JENIS PEMBAYARAN NO.: 1.

3
JENIS PEKERJAAN : MOBILISASI

Lembar 1.2-1
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

A. PERALATAN
Periksa lembar 1.2-2 19,700,000.00

B. FASILITAS KONTRAKTOR
1 Base Camp (Sewa) M2 10.00 500,000.00 5,000,000.00
2 Kantor M2 6.00 500,000.00 3,000,000.00
3 Barak M2 10.00 500,000.00 5,000,000.00
4 Gudang, dan lain-lain M2 10.00 500,000.00 5,000,000.00

C. FASILITAS DIREKSI TEKNIS


1 Kantor M2 2.00 2,000,000.00 4,000,000.00
2 Akomodasi Untuk Direksi Ls 4.00 500,000.00 2,000,000.00
3 Perabotan & Layanan Set 12.00 400,000.00 4,800,000.00
4 Kendaraan Set 3.00 25,000,000.00 75,000,000.00
5 Kendaraan Operasional Roda Empat Unit 1.00 75,000,000.00 75,000,000.00

D. LAIN-LAIN
1 Pegukuran dan Pematokan Ls 1.00 2,500,000.00 2,500,000.00
2 Papan Nama Proyek Ls 2.00 300,000.00 600,000.00
3 Listrik Ls 1.00 1,500,000.00 1,500,000.00
4 Air Ls 1.00 1,500,000.00 1,500,000.00
5 As Build Drawing Ls 1.00 2,000,000.00 2,000,000.00
6 Dokumentasi Ls 1.00 1,000,000.00 1,000,000.00
7 Pelaporan Ls 1.00 1,000,000.00 1,000,000.00

F. DEMOBILISASI LS 1.00 1,200,000.00 1,200,000.00

Total Biaya Mobilisasi ###

Catatan :
Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
JENIS PEMBAYARAN NO.: 1.3
JENIS PEKERJAAN : MOBILISASI
Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

A. PERALATAN

1 ASPHALT MIXING PLANT Unit 1.00 2,000,000.00 2,000,000.00


2 ASPHALT FINISHER Unit 1.00 1,000,000.00 1,000,000.00
3 ASPHALT SPRAYER Unit 1.00 1,000,000.00 1,000,000.00
4 BULLDOZER 100-150 HP Unit 1.00 2,000,000.00 2,000,000.00
5 COMPRESSOR 4000-6500 L\M Unit 1.00 500,000.00 500,000.00
6 CRANE 10-15 TON Unit 1.00 1,000,000.00 1,000,000.00
7 DUMP TRUCK 3-4 M3 Unit 1.00 500,000.00 500,000.00
8 EXCAVATOR 80-140 HP Unit 1.00 2,000,000.00 2,000,000.00
9 GENERATOR SET Unit 1.00 500,000.00 500,000.00
10 MOTOR GRADER >100 HP Unit 1.00 1,000,000.00 1,000,000.00
11 WHEEL LOADER 1.0-1.6 M3 Unit 1.00 2,000,000.00 2,000,000.00
12 TANDEM ROLLER 6-8 T. Unit 1.00 2,000,000.00 2,000,000.00
13 TIRE ROLLER 8-10 T. Unit 1.00 2,000,000.00 2,000,000.00
14 VIBRATORY ROLLER 5-8 T. Unit 1.00 1,000,000.00 1,000,000.00
15 WATER TANKER 3000-4500 L. Unit 1.00 500,000.00 500,000.00
16 Pheneomatic Roller Unit 1.00 200,000.00 200,000.00
17 SURVEY EQUIPMENT SET 1.00 500,000.00 500,000.00

Total untuk Item A pada Lembar 1 19,700,000.00


BOBOT

JADWAL WAKTU PELAKSANAAN (KURVA "S")


PROGRAM : PEMBANGUNAN JALAN
KEGIATAN : PEMBANGUNAN JALAN
NAMA PAKET : PEMBUATAN BADAN JALAN 10.4
LOKASI Jalur 1

WAKTU PELAKSANAAN BULAN KE -


NO. U R A I A N 1 2 3 4 5 6 7 8 9 10 11 12 Keterangan

I PERSIAPAN 100

1. Pembersihan Lahan 0.04 0.007 0.007 0.007 0.014

90
2 Pengukuran 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Jangka Waktu
3 MOBILISASI DAN DEMOBILISASI 0.00 0.000 0.000 0.000 Pelaksanaan 14
Bulan
80
II PEKERJAAN TANAH

1 Galian Tanah Biasa 0.52 0.003 0.023 0.026 0.042 0.062 0.052 0.052 0.078 0.026 0.052 0.026
70

2 Timbunan Tanpa Material 0.38 0.002 0.019 0.038 0.038 0.055 0.075 0.075 0.038 0.038

60
III DRAINASE

1 Galian Saluran (%)


0.00 0.001 0.001
50
2 Pemasangan Precast U-Ditch 0.00 0.001 0.001 0.001 0.001

IV PEKERJAAN STRUKTUR JALAN


40
1 Timbunan Pilihan Untuk Bahu Jalan 0.01 0.002 0.005 0.005

V PERKERASAN BERBUTIR 30

1 Lapis Pondasi Bawah Sirtu 0.03 0.006 0.011 0.011

2 Lapis Pondasi Atas Batu Pecah 0.00 0.000 0.000 20

VI PERKERASAN ASPAL
10
1 Lapis Resap Pengikat 0.01

2 Lapis Aspal Beton 0.00


0
I RENCANA KEMAJUAN MINGGUAN 0.99 0.01 0.01 0.03 0.04 0.06 0.10 0.09 0.11 0.16 0.11 0.11 0.08
II RENCANA KUMULATIF MINGGUAN - 0.01 0.02 0.05 0.09 0.15 0.25 0.34 0.45 0.61 0.72 0.83 0.90
Estimasi Waktu Pekerjaan = 1 Tahun
Analisa Waktu

Pekerjaan Alat Jumlah

- Dumptruck 4
1.1 Pembersihan Lahan > - Pekerja 20
- Mandor 4
- Theodolit 2
1.2 Pengukuran > - Pekerja 5
- Mandor 1
-Excavator 14
-Dumptruck 2
2.1 Galian >
- Pekerja 36
- Mandor 9
- Excavator 5
- Dumptruck 14
- Motorgrader 7
2.2 Timbunan > - Vibrator 7
- Water Tank Truck 7
- Pekerja 14
- Mandor 7
-Excavator 1
-Dumptruck 1
3.1 Galian Drainase >
- Pekerja 4
- Mandor 1
-Excavator 1
3.2 Precast > - Pekerja 41
- Mandor 1
- Wheel Loader 1
- Dump Truck 1
- Motor Grider 1
- Vibratory Roller 1
4.1 Bahu Jalan >
- Tire Roller 1
- Water Tanker 1
- Pekerja 7
- Mandor 1
- Wheel Loader 2
- Dump Truck 4
- Motor Grider 2
- Vibratory Roller 2
4.2 Lapis Pondasi Bawah >
- Pneumatic Roller 2
- Water Tanker 2
- Pekerja 14
- Mandor 2
- Wheel Loader 2
-Dump Truck 2
- Motor Grider 1
- Vibratory Roller 1
4.3 Lapis Pondasi Atas >
- Pneumatic Roller 1
- Water Tanker 1
- Pekerja 7
- Mandor 1
Asphalt Sprayer 2
Air Compressor 2
4.4 Lapis Perekat > Dump Truck 2
Pekerja 10
Mandor 2
Wheel Loader 1
Dump Truck 1
Asphalt Mixing 1
Genset 1
4.5 Lapis Perekat > Asphalt Finisher 1
Tandem Roller 1
Pneumatic Roller 1
Pekerja 10
Mandor 2
Jalur 1
Data Perencanaan Pembangunan Jalan Baru

Panjang Jalur = 24346.15385 m


Total Galian = 167386.117 m
Total Timbunan = 90524.52273 m
Selisih = 76861.59428 m

A. Perhitungan Pekerjaan Tanah


-Pekerjaan Galian Tanah =
-Pekerjaan Timbunan Tanah =
Selisih =
B. Perhitungan Pekerjaan Drainase
B=
H=

-Pekerjaan Galian Drainase


Luas =
Volume =
C. Timbunan Bahu Jalan

Luas =
Volume =
D. PPembersihan Lahan
Lebar Jalan =
Luas =
E.
- Volume Lapis Permukaan

Luas Jalan =
Volume =
- Volume Lapis Pondasi Atas

Luas Jalan =
Volume =
- Volume Lapis Pondasi Bawah

Luas Jalan =
Volume =
- Volume Lapis Perekat
Lebar Jalan =
Lapis Perekat =
Kebutuhan =

Analisa Waktu Jalur 1


Waktu
Produktifitas Volume Jam Hari Minggu
8 7

356.67 m/jam 105905.769 m 296.930 37.116 5.302

250 m/jam 24346.154 m 97.385 12.173 1.739

635.47 m/jam 167386.117 m 263.406 32.926 37.629

226.95 m/jam 90524.523 m 398.874 49.859 7.123

45.39 m/jam 31163.077 m 686.563 85.820 12.260

54.47 m/jam 31163.077 m 572.115 71.514 10.216

28.01 m/jam 105905.769 m 3780.999 472.625 7.000


49.38 m/jam 13774.080 m 278.940 34.868 4.981

83 m/jam 32572.719 m 392.442 49.055 7.008

664 L/jam 149972.308 L 225.862 28.233 4.033

268.92 m/jam 18503.077 m 68.805 8.601 1.229


n Tanah
167386.12 m
90524.523 m
76861.594 m

0.8
0.8

0.64 m
31163.0769 m

0.86 m
41875.3846 m

4.35 m
105905.769 m

0.76 m
18503.0769 m

m
1.3379
32572.7192 m
0.56576 m
13774.08 m

187465.385 m
0.8 L/m
149972.308 L

Waktu
Minggu Pekerjaan
Selesai Dalam
7

5.302 1.326 1.1 Pembersihan Lahan

1.739 0.435 1.2 Pengukuran

37.629 9.407 2.1 Galian

7.123 1.781 2.2 Timbunan

12.260 3.065 3.1 Galian Drainase

10.216 2.554 3.2 Precast

7.000 1.750 4.1 Bahu Jalan


4.981 1.245 4.2 Lapis Pondasi Bawah

7.008 1.752 4.3 Lapis Pondasi Atas

4.033 1.008 4.4 Lapis Perekat

1.229 0.307 4.5 Lapis Perekat


Data Perencanaan Pembangunan

Panjang Jalur
Total Galian
Total Timbunan
Selisih
Analisa Waktu Jalur 2

n Alat Jumlah Produktifitas Volume

- Dumptruck 4
> - Pekerja 20 356.68 m/jam 92186.538
- Mandor 4
- Theodolit 2
> - Pekerja 5 250 m/jam 21192.308
- Mandor 1
-Excavator 14
-Dumptruck 2
> 635.47 m/jam 267468.200
- Pekerja 36
- Mandor 9
- Excavator 10
- Dumptruck 14
- Motorgrader 7
> - Vibrator 7 453.9 m/jam 95951.136
- Water Tank Truck 7
- Pekerja 14
- Mandor 7
-Excavator 1
-Dumptruck 1
> 45.39 m/jam 27126.154
- Pekerja 4
- Mandor 1
-Excavator 1
> - Pekerja 41 54.47 m/jam 27126.154
- Mandor 1
- Wheel Loader 1
- Dump Truck 1
- Motor Grider 1
- Vibratory Roller 1
> 28.01 m/jam 92186.538
- Tire Roller 1
- Water Tanker 1
- Pekerja 7
- Mandor 1
- Wheel Loader 2
- Dump Truck 4
- Motor Grider 2
- Vibratory Roller 2
> 49.38 m/jam 11989.760
- Pneumatic Roller 2
- Water Tanker 2
- Pekerja 14
- Mandor 2
- Wheel Loader 1
-Dump Truck 2
- Motor Grider 1
- Vibratory Roller 1
> 41.5 m/jam 28353.188
- Pneumatic Roller 1
- Water Tanker 1
- Pekerja 7
- Mandor 1
Asphalt Sprayer 2
Air Compressor 2
> Dump Truck 2 664 L/jam 130544.615
Pekerja 10
Mandor 2
Wheel Loader 1
Dump Truck 1
Asphalt Mixing 1
Genset 1
> Asphalt Finisher 1 268.92 m/jam 16106.154
Tandem Roller 1
Pneumatic Roller 1
Pekerja 10
Mandor 2
Jalur 2
ncanaan Pembangunan Jalan Baru

= 21192.308 m
= 267468.200 m
= 95951.136 m
= 171517.06399 m

A. Perhitungan Pekerjaan Tanah


-Pekerjaan Galian Tanah = 267468 m
-Pekerjaan Timbunan Tanah = 95951.14 m
Selisih = 171517 m
B. Perhitungan Pekerjaan Drainase
B= 0.8
H= 0.8

-Pekerjaan Galian Drainase


Luas = 0.64 m
Volume = 27126.15 m
C. Timbunan Bahu Jalan

Luas = 0.86 m
Volume = 18225.38 m
D. Pembersihan Lahan
Lebar Jalan = 4.35 m
Luas = 92186.54 m
E.
- Volume Lapis Permukaan

Luas Jalan = 0.76 m


Volume = 16106.15 m
- Volume Lapis Pondasi Atas

Luas Jalan = 1.3379 m


Volume = 28353.19 m
- Volume Lapis Pondasi Bawah

Luas Jalan = 0.56576 m


Volume = 11989.76 m
- Volume Lapis Perekat
Lebar Jalan = 163180.8 m
Lapis Perekat = 0.8 L/m
Kebutuhan = 130544.6 L

Waktu
lume Jam Hari Minggu
Selesai Dalam
8 7

m 258.457 32.307 4.615 1.154

m 84.769 10.596 1.514 0.378

m 420.899 52.612 60.128 15.032

m 211.393 26.424 3.775 0.944

m 597.624 74.703 10.672 2.668

m 498.002 62.250 8.893 8.893

m 3291.201 411.400 7.000 1.750


m 242.806 30.351 4.336 1.084

m 683.209 85.401 12.200 3.050

L 196.603 24.575 3.511 0.878

m 59.892 7.486 1.069 0.267


DAFTAR KUANTITAS DAN HARGA

PROGRAM : PEMBANGUNAN JALAN


KEGIATAN : PEMBANGUNAN JALAN
NAMA PAKET : PEMBUATAN BADAN JALAN
LOKASI Jalur 1

No. Mata Perkiraan Harga Jumlah


Uraian Satuan
Pembayaran Kuantitas Satuan Harga-Harga
(Rupiah) (Rupiah)
a b c d e f = (d x e)

DIVISI I. UMUM / PERSIAPAN


1.1 Pembersihan Lahan M2 105,905.8 161,611 17,115,552,064
1.2 Pengukuran M' 24,346.2 14,540 353,983,274
1.3 Mobilisasi & Demobilisasi Ls 1.00 209,800,000.00 209,800,000.00

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 17,679,335,337.89

DIVISI II. PEKERJAAN TANAH

2.1 Galian M3 167,469.14 1,470,081.73 246,193,321,532.66


2.2 Timbunan M3 90,525 1,971,585.85 178,476,868,005.54

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 424,670,189,538.19

DIVISI III. PEKERJAAN DRAINASE


3.1 Galian Saluran M3 31,163 28,360.45 883,798,793.74
3.2 Pemasangan Precast U-Ditch M3 572 2,977,467.91 1,703,452,569.48

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 2,587,251,363.22

DIVISI IV. TIMBUNAN PILIHAN UNTUK BAHU JALAN

4.1 Timbunan Pilihan Untuk Bahu Jalan M3 105,905.77 53,167.47 5,630,741,656.63


-

Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 5,630,741,656.63

DIVISI V. PERKERASAN BERBUTIR


5.2 Lapis Pondasi Bawah Sirtu M3 13,774 962,356.22 13,255,571,528.85
0 Lapis Pondasi Batu Pecah M3 784.88 368,386.98 289,141,342.48
-

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 13,544,712,871.33

DIVISI VI. LAPIS ASPHAL


0 0 L 149,972 31,415.30 4,711,425,362.82
0 0 M3 18,503.08 252,187.83 4,666,250,871.92
-

Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 9,377,676,234.74
DAFTAR KUANTITAS DAN HARGA

PROGRAM : PEMBANGUNAN JALAN


KEGIATAN : PEMBANGUNAN JALAN
NAMA PAKET : PEMBUATAN BADAN JALAN
LOKASI Jalur 2

No. Mata Perkiraan Harga Jumlah


Uraian Satuan
Pembayaran Kuantitas Satuan Harga-Harga
(Rupiah) (Rupiah)
a b c d e f = (d x e)

DIVISI I. UMUM / PERSIAPAN


1.1 Pembersihan Lahan M2 92,186.5 640,175 59,015,559,885.62
1.2 Pengukuran M' 21,192.31 14,511.62 307,534,761.79
1.3 Mobilisasi dan Demobilisasi Ls 1.0 209,800,000 209,800,000.00

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 59,532,894,647.41

DIVISI II. PEKERJAAN TANAH

2.1 Galian M3 267,468.20 2,284,554.06 611,045,562,706.00


2.2 Timbunan Tanpa Material M3 95,951 377,760.30 36,246,530,310.37

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 647,292,093,016.37

DIVISI III. PEKERJAAN DRAINASE


3.1 Galian Saluran M3 27,126 8,129.50 220,522,088.48
3.2 Pemasangan Precast U-Ditch M3 27,126 2,986,712.21 81,018,015,031.45

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 81,238,537,119.93

DIVISI IV. TIMBUNAN PILIHAN UNTUK BAHU JALAN

4.1 Timbunan Pilihan Untuk Bahu Jalan M3 92,186.54 53,167.47 4,901,324,885.94


-

Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 4,901,324,885.94

DIVISI V. PERKERASAN BERBUTIR


5.2 Lapis Pondasi Bawah Sirtu M3 11,990 962,356.22 11,538,420,082.78
0 Lapis Pondasi Batu Pecah M3 28,353.19 368,386.98 10,444,945,510.00
-

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 21,983,365,592.78

DIVISI VI. LAPIS ASPHAL


0 0 L 130,545 31,415.30 4,101,098,538.57
0 0 M3 16,106.15 252,187.83 4,061,776,035.43
-
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 8,162,874,574.00
NO. U R A I A N TOTAL

I. PEKERJAAN PERSIAPAN 17,679,335,338


1 Pembersihan Lokasi 17,115,552,064
2 Pengukuran 353,983,274
3 Kantor 3,000,000
4 Gudang 5,000,000
5 Papan Nama Proyek 600,000

II. PEKERJAAN TANAH 424,670,189,538


1 Galian 246,193,321,533
2 Timbunan 178,476,868,006

III. PEKERJAAN DRAINASE 2,587,251,363


1 Galian Saluran 883,798,794
2 Pemasangan Precast 1,703,452,569

IV. PEKERJAAN STRUKTUR JALAN RAYA 5,630,741,657


1 Timbunan Bahu Jalam 5,630,741,657

V. PEKERJAAN PERKERASAN BERBUTIR 13,544,712,871


1 Lapis Pondasi Bawah Sirtu 13,255,571,529
2 Lapis Pondasi Atas Batu Pecah 289,141,342

VI. PERKERASAN ASPAL 9,377,676,235


1 Lapis Resap Pengikat 4,711,425,363
2 Lapis Aspal Beton 4,666,250,872

TOTAL BOBOT 473,489,907,002


BOBOT RENCANA PER MINGGU
KUMULATIF BOBOT RENCANA PER MINGGU
WAKTU PELAKSANAAN BULAN KE -
1 2 3 4 5 6

0.037
0.036 0.018 0.018 Chart Title
0.001 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000

0.897
0.520 0.003 0.023 0.031 0.047 0.094
0.377
(%) 0.063 0.063 0.063 0.063

0.005
0.002 0.000 0.000
0.004 0.001

0.012
0.012

0.029
0.028
0.001

0.020
0.010
0.010

1.00 1 2 3 4 5 6 7
0.00 0.02 0.02 0.09 0.09 0.11 0.16
0.02 0.04 0.13 0.22 0.33 0.49
SANAAN BULAN KE -
7 8 9 10 11 12 Keterangan

1.00

Chart Title
0.000 0.000 0.000 0.000 0.90

0.80

0.70
0.104 0.104 0.083 0.026 0.003
0.063 0.063
0.60

0.000 0.000 0.50


0.001 0.001

0.40
0.006 0.006

0.30

0.014 0.014
0.000 0.000 0.20

0.005 0.005 0.10


0.010
0.00
6 7 8 9 10 11
0.17 0.19 0.10 0.03 0.02
0.66 0.85 0.95 0.98 1.00
0.083

0.1
NO. U R A I A N TOTAL

I. PEKERJAAN PERSIAPAN 17,679,335,338


1 Pembersihan Lokasi 17,115,552,064
2 Pengukuran 353,983,274
3 Base Camp 3,000,000
5 Papan Nama Proyek 600,000

II. PEKERJAAN TANAH 424,670,189,538


1 Galian 246,193,321,533
2 Timbunan 178,476,868,006

III. PEKERJAAN DRAINASE 2,587,251,363


1 Galian Saluran 883,798,794
2 Pemasangan Precast 1,703,452,569

IV. PEKERJAAN STRUKTUR JALAN RAYA 5,630,741,657


1 Timbunan Bahu Jalam 5,630,741,657

V. PEKERJAAN PERKERASAN BERBUTIR 13,544,712,871


1 Lapis Pondasi Bawah Sirtu 13,255,571,529
2 Lapis Pondasi Atas Batu Pecah 289,141,342

VI. PERKERASAN ASPAL 9,377,676,235


1 Lapis Resap Pengikat 4,711,425,363
2 Lapis Aspal Beton 4,666,250,872

TOTAL BOBOT 473,489,907,002


BOBOT RENCANA PER MINGGU
KUMULATIF BOBOT RENCANA PER MINGGU
WAKTU PELAKSANAAN BULAN KE -
1 2 3 4 5 6

0.037
0.036 0.018 0.018
0.001 0.000 0.000 0.000 0.000 0.000
Chart Title
0.000
0.000 0.000
0.000 0.000

0.897
0.520 0.003 0.024 0.031 0.047 0.094
0.377 0.063 0.063 0.063 0.063
(%)
0.005
0.002 0.000 0.000
0.004 0.001

0.012
0.012

0.029
0.028
0.001

0.020
0.010
0.010

1.00
0.00 0.02 0.02 0.09 0.09 0.11 0.16
1 0.02 2 0.04 3 0.13 4 0.22 5 0.33 6 0.49 7
SANAAN BULAN KE -
7 8 9 10 11 12 Keterangan

1.00

Chart Title 0.000 0.000 0.000 0.000


0.90

0.80

0.104 0.104 0.083 0.026 0.003


0.063 0.063 0.70

0.60
0.000 0.000
0.001 0.001
0.50

0.006 0.006
0.40

0.014 0.014
0.30
0.000 0.000

0.20
0.005 0.005
0.010
0.10

0.17 0.19 0.10 0.03 0.02 0.00


7 0.66 8 0.85 0.95
9 0.98 10 1.00 11
0.083

0.1