RENCANA KERJA EKSPLORASI

WAKTU & ESTIMASI PELAKSANAAN KEGIATAN


PERSONEL
NO. JENIS KEGIATAN JULI AGUSTUS SEPTEMBER
I II III IV I II III IV I II III IV (Orang)
1 DRILLING 24
2 SURVEY PENGUKURAN 5
3
4 LAND CLEARING DAN PEMBUATAN PARIT BATAS 5
5 PENGUPASAN OB 16
6 TEST MINING 16
7 PENAMBANGAN 23

NOTE :
Minggu kedua September Hari raya Idul Fitri
Minggu Pertama Juli hingga Minggu Pertama Agustus Mesin bor 2 unit
Setiap minggu terdiri dari 6 Hari, Jumat Libur
SPLORASI DAN TAMBANG
PERALATAN DAN PERLENGKAPAN BIAYA KETERANGAN

APD, MESIN BOR 4 BUAH DAN PERIPERALNYA, MOBIL LV,MOTOR WIN 100 3 UNIT 173,557,000.00
APD, DAN PERLENGKAPAN STANDAR 6,660,000.00

DOZER 1 UNIT, EXCAVATOR 1 UNIT 144,180,000.00


DOZER 2 UNIT, EXCAVATOR 2 UNIT, MOBIL DT 10 UNIT 688,690,000.00
DOZER 2 UNIT, EXCAVATOR 2 UNIT, MOBIL DT 10 UNIT 345,925,000.00
EXCAVATOR 4 UNIT, LOADER 2 UNIT, MOBIL DT 15 UNIT 381,500,000.00
Total Biaya ###
Jumlah Karyawan Besaran Upah
No. Jenis Pekerjaan
(Orang) Per Orang Per Hari Per Minggu Per Bulan Per 3 Bulan
1 16 Helper Bor 50,000.00 800,000.00 4,800,000.00 19,200,000.00 57,600,000.00
2 4 Operator Bor 75,000.00 300,000.00 1,800,000.00 7,200,000.00 21,600,000.00
3 1 Driver 50,000.00 50,000.00 300,000.00 1,200,000.00 3,600,000.00
4 3 Asisten Well Site 100,000.00 300,000.00 1,800,000.00 7,200,000.00 21,600,000.00
5 5 Helper Survey 50,000.00 250,000.00 1,500,000.00 6,000,000.00
6 3 Operator Alat Berat untuk LC
7 1 Checker
8 1 Helper Logistik BBM untuk LC
9 4 Operator Alat Berat untuk Pengupasan OB
10 10 Sopir DT Untuk Pengupasan OB
11 2 Checker & Helper
12 4 Operator Alat Berat untuk Test Mining
13 10 Sopir DT Untuk Test Mining
14 2 Checker & Helper
15 6 Operator Alat berat
16 15 Sopir DT
17 1 Pengawas
18 1 Koordinator Tambang
Total 89
Keterangan
JENIS PERALATAN DAN PERLENGKAPAN YANG DIGUNAKAN EKSPLORASI DAN TAMBANG

Biaya Operasional
Keterangan
Jenis
No. Peralatan Dan Kelengkapannya
Jumlah Per Unit Keseluruhan
Per Hari Per Bulan Per Triwulan Per Hari Per Bulan Per Triwulan
1 TOHO D2G 1Unit 75,000.00 2,820,000.00 8,460,000.00 75,000.00 2,820,000.00 8,460,000.00
2 MD 1Unit 172,500.00 4,912,000.00 14,736,000.00 172,500.00 4,912,000.00 14,736,000.00
3 MD New 2 Unit 75,000.00 2,620,000.00 7,860,000.00 150,000.00 5,240,000.00 15,720,000.00
4 Mobil Ranger 1 Unit 150,000.00 4,590,000.00 13,770,000.00 150,000.00 4,590,000.00 13,770,000.00
5 Genset Harry 7000 Watt 1 Unit 52,500.00 1,320,000.00 3,960,000.00 52,500.00 1,320,000.00 3,960,000.00
6 Honda Win 100 3 Unit 37,500.00 924,000.00 2,772,000.00 112,500.00 2,772,000.00 8,316,000.00
7 APD 57 Set 16,050,000.00
Total 81,012,000.00
Kebutuhan Dan Biaya Operasional Perala
Kebutuhan Operasional
No. Jenis Peralatan Solar (Liter) Bensin (Liter) Oli Mesin (Liter) Oli Hidrolik (liter)
Per Hari Per Bulan Per Triwulan Per Hari Per Bulan Per Triwulan Per Bulan Per Triwulan Per Bulan Per Triwulan
1 TOHO D2G 10 240 720 5 15 10 30
2 MD 20 480 1440 3 72 216 3 9 10 30
3 MD New 10 240 720 5 15 10 30
4 Mobil Ranger 20 480 1440 5 15
5 Genset Harry 7000 Watt 7 168 504 2.5 7.5
6 Motor Honda Win 100 5 120 360 1 3
Operasional Peralatan Dan Perlengkapan Eksplorasi Dan Tambang
Kebutuhan Operasional
Biaya Operasiional (R
Minyak Rem (Liter) Filter Oli (Buah) Filter Solar (Buah) Penggantian Berkala (Rp) Maintenannce Ringan (Rp)
Per Bulan Per Triwulan Per Bulan Per Triwulan Per Bulan Per Triwulan Per Bulan Per Triwulan Per Bulan Per Triwulan Per Hari
500,000.00 1,500,000.00 200,000.00 600,000.00 75,000.00
300,000.00 900,000.00 200,000.00 600,000.00 172,500.00
300,000.00 900,000.00 200,000.00 600,000.00 75,000.00
1 3 1 3 1 3 500,000.00 1,500,000.00 200,000.00 600,000.00 150,000.00
52,500.00
150,000.00 450,000.00 100,000.00 300,000.00 37,500.00
Biaya Operasiional (Rp)
Keterangan
Per Bulan Per Triwulan
2,820,000.00 8,460,000.00
4,912,000.00 14,736,000.00
2,620,000.00 7,860,000.00
4,590,000.00 13,770,000.00
1,320,000.00 3,960,000.00
924,000.00 2,772,000.00
Total 51,558,000.00
Kebutuhan Dan Biaya APD Eksplorasi Dan Tambang
Jumlah Jenis dan harga APD
No. Jenis Pekerjaan
(Orang) Sepatu Helm Jas Hujan Kaos Tangan Rompi Safety Kacamata Debu Masker
1 Helper Bor 18 75,000.00 35,000.00 55,000.00
50,000.00
2 Operator Bor 3 145,000.00 35,000.00 55,000.00 45,000.00
3 Driver 1 145,000.00 35,000.00 45,000.00 55,000.00 15,000.00
4 Asisten Well Site 3 145,000.00 35,000.00 55,000.00 45,000.00 55,000.00 15,000.00
5 Helper Survey 4 75,000.00 35,000.00 55,000.00
6 Operator Alat Berat 8 145,000.00 35,000.00 45,000.00 55,000.00 15,000.00
7 Checker 1 75,000.00 35,000.00 55,000.00 45,000.00 55,000.00 15,000.00
8 Helper Logistik BBM 1 75,000.00 35,000.00 55,000.00 45,000.00 55,000.00 15,000.00
9 Sopir DT 15 145,000.00 35,000.00 55,000.00 45,000.00 55,000.00 15,000.00
10 Pengawas 1 145,000.00 35,000.00 55,000.00 45,000.00 55,000.00 15,000.00
11 Koordinator Tambang 1 145,000.00 35,000.00 55,000.00 45,000.00 55,000.00 15,000.00
Total 56 1,200,000.00
Tambang
Biaya Per Orang Biaya Total Keterangan
165,000.00 4,170,000.00 Pemakaian Kaos Tangan
280,000.00 840,000.00 24 Lusin/Triwulan
295,000.00 295,000.00
350,000.00 1,050,000.00
165,000.00 660,000.00
295,000.00 2,360,000.00
280,000.00 280,000.00
280,000.00 280,000.00
350,000.00 5,250,000.00
350,000.00 350,000.00
350,000.00 350,000.00
15,885,000.00
Rincian Biaya Survey
Biaya Upah
No. Jenis Kegiatan Jumlah Karyawan Jenis Peralatan Jumlah Peralatan
/Hari /Bulan
Mesin Bor 4
1,475,000.00 35,400,000.00
1 DRILLING 24 Mobil 1
Motor win 100 3
2 SURVEY PENGUKURAN 4 250,000.00 6,000,000.00
Jenis Peralatan Jumlah Peralatan /Hari Estimasi Waktu X Upah Harian
LAND CLEARING DAN Dozer 2
3 5
PEMBUATAN PARIT BATAS Excavator PC 200 1
Jenis Peralatan Jumlah Peralatan /Hari Estimasi Waktu X Upah Harian
Dozer 2
4 PENGUPASAN OB 16 Excavator PC 200 2
Dump Truck 10
Jenis Peralatan Jumlah Peralatan /Hari Estimasi Waktu X Upah Harian
Dozer 2
5 TEST MINING 16 Excavator PC 200 2
Dump Truck 10
Jenis Peralatan Jumlah Peralatan /Hari Estimasi Waktu X Upah Harian
Dozer 2
6 PENAMBANGAN 23 Excavator PC 320 4
Dump Truck 15
ncian Biaya Survey
ya Upah Biaya Operasional
Biaya APD Total Biaya Keterangan
/Triwulan /Hari /Bulan /Triwulan
397,500.00 12,972,000.00 38,916,000.00
106,200,000.00
150,000.00 4,590,000.00 13,770,000.00 6,355,000.00 173,557,000.00
112,500.00 2,772,000.00 8,316,000.00
660,000.00 6,660,000.00
masi Waktu X Upah Harian /Hari Estimasi Waktu X Biaya Harian Biaya APD Total Biaya
10,720,000.00 107,200,000.00 (10 Hari)
1,180,000.00 144,180,000.00
3,580,000.00 35,800,000.00 (10 Hari)
masi Waktu X Upah Harian /Hari Estimasi Waktu X Biaya Harian Biaya APD Total Biaya
10,720,000.00 214,400,000.00 (20 Hari)
7,160,000.00 143,200,000.00 (20 Hari) 2,090,000.00 688,690,000.00
16,450,000.00 329,000,000.00 (20 Hari)
masi Waktu X Upah Harian /Hari Estimasi Waktu X Biaya Harian Biaya APD Total Biaya
10,720,000.00 107,200,000.00 (10 Hari)
7,160,000.00 71,600,000.00 (10 Hari) 2,625,000.00 345,925,000.00
16,450,000.00 164,500,000.00 (10 Hari)
masi Waktu X Upah Harian /Hari Estimasi Waktu X Biaya Harian Biaya APD Total Biaya
10,720,000.00 75,040,000.00 (7 Hari)
18,680,000.00 130,760,000.00 (7 Hari) 2,975,000.00 381,500,000.00
24,675,000.00 172,725,000.00 (7 Hari)