Anda di halaman 1dari 64

JADWAL PELAKSANAAN KEGIATAN

Program : PROGRAM SANITASI PERDESAAN PADAT KARYA


Pekerjaan : PEMBANGUNAN SEPTICTANK KOMUNAL
Lokasi : DESA LUBAK MANIS
Sumber Dana : APBN TA. 2019
JUMLAH HARGA September Oktober November Desember
NO URAIAN PEKERJAAN Bobot % Keterangan
(Rp.) 1 2 3 4 1 2 3 4 1 2 3 4 1 2

B PEMBUATAN SEPTICTANK 308,700,295 88.200 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30 6.30

C PEKERJAAN SANITAIR 23,799,705 6.800 2.27 2.27 2.27

D OPERSIONAL 17,500,000 5.00 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36 0.36

- - - -
Bobot Rencana 350,000,000 100.00 6.66 6.66 6.66 6.66 6.66 6.66 6.66 6.66 6.66 6.66 8.92 8.92 8.92 6.66
Bobot Komulatif 350,000,000 6.66 13.31 19.97 26.63 33.29 39.94 46.60 53.26 59.91 66.57 75.50 84.42 93.34 100.0
Malinau ….Agustus 2019

TFL TEKNIK TFL PEMBERDAYAAN KETUA


KSM "LUBAK MANIS"

WAHYU HARUM, ST DENYANA NASUTION, ST LAZARUS


REKAPITULASI RENCANA ANGGARAN BIAYA
(ENGINEER ESTIMATE)

Program : PROGRAM SANITASI PERDESAAN PADAT KARYA


Pekerjaan : PEMBANGUNAN SEPTICTANK KOMUNAL
Lokasi : DESA LUBAK MANIS
Sumber Dana : APBN TA. 2019

NO. URAIAN PEKERJAAN JUMLAH HARGA SATUAN TOTAL PEKERJAAN

1 2 3 4 5

A PEMBUATAN SEPTICTANK 6 UNIT Rp. 51,450,049.17 Rp. 308,700,295


B PEKERJAAN SANITAIR 6 UNIT 23,799,705
C BOP 5% Rp. 17,500,000
D Rp.
I JUMLAH TOTAL Rp. 350,000,000
II JUMLAH TOTAL FISIK Rp. 350,000,000
III PEMBULATAN Rp.
TERBILANG :

Malinau. Agustus 2019

Di Periksa oleh :
TFL TEKNIK TFL PEMBERDAYAAN KETUA
KSM "LUBAK MANIS"

WAHYU HARUM, ST DENYANA NASUTION, ST LAZARUS

Disetujui Oleh
PPK PSPLP
SATKER PELAKSANAAN
PRASARANA PEMUKIMAN WILAYAH
KALIMANTAN UTARA

BRETLY DAVID MUNTUAN, ST


NIP. 1974408152009111001
RENCANA ANGGARAN BIAYA
(ENGINEER ESTIMATE)

Program : PROGRAM SANITASI PERDESAAN PADAT KARYA


Pekerjaan : PEMBANGUNAN SEPTICTANK KOMUNAL
Lokasi : DESA LUBAK MANIS KEC. MALINAU UTARA KAB. MALINAU
Sumber Dana : APBN TA. 2019

A PEKERJAAN PERSIAPAN
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN VOLUME/SATUAN
( Rp. ) ( Rp. )
a b c d e = (c x d)
1 Pekerjaan Pengukuran dan Pemasangan Bowplank 4.00 M' 67,290.00 269,160.00
2 Papan Nama Proyek 1.00 Bh 250,000.00 250,000.00

Jumlah 519,160.00

B PEKERJAAN TANAH
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN VOLUME/SATUAN
( Rp. ) ( Rp. )
a b c d e = (c x d)
1 Galian Tanah 3.00 M3 99,000.00 297,000.00
2 Urugan pasir bawah Lantai 3.60 M3 189,000.00 680,400.00
3 Urugan kembali 0.10 M3 55,000.00 5,500.00

Jumlah 982,900.00

C PEKERJAAN PONDASI
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN VOLUME/SATUAN
( Rp. ) ( Rp. )
a b c d e = (c x d)
1 Tiang Pancang ulin 10cm x 10cm - 2 meter 3.00 M' 200,000.00 600,000.00

Jumlah 600,000.00

D PEKERJAAN BETON
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN VOLUME/SATUAN
( Rp. ) ( Rp. )
a b c d e = (c x d)
1 Beton lantai Kerja 1 : 3 : 5, T = 10 cm
a. Cor Beton 0.30 M3 1,535,555.00 460,666.50
2 Beton Kolom (15 x 15)
a. Cor beton 1 : 2 : 3 0.14 M3 1,625,400.00 219,429.00
b. Pembesian 31.85 Kg 108,035.00 3,440,890.14
c. Pasang begisting 12.60 M2 351,500.00 4,428,900.00
a. Cor beton 1 : 2 : 3 0.09 M3 1,625,400.00 146,286.00
b. Pembesian 9.51 Kg 108,035.00 1,027,576.86
c. Pasang begisting 2.10 M2 191,300.00 401,730.00
a. Cor beton 1 : 2 : 3 0.16 M3 1,625,400.00 256,000.50
b. Pembesian 20.64 Kg 108,035.00 2,229,969.69
c. Pasang begisting 2.00 M2 351,500.00 703,000.00
a. Cor beton 1 : 2 : 3 2.38 M3 1,625,400.00 3,874,619.37
b. Pembesian 150.00 Kg 108,035.00 16,205,250.00
c. Pasang begisting 20.12 M2 351,500.00 7,070,951.40
6 beton Plat Dudukan Filter T = 5 cm
a. Cor beton 1 : 2 : 3 0.10 M3 1,625,400.00 156,038.40
b. Pembesian 4.17 Kg 108,035.00 450,897.31
c. Pasang begisting 0.68 M2 351,500.00 239,020.00

Jumlah 35,777,595.17

Page 3 of 64
RENCANA ANGGARAN BIAYA
(ENGINEER ESTIMATE)

Program : PROGRAM SANITASI PERDESAAN PADAT KARYA


Pekerjaan : PEMBANGUNAN SEPTICTANK KOMUNAL
Lokasi : DESA LUBAK MANIS KEC. MALINAU UTARA KAB. MALINAU
Sumber Dana : APBN TA. 2019

E PEKERJAAN DINDING DAN PLESTERAN


HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN VOLUME/SATUAN
( Rp. ) ( Rp. )
a b c d e = (c x d)
1 Pasangan Dinding 1/2 Bata 1Pc : 2Ps 12.00 M2 207,145.00 2,485,740.00
2 Plesteran dinding Bata 1Pc : 2Ps + acian 40.00 M2 73,025.60 2,921,024.00

Jumlah 5,406,764.00

F PEKERJAAN MANHOLE & BAK KONTROL


HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN VOLUME/SATUAN
( Rp. ) ( Rp. )
a b c d e = (c x d)
1 Manhole Ø 40 1.00 Bh 1,600,000.00 1,600,000.00
2 Pengadaan Filter Bakteri 700.00 Bh 5,000.00 3,500,000.00
3 Pembuatan Bak Kontrol 3.00 bh 1,000,000.00 3,000,000.00

Jumlah 8,100,000.00

G PEKERJAAN PENGECATAN
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN VOLUME/SATUAN
( Rp. ) ( Rp. )
a b c d e = (c x d)
1 Pengecatan SEPTIKTANK 3.00 M2 21,210.00 63,630.00

Jumlah 63,630.00

H PEKERJAAN SANITAIR
HARGA SATUAN JUMLAH
NO. URAIAN PEKERJAAN VOLUME/SATUAN
( Rp. ) ( Rp. )
a b c d e = (c x d)
1 Pekerjaan Pipa Induk
a. Pasangan Pipa PVC Ø 3" 102.00 Lonjor 166,100.00 16,942,200.00 20.00
2 Pekerjaan Pipa Bangunan IPAL 40.00
a. Pasangan Pipa PVC Ø 3" 12.00 Lonjor 166,100.00 1,993,200.00 60.00
b. Pasangan Fitting TEE Ø 3" 49.00 bh 34,995.00 1,714,755.00 30.00
3 Pekerjaan Fitting dan Pipa PVC SR 18.00
a. Pasangan Pipa PVC Ø 3" Lonjor 166,100.00 - 26.00
c. Pasangan Fitting TEE Ø 3" 30.00 Bh 34,995.00 1,049,850.00 194.00
d. Pasangan Fitting ELBOW Ø 3" 60.00 Bh 34,995.00 2,099,700.00 48.50

Jumlah 23,799,705.00

Page 4 of 64
REKAPITULASI RENCANA ANGGARAN BIAYA
(ENGINEER ESTIMATE)

Program : PROGRAM SANITASI PERDESAAN PADAT KARYA


Pekerjaan : PEMBANGUNAN SEPTICTANK KOMUNAL
Lokasi : DESA LUBAK MANIS
Sumber Dana : APBN TA. 2019

NO. URAIAN PEKERJAAN TOTAL PEKERJAAN

1 2 3

A PEKERJAAN PERSIAPAN Rp. 519,160.000


B PEKERJAAN TANAH Rp. 982,900.000
C PEKERJAAN PONDASI Rp. 600,000.000
D PEKERJAAN BETON Rp. 35,777,595.168
E PEKERJAAN DINDING DAN PLESTERAN Rp. 5,406,764.000
F PEKERJAAN MANHOLE & BAK KONTROL Rp. 8,100,000.000
G PEKERJAAN PENGECATAN Rp. 63,630.000

I JUMLAH TOTAL Rp. 51,450,049.168


II JUMLAH TOTAL FISIK Rp. 51,450,049.168
III PEMBULATAN Rp. 51,450,000.00
Malinau. Agustus 2019
Di Periksa oleh :

TFL TEKNIK TFL PEMBERDAYAAN KETUA


KSM "LUBAK MANIS"

WAHYU HARUM, ST DENYANA NASUTION, ST LAZARUS

Disetujui Oleh
PPK PSPLP
SATKER PELAKSANAAN
PRASARANA PEMUKIMAN WILAYAH
KALIMANTAN UTARA

BRETLY DAVID MUNTUAN, ST


NIP. 1974408152009111001
DAFTAR HARGA SATUAN MATERIAL

Program : PROGRAM SANITASI PERDESAAN PADAT KARYA


Pekerjaan : PEMBANGUNAN SEPTICTANK KOMUNAL
Lokasi : DESA LUBAK MANIS KEC. MALINAU UTARA KAB. MALINAU
Sumber Dana : APBN TA. 2019

HARGA
NO. URAIAN SATUAN KETERANGAN
(Rp)
1 2 3 5
UPAH
1 Tukang OH 120,000.00
2 Pekerja OH 110,000.00

BAHAN
1 Semen Portland (PC) Kg 1,900.00
2 Semen @ 50 Kg Zak 95,000.00
3 Pasir Beton Kg 130.00
M3 130,000.00
5 Batu Pecah/Split 1-2 Kg 495.00
M3 495,000.00
6 Kawat Beton Kg 25,000.00
7 Batu Bata Bh 1,700.00
8 Lem Pipa bh 90,000.00
9 Minyak Begisting Liter 69,000.00
10 Tanah Timbunan M3 109,000.00
11 Air Liter 100.00

BAHAN LANGIT-LANGIT
1 Plywood 6 mm Lembar 130,000.00

BAHAN BESI
1 Besi Polos/Ulir btg 101,000.00

BAHAN KAYU
1 Kayu Balok 5/7 Meranti M3 2,420,000
2 Kayu Papan 3/20 Meranti M3 2,310,000
3 Dolken Kayu diameter 8-10/400 cm Batang 31,000
4 Kayu untuk perancah M3 2,000,000
5 Kayu Ulin 10/10 M3 5,000,000
6 Papan Ulin 2,5/20 M3 6,600,000
7 Balok Kayu Lembasung 6/12 M3 2,310,000
8 Balok Kayu Ulin 5/10 M3 5,000,000
9 Kayu untuk perancah 4 M' Batang 31,000
10 Kayu Lembasung 10 x 10 x 4 m M3 4,000,000

BAHAN PAKU
1 Paku Biasa 1/2" - 1" Kg 20,000.00
2 Paku Biasa 1,5" - 2" Kg 20,000.00
3 Paku Biasa 4" - 5" Kg 20,000.00
4 Paku Ulin 1", 2" , 4" Kg 25,000.00

BAHAN FINISHING
1 Amplas Kayu / Besi Lembar 10,000.00
2 Kuas Cat Bh 25,000.00
3 Meni Kayu / Besi Kg 38,500.00
4 Dempul Plamir Kg 49,500.00
9 Cat dasar Kg 65,000.00

BAHAN SANITAIR
1 Pipa PVC 3" btg 118,000.00
2 Fittings Elbow 3'' Bh 16,500.00
3 Fittings Tee Conection 3'' Bh 16,500.00
Page 6 of 64
HARGA
NO. URAIAN SATUAN KETERANGAN
(Rp)
1 2 3 5
4 Lem Pipa Bh 35,000.00
5 Seal Tape Bh 5,000.00

PENGADAAN KONSTRUKSI
1 Tiang Pancang ulin 10cm x 10 cm - 2 meter m3 5,000,000.00
3 Manhoule Ø 40 Bh 1,600,000.00

SEWA PERALATAN
2 Concrete Mixer (Molen) hari 300,000.00
5 Ponton + Tug Boat Jam 1,972,184.76

Page 7 of 64
RENCANA PENGGUNAAN DANA
PROGRAM SANITASI PERDESAAN PADAT KARYA
PEMBANGUNAN SEPTICTANK KOMUNAL
KSM LUBAK MANIS
Tahap I
Desa : Lubak Manis Kab. : Malinau
Kecamatan : Malinau Utara Provinsi : Kalimantan Utara

Volume

No Uraian Realisasi s/d pengajuan Harga Satuan Jumlah Pengajuan


Kebutuhan Jumlah Kumulatif Unit/ Satuan
Tahap lalu sekarang

1 2 3 4 5 6=4+5 7 8 9=5x8
A Bahan Rp 238,500,000
1 Semen Portland (PC) 450 450 450 Zak Rp 95,000.000 Rp 42,750,000
2 Pasir Beton 31.0 31.0 31.0 m³ Rp 130,000 Rp 4,030,000
3 Tanah Urug 28.00 28.0 28.00 m³ Rp 109,000 Rp 3,052,000
4 Batu Pecah/Split 1-2 30.0 30.0 30.00 m³ Rp 495,000 Rp 14,850,000
5 Kawat Beton 30.00 30.0 30.00 kg Rp 25,000 Rp 750,000
6 Batu Bata 6300.00 6,300.0 6,300.00 bh Rp 1,700 Rp 10,710,000
7 Minyak Begisting 25.00 25.0 25.00 ltr Rp 69,000 Rp 1,725,000
8 Air 3190.00 3,190.0 3,190 ltr Rp 100.00 Rp 319,000
9 Plywood 9 mm 50.00 50.0 50.00 Lbr Rp 130,000 Rp 6,500,000
10 Besi Polos/Ulir -
- Besi polos 295.00 295.0 295.00 btg Rp 101,000 Rp 29,795,000
11 Kayu Balok Kelas III 7.00 7.0 7.00 m³ Rp 2,420,000 Rp 16,940,000
12 Kayu Papan Kelas III 7.00 7.0 7.00 m³ Rp 2,310,000 Rp 16,170,000
13 Dolken Kayu diameter 8-10/400 cm 250.00 250.0 250.00 btg Rp 31,000 Rp 7,750,000
14 Tiang Pancang Ulin 10x10x200 cm 22.00 22.0 22.00 btg Rp 200,000 Rp 4,400,000
15 Paku Biasa 50.00 50.0 50.00 kg Rp 20,000 Rp 1,000,000
16 Amplas Kayu / Besi 17.00 17.0 17.00 Lbr Rp 10,000 Rp 170,000
17 Kuas Cat 15.00 15.0 15.00 Bh Rp 25,000 Rp 375,000
18 Meni Kayu / Besi 10.00 10.0 10.00 Kg Rp 38,500 Rp 385,000
19 Dempul Plamir 23.00 23.0 23.00 Kg Rp 49,500 Rp 1,138,500
20 Pemasangan Pipa PVC Air Limbah Ø 3" 72.00 72.0 72.00 btg Rp 118,000 Rp 8,496,000
21 Pipa PVC Air Limbah Ø 3" 102.00 102.0 102.00 btg Rp 118,000 Rp 12,036,000
Fittings Elbow Ø 3'' 49.00 49.0 49.00 bh Rp 16,500 Rp 808,500
Fittings Tee Conection 3'' 60.00 60.0 60.00 bh Rp 16,500 Rp 990,000
22 Lem Pipa 53.00 53.0 53.00 bh Rp 35,000 Rp 1,855,000
23 Seal Tape 51.00 51.0 51.00 bh Rp 5,000 Rp 255,000
24 Filter Bakteri
a. media filter 4200.00 4,200.0 4,200.00 bh Rp 5,000 Rp 21,000,000
b. ijuk, arang, batu keriki/koral, pasir 6.00 6.0 6.00 Ls Rp 1,000,000 Rp 6,000,000
25 Penutup Manhoule Ø 40 6.00 6.0 6.00 Bh Rp 1,600,000 Rp 9,600,000
26 Nama Proyek 1.00 1.0 1.00 Ls Rp 250,000 Rp 250,000
27 Concrete Mixer (Molen) 48.00 48.0 48.00 sewa-hari Rp 300,000 Rp 14,400,000
-
B UPAH Rp 94,000,000
1 Tukang 270.00 270.0000 270.00 HOK Rp 120,000 Rp 32,400,000
2 Pekerja 560.0000 560.0000 560.00 HOK Rp 110,000 Rp 61,600,000

C BOP Rp 17,500,000
1 Alat Tulis Kantor (ATK) 1.00 1.00 1.00 Ls Rp 2,500,000 Rp 2,500,000
2 Dokumentasi 1.00 1.00 1.00 Ls Rp 500,000 Rp 500,000
3 Foto Copy & Jilid 1.00 1.00 1.00 Ls Rp 2,500,000 Rp 2,500,000
4 Materai dll 1.00 1.00 1.00 Ls Rp 1,000,000 Rp 1,000,000
5 Test Kebocoran 1.00 1.00 1.00 Ls Rp 1,000,000 Rp 1,000,000
6 Transportasi 18.00 18.00 18.00 Kali Rp 250,000 Rp 4,500,000
7 Konsumsi Pertemuan 10.00 10.00 10.00 Kali Rp 550,000 Rp 5,500,000
Total Rp 350,000,000
Total Di Bulatkan Rp 350,000,000

Diveifikasi Diperiksa Oleh : Disusun oleh :


PPK PENGEMBANGAN PLP FASKAB
TFL TEKNIK TFL PEMBERDAYAAN KETUA
SATUAN KERJA
PELAKSANAAN PRASARANA PEMUKIMAN KSM "LUBAK MANIS"
PROVINSI KALIMANTAN UTARA

HADI PURNUMO, ST WAHYU HARUM, ST DENYANA NASUTION, ST LAZARUS


BRETLY DAVID MUNTUAN, ST
NIP. 1974408152009111001
RENCANA PENGGUNAAN DANA
PROGRAM SANITASI PERDESAAN PADAT KARYA
PEMBANGUNAN SEPTICTANK KOMUNAL
KSM LUBAK MANIS
Tahap I
Desa : Lubak Manis Kab. : Malinau
Kecamatan : Malinau Utara Provinsi : Kalimantan Utara

Volume

No Uraian Realisasi s/d pengajuan Harga Satuan Jumlah Pengajuan


Kebutuhan Jumlah Kumulatif Unit/ Satuan
Tahap lalu sekarang

1 2 3 4 5 6=4+5 7 8 9=5x8
A Bahan Rp 173,880,000
1 Semen Portland (PC) 297.00 297 297 Zak Rp 95,000.000 Rp 28,215,000
2 Pasir Beton 22.00 22.0 22.0 m³ Rp 130,000 Rp 2,860,000
3 Tanah Urug 20.00 20.0 20.00 m³ Rp 109,000 Rp 2,180,000
4 Batu Pecah/Split 1-2 29.00 29.0 29.00 m³ Rp 495,000 Rp 14,355,000
5 Kawat Beton 21.00 21.0 21.00 kg Rp 25,000 Rp 525,000
6 Batu Bata 4410.00 4,410.0 4,410.00 bh Rp 1,700 Rp 7,497,000
7 Minyak Begisting 18.00 18.0 18.00 ltr Rp 69,000 Rp 1,242,000
8 Air 2190.00 2,190.0 2,190 ltr Rp 100.00 Rp 219,000
9 Plywood 9 mm 35.00 35.0 35.00 Lbr Rp 130,000 Rp 4,550,000
10 Besi Polos/Ulir
- Besi polos 207.00 207.0 207.00 btg Rp 101,000 Rp 20,907,000
11 Kayu Balok Kelas III 5.00 5.0 5.00 m³ Rp 2,420,000 Rp 12,100,000
12 Kayu Papan Kelas III 5.00 5.0 5.00 m³ Rp 2,310,000 Rp 11,550,000
13 Dolken Kayu diameter 8-10/400 cm 175.00 175.0 175.00 btg Rp 31,000 Rp 5,425,000
14 Tiang Pancang Ulin 10x10x200 cm 22.00 22.0 22.00 btg Rp 200,000 Rp 4,400,000
15 Paku Biasa 37.00 37.0 37.00 kg Rp 20,000 Rp 740,000
16 Amplas Kayu / Besi - - Lbr Rp 10,000 Rp -
17 Kuas Cat - - Bh Rp 25,000 Rp -
18 Meni Kayu / Besi - - Kg Rp 38,500 Rp -
19 Dempul Plamir - - Kg Rp 49,500 Rp -
20 Pemasangan Pipa PVC Air Limbah Ø 3" 72.00 72.0 72.00 btg Rp 118,000 Rp 8,496,000
21 Pipa PVC Air Limbah Ø 3" - - btg Rp 118,000 Rp -
Fittings Elbow Ø 3'' 34.00 34.0 34.00 bh Rp 16,500 Rp 561,000
Fittings Tee Conection 3'' 42.00 42.0 42.00 bh Rp 16,500 Rp 693,000
22 Lem Pipa 38.00 38.0 38.00 bh Rp 35,000 Rp 1,330,000
23 Seal Tape 37.00 37.0 37.00 bh Rp 5,000 Rp 185,000
24 Filter Bakteri
a. media filter 4200.00 4,200.0 4,200.00 bh Rp 5,000 Rp 21,000,000
b. ijuk, arang, batu keriki/koral, pasir 6.00 6.0 6.00 Ls Rp 1,000,000 Rp 6,000,000
25 Penutup Manhoule Ø 40 6.00 6.0 6.00 Bh Rp 1,600,000 Rp 9,600,000
26 Nama Proyek 1.00 1.0 1.00 Ls Rp 250,000 Rp 250,000
27 Concrete Mixer (Molen) 30.00 30.0 30.00 sewa-hari Rp 300,000 Rp 9,000,000

B UPAH Rp 58,870,000
1 Tukang 189 189.0000 189.00 HOK Rp 120,000 Rp 22,680,000
2 Pekerja 329 329.0000 329.00 HOK Rp 110,000 Rp 36,190,000

C BOP Rp 12,250,000
1 Alat Tulis Kantor (ATK) 0.8 0.75 0.75 Ls Rp 2,500,000 Rp 1,875,000
2 Dokumentasi 0.8 0.75 0.75 Ls Rp 500,000 Rp 375,000
3 Foto Copy & Jilid 0.8 0.75 0.75 Ls Rp 2,500,000 Rp 1,875,000
4 Materai dll 0.8 0.75 0.75 Ls Rp 1,000,000 Rp 750,000
5 Test Kebocoran - - Ls Rp 1,000,000 Rp -
6 Transportasi 13.0 13.00 13.00 Kali Rp 250,000 Rp 3,250,000
7 Konsumsi Pertemuan 7.5 7.50 7.50 Kali Rp 550,000 Rp 4,125,000
Total Rp 245,000,000
Total Di Bulatkan Rp 245,000,000

Diveifikasi Diperiksa Oleh : Disusun oleh :

PPK PENGEMBANGAN PLP FASKAB


TFL TEKNIK TFL PEMBERDAYAAN KETUA
SATUAN KERJA KSM "LUBAK MANIS"
PELAKSANAAN PRASARANA PEMUKIMAN
PROVINSI KALIMANTAN UTARA

HADI PURNUMO, ST WAHYU HARUM, ST DENYANA NASUTION, ST LAZARUS


BRETLY DAVID MUNTUAN, ST
NIP. 1974408152009111001
RENCANA PENGGUNAAN DANA BANK
PROGRAM SANITASI PERDESAAN PADAT KARYA
PEMBANGUNAN SEPTICTANK KOMUNAL
KSM LUBAK MANIS
Tahap I
Desa : Lubak Manis
Kecamatan : Malinau Utara

Volume

No Uraian Realisasi s/d pengajuan


Kebutuhan
Tahap lalu sekarang

1 2 3 4 5
A Bahan
1 Semen Portland (PC) 122 122
2 Pasir Beton 10 10.0
3 Tanah Urug 10 10.0
4 Batu Pecah/Split 1-2 10 10.0
5 Kawat Beton 10 10.0
6 Batu Bata -
7 Minyak Begisting -
8 Air 890 890.0
9 Plywood 9 mm -
10 Besi Polos/Ulir
- Besi polos 150 150.0
11 Kayu Balok Kelas III 3.0 3.0
12 Kayu Papan Kelas III 2.5 2.5
13 Dolken Kayu diameter 8-10/400 cm 100 100.0
14 Tiang Pancang Ulin 10x10x200 cm 22 22.0
15 Paku Biasa 17 17.0
16 Amplas Kayu / Besi -
17 Kuas Cat -
18 Meni Kayu / Besi -
19 Dempul Plamir -
20 Pemasangan Pipa PVC Air Limbah Ø 3" -
21 Pipa PVC Air Limbah Ø 3" -
Fittings Elbow Ø 3'' -
Fittings Tee Conection 3'' -
22 Lem Pipa -
23 Seal Tape -
24 Filter Bakteri
a. media filter -
b. ijuk, arang, batu keriki/koral, pasir -
25 Penutup Manhoule Ø 40 -
26 Nama Proyek 1 1.0
27 Concrete Mixer (Molen) 5 5.0
-
B UPAH
1 Tukang 51.0 51.0000
2 Pekerja 110.0 110.0000

C BOP
1 Alat Tulis Kantor (ATK) 0.30 0.30
2 Dokumentasi 0.30 0.30
3 Foto Copy & Jilid 0.30 0.30
4 Materai dll 0.30 0.30
5 Test Kebocoran 0.00 -
6 Transportasi 4.00 4.00
7 Konsumsi Pertemuan 3.00 3.00
Total
Total Di Bulatkan

Diveifikasi Diperiksa Oleh :

PPK PENGEMBANGAN PLP FASKAB


SATUAN KERJA TFL TEKNIK
PELAKSANAAN PRASARANA PEMUKIMAN
PROVINSI KALIMANTAN UTARA

HADI PURNUMO, ST WAHYU HARUM, ST


BRETLY DAVID MUNTUAN, ST
NIP. 1974408152009111001
NAAN DANA BANK
DESAAN PADAT KARYA
TICTANK KOMUNAL
K MANIS
pI
Kab. : Malinau
Provinsi : Kalimantan Utara

Volume

Harga Satuan Jumlah Pengajuan


Jumlah Kumulatif Unit/ Satuan

6=4+5 7 8 9=5x8
Rp 57,044,000
122 Zak Rp 95,000.000 Rp 11,590,000
10.0 m³ Rp 130,000 Rp 1,300,000
10.00 m³ Rp 109,000 Rp 1,090,000
10.00 m³ Rp 495,000 Rp 4,950,000
10.00 kg Rp 25,000 Rp 250,000
- bh Rp 1,700 Rp -
- ltr Rp 69,000 Rp -
890 ltr Rp 100.00 Rp 89,000
- Lbr Rp 130,000 Rp -

150.00 btg Rp 101,000 Rp 15,150,000


3.00 m³ Rp 2,420,000 Rp 7,260,000
2.50 m³ Rp 2,310,000 Rp 5,775,000
100.00 btg Rp 31,000 Rp 3,100,000
22.00 btg Rp 200,000 Rp 4,400,000
17.00 kg Rp 20,000 Rp 340,000
- Lbr Rp 10,000 Rp -
- Bh Rp 25,000 Rp -
- Kg Rp 38,500 Rp -
- Kg Rp 49,500 Rp -
- btg Rp 118,000 Rp -
- btg Rp 118,000 Rp -
- bh Rp 16,500 Rp -
- bh Rp 16,500 Rp -
- bh Rp 35,000 Rp -
- bh Rp 5,000 Rp -

- bh Rp 5,000 Rp -
- Ls Rp 1,000,000 Rp -
- Bh Rp 1,600,000 Rp -
1.00 Ls Rp 250,000 Rp 250,000
5.00 sewa-hari Rp 300,000 Rp 1,500,000

Rp 18,220,000
51.00 HOK Rp 120,000 Rp 6,120,000
110.00 HOK Rp 110,000 Rp 12,100,000

Rp 4,600,000
0.30 Ls Rp 2,500,000 Rp 750,000
0.30 Ls Rp 500,000 Rp 150,000
0.30 Ls Rp 2,500,000 Rp 750,000
0.30 Ls Rp 1,000,000 Rp 300,000
- Ls Rp 1,000,000 Rp -
4.00 Kali Rp 250,000 Rp 1,000,000
3.00 Kali Rp 550,000 Rp 1,650,000
Rp 79,864,000
Rp 79,864,000

Disusun oleh :

TFL TEKNIK TFL PEMBERDAYAAN KETUA


KSM "LUBAK MANIS"

WAHYU HARUM, ST DENYANA NASUTION, ST LAZARUS


#VALUE!
1906 2.32 3.05
2433 0.26
4.44 0.22
1021506.822 0.99
0.05
1260 -
Rp - -
Rp 79,864,000 2.00 Rp 79,864,000.00
Rp (270,136,000) - 200000000
Rp 350,000,000 -Rp 120,136,000.00
Rp 79,864,000 50,000,000,000.00
221.95 3.03
0.35994757 1.45
0.85986019 1.16
41.5930094 0.62
200000 5000000 0.88
8.31860188 0.07
-
-
-
-
/500000000*100
-
-
-
-
648 291600000 -
450000 -
-
#VALUE!
-
0.05
0.30

19.1483917 50,000,000.00
59.9128007 1.22
2.42

17,500,000.00 0.15
12,250,000.00 0.03
0.15
Rp 245,000,000 0.06
Rp 350,000,000 -
0.20
Rp - 0.33
500,000,000.01
196000000 (420,136,000.01)
Rp 79,864,000
Rp 79,864,000.00
500000000
Rp 420,136,000.00
RENCANA PENGGUNAAN DANA BANK
PROGRAM SANITASI PERDESAAN PADAT KARYA
PEMBANGUNAN SEPTICTANK KOMUNAL
KSM LUBAK MANIS
Tahap II
Desa : Lubak Manis
Kecamatan : Malinau Utara

Volume

No Uraian Realisasi s/d pengajuan


Kebutuhan
Tahap lalu sekarang

1 2 3 4 5
A Bahan
1 Semen Portland (PC) 20.00 20
2 Pasir Beton 5.00 5.0
3 Tanah Urug 5.00 5.0
4 Batu Pecah/Split 1-2 5.00 5.0
5 Kawat Beton 11.00 11.0
6 Batu Bata 2205.00 2,205.0
7 Minyak Begisting 10.00 10.0
8 Air 1300.00 1,300.0
9 Plywood 9 mm 22.00 22.0
10 Besi Polos/Ulir
- Besi polos 57.00 57.0
11 Kayu Balok Kelas III 1.00 1.0
12 Kayu Papan Kelas III 1.50 1.5
13 Dolken Kayu diameter 8-10/400 cm 75.00 75.0
14 Tiang Pancang Ulin 10x10x200 cm -
15 Paku Biasa 10.00 10.0
16 Amplas Kayu / Besi -
17 Kuas Cat -
18 Meni Kayu / Besi -
19 Dempul Plamir -
20 Pemasangan Pipa PVC Air Limbah Ø 3" -
21 Pipa PVC Air Limbah Ø 3" -
Fittings Elbow Ø 3'' -
Fittings Tee Conection 3'' -
22 Lem Pipa -
23 Seal Tape -
24 Filter Bakteri
a. media filter 4200.00 4,200.0
b. ijuk, arang, batu keriki/koral, pasir 6.00 6.0
25 Penutup Manhoule Ø 40 6.00 6.0
26 Nama Proyek -
27 Concrete Mixer (Molen) 12.00 12.0

B UPAH
1 Tukang 60.00 60.0000
2 Pekerja 99.00 99.0000

C BOP
1 Alat Tulis Kantor (ATK) 0.20 0.20
2 Dokumentasi 0.30 0.30
3 Foto Copy & Jilid 0.30 0.30
4 Materai dll 0.20 0.20
5 Test Kebocoran 0.00 -
6 Transportasi 4.00 4.00
7 Konsumsi Pertemuan 4.00 4.00
Total
Total Di Bulatkan

Diveifikasi Diperiksa Oleh :

PPK PENGEMBANGAN PLP FASKAB


SATUAN KERJA TFL TEKNIK
PELAKSANAAN PRASARANA PEMUKIMAN
PROVINSI KALIMANTAN UTARA

HADI PURNUMO, ST WAHYU HARUM, ST


BRETLY DAVID MUNTUAN, ST
NIP. 1974408152009111001
NAAN DANA BANK
DESAAN PADAT KARYA
TICTANK KOMUNAL
K MANIS
p II
Kab. : Malinau
Provinsi : Kalimantan Utara

Volume

Harga Satuan Jumlah Pengajuan


Jumlah Kumulatif Unit/ Satuan

6=4+5 7 8 9=5x8
Rp 67,640,500
20 Zak Rp 95,000.000 Rp 1,900,000
5.0 m³ Rp 130,000 Rp 650,000
5.00 m³ Rp 109,000 Rp 545,000
5.00 m³ Rp 495,000 Rp 2,475,000
11.00 kg Rp 25,000 Rp 275,000
2,205.00 bh Rp 1,700 Rp 3,748,500
10.00 ltr Rp 69,000 Rp 690,000
1,300 ltr Rp 100.00 Rp 130,000
22.00 Lbr Rp 130,000 Rp 2,860,000

57.00 btg Rp 101,000 Rp 5,757,000


1.00 m³ Rp 2,420,000 Rp 2,420,000
1.50 m³ Rp 2,310,000 Rp 3,465,000
75.00 btg Rp 31,000 Rp 2,325,000
- btg Rp 200,000 Rp -
10.00 kg Rp 20,000 Rp 200,000
- Lbr Rp 10,000 Rp -
- Bh Rp 25,000 Rp -
- Kg Rp 38,500 Rp -
- Kg Rp 49,500 Rp -
- btg Rp 118,000 Rp -
- btg Rp 118,000 Rp -
- bh Rp 16,500 Rp -
- bh Rp 16,500 Rp -
- bh Rp 35,000 Rp -
- bh Rp 5,000 Rp -

4,200.00 bh Rp 5,000 Rp 21,000,000


6.00 Ls Rp 1,000,000 Rp 6,000,000
6.00 Bh Rp 1,600,000 Rp 9,600,000
- Ls Rp 250,000 Rp -
12.00 sewa-hari Rp 300,000 Rp 3,600,000

Rp 18,090,000
60.00 HOK Rp 120,000 Rp 7,200,000
99.00 HOK Rp 110,000 Rp 10,890,000

Rp 4,800,000
0.20 Ls Rp 2,500,000 Rp 500,000
0.30 Ls Rp 500,000 Rp 150,000
0.30 Ls Rp 2,500,000 Rp 750,000
0.20 Ls Rp 1,000,000 Rp 200,000
- Ls Rp 1,000,000 Rp -
4.00 Kali Rp 250,000 Rp 1,000,000
4.00 Kali Rp 550,000 Rp 2,200,000
Rp 90,530,500
Rp 90,530,500

Disusun oleh :

TFL TEKNIK TFL PEMBERDAYAAN KETUA


KSM "LUBAK MANIS"

WAHYU HARUM, ST DENYANA NASUTION, ST LAZARUS


#VALUE!
1906 0.38
2433 0.13
4.44 0.11
1021506.822 0.50
0.06
1260 0.75
0.14
Rp 90,530,500 2.00
Rp (259,469,500) 0.57
Rp 350,000,000
Rp 90,530,500 50,000,000,000.00
221.95 1.15
0.35994757 0.48
0.85986019 0.69
41.5930094 0.47
200000 5000000 -
8.31860188 0.04
-
-
-
-
/500000000*100
-
-
-
-
648 291600000 -
450000 -
4.20
#VALUE!
1.92
-
0.72

19.1483917
59.9128007 1.44
2.18

17,500,000.00 0.10
12,250,000.00 0.03
0.15
Rp 245,000,000 0.04
Rp 350,000,000 -
0.20
0.44

196000000
0.50

Rp 90,530,500.00 Rp 90,530,500.00
200000000 500000000
-Rp 109,469,500.00 Rp 409,469,500.00
50,000,000.00

500,000,000.01
(409,469,500.01)
RENCANA PENGGUNAAN DANA BANK
PROGRAM SANITASI PERDESAAN PADAT KARYA
PEMBANGUNAN SEPTICTANK KOMUNAL
KSM LUBAK MANIS
Tahap III
Desa : Lubak Manis
Kecamatan : Malinau Utara

Volume

No Uraian Realisasi s/d pengajuan


Kebutuhan
Tahap lalu sekarang

1 2 3 4 5
A Bahan
1 Semen Portland (PC) 155 155
2 Pasir Beton 7 7.0
3 Tanah Urug 5 5.0
4 Batu Pecah/Split 1-2 14 14.0
5 Kawat Beton 0 -
6 Batu Bata 2205 2,205.0
7 Minyak Begisting 8 8.0
8 Air 0 -
9 Plywood 9 mm 13 13.0
10 Besi Polos/Ulir 0
- Besi polos 0 -
11 Kayu Balok Kelas III 1 1.0
12 Kayu Papan Kelas III 1 1.0
13 Dolken Kayu diameter 8-10/400 cm 0 -
14 Tiang Pancang Ulin 10x10x200 cm 0 -
15 Paku Biasa 10 10.0
16 Amplas Kayu / Besi 0 -
17 Kuas Cat 0 -
18 Meni Kayu / Besi 0 -
19 Dempul Plamir 0 -
20 Pemasangan Pipa PVC Air Limbah Ø 3" 72 72.0
21 Pipa PVC Air Limbah Ø 3" 0 -
Fittings Elbow Ø 3'' 34 34.0
Fittings Tee Conection 3'' 42 42.0
22 Lem Pipa 38 38.0
23 Seal Tape 37 37.0
24 Filter Bakteri 0
a. media filter 0 -
b. ijuk, arang, batu keriki/koral, pasir 0 -
25 Penutup Manhoule Ø 40 0 -
26 Nama Proyek 0 -
27 Concrete Mixer (Molen) 13 13.0
-
B UPAH
1 Tukang 78 78.0000
2 Pekerja 120 120.0000

C BOP
1 Alat Tulis Kantor (ATK) 0.25 0.25
2 Dokumentasi 0.15 0.15
3 Foto Copy & Jilid 0.15 0.15
4 Materai dll 0.25 0.25
5 Test Kebocoran 0.00 -
6 Transportasi 5.00 5.00
7 Konsumsi Pertemuan 0.50 0.50
Total
Total Di Bulatkan

Diveifikasi Diperiksa Oleh :

PPK PENGEMBANGAN PLP FASKAB


SATUAN KERJA TFL TEKNIK
PELAKSANAAN PRASARANA PEMUKIMAN
PROVINSI KALIMANTAN UTARA

HADI PURNUMO, ST WAHYU HARUM, ST


BRETLY DAVID MUNTUAN, ST
NIP. 1974408152009111001
NAAN DANA BANK
DESAAN PADAT KARYA
TICTANK KOMUNAL
K MANIS
p III
Kab. : Malinau
Provinsi : Kalimantan Utara

Volume

Harga Satuan Jumlah Pengajuan


Jumlah Kumulatif Unit/ Satuan

6=4+5 7 8 9=5x8
Rp 49,195,500
155 Zak Rp 95,000.000 Rp 14,725,000 297 142 297
7.0 m³ Rp 130,000 Rp 910,000 22 15 22
5.00 m³ Rp 109,000 Rp 545,000 20 15 20
14.00 m³ Rp 495,000 Rp 6,930,000 29 15 29
- kg Rp 25,000 Rp - 21 21 21
2,205.00 bh Rp 1,700 Rp 3,748,500 4410 2205 4410
8.00 ltr Rp 69,000 Rp 552,000 18 10 18
- ltr Rp 100.00 Rp - 2190 2190 2190
13.00 Lbr Rp 130,000 Rp 1,690,000 35 22 35
0 0 0
- btg Rp 101,000 Rp - 207 207 207
1.00 m³ Rp 2,420,000 Rp 2,420,000 5 4 5
1.00 m³ Rp 2,310,000 Rp 2,310,000 5 4 5
- btg Rp 31,000 Rp - 175 175 175
- btg Rp 200,000 Rp - 22 22 22
10.00 kg Rp 20,000 Rp 200,000 37 27 37
- Lbr Rp 10,000 Rp - 0 0 0
- Bh Rp 25,000 Rp - 0 0 0
- Kg Rp 38,500 Rp - 0 0 0
- Kg Rp 49,500 Rp - 0 0 0
72.00 btg Rp 118,000 Rp 8,496,000 72 0 72
- btg Rp 118,000 Rp - 0 0 0
34.00 bh Rp 16,500 Rp 561,000 34 0 34
42.00 bh Rp 16,500 Rp 693,000 42 0 42
38.00 bh Rp 35,000 Rp 1,330,000 38 0 38
37.00 bh Rp 5,000 Rp 185,000 37 0 37
0 0 0
- bh Rp 5,000 Rp - 4200 4200 4200
- Ls Rp 1,000,000 Rp - 6 6 6
- Bh Rp 1,600,000 Rp - 6 6 6
- Ls Rp 250,000 Rp - 1 1 1
13.00 sewa-hari Rp 300,000 Rp 3,900,000 30 17 30
0 0 0
Rp 22,560,000 0 0 0
78.00 HOK Rp 120,000 Rp 9,360,000 189 111 189
120.00 HOK Rp 110,000 Rp 13,200,000 329 209 329
0 0 0
Rp 2,850,000 0 0 0
0.25 Ls Rp 2,500,000 Rp 625,000 0.7 0.5 0.8
0.15 Ls Rp 500,000 Rp 75,000 0.8 0.6 0.8
0.15 Ls Rp 2,500,000 Rp 375,000 0.9 0.6 0.8
0.25 Ls Rp 1,000,000 Rp 250,000 0.5 0.5 0.8
- Ls Rp 1,000,000 Rp - 5.0 0.0 0.0
5.00 Kali Rp 250,000 Rp 1,250,000 8.5 8.0 13.0
0.50 Kali Rp 550,000 Rp 275,000 7.0 7.0 7.5
Rp 74,605,500
Rp 74,605,500

Disusun oleh :

TFL TEKNIK TFL PEMBERDAYAAN KETUA


KSM "LUBAK MANIS"

WAHYU HARUM, ST DENYANA NASUTION, ST LAZARUS


173,880,000 Rp 173,880,000
28,215,000 Rp 28,215,000 1906
2,860,000 Rp 2,860,000 2433
2,180,000 Rp 2,180,000 4.44
14,355,000 Rp 14,355,000 1021506.822
525,000 Rp 525,000
7,497,000 Rp 7,497,000 1260
1,242,000 Rp 1,242,000
219,000 Rp 219,000 Rp 74,605,500
4,550,000 Rp 4,550,000 Rp (275,394,500)
- Rp - Rp 350,000,000
20,907,000 Rp 20,907,000 Rp 74,605,500
12,100,000 Rp 12,100,000 221.95
11,550,000 Rp 11,550,000 0.35994757
5,425,000 Rp 5,425,000 0.85986019
4,400,000 Rp 4,400,000 41.5930094
740,000 Rp 740,000 200000 5000000
- Rp - 8.31860188
- Rp -
- Rp -
- Rp -
8,496,000 Rp 8,496,000
- Rp -
561,000 Rp 561,000
693,000 Rp 693,000
1,330,000 Rp 1,330,000
185,000 Rp 185,000
- Rp -
21,000,000 Rp 21,000,000 648 291600000
6,000,000 Rp 6,000,000 450000
9,600,000 Rp 9,600,000
250,000 Rp 250,000
9,000,000 Rp 9,000,000
- Rp -
58,870,000 Rp 58,870,000
22,680,000 Rp 22,680,000
36,190,000 Rp 36,190,000 19.1483917
- Rp - 59.9128007
12,250,000 Rp 12,250,000
1,875,000 Rp 1,875,000
375,000 Rp 375,000
1,875,000 Rp 1,875,000 17,500,000.00
750,000 Rp 750,000 12,250,000.00
- Rp -
3,250,000 Rp 3,250,000 Rp 245,000,000
4,125,000 Rp 4,125,000 Rp 350,000,000
245,000,000 Rp 245,000,000
245,000,000 Rp 245,000,000

Rp 245,000,000 196000000
Rp 71
4.21 3.88
0.26
0.16
1.98
-
1.07
0.16
- Rp 74,605,500.00 Rp 74,605,500.00
0.48 200000000 500000000
- -Rp 125,394,500.00 Rp 425,394,500.00
-
0.69
0.66
-
-
0.06
-
-
-
-
2.43
-
0.16
0.20
0.38
0.05
-
-
-
-
-
1.11
-
6.45
2.67
3.77 50,000,000.00
-
0.81
0.18
0.02
0.11
0.07
-
0.36
0.08
21.32
21.32
500,000,000.01
(425,394,500.01)
RENCANA PENGGUNAAN DANA
PROGRAM SANITASI PERDESAAN PADAT KARYA
PEMBANGUNAN SEPTICTANK KOMUNAL
KSM LUBAK MANIS
Tahap II
Desa : Lubak Manis Kab. : Malinau
Kecamatan : Malinau Utara Provinsi : Kalimantan Utara

Volume

No Uraian Realisasi s/d pengajuan Harga Satuan Jumlah Pengajuan


Kebutuhan Jumlah Kumulatif Unit/ Satuan
Tahap lalu sekarang

1 2 3 4 5 6=4+5 7 8 9=5x8
A Bahan Rp 64,620,000
1 Semen Portland (PC) 153 153 153 Zak Rp 95,000.000 Rp ###
14,535,000
2 Pasir Beton 9 9.0 9.0 m³ Rp 130,000 Rp ###
1,170,000
3 Tanah Urug 8 8.0 8.00 m³ Rp 109,000 Rp ###
872,000
4 Batu Pecah/Split 1-2 1 1.0 1.00 m³ Rp 495,000 Rp ###
495,000
5 Kawat Beton 9 9.0 9.00 kg Rp 25,000 Rp ###
225,000
6 Batu Bata 1890 1,890.0 1,890.00 bh Rp 1,700 Rp ###
3,213,000
7 Minyak Begisting 7 7.0 7.00 ltr Rp 69,000 Rp ###
483,000
8 Air 1000 1,000.0 1,000 ltr Rp 100.00 Rp ###
100,000
9 Plywood 9 mm 15 15.0 15.00 Lbr Rp 130,000 Rp ###
1,950,000
10 Besi Polos/Ulir 0 -
- Besi Ø 10 88 88.0 88.00 btg Rp 101,000 Rp ###
8,888,000
11 Kayu Balok Kelas III 2 2.0 2.00 m³ Rp 2,420,000 Rp ###
4,840,000
12 Kayu Papan Kelas III 2 2.0 2.00 m³ Rp 2,310,000 Rp ###
4,620,000
13 Dolken Kayu diameter 8-10/400 cm 75 75.0 75.00 btg Rp 31,000 Rp ###
2,325,000
14 Tiang Pancang Ulin 10x10x200 cm 0 - - btg Rp 200,000 Rp ###-
15 Paku Biasa 13 13.0 13.00 kg Rp 20,000 Rp ###
260,000
16 Amplas Kayu / Besi 17 17.0 17.00 Lbr Rp 10,000 Rp ###
170,000
17 Kuas Cat 15 15.0 15.00 Bh Rp 25,000 Rp ###
375,000
18 Meni Kayu / Besi 10 10.0 10.00 Kg Rp 38,500 Rp ###
385,000
19 Dempul Plamir 23 23.0 23.00 Kg Rp 49,500 Rp ###
1,138,500
20 Pemasangan Pipa PVC Air Limbah Ø 3" 0 - - btg Rp 118,000 Rp ###-
21 Pipa PVC Air Limbah Ø 3" 102 102.0 102.00 btg Rp 118,000 Rp ###
12,036,000
Fittings Elbow Ø 3'' 15 15.0 15.00 bh Rp 16,500 Rp 247,500
Fittings Tee Conection 3'' 18 18.0 18.00 bh Rp 16,500 Rp 297,000
22 Lem Pipa 15 15.0 15.00 bh Rp 35,000 Rp 525,000
23 Seal Tape 14 14.0 14.00 bh Rp 5,000 Rp 70,000
24 Filter Bakteri 0 ###
a. media filter 0 - - bh Rp 5,000 Rp ###-
b. ijuk, arang, batu keriki/koral, pasir 0 - - Ls Rp 1,000,000 Rp ###-
25 Penutup Manhoule Ø 40 0 - - Bh Rp 1,600,000 Rp -
26 Nama Proyek 0 - - Ls Rp 250,000 Rp ###-
27 Concrete Mixer (Molen) 18 18.0 18.00 sewa-hari Rp 300,000 Rp ###
5,400,000
0 - ###
B UPAH Rp ###
35,130,000
1 Tukang 81 81.0000 81.00 HOK Rp 120,000 Rp 9,720,000
2 Pekerja 231 231.0000 231.00 HOK Rp 110,000 Rp 25,410,000
0
C BOP Rp 5,250,000
1 Alat Tulis Kantor (ATK) 0.3 0.25 0.25 Ls Rp 2,500,000 Rp 625,000
2 Dokumentasi 0.3 0.25 0.25 Ls Rp 500,000 Rp ###
125,000
3 Foto Copy & Jilid 0.3 0.25 0.25 Ls Rp 2,500,000 Rp ###
625,000
4 Materai dll 0.3 0.25 0.25 Ls Rp 1,000,000 Rp ###
250,000
5 Test Kebocoran 1.0 1.00 1.00 Ls Rp 1,000,000 Rp ###
1,000,000
6 Transportasi 5.0 5.00 5.00 Kali Rp 250,000 Rp ###
1,250,000
7 Konsumsi Pertemuan 2.5 2.50 2.50 Kali Rp 550,000 Rp ###
1,375,000
Total Rp ###
105,000,000
Total Di Bulatkan Rp ###
105,000,000

###
Diveifikasi Diperiksa Oleh : Disusun oleh :

PPK PENGEMBANGAN PLP FASKAB


TFL TEKNIK TFL PEMBERDAYAAN KETUA
SATUAN KERJA KSM "LUBAK MANIS"
PELAKSANAAN PRASARANA PEMUKIMAN
PROVINSI KALIMANTAN UTARA

HADI PURNUMO, ST WAHYU HARUM, ST DENYANA NASUTION, ST LAZARUS


BRETLY DAVID MUNTUAN, ST
NIP. 1974408152009111001
RENCANA PENGGUNAAN DANA
PROGRAM SANITASI PERDESAAN PADAT KARYA
PEMBANGUNAN SEPTICTANK KOMUNAL
KSM LUBAK MANIS
Tahap II
Desa : Lubak Manis
Kecamatan : Malinau Utara

Volume

No Uraian Realisasi s/d pengajuan


Kebutuhan
Tahap lalu sekarang

1 2 3 4 5
A Bahan
1 Semen Portland (PC) 153 153
2 Pasir Beton 9 9.0
3 Tanah Urug 8 8.0
4 Batu Pecah/Split 1-2 1 1.0
5 Kawat Beton 9 9.0
6 Batu Bata 1890 1,890.0
7 Minyak Begisting 7 7.0
8 Air 1000 1,000.0
9 Plywood 9 mm 15 15.0
10 Besi Polos/Ulir 0 -
- Besi Ø 10 88 88.0
11 Kayu Balok Kelas III 2 2.0
12 Kayu Papan Kelas III 2 2.0
13 Dolken Kayu diameter 8-10/400 cm 75 75.0
14 Tiang Pancang Ulin 10x10x200 cm 0 -
15 Paku Biasa 13 13.0
16 Amplas Kayu / Besi 17 17.0
17 Kuas Cat 15 15.0
18 Meni Kayu / Besi 10 10.0
19 Dempul Plamir 23 23.0
20 Pemasangan Pipa PVC Air Limbah Ø 3" -
21 Pipa PVC Air Limbah Ø 3" 102 102.0
Fittings Elbow Ø 3'' 15 15.0
Fittings Tee Conection 3'' 18 18.0
22 Lem Pipa 15 15.0
23 Seal Tape 14 14.0
24 Filter Bakteri 0
a. media filter 0 -
b. ijuk, arang, batu keriki/koral, pasir 0 -
25 Penutup Manhoule Ø 40 0 -
26 Nama Proyek 0 -
27 Concrete Mixer (Molen) 18 18.0
-
B UPAH
1 Tukang 81 81.0000
2 Pekerja 231 231.0000

C BOP
1 Alat Tulis Kantor (ATK) 0.3 0.25
2 Dokumentasi 0.3 0.25
3 Foto Copy & Jilid 0.3 0.25
4 Materai dll 0.3 0.25
5 Test Kebocoran 1.0 1.00
6 Transportasi 5.0 5.00
7 Konsumsi Pertemuan 2.5 2.50
Total
Total Di Bulatkan

Diveifikasi Diperiksa Oleh :

PPK PENGEMBANGAN PLP FASKAB


SATUAN KERJA TFL TEKNIK
PELAKSANAAN PRASARANA PEMUKIMAN
PROVINSI KALIMANTAN UTARA

HADI PURNUMO, ST WAHYU HARUM, ST


BRETLY DAVID MUNTUAN, ST
NIP. 1974408152009111001
GUNAAN DANA
DESAAN PADAT KARYA
TICTANK KOMUNAL
K MANIS
p II
Kab. : Malinau
Provinsi : Kalimantan Utara

Volume

Harga Satuan Jumlah Pengajuan


Jumlah Kumulatif Unit/ Satuan

6=4+5 7 8 9=5x8
Rp 64,620,000
153 Zak Rp 95,000.000 Rp 14,535,000 1906
9.0 m³ Rp 130,000 Rp 1,170,000 2433
8.00 m³ Rp 109,000 Rp 872,000 4.44
1.00 m³ Rp 495,000 Rp 495,000 1021506.822
9.00 kg Rp 25,000 Rp 225,000
1,890.00 bh Rp 1,700 Rp 3,213,000 1260
7.00 ltr Rp 69,000 Rp 483,000
1,000 ltr Rp 100.00 Rp 100,000
15.00 Lbr Rp 130,000 Rp 1,950,000 Rp (245,000,000)
Rp 350,000,000
88.00 btg Rp 101,000 Rp 8,888,000 Rp 105,000,000
2.00 m³ Rp 2,420,000 Rp 4,840,000
2.00 m³ Rp 2,310,000 Rp 4,620,000
75.00 btg Rp 31,000 Rp 2,325,000
- btg Rp 200,000 Rp -
13.00 kg Rp 20,000 Rp 260,000 200000
17.00 Lbr Rp 10,000 Rp 170,000
15.00 Bh Rp 25,000 Rp 375,000
10.00 Kg Rp 38,500 Rp 385,000
23.00 Kg Rp 49,500 Rp 1,138,500
- btg Rp 118,000 Rp -
102.00 btg Rp 118,000 Rp 12,036,000
15.00 bh Rp 16,500 Rp 247,500
18.00 bh Rp 16,500 Rp 297,000
15.00 bh Rp 35,000 Rp 525,000
14.00 bh Rp 5,000 Rp 70,000

- bh Rp 5,000 Rp - 648
- Ls Rp 1,000,000 Rp - 450000
- Bh Rp 1,600,000 Rp -
- Ls Rp 250,000 Rp -
18.00 sewa-hari Rp 300,000 Rp 5,400,000

Rp 35,130,000
81.00 HOK Rp 120,000 Rp 9,720,000
231.00 HOK Rp 110,000 Rp 25,410,000

Rp 5,250,000
0.25 Ls Rp 2,500,000 Rp 625,000
0.25 Ls Rp 500,000 Rp 125,000
0.25 Ls Rp 2,500,000 Rp 625,000
0.25 Ls Rp 1,000,000 Rp 250,000
1.00 Ls Rp 1,000,000 Rp 1,000,000
5.00 Kali Rp 250,000 Rp 1,250,000
2.50 Kali Rp 550,000 Rp 1,375,000
Rp 105,000,000
Rp 105,000,000 Rp 350,000,000

Disusun oleh : 196000000


TFL TEKNIK TFL PEMBERDAYAAN KETUA
KSM "LUBAK MANIS"

WAHYU HARUM, ST DENYANA NASUTION, ST LAZARUS


#VALUE!
2.91 3.83
0.23
0.17
0.10
0.05
0.64
0.10
2.00 Rp 105,000,000.00 Rp 105,000,000.00
0.39 200000000 500000000
-Rp 95,000,000.00 Rp 395,000,000.00
50,000,000,000.00
221.95 1.78
0.35994757 0.97
0.85986019 0.92
41.5930094 0.47
5000000 -
8.31860188 0.05
0.03
0.08
0.08
0.23
/500000000*100
-
0.05
0.06
0.11
291600000 0.01
-
-
#VALUE!
-
-
1.08

19.1483917 50,000,000.00
59.9128007 1.94
5.08

0.13
0.03
0.13
0.05
0.20
0.25
0.28
500,000,000.01
(395,000,000.01)
ANALISA HARGA SATUAN PEKERJAAN

Program : PROGRAM SANITASI PERDESAAN PADAT KARYA


Pekerjaan : PEMBANGUNAN SEPTICTANK KOMUNAL
Lokasi : DESA LUBAK MANIS KEC. MALINAU UTARA KAB. MALINAU
Sumber Dana : APBN TA. 2019

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
1 Pengukuran dan Pemasangan Bowplank per M'
A TENAGA
Pekerja L.01 OH 0.1000 110,000.00 11,000.00
Tukang L.02 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.0100 -
Mandor L.04 OH 0.0050 -
JUMLAH TENAGA KERJA 23,000.00
B BAHAN
Kayu Balok 5/7 M3 0.0120 2,310,000.00 27,720.00
Paku 2-3" Kg 0.0200 20,000.00 400.00
Kayu Papan 3/20 M3 0.0070 2,310,000.00 16,170.00
JUMLAH HARGA BAHAN 44,290.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 67,290.00


E Harga Satuan Pekerjaan (D) 67,290.00

Page 42 of 64
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
3 Galian tanah biasa sedalam 2 meter per 1 M3
A TENAGA
Pekerja L.01 OH 0.9000 110,000.00 99,000.00
Mandor L.04 OH 0.0450 - -
JUMLAH TENAGA KERJA 99,000.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 99,000.00


E Harga Satuan Pekerjaan (D) 99,000.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
4 Urugan kembali per 1 M3
A TENAGA
Pekerja L.01 OH 0.5000 110,000.00 55,000.00
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA 55,000.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 55,000.00


E Harga Satuan Pekerjaan (D) 55,000.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7

5 Urugan pasir per 1 M3


A TENAGA
Pekerja L.01 OH 0.3000 110,000.00 33,000.00
Mandor L.04 OH 0.0100 - -
JUMLAH TENAGA KERJA 33,000.00
B BAHAN
Pasir urug M3 1.2000 130,000.00 156,000.00

JUMLAH HARGA BAHAN 156,000.00


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 189,000.00


E Harga Satuan Pekerjaan (D) 189,000.00

Page 43 of 64
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
6 Urugan tanah per 1 M3
A TENAGA
Pekerja L.01 OH 0.2500 110,000.00 27,500.00
Mandor L.04 OH 0.0250 - -
JUMLAH TENAGA KERJA 27,500.00
B BAHAN
Tanah urug M3 1.2000 109,000.00 130,800.00

JUMLAH HARGA BAHAN 130,800.00


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 158,300.00


E Harga Satuan Pekerjaan (D) 158,300.00

Page 44 of 64
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
10 Pasangan 1/2 batu bata dengan 1Pc : 2Ps per M2
A TENAGA
Pekerja L.01 OH 0.3200 110,000.00 35,200.00
Tukang L.02 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.0100 -
Mandor L.04 OH 0.0150 -
JUMLAH TENAGA KERJA 47,200.00
B BAHAN
Batu bata Bh 70.0000 1,700.00 119,000.00
Semen portland Kg 18.9500 1,900.00 36,005.00
Pasir M3 0.0380 130,000.00 4,940.00

JUMLAH HARGA BAHAN 159,945.00


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 207,145.00


E Harga Satuan Pekerjaan (D) 207,145.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7

11 Membuat Beton lantai kerja Sp. 1 : 3 : 5 Per 1 M3 fc= 14,5 Mpa (K-175) Mekanis
A TENAGA
Pekerja L.01 OH 1.6500 110,000.00 181,500.00
Tukang L.02 OH 0.2500 120,000.00 30,000.00
Kepala Tukang L.03 OH 0.0250 - -
Mandor L.04 OH 0.0800 - -
JUMLAH TENAGA KERJA 211,500.00
B BAHAN
Semen Portlad Kg 326.0000 1,900.00 619,400.00
Pasir Beton kg 760.0000 130.00 98,800.00
Batu Pecah/Split 1-2 kg 1,029.000 495.00 509,355.00
Air liter 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 1,249,055.00
C PERALATAN
Concrete Mixer (Molen) sewa-hari 0.2500 300,000.00 75,000.00
JUMLAH HARGA ALAT 75,000.00

D Jumlah (A+B+C) 1,535,555.00


E Harga Satuan Pekerjaan (D) 1,535,555.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7

12 Membuat Beton Bertulang 1Pc : 2Ps : 3Kr fc= 19,3 Mpa (K-225) Mekanis
A TENAGA
Pekerja L.01 OH 1.6500 110,000.00 181,500.00
Tukang L.02 OH 0.2750 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.0280 - -
Mandor L.04 OH 0.0830 - -
JUMLAH TENAGA KERJA 214,500.00
B BAHAN
Semen Portlad Kg 371.0000 1,900.00 704,900.00
Pasir Beton kg 698.0000 130.00 90,740.00
Batu Pecah 1-2 M3 1,048.0000 495.00 518,760.00
Air liter 215.0000 100.00 21,500.00
JUMLAH HARGA BAHAN 1,335,900.00
C PERALATAN
Concrete Mixer (Molen) sewa-hari 0.2500 300,000.00 75,000.00
JUMLAH HARGA ALAT 75,000.00

D Jumlah (A+B+C) 1,625,400.00


E Harga Satuan Pekerjaan (D) 1,625,400.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
13 Pembesian dengan besi polos atau ulir per 1 Kg
A TENAGA
Pekerja L.01 OH 0.0070 110,000.00 770.00
Tukang L.02 OH 0.0070 120,000.00 840.00
Kepala Tukang L.03 OH 0.0007 - -
Mandor L.04 OH 0.0004 - -
JUMLAH TENAGA KERJA 1,610.00
B BAHAN
Besi Polos/Ulir Kg 1.0500 101,000.00 106,050.00
Kawat Beton Kg 0.0150 25,000.00 375.00
JUMLAH HARGA BAHAN 106,425.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 108,035.00


E Harga Satuan Pekerjaan (D) 108,035.00

Page 45 of 64
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
15 Pasang begisting untuk kolom per 1 M2
A TENAGA
Pekerja L.01 OH 0.6600 110,000.00 72,600.00
Tukang L.02 OH 0.3300 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.0330 - -
Mandor L.04 OH 0.0330 - -
JUMLAH TENAGA KERJA 112,200.00
B BAHAN
Kayu begisting M3 0.0400 2,000,000.00 80,000.00
Paku biasa Kg 0.4000 20,000.00 8,000.00
Minyak begisting Ltr 0.2000 69,000.00 13,800.00
Balok kayu M3 0.0150 2,000,000.00 30,000.00
Plywood tebal 6 mm Lbr 0.3500 130,000.00 45,500.00
Kayu perancah Btg 2.0000 31,000.00 62,000.00
JUMLAH HARGA BAHAN 239,300.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 351,500.00


E Harga Satuan Pekerjaan (D) 351,500.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7

16 Pasang begisting untuk sloof per 1 M2


A TENAGA
Pekerja L.01 OH 0.5200 110,000.00 57,200.00
Tukang L.02 OH 0.2600 120,000.00 31,200.00
Kepala Tukang L.03 OH 0.0260 - -
Mandor L.04 OH 0.0260 - -
JUMLAH TENAGA KERJA 88,400.00
B BAHAN
Kayu begisting M3 0.0450 2,000,000.00 90,000.00
Paku biasa Kg 0.3000 20,000.00 6,000.00
Minyak begisting Ltr 0.1000 69,000.00 6,900.00
JUMLAH HARGA BAHAN 102,900.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 191,300.00


E Harga Satuan Pekerjaan (D) 191,300.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
17 Pasang begisting untuk balok per 1 M2
A TENAGA
Pekerja L.01 OH 0.6600 110,000.00 72,600.00
Tukang L.02 OH 0.3300 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.0330 - -
Mandor L.04 OH 0.0330 - -
JUMLAH TENAGA KERJA 112,200.00
B BAHAN
Kayu begisting M3 0.0400 2,000,000.00 80,000.00
Paku biasa Kg 0.4000 20,000.00 8,000.00
Minyak begisting Ltr 0.2000 69,000.00 13,800.00
Balok kayu M3 0.0180 2,000,000.00 36,000.00
Plywood tebal 6 mm Lbr 0.3500 130,000.00 45,500.00
Kayu perancah Btg 2.0000 31,000.00 62,000.00
JUMLAH HARGA BAHAN 245,300.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 357,500.00


E Harga Satuan Pekerjaan (D) 357,500.00

Page 46 of 64
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
18 Pasang begisting untuk lantai per 1 M2
A TENAGA
Pekerja L.01 OH 0.6600 110,000.00 72,600.00
Tukang L.02 OH 0.3300 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.0330 - -
Mandor L.04 OH 0.0330 - -
JUMLAH TENAGA KERJA 112,200.00
B BAHAN
Kayu begisting M3 0.0400 2,000,000.00 80,000.00
Paku biasa Kg 0.4000 20,000.00 8,000.00
Minyak begisting Ltr 0.2000 69,000.00 13,800.00
Balok kayu M3 0.0150 2,000,000.00 30,000.00
Plywood tebal 6 mm Lbr 0.3500 2,000,000.00 700,000.00
Kayu perancah Btg 6.0000 31,000.00 186,000.00
JUMLAH HARGA BAHAN 1,017,800.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,130,000.00


E Harga Satuan Pekerjaan (D) 1,130,000.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7

19 Plesteran dinding 1Pc : 2Ps Per 1 M2


A TENAGA
Pekerja L.01 OH 0.3000 110,000.00 33,000.00
Tukang L.02 OH 0.1500 120,000.00 18,000.00
Kepala Tukang L.03 OH 0.0150 - -
Mandor L.04 OH 0.0150 - -
JUMLAH TENAGA KERJA 51,000.00
B BAHAN
Portland Cemen Kg 10.2240 1,900.00 19,425.60
Pasir Pasang M3 0.0200 130,000.00 2,600.00
JUMLAH HARGA BAHAN 22,025.60
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 73,025.60


E Harga Satuan Pekerjaan (D) 73,025.60

Page 47 of 64
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
20 Acian Per 1 M2
A TENAGA
Pekerja L.01 OH 0.2000 110,000.00 22,000.00
Tukang L.02 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.0100 - -
Mandor L.04 OH 0.0100 - -
JUMLAH TENAGA KERJA 34,000.00
B BAHAN
Portland Cemen Kg 3.2500 1,900.00 6,175.00

JUMLAH HARGA BAHAN 6,175.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 40,175.00


E Harga Satuan Pekerjaan (D) 40,175.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
21 Bak Kontrol Pas. Bata 45cm x 45cm tinggi 50cm 1 Bh
A TENAGA
Pekerja L.01 OH 3.2000 110,000.00 352,000.00
Tukang L.02 OH 1.1500 120,000.00 138,000.00
Kepala Tukang L.03 OH 0.0110 - -
Mandor L.04 OH 0.0160 - -
JUMLAH TENAGA KERJA 490,000.00
B BAHAN
Bata Merah bh 70.0000 1,700.00 119,000.00
Portland Cemen kg 77.0000 1,900.00 146,300.00
Pasir Pasang m3 0.1300 130,000.00 16,900.00
Pasir Beton m3 0.0900 130,000.00 11,700.00
Batu Pecah/Split 1-2 m3 0.0200 495,000.00 9,900.00
Baja Tulangan 2.0000 101,000.00 202,000.00

JUMLAH HARGA BAHAN 505,800.00


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 995,800.00


E Harga Satuan Pekerjaan (D) 995,800.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7

22 Pengecatan 1 M2 Tembok Baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA
Pekerja L.01 OH 0.0200 110,000.00 2,200.00
Tukang L.02 OH 0.0630 120,000.00 7,560.00
Kepala Tukang L.03 OH 0.0063 - -
Mandor L.04 OH 0.0030 - -
JUMLAH TENAGA KERJA 9,760.00
B BAHAN
Plamir Kg 0.1000 49,500.00 4,950.00
Cat Dasar Kg 0.1000 65,000.00 6,500.00
Cat Penutup Kg 0.2600 - -
JUMLAH HARGA BAHAN 11,450.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 21,210.00


E Harga Satuan Pekerjaan (D) 21,210.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
23 Pemasangan 1 M' Pipa HDPE Ø 3"
A TENAGA
Pekerja L.01 OH 0.0400 110,000.00 4,400.00
Tukang L.02 OH 0.0200 120,000.00 2,400.00
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA 6,800.00
B BAHAN
Pipa HDPE Ø 3" M' 1.0000 118,000.00 118,000.00
Perlengkapan 35 % x Pipa % 35.0000 41,300.00 41,300.00
JUMLAH HARGA BAHAN 159,300.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 166,100.00


E Harga Satuan Pekerjaan (D) 166,100.00

Page 48 of 64
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
22 Pemasangan 1 Bh Tee Ø 3
A TENAGA
Pekerja L.01 OH 0.1060 120,000.00 12,720.00
Tukang L.02 OH 0.0530 - -
Mandor L.04 OH 0.0110 - -
JUMLAH TENAGA KERJA 12,720.00
B BAHAN
Tee Ø 3 bh 1.0000 16,500.00 16,500.00
Perlengkapan 35 % x Pipa % 35.0000 5,775.00 5,775.00
JUMLAH HARGA BAHAN 22,275.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 34,995.00


E Harga Satuan Pekerjaan (D) 34,995.00

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
27 Pemasangan 1 Bh ELBOW Ø 3
A TENAGA
Pekerja L.01 OH 0.1060 120,000.00 12,720.00
Tukang L.02 OH 0.0530 - -
Mandor L.04 OH 0.0110 - -
JUMLAH TENAGA KERJA 12,720.00
B BAHAN
ELBOW Ø 3 bh 1.0000 16,500.00 16,500.00
Perlengkapan 35 % x Pipa % 35.0000 5,775.00 5,775.00
JUMLAH HARGA BAHAN 22,275.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 34,995.00


E Harga Satuan Pekerjaan (D) 34,995.00

Page 49 of 64
BACK UP DATA

NO. URAIAN PEKERJAN URAIAN VOLUME VOLUME

1 2 3 4
0 PEKERJAAN PERSIAPAN
1 Galian Tanah Panjang 2.00
Lebar (B) 1.50
Tinggi (H) 1.00
Volume 3.00
2 Urugan pasir bawah Lantai
Panjang 2.00
Lebar (B) 1.50
Tinggi (H) 0.10
Volume 3.60
3 Urugan kembali
Volume 0.10
0 PEKERJAAN PONDASI
1 Tiang Pancang ulin 10cm x 10cm - 2 meter

volume 3.00
D PEKERJAAN BETON
1 Beton lantai Kerja 1 : 3 : 5, T = 10 cm Panjang 2.00
Lebar (B) 1.50
Tinggi (H) 0.10
volume 0.30
2 Beton Kolom (15 x 15)
a. Cor beton 1 : 2 : 3 Panjang 1.00
Lebar (B) 0.15
Tinggi (H) 0.15
Jumlah 6.00
Volume 0.14
Total Volume Cor Beton 0.14
b. Pembesian
Tulangan pokok Diameter besi 10.00
Koefisien per m 0.617
Jarak Tulangan 0.20
Jumlah 4.00
Pembulatan 4.00
Panjang Tulangan 1.00
Berat Tulangan 2.47
Beugel Diameter besi 8.00
Koefisien per m 0.395
Jarak Tulangan 0.20
Jumlah 6.00
Pembulatan 6.00
Panjang Tulangan 0.60
Berat Tulangan 2.84
Total Volume Pembesian V1 31.85
Total Volume Pembesian V1+V2 31.85
3 Beton Sloof (15 x 15)
a. Cor beton 1 : 2 : 3 Panjang 4.00
Lebar (B) 0.15
Tinggi (H) 0.15
Volume 0.09
Total Volume Cor Beton 0.09
b. Pembesian
Tulangan pokok Diameter besi 8.00
Koefisien per m 0.395
Jarak Tulangan 0.20
Jumlah 4.00
Pembulatan 4.00
Panjang Tulangan 4.00
Berat Tulangan 6.31
Beugel Diameter besi 6.00
Koefisien per m 0.222
Jarak Tulangan 0.20
Jumlah 21.00
Pembulatan 36.00
Panjang Tulangan 0.40
Berat Tulangan 3.20
Total Volume Pembesian V1 9.51
c. Pasang begisting
Panjang 7.00
Tinggi (H) 0.15
Lebar (B) 0.15
Volume 2.10
Total Volume begisting 2.10
4 Beton Balok (15 x 15)
a. Cor beton 1 : 2 : 3 Panjang 7.00
Lebar (B) 0.15
Tinggi (H) 0.15
Volume 0.16
Total Volume Cor Beton 0.16
b. Pembesian
Tulangan pokok Diameter besi 8.00
Koefisien per m 0.395
Jarak Tulangan 0.20
Jumlah 4.00
Pembulatan 4.00
Panjang Tulangan 7.00
Berat Tulangan 11.05
Beugel Diameter besi 6.00
Koefisien per m 0.222
Jarak Tulangan 0.20
Jumlah 36.00
Pembulatan 36.00
Panjang Tulangan 0.60
Berat Tulangan 4.80
Total Volume Pembesian V1 15.85
Total Volume Pembesian V1+V2 20.64
c. Pasang begisting
Panjang 7.00
Tinggi (H) 0.15
Lebar (B) 0.15
Volume 2.10
Total Volume begisting 2.00
5 Plat Beton
a. Cor beton 1 : 2 : 3 Panjang (Dinding) 7.00
Tinggi (H) 1.00
Tebal 0.15
Volume 1.05
Panjang Dinding (Outlet & Inlet) 0.30
Tinggi (H) 0.30
Tebal 0.15
Volume 0.03
Panjang atas (Outlet & Inlet) 0.30
Tinggi (H) 0.30
Tebal 0.15
Volume 0.03
Panjang Plat (Bawah) 3.00
Lebar (B) 1.50
Tinggi (H) 0.15
Volume 0.60
Panjang Plat (Atas) 3.00
Lebar (B) 1.50
Tinggi (H) 0.15
Volume 0.68
Total Volume Cor Beton 2.38
b. Pembesian Dinding
Tulangan pokok Diameter besi 8.00
Koefisien per m 0.395
Jarak Tulangan 0.20
Jumlah 36.00
Pembulatan 36.00
Panjang Tulangan 1.00
Berat Tulangan 28.42
Beugel Diameter besi 6.00
Koefisien per m 0.222
Jarak Tulangan 0.20
Jumlah 6.00
Pembulatan 6.00
Panjang Tulangan 7.00
Berat Tulangan 18.65
Total Volume Pembesian (Dinidng) 47.06
Bawah
Tulangan pokok Diameter besi 8.00
Koefisien per m 0.395
Jarak Tulangan 0.20
Jumlah 16.00
Pembulatan 16.00
Panjang Tulangan 1.50
Berat Tulangan 18.94
Beugel Diameter besi 6.00
Koefisien per m 0.222
Jarak Tulangan 0.20
Jumlah 8.50
Pembulatan 9.00
Panjang Tulangan 3.00
Berat Tulangan 11.99
Total Volume Pembesian (Bawah) 30.93
Atas
Tulangan pokok Diameter besi 8.00
Koefisien per m 0.395
Jarak Tulangan 0.20
Jumlah 16.00
Pembulatan 16.00
Panjang Tulangan 1.50
Berat Tulangan 18.94
Beugel Diameter besi 6.00
Koefisien per m 0.222
Jarak Tulangan 0.20
Jumlah 8.50
Pembulatan 9.00
Panjang Tulangan 7.30
Berat Tulangan 29.17
Total Volume Pembesian (Bawah) 48.12
Dinding (Outlet & Inlet)
Tulangan pokok Diameter besi 8.00
Koefisien per m 0.395
Jarak Tulangan 0.20
Jumlah 2.50
Pembulatan 3.00
Panjang Tulangan 0.30
Berat Tulangan 0.71
Beugel Diameter besi 8.00
Koefisien per m 6.000
Jarak Tulangan 0.20
Jumlah 2.50
Pembulatan 3.00
Panjang Tulangan 0.30
Berat Tulangan 10.80
Total Volume Pembesian (Bawah) 23.02
Atas (Outlet & Inlet)
Tulangan pokok Diameter besi 8.00
Koefisien per m 0.395
Jarak Tulangan 0.20
Jumlah 2.50
Pembulatan 3.00
Panjang Tulangan 0.30
Berat Tulangan 0.71
Beugel Diameter besi 6.00
Koefisien per m 0.222
Jarak Tulangan 0.20
Jumlah 2.50
Pembulatan 2.00
Panjang Tulangan 0.30
Berat Tulangan 0.27
Total Volume Pembesian (Bawah) 1.95
Total Volume Pembesian 151.09
c. Pasang begisting Dinding
Panjang 7.00
Tinggi (H) 1.00

Volume 14.00
Panjang Dinding (Outlet & Inlet)
Panjang 0.30
Tinggi (H) 0.30

Volume 0.36
Panjang atas (Outlet & Inlet)
Panjang 0.30
Lebar 0.30
tebal 0.15
Volume 1.89

Panjang Plat (Atas)


Panjang 2.00
Lebar 1.50
tebal 0.12
Volume 3.84
Total Volume begesting 20.09
6 beton Plat Dudukan Filter T = 5 cm
a. Cor beton 1 : 2 : 3 Panjang 0.40
Lebar 0.80
Tebal 0.10
jumlah 3.00
Volume 0.10
b. Pembesian
Tulangan pokok Diameter besi 8.00
Koefisien per m 0.395
Jarak Tulangan 0.20
Jumlah 3.00
Pembulatan 3.00
Panjang Tulangan 0.80
Berat Tulangan 0.95
Beugel Diameter besi 6.00
Koefisien per m 0.222
Jarak Tulangan 0.20
Jumlah 5.00
Pembulatan 5.00
Panjang Tulangan 0.40
Berat Tulangan 0.44
Total Volume Pembesian 1.39
Total Volume Pembesian (dudukan filter) 4.17
c. Pasang begisting
Panjang 0.40
Tinggi (H) 0.80
tebal 0.15
Volume 0.68
0 PEKERJAAN DINDING DAN PLESTERAN
1 Pasangan Dinding 1/2 Bata 1Pc : 2Ps Panjang 4.00
Tinggi 1.00
jumlah 3.00
Volume 12.00
2 Plesteran dinding Bata 1Pc : 2Ps + acian Panjang 4.00
Tinggi 1.00
jumlah 5.00
Volume 40.00
` 0 PEKERJAAN PENGECATAN
1
Panjang 2.00
lebar 1.50
Volume 3.00
` 0 PEKERJAAN SANITAIR
1 Pekerjaan Pipa Induk HDPE 4'' 6.00
Panjang 36.00
Volume di bulatkan 36.00
2 Pekerjaan Pipa HDPE 4'' sambungan SR 69.25
Panjang 415.50
Volume di bulatkan 415.50
3 Pekerjaan Pipa HDPE 4'' DI DALAM IPAL panjang 2.00
jumlah 6.00
Volume 12.00
4 Pekerjaan Fitting Conection HDPE Elbow 4''
jumlah 20.00
Volume 20.00
6 Pekerjaan Fitting Conection HDPE TEE 4''
jumlah 25.00
Volume 25.00
7 Pekerjaan Fitting Conection HDPE TEE 4'' DI DALAM
IPAL jumlah 59.00
Volume 59.00
LUME

m
m
m
m3

m
m
m
m3

m3 ok

Btg

m
m
m
m3 ok

m 9 40.5 49.5 8.25


m
m
titik
m3
m3 ok

mm
Kg/m
m
bh
bh
m
Kg/m ok
mm
Kg/m
m
bh
bh
m
Kg/m
Kg/m ok
Kg/m ok

m 31.4
m
m
m2 ok 5
m2 ok 26.9200

mm 1.2 2 2.4
Kg/m 0.65 2 1.3
m 3.7
bh 7.4
bh
m
Kg/m ok
mm besi 6
Kg/m
m
bh
bh
m
Kg/m ok
Kg/m

m
m
m
m2
m2 ok

m
m
m
m2
m2 ok

mm
Kg/m
m
bh
bh
m
Kg/m ok
mm
Kg/m
m
bh
bh
m
Kg/m
Kg/m
Kg/m ok

m
m
m
m2
m2 ok

m
m
m
M3 ok 7.00
m 7.45
m

M3 ok 2.69166666666667
m
m

M3 ok
m
m
m
m ok
m
m
m
m
M3 ok

mm
Kg/m
m
bh
bh
m
Kg/m ok
mm
Kg/m
m
bh
bh
m
Kg/m
Kg/m ok

mm
Kg/m
m
bh
bh
m
Kg/m ok
mm
Kg/m
m
bh
bh
m
Kg/m
Kg/m ok

mm
Kg/m
m
bh
bh
m
Kg/m ok
mm
Kg/m
m
bh
bh
m
Kg/m
Kg/m ok

mm
Kg/m
m
bh
bh
m
Kg/m ok
mm
Kg/m
m
bh
bh
m
Kg/m
Kg/m ok

mm
Kg/m
m
bh
bh
m
Kg/m ok
mm
Kg/m
m
bh
bh
m
Kg/m
Kg/m
Kg/m 0k

m
m

m2 ok

m
m

m2 ok

m
m
m
m2 ok

m
m
m
m2
m2 0k

m
m
m
bh
m2 ok

mm
Kg/m
m
bh
bh
m
Kg/m ok
mm
Kg/m
m
bh
bh
m
Kg/m
Kg/m
Kg/m ok

m
m
m
m2 ok

m
m
titik
m2 ok
m
m
titik
m2 ok
m 69
m
m2 ok pipa induk Ø 6
1 2 3 4 5
Btg 0 0 0 415.5 0
m 69
m pipa SR Ø 4 `
btg 50 Jumlah (m) btg (panjang 6 m) di bulatkan
m 8 40 6.66666666666667 34
m
conection TEE Ø 6
m 8 Jumlah (m) Buah 8
m 2.5 40 40
pipa L 12
m
m 12 conection ELBOW
pipa T 4
m
m
pipa T 9
Bh -
m
16

6 7 8 9 Jumlah (m) btg (panjang 6 m) di bulatkan


0 0 0 0 415.5 69.25 15
0
16

conection TEE Ø 4 conection TURUNAN Ø 4 KE Ø 6


Jumlah (m) Buah 2 8 Buah
25 1 4 4

conection ELBOW Ø 4 Bak Kontrol ( 2 SR 1 BAK KONTROL)


Bak Kontrol ( 2 SR 1 BAK KONTROL)
8 Buah
3 0.25
16 17 18 19 20 21 22 23 24 25
26
RENCANA ANGGARAN BIAYA
(ENGINEER ESTIMATE)

Program : PROGRAM SANITASI PERDESAAN PADAT KARYA


Pekerjaan : PEMBANGUNAN SEPTICTANK KOMUNAL
Lokasi : DESA LUBAK MANIS
Sumber Dana : APBN TA. 2019

REAISASI SAPAI DENGAN TAHAP


VOLUME HARGA SATUAN JUMLAH BOBOT LALU RANCANA KERJA
NO. URAIAN PEKERJAAN KETERANGAN
SATUAN JUMLAH
( Rp. ) ( Rp. ) (%) VOLUME BOBOT VOLUME JULAH HARGA BOBOT
HARGA
a b c d e = (c x d)
A PEKERJAAN PERSIAPAN
1 Pekerjaan Pengukuran dan Pemasangan Bowplank 4.00 M' 67,290.00 269,160.00 0.12 4.00 269,160.00 #REF!
2 Plang nama digital printing 1.00 Bh 250,000.00 250,000.00 0.11 1.00 250,000.00 #REF!
3 Pembuatan Shop Drawing, As Built Drawing, Dokumentasi dan 1.00 Ls 500,000.00 500,000.00 0.23 1.00 500,000.00 #REF!
Pelaporan
Jumlah 1,019,160.00 0.46 1,019,160.00 #REF!
B PEKERJAAN TANAH
1 Galian Tanah 3.00 M3 99,000.00 297,000.00 0.13 3.00 297,000.00 #REF!
2 Urugan pasir bawah Lantai 3.60 M3 189,000.00 680,400.00 0.31 3.60 680,400.00 #REF!
3 Urugan kembali 0.10 M3 55,000.00 5,500.00 0.00 0.10 5,500.00 #REF!
Jumlah 982,900.00 0.44 982,900.00 #REF!
C PEKERJAAN PONDASI
1 Tiang Pancang Beton 10cm x 10cm - 2 meter 3.00 M' 300,000.00 900,000.00 0.41 3.00 900,000.00 #REF!
Jumlah 900,000.00 0.41 900,000.00 #REF!
D PEKERJAAN BETON
1 Beton lantai Kerja 1 : 3 : 5, T = 10 cm
a. Cor Beton 0.30 M3 1,535,555.00 460,666.50 0.21 0.30 460,666.50 #REF!
2 Beton Kolom (15 x 15) - - #REF!
a. Cor beton 1 : 2 : 3 0.14 M3 1,625,400.00 219,429.00 0.10 0.14 219,429.00 #REF!
b. Pembesian 31.85 Kg 108,035.00 3,440,890.14 1.55 31.85 3,440,890.14 #REF!
3 Beton Sloof (15 x 15) - - #REF!
a. Cor beton 1 : 2 : 3 0.09 M3 1,625,400.00 146,286.00 0.07 0.09 146,286.00 #REF!
b. Pembesian 9.51 Kg 108,035.00 1,027,576.86 0.46 9.51 1,027,576.86 #REF!
4 Beton Balok (15 x 15) - - #REF!
a. Cor beton 1 : 2 : 3 0.16 M3 1,625,400.00 256,000.50 0.12 0.16 256,000.50 #REF!
b. Pembesian 20.64 Kg 108,035.00 2,229,969.69 1.00 20.64 2,229,969.69 #REF!
5 Beton Plat - - - #REF!
a. Cor beton 1 : 2 : 3 2.38 M3 1,625,400.00 3,874,619.37 1.75 2.38 3,874,619.37 #REF!
b. Pembesian 151.09 Kg 108,035.00 16,322,565.20 7.35 151.09 16,322,565.20 #REF!
c. Pasang begisting 20.09 M2 351,500.00 7,061,635.00 3.18 20.09 7,061,635.00 #REF!
6 beton Plat Dudukan Filter T = 5 cm #REF!
a. Cor beton 1 : 2 : 3 0.10 M3 1,625,400.00 156,038.40 0.07 0.10 156,038.40 #REF!
b. Pembesian 4.17 Kg 108,035.00 450,897.31 0.20 4.17 450,897.31 #REF!
c. Pasang begisting 0.68 M2 351,500.00 239,020.00 0.11 0.68 239,020.00 #REF!
Jumlah 35,885,593.96 18.66 35,885,593.96 #REF! - -

Page 63 of 64
RENCANA ANGGARAN BIAYA
(ENGINEER ESTIMATE)

Program : PROGRAM SANITASI PERDESAAN PADAT KARYA


Pekerjaan : PEMBANGUNAN SEPTICTANK KOMUNAL
Lokasi : DESA LUBAK MANIS
Sumber Dana : APBN TA. 2019

E PEKERJAAN DINDING DAN PLESTERAN


1 Pasangan Dinding 1/2 Bata 1Pc : 2Ps 12.00 M2 207,145.00 2,485,740.00 1.12 12.00 1,943,502.74 #REF! 12.00 542,237.26 #REF!
2 Plesteran dinding Bata 1Pc : 2Ps + acian 40.00 M2 73,025.60 2,921,024.00 1.32 40.00 2,921,024.00 #REF!
Jumlah 5,406,764.00 2.44 1,943,502.74 #REF! 3,463,261.26 #REF!
F PEKERJAAN MANHOLE & BAK KONTROL
1 Pengadaan Manhole Ø 40 1.00 Bh #REF! #REF! #REF! 1.00 #REF! #REF! 1.00
2 Pengadaan Filter Bakteri 1.00 Ls 3,500,000.00 3,500,000.00 1.58 1.00 3,500,000.00 #REF!
3 Pembuatan Bak Kontrol 3.00 bh 995,800.00 2,987,400.00 1.35 3.00 2,987,400.00 #REF!
Jumlah #REF! #REF! #REF! #REF! 6,487,400.00 #REF!
G PEKERJAAN PENGECATAN
1 Pengecatan SEPTICTANK 3.00 M2 21,210.00 63,630.00 0.03 63,630.00 #REF!
Jumlah 63,630.00 0.03 63,630.00 #REF!

TOTAL NILAI #REF! #REF! #REF! #REF! 10,014,291.26 #REF!


TOTAL NILAI KEGIATAN SEPTIKTENK 6 TITIK #REF! #REF! #REF! #REF! 60,085,747.58 27.07
B PEKERJAAN SANITAIR
1 Pekerjaan Pipa Induk
a. Pasangan Pipa HDPE Ø 4" 36.00 M' 166,100.00 5,979,600 2.69 5,979,600.00 #REF!
2 Pekerjaan Pipa Bangunan IPAL
a. Pasangan Pipa HDPE Ø 4" 12.00 M' 166,100.00 1,993,200 0.90 1,993,200.00 #REF!
b. Pasangan Fitting TEE Ø 4" 59.00 bh 34,995.00 2,064,705 0.93 2,064,705.00 #REF!
3 Pekerjaan Fitting dan Pipa HDPE SR
a. Pasangan Pipa HDPE Ø 4" 415.50 M' 166,100.00 69,014,550 31.09 69,014,550.00 #REF!
c. Pasangan Fitting TEE Ø 4" 25.00 Bh 34,995.00 874,875 0.39 874,875.00 #REF!
d. Pasangan Fitting ELBOW Ø 4" 20.00 Bh 34,995.00 699,900 0.32 699,900.00 #REF!
Bh - #REF!
Jumlah 80,626,830 36.32 80,626,830.00 #REF!
BIAYAOPERASIONAL (BOP) 1 LS 17,500,000.00 17,500,000 #REF! 12,250,000 #REF! 5,250,000 #REF!
TOTAL NILAI KEGIATAN #REF! #REF! #REF! #REF! 145,962,578 #REF!
Pekerjaan s/d Bulan Lalu
Rencana Pekerjaan Tahap Pertama 145,962,578
Total Rencana Pekerjaan #REF!
TERBILANG DUA RATUS DUA PULUH DUA JUATA RUPIAH

Page 64 of 64