Rumus
Ak = Q/vt Simbol
Luas KPL (m2) Ak
Jumlah aliran rata2 pertahun (m3/det) Q
kecepatan vertikal partikel (m/det) vt
Q = Vl=Va+Vt
Satuan Simbol
(m3/th) Q
(m3/hari) Q
(m3/detik) Q
Parameter Satuan
Parameter Satuan
Kesimpulan :
Seluruh Daya tampung KPL BTA 01 s.d id BTA 03 mencukupi kebutuhan pengelolaan limbah cair
KOLAM PENGENDAP LUMPUR IUP MUARA TIGA BESAR (MTB) TAHUN 2022
EDIMEN YANG MASUK KE KPL IUP MUARA TIGA BESAR (MTB) TAHUN 2022
UMPUR YANG MASUK DI KPL IUP MUARA TIGA BESAR (MTB) TAHUN 2022
DAN RENCANA PENGURASAN KPL IUP MUARA TIGA BESAR (MTB) TAHUN 2022
22
KPL MT 12
24,371
2,521
9.7
1.15
1
2.45
93,939
-
93,939
KPL MT 12
303
0.06
0.0002
KPL MT 12
1,910,095.9
5,233.1
0.06
KPL MT 12
2,051
5,100
18
KPL MT 12
9947 > 200
Berarti KPL ok
PERENCANAAN SIPIL DA
TAMBANG MT
Kode sump
Elevasi dasar sump
Luas catchmen area
Faktor pompa rencana (C) 0.3
Debit pompa (D) =B*C 378.783
Debit kiriman (E)
Debit pompa rencana (F) =D+E 378.783
Faktor sump rencana (G) 1,243
Vol. air sisa rencana (H) =B*G 1,569,154
Vol. sump dibutuhkan (H') =H*1.1 1,726,070
TAMBANG MT
Kode sump
Elevasi dasar sump
Luas catchmen area
Faktor pompa rencana (C) 0.3
Debit pompa (D) =B*C 100.854
Debit kiriman (E)
Debit pompa rencana (F) =D+E 100.854
Faktor sump rencana (G) 1,243
Vol. air sisa rencana (H) =B*G 417,800
Vol. sump dibutuhkan (H') =H*1.1 459,580
TAMBANG MTBU
MT-14 (AL-10)
(A) -79
(B) 1,263 ha
RESUME
m3/mnt Debit pompa teori 1096.86 m3/mnt
m3/mnt Faktor pompa teori 0.869
m /mnt
3
Faktor sump teori 1,103 m3/ha
m3/ha Volume air sisa teori 1,393,046 m3
m3 Vol. sump dibutuhkan 1,532,351 m3
m3 Kecepatan ijin aliran dalam pipa Oke…
TAMBANG MTBU
MT-03
(A) -7
(B) 336 ha
RESUME
m3/mnt Debit pompa teori 4125.93 m3/mnt
m3/mnt Faktor pompa teori 12.273
m3/mnt Faktor sump teori 811 m3/ha
m3/ha Volume air sisa teori 272,739 m3
m3 Vol. sump dibutuhkan 300,013 m3
m3 Kecepatan ijin aliran dalam pipa Oke…
102
46
52.42
98.42
Q (m3/mnt)
0.00
0.00
2121.19
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2121.19
Kec (m/s)
1.00
1.00
675.97
1.00
1.00
675.97
HrB (m)
16296.73
0.00
25651.50
51303.00
23312.74
48096.56
0.00
765549.58
Oke…
102
41
52.42
93.42
Q (m3/mnt)
0.00
0.00
2118.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2118.14
Kec (m/s)
1.00
1.00
674.99
1.00
1.00
674.99
HrB (m)
16253.38
0.00
25583.27
51166.54
23245.71
47968.63
0.00
763508.26
Pit Parameter m2 elevasi (meter)
Atas (Main Sump) 160,758.81 2
Bawah (Main Sump) 1,304,552.46 -79
MTBU Tinggi (Main Sump) 81
Rencana mine sump 59,345,106.44 m3
kebutuhan volume 1,726,069.85 m3
Volume Rencana Mine sump memadai kebutuhan daya tampung
C. Debit Saluran
Q1 = C x It x A/360
D. Dimensi Saluran
F = (B + ( m x h )) x h
O = (2 x ((m x h)2 + h2))1/2) + B
v = 1/n x (F/O)2/3 x S1/2
15.00 (m) =B F
1.00 ( 1 : #,## ) = m m2
3.00 (m) =h
54.00
0.035 =n
0.029 =S Catatan :
- Aliran Air Dapat Mengerosi Saluran
- Perlu Perkuatan Dinding Saluran
E. Sketsa
H= 3.00 m,
1: 1.00
B
Kapasitas Pengaliran 128% 15.00
Tahun 2022
TATA CARA KERJA
PEMBUATAN RENCANA No. Dok.
DAN EVALUASI HIDROLOGI No. Rev.
PERHITUNGAN DIMENSI Halaman
SALURAN
C. Debit Saluran
Q1 = C x It x A/360
D. Dimensi Saluran
F = (B + ( m x h )) x h
O = (2 x ((m x h)2 + h2))1/2) + B
v = 1/n x (F/O)2/3 x S1/2
5.00 (m) =B F
1.00 ( 1 : #,## ) = m m2
2.50 (m) =h
18.75
0.035 =n
0.029 =S Catatan :
- Aliran Air Dapat Mengerosi Saluran
- Perlu Perkuatan Dinding Saluran
E. Sketsa
H= 2.50 m,
1: 1.00
B
Kapasitas Pengaliran 127% 5.00
Tahun 2022
TATA CARA KERJA
PEMBUATAN RENCANA No. Dok.
DAN EVALUASI HIDROLOGI No. Rev.
PERHITUNGAN DIMENSI Halaman
SALURAN
C. Debit Saluran
Q1 = C x It x A/360
D. Dimensi Saluran
F = (B + ( m x h )) x h
O = (2 x ((m x h)2 + h2))1/2) + B
v = 1/n x (F/O)2/3 x S1/2
2.00 (m) =B F
1.00 ( 1 : #,## ) = m m2
1.50 (m) =h
5.25
0.035 =n
0.029 =S Catatan :
- Aliran Air Aman
- Tidak Perlu Perkuatan Dinding Saluran
E. Sketsa
H= 1.50 m,
1: 1.00
B
Kapasitas Pengaliran 172% 2.00
Tahun 2022
TATA CARA KERJA
PEMBUATAN RENCANA No. Dok.
DAN EVALUASI HIDROLOGI No. Rev.
PERHITUNGAN DIMENSI Halaman
SALURAN
C. Debit Saluran
Q1 = C x It x A/360
D. Dimensi Saluran
F = (B + ( m x h )) x h
O = (2 x ((m x h)2 + h2))1/2) + B
v = 1/n x (F/O)2/3 x S1/2
2.50 (m) =B F
1.00 ( 1 : #,## ) = m m2
2.00 (m) =h
9.00
0.035 =n
0.029 =S Catatan :
- Aliran Air Dapat Mengerosi Saluran
- Perlu Perkuatan Dinding Saluran
E. Sketsa
H= 2.00 m,
1: 1.00
B
Kapasitas Pengaliran 195% 2.50
Tahun 2022
TATA CARA KERJA
PEMBUATAN RENCANA No. Dok.
DAN EVALUASI HIDROLOGI No. Rev.
PERHITUNGAN DIMENSI Halaman
SALURAN
C. Debit Saluran
Q1 = C x It x A/360
D. Dimensi Saluran
F = (B + ( m x h )) x h
O = (2 x ((m x h)2 + h2))1/2) + B
v = 1/n x (F/O)2/3 x S1/2
2.00 (m) =B F
1.00 ( 1 : #,## ) = m m2
2.50 (m) =h
11.25
0.035 =n
0.029 =S Catatan :
- Aliran Air Dapat Mengerosi Saluran
- Perlu Perkuatan Dinding Saluran
E. Sketsa
H= 2.50 m,
1: 1.00
B
Kapasitas Pengaliran 105% 2.00
Tahun 2022
TATA CARA KERJA
PEMBUATAN RENCANA No. Dok.
DAN EVALUASI HIDROLOGI No. Rev.
PERHITUNGAN DIMENSI Halaman
SALURAN
D. Dimensi Saluran
F = (B + ( m x h )) x h
O = (2 x ((m x h)2 + h2))1/2) + B
v = 1/n x (F/O)2/3 x S1/2
2.00 (m) =B F
1.00 ( 1 : #,## ) = m m2
2.50 (m) =h
11.25
0.035 =n
0.029 =S Catatan :
- Aliran Air Dapat Mengerosi Saluran
- Perlu Perkuatan Dinding Saluran
E. Sketsa
H= 2.50 m,
1: 1.00
B
Kapasitas Pengaliran 159% 2.00
Tahun 2022
: BAMSF:REN:7.1.0:03:21
:1 DAN EVALUASI HI
:
Nama Saluran
Lokasi Saluran
C. Debit Saluran
Q1 = C x It x A/360
Q3 (lain-lain) Q (total) C
m3/detik m3/detik
0.00 357.66 0.70
D. Dimensi Saluran
F = (B + ( m x h )) x h
O = (2 x ((m x h)2 + h2))1/2) + B
v = 1/n x (F/O)2/3 x S1/2
O v Q 5.00
m m/detik m3/detik 1.00
2.00
23.49 8.50 459.02
0.035
0.029
ir Dapat Mengerosi Saluran
erkuatan Dinding Saluran
E. Sketsa
Kapasitas Pengaliran
Tahun 2022
: BAMSF:REN:7.1.0:03:21
:1 DAN EVALUASI HI
:
Nama Saluran
Lokasi Saluran
C. Debit Saluran
Q1 = C x It x A/360
Q3 (lain-lain) Q (total) C
m3/detik m3/detik
0.00 96.91 0.70
D. Dimensi Saluran
F = (B + ( m x h )) x h
O = (2 x ((m x h)2 + h2))1/2) + B
v = 1/n x (F/O)2/3 x S1/2
O v Q 1.00
m m/detik m3/detik 1.00
1.50
12.07 6.54 122.71
0.035
0.029
ir Dapat Mengerosi Saluran
erkuatan Dinding Saluran
E. Sketsa
Kapasitas Pengaliran
Tahun 2022
: BAMSF:REN:7.1.0:03:21
:1 DAN EVALUASI HI
:
Nama Saluran
Lokasi Saluran
C. Debit Saluran
Q1 = C x It x A/360
Q3 (lain-lain) Q (total) C
m3/detik m3/detik
0.00 13.24 0.70
D. Dimensi Saluran
F = (B + ( m x h )) x h
O = (2 x ((m x h)2 + h2))1/2) + B
v = 1/n x (F/O)2/3 x S1/2
O v Q 2.00
m m/detik m3/detik 1.00
2.50
6.24 4.35 22.82
0.035
0.029
erlu Perkuatan Dinding Saluran
E. Sketsa
Kapasitas Pengaliran
Tahun 2022
: BAMSF:REN:7.1.0:03:21
:1 DAN EVALUASI HI
:
Nama Saluran
Lokasi Saluran
C. Debit Saluran
Q1 = C x It x A/360
Q3 (lain-lain) Q (total) C
m3/detik m3/detik
0.00 24.04 0.70
D. Dimensi Saluran
F = (B + ( m x h )) x h
O = (2 x ((m x h)2 + h2))1/2) + B
v = 1/n x (F/O)2/3 x S1/2
O v Q 1.00
m m/detik m3/detik 1.00
1.50
8.16 5.21 46.89
0.035
0.029
ir Dapat Mengerosi Saluran
erkuatan Dinding Saluran
E. Sketsa
Kapasitas Pengaliran
Tahun 2022
: BAMSF:REN:7.1.0:03:21
:1
:
Nama Saluran
Lokasi Saluran
A. Waktu Konsentrasi
Intensitas Curah Hujan tc = 60 * (0,871*(L3/H))0,385
It = a / (tc + b)
I2 = 7.524,45 / ( tc + 37,90 )
L
It (periode ulang t tahun) km
mm/jam 1.00
146.41
C. Debit Saluran
Q1 = C x It x A/360
C
Q3 (lain-lain) Q (total)
m3/detik m3/detik 0.70
0.00 60.33
D. Dimensi Saluran
F = (B + ( m x h )) x h
O = (2 x ((m x h)2 + h2))1/2) + B
v = 1/n x (F/O)2/3 x S1/2
2.00
O v Q 1.00
m m/detik m3/detik 2.00
0.035
9.07 5.63 63.37
0.029
Kapasitas Pengaliran
: BAMSF:REN:7.1.0:03:21
:1
:
O v Q
m m/detik m3/detik
9.07 5.63 63.37
: MTBU
: Inlet Outlet KPL MT-08
Debit Saluran
Q1 = C x It x A/360
Dimensi Saluran
F = (B + ( m x h )) x h
O = (2 x ((m x h)2 + h2))1/2) + B
v = 1/n x (F/O)2/3 x S1/2
(m) =B F O v Q
( 1 : #,## ) = m m2 m m/detik m3/detik
(m) =h 14.00 10.66 5.85 81.94
=n
=S Catatan :
- Aliran Air Dapat Mengerosi Saluran
- Perlu Perkuatan Dinding Saluran
H= 2.00 m,
1: 1.00
B
160% 5.00
: MTBU
: Inlet Outlet KPL MT-09
Debit Saluran
Q1 = C x It x A/360
Dimensi Saluran
F = (B + ( m x h )) x h
O = (2 x ((m x h)2 + h2))1/2) + B
v = 1/n x (F/O)2/3 x S1/2
(m) =B F O v Q
( 1 : #,## ) = m m2 m m/detik m3/detik
(m) =h 3.75 5.24 3.90 14.64
=n
=S Catatan :
- Aliran Air Aman
- Tidak Perlu Perkuatan Dinding Saluran
H= 1.50 m,
1: 1.00
B
193% 1.00
: MTBU
: Inlet Outlet KPL MT-10
Debit Saluran
Q1 = C x It x A/360
Dimensi Saluran
F = (B + ( m x h )) x h
O = (2 x ((m x h)2 + h2))1/2) + B
v = 1/n x (F/O)2/3 x S1/2
(m) =B F O v Q
( 1 : #,## ) = m m2 m m/detik m3/detik
(m) =h 11.25 9.07 5.63 63.37
=n
=S Catatan :
- Aliran Air Dapat Mengerosi Saluran
- Perlu Perkuatan Dinding Saluran
H= 2.50 m,
1: 1.00
B
123% 2.00
: MTBU
: Inlet Outlet KPL MT-11
Debit Saluran
Q1 = C x It x A/360
Dimensi Saluran
F = (B + ( m x h )) x h
O = (2 x ((m x h)2 + h2))1/2) + B
v = 1/n x (F/O)2/3 x S1/2
(m) =B F O v Q
( 1 : #,## ) = m m2 m m/detik m3/detik
(m) =h 3.75 5.24 3.90 14.64
=n
=S Catatan :
- Aliran Air Aman
- Tidak Perlu Perkuatan Dinding Saluran
H= 1.50 m,
1: 1.00
B
130% 1.00
: MTBU
: Inlet Outlet KPL MT-12
Debit Saluran
Q1 = C x It x A/360
(m) =B F O v Q
( 1 : #,## ) = m m2 m m/detik m3/detik
(m) =h
8.00 7.66 5.02 40.19
=n
=S Catatan :
- Aliran Air Dapat Mengerosi Saluran
- Perlu Perkuatan Dinding Saluran
H= 2.00 m,
1: 1.00
B
194% 2.00
EN:7.1.0:03:21
EN:7.1.0:03:21
EN:7.1.0:03:21
EN:7.1.0:03:21
EN:7.1.0:03:21
KPL MT-14 (AL-10)
H= 3.00
B
15.00
Kapasitas Alir 128%
KPL MT-03
H= 2.50
B
5.00
Kapasitas Alir 127%
KPL MT-01
H= 1.50
B
2.00
Kapasitas Alir 172%
KPL MT-02
H= 2.00
B
2.50
Kapasitas Alir 195%
KPL MT-04
H= 2.50
B
2.00
Kapasitas Alir 105%
KPL MT-05
H= 2.50
B
2.00
Kapasitas Alir 159%
KPL MT-08
H= 2.00
B
5.00
Kapasitas Alir 160%
KPL MT-09
H= 1.50
B
1.00
Kapasitas Alir 193%
KPL MT-10
H= 2.50
B
2.00
Kapasitas Alir 123%
KPL MT-11
H= 1.50
B
1.00
Kapasitas Alir A
KPL MT-12
H= 2.00
B
2.00
Kapasitas Alir 194%
Elevasi Panjang Penampang Kecepatan
stick Bawah Atas m2 m/detik
0 0 0 0 8.50
0.1 15.00 15.20 1.51 8.50
0.2 15.00 15.40 3.04 8.50
0.3 15.00 15.60 4.59 8.50
0.4 15.00 15.80 6.16 8.50
0.5 15.00 16.00 7.75 8.50
0.6 15.00 16.20 9.36 8.50
m, 0.7 15.00 16.40 10.99 8.50
1: 1.00 0.8 15.00 16.60 12.64 8.50
0.9 15.00 16.80 14.31 8.50
1 15.00 17.00 16 8.50
1.1 15.00 17.20 17.71 8.50
1.2 15.00 17.40 19.44 8.50
1.3 15.00 17.60 21.19 8.50
1.4 15.00 17.80 22.96 8.50
1.5 15.00 18.00 24.75 8.50
1.6 15.00 18.20 26.56 8.50
1.7 15.00 18.40 28.39 8.50
1.8 15.00 18.60 30.24 8.50
1.9 15.00 18.80 32.11 8.50
2 15.00 19.00 34 8.50
2.1 15.00 19.20 35.91 8.50
2.2 15.00 19.40 37.84 8.50
2.3 15.00 19.60 39.79 8.50
2.4 15.00 19.80 41.76 8.50
2.5 15.00 20.00 43.75 8.50
2.6 15.00 20.20 45.76 8.50
2.7 15.00 20.40 47.79 8.50
2.8 15.00 20.60 49.84 8.50
2.9 15.00 20.80 51.91 8.50
3 15.00 21.00 54 8.50
Debit
m3/detik m3/menit
0 0
3.3 200.3
6.8 408.4
10.4 624.3
14.1 848.2
18.0 1,079.8
22.0 1,319.4
26.1 1,566.8
30.4 1,822.0
34.8 2,085.1
39.3 2,356.0
43.9 2,634.8
48.7 2,921.5
53.6 3,216.0
58.6 3,518.3
63.8 3,828.6
69.1 4,146.6
74.5 4,472.5
80.1 4,806.3
85.8 5,147.9
91.6 5,497.4
97.6 5,854.7
103.7 6,219.9
109.9 6,593.0
116.2 6,973.9
122.7 7,362.6
Debit
m3/detik m3/menit
0 0
0.9 54.8
1.9 114.8
3.0 180.0
4.2 250.4
5.4 326.1
6.8 406.9
8.2 493.0
9.7 584.3
11.3 680.8
13.0 782.5
14.8 889.5
16.7 1,001.7
18.7 1,119.0
20.7 1,241.6
22.8 1,369.5
25.0 1,502.5
27.3 1,640.7
29.7 1,784.2
32.2 1,932.9
34.8 2,086.8
Debit
m3/detik m3/menit
0 0
1.4 81.3
2.8 168.8
4.4 262.6
6.0 362.6
7.8 468.9
9.7 581.5
11.7 700.3
13.8 825.3
15.9 956.6
18.2 1,094.1
20.6 1,237.9
23.1 1,388.0
25.7 1,544.3
28.4 1,706.9
31.3 1,875.7
34.2 2,050.7
37.2 2,232.1
40.3 2,419.6
43.6 2,613.4
46.9 2,813.5
50.3 3,019.8
53.9 3,232.4
57.5 3,451.2
61.3 3,676.3
65.1 3,907.7
Debit
m3/detik m3/menit
0 0
1.2 71.0
2.5 148.7
3.9 233.2
5.4 324.4
7.0 422.4
8.8 527.2
10.6 638.7
12.6 757.0
14.7 882.1
16.9 1,013.9
19.2 1,152.4
21.6 1,297.7
24.2 1,449.8
26.8 1,608.7
29.6 1,774.3
32.4 1,946.6
35.4 2,125.7
38.5 2,311.6
41.7 2,504.2
45.1 2,703.6
Debit
m3/detik m3/menit
0 0
1.2 71.0
2.5 148.7
3.9 233.2
5.4 324.4
7.0 422.4
8.8 527.2
10.6 638.7
12.6 757.0
14.7 882.1
16.9 1,013.9
19.2 1,152.4
21.6 1,297.7
24.2 1,449.8
26.8 1,608.7
29.6 1,774.3
32.4 1,946.6
35.4 2,125.7
38.5 2,311.6
41.7 2,504.2
45.1 2,703.6
Debit
m3/detik m3/menit
0 0
4.3 260.1
8.8 530.4
13.5 810.9
18.4 1,101.7
23.4 1,402.6
28.6 1,713.7
33.9 2,035.0
39.4 2,366.5
45.1 2,708.2
51.0 3,060.2
57.0 3,422.3
63.2 3,794.6
69.6 4,177.1
76.2 4,569.8
82.9 4,972.7
89.8 5,385.9
96.8 5,809.2
104.0 6,242.7
111.4 6,686.4
119.0 7,140.4
Debit
m3/detik m3/menit
0 0
0.4 25.8
0.9 56.2
1.5 91.3
2.2 131.1
2.9 175.6
3.7 224.8
4.6 278.7
5.6 337.2
6.7 400.4
7.8 468.3
Debit
m3/detik m3/menit
0 0
1.2 71.0
2.5 148.7
3.9 233.2
5.4 324.4
7.0 422.4
8.8 527.2
10.6 638.7
12.6 757.0
14.7 882.1
16.9 1,013.9
19.2 1,152.4
21.6 1,297.7
24.2 1,449.8
26.8 1,608.7
29.6 1,774.3
32.4 1,946.6
35.4 2,125.7
38.5 2,311.6
41.7 2,504.2
45.1 2,703.6
Debit
m3/detik m3/menit
0 0
0.4 25.8
0.9 56.2
1.5 91.3
2.2 131.1
2.9 175.6
3.7 224.8
4.6 278.7
5.6 337.2
6.7 400.4
7.8 468.3
Debit
m3/detik m3/menit
0 0
1.1 63.3
2.2 132.6
3.5 208.0
4.8 289.4
6.3 376.8
7.8 470.3
9.5 569.7
11.3 675.3
13.1 786.8
15.1 904.4
17.1 1,028.0
19.3 1,157.6
21.6 1,293.2
23.9 1,434.9
26.4 1,582.6
28.9 1,736.4
31.6 1,896.1
34.4 2,061.9
37.2 2,233.8
40.2 2,411.6
KOMPARTEMEN
KPL MT-01 KPL MT-02
LA LB T D. Tampung LA LB T
1.00 1,117.73 1,001.49 5.00 4,238.45 2,163.71 831.04 5.00
2.00 950.47 688.60 5.00 3,278.14 2,083.46 1,100.90 5.00
3.00 1,660.35 578.31 5.00 4,477.32 1,496.36 505.46 5.00
4.00 1,466.65 1,101.83 5.00 5,136.96
5.00 1,546.19 1,126.14 5.00 5,344.67
6.00 1,638.94 910.95 5.00 5,099.78
7.00 1,842.84 980.18 5.00 5,646.03
8.00 1,348.27 1,047.16 5.00 4,790.87
9.00 1,548.21 833.10 5.00 4,762.63
10.00
Daya Tampung 13,119.66 8,267.76 42,774.85 5,743.53 2,437.40
Ket :
LA = Luas Atas LA = m2
LB = Luas Bawah LB = m2
T = Tinggi T=m
D. Tampung = m3
L MT-02 KPL MT-03 KPL MT-04
D. Tampung LA LB T D. Tampung LA LB T
5,989.50 554.19 181.44 5.00 1,471.25 1,070.58 420.52 5.00
6,368.72 604.14 219.54 5.00 1,647.35 2,157.87 557.53 5.00
4,003.64 141.80 18.47 5.00 320.55 2,166.84 633.61 5.00
345.58 117.89 5.00 926.94 2,401.95 755.91 5.00
401.25 91.65 5.00 985.81 2,337.30 747.11 5.00
402.64 92.08 5.00 989.43 2,193.46 535.31 5.00
96.91 12.90 5.00 219.63
D. Tampung LA LB T D. Tampung LA LB T
2,982.21 214.43 57.88 5.00 544.62 8,960.11 534.12 5.00
5,430.81 946.25 146.47 5.00 2,185.43 797.74 97.73 5.00
5,600.91 1,208.95 182.73 5.00 2,783.36 309.43 51.75 5.00
6,315.72 948.24 114.64 5.00 2,125.76
6,168.82 1,179.77 194.34 5.00 2,748.22
5,457.55 1,170.35 168.24 5.00 2,677.17
1,579.63 93.34 5.00 3,345.94
4,450.35 521.75 5.00 9,944.20
3,030.16 527.58 5.00 7,115.48
1,856.74 342.12 5.00 4,397.73
31,956.01 16,584.88 2,349.08 37,867.91 10,067.27 683.61
MT-08 KPL MT-09 KPL MT-10
D. D.
Tampung LA LB T Tampung LA LB T
18,988.46 1,201.79 175.04 5.00 2,753.66 458.37 175.10 5.00
1,790.94 1,593.54 395.29 5.00 3,977.65 227.42 62.72 5.00
722.36 772.07 92.96 5.00 1,730.06 455.97 173.18 5.00
780.41 95.48 5.00 1,751.79
1,490.93 98.86 5.00 3,179.58
304.30 5.51 5.00 619.62
1,508.15 69.13 5.00 3,154.56
3,346.33 517.81 5.00 7,728.28
1,186.65 156.24 5.00 2,685.78
D. Tampung LA LB T D. Tampung LA LB T
1,266.94 1,629.99 375.79 5.00 4,011.56 591.70 183.28 5.00
580.28 1,060.42 266.50 5.00 2,653.84 482.43 101.25 5.00
1,258.30 971.77 342.06 5.00 2,627.66 491.09 113.61 5.00
1,240.12 992.10 5.00 4,464.43 486.09 100.67 5.00
136.65 54.92 5.00 383.14
321.19 527.71 5.00 1,697.80