 m2 404,326.20 3,881,532.00
7 Pondasi poer (P2) 80 x 120 -
Beton D.2 0.77 m3 1,143,862.02 878,486.00
Besi D.3 8.68 kg 16,528.95 143,536.00
Bekisting D.4 9.60 m2 404,326.20 3,881,532.00
8 Pasir Urug bawah poer 10 cm B.5 0.94 m3 219,190.00 205,162.00
9 Lantai Kerja 5 cm D.1 0.47 m3 909,043.87 425,433.00
10 Rollag Bata F.0 16.26 m2 265,190.00 4,311,989.00
11 Sloof 20/25 -
Beton D.2 m3 1,143,862.02 -
Besi D.3 kg 16,528.95 -
Bekisting D.5 m2 442,679.85 -
Jumlah 44,778,552.00
Pekerjaan Beton
1 Kolom 20/20
Beton D.2 1.30 m3 1,143,862.02 1,482,445.18
Besi D.3 152.70 kg 16,528.95 2,523,894.00
Bekisting D.6 10.80 m2 359,401.80 3,881,539.00
2 Kolom 20/60
Beton D.2 0.58 m3 1,143,862.02 658,864.52
Besi D.3 188.99 kg 16,528.95 3,123,842.00
Bekisting D.6 11.52 m2 329,272.03 3,793,214.00
3 Balok 20/30
Beton D.2 0.72 m3 1,143,862.02 823,581.00
Besi D.3 117.02 kg 16,528.95 1,934,300.00
Bekisting D.7 9.60 m2 386,325.25 3,708,722.00
4 Ring balk
Beton D.2 0.17 m3 1,143,862.02 192,169.00
Besi D.3 26.18 kg 16,528.95 432,739.00
Bekisting D.7 3.08 m2 386,325.25 1,189,882.00
5 Dak Beton
Beton D.2 1.15 m3 1,143,862.02 1,310,866.00
Besi D.3 264.93 kg 16,528.95 4,378,952.00
Bekisting D.8 35.58 m2 357,188.28 12,708,759.00
Jumlah 42,143,768.70
Jumlah Pekerjaan Struktural 86,922,320.70
C PEKERJAAN ATAP
1 Rangka Atap Baja Ringan -- 46.24 m2 160,000.00 7,398,400.00
2 Penutup atap genteng metal J.1 46.24 m2 78,297.75 3,620,488.00
3 Lisplank kalsiplank tebal 8 mm' J.4 27.56 m 103,597.75 2,855,154.00
Jumlah 13,874,042.00
No. Uraian Pekerjaan Kode Analisa Volume Harga Satuan (Rp) Jumlah Harga (Rp)

(1) (2) (3) (4) (5) (6)


D PEKERJAAN DINDING DAN PEREKAT
1 Dinding Bata ringan 1/2 batu campuran 1 : 4 F.2 58.01 m2 122,268.00 7,092,155.00
2 Plesteran G.2 116.01 m2 62,845.20 7,290,672.00
3 Acian G.3 116.01 m2 38,065.00 4,415,921.00
Jumlah 18,798,748.00
E PEKERJAAN LANGIT-LANGIT
1 Rangka plafon besi hollow uk. 40.40.2 mm E.3 24.00 m2 114,655.00 2,751,720.00
2 Plafond Kalsiboard 3,5 mm I.1 24.00 m2 65,283.78 1,566,811.00
3 List plafon dalam gypsum tebal 10 cm I.2 44.60 m 42,031.35 1,874,598.00
Jumlah 6,193,129.00
F PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Urugan Pasir bawah lantai B.5 4.932 m3 219,190.00 1,081,045.08
2 cor beton tumbuk
Beton D.2 3.93 m3 1,143,862.02 4,496,750.38
Besi D.3 264.93 kg 16,528.95 4,378,951.73
Bekisting D.8 35.58 m2 357,188.28 12,708,758.82
3 Pasangan Keramik dinding D.3 37.60 m2 103,755.88 3,901,221.00
4 Pemasangan lantai ubin warna ukuran 30 cm × 30 cm H.2 12.00 m2 103,755.88 1,245,071.00
5 Pemasangan Lantai Granite 60 x 60 H.5 12.00 m2 340,653.00 4,087,836.00
Jumlah 31,899,634.01
G PEKERJAAN KUSEN PINTU, JENDELA DAN KELENGKAPANNYA
1 Jendela + ventilasi frame alumunium N.2 6.00 buah 1,867,000.00 11,202,000.00
2 Pintu PVC Toilet 6.00 buah 3,750,000.00 22,500,000.00
Jumlah 33,702,000.00
H PEKERJAAN SANITASI & UTILITAS
1 Kran Air 6.00 buah 113,740.75 682,444.50
2 Bak Air K.3 4.00 buah 2,229,045.00 8,916,180.00
3 Pemasangan closet jongkok K.4 4.00 buah 870,090.00 3,480,360.00
4 Pemasangan wastafel K.6 3.00 buah 1,622,191.15 4,866,573.45
5 Pemasangan urinoir K.5 2.00 buah 953,649.00 1,907,298.00
6 Instalasi Air bersih K.9 24.00 m 64,662.20 1,551,892.80
7 Instalasi Air kotor K.11 15.00 m 707,775.55 10,616,633.25
8 Septictank 1.00 unit 7,429,000.00 7,429,000.00
9 Instalasi Air bekas K.10 26.00 m 117,670.30 3,059,427.80
10 Tandon Air Stenless 2.00 Unit 3,000,000.00 6,000,000.00
Jumlah 48,509,809.80
I PEKERJAAN FINISHING
1 Pengecatan dinding bata interior M.2 58.01 m2 27,451.79 1,592,341.00
2 Pengecatan dinding bata eksterior M.3 44.01 m2 46,560.28 2,048,885.00
3 Pengecatan kusen kayu M.1 10.88 m2 51,847.91 564,105.00
4 Pasangan Dinding batu alam bata façade 21.84 m2 350,000.00 7,644,000.00
5 Kaca Watafel + meja 1.90 m 1,990,000.00 3,781,000.00
6 Vegetasi depan tolilet 1.00 ls 1,000,000.00 1,000,000.00
Jumlah 16,630,331.00
J PEKERJAAN ELEKTRIKAL
1 Instalasi pemasangan titik lampu -- 10.00 titik 150,000.00 1,500,000.00
2 MCB 3 phase 50 ampere -- 1.00 unit 356,821.05 356,821.00
5 Lampu LED -- 8.00 unit 212,300.00 1,698,400.00
Lampu TL-D 18 W 2.00 unit 212,300.00 424,600.00
6 Sakelar ganda -- 4.00 unit 104,000.00 416,000.00
8 Stop kontak -- 2.00 unit 11,300.00 22,600.00
Jumlah 4,418,421.00
Total 263,032,435.51
BACK UP RUANG KELAS
No. Uraian Pekerjaan Pekerjaan Perhitungan Volume Volume
Panjang Lebar
Pengukuran dan Pemasangan Bowplank dan
1
Persiapan

2 Fondasi
Panjang Lebar Bawah Lebar Atas Tinggi Jumlah Luas
Galian Tanah 43.00 0.90 0.30 0.85 1.00 0.51 21.93

Tanah Urug 6.00 6.00 0.85 1.00 30.60

Pasir Urug bawah pondasi 43.00 0.90 0.15 1.00 5.81

Pasangan batu kosong 43.00 0.90 0.15 1.00 5.81

Pondasi Batu Gunung 43.00 0.80 0.30 0.80 1.00 18.92

Pasangan Rollag 16.26


Panjang lebar bawah jumlah Tinggi Volume
0.94
Pasir Urug Bawah Pondasi (poer kecil) 0.90 0.90 6.00 0.10 0.49 0.49
0.90 1.25 4.00 0.10 0.45 0.45

0.47
Lantai Kerja Bawah Pondasi 0.90 0.90 6.00 0.05 0.24
0.90 1.25 4.00 0.05 0.23

Panjang Lebar Tinggi Volume Jumlah Jumlah Panjang


Pondasi Poer 100/100 0.80 0.80 0.20 0.13 6.00 0.77 0.77
0.80 1.20 0.20 0.19 4.00 0.77 0.77

Panjang Lebar Jumlah 16.00


Kayu galam (poer besar) 4.00 4.00 1.00 16.00

Panjang Lebar Tinggi Volume jumlah Total Pjg Kseluruhan


3 Sloof 20/25 86.00 0.20 0.25 4.300 4.30

4 Balok Lantai
Balok 20/30 12.00 0.20 0.30 0.720 - 0.72

4 Kolom
Panjang Lebar Tinggi Volume Jumlah
a Neut 30/30 (N1) 0.30 0.30 0.70 0.06 24.00 1.51 1.51
Neut 20/20 (N2) 0.20 0.20 0.70 0.03 7.00 0.20 0.20
b Kolom 20/30 (K1) 0.20 0.30 3.60 0.22 6.00 1.30
Kolom 20/60(K2) 0.20 0.20 3.60 0.14 4.00 0.58

5 Ringbalk 15/20
Panjang Lebar Tinggi Volume Jumlah
5.60 0.15 0.20 0.17 0.17

6 Dinding Bata Panjang Tinggi Luas Jumlah Luasan Kusen Luasan Kolom
a Depan 6.00 4.40 26.40 1.00 11.04 15.36
b Belakang 6.00 3.35 20.10 1.00 5.06 15.05
c Samping 3.40 4.00 6.80 2.00 13.60
d Dalam 2.00 3.50 7.00 2.00 14.00
4.00 3.50 14.00 1.00 14.00
Jumlah 58.01

7 Plesteran 58.01

8 Acian Dinding 58.01

9 Lantai Pajang Lebar Tebal Luasan


Cor Plat Lantai t=12 cm 24.00 9.00 0.12 25.92 25.92
8.00 3.00 0.12 2.88 2.88
Cor dak Beton 11.46 0.1 1.15 1.15
28.80
Pasangan Keramik 24.00 9.00 216.00 216.00
8.00 3.00 24.00 24.00
240.00
10 Plafond Panjang Lebar Luas Jumlah
Plafond plywood hollow uk 4 x 4 m tebal 2 mm 24.10 9.73 33.83 67.66
2.58 10.00 12.58 25.16
- - - - -
Jumlah 92.82

11 List Plafond Panjang Lebar


a List gypsum (plafond dalam) 78.52 - - - 78.52
- - - 1.00 -
Jumlah 78.52
BACK UP RUANG KELAS
No. Uraian Pekerjaan Pekerjaan Perhitungan Volume Volume
12 Kusen Panjang Lebar Tinggi Jumlah
a Pintu P1
Kusen 2.3 0.8 1.84 6 11.040
b Jendela type J1 1.25 0.450 0.56 6.00 3.375
kusen Ventilasi 2/3 0.40 0.300 0.12 14.00 1.680
Pintu Toilet

13 Cat Tembok Panjang Lebar Luas Jumlah Kusen


a Cat Depan 15.36 30.72
Cat Belakang 15.05 30.09
Cat Samping 13.60 27.20
Cat samping dalam 14.00 28.00
116.01

14 Cat Minyak Panjang Lebar Luas Jumlah Jumlah kusen


1 Kusen P1 -
Daun Pintu 6.00
Ventilasi #REF!
-
2 Kusen P1 -
Daun Pintu #REF!
Ventilasi 0.34
-
3 Kusen J1 -
Daun jendela #REF!
Ventilasi #REF!
-
4 Kusen J2 -
Daun Jendela #REF!
Ventilasi 1.68
#REF!
15 Cat Plafond Panjang Lebar Luas Jumlah
Plafond plywood ukuran 124 cm x 60 cm 7.00 8.00 56.00 3.00 168.00
Plafond plywood ukuran 124 cm x 60 cm 7.00 10.00 70.00 1.00 70.00
Plafond plywood ukuran 124 cm x 60 cm 24.00 1.00 24.00 1.00 24.00
Plafond plywood ukuran 124 cm x 60 cm 7.00 0.80 5.60 2.00 11.20
Plafond plywood ukuran 124 cm x 60 cm 24.00 2.73 65.52 1.00 65.52
Plafond plywood ukuran 124 cm x 60 cm 2.58 10.00 25.80 1.00 25.80
364.52

16 Atap Panjang Lebar


Penutup atap 26.15 12.50 326.88
Penutup atap 7.80 11.74 91.57
418.45
Panjang
Listplank 68.93 68.93

Rangka atap baja ringan Kuda-kuda


Panjang Lebar
26.15 12.50 418.45
BACK UP RUANG KELAS
Satuan

Ls

m3

m3

m3

m3

m3

m2

m3

m3

m3
m3

btg

m3

m3

m3
m3
m3
m3

m3

m2
m2
m2

m2

m2

m2

m3

m2

m2

m2
m2

m
m
m
BACK UP RUANG KELAS
Satuan

m2
m2
m2

m2
m2
m2

m2
bh
m3

m2
bh
m3

bh
m3

bh
m3

m2

m2

m2
m2
m2

m'

m2
m2
RINCIAN BERAT PEMBESIAN
BETON TULANGAN UTAMA TULANGAN SENGKANG UTAMA M3 BERAT BERAT CEK
No. UNIT PEKERJAAN B H T VOL Jarak P JLH dia. FB KG Panjang Jarak Jumlah dia. FB KG + BETON BESI (KG) BESI KUBIKASI
cm mm. kg/m Sengkang cm Sengkang mm. kg/m SENGKANG MAX BESI

A Bangunan Kelas
2 Poer 80/80 0.80 0.80 0.25 0.16 15.00 0.25 6.00 13 1.042 1.56 3.05 12.5 3.00 10 0.617 5.64 7.20 1 45 200 OK Pokok D 13, Senglang 10 polos
2 Poer 80/120 0.80 1.20 0.25 0.24 15.00 0.25 6.00 13 1.042 1.56 3.85 12.5 3.00 10 0.617 7.12 8.68 1 36 200 OK Pokok D 13, Senglang 10 polos

3 Balok sloof 20/25 0.20 0.25 86.00 4.30 86.00 7.00 12 0.888 534.46 0.75 15 575.00 8 0.395 170.16 704.63 1 164 200 OK

4 Balok Lantai 20/30 0.20 0.30 12.00 0.72 12.00 7.00 12 0.888 74.58 0.85 15 81.00 10 0.617 42.45 117.02 1 163 200 OK

6 Kolom 20/30 0.20 0.30 21.60 1.30 21.60 4.00 12 0.888 76.71 0.85 15 145.00 10 0.617 75.99 152.70 1 118 300 OK
7 Kolom 20/60 0.20 0.60 14.40 1.73 14.40 8.00 12 0.888 102.28 1.45 15 97.00 10 0.617 86.72 188.99 1 109 300 OK

8 Neut 30/30 0.30 0.30 19.20 1.73 19.20 6.00 12 0.888 102.28 1.05 15 129.00 10 0.617 83.51 185.79 1 108 300 OK #REF!
9 Neut 20/20 0.30 0.30 5.60 0.50 5.60 4.00 12 0.888 19.89 1.05 15 39.00 10 0.617 25.25 45.13 1 90 300 OK #REF!

10 Ring Balk 15/20 0.15 0.20 5.60 0.17 5.60 4.00 12 0.888 19.89 0.55 20 29.00 8 0.395 6.29 26.18 1 156 200 OK

11 Plat Lantai tebal 10 cm 5.73 6 0.12 4.13 15.00 6.17 40.00 10 0.617 152.16 5.90 20.0 31.00 10 0.617 112.76 264.93 1 64 150 OK

Besi dia. 8 = 0.395 285


Besi dia. 6 = 0.222
1 mm 0.1 cm
1m 100 cm
1 cm 10 mm
* FS) FAKTOR MAKSIMAL BERAT BETON 1M3 :

1M3 Pondasi beton bertulang 150 kg besi + bekisting


1M3 Sloof beton bertulang 200 kg besi + bekisting
1M3 Kolom beton bertulang 300 kg besi + bekisting
1M3 Balok beton bertulang 200 kg besi + bekisting
1M3 Plat beton bertulang 150 kg besi + bekisting
RINCIAN BEKISTING

BETON BEKISTING
Tnggi/
NO. URAIAN PEKERJAAN Jumlah B H panjang Vol 1 M3 Luas B Luas H Jumlah Jumlah Keperluan Keperluan Total Luas Total Satuan
n Beton M2 M2 B H Bekisting B Bekisting H Bekisting Bekisting

B Bangunan Kelas
1 Poer 80/80 6 0.8 0.8 0.30 1.15 0.87 0.64 0.24 1 4 0.64 0.96 9.6 8.33 M2
1 Poer 80/120 4 0.8 1.2 0.30 1.15 0.87 0.96 0.36 1 4 0.96 1.44 9.6 8.33 M2

2 Sloof 20/25 1 0.2 0.25 86.00 4.30 0.23 17.20 21.50 1 2 17.20 43.00 30.1 7.00 M2

3 Kolom 20/30(K1) 6 0.2 0.3 3.6 1.30 0.77 0.72 1.08 1 1 0.72 1.08 10.8 8.33 M2
4 Kolom 20/60(K2) 4 0.2 0.6 3.6 1.73 0.58 0.72 2.16 1 1 0.72 2.16 11.5 6.67 M2

5 Ring Balk 15/20 1 0.15 0.2 5.60 0.17 5.95 0.84 1.12 1 2 0.84 2.24 3.1 18.33 M2

6 Balok Lantai 20/30 1 0.2 0.3 12.00 0.72 1.39 2.40 3.60 1 2 2.40 7.20 9.6 13.33 M2

8 Plat Lantai 1 5.73 6 0.20 6.45 0.16 34.38 1.20 1 1 34.38 1.20 35.6 5.52 M2
RENCANA ANGGARAN BIAYA

PEKERJAAN : PAVING HALAMAN


LOKASI : RANTAU, KAB. TAPIN
TAHUN ANGGARAN : 2018

HARGA
NO URAIAN PEKERJAAN ANALISA VOLUME SATUAN SATUAN
(Rp)
1 2 3 4 5 6

I PEKERJAAN TANAH
1 Pek.Pasir Urug bawah bata press SNI-ABK. A.2.3.1.11 8.09 M³ 219,190.00

Sub Jumlah

II PEKERJAAN PASANGAN
1 Pemasangan Bata Press (Paving Block) SNI-ABK.012 60.80 M² 264,989.90

Sub Jumlah

III PEKERJAAN COR BETON


1 Cor beton Pengunci bata press tebal 25cm SNI-ABK. A.2.3.1.11. 8.09 M³ 1,143,862.02
2 Pekerjaan bekisting beton SNI-ABK. A.4.1.1.24. 4.68 M² 357,188.28

Sub Jumlah
IV PEKERJAAN DRAINASE
1 Drainase sekeliling bangunan A.7.1.1.2. 31.20 M 145,000.00

Sub Jumlah
JUMLAH TOTAL
JUMLAH
HARGA
(Rp)
7

1,773,269.02

1,773,269.02

16,111,385.92

16,111,385.92

9,253,958.14
1,671,641.13

10,925,599.26

4,524,000.00

4,524,000.00

33,334,254.20

Anda mungkin juga menyukai