Mesin Pengukuran 1 1.5 1 1.5 7.2 1.2 7.2 1.2 15.9 1 15.9 1 1.2 51.58 114.372 114.372
Mesin Pemotongan 1 1 1 1 7.2 1.2 0.948 1.2 9.148 1 9.148 1 1.2 30.0736 71.15904 71.15904
Mesin Penghalusan 1 1 1 1 0.948 1.2 0.948 1.2 2.896 1 2.896 1 1.2 10.0672 30.64608 30.64608
Total 71.15904
MAINTENANCE
INCOMING OUTGOING
MESIN MAINTENANCE
MATERIAL MATERIAL
INCOMING MESIN OUTGOING
OPERATOR
MATERIAL PEMOTONGAN MATERIAL
TRANSPORTASI OPERATOR
TRANSPORTASI
7.2 30.07 0.95
Desain Ukuran Luas Lantai Mesin Pengukuran
Desain Ukuran Luas Lantai Mesin Penghalusan
MAINTENANCE MAINTENANCE
OPERATOR OPERATOR
TRANSPORTASI TRANSPORTASI
7.2 51.58 7.2 0.95 10.07 0.95
50 jam/minggu
Jam Kerja Perminggu 5 Hari Spek box besar
Jam Kerja Perhari 16 jam 1 box besar: 100 dus kecil
Produksi Perjam 4 unit
Produksi Perminggu 80 unit
Tinggi maksimal tumpukan 2 meter 320
Allowance Luas
Ukuran Product Produksi/ Kapasitas Jumlah Jumlah Luas alas Kebutuhan Allowance
Nama Type/ Produksi/ Luas Lantai
No Qty Minggu( Box besar box 1 total box besar Luas Lantai Luas Lantai
Kompenen Ukuran Jam(unit) Transportasi Warehouse
P (m) L (m) t (m) Unit) (Pcs) tumpukan tumpukan (m2) (m2) (100%)
(30%) (m2)
1 Trolley 79 1 0.34 0.64 0.79 4 20 1 3 1 0.2176 0.2176 0.2176 0.06528 0.50048
Total 0.50048
Luas Lantai Pelayanan Produksi
Ukuran Allowance Luas + Jumlah
No. Nama Ruangan Luas (m²) Luas Lantai
P (m) L (m) 50% Allowance Ruangan
1 Laboratorium 5 5 25 12.5 37.5 3 112.5
2 Maintenance 9 8 72 36 108 1 108
Total 220.5
I,III,IV
II Warehouse
I,II,IV
III Gudang FG
II, III
IV Shipping
I
V Laboratorium
VI Maintenance I
VII Pengolahan Limbah
VIII Area Istirahat
IX Masjid
X Klinik
XI General Office
XII Toilet
XIII Parkir
XIV Pos Security
XV Loker
DERAJAT KEDEKATAN
O U X A = Mutlak
XII, IV, VIII,IX,X,XI,XV VII,XIII,XIV E = Sangat Penting
V VI,VII,VIII,IX,X,XI,XII, XIII, XIV, XV
I = Penting
V VI,VII,VIII,IX,X,XI,XII, XIII, XIV, XV
O = Cukup
I VI,VII,VIII,IX,X,XI,XII, XIII, XIV, XV
U = Tidak Penting
II, III, IV, VI, VII, VIII,
XIII, XIV, XV
IX, X, XI, XII X = Tidak boleh dekat
A-II,III E-VI A-I,III,IV E- A-I,II,IV E- A-II,III
I II III
Area Produksi Warehouse Gudang FG
X- X- X-
VI VII VIII
Maintenance Pengolahan Limbah Area Istirahat
I- O- I- O- I- O- I-
A- E- A- E- A- E- A-
X- X- X-
XI XII XIII
General Office Toilet Parkir Pos Security
I- O- I- O- I- O- I-
E- A- E-
X-XIII,XIV,XV X-XIII,XIV,XV
IV V
Shipping Laboratorium
O-I I-I O-
E- A- E-
X- X-
IX X
Masjid Klinik
O- I- O-
E- A- E-
X- X-
XIV XV
Pos Security Loker
O- I- O-
NO AKTIVITAS DERAJAT KEPENTINGAN
1 Area Produksi
2 Warehouse
3 Gudang FG
4 Shipping
5 Laboratorium
6 Maintenance
7 Pengolahan Limbah
8 Area Istirahat
9 Masjid
10 Klinik
11 General Office
12 Toilet
13 Parkir
14 Pos Security
15 Loker